HomeMy WebLinkAbout2021-2022 Proposed Budget (Preliminary)2021-2022Proposed Budget
City of Renton • 1055 South Grady Way • Renton, WA 98057 • rentonwa.gov
CITY OF RENTONBusiness Plan 2021–2026 GOALS
VISION Renton: The center of
opportunity in the Puget Sound
Region where families and
businesses thrive
MISSION The City of Renton, in
partnership and communication with
residents, businesses, and schools, is
dedicated to:
Provide a safe, healthy, vibrant community
Promote economic vitality and
strategically position Renton for the future
Support planned growth and influence
decisions to foster environmental
sustainability
Build an inclusive informed city with
equitable outcomes for all in support of
social, economical, and racial justice
Meet service demands and provide
high quality customer service
Provide a safe, healthy, vibrant
community
Promote safety, health, and security through
effective communication and service delivery
Facilitate successful neighborhoods through
community involvement
Encourage and partner in the development
of quality housing choices for people of all
ages and income levels
Promote a walkable, pedestrian and bicycle-
friendly city with complete streets, trails, and
connections between neighborhoods and
community focal points
Provide opportunities for communities to
be better prepared for emergencies
Promote economic vitality and
strategically position Renton for
the future
Promote Renton as the progressive,
opportunity-rich city in the Puget Sound
region
Capitalize on opportunities through bold
and creative economic development strategies
Recruit and retain businesses to ensure a
dynamic, diversified employment base
Nurture entrepreneurship and foster
successful partnerships with businesses and
community leaders
Leverage public/private resources to focus
development on economic centers
Support planned growth and
influence decisions to foster
environmental sustainability
Foster development of vibrant, sustainable,
attractive, mixed-use neighborhoods in urban
centers
Uphold a high standard of design and
property maintenance
Advocate Renton’s interests through
state and federal lobbying efforts, regional
partnerships and other organizations
Pursue transportation and other regional
improvements and services that improve
quality of life
Assume a crucial role in improving our
community’s health and environmental
resiliency for future generations
Pursue initiatives to increase mobility,
promote clean energy in our existing buildings
and in new development, preserve and
expand open spaces and tree coverage, and
other efforts to reduce CO2 and greenhouse
gas emissions
Building an inclusive informed city
with equitable outcomes for all in
support of social, economic, and
racial justice
Achieve equitable outcomes by eliminating
racial, economic and social barriers in internal
practices, city programs, services, and policies
such as hiring and contracting
Improve access to city services, programs and employment, provide opportunities and eradicate disparities for residents, workers and businesses
Promote understanding and appreciation
of our diversity through celebrations,
educational forums and festivals
Seek out opportunities for ongoing
two-way dialogue with ALL communities,
engage those historically marginalized, and
ensure that we lift every voice, listen and take
action on what we learn
Build capacity within the city to implement
inclusion and equity by providing the
knowledge, skills, awareness, and tools
to integrate anti-racism approaches into
daily work
Meet service demands and provide
high quality customer service
Plan, develop, and maintain quality services,
infrastructure, and amenities
Prioritize services at levels that can be
sustained by revenue
Retain a skilled workforce by making Renton
the municipal employer of choice
Develop and maintain collaborative
partnerships and investment strategies that
improve services
Respond to growing service demands
through partnerships, innovation, and
outcome management
2021/2022 Preliminary Budget City of Renton, Washington
i
Updated 09/09/2020
Boards, Commissions, and Committees Location Day Time
AIRPORT ADVISORY COMMITTEE Meetings scheduled as needed
BUDGET ADVISORY COMMITTEE Meetings scheduled as needed
BENSON HILL COMMUNITY PLAN ADVISORY BOARD Meetings scheduled as needed
CITY CENTER COMMUNITY PLAN ADVISORY BOARD Meetings scheduled as needed
CIVIL SERVICE COMMISSION 1st Flr. HR Training. Rm. 4th Tuesday 4:15 p.m.
FIREFIGHTER’S PENSION BOARD 7th Flr. Mayor’s Conf. Rm. 3rd Thursday 2:00 p.m.
HISTORICAL SOCIETY BOARD Renton Museum 4th Wednesday 5:30 p.m.
HUMAN SERVICES ADVISORY COMMITTEE 7th Flr. Council Conf.Rm. 3rd Tuesday 3:00 p.m.
INDEPENDENT SALARY COMMISSION Meetings scheduled as needed
LEOFF BOARD 1st Flr. HR Conf. Rm. 4th Tuesday 9 a.m.
MUNICIPAL ARTS COMMISSION 7th Flr. Conf. Center. 1st Tuesday 6:00 p.m.
NON‐MOTORIZED TRANSPORTATION ADVISORY COMMITTEE Meetings scheduled as needed
PARKS COMMISSION Locations vary 2nd Tuesday 4:30 p.m.
PARKS, TRAILS, AND COMMUNITY FACILITIES COMMITTEE Meetings scheduled as needed
PLANNING COMMISSION Council Chambers 1ST and 3RD
Wednesdays
6:00 p.m.
RENTON HOUSING AUTHORITY 2900 NE 10th St. 2nd Monday 9:00 a.m.
SENIOR CITIZENS ADVISORY COMMITTEE Senior Activity Center 1st Monday 10:00 a.m.
SISTER CITY ADVISORY COMMITTEE Meetings scheduled as needed
2021/2022 Preliminary Budget City of Renton, Washington
ii
Mayor Armondo Pavone Judge Terry Jurado Judge Kara Murphy Richards
Serving as Mayor since 2020 Serving since 1998 Serving since 2020
City Council 2014‐2019
Renton City Council
Angelina Benedetti Randy Corman Ryan McIrvin Valerie O’Halloran
Serving since 2020 Serving since 1994 Serving since 2016 Serving since 2020
Ruth Perez Ed Prince Kim‐Khánh Văn
Serving since 2014 Serving since 2012 Serving since 2020
2021/2022 Preliminary Budget City of Renton, Washington
iii
The Government Finance Officers Association of the United States and Canada (GFOA)
presented a Distinguished Budget Presentation Award to City of Renton, Washington for its
biennial budget for the biennium beginning January 1, 2019. In order to receive this award, a
governmental unit must publish a budget document that meets program criteria as a policy
document, as a financial plan, as an operations guide, and as a communications device. This
award is valid for a period of two years only. We believe our current budget continues to
conform to program requirements, and we are submitting it to GFOA to determine its eligibility
for another award.
2021/2022 Preliminary Budget City of Renton, Washington
iv
Table of Contents
Page
EXECUTIVE SUMMARY
Budget Message from the Mayor 1‐1
2021/2022 Budget Highlights 1‐5
Budget at a Glance 1‐13
Long Range Plan 1‐23
Financial Management Policies 1‐44
RENTON RESULTS
Budget Framework 2‐1
Renton Results Overview 2‐4
Safety and Health ‐ Programs, Resources and Results 2‐6
Representative Government ‐ Programs, Resources and Results 2‐11
Livable Community ‐ Programs, Resources and Results 2‐15
Mobility ‐ Programs, Resources and Results 2‐20
Utilities and Environment ‐ Programs, Resources and Results 2‐23
Internal Services ‐ Programs, Resources and Results 2‐29
Revenue, Expenditure and Capital Budgets by City Service Area 2‐35
Reconciliation to Total Budget 2‐42
BUDGET BY DEPARTMENT
Legislative 3‐1
Executive 3‐6
City Attorney 3‐24
Court Services 3‐28
Administrative Services (AS) 3‐32
Community and Economic Development (CED) 3‐41
Community Services 3‐58
Human Resources and Risk Management (HR&RM) 3‐81
Other City Services 3‐88
Police 3‐90
Public Works (PW) 3‐104
DEBT MANAGEMENT
Overview 4‐1
Outstanding Debt 4‐2
Computation of Limitation of Indebtness & Debt Service to Maturity by Funding Sources 4‐3
Debt Service Coverage Ratio 4‐4
General Obligation Debt 4‐5
Waterworks Debt 4‐7
2021/2022 Preliminary Budget City of Renton, Washington
v
Table of Contents
Page
CAPITAL INVESTMENT PROGRAM
City Wide Narrative 5‐1
City Wide Summary 5‐5
General Government 5‐6
Transportation 5‐79
Airport 5‐109
Golf Course 5‐121
Water 5‐129
Wastewater 5‐153
Surface Water 5‐163
BUDGET BY FUND
Summary All Funds 6‐1
General Governmental 6‐11
Special Revenue 6‐12
Debt Service 6‐16
Capital Investment Program 6‐17
Enterprise 6‐26
Internal Service 6‐33
Investment Trust 6‐40
APPENDIX
General Information 7‐1
Largest Taxpayers/Principal Employers 7‐2
Full‐Time Employee Staffing 7‐3
Comparison of Taxes and Rates 7‐4
2020/2021 Index of Positions and Pay Ranges (2020 represented pending development) 7‐5
2021/2022 Rates and Fees Schedule 7‐17
2021/2022 Utility Rates Brochure Not shown for Proposed Budget 7‐XX
Budget Glossary 7‐34
Adopted Legislations (Budget, Taxes, Fees, and etc) Not shown for Proposed Budget 7‐XX
2021/2022 Preliminary Budget City of Renton, Washington
vi
Readers Guide to the Budget
The following Reader's Guide lists each major section of this document in the order that it appears and provides
a brief description of what you will find in that section. Please refer to the Table of Contents for specific section
locations and content details.
Section 1: Executive Summary
The Introduction presents the Mayor’s budget message. His letter articulates City initiatives and issues for the
2021/2022 Biennial Budget. Following this are the 2021/2022 Budget Highlights, Budget at a Glance, Long
Range Plan, and Financial Management Policies. Included in the Executive Summary section is a condensed view
of the budget, covering everything from a summary of the budget process to summaries for fund types,
department expenditures and employment history, and revenue sources and levels.
Section 2: Renton Results
In this section we present the City of Renton’s performance management initiative originated in 2007 to clearly
illustrate the services provided by the City of Renton, the resources needed to provide these services, and the
results of the service efforts to facilitate policy decisions and provide accountability to the community.
Section 3: Budget by Department
In this section we present budget information organized by department and division. Each department, and
each division within that department, presents its mission statement, expenditure budget, staffing levels, and
funding decisions.
Section 4: Debt Management
An extensive overview of Renton’s debt program is presented here. This includes financial data on debt
limitations, property tax rates and revenues, long‐term debt service requirements, and a schedule of the City’s
overall outstanding debt.
Section 5: Capital Investment Program (CIP)
This project listing provides a summary of the six‐year CIP plan. We list projects by activity and by managing
department.
Section 6: Budget by Fund
This section gives a display for each fund’s revenue, expenditures, and fund balance that compares current
program levels with those of past years.
Section 7: Appendix
In this appendix, we provide selected demographics, economic statistics, an index of salaries and pay ranges,
and some general information about the City of Renton. We have also included here a glossary of commonly
used budget terms.
2021/2022 Preliminary Budget City of Renton, Washington
vii
This page is intentionally left blank
2021/2022 Preliminary Budget City of Renton, Washington
viii
1 EXECUTIVE SUMMARY
Budget Message from the Mayor
1‐1
2021/2022 Budget Highlights
1‐5
Budget at a Glance
1‐13
Long Range Plan
1‐23
Financial Management Policies
1‐44
ADMINISTRATIVE SERVICES
Jan Hawn, Administrator
425‐430‐6858
RENTON CITIZENS
MAYOR
Armondo Pavone
425‐430‐6500
MUNICIPAL COURT JUDGES
Terry Jurado
Kara Murphy Richards
425‐430‐6550
CITY COUNCIL
Ruth Pérez, President
Angelina Benedetti, Randy Corman,
Ryan McIrvin, Valerie O'Halloran, Ed Prince, Kim‐Khánh Văn
425‐430‐6500
CHIEF ADMINISTRATIVEOFFICER
Vacant
425‐430‐6500
COMMUNITY SERVICES
Kelly Beymer, Administrator
425‐430‐6600
PUBLIC WORKS
Martin Pastucha, Administrator
425‐430‐7394
EXECUTIVE
COMMUNITY AND ECONOMIC
DEVELOPMENT
Chip Vincent, Administrator
425‐430‐6580
POLICE
Ed VanValey, Chief
425‐430‐7503
HUMAN RESOURCES & RISK
MANAGEMENT
Ellen Bradley‐Mak, Administrator
425‐430‐7650
Facilities
Jeffrey Minisci, Director
Renton History Museum
Elizabeth Stewart, Manager
Golf Course
Doug Mills, Manager
Maintenance Services
Michael Stenhouse, Director
Utility Systems
Ronald Straka, Director
Transportation Systems
Jim Seitz, Director
Economic Development
Cliff Long, Director
Long Range Planning
Angie Mathias, Manager
Planning
Mayor's Office
City Clerk / Cable Manager
Jason Seth, City Clerk
Public Affairs
Preeti Shridhar, Deputy Public
Affairs Administrator
Support Operations Bureau
Field Operations Bureau
Emergency Management
Deborah Needham, Director
Human Resources
Kim Gilman, Manager
Risk Management
Kelsey Ternes, Manager
Benefits
Wendy Rittereiser, Manager
Finance
Kari Roller, Director
Information Technology
Mehdi Sadri, Director
Staff Services
Special Operations
Investigations
Administrative
Services
Patrol Services
Patrol Operations
CITY ATTORNEY
Shane Maloney, Administrator
425‐255‐8678
Parks and Trails
Cailin Hunsaker, Director
Human Services
Guy Williams, Manager
Parks Planning and Natural
Resources
Leslie Betlach, Director
Recreation and
Neighborhoods Jennifer Henning, Director
Airport
Vacant, Manager Building Official
Craig Burnell
Organizational Development
Kristi Rowland, Manager
Budget Message from the
Mayor - Placeholder pages
2021/2022 Preliminary Budget City of Renton, Washington
Executive Summary - Budget Message from the Mayor 1 - 1
Budget Message from the
Mayor - Placeholder pages
2021/2022 Preliminary Budget City of Renton, Washington
Executive Summary - Budget Message from the Mayor 1 - 2
Budget Message from the
Mayor - Placeholder pages
2021/2022 Preliminary Budget City of Renton, Washington
Executive Summary - Budget Message from the Mayor 1 - 3
2021/2022 Preliminary Budget City of Renton, Washington
Executive Summary - Budget Message from the Mayor 1 - 4
Budget Message from the
Mayor - Placeholder pages
City of Renton
2021‐2022 Budget Highlights
Budget Overview
The total proposed 2021‐2022 budget has revenue of $494.2 million
and a total expenditure of $507.5 million. This is 4.0% less in revenue
and a 3.4% decrease in expenditures when compared with the 2019‐
2020 adopted budget.
The majority of the City’s revenue sources are projected to decrease in
2021 due to closures resulting from COVID‐19, particularly retail sales
and use tax, utility tax, other licenses and permits, and other
intergovernmental and miscellaneous revenues. There is also a
significant decrease in grant revenue in the Transportation CIP. These
revenues are expected to stabilize by 2022. The primary reason for the
decrease in expenditures is lower expenditures related to capital
improvements.
Given the revenue losses associated with COVID‐19, the City is using a
“baseline” budget for the first year of the upcoming biennium. As a
result, there are no additional positions being proposed in this budget.
This proposed budget includes the elimination of 2.5 positions (1.5 for
limited term employees and 1.0 full‐time position) for a total authorized
number of 614.03 FTEs for 2021 and 614.03 for 2022.
Projected Budget Gap The proposed budget reflects a fund balance decrease of $23.4 million
at the end of 2022 in the City’s General Fund, in large part due to the
loss of revenue due to COVID‐19 and the fact that the City’s costs grow
faster than the pace at which revenues grow. With an inflationary
adjustment for future wages and projected employee medical benefit
cost increases, a gap will occur in 2022 and continue to grow larger
beyond the current biennium. The ongoing gap requires long‐term,
sustainable solutions.
The 2021‐2022 Budget will
stabilize and maintain core
services
The proposed 2021‐2022 budget does not contain any citywide cuts.
