Loading...
HomeMy WebLinkAboutMFP20003812.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20003812 IVR Number: 20003812 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:08/27/2020Application Date:7227801075Parcel Number: 2715 SUNSET LN NE, APT Permit Type:09/29/2020Issue Date:Franchise Permit Work Class:09/29/2021Expiration Date:Minor Utility Job Number: 105094152Franchise Type:Electric Description: Puget Sound Energy Electric AT V01 & J01 TRUCK TO BE PARKED IN ROW. CREW TO PULL WIRE FROM E01 TO V01. CREW TO REMOVE WIRE FROM P02 TO P01 ON GLENNWOOD AVE. ADDRESS PROVIDED BY CUSTOMER WAS 1073 HARRINGOTN AVE NE Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contractor Business License Number: 5109Construction Contractor: POTELI*227PL COLPITTS SUNSET LLC 2256 38TH PL E SEATTLE , WA 98112 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20003812 Scott Warlick CED 9/29/2020 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date HARRINGTON AVE NESUNSET LN NE NE 1 0 TH S T SUNSET LN NE1010111110 10 1212 1212 SUNSET LN NEGLENNWOOD AVE NE1212 1212 1010 10 10 Vault V01 Vault J01 E01 P01 P02 RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 00 0 000 0000 NO PARKINGNO-PAR K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSTOP FLAGGER STOP FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LA N E ROAD AHEAD 100'X'X' ROAD WORK AHEA D W20-1100'USE MAXIMUM AVAILABLE SPACE FOR SIGNS 1414 STOP FLAGGER STOP FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AW20-4ONE LANEROADAHEADX'X'USE MAXIMUM AVAILABLE SPACE FOR SIGNS ROADWORKAHEADW20-1100'ROADWORKAHEADW20-1 100' S/W CLOSEDR9-9CROSS HERE SIDEWALK CLOSEDAHEADS/WCLOSEDR9-9CROSS HERESIDEWALK CLOSEDAHEADNEAREST ADJACENT ST CROSSABLE CORNER OR CROSSWALK PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA300 X'ROADWORKAHEADW20-1 X'ROADWORKAHEADW20-1N TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 PSE PUGETSOUNDENERGY JOB105094152 1073 HARRINGTON AVE NE, RENTON 08/04/2020 FLAVIANA.NUNES@PSE.COM 425-424-7809 SHEET 1 of 1 Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY VAULTVault MFP20003812 N Vicinity Map 47.5007, -122.1828 Owner / Developer Contact Info officeATTN: RENTON HOUSING AUTHORITY 2900 NE 10TH ST RENTON, WA 98056 JEFF SNOWDEN 206.382.1900 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 508543002 105094152 N/A 108120686 N/A 593219648 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Removal OH Maint. Relocation Temporary Job Order Distribution Service Stubs HP Svc/MSA 105094152 N/A DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 253.395.6850 . E. PASAYE . 6.24.20 N/A .N/A E. PASAYE . 6.24.20 REDT # ( RW-117276 )RENTON SUNSET OAKS APARTMENTS 3Ø PRIMARY U/G LINE EXTENSION - 3M/F BLDGS, 60 UNITS 1073 HARRINGTON AVE NE, RENTON, WA 98056 PUGET SOUND ENERGY N/A N/A N/A 105094152 N/A 1 OF 3 KING N/A N/A QCSOKE 09NW-T23N-R05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 COMCAST BILL WALKER 253.288.7538 CENTURYLINK KENNETH LUU 206 346.0144 RIGHT OF WAY FABIANA DODSON 425.456.2293 . . . E-Mail: Cell Phone: Project Manager Contact Information: Manager:RANDY BLACKIE 253.395.6850 randy.blackie@pse.com x xx ... ... ... jsnowden@chartercon.com TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) JOINT TRENCH DETAIL NOT TO SCALE JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4.Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) ROAD SIDE NATIVE SECONDARY POWER PEDESTAL MATERIAL P/L Power Secondary Power Primary Conduit Tel. & TV 12" Min 12" Sand Cover when gas line is in trench Sand 6" or 12" 4" Sand Bedding 1' 36" Cover 42" Gas 12" 18" Lower 2" 10" Pedestal PSE 10' FRONTAGE EASEMENT 1' Cover ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Gas 12" Min Horizontal Separation Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN POWER GENERAL NOTES - MULTIFAMILY PROJECT 11. 7. 6. 5. 4. 3. 2. 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. 10. CLEAR WORKING SPACE FOR VAULTS NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN SITE MINIMUM CLEARANCES FROM OIL-FILLED EQUIP. TO BLDG. FEATURES NOT TO SCALE FIRE ESCAPE SERVICE GAS RELIEF DOOR, WINDOW, VENT, OR OTHER OPENING TANK FUEL VENT OIL-FILLED ELECTRICAL EQUIPMENT SPRINKLER VALVE, STANDPIPE, OR HYDRANT 20' 3' 10' 6' 10' (TRANSFORMER) x TOP VIEW Excavation - 10-1/3 cubic yards SIDE VIEW Rock Crushed 6" 4'-4" 2" 8'-0" 4'-8" 3'-6" 4'-8" 6" 20" 4'-8"5'-6" 44" 8'-0" No Secondary PSE Primary Conduit Customer's conduit/cables may enter on any vault side except the front or side where PSE's primary conduit/cable enters. Note: Customer's conduit/cables must match PSE's left/right vault entry orientation and coil in the same direction as PSE's primary conductors. VAULT DETAIL @ V01 NOT TO SCALE Oil-Filled Equipment Clearances per PSE Std 0700.1500 If the oil-filled equipment is adjacent to… Clearance Requirement Combustible walls or roof (including stucco).10 FT Combustible walls using a reduced-flammability transformer. Gas service meter relief vent.3 FT Noncombustible walls, soffits, and roofs (including brick, concrete, steel and stone) providing the side of the transformer facing the wall does not have doors. Materials that pass UBC Std. 2-1 or ASTM E136-79 are considered to be noncombustible. 3 FT Generators, customer-owned transformers, fire sprinkler valves, standpipes, and fire hydrants.6 FT Doors, windows, vents, fire escapes, or other building openings.10 FT The water's edge of a swimming pool or any body of water.15 FT Facilities used to dispense or store LP, hazardous liquids, or fuel.20 FT Individual domestic and irrigation wells. Clearance not required on pole mounted transformers (pole placement still applies as stated in 6450.3000), TUT's installed in sealed vaults, 7200V single-phase padmount transformers 50kva or less, and reduced flammability oil. 100 FT The following styles of guard posts are approved for Puget Sound Energy transformers: - 6 ft x 4 in. diameter Schedule 40 or better galvanized steel pipe filled with concrete. The concrete shall have a minimum compressive strength of 3000 psi after 28 days. The exposed portion of the post shall be painted traffic yellow. - 6 ft x 9 in. diameter precast steel-reinforced concrete post. Available from Utility Vault Company, Auburn, WA; or Hanson Inc., Tacoma, WA. The exposed portion of the post shall be painted traffic yellow. GUARD POST INSTALLATION @ V01 NOT TO SCALE 0700.1600-02 CONCRETE GUARD POST INSTALLATION MIN 6" PAINTED YELLOW MIN 2'-6" 6" 3'-6" 6'-0" LENGTH DEVELOPER NOTE: Developer to install bollards per this detail if transformers cannot be placed a minimum of 5' from drivable surfaces. GUARD POST LOCATIONS 10' MIN. REQUIRED ROAD OR PARKING AREA GUARD POSTS 5' MIN WORK SPACE 5' MAX 5' MAX 5' MAX 5' MIN 5' MIN CURB OR EDGE OF PAVEMENT CURB OR EDGEOF PAVEMENTPAD & FRONT GUARD XFMR 3' MIN TYPICAL MIN 18"18" MIN MIN 3' A.M.Paulsen 206.437.9150 7.28.20 MFP20003812 REMOVE BLDG A 10 UNITS ~400 SQ.FT. BLDG C 9 UNITS ~400 SQ.FT. BLDG B 41 UNITS ~550 SQ.FT. SECTION 1 BLDG B SECTION 2 PUBLIC ALLEY FEEDPRE 11 DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM V01 TO METER LOCATIONS (TYPICAL) 'A' 'B'(4) 300kcmil(4) 300kcmil (2) 500kcmil (2) 500kcmil EX: 1-4"#2ACSRABCN 15'51' 60' IF CUSTOMER INSTALLS THIS CONDUIT AS A CROSSING, CITY OF RENTON REQUIRES SCH 80 CONDUIT TO REMAIN 1" = 20' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 253.395.6850 . E. PASAYE . 6.24.20 N/A .N/A E. PASAYE . 