There are also no new budget requests in this proposed budget as a
result of 2021 being a “baseline budget,” but the focus is to continue to
stabilize and maintain core City services at a level that is expected by
our residents and businesses, and will position Renton for the future.
Fund Balance
The overall 2021‐2022 proposed expenditures exceed the proposed
revenues by $13.3 million and results in a projected overall fund
balance of $138.2 million, approximately 8.8% less than the estimated
2020 estimated ending fund balance.
The decrease in the fund balance is primarily attributable to projected
loss of revenue associated with COVID‐19 and increases in medical and
dental rates.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 5Executive Summary - 2021/2022 Budget Highlights
The General Fund balance will be maintained at $15.3 million, just
above the 12% of General Fund operating expenditures, as targeted by
our fiscal policy.
Overall, the City is in sound financial condition.
General Government
Overview
Of the $494.2 million total revenue, $203.1 million is in the City’s
General Fund. The $203.1 million revenue is $2.4 million or 1.2% greater
than the 2019‐2020 budget. The increase is due to an increase in
property taxes, business & occupation tax, and other taxes in 2022.
Personnel makes up the largest single category of expenses for the City
at 41% of the total citywide budget. Wage adjustments, medical
premiums, and pension increases tend to rise at a higher percentage
increase than revenues grow.
Given various costs increases to maintain existing services, even with
accompanying revenues and fee adjustments, the General Fund
continues to show persistent budget gaps into the future. The gap starts
at $9.4 million in 2020 and will grow over time to $14.8 million by 2026.
This is due to the loss of revenue in 2020 associated with COVID‐19 and
the fundamental imbalance between the revenue options available to
local governments and the services local governments are expected to
provide. Renton is not an exception. This issue has been a high priority
topic for the State Legislature and citizen advisory panels for various
past State Governors. But, in the end, this is a problem left for local
governments to solve themselves with the limited tools available.
General Fund Revenues
Business and Occupation
(B&O) Tax/Business License
Fees
To bridge the gap and to address the structural imbalance, the City
implemented one of the tools available to help generate the amount of
sustainable revenue needed in the near future, and beyond the current
biennium. The City engaged businesses and community leaders in the
process and received valuable input that allowed us to structure and
implement the B&O tax effective January 1, 2016 in a way that would
minimize impact to the business community.
The proposed 2021‐2022 budget continues the B&O tax implemented
on January 1, 2016. The key provisions of the B&O tax are:
Businesses with $500,000 or higher annual gross receipts are
required to pay B&O tax.
The 2020 B&O tax maximum amount paid is capped at $4.723
million per year. This cap is automatically adjusted annually by
inflation.
The tax rate is 0.085% for all business activities other than
retail, which have a rate of 0.05%.
Limits the non‐profit and government exemptions for both
2021/2022 Preliminary Budget City of Renton, Washington
1 - 6Executive Summary - 2021/2022 Budget Highlights
As noted above, budgeted expenditures for 2021 have been set at a
baseline level due to the impact of revenue losses related to
COVID‐19. The only changes proposed for the 2021‐2022 Preliminary
Budget are due to:
Amendments to the original Adopted 2019‐2020 Budget made
during that timeframe;
Increases to costs for medical and employee benefits; and
A proposed budgeted cost‐of‐living adjustment in 2022 of 2%.
Property Tax
Sales Tax
Utility Tax
Fee Adjustments
B&O tax and Business License fee.
A three‐year, new employer tax credit for new businesses with
50 or more employees in Renton.
The B&O tax was the only revenue option that the City Council could
implement without going to voters, which could generated the funds
needed to maintain General Fund City services into the future. It will
provide approximately $6.5 million in revenue in 2021 and is projected
to increase to approximately $9.5 million in 2022. Most of the revenue
generated will be needed for the General Fund, although a portion will
help fund capital improvement projects.
Property tax revenue is projected to grow by just over $4.0 million
based on the 1% growth limit plus 1% for new construction. The City
also increased its levy in 2019 by approximately $1.0 million in property
tax for debt service payments related to the bonds for major
maintenance projects for parks, and will continue until the bonds are
fully paid. The total levy collection for 2021 is projected to be $21.5
million.
Sales tax is projected to decrease by 9.9% in 2021 and then increase by
8.7% in 2022 (as the economy recovers from the impact of COVID‐19).
Utility taxes are projected to decrease by 8.3% in 2021 and then
increase by 4.8% in 2022. The decrease is also due to the impact of
COVID‐19.
Consistent with prior year practices, the fee schedule has been
reviewed and the proposed budget includes various fee increases, as
outlined in the proposed fee schedule.
General Fund Expenditures
2021/2022 Preliminary Budget City of Renton, Washington
1 - 7Executive Summary - 2021/2022 Budget Highlights
The highlights of any major budget amendments to the Adopted 2019‐
2020 Budget are noted below.
Legislative
No additional budget requests other than those noted above.
Executive
$517k for court public
defenders
The Executive Department budget reflects an increase of $517k due to
increase in public defense services cases and contract costs.
Community & Economic
Development
$34k for SKCHHP member
contributions
$20k for recording fees
The proposed budget for Community and Economic Development
includes $34k member contribution to South King County Housing and
Homeless Partners. It also includes $20k in recording fees paid to King
County, offset by fees charged to applicants.
Community Services
No additional budget requests other than those noted above.
Police
$600k in overtime
The proposed budget for Police includes an increase of $600k in
overtime budget to more accurately reflect actual costs.
Public Works No additional budget requests other than those noted above.
Administrative Services
No additional budget requests other than those noted above.
Human Resources &
Risk Management
City Attorney
No additional budget requests other than those noted above.
No additional budget requests other than those noted above.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 8Executive Summary - 2021/2022 Budget Highlights
Court
$20k for security officers
The Court Services budget reflects an increase of $20k to the security
officers’ budget.
Capital Funds
Governmental Capital
Improvements Fund (316)
2‐Year Total $5.4M
The proposed 2021‐2022 budget includes $5.4 million in General
Governmental capital projects. The funds are needed to preserve and
enhance over $80 million of sports courts and fields, outdoor
structures, buildings and amenities in our community. This budget will
continue to dedicate the B&O taxes to supplement the Real Estate
Excise Tax, King County Parks Levies, grants, donations, and general
fund transfers.
Details of the $5.4M million projects and use of City resources for these
projects can be found in the CIP section (5) of this budget.
Transportation Improvements
Fund (317)
2‐Year Total $1.6 million
The Transportation Improvement Plan (TIP) includes $1.3 million in
Governmental capital projects and is set to be approved by the City
Council after the public hearing scheduled in October. Details of the
projects and use of City resources for these projects can be found in the
CIP section of this budget.
Enterprise Funds
The City has several enterprise type (or business type) operations,
that must be self‐sustaining. These include the Water, Wastewater,
and Surface Water utilities; the Solid Waste utility; the Maplewood
Golf Course, and the Renton Municipal Airport.
Utilities
$2.5M in payment to garbage
contractor
$168k in local hazardous
waste management program
fee
$600k in King County waste
water charge
Rate increases
The Water, Wastewater, and Surface Water utility funds are
accounted for and budgeted separately, but are managed as a system
in accordance with the City’s financial management policies. The
system conducts a comprehensive rate study every six years with the
assistance of outside consultants, with biannual updates performed
by City staff.
The proposed budget for Utilities includes an increase of $2.5M for
payment to garbage contractor (Republic Services), $168k for local
hazardous waste management program fee, $600k for King County
wastewater charge to align with the updated wastewater and solid
waste utility rate model.
The 2021 and 2022 update shows 2% increase for Water, Wastewater,
and Surface Water.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 9Executive Summary - 2021/2022 Budget Highlights
King County Metro is raising the sewer treatment charge by 4.5%
effective 2021. King County solid waste disposal fee will remain the
same for 2021 as the 2020 rate of $140.82/ton.
The Solid Waste Utility is proposing a 2% rate increase in residential
rates for 2021/2022.
Maplewood Golf Course
The proposed budget shows no increase for the Maplewood Golf
Course.
Internal Service Funds
The City operates several “businesses” that provide service internally
to other City departments. These include the Equipment Rental Fund
(501), Insurance Fund (502, property, liability, worker’s comp, and
unemployment), Information Technology Fund (503), Facilities Fund
(504), Communications Fund (505, print, mail, and general
communication), Healthcare Insurance Fund (512), and LEOFF1
Retiree Healthcare Fund (522).
All of the costs identified herein are paid for and included in the
operating departments’ budget. The charges are calculated based on
either specific charges or by systematic cost allocation. The health
insurance charge (for both active and retired employees) is part of
personnel benefit costs. The remaining internal service funds (Fleet,
Property/Liability Insurance, Technology, Facilities, and
Communications) services are paid as internal service charges.
About 80% of all internal service charges are paid by the General
Fund; therefore, the cost of internal service fund operations directly
affects the General Fund’s bottom line.
Equipment Rental Fund
Operating: $2.9M in
2021/$2.9 M in 2022
$2.1M in 2021 and $1.4M in
2022 proposed
equipment
replacements/new additions
The Equipment Rental fund maintains nearly 733 pieces of
equipment, of which approximately 500 are vehicles and mobile
equipment used intensively in delivering City services. The Fund also
accumulates replacement reserves for the replacement of vehicles
when needed.
The proposed budget includes $2.1M in 2021 and $1.4M in 2022 for
equipment replacements and new acquisitions. See Public Work’s
Budget by Department (section 3) for the full detailed listing.
Information Technology
Operating: $6.1M in
2021/$6.2M in 2022
The Information Technology (IT) Fund was created in 2007 to allocate
the costs of the City’s centralized IT services costs. This fund provides
for citywide communication and data processing systems
improvements, maintenance and support including phone and
computer hardware and software, data center servers, storage and
2021/2022 Preliminary Budget City of Renton, Washington
1 - 10Executive Summary - 2021/2022 Budget Highlights
Capital:$659k network systems, business application systems development,
implementation and support, Geographic Information Systems and
services, and mobile devices, copier and printer equipment for the
City.
The proposed budget of $6.4 million in 2021 and $6.6 million in 2022
includes a total of $659k in IT capital projects over the 2‐year budget
period. This includes major replacement and enhancement of existing
core networking, servers and storage equipment, end‐user
computers, copiers and printers.
Risk Management
Operating: $17.2M in 2021
/$18.4M in 2022
The City’s Risk Management program consists of three funds: the
Property and Liability Insurance Fund (502), the Employee Health
Insurance Fund (512), and the LEOFF I Retiree Medical Fund (522).
The 502 Fund’s annual budget totals $3.3 million in 2021 and $3.3
million in 2022, consisting of property and liability insurance, workers
compensation, unemployment insurance, and program
administration. In 2020, all of the remaining portion of the
Annexation Sales Tax reserve were transferred to the General Fund to
help offset the revenue losses related to COVID‐19.
The City self‐insures employee health benefits with stop‐loss
coverage of $250k per incident. The 2021 and 2022 budget and
charges are based on projected plan costs by the number of
employees. The 2021 premium increase is based on actual plan cost
increases for the prior year (from July 1, 2019 through June 30, 2020),
with an actuarial analysis and the need to maintain 30% in reserves
taken into account. The 2022 premium increase is calculated based
on a projected 9% increase.
Providing retiree health care is required by state law for LEOFF I
retirees. The City’s contribution is determined actuarially and re‐
evaluated every other year. The most recent actuarial study put the
City’s obligation at approximately $39.4 million in present value
therefore the City is contributing $2.6M per year to fund this
obligation in 2021 and 2022.
Facilities
Operating: $6.1 million for
2021/$6.4 million for 2022
The Facilities Fund (504) was fully implemented in 2010 to accumulate
costs for maintaining and operating the City’s offices, public facilities
(primarily used by the general public), and operational facilities
(primarily used for City operations purposes), and charges the costs
to the appropriate functions/departments.
Communications
Operating: $1.2 million/year
The Communications Fund was also created in 2010 by pooling
citywide communications resources for the central print shop,
interoffice mail, external postage and printing services, and the
Government TV channel operation. These were put in one place for
consistent coordination of brands, messages, and better prioritization
2021/2022 Preliminary Budget City of Renton, Washington
1 - 11Executive Summary - 2021/2022 Budget Highlights
of workload. The annual operating cost is at $1.2 million per year,
which is allocated based on actual services demand by departments.
Pension Trust Fund
Firemen’s Pension
$210k in 2021; $200k in 2022
for Pension benefit payment
The City is the custodian of the Firemen’s Pension Fund, a trust fund
managed by appointed Trustees consisting of City elected officials and
retired pensioners.
The Fund accumulates resources and pays current pension benefits
per state law. The Fund has sufficient assets to fully fund the City’s
pension obligation. Currently the plan assets generate more than
sufficient earnings to cover the benefits; and the City also receives a
distribution of a state fire insurance premium surcharge that is
restricted exclusively for fire pensions. The fund balance is expected
to grow due to the “overfunded” status of the Pension. After the plan
is closed and all beneficiaries are expired, the balance may be moved
to LEOFF 1 retiree medical.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 12Executive Summary - 2021/2022 Budget Highlights
The Budget Process
Washington state law requires that cities must adopt a balanced budget prior to the beginning of the fiscal year.
The adopted budget appropriates funds and establishes legal expenditure limits for the upcoming fiscal year.
Washington state law also allows for the adoption of biennial budgets provided the City Council also adopts a
second ordinance for a mid‐biennial review and modification prior to the end of the first year in the fiscal
biennium. In 2011, the City of Renton moved from an annual budget to a biennial budget with mid‐biennial
review.
Budget Development and Adoption
The City of Renton’s development of the biennial budget occurs every two years from February through October.
Development begins with the Mayor and the Council’s review of the City’s current service levels and projected
revenues into the new biennium to determine if they need to make significant changes to the budget. During this
review, the Mayor’s first priority is to ensure that the City is able maintain the current levels of service. As costs
to maintain service levels continue to rise, additional funding may need to be identified to preserve the current
levels of service. Alternatively, if revenues are expected to decline, cost‐cutting measures may be implemented.
The Mayor and the Council hold a strategic planning retreat in February of each year in order to determine
whether the City’s current levels of service are meeting the needs of our community, adopt the City’s Business
Plan Goals, and sets policy direction and priorities for the next budget cycle.
During June and July, City departments prepare and submit budget proposals with the estimates for providing
existing service levels for each year in the biennium. In addition, they submit capital improvement program (CIP)
budgets. In a typical biennial budget development, departments also requests for new programs that they would
like the Mayor to consider, which include current service level expansion and new services. However due to the
pandemic and the City’s current budget status, there are no new program requests during this budget cycle. The
Mayor then evaluates the departments' proposals to ensure they align with Council’s adopted Business Plan Goals
and recommends to Council for approval.
The Mayor must provide a proposed biennial budget to the Council no later than October 31. The Mayor’s
proposal also includes the estimated revenue to support the costs of providing City services. Proposed
expenditures cannot exceed the reasonably anticipated revenue sources, unless new revenue sources are also
being proposed, in which case, proposed legislation to authorize the new revenue sources must be submitted to
the City Council along with the proposed budget.
After the Mayor submits the proposed budget, the Council conducts a public hearing in October. During the same
time frame, the Council holds committee meetings in open sessions to discuss budget requests with department
representatives and make subsequent amendments to the Mayor’s proposed budget. Once the public hearings
have been held, the deliberative process is complete, and the Council has made their changes, the City Council
will adopt the budget ordinance in November.
Once the Council adopts the budget, the Mayor must ensure that expenditures are made within legal limits. If the
economy changes or the City identifies unanticipated needs during the year that require changing the budget, the
Mayor will recommend those changes. A Council‐adopted ordinance must accompany all budget increases. If
revenues fall short, the Mayor can make decreases to the budget to ensure that the City does not overspend
available resources.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 13Executive Summary - Budget at a Glance
Biennial Budget Calendar
The following table illustrates a typical biennial budget calendar for both the initial budget development year and
the mid‐biennium adjustment year. The process and legal deadlines in Year 1 is identical to the annual budget
process. Year 2 is the simplified mid‐year review process.
123456789101112123456789101112
1. Administration Planning Retreat
2. Council sets budget priorities and guidance in workshop
3. First quarter financial report to Council Committee of
the Whole updates revenue projections
4. Administration develops budget parameters
5. Staff provide Capital Facilities Plan update to Council
6. Departments submits budget requests
7. Finance reviews requests to ensure consistency with
Council’s and Mayor’s directions
8. Departments identify necessary mid‐biennium
adjustments
9. Finance updates revenue estimates and compiles with
department submittals
10. Preliminary budget document prepared, printed, and
filed with City Clerk and presented to the City Council (at
least 60 days prior to the ensuing fiscal year)
11. City Clerk publishes notice of the filing of preliminary
budget and notice of public hearing to be held during
preliminary budget deliberations
14. City Council adopts an ordinance to establish the
amount of property taxes to be levied in the ensuing year
15. Final budget/Mid‐biennium adjustments, as adopted, is
published and distributed within the first three months of
the following year
13. City Council makes modifications to the proposed
budget/mid‐biennium adjustments
Process Description Year 1Year 2
12. City Council conducts workshops and public hearings on
the preliminary budget including revenues and property tax
2021/2022 Preliminary Budget City of Renton, Washington
1 - 14Executive Summary - Budget at a Glance
Budgetary Basis and Basis of Accounting
Basis of accounting refers to the point at which revenues or expenditures/expenses are recognized. The City’s
budget is adopted on the modified accrual basis of accounting: revenue is reported when it is both measurable
and available and expenditures are reported when the liabilities are incurred. Property tax, sales taxes, and other
tax‐payer assessed revenues due for the current year are considered both measurable and available for budgetary
purposes, even though a portion may be collected in the subsequent year. Licenses, fines, penalties, and
miscellaneous revenues are recorded as revenue as they are received in cash since this is when they are both
available and can be accurately measured.
The budgetary basis of accounting does vary slightly from the City’s financial statement reporting. Both
governmental activities and business‐type activities in the government‐wide statements, the proprietary fund,
and the fiduciary fund statements are presented on the full accrual basis of accounting. Revenues are recognized
when earned and expenses are recognized when incurred. Whereas, the governmental fund financial statements
are presented on the modified accrual basis of accounting, similar to the budgetary basis of accounting except for
the following differences:
Perspective differences – the General Fund is structured differently for budgeting purposes than it is for
reporting under GAAP. This City maintains various management funds that are reported within the
General Fund. Consolidation of the funds results in the elimination of transfers between the consolidated
funds for GAAP reporting.
Basis difference – certain payments and receipts are budgeted for in a manner that is inconsistent with
GAAP. Interfund payments for indirect cost allocations and reimbursement of payroll costs associated
with capital projects are budgeted as interfund revenues; however, these payments are reclassified as a
reduction of the expenditure for GAAP reporting. In addition, interfund loan payments are budgeted as
debt service expenditures; however, these payments are reclassified as a reduction of the interfund loan
payable for GAAP reporting.
The budget, as adopted, constitutes the legal authority for expenditures. The budget is adopted with budgetary
control at the fund level, by year. Expenditures may not legally exceed appropriations at the fund level of detail
for each year of the biennium. Transfers or revisions within funds are allowed, but only the City Council has the
legal authority to increase or decrease a given fund’s budget. Any unspent operating appropriations automatically
lapse at the end of each fiscal year, except for any amounts that are continued through the City’s annual adopted
carry‐forward ordinance. The carry‐forward ordinance also identifies unspent capital appropriations to be carried
forward into the following year.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 15Executive Summary - Budget at a Glance
Governmental Funds
*General Government
General Fund
000
Community Services
Fund
000‐001
Street Fund
000‐003
CD Block Grant Fund
000‐004
Leased City Properties
000‐108
Economic Development Reserve
000‐098
Museum Fund
000‐005
Debt Service
LTGO
215
Special Revenue
Special Hotel/Motel
Tax
110
Municipal Art
125
Cable Communication
127
Springbook Wetlands
Bank Fund
135
Police Seizure Fund
140,141
Capital Projects
Mitigation Funds
303, 304, 305
REET Funds
308, 309
*Municiple Facilities
CIP
316, 336, 346
*Transportation CIP
317
Proprietary Funds
Enterprise
*Waterworks
Utilities
Utility Operations
405,406,407,
416
Utility Construction
425,426,427
Utility Debt Service
Airport
Airport Operations
402
Airport Construction
422
Solid Waste
Utility
403
Golf Course
Golf Operations
404
Golf Construction
424
Internal Service
Equipment Rental
501
Insurance Services
502, 512, 522
Information
Technology
503
Facilities
504
Communication
505
Budgetary Fund Structure
Financial Structure
The City’s budget comprises seven major fund types, as shown below: General Government, Special Revenue,
Debt Service, Capital Projects, Enterprise, Internal Service, and Fiduciary Funds. The following pages provide a
general overview of each fund type.
Major Funds are those with budgets representing ten percent or more of the City’s overall budget. They are
marked with an asterisk (*).
2021/2022 Preliminary Budget City of Renton, Washington
1 - 16Executive Summary - Budget at a Glance
1. General Governmental Funds
These funds are used to account for resources that are generally not dedicated for a specific purpose. They
are used to meet the basic services that your local government provides.
Major Revenues Primary Services
• Taxes • Police protection
• Fees, licenses, and permits • Parks and recreation
• Fines and forfeitures • Municipal Court / legal services
• Intergovernmental (Federal, State, and Local) • Street maintenance planning
• Economic development / planning
• Administrative functions
2. Special Revenue Funds
These funds are used to account for revenues that are to be used for a specific purpose as required by law or
administrative action.
Major Revenues Primary Services
• Federal, State, and Local Grants • Economic development
• Taxes • Cable communications
Drug seizure funds • Police drug enforcement
• Art fund
3. Debt Service Funds
These funds are used to account for accumulation of dedicated revenue and payment of principal and
interest related to the City’s general obligation bond issues.
Major Revenues Primary Services
• Property tax levies • Payment of principal and interest on
outstanding bonds
• Real estate excise tax
• Special assessments
2021/2022 Preliminary Budget City of Renton, Washington
1 - 17Executive Summary - Budget at a Glance
4. Capital Investment Funds
These funds are used to account for the acquisition and construction of major capital facilities and
equipment. All projects supported by these funds can be found in the 2019‐2024 City of Renton Capital
Investment Program section.
5. Enterprise Funds
These funds are used to account for operations that are financed and operated in a manner similar to private
business enterprises. Services are financed primarily through user fees.
Major Revenues Primary Services
• Service (user) charges • City utilities
• Federal, State, and Local Grants • Renton Municipal Airport
• Revenue bonds • Maplewood Golf Course
• State loans
6. Internal Service Funds
These funds are used to account for the goods and services furnished by one city department for another
department on a cost reimbursement basis.
Major Revenues Primary Services
• Charges to other city departments • Fleet management
• Insurance, health / property liability
• Information technology
• Facilities
• Communications
7. Fiduciary Funds
These funds are used to account for assets held by the City in a trustee capacity.
Major Revenues Primary Services
• Investment interest • Fire pension fund
Major Revenues Primary Services
• Federal, State, and Local Grants • Capital investment projects
• Special assessments
• Property tax
• B&O tax & business licensing fee
• Real estate excise tax
• Impact mitigation
2021/2022 Preliminary Budget City of Renton, Washington
1 - 18Executive Summary - Budget at a Glance
Employment History – City of Renton
General
Government Enterprise Total FTE's
2021/2022 Proposed Staffing Changes
Regular (full‐time and part‐time) 497.94 117.09 615.03
Community Services ‐1.00 ‐1.00
Total Regular (full‐time and part‐time) 496.94 117.09 614.03
Authorized Limited Term Staffing 1.50 0.00 1.50
Executive ‐1.00 ‐1.00
Community Services ‐0.50 ‐0.50
Total Limited Term Staffing 0.00 0.00 0.00
Total 2022 Proposed Staffing (Regular + Limited Term) 496.94 117.09 614.03
The total authorized FTE count is for regular full‐time, part‐time and limited term positions. Refer to the Budget by Department section for additional
detail.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 19Executive Summary - Budget at a Glance
Employment History – City of Renton (continued)
General
Government Enterprise Total FTE's
2019/2020 Adopted Staffing Changes
Regular (full‐time and part‐time) 463.82 105.09 568.91
Court Services 2.00 2.00
City Attorney 0.12 0.12
Community Services 5.00 5.00
Community & Economic Development 5.00 5.00
Administrative Services 3.00 3.00
Human Resources and Risk Management 1.00 1.00
Public Works 4.003.007.00
Police 1.50 1.50
Total Regular (full‐time and part‐time) 485.44 108.09 593.53
Authorized Limited Term Staffing 2.50 0.00 2.50
Community Services ‐1.50 ‐1.50
Community & Economic Development ‐1.00 ‐1.00
Total Limited Term Staffing 0.00 0.00 0.00
Total 2020 Adopted Staffing (Regular + Limited Term)485.44 108.09 593.53
2019/2020 Adjustments
Regular (full‐time and part‐time)485.44 108.09 593.53
Court Services 1.00 1.00
Community Services 10.00 9.00 19.00
Admistrative Services 1.00 1.00
Public Works 0.50 0.50
Total Regular (full‐time and part‐time) 497.94 117.09 615.03
Authorized Limited Term Staffing 0.00 0.00 0.00
Executive 1.00 1.00
Community Services 0.50 0.50
Total Limited Term Staffing 1.50 0.00 1.50
Total 2020 Authorized Staffing (Regular + Limited Term)499.44 117.09 616.53
2021/2022 Preliminary Budget City of Renton, Washington
1 - 20Executive Summary - Budget at a Glance
Staffing (Full‐Time Equivalent Employees – FTE) Comparison by Department (1 of 2)
See Budget by Department (3‐1) for details.
2018 2019 2019 2020 2020 2021 2022 Change Change
Department Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Legislative Services
City Council Members 7.00 7.00 7.00 7.00 7.00 7.00 7.00 0.00 0.00
City Council Liaison 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00
Total Regular FTE 8.00 8.00 8.00 8.00 8.00 8.00 8.00 0.00 0.00
Executive
Mayor’s Office 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.00 0.00
Communications 5.63 5.63 6.63 5.63 6.63 5.63 5.63 0.00 0.00
Emergency Management 3.00 3.00 3.00 3.00 3.00 3.00 3.00 0.00 0.00
Total Regular FTE 13.63 13.63 14.63 13.63 14.63 13.63 13.63 0.00 0.00
Court Services
Municipal Court 14.00 16.00 17.00 16.00 17.00 17.00 17.00 1.00 0.00
Total Regular FTE 14.00 16.00 17.00 16.00 17.00 17.00 17.00 1.00 0.00
City Attorney
City Attorney 13.88 14.00 14.00 14.00 14.00 14.00 14.00 0.00 0.00
Total Regular FTE 13.88 14.00 14.00 14.00 14.00 14.00 14.00 0.00 0.00
Community Services
Administration 2.00 2.00 2.00 3.00 2.00 2.00 2.00 ‐1.00 0.00
Park Maintenance 27.00 27.00 26.85 27.00 34.85 34.85 34.85 7.85 0.00
Recreation Services 19.17 19.17 19.75 19.17 19.75 19.25 19.25 0.08 0.00
Human Services/CDBG 4.33 4.33 4.50 4.33 4.50 4.50 4.50 0.17 0.00
Museum 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00
Municipal Golf Course 9.75 9.75 9.00 9.75 12.00 12.00 12.00 2.25 0.00
Parks Plan and Nat Res 5.00 4.00 7.40 4.00 7.40 6.40 6.40 2.40 0.00
Facilities 25.25 28.75 29.00 28.75 35.00 35.00 35.00 6.25 0.00
Total Regular FTE 93.50 96.00 99.50 97.00 116.50 115.00 115.00 18.00 0.00
Community and Economic Development
Administration 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.00 0.00
Economic Development 4.00 5.00 6.00 5.00 6.00 6.00 6.00 1.00 0.00
Planning 29.50 31.50 30.50 31.50 30.50 30.50 30.50 ‐1.00 0.00
Development Services 19.00 19.00 19.00 20.00 20.00 20.00 20.00 0.00 0.00
Total Regular FTE 54.50 57.50 57.50 58.50 58.50 58.50 58.50 0.00 0.00
Administrative Services
City Clerk 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0.00 0.00
Finance 20.50 21.50 21.50 21.50 22.50 22.00 22.00 0.50 0.00
Information Systems 18.50 20.50 20.50 20.50 20.50 21.00 21.00 0.50 0.00
Total Regular FTE 45.00 48.00 48.00 48.00 49.00 49.00 49.00 1.00 0.00
2021/2022 Preliminary Budget City of Renton, Washington
1 - 21Executive Summary - Budget at a Glance
Staffing (Full‐Time Equivalent Employees – FTE) Comparison by Department (2 of 2)
See Budget by Department (3‐1) for details.
2018 2019 2019 2020 2020 2021 2022 Change Change
Department Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Human Resources/Risk Management
Admin/Civil Svc Commission 7.00 8.00 8.00 8.00 8.00 7.70 7.70 ‐0.30 0.00
Risk Management 3.25 3.25 3.25 3.25 3.25 2.75 2.75 ‐0.50 0.00
Benefits 1.75 1.75 1.75 1.75 1.75 2.55 2.55 0.80 0.00
Total Regular FTE 12.00 13.00 13.00 13.00 13.00 13.00 13.00 0.00 0.00
Public Works
Administration 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.00 0.00
Maintenance Services 88.00 92.00 92.00 92.00 92.00 92.00 92.00 0.00 0.00
Transportation Services 28.50 30.50 31.00 30.50 31.00 31.00 31.00 0.50 0.00
Utility Systems 27.50 28.50 28.50 28.50 28.50 28.50 28.50 0.00 0.00
Airport 9.00 9.00 9.00 9.00 9.00 9.00 9.00 0.00 0.00
Total Regular FTE 155.00 162.00 162.50 162.00 162.50 162.50 162.50 0.50 0.00
Police
Administration 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0.00 0.00
Patrol Operations 67.00 67.00 67.00 67.00 67.00 67.00 67.00 0.00 0.00
Special Operations 22.00 22.00 22.00 22.00 20.00 20.00 20.00 ‐2.00 0.00
Patrol Services 14.50 15.00 15.00 16.00 16.00 16.00 16.00 0.00 0.00
Investigations 22.00 22.00 22.00 22.00 24.00 24.00 24.00 2.00 0.00
Administrative Services 16.00 16.00 16.00 15.00 15.00 15.00 15.00 0.00 0.00
Staff Services 16.40 17.40 17.40 17.40 17.40 17.40 17.40 0.00 0.00
Total Regular FTE 161.90 163.40 163.40 163.40 163.40 163.40 163.40 0.00 0.00
Total All Staffing (Regular FTE) 571.41 591.53 597.53 593.53 616.53 614.03 614.03 20.51 0.00
2021/2022 Preliminary Budget City of Renton, Washington
1 - 22Executive Summary - Budget at a Glance
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
Citywide Revenues and Sources
2018 2019 2020 2019 2020 2021 2022 2021‐22 vs. 2019‐20 Adp
Citywide Revenue & Resources Actual Adopted Adopted Actual Yr End Est Proposed Proposed $ %
Revenue:
Property Tax 19,463,461$ 20,885,254$ 21,280,959$ 20,978,323$ 21,280,959$ 21,494,697$ 21,709,653$ 1,038,137 2.4%
Sales Tax 33,653,313 30,770,813 31,848,434 32,458,666 27,648,434 28,648,434 31,139,645 (2,831,168) ‐4.7%
Utility Taxes 16,405,034 16,282,153 16,442,011 15,601,647 14,792,011 15,100,639 15,815,967 (1,807,559) ‐5.8%
B&O Tax 10,689,216 8,000,000 8,280,000 11,078,932 4,500,000 6,500,000 9,500,000 (280,000) ‐1.8%
Real Estate Excise Tax 7,815,124 4,000,000 4,000,000 6,737,711 4,000,000 4,500,000 4,600,000 1,100,000 12.1%
Other Taxes 4,821,661 4,027,174 4,035,174 4,864,526 2,953,666 3,468,666 4,532,519 (61,163) ‐0.8%
Sub‐total ‐ Taxes 92,847,809 83,965,394 85,886,578 91,719,804 75,175,070 79,712,436 87,297,784 (2,841,753) ‐1.7%
Business License Fee 1,032,670 681,455 1,033,780 1,098,584 918,780 918,780 927,968 131,513 7.1%
Licenses & Permits 111,940 265,674 265,674 123,250 140,674 140,674 140,674 (250,000) ‐88.9%
State Shared Revenue 4,469,681 4,563,592 4,610,277 4,363,063 5,624,226 4,627,277 4,632,277 85,685 0.9%
Development Services 5,270,109 5,333,776 5,334,427 5,192,753 3,946,427 3,676,588 4,642,706 (2,348,909) ‐28.2%
Utility Service Charges 74,493,084 77,731,991 78,723,031 76,597,631 78,723,031 79,813,861 82,300,125 5,658,964 3.5%
Other Charges for Services 4,254,140 4,380,039 3,815,900 4,318,381 2,480,690 3,224,372 3,303,652 (1,667,915) ‐25.6%
Fines and Forfeits 7,947,995 7,759,216 5,935,387 8,647,104 4,975,587 5,543,507 5,751,054 (2,400,042) ‐21.2%
Interest Earnings 10,284,241 6,609,451 6,570,171 9,985,113 6,185,370 6,028,409 6,753,329 (397,884) ‐3.1%
Miscellaneous Revenue 2,028,525 3,838,945 2,784,540 1,729,718 4,458,470 298,722 298,722 (6,026,041) ‐1008.6%
Subtotal Operating Revenue 202,740,193 195,129,533 194,959,765 203,775,401 182,628,325 183,984,626 196,048,291 (10,056,382) ‐2.6%
Other 1x Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ N/A
Intergovernmental Grants 7,173,760 16,132,300 13,647,065 5,734,268 35,842,159 500,564 434,677 (28,844,124) ‐3084.1%
Mitigation Fees/Capital Contri.6,768,844 1,368,500 1,783,975 4,316,689 1,868,861 1,168,500 1,168,500 (815,475) ‐34.9%
Bond/Loan/Capital Proceeds 175,000 175,000 175,000 23,613,852 175,000 ‐ ‐ (350,000) #DIV/0!