6.24.20 REDT # ( RW-117276 )RENTON SUNSET OAKS APARTMENTS 3Ø PRIMARY U/G LINE EXTENSION - 3M/F BLDGS, 60 UNITS 1073 HARRINGTON AVE NE, RENTON, WA 98056 PUGET SOUND ENERGY N/A N/A N/A 105094152 1" = 20' 2 OF 3 KING N/A N/A QCSOKE 09NW-T23N-R05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 COMCAST BILL WALKER 253.288.7538 CENTURYLINK KENNETH LUU 206 346.0144 RIGHT OF WAY FABIANA DODSON 425.456.2293 . . . SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-11 6.8.20 224 231 260 10 10 10 234 241 270 ... ... ... SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: 250' 17 550 65 AMPS THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. FAULT CURRENT TABLE 3Ø PM TRANSFORMERS (208Y/120V) 120V WINDINGS 208V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 225kVA 0.3 -- 2.10 39,700 AMPS DEVELOPER TO COORDINATE WITH PSE PROJECT MANGER & SERVICE PROVIDER PRIOR TO EXCAVATING WITHIN 3' OF LOCATE MARKS OF PSE ENERGIZED FACILITIES CROSSING CONDUIT TABLE X-ING # LOCATION POWER XING LENGTH TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY CONDUIT OFFSET (As Built) X01 'A' 'B' 4 SCH80 180'( )' WCL 15 PRIMARY 4" SCHED 80 GREY PVC = 15 FT 4" PVC PLUG /CAPS = 2 CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS A 10 V01 4 300kcmil - B WEST 21 V01 2 500kcmil - B EAST 21 V01 2 500kcmil - C 9 V01 4 300kcmil - ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE J- BOX CABLE ENTRY DETAIL NOT TO SCALE 12kV CABLE ROUTING Cables should enter the vault so that all of the cables will lay in the same direction. TOP VIEW J01 AND E01 INSTALLED ON SCH 73 WORK ORDER #101128849 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING # A 10 + HP 400 100/200 A ELEC 41KW 65 3.8 @ V01 0.5 @ V01 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING # C 9 + HP 400 100/200 A ELEC 39KW 65 3.8 @ V01 0.5 @ V01 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: Units: BUILDING # B 41 + HP 550 100/200 A ELEC 143KW 65 3.8 @ V01 0.5 @ V01 COMM. DEMAND: 15.6KW (BLDG HOUSE METER) COMM. DEMAND: 15.6KW (BLDG HOUSE METER) COMM. DEMAND: 15.6KW (BLDG HOUSE METER) At P01 (318570-166677) 1983 CLASS 3-30' -REMOVE POLE AND ALL PSE EQUIPMENT -COMM TO REMOVE FACILITIES FROM POLE SPAN NOTES REMOVED ( )' 1/O TRIPLEX WIRE P01 TO P02 REMOVE ±160 FT 1/O OH TRIPLEX WIRE SITE NOTES RETIREMENT POLE TABLE SITE # POLE DATA POLE TRANSFERS REMARKS GRID # HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION) P01 318570 166677 30' 3 1983 COMCAST LABOR UNITS - - - - - - DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM V01 TO METER LOCATIONS A.M.Paulsen 206.437.9150 7.28.20 MFP20003812 NEW 1/O AL EIS514-AØ EIS515-BØ EIS516-CØ FEEDPRE 11 'A' 'B'#2ACSRABCN BLDG A 10 UNITS ~400 SQ.FT. DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM V01 TO METER LOCATION(S) (TYPICAL) 'A' 'B'(4) 300kcmil(4) 300kcmil (2) 500kcmil (2) 500kcmil BLDG B 41 UNITS ~550 SQ.FT. SECTION 1 BLDG B SECTION 2 BLDG C 9 UNITS ~400 SQ.FT. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. BLACKIE 253.395.6850 . E. PASAYE . 6.24.20 N/A .N/A E. PASAYE . 6.24.20 REDT # ( RW-117276 )RENTON SUNSET OAKS APARTMENTS 3Ø PRIMARY U/G LINE EXTENSION - 3M/F BLDGS, 60 UNITS 1073 HARRINGTON AVE NE, RENTON, WA 98056 PUGET SOUND ENERGY N/A N/A N/A 105094152 AS SHOWN 3 OF 3 KING N/A N/A QCSOKE 09NW-T23N-R05E N/A N/A 2305E034 2305E040 2305E034 PRE-11 COMCAST BILL WALKER 253.288.7538 CENTURYLINK KENNETH LUU 206 346.0144 RIGHT OF WAY FABIANA DODSON 425.456.2293 . . . ... ... ... EX OVERHEAD CIRCUIT MAP 2305E040 SCALE: 6" = 1 MILE NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE EX UNDERGROUND CIRCUIT MAP 2305E034 NOT TO SCALE SITE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE VAULT & EQUIPMENT TABLE SITE # GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 318576 166671 4'-8"x4'-8"x3'-6" HH w/4'-8"x 5'-6"x6" Cover Matid: 7663900 225KVA PM TRF 120/208 Matid: 6258150 3 - PM3P15S 6045.5000 Existing J01 318573 166654 4'8"x7'x5' w/2-3' Sq Doors Matid: Existing J-Box Below Grade w/4-Pos J-Bus x3 Matid: Existing 3 - ELB10J 6041.1000 TAP 3Ø NOT TO SCALE NEW CONDUIT DIAGRAM CUST. OWNED PRIMARY 4" CONDUIT LEGEND PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90° 45° 22° 11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST. ACTUAL E01 V01 4 1 175 2 - - -CONDUIT ONLY ----- J01 V01 CABLE ONLY 467 480 1/0 AL JKT 255 EIS514 EIS515 EIS516 -1.8 4" PVC (FT) & BENDS =175 2 0 0 0 1/0 AL JKT TOTAL (FT) =255 TTL(Gal.)1.8 AØEIB742 BØEIB743 CØEIB744 AØEHC863 BØEHC864 CØEHC865 AØEHC862 BØEHC863 CØEHC864 A.M.Paulsen 206.437.9150 7.28.20 MFP20003812