Subtotal Capital Sources 14,117,604 17,675,800 15,606,040 33,664,809 37,886,020 1,669,064 1,603,177 (30,009,599) ‐917.1%
Interfund Services 35,128,056 35,985,368 40,324,415 37,746,120 36,156,653 44,482,295 45,899,929 14,072,441 15.6%
Interfund Transfers 4,344,005 8,882,576 6,373,170 39,159,223 40,044,413 11,772,387 8,719,459 5,236,100 25.6%
Subtotal Interfund Transactions 39,472,061 44,867,944 46,697,585 76,905,343 76,201,066 56,254,682 54,619,388 19,308,541 17.4%
Total Rev/Other Svcs 256,329,858$ 257,673,277$ 257,263,390$ 314,345,553$ 296,715,411$ 241,908,372$ 252,270,855$ (20,757,440) ‐4.2%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 23Executive Summary - Long Range Plan
OVERVIEW CITY OF RENTON 2021‐2022 BIENNIAL BUDGET
Citywide Expenditures & Uses
by Department
2018 2019 2020 2019 2020 2021 2022 2021‐22 vs. 2019‐20 Adp
Citywide Expenditure & Uses Actual Adopted Adopted Actual Yr End Est Proposed Proposed $ %
Legislative 377,512$ 414,410$ 429,907$ 359,238$ 420,924$ 512,544$ 526,945$ 195,173 18.8%
Court 2,221,909 2,646,159 2,750,176 2,385,767 2,706,695 3,102,930 3,215,462 922,056 14.6%
Executive*4,041,124 4,146,897 4,262,890 4,583,261 5,082,290 4,977,882 5,039,971 1,608,065 16.1%
Administrative Services 11,064,929 11,778,561 12,130,423 11,163,987 13,324,625 12,688,572 13,015,899 1,795,487 7.0%
City Attorney 2,216,692 2,393,230 2,503,762 2,349,370 2,421,421 2,611,347 2,700,512 414,868 7.8%
Community & Eco Development 8,292,882 9,703,958 10,341,490 8,830,870 12,731,142 10,808,262 11,186,070 1,948,884 8.9%
Community Services 31,161,774 30,531,759 29,712,123 35,551,307 53,550,719 30,535,030 30,221,141 512,289 0.8%
Police 38,525,178 40,278,922 42,849,585 41,523,529 42,589,454 42,530,483 43,642,136 3,044,113 3.5%
Public Works 99,155,836 126,210,634 119,997,176 106,245,837 212,943,243 97,620,437 109,916,775 (38,670,598) ‐18.6%
Human Resource Risk Management 15,937,907 17,436,117 18,507,795 15,066,158 18,608,294 18,877,237 20,133,146 3,066,471 7.9%
Other City Services**8,702,840 10,378,849 10,394,115 9,829,146 9,758,065 12,958,012 10,144,791 2,329,839 10.1%
Total Operating Expenditures 221,698,581 255,919,495 253,879,443 237,888,471 374,136,872 237,222,737 249,742,847 (22,833,353) ‐4.7%
Subtotal Uses 221,698,581 255,919,495 253,879,443 237,888,471 374,136,872 237,222,737 249,742,847 (22,833,353) ‐4.7%
Inter‐Fund Transfers/Loans (various)4,344,005 8,882,576 6,373,170 39,159,222 40,044,413 11,772,387 8,719,459 5,236,100 25.6%
Total Exp/Other Uses 226,042,586 264,802,071 260,252,613$ 277,047,693$ 414,181,285$ 248,995,124$ 258,462,306$ (17,597,253) ‐3.5%
In(De)crease in Fund Balance 30,287,272 (7,128,793) (2,989,223) 37,297,859 (117,465,874) (7,086,753) (6,191,451)
Beginning FB 201,313,616 127,655,169 120,526,876 231,600,888 268,898,747 151,432,873 144,346,120
Ending FB 231,600,888 120,526,376 117,537,653 268,898,747 151,432,873 144,346,120 138,154,670
*Emergency Management is reported under Executive effective July 2016
** Debt Service is reported under Other City Services
2021/2022 Preliminary Budget City of Renton, Washington
1 - 24Executive Summary - Long Range Plan
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
Citywide Expenditures & Uses by Line Item
2018 2019 2020 2019 2020 2021 2022 2021‐22 vs. 2019‐20 Adp
Citywide Actual Adopted Adopted Actual Yr End Est Proposed Proposed $ %
Expenditure by Line item
Wages 49,152,270$ 53,305,376$ 56,114,303$ 51,846,610$ 56,386,715$ 58,636,958$ 60,504,765$ 9,722,044 8.9%
Overtime 2,931,108 1,580,515 1,580,915 3,001,168 2,028,083 2,172,115 2,172,515 1,183,200 37.4%
Retirement 5,435,636 5,883,860 6,161,159 5,745,397 6,056,105 7,627,125 7,913,773 3,495,878 29.0%
Social Security 3,753,143 3,986,417 4,164,911 3,990,694 4,083,745 4,389,299 4,505,050 743,022 9.1%
Medical 9,394,072 11,311,149 12,348,716 10,154,770 12,133,666 13,443,330 14,653,262 4,436,727 18.8%
LEOFF Medical 2,591,684 2,591,684 2,591,684 2,591,684 1,591,684 2,591,684 2,591,684 ‐ 0.0%
Payroll Taxes 1,596,924 2,169,539 2,217,582 1,763,857 2,184,605 2,301,287 2,348,761 262,927 6.0%
Intermittent Pay / Benefit 2,627,314 2,481,087 2,486,045 2,710,737 553,190 1,881,262 1,882,826 (1,203,044) ‐24.2%
Total Personnel Costs 77,482,151 83,309,626 87,665,315 81,804,918 85,017,793 93,043,059 96,572,636 18,640,753 10.9%
Materials/Supplies & Small Eq 5,606,008 5,895,926 5,752,067 6,077,696 7,535,662 5,594,328 5,593,217 (460,448) ‐4.0%
Services 53,446,660 52,882,394 52,624,088 72,007,007 76,034,693 75,645,045 76,673,176 46,811,740 44.4%
Intergovernmental 16,706,564 17,005,234 17,424,972 ‐ 1,423,152 ‐ ‐ (34,430,206) ‐100.0%
Debt Service 9,425,122 10,595,498 10,595,767 10,859,832 10,959,717 10,773,594 7,929,644 (2,488,027) ‐11.7%
Interfund‐IDC & Services 3,609,388 4,014,281 4,182,109 3,998,455 4,570,883 4,373,267 4,499,582 676,459 8.3%
IS‐IT 4,579,533 4,952,889 5,766,490 4,968,389 5,371,015 6,435,900 6,578,379 2,294,900 21.4%
IS‐Communication 1,101,300 1,104,816 1,133,441 1,104,816 499,428 1,154,732 1,186,600 103,075 4.6%
IS‐ER M&O 2,318,681 2,434,146 3,080,531 2,508,322 2,963,270 2,890,489 2,940,243 316,055 5.7%
IS‐ER RR 1,932,253 2,821,580 2,594,285 2,536,580 604,778 3,502,287 3,263,371 1,349,793 24.9%
IS‐Insurance 1,729,676 1,688,665 1,717,565 1,688,665 1,698,109 1,740,148 1,767,616 101,534 3.0%
IS‐Facilities 4,104,771 4,424,369 5,318,506 4,402,269 4,149,775 5,992,730 6,179,470 2,429,325 24.9%
IS‐EE Medical 11,604,389 12,811,989 13,708,707 10,886,977 13,924,707 13,924,752 15,056,476 2,460,532 9.3%
Transfer out (capital/Reserves)4,344,005 8,882,576 6,373,170 39,159,217 40,044,413 11,772,387 8,719,459 5,236,100 34.3%
Subtotal Non‐Personnel Cost 120,508,350 129,514,364 130,271,697 160,198,226 169,779,602 143,799,658 140,387,234 24,400,831 9.4%
Exp Before Capital 197,990,500 212,823,990 217,937,013 242,003,144 254,797,395 236,842,717 236,959,869 43,041,584 10.0%
Capital 28,052,085 51,978,081 42,315,600 35,044,550 159,383,890 12,152,407 21,502,437 (60,638,837) ‐64.3%
Exp Before Interfund 28,052,085 51,978,081 42,315,600 35,044,550 159,383,890 12,152,407 21,502,437 (60,638,837) ‐64.3%
Grand Total 226,042,586$ 264,802,071$ 260,252,613$ 277,047,693$ 414,181,285$ 248,995,124$ 258,462,306$ (17,597,253)$ ‐3.4%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 25Executive Summary - Long Range Plan
OVERVIEW CITY OF RENTON 2021‐2022 BIENNIAL BUDGET
General Fund Revenues and Sources
*Note: An additional property tax of $1.1 million was levied in 2019 to fund the annual debt service for bonds issued for a $14.5 million in Parks Major
Maintenance LTGO bonds.
Property
Tax
18%
Sales Tax
31%
Utility
Tax
16%
B & O
Taxes
8%
Other
Taxes
2%
Intergovt
3%
Dev. Svs
5%
Svc Chrgs
4%
Court
Fines
4%
Interfund
5%
Misc.
4%
2019‐20 General Fund Revenue &
Sources $200.7 million
2018 2019 2020 2019 2020 2021 2022 2021‐22 vs. 2019‐20 Adp
General Government Actual Adopted Adopted Actual Yr End Est Proposed Proposed $ %
Revenue:
Property Tax 17,838,993$ 17,392,662$ 17,429,367$ 20,978,323$ 21,280,959$ 21,494,697$ 21,709,653$ 8,382,321 25.6%
Sales Tax 33,139,208 30,570,813 31,648,434 31,927,080 26,948,434 28,448,434 30,939,645 (2,831,168) ‐4.5%
Utility Taxes 16,365,034 16,242,153 16,402,011 15,561,647 14,792,011 15,100,639 15,815,967 (1,727,559) ‐5.6%
Business & Occupation Tax 10,689,216 8,000,000 8,280,000 11,078,932 4,500,000 6,500,000 9,500,000 (280,000) ‐2.0%
Less: Transfer to CIP (1,379,314) (2,000,000) (2,040,000) ‐ ‐ ‐ ‐ 4,040,000 ‐104.8%
Real Estate Excise Tax 7,815,124 4,000,000 4,000,000 6,737,711 4,000,000 ‐ ‐ (8,000,000) ‐90.5%
Less: Transfer to CIP (7,815,124) (4,000,000) (4,000,000) ‐ (4,000,000) ‐ ‐ 8,000,000 ‐90.5%
Other Taxes 4,754,853 3,955,500 3,963,500 4,779,349 2,895,992 3,410,992 4,474,845 (33,163) ‐0.4%
Subtotal Taxes 81,407,990 74,161,128 75,683,312 91,063,040 70,417,396 74,954,762 82,440,110 7,550,431 5.2%
Business License (GF portion)676,041 681,455 1,033,780 1,098,584 918,780 918,780 927,968 131,513 9.8%
Building Permit/Development Services 4,682,058 5,223,637 5,223,637 4,598,496 3,460,637 3,460,637 4,426,190 (2,560,447) ‐22.9%
Other Lic. and Permits 93,050 108,174 108,174 82,935 94,174 94,174 94,174 (28,000) ‐13.0%
InterGov 3,853,293 3,295,735 3,332,420 4,355,024 4,242,381 4,507,277 4,507,277 2,386,399 33.1%
Other Charges for Svcs 4,568,702 4,204,600 4,233,861 4,850,245 2,360,828 3,079,638 4,034,696 (1,324,127) ‐16.6%
InterFund Service Charge 3,900,407 4,431,371 4,599,200 4,194,724 4,987,974 4,789,667 4,918,634 677,730 7.9%
Court Fines 4,273,192 4,259,187 4,259,187 4,688,980 3,232,187 3,829,782 3,829,782 (858,810) ‐15.0%
Miscellaneous Revenue 1,946,451 1,132,122 1,127,122 1,969,278 1,237,870 1,132,122 1,132,122 5,000 0.2%
General Fund Operating Rev 105,401,185 97,497,409 99,600,693 116,901,306 90,952,226 96,766,839 106,310,953 5,979,689 3.1%
Transfer 9,167 ‐ ‐ 12,226,453 13,606,386 ‐ ‐ ‐ N/A
Capital and Other Grants ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ N/A
1X Revenue 375,866 1,815,120 1,834,502 1,826,735 10,208,733 ‐ ‐ (3,649,622) ‐468.1%
Subtotal Other Sources 385,033 1,815,120 1,834,502 14,053,188 23,815,119 ‐ ‐ (3,649,622) ‐468.1%
Total Rev/Other Svcs 105,786,218 99,312,529 101,435,195 130,954,493 114,767,345 96,766,839 106,310,953 2,330,067 1.2%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 26Executive Summary - Long Range Plan
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
General Fund Expenditures by Department and Change in Fund Balance
2018 2019 2020 2019 2020 2021 2022 2021‐22 vs. 2019‐20 Adp
General Government Actual Adopted Adopted Actual Yr End Est Proposed Proposed $ %
Expenditures by Dept:
Legislative 377,512$ 414,410$ 429,907$ 359,238$ 420,924$ 512,544$ 526,945$ 195,173 26.2%
Executive*2,010,913 2,302,698 2,309,263 2,532,776 2,562,066 2,945,767 2,952,372 1,286,178 32.4%
Court Services 2,222,633$ 2,646,159$ 2,750,176$ 2,406,014$ 2,706,695$ 3,102,930$ 3,215,462$ 922,056 20.6%
City Attorney 2,216,692 2,393,230 2,503,762 2,353,520 2,421,421 2,611,347 2,700,512 414,868 9.4%
Community & Economic Devl.8,151,701 9,327,234 9,964,766 8,380,740 11,240,359 10,808,262 11,186,070 2,702,332 15.4%
Administrative Services 4,702,202 4,932,881 5,234,532 4,614,165 4,884,924 5,402,784 5,583,700 819,072 9.1%
Human Resources 1,268,733 1,506,283 1,626,606 1,438,605 1,530,267 1,656,832 1,703,366 227,309 8.5%
Police 37,793,319 40,229,463 42,849,585 41,345,053 42,598,484 42,530,483 43,642,136 3,093,572 4.3%
Fire & ES*590,655 645,858 726,748 564,098 729,951 781,615 805,202 214,210 17.9%
Public Works 11,645,555 12,143,885 12,969,759 12,612,311 12,383,390 13,716,809 14,039,956 2,643,121 11.4%
Community Services 15,610,341 15,917,978 16,840,681 15,831,033 15,256,245 18,346,426 18,769,206 4,356,973 13.7%
Other City Services**3,064,656 3,335,181 3,338,179 25,560,746 19,993,322 5,133,270 5,131,148 3,591,058 48.3%
General Fund Operating Exp 89,654,911 95,795,260 101,543,964 117,998,300 116,728,049 107,549,070 110,256,077 20,465,922 11.5%
1‐Time **3,087,548 5,429,704 3,030,743 9,477,588 7,434,573 5,192,098 3,434,823 166,474 2.6%
Grant Expenses ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ N/A
Subtotal Other Uses 3,087,548 5,429,704 3,030,743 9,477,588 7,434,573 5,192,098 3,434,823 166,474 2.6%
Total Exp/Other Uses 92,742,459 101,224,964 104,574,708 127,475,888 124,162,621 112,741,168 113,690,900 20,632,396 11.1%
In(Decrease) in FB 13,043,758 (1,912,435) (3,139,513) 3,478,606 (9,395,276) (15,974,329) (7,379,947)
Beginning Fund balance 31,534,619 30,807,162 28,895,226 44,578,377 48,056,982 38,661,706 22,687,377
Ending Fund Balance (EFB)44,578,377 28,894,727 25,755,713 48,056,982 38,661,706 22,687,377 15,307,430
EFB as % of Operating Budget 50% 30% 25% 41% 33% 21% 14%
*Emergency Management is reported under Executive effective July 2016
** Includes Debt Service
2021/2022 Preliminary Budget City of Renton, Washington
1 - 27Executive Summary - Long Range Plan
OVERVIEW CITY OF RENTON 2021‐2022 BIENNIAL BUDGET
General Fund Expenditures by Line Item
2018 2019 2020 2019 2020 2021 2022 2021‐22 vs. 2019‐20 Adp
General Fund Actual Adopted Adopted Actual Yr End Est Proposed Proposed $ %
Expenditure by Line item
Wages 35,132,243$ 38,654,827$ 40,792,785$ 37,445,824$ 41,029,824$ 42,565,430$ 43,916,110$ 7,033,929 8.9%
Overtime 2,654,648 1,351,771 1,352,171 2,687,020 1,836,568 1,943,371 1,943,771 1,183,200 43.8%
Retirement 3,741,527 3,998,127 4,195,854 3,924,943 4,134,958 5,264,192 5,461,599 2,531,811 30.9%
Social Security 2,761,392 2,882,380 3,013,913 2,928,189 2,958,868 3,183,888 3,264,697 552,291 9.4%
Medical 6,701,738 8,024,710 8,789,007 7,197,113 8,626,526 9,382,816 10,227,293 2,796,392 16.6%
LEOFF Medical 2,591,684 2,591,684 2,591,684 2,591,684 1,591,684 2,591,684 2,591,684 ‐ 0.0%
Payroll Taxes 1,017,961 1,490,230 1,529,026 1,139,751 1,507,238 1,598,533 1,641,853 221,130 7.3%
Intermittent Pay / Benefit 1,788,526 1,860,049 1,845,803 1,924,386 234,839 1,478,279 1,463,279 (764,295) ‐20.6%
Total Personnel Costs 56,389,719 60,853,779 64,110,243 59,838,911 61,920,505 68,008,193 70,510,286 13,554,458 10.8%
Materials/Supplies & Small Eq 1,514,511 1,801,905 1,748,846 1,762,852 1,590,637 1,669,177 1,668,066 (213,508) ‐6.0%
Services 9,914,970 10,525,350 10,474,860 20,021,956 22,813,345 21,429,240 21,383,038 21,812,069 103.9%
Intergovernmental 9,125,549 9,546,878 9,965,507 ‐ ‐ ‐ ‐ (19,512,385) ‐100.0%
Debt Service 175,000 175,000 175,000 175,000 175,000 ‐ ‐ (350,000) ‐100.0%
Interfund‐IDC & Services 41,353 12,342 12,342 91,476 12,342 12,342 12,342 ‐ 0.0%
IS‐IT 3,707,534 3,904,788 4,547,586 3,920,288 4,223,192 5,044,242 5,157,664 1,749,532 20.7%
IS‐Communication 900,609 875,222 899,703 875,222 403,909 926,117 954,543 105,735 6.0%
IS‐ER M&O 1,707,426 1,850,756 2,372,674 1,900,467 2,256,913 2,138,604 2,178,413 93,587 2.2%
IS‐ER RR 1,128,338 1,837,393 1,716,692 1,552,393 385,380 2,172,004 2,052,011 669,930 18.8%
IS‐Insurance 1,412,542 1,356,995 1,379,931 1,356,995 1,364,300 1,373,629 1,395,537 32,240 1.2%
IS‐Facilities 3,929,471 4,086,357 4,848,124 4,086,357 3,819,722 5,324,145 5,492,799 1,882,463 21.1%
Subtotal Non‐Personnel Cost 33,557,303 35,972,986 38,141,265 35,743,006 37,044,739 40,089,500 40,294,413 6,269,663 8.5%
Exp Before Capital 89,947,022 96,826,764 102,251,508 95,581,917 98,965,244 108,097,693 110,804,700 19,824,121 10.0%
Transfer out (capital/Reserves)2,795,437 4,398,200 2,323,200 31,893,971 25,197,377 4,643,475 2,886,200 808,275 12.0%
Early Ret./Refunding Escrow ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ N/A
Exp Before Interfund 2,795,437 4,398,200 2,323,200 31,893,971 25,197,377 4,643,475 2,886,200 808,275 12.0%
Grand Total 92,742,459$ 101,224,964$ 104,574,708$ 127,475,888$ 124,162,621$ 112,741,168$ 113,690,900$ 20,632,396$ 10.0%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 28Executive Summary - Long Range Plan
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
Change in Fund Balance
The 2021‐22 proposed budget will result in a net decrease in fund balance of $13.3 million citywide. The change
is a combination of projected loss of revenue associated with COVID‐19 pandemic, capital project funding timing
(all capital project related funds, as well as enterprise funds), planned increase in reserves for replacements
(Equipment Rental Fund), planned use of reserve contingencies (Insurance Fund) and increases to employee
benefits.
Fund
Beginning
Fund Balance
2021‐2022
Proposed
Revenue
2021‐2022
Proposed
Expenditure
2021‐2022
Change $
2021‐2022
Change %
Ending Fund
Balance
000 GENERAL 31,769,747 143,495,838 164,585,532 (21,089,694) ‐66%10,680,053
001 COMMUNITY SERVICES 3,060,626 28,904,464 31,952,604 (3,048,140) ‐100%12,486
003 STREETS 807,985 27,973,631 26,746,834 1,226,797 152%2,034,782
004 COMMUNITY DEVELOPMENT BLOCK GRANT 14,187 849,714 849,714 ‐ 0%14,187
005 MUSEUM 65,653 528,258 586,975 (58,717) ‐89%6,936
098 ECONOMIC DEVELOPMENT RESERVE 2,551,659 ‐ ‐ ‐ 0%2,551,659
108 LEASED CITY PROPERTIES 391,849 1,325,886 1,710,409 (384,523) ‐98%7,326
000 General Governmental 38,661,706 203,077,791 226,432,068 (23,354,276) ‐60% 15,307,430
110 SPECIAL HOTEL‐MOTEL TAX 677,327 400,000 ‐ 400,000 59%1,077,327
125 MUNICIPAL ART FUND 7,735 235,800 235,800 ‐ 0%7,735
127 CABLE COMMUNICATIONS DEVELOPMENT 603,760 195,348 195,348 ‐ 0%603,760
135 SPRINGBROOK WETLANDS BANK 345,658 ‐ ‐ ‐ 0%345,658
215 GENERAL GOVERNMENT MISC DEBT SVC 4,897,482 11,478,987 11,494,939 (15,952) (0) 4,881,530
303 COMMUNITY SERVICES IMPACT MITIGATION 1,027,590 173,000 316,000 (143,000) ‐14%884,590
304 FIRE IMPACT MITIGATION 2,105,750 198,000 937,621 (739,621) ‐35%1,366,129
305 TRANSPORTATION IMPACT MITIGATION 2,566,232 400,000 400,000 ‐ 0%2,566,232
308 REET 1 FUND 1,368,855 4,550,000 5,180,000 (630,000) ‐46%738,855
309 REET 2 FUND 1,451,451 4,550,000 5,998,650 (1,448,650) ‐100%2,801
316 MUNICIPAL FACILITIES CIP 1,105,075 5,165,025 5,410,395 (245,370) ‐22%859,705
317 CAPITAL IMPROVEMENT 777,424 4,400,000 1,258,250 3,141,750 404%3,919,174
336 NEW LIBRARY DEVELOPMENT 16,408 ‐ ‐ ‐ 0%16,408
346 NEW FAMILY FIRST CENTER DEVELOPMENT 7,977,453 ‐ 500,000 (500,000) ‐6%7,477,453
4x2 AIRPORT 1,462,745 6,103,534 5,922,074 181,460 ‐71% 1,644,205
403 SOLID WASTE UTILITY 2,515,860 45,750,089 45,927,557 (177,468) ‐7%2,338,392
4X4 MUNICIPAL GOLF 569,988 5,885,930 5,345,066 540,864 198% 1,110,852
4X5 WATER 7,145,207 37,079,429 32,376,995 4,702,434 101% 11,847,641
4X6 WASTEWATER 5,662,785 23,964,799 23,407,667 557,132 16% 6,219,917
416 KING COUNTY METRO 5,961,906 35,303,715 35,303,715 ‐ 0%5,961,906
4X7 SURFACE WATER 12,784,171 25,265,201 27,569,051 (2,303,850) ‐68% 10,480,321
501 EQUIPMENT RENTAL 5,636,326 12,920,389 9,328,407 3,591,982 64%9,228,308
502 INSURANCE 14,637,136 7,095,018 6,578,812 516,206 4%15,153,342
503 INFORMATION TECHNOLOGY 2,364,514 13,328,280 12,993,767 334,513 14%2,699,027
504 FACILITIES 454,366 12,180,200 12,525,378 (345,179) ‐76%109,187
505 COMMUNICATIONS 717,150 2,343,332 2,337,548 5,784 1%722,934
512 HEALTHCARE INSURANCE 5,301,437 26,044,360 26,264,262 (219,902) ‐4%5,081,535
522 LEOFF1 RETIREES HEALTHCARE 14,795,948 5,416,000 2,807,110 2,608,890 18%17,404,838
611 FIREMENS PENSION 7,833,427 675,000 410,950 264,050 3%8,097,477
All Other Funds 112,771,166 291,101,436 281,025,361 10,076,075 9% 122,847,241
TOTAL ALL FUNDS 151,432,872$ 494,179,227$ 507,457,429$ (13,278,202)$ ‐9% 138,154,670$
2021/2022 Preliminary Budget City of Renton, Washington
1 - 29Executive Summary - Long Range Plan
OVERVIEW CITY OF RENTON 2021‐2022 BIENNIAL BUDGET
Change in Fund Balance
2021/2022 Preliminary Budget City of Renton, Washington
1 - 30Executive Summary - Long Range Plan
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
General Fund Long Range Projection
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Summary ($ in Million)Actual Actual Actual Projected Projected Projected Projected Projected Projected Projected
Beginning Fund Balance 24.4$ 31.5$ 44.6$ 48.1$ 38.7$ 22.7$ 15.3$ 7.0$ (3.4)$ (15.9)$
Operating Revenue 103.8$ 105.4$ 129.1$ 104.6$ 96.8$ 106.3$ 108.0$ 109.6$ 111.3$ 113.0$
Base Operating Expenditure1 (86.3) (89.7) (118.0) (116.7) (107.5) (110.3) (116.4) (120.0) (123.8) (127.8)
Operating Surplus (Deficit) 17.5$ 15.7$ 11.1$ (12.2)$ (10.8)$ (3.9)$ (8.4)$ (10.4)$ (12.5)$ (14.8)$
1X Sources2 0.9$ 0.4$ 1.8$ 10.2$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
1X Uses3 (11.3) (3.1) (9.5) (7.4) (5.2) (3.4) ‐ ‐ ‐ ‐
Net Resources ‐ Uses 7.1$ 13.0$ 3.5$ (9.4)$ (16.0)$ (7.4)$ (8.4)$ (10.4)$ (12.5)$ (14.8)$
Ending Fund Balance 31.5$ 44.5$ 48.1$ 38.7$ 22.7$ 15.3$ 7.0$ (3.4)$ (15.9)$ (30.7)$
Ending Bal as % of Opr Budget (Target=12 36.52% 49.68% 40.73% 33.12% 21.09% 13.88% 5.97%‐2.85%‐12.87%‐24.03%
Key Revenue Assumptions:2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Sales Tax Growth4 0.3% 2.7%‐3.7%‐15.6%5.6% 8.8% 2.5% 2.5% 2.5% 2.5%
Property Tax1 ‐41.6%‐9.5%17.6% 1.4%1.0% 1.0% 2.0% 2.0% 2.0% 2.0%
B&O/Business License 2.0% 2.0%2.0% 2.0%2.0% 2.0% 2.0% 2.0% 2.0% 2.0%
Overall Operating Revenue Growth ‐11.7% 1.5% 22.5%‐19.0%‐7.5% 9.9% 1.6% 1.5% 1.5% 1.5%
Key Expenditure Assumptions:2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Wage Increase 2.5% 2.5% 3.0% 3.0% 0.0% 2.0% 3.0% 3.0% 3.0% 3.0%
Medical Cost Growth Rate 0.0% 5.0% 8.0% 8.0% 8.0% 9.0% 8.0% 8.0% 8.0% 8.0%
PERS (Pension) Contribution Rate 12.9% 12.9% 13.9% 13.9% 14.9% 14.9% 14.9% 14.9% 14.9% 14.9%
Overall Operating Expense Growth ‐17.6% 3.8% 31.6%‐1.1%‐7.9% 2.5% 5.6% 3.1% 3.2% 3.2%
1Large 2017 decrease is due to the formation of the Renton Regional Fire Authority (RRFA).
2019 and 2020 includes a $900K and $4.5M transfer respectively from Annexation Sales Tax Reserve (Fund 502).
3Includes $250k for inflationary contingency and $0 for capital contingency starting in 2019.
4 Beginning in 2018 reduced growth of overall sales tax revenue reflect the end of annexation sales tax credit starting September 2018 and overall slower growth in economy.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 31Executive Summary - Long Range Plan
OVERVIEW CITY OF RENTON 2021‐2022 BIENNIAL BUDGET
The City’s fiscal policy requires the City to prepare a long‐term projection for General Governmental and other
funds as deemed necessary. The City prepares projections for tax‐supported Governmental funds as well as rate‐
supported utility funds. The purposes are similar: to ensure operations, as well as maintaining capital assets, are
sustainable with taxes and utility rate revenues. These plans allow the City to proactively manage and implement
corrective measures over time to avoid sudden drastic changes in service levels or in revenue/tax policies.
In addition, the City’s fiscal policy requires a balanced budget, with operating costs covered by operating revenues.
While the policy does not require a balanced budget in the projected period beyond the current budget years, the
intent is to adjust current operations to a sustainable level within the projected horizon.
Approximately 77% of General Fund Revenue is from taxes, 29% from sales tax and 21% from property tax alone.
The key revenue assumptions shown in the table above reflect a projection for a healthy economy that will
generate 1.0% of new construction value per year to be added to the property tax roll over the next four years;
however, the property tax levy rate reflects a $1.10/$1,000 AV decrease in 2017 and a $0.46/$1,000 AV decrease
in the levy in 2018 due to the formation of the Regional Fire Authority (RFA). From 2019 forward, the City is
levying an additional $1.1 million in property taxes to fund the annual debt service for a parks capital
improvements LTGO bond issued in 2019. The key assumptions include a strong sales tax growth rate of 2.5%
per year and a B&O tax growth rate of 2% per year. Key expenditure growth drivers are wages, employee
healthcare costs, and state pension costs. The assumption is that wages will grow by the rate of inflation, that
employee healthcare costs will grow by the historical average used as a gauge and taking into account an actuarial
analysis and the need to maintain a minimum of 30% in reserves, and that state pension contributions will increase
from 13.9% to 14.9% over the planning period. These underlying assumptions cannot bring the overall revenue
growth to match the projected expenditure growth. This is the structural deficit that local governments are faced
with and have visited again and again, but no permanent fix is in sight. Unless the State Legislature takes action
to allow property tax to grow by inflation and population growth, this issue will persist into the future.
To solve this problem locally, the City implemented the B&O tax effective January 1, 2016, discussed more fully
below in the “B&O Tax/Business License Fee” section, which allowed General Fund revenue to grow at a rate more
similar to the projected operating expenditures.
MAJOR REVENUES
Property Tax (RCW 84.52)
Annexations and new construction have contributed to substantial growth in the City’s property tax base in the
past decade, but was eroded by the Great Recession. The City’s assessed value (AV) peaked in 2009 at $13.2 billion
when the $2 billion (or 24%) value from Benson Hill annexation was added to our tax base. The Great Recession
eroded the tax base to $10.6 billion by 2013 or by 19% during this period. The valuation improved incrementally
each year by an average of 10.6%. The City’s 2020 assessed value from the King County Assessor’s Office was
$19.9 billion. Preliminary information for the City’s 2021 assessed value was not available at the time of the
printing of this document.
While the assessed value often increases or decreases by a large percentage from year to year, the City’s property
tax revenues do not. This is due to the manner in which Washington State’s property tax collection is determined
and the limitations placed on the amount that can be raised by a governmental entity as determined by state law.
Two basic limitations are the limitation on the tax rate and the limitation on the rate of growth in property tax
revenue.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 32Executive Summary - Long Range Plan
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
1. The Tax Rate Limit:
The state constitution establishes the maximum regular property tax levy increase for all taxing districts
combined at 1%, or $10 per $1000, of assessed value of the property. This limitation is further divided by the
RCW to the various taxing districts. For cities served by library and/or fire districts, the tax rate limit is
calculated by deducting the amount levied by the library district (up to $0.50 per thousand dollars AV) and
the fire district (up to $1.50 per thousand dollars AV) from the $3.60 local portion of the levy. For cities that
have a fire pension fund, as does Renton, an additional $0.225 may be levied. Based on this calculation,
Renton’s property tax rate is limited to $3.325 per $1,000 of assessed value.
2. The 1% growth limit in property tax revenue:
Before 2002, a taxing district could increase the property tax levy amount annually by 6% of the amount levied
in the previous year, up to the applicable tax rate limit discussed above. This growth limit was established in
1973 as the Legislature responded to people's concerns that property taxes were rising too fast due to the
real estate boom occurring at that time.
Initiative 747, approved by voters in 2001 and taking effect in 2002, lowered the limit to the lesser of 1% or
inflation. Property tax growth resulting from new construction, changes in value of state‐assessed utility
property, and newly annexed property are exempt from this limit and may be added to the base tax levy. This
growth limit can be "lifted" by voters with a simple majority approval, and the amount can be added to the
levy base permanently for future years if the intent is clearly stated in the ballot measure.
Distribution of Property Tax
Most properties in Renton pay $11.08 per $1000 AV in
2020, of which 10% goes to City services. The
remaining 90% goes to the Renton Regional Fire
Authority (7%), Sound Transit (2%), Renton School
District (32%), King County (12%) for regional services,
the State School fund (27%), King County Library
System (3%), Valley Medical (4%), Port of Seattle (1%),
and Emergency Medical Services (2%). The City’s
portion of property tax is $489 in 2020 on an average
home.
Past and Projected Property Tax Revenue
Year
Assessed
Value
(millions) % change
Property Tax
Revenue
%
change
2017 Actual 15,035$ 8.8% 19,714,626$ ‐41.6%
2018 Actual 16,831$ 11.9% 17,838,993$ ‐9.5%
2019 Actual 19,061$ 13.2% 20,978,323$ 17.6%
2020 Actual 19,919$ 4.5% 21,280,959$ 1.4%
2021 Prop. 20,517$ 3.0% 21,494,697$ 1.0%
2022 Prop.21,132$ 3.0% 21,709,653$ 1.0%
2023 Proj.21,766$ 3.0% 22,143,846$ 2.0%
2024 Proj.22,419$ 3.0% 22,586,723$ 2.0%
2025 Proj.23,092$ 3.0% 23,038,457$ 2.0%
2026 Proj.23,784$ 3.0%23,499,227$ 2.0%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 33Executive Summary - Long Range Plan
OVERVIEW CITY OF RENTON 2021‐2022 BIENNIAL BUDGET
Sales Tax (RCW 82.14)
Sales tax is the second largest taxing source for
Renton representing approximately 29% of
General Fund revenue. Renton’s economy
generates approximately $282 million in sales
taxes, but similar to property tax, the City only
receives approximately 10% of the sales tax
revenue generated within Renton. The remaining
90% goes to other government entities and to
support public transit and public facility agencies.
In addition to the local sales tax, the City also
receives a distribution of a voter‐approved
criminal justice sales tax. Up until mid‐2018, the
City also received a 0.1% annexation sales tax for the
annexation of the Benson Hill area in 2008.
The sales tax receipts starting in 2020 were lower due to
closures due to the impact of the COVID‐19 pandemic, but
are expect to rebound starting in 2021.
Criminal Justice Sales Tax (RCW 82.14.340)
Criminal justice sales tax is a 0.1% voter‐approved optional
sales tax in King County, collected countywide and
distributed based on population. Because it employs a
more diverse tax base and different distribution formula
than regular sales taxes, this source is typically more stable
and is projected to grow by the inflationary growth plus
population growth.
Composition and Projected Growth
The current year composition of the City’s sales tax is
relatively diverse with general retail representing the
largest portion at 30%, followed by service industry at
26%, automotive at 17%, construction at 12%,
wholesaling at 7% and manufacturing and
miscellaneous at 6% and 2%, respectively. This is
relatively consistent with historical average with the
exception of services and contracting sectors.
Like many other cities in the state, Renton’s sales tax was one
of the hardest hit revenue sources by the Great Recession with
an overall peak‐to‐through reduction of 18% and a revenue
loss of $3.8 million, and took six years after the recession
State
64%
City
10%Sound
Transit
14%
KC Transit
9%
KC General
2%
Criminal
Justice
1%
Sales Tax Distribution
Sector
Average
2012‐2019
2020
Projected Difference
Retail 29.8% 30.5% 0.7%
Manuf.6.9% 5.9%‐1.0%
Services 22.7% 25.6% 2.9%
Construction 14.0% 11.6%‐2.4%
Wholesale 5.6% 6.7% 1.1%
Auto 18.5% 17.4%‐1.1%
Misc.2.6% 2.4%‐0.2%
Total 100.0% 100.0%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 34Executive Summary - Long Range Plan
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
ended in 2014 for the sales tax revenue to exceed the peak reached in 2008. As noted above, sales tax was hard
hit again in 2020 as a result of closures due to COVID‐19 pandemic.
The projection of future sales tax growth is based on inflation and population growth. The slower and negative
growth in 2019 reflects the end of the distribution of annexation sales tax credit (mid‐2018). In 2020 the sales
tax has decreased significantly due to the COVID ‐19 pandemic. Many businesses were operating at a lower
capacity during this time. The projection for 2021‐2022 is to show a slow rebound from the impacts of the
pandemic.
Utility Taxes (RCW 82.16)
Cities and towns in Washington State
are authorized to levy a tax on the
gross income derived from sales of
utility services generated within the
city or town; this is known as a utility
tax. The tax rate for electric, phone,
and gas utilities are limited to 6%
without voter approval, with no
limitation on other public utilities.
The City currently levies a 6% utility
tax on phone (both landline and
cellular services), electric, natural gas,
and cable services. City utilities
(water, sewer, storm drainage, and solid waste), pay an interfund utility tax. The current tax rates are 6% for
sewer and 6.8% for water, storm drainage, and garbage (both City operated and franchise provider operated)
services. The additional 0.8% was added during the 2013‐14 budget to generate additional revenue for general
governmental capital projects.
Projections in revenues over the next few years anticipate a slight decrease due to the COVID‐19 pandemic.
The tax revenues are sensitive to overall consumer consumption levels, weather conditions and the general
overall economic conditions. The projections for future years anticipate these revenues will stabilize by 2022
and are projected to grow by population plus inflation.
Year Electric Natural Gas
Brokered
NG
City
Utilities Cable TV Phone Cell Phone
Non‐City
Garbage Total % Change
2017 Actual 5,721,366 1,630,375 180,456 4,840,530 1,651,405 866,519 1,481,298 627,254 16,999,203 6.9%
2018 Actual 5,592,795 1,446,693 141,408 4,925,046 1,525,625 830,975 1,159,489 743,003 16,365,034 ‐3.7%
2019 Actual 5,125,961 1,324,323 224,519 4,976,990 1,457,008 858,927 797,541 796,379 15,561,647 ‐4.9%
2020 Est 4,342,500 1,307,000 230,900 5,067,500 1,535,524 858,041 667,146 783,400 14,792,011 ‐4.9%
2021 Prop. 4,999,175 1,223,009 230,900 5,050,477 1,436,847 802,901 624,273 733,057 15,100,639 2.1%
2022 Prop. 5,574,163 1,229,124 232,055 5,199,416 1,451,215 762,756 630,516 736,722 15,815,967 4.7%
2023 Proj. 5,657,775 1,235,270 233,215 5,277,407 1,465,727 724,618 636,821 740,406 15,971,239 1.0%
2024 Proj. 5,742,642 1,241,446 234,381 5,356,568 1,480,384 688,387 643,189 744,108 16,131,106 1.0%
2025 Proj. 5,828,782 1,247,653 235,553 5,436,917 1,495,188 653,968 649,621 747,828 16,295,510 1.0%
2026 Proj. 5,916,213 1,253,891 236,731 5,518,470 1,510,140 621,270 656,117 751,567 16,464,401 1.0%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 35Executive Summary - Long Range Plan
OVERVIEW CITY OF RENTON 2021‐2022 BIENNIAL BUDGET
B&O Tax and Business License Fee
The City of Renton first
implemented a per employee
based business license fee in 1998
with the rate set at $55 per full‐time
equivalent employee in response to
transportation infrastructure needs
in Renton. Non‐profit and
government organizations are
required to obtain a license but are
exempt from paying this fee. The
$55 per employee rate was
adjusted in 2013 to create a 1) a base fee registration fee of $45; and 2) an increase from $55 per FTE to $65 per
FTE (FTE is defined as each 1,920 worker hours). The 2015 fee increase generated approximately an additional
$625k annually, which is dedicated to Capital Projects. Effective January 1st, 2018, the City repealed the Per
Employee Business License Fee (while concurrently decreasing the threshold for B&O tax from $1.5 million to
$500,000). All businesses are required to pay a business license registration fee at the time of application of $150.
B&O Tax
The proposed budget includes the B&O tax implemented on January 1, 2016. The B&O tax is based on gross
receipts of a business. The key provisions of the B&O tax are:
Businesses with $500,000 or higher annual gross receipts are required to pay B&O tax.
The B&O tax maximum amount paid is capped at $4,723,140 a year (2020) and will automatically be
adjusted annually by inflation.
The tax rate is 0.085% (maximum allowed is 0.2%; statewide average is 0.15%) for all business activities
other than retail, which has a rate of 0.05%; these rates cannot be adjusted by more than the rate of
inflation in any given year.
Provides a three‐year, new employer tax credit for new businesses with 50 or more employees in Renton.
The B&O tax was the only revenue option that City Council could take which generated the funds needed to
maintain general City services. It will provided $3.8 million in additional revenue (net of per employee business
license fee loss) in 2016 and increased to $11 million in 2019. The 2020 year end estimate is projected to
decrease significantly and is estimated to be $4.5 million. The decrease is due to the fact that many local
businesses were impacted by the COVID‐19 pandemic, as well as the grounding of the 737Max which has halted
production at the local Boeing plant in Renton. As businesses begin to open back up, the B&O tax is projected to
rebound slowly over the next 2 years. Most of the B&O tax is needed for the General Fund operations. Without
this funding source, the City would need to reduce services from General Fund operations, which would result in
significantly reducing services to the community. The B&O tax and business licenses fees are also used to
partially pay for transportation and general governmental capital improvements.
Year Business License B&O Tax Total Revenue % change General Fund Transp. CIP
Gen Gov
CIP
Total
Allocated
2017 Actual 857,535 9,633,034 10,490,568 56.6% 8,016,594 2,088,770 1,000,000 11,105,364
2018 Actual 676,041 10,689,216 11,365,257 8.3% 9,985,943 1,735,943 ‐ 11,721,886
2019 Actual 1,098,584 11,078,932 12,177,516 7.1% 12,177,516 2,000,000 ‐ 14,177,516
2020 Est 918,780 4,500,000 5,418,780 ‐55.5% 5,418,780 2,040,000 ‐ 7,458,780
2021 Prop. 918,780 6,500,000 7,418,780 36.9% 7,418,780 500,000 500,000 8,418,780
2022 Prop. 927,968 9,500,000 10,427,968 40.6% 10,427,968 500,000 500,000 11,427,968
2023 Proj. 937,248 9,690,000 10,627,248 1.9% 10,627,248 ‐ ‐ 10,627,248
2024 Proj. 946,620 9,883,800 10,830,420 1.9% 10,830,420 ‐ ‐ 10,830,420
2025 Proj. 956,086 10,081,476 11,037,562 1.9% 11,037,562 ‐ ‐ 11,037,562
2026 Proj. 965,647 10,283,106 11,248,753 1.9% 11,248,753 ‐ ‐ 11,248,753
2021/2022 Preliminary Budget City of Renton, Washington
1 - 36Executive Summary - Long Range Plan
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
Real Estate Excise Tax (REET)
The State of Washington levies a real estate excise tax (REET) on all sales of
real estate (measured by the full selling price, including the amount of any
liens, mortgages, and other debts given to secure the purchase) at a rate of
1.28%. Local governments are also authorized to impose REET. All cities
and counties may levy a quarter percent tax (described as "the first quarter
percent of the real estate excise tax" or "REET 1"). Cities and counties
planning under the Growth Management Act (GMA) have the authority to
levy a second quarter percent tax (“REET 2”). The statute further specifies
that, if a county is required to plan under GMA or if a city is located in such
a county, the tax may be levied by a vote of the legislative body. If,
however, the county chooses to plan under GMA, the tax must be approved
by a majority of the voters.
REET 1 (RCW 82.46.010):
Initially authorized in 1982, cities and counties can use the receipts of REET 1 for all capital purposes. An
amendment in 1992 states that cities and counties with a population of 5,000 or more planning under the GMA
must spend REET 1 receipts solely on capital projects that are listed in the capital facilities plan element of their
comprehensive plan. Capital projects are: “public works projects of a local government for planning, acquisition,
construction, reconstruction, repair, replacement, rehabilitation, or improvement of streets; roads; highways;
sidewalks; street and road lighting systems; traffic signals; bridges; domestic water systems; storm and sanitary
sewer systems; parks; recreational facilities; law enforcement facilities; fire protection facilities; trails; libraries;
administrative and judicial facilities.” Receipts pledged to debt retirement prior to April 1992 and/or spent prior
to June 1992 are grandfathered from this restriction.
REET 2 (RCW 82.46.035):
The second quarter percent of the real estate excise tax (authorized in 1990) provides funding for cities and
counties to finance capital improvements required to occur concurrently with growth under the Growth
Management Act. An amendment in 1992 defines the "capital project" as: "Public works projects of a local
government for planning, acquisition, construction, reconstruction, repair, replacement, rehabilitation, or
improvement of streets, roads, highways, sidewalks, street and road lighting systems, traffic signals, bridges,
domestic water systems, storm and sanitary sewer systems, and planning, construction, reconstruction, repair,
rehabilitation, or improvement of parks.” Because of this amendment, acquisition of park land was no longer a
permitted use of REET 2 after March 1, 1992.
Another amendment was made in 2011 to allow cities using REET for maintenance purpose for a period of 3 years
as a way to assist cities to cope with general revenue losses due to the Great Recession.
Year
REET
Revenue % change
2017 Actual 7,211,736 17.8%
2018 Actual 4,420,000 ‐38.7%
2019 Actual 6,737,711 52.4%
2020 Est. 4,000,000 ‐40.6%
2021 Prop. 4,500,000 12.5%
2022 Prop. 4,600,000 2.2%
2023 Proj. 4,600,000 0.0%
2024 Proj. 4,600,000 0.0%
2025 Proj. 4,600,000 0.0%
2026 Proj. 4,600,000 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 37Executive Summary - Long Range Plan
OVERVIEW CITY OF RENTON 2021‐2022 BIENNIAL BUDGET
Trend and Projection
The combined two quarter‐percent of the REET
is expected to generate $4.5 million and $4.6
million for 2021 and 2022 respectively. This is
consistent with past amounts with the
exception of 2016, 2017, and 2019 when
several large transactions increased REET
revenue. REET revenue is used for the General
Governmental Debt Service Fund (215),
Transportation CIP Fund (317) and General
Governmental CIP Fund (316).
Gambling Excise Tax (RCW 9.46.110 & 9.46.113)
The City levies gambling taxes as follows:
5% on net receipts for bingo and raffles
2% for amusement games
5% on net receipts for for‐profit
punchboards and pull‐tabs
10% on gross receipts for card rooms
All rates are the maximum authorized by state
statute, except for the card rooms, which has a
maximum rate of 20%. The State Legislature began
allowing the operation of "enhanced card rooms" or
mini‐casinos on non‐tribal land on a pilot basis in 1997 and on a permanent basis in the spring of 2000. This
activity provided a significant revenue source for Renton, which generates about 80% of the City’s gambling taxes.
The remaining 21% are made up of pull‐tabs and bingo.
Revenues from these activities are required to be used primarily for the purpose
of gambling enforcement (RCW 9.46.113). Case law has clarified that
"primarily" means "first be used" for gambling law enforcement purposes to the
extent necessary for that city. The remaining funds may be used for any general
government purpose. The City designates Gambling Tax revenue as a law
enforcement resource.
Gambling revenues remained relatively stable for many years until 2010 when
two gambling establishments went out of business. The City’s 2013 revenue took another hit as one of the
remaining card rooms had financial problems and went into bankruptcy protection in early 2014. A buyer acquired
the business and gambling tax revenue reached $1.6 million in 2014, and stabilized at approximately $2.8 million
thereafter. Gambling revenues are expected to decrease significantly in 2020 due to the gambling establishments
forced to close during the pandemic. This tax is expected to stabilize at $2.0 million and $2.4 million for the
planning period.
The City’s current gambling tax also exempts raffles and bingos held by non‐profit organizations insofar as the
revenue received is used for charitable purposes. This modification has a negligible effect on gambling tax
revenue.
Year
Gambling
Tax % change
2017 Actual 2,695,368 7.8%
2018 Actual 2,831,045 5.0%
2019 Actual 2,883,506 1.9%
2020 Est 1,385,000 ‐52.0%
2021 Prop. 1,900,000 37.2%
2022 Prop. 2,485,000 30.8%
2023 Proj. 2,485,000 0.0%
2024 Proj. 2,485,000 0.0%
2025 Proj. 2,485,000 0.0%
2026 Proj. 2,485,000 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 38Executive Summary - Long Range Plan
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
LICENSES AND PERMITS
Permit and Development Fees
Permit and development revenues were one of the most severely impacted revenues by the Great Recession. The
overall decline peak‐to‐trough is 54%. The bottom was reached in 2009 and has since seen a gradual recovery.
There was a small market rate fee adjustment in 2019. After making a significant adjustment after two decades
of no‐adjustments in 2010, the City changed its practice to maintain a more gradual, stable pattern of fee
adjustments for the future. The proposed 2021‐2022 budget project a decrease in development fees in 2020 and
2021 due to the COVID‐19 pandemic. Projections beyond the current budget reflect a rebound in revenue for
2022 and cyclical fluctuations in anticipation of potential economic changes.
Franchise Fees
Franchise fees are charges levied on private utility companies to recoup
the City’s costs for their use of City streets and other public properties.
The franchise fees on electric, natural gas, and telephone utilities are
limited by statute to the actual administrative expenses incurred by the
City directly related to receiving and approving permits, licenses, or
franchisees. Cable TV franchise fees are governed by the Federal Cable
Communications Policy Act of 1994 and are negotiated with cable
companies for an amount not to exceed 5% of gross revenues, which is
the primary source of the City’s franchise fee revenue. We are estimating
a decrease in 2020 due to the impacts of the pandemic but expect to see a gradual rebound in the next few years
with a long‐term projection of a relatively flat revenue increase.
Intergovernmental Revenues (State‐Shared Revenues)
Intergovernmental revenues include state‐shared revenues, governmental grants and miscellaneous transfers
and, up until the formation of the Regional Fire Authority in 2016, revenue from inter‐governmental service
contracts such as the Fire and Emergency Services contracts with Fire District 25 (since 1996) and Fire District 40
(since 2008). The following information is primarily intergovernmental revenues in the City’s operating funds.
There are also substantial grant revenues in the capital project funds, particularly for transportation and parks
improvement projects.
The state‐shared revenues are from taxes and fees collected by the state and disbursed to municipalities based
on population or other criteria. In the past, the primary sources of these state‐shared revenues are fuel tax (tax
Year
Building & Fire
Permits Plan Review Total % change
2017 Actual 3,464,550 1,491,294 4,955,844 ‐7%
2018 Actual 3,221,195 1,460,863 4,682,058 ‐6%
2019 Actual 3,048,398 1,550,097 4,598,496 ‐2%
2020 Est. 2,432,231 1,028,406 3,460,637 ‐25%
2021 Prop. 2,432,231 1,028,406 3,460,637 0%
2022 Prop. 2,852,973 1,573,217 4,426,190 28%
2023 Proj. 2,938,562 1,620,414 4,558,976 3%
2024 Proj. 2,938,562 1,620,414 4,558,976 0%
2025 Proj. 2,938,562 1,620,414 4,558,977 0%
2026 Proj. 2,938,562 1,620,414 4,558,978 0%
Year Franchise % change
2017 Actual 1,562,100 11.1%
2018 Actual 1,508,915 ‐3.4%
2019 Actual 1,520,143 0.7%
2020 Est. 1,231,692 ‐19.0%
2021 Prop. 1,231,692 0.0%
2022 Prop. 1,659,950 34.8%
2023 Proj. 1,668,250 0.5%
2024 Proj. 1,676,591 0.5%
2025 Proj. 1,684,974 0.5%
2026 Proj. 1,693,399 0.5%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 39Executive Summary - Long Range Plan
OVERVIEW CITY OF RENTON 2021‐2022 BIENNIAL BUDGET
on gasoline consumption), liquor sales profit, and excise tax. This resource once provided 14% of the City’s
operational funds, but has decreased to just a little over 3%, mainly due to the elimination of the Motor Vehicle
Excise Tax (MVET) and the $30 limit on vehicle license fees. The remaining intergovernmental revenues (fuel taxes,
liquor tax, liquor profits, and criminal justice) reflect consistent or slight increases since 2015.
The amount of grant revenue fluctuates greatly from year to year. The base grant amount reflects the Community
Development Block Grant (CDBG) and a couple of small public safety grants. The higher amount in 2014‐2015
timeframe reflects the SAFER and COPS grants used to restore six police and 9 firefighter positions during the
Great Recession.
Charge for Services
Charges for services include revenue
generated from services provided to the
general public (including recreation fees,
facility rental fees), certain public safety
services, as well as services provided
internally between City departments
(Interfund Services) that are not operated
through Internal Service Fund structure.
This source has been impacted by the
pandemic with an expected overall
decrease of 23% in 2020 and is expected
to rebound in 2022 to generate
approximately $9 million per year.
Parks and Recreation Fees
Overall, recreation fees are generated from recreation classes, athletic programs, leagues and field rentals, senior
activity center, community center, and aquatic center fees and rentals. In 2020 this revenue source is projected
to decrease 70% from prior years as the City was required to close its recreation centers in March due to the
pandemic. This revenue source is expected to rebound to the pre‐pandemic figures in 2022.
Year
State Shared
Revenue
Grants &
Misc.
2017 Actual 3,272,879 569,397
2018 Actual 3,352,872 309,561
2019 Actual 3,991,818 543,726
2020 Est. 3,332,420 1,053,949
2021 Prop. 4,042,420 ‐
2022 Prop. 4,042,420 ‐
2023 Proj. 4,090,306 ‐
2024 Proj. 4,138,911 ‐
2025 Proj. 4,188,245 ‐
2026 Proj. 4,238,318 ‐
2021/2022 Preliminary Budget City of Renton, Washington
1 - 40Executive Summary - Long Range Plan
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
Public Safety Services
Public Safety services revenue includes private
security, electronic home detention, passport
processing, court cost recovery and
miscellaneous services. The revenue is
projected to be $1.4 million for 2020, a
decrease of 10% from prior year as many of
these services have not been available due to
the pandemic. A rebound of these revenues
are expected over the next two years.
Interfund Services
In addition to activities accounted for in the Internal Service Funds that are fully allocated to all operating
departments, the City also has two types of interfund transactions that are intended to reimburse service costs
incurred by one fund while services are consumed by another.
1) Indirect Cost: All enterprise funds are required to reimburse the General Fund for overhead costs such as
accounting, human resources, records management, legal, and administrative expenses; and
2) Soft Capital Transfer: This is for staff time spent on capital projects for design, engineering, inspection,
project management and sometimes small project construction.
The indirect cost is determined through a cost allocation model using transaction volume, number of full‐time
employees, and size of budget as determining factors. The “soft capital” transfers are based on actual labor and
material costs incurred. The revenue is projected to be $4.7 million for 2021, slightly lower than 2020 projected.
Fines and Forfeits
Fines and forfeits account for civil and
criminal penalties as authorized by the
state and adopted by the City code and
collected through the Renton Municipal
Court.
The City implemented the Photo‐
Enforcement system at high collision
intersections and at school zones during
the fall of 2008, and 2009 revenue was
the first full year’s operation of the system. The revenue declined in 2013 and 2014 due to the temporary
suspension of enforcement in one major intersection because of road construction and the removal of one school
zone camera. In 2015, the City added a few more cameras, which resulted in a small increase in revenues. In
2018, the City added eight more cameras which resulted in an additional $1.1 million projected revenue increase.
The 2020 decrease of 30% from prior year was again from the suspension of school zone cameras with schools
closed from the COVID‐19 pandemic. These revenues are expected to rebound once schools are open to students
again.
Year
Public
Safety % change Year
Parks and
Rec % change Year
Interfund
Services
%
change
2017 Actual 1,116,882 ‐8.4% 2017 Actual 3,556,113 8.1% 2017 Actual 3,916,334 8.9%
2018 Actual 1,302,913 16.7% 2018 Actual 3,230,399 ‐9.2% 2018 Actual 3,900,407 ‐1.8%
2019 Actual 1,572,938 20.7% 2019 Actual 3,277,304 1.5% 2019 Actual 4,194,724 7.2%
2020 Est. 1,411,200 ‐10.3% 2020 Est. 949,628 ‐71.0% 2020 Est. 4,987,974 ‐18.8%
2021 Prop. 1,324,327 ‐6.2% 2021 Prop. 1,691,663 78.1% 2021 Prop. 4,789,667 6.2%
2022 Prop. 1,594,768 20.4% 2022 Prop. 2,439,928 44.2% 2022 Prop. 4,918,634 14.7%
2023 Proj. 1,594,768 0.0% 2023 Proj. 2,439,928 0.0% 2023 Proj. 4,918,634 0.0%
2024 Proj. 1,594,768 0.0% 2024 Proj. 2,439,928 0.0% 2024 Proj. 4,918,634 0.0%
2025 Proj. 1,594,768 0.0% 2025 Proj. 2,439,928 0.0% 2025 Proj. 4,918,634 0.0%
2026 Proj. 1,594,768 0.0% 2026 Proj. 2,439,928 0.0% 2026 Proj. 4,918,634 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 41Executive Summary - Long Range Plan
OVERVIEW CITY OF RENTON 2021‐2022 BIENNIAL BUDGET
Miscellaneous Revenues
Miscellaneous revenues include interest income, cellular tower site rentals, donations, sales of documents, etc.
The majority of the revenue is investment interest income; however, the Treasury note is yielding near the
historical low. Revenue is expected to remain low in the near future.
Enterprise Funds
UTILITY RATES
Water and Sewer Rates
The water, sewer, and
surface water rates fund all
of the costs associated with
providing these services, as
well as necessary capital
improvements to these
utility systems. Other
sources, including hookup
fees, development charges,
grants, etc., are also
available, but are limited,
unpredictable, and primarily
related to the capital programs. Due to the increased costs of maintaining the systems, regulatory requirements,
and higher general operating costs, the City continuously reviews these rates and makes adjustments as needed.
Rate Related Fiscal Policy
During the summer of 2010, the City Council adopted a set of fiscal policies to guide future rate setting for all City
utilities. These policies address minimum fund balances, as well as the financing of capital improvements in the
future. Specifically, the policies rely on rates to finance preservation of existing systems and only use bonding to
finance system capacity improvements. This capital financing policy required a substantial rate increase in 2011
and 2012 to provide for consistent system replacement/reinvestment. The rate model was updated in 2020
showing a rate increase for 2021 to include a 4% increase in residential garbage rates and a 2% increase for all
other City utilities. Modest rate increases beyond 2021‐22 biennium are projected and are in line with the utilities’
historical rate increases.
In addition to the proposed City rate increases, King County Metro (which provides sewer treatment) is proposing
a 4.5% rate increase in 2021 and no increase in 2022.
Year Miscellaneous % change
2017 Actual 1,815,393 18.0%
2018 Actual 1,946,451 7.2%
2019 Actual 1,969,278 1.2%
2020 Est 1,237,870 ‐37.1%
2021 Prop. 1,132,122 ‐8.5%
2022 Prop. 1,132,122 0.0%
2023 Proj. 1,093,854 ‐3.4%
2024 Proj. 1,061,326 ‐3.0%
2025 Proj. 1,033,677 ‐2.6%
2026 Proj. 1,010,175 ‐2.3%
2021/2022 Preliminary Budget City of Renton, Washington
1 - 42Executive Summary - Long Range Plan
CITY OF RENTON 2021‐2022 BIENNIAL BUDGET OVERVIEW
Maplewood Golf Course
The City’s Maplewood Golf Course Fund was created by
Ordinance 3884 in 1985. Maplewood Golf Course is owned
and operated by the City. The golf course is also a water utility
resource as it is the location of City wells that provide drinking
water to our community. The use of this space as a golf course
helps preserve the quality of the well water for future
generations.
The course is managed by the Community Services Department and is operated as a separate enterprise fund of
the City as a fully self‐sustained operation. The Golf Course refunded $1.85 million in revenue bonds with an
interfund loan from the City at the true interest cost of 2.24% in 2010. This interfund loan was repaid in full by
2015 and freed up around $400,000 per year for operations and capital programs. The capital funds are used
primarily on a pay‐as‐you‐go basis for additional
improvement to the golf course.
The green fees are in line with other municipal courses
in neighboring communities.
Utility Revenue & Rate
Increases 2017 2018 2019 2020
2021
Proposed
2022
Proposed
2023
Projected
2024
Projected
2025
Projected
2026
Projected
Water Rate Revenue 17,483,723 17,683,513 17,139,317 18,772,649 16,896,642 18,030,511 18,391,121 18,758,944 19,134,123 19,516,805
Rate Increase 0.0% 0.0% 0.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%
Sewer Rate Revenue 10,286,228 10,581,156 10,668,423 11,067,654 11,081,573 11,473,089 11,702,551 11,936,602 12,175,334 12,418,841
Rate Increase 4.0% 4.0% 0.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%
Storm Revenue 10,820,568 11,202,339 11,196,321 12,524,641 11,583,746 11,989,269 12,229,054 12,473,635 12,723,108 12,977,570
Rate Increase 4.0% 4.0% 0.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0%
Garbage Revenue 19,471,376 18,519,997 20,305,164 19,338,494 22,631,694 23,099,011 24,022,971 24,983,890 25,983,246 27,022,576
Rate Increase (residential) 0.0% 1.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0% 4.0%
$0.0
$0.5
$1.0
$1.5
$2.0
$2.5
12 13 14 15 16 17 18 19 20 21
Prop.
22
Prop.
23
Proj.
24
Proj.
25
Proj.
26
Proj.MillionsPast and Projected Total Golf Course
Green Fee Driving Range
Other Operating
2021/2022 Preliminary Budget City of Renton, Washington
1 - 43Executive Summary - Long Range Plan
Financial Management Policies
I. Executive Summary
The City of Renton is committed to maintaining the highest standards of responsible financial management.
The City, including the City Council, Mayor and staff will work together to ensure that all financial matters of
the City are addressed with care, integrity, and in the best interest of the City. The rules and procedures
contained in this section are designed to:
Protect the assets of the City of Renton;
Ensure the maintenance of open and accurate records of the City’s financial activities;
Provide a framework of operating standards, behavioral expectations, and performance measures;
Ensure compliance with federal, state, and local legal and reporting requirements; and
Provide a means for the City Council to update and monitor these policies with the assistance and
cooperation of the Mayor’s office and the Finance and Information Services Administrator.
The following lines of authority are to enable the City of Renton to ensure its policies are meeting their goals
and promoting the financial wellness of the City.
1. The Renton City Council has the authority to execute such policies as it deems to be in the best interest
of the City within the parameters of federal, state, and local law.
2. The Finance Committee has the authority to perform reviews of the organization’s financial activity,
determine the allocation of investment deposits, and insure that adequate internal controls are in place.
3. The Mayor and Chief Administrative Officer (CAO) have the authority to oversee the development of the
biennial budget, make spending decisions within the parameters of the approved budget, enter into
contractual agreements, make capital asset purchase decisions and make decisions regarding the
allocation of expenses within designated parameters. Unless otherwise specified in this document,
principal responsibility for complying with the directives enumerated herein shall be vested in the
Mayor.
4. Each Department Administrator has the authority to expend City funds within approved budget
authority and in accordance with procedures prescribed by the Mayor’s Office, and to recommend
spending requests within the parameters of the approved budget process to the Mayor.
II. Financial Management Policies
1. Investment Policy (210‐07): Applies to the investment of available City funds, excluding fire pension
funds.
a. The City has the responsibility to manage these invested funds through diversification of funds,
attaining the highest interest rate available, and maintaining a sufficient level of liquidity to meet
operating requirements that can be reasonably anticipated. This responsibility is delegated out to
the Fiscal Services Director who shall act as the City’s Investment Officer. The actions taken by the
City’s Investment Officer will be reviewed quarterly by the City Council’s Investment Committee,
which is comprised of the Mayor, the Chief Administrative Officer, the Finance and Information
Services Administrator, and a member of the City Council.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 44Executive Summary - Financial Management Policies
2. Purchasing, Bidding, and Contracting Requirements Policy (250‐02): Applies to selection, bidding,
leasing, and contracting requirements for goods, services and public works projects throughout the City.
a. The City encourages funds expended by the City be reinvested in the local economy whenever it is
possible and practical to do so. The City must also utilize uniform, efficient, and competitive bidding,
purchasing, quoting, Request for Proposals (RFPs), cooperative purchasing, and Statements of
Qualifications (SOQs) consistent with State law. This is to ensure that all public purchases and
contracts for services, equipment, materials, supplies, and public works are executed and managed
at the highest professional and ethical standard while achieving the greatest attainable level of
quality and value permitted by law.
3. Bad Debt Policy (220‐03): Applies to handling the collection of bad debt.
a. The City has designated the responsibility of formulating, implementing, and conducting the
collection of bad debt to the Finance Department. When accounts are determined to be
uncollectable by the Finance Department the accounts are then referred to the City’s designated
collection agent. The Renton Municipal Court is responsible for conducting their own collection
efforts and refer to their own designated collection agent.
4. Administration of Grants Policy (210‐09): Applies to the identification, application, administration, and
reporting of grants from various external sources.
a. Each department within the City will actively pursue opportunities to obtain grant resources,
maintain an active and diverse portfolio, and utilize grant funds to supplement and enhance the
long term goals and objectives of the City. The grant administration and applications shall be
coordinated through the Grant Analyst. This policy includes all government grants, regardless of
dollar amount, and all private grants over $30,000.
5. Surplus & Disposal of Surplus Personal Property Policy (250‐10): Applies to the efficient use and disposal
of surplus personal property.
a. The City’s surplus personal property that retains commercial value will be disposed of in the most
cost effective and efficient manner that achieves the highest value for the City. The surplus property
will first be transferred between departments as needed. After that the surplus property may be
traded in, sold, or donated. A donation of property can only occur if the organization receiving the
property serves or benefits the public in accordance with RCW 39.33.010.
6. Cash Control Policy (210‐05): Applies to the proper procedures for receipting and depositing cash and
checks received by city departments.
a. To facilitate citizens/customers doing business with the City of Renton, receipts will be written by
each department who accepts payments. The departments will then remit the payments to the
Finance Department to insure the safety of cash deposits and to maximize the investment of cash to
its full potential. No checks shall be cashed or written for more than the amount of the purchase.
7. Purchasing Cards Policy (250‐18): Applies to the proper use of purchasing cards to procure goods or
services for official City business purposes.
a. Authorized cardholders can make purchases using a City issued purchasing card (“Card” or “ Cards”)
to provide efficient, cost effective means to pay for goods and services for official City business.
b. The Card is designed to be a cost effective alternative to the traditional invoice payment process; it
does not affect requirements to comply with State or Local procurement laws, regulations, or
policies.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 45Executive Summary - Financial Management Policies
c. The Card is not intended to replace effective procurement planning which can result in quantity
discounts, reduced number of trips and more efficient use of City resources.
d. The Administrative Services Administrator may establish additional rules and procedures from time
to time consistent with this Policy and provide the appropriate forms and instructions.
e. Exceptions to the rules may be made under declared emergencies upon written directive of the
Mayor, Chief Administrative Officer, designated Emergency Management Official or their designee.
8. Budget Preparation & Control Policy (220‐01): Applies to the budget preparation responsibility and
provides guidelines and procedures for expenditure control and budget amendments.
The goal of this policy is to provide a comprehensive process for financial planning, control and
evaluation of the City’s revenues and expenditures which complies with legal requirements and provides
adequate financial information and controls.
a. Budget Preparation: Department heads are required to prepare line item budgets requests, the
Mayor and Finance staff use the requests to prepare and submit a preliminary budget for City
Council to consider. The City Council will then adopt the final budget at the fund level by ordinance.
b. Budget development: The City shall prepare a biennial budget that is consistent with state law, the
long‐term financial planning model, the financial management policies, and industry best practices.
i. The City of Renton’s biennial budget shall be prepared using the following schedule and process
as a general guide:
(a) Review stakeholder input such as surveys, public forums, neighborhood meeting notes and
business community communication.
(b) The Mayor, City Council and Chief Administrative Officer will conduct a goal‐setting retreat
with the Department Administrators updating the Business Plan and other policy guidance.
(c) The City Council and Administration will meet to review and discuss the prior year’s audited
results, current year budget status, next budget schedule, process, budget guidelines and
budget preparation items of interest.
(d) The Administrative Services Administrator prepares the budget preparation instructions and
meets with Department Administrators to distribute budget instructions and discuss budget
preparation.
(e) The instructions will include policy priorities, estimates of compensation adjustments,
internal service and indirect charges.
(f) Departments will provide to the Administrative Services Department budget estimates and
requests conforming to the budget instructions.
(g) The Mayor submits a proposed balanced Preliminary Budget to the City Council in
conformance with state law.
(h) A balanced budget should be comprised of funding recommendations for the operating and
capital budgets that do not exceed the estimated resources of the entity.
(i) The City Council conducts public hearings on the proposed budget in conformance with
state law.
(j) The City Council sets the City’s property tax levies.
(k) The City Council adopts the final budget ordinance.
(l) The Final Budget Document is published and posted to the City website.
ii. Budget amendments should be presented for consideration when the need arises.
(a) Budget authority shall be at the fund level.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 46Executive Summary - Financial Management Policies
(b) Changes resulting in a need to revise the appropriation authority shall be presented as they
occur.
c. Revenues
i. Revenue forecasts shall assess the full spectrum of resources available to finance City programs
and services.
ii. The City shall consider the diversification of revenue as a strategy when developing its financial
plans.
iii. Should an economic downturn develop that results in (potential) revenue shortfalls or fewer
available resources, the City will make appropriate adjustments to its budget.
iv. Revenue estimates shall be based on forecasting methods recommended by the Government
Finance Officers Association (GFOA) and will typically be conservative rather than aggressive.
d. Expenditures: Priority shall be given to expenditures that will improve productivity.
In addition to the policies above the City of Renton also adheres to the following policies that are currently
adopted and reviewed on a biennial basis along with the budget document.
9. Accounting Records and Reports
a. Basis of Accounting
i. The City’s Comprehensive Annual Financial Report (CAFR) on its financial activity shall be
presented in compliance with Generally Accepted Accounting Principles (GAAP) as defined by
the Governmental Accounting Standards Board (GASB).
b. Basis of Budget
i. The City budget is presented on a GAAP basis of accounting.
c. Fund Accounting
i. The City of Renton’s accounting and budgeting systems use a fund accounting consistent with
guidance provided by the GASB and the Washington State Auditor’s Office.
ii. The funds are grouped into categories: General Fund, Special Revenue, Debt Service, Capital
Projects, Enterprise, Internal Service, and Fiduciary/Trust.
iii. The City Council shall create and eliminate funds as appropriate by separate ordinance, or
through the budget ordinance.
iv. Funds shall either be “external” or “internal” for financial reporting purposes.
(a) Internal funds shall be separate sets of accounts for the purpose of enhancing internal
management control only. These funds shall reside within an external fund. For cash
management purposes, internal funds may rely on their related external fund without
payment of interest or violation of the City’s cash management policies. (See Interfund Loan
policy for further clarification).
v. The City’s financial accounting system shall insure that the status and transactions of each
account and their relationship to budget authority is clear.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 47Executive Summary - Financial Management Policies
d. Financial Reporting
i. The CAFR shall be timely and comprehensive and meet or exceed professional industry
standards.
ii. The City’s budget documents shall provide for comparison with prior years.
iii. Revenue and expenditure reports shall be prepared monthly and be available on the City’s
website.
iv. A written analysis of the City’s monthly report shall be prepared quarterly, coordinated with the
Chief Administrative Officer and Mayor, reviewed with the City Council, and available on the
City’s website.
v. All budget amendments shall be included in the monthly report.
vi. Any outstanding interfund loans shall be disclosed in the quarterly report.
e. Audit
i. The City shall commission an annual audit of its financial reports and related records to be
conducted by the Washington State Auditor’s Office.
ii. At the conclusion of the audit, the auditor shall be available to brief the City Council on the
results.
iii. The results of the audit shall be available to the public.
10. Financial Planning
a. The City shall maintain a long‐term (five year) financial planning model.
i. The financial planning model shall:
(a) be based on the currently adopted budget;
(b) utilize these policies;
(c) be based on assumptions and drivers realistically expected to occur;
(d) clearly document the assumptions and drivers used and the results of the use of such
assumptions and drivers;
(e) be designed in such a way to permit analysis of alternative strategies;
(f) relate to the related plans of the City to include Service Delivery Plans, Comprehensive
Plans, Master Plans, etc.; and
(g) shall be prepared for the General Government and such other funds as the deemed
necessary.
b. Capital Improvements
i. A comprehensive six‐year plan for City capital investments shall be prepared biennially and
adopted by the City Council as part of the City budget.
(a) All projects included in the Capital Investment Program (CIP) shall be consistent with the
City’s Comprehensive Plan.
(b) The Capital Investment Program shall be prepared in consultation with Council Committees
for ongoing capital investments.
ii. All proposed capital improvement projects shall include a recommended or likely source of
funding.
iii. Private development (including residential, commercial and industrial projects) shall pay its fair
share of the capital investments that are necessary to serve the development in the form of
system development charges, impact fees, mitigation fees, or benefit districts.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 48Executive Summary - Financial Management Policies
iv. Capital project proposals should indicate the project's impact on the operating budget,
including, but not limited to, long‐term maintenance costs necessary to support the investment.
v. Capital projects shall be budgeted for on a project life basis (rather than fiscal year).
11. Policy on Stabilization Funds: Sufficient fund balances and reserve levels are important in the long‐
term financial stability of the City.
a. The City shall maintain reserves required by law, ordinance and/or bond covenants. In addition, the
City of Renton has its own minimum requirements on reserve levels that are detailed below.
i. General Government
(a) The City shall maintain reserves in the General Government Funds at least 8% of total
budgeted operating expenditures with a target of 12%.
(b) In addition, the City shall maintain an additional reserve as a part of the City’s Risk
Management Funds in a minimum amount of at least 8% of General Fund operating
expenditures.
(c) In addition, the City shall maintain an “Anti‐Recessionary Reserve” in an amount of at least
4% of General Government budgeted operating expenditures. Expenditures utilizing the
“Anti Recessionary Reserve” require a two‐thirds majority vote of the City Council and will
be replenished within three (3) years.
(d) In addition, the City shall accumulate reserves of $5,400,000 for the Annexation Sales Tax
Credit Expiration/Transition using year‐end savings, until fully funded. Expenditures utilizing
the “Annexation Sales Tax Credit Expiration/Transition Reserve” require a two‐thirds
majority vote of the City Council.
(e) In addition, the City shall reserve $2,500,000 for the Economic Development Revolving Fund
using year‐end savings until funded. Expenditures utilizing the “Economic Development
Revolving Fund Reserve” require a two‐thirds majority vote of the City Council.
ii. Debt Service
(a) The City shall maintain one year payments in voted general obligation debt service funds
and revenue bonds.
(b) In addition, a one year payment reserve will be established for all councilmanic general
obligation bonds issued after 2013.
iii. Enterprise Funds
(a) Water, Wastewater, and Surface Water Utility Fund shall each maintain reserves of 12% of
total budgeted operating expenses or 30 to 45 days.
(b) King County Wastewater Treatment Fund shall maintain reserves of $380,000
(approximately 3% of total operating expenses).
(c) Solid Waste Fund shall maintain reserves of $400,000.
(d) Golf Fund shall maintain reserves of 25% of total budgeted operating expenses.
(e) All other Enterprise Funds shall maintain reserves of 10% ‐ 20% of total budgeted operating
expenses.
iv. Reserve balances of other funds shall be set through the budget process in an amount
consistent with the purpose and nature of the fund.
b. Replacement reserves shall be established for equipment, and computer software should the need
continue beyond the estimated initial useful life, regardless of whether the equipment is acquired
2021/2022 Preliminary Budget City of Renton, Washington
1 - 49Executive Summary - Financial Management Policies
via lease, gift or purchase. Service charges paid by City departments to the appropriate Internal
Service funds should include an amount to provide for replacements.
i. The City shall establish a Public Safety Small Equipment Reserve as a sub‐fund to the Equipment
Rental Fund. Beginning 2015, the City shall contribute $200,000 a year to accumulate reserves
specifically for Public Safety small equipment items.
12. Policy on Fees and Charges
a. The City shall biennially review all fees for licenses, permits, fines, rates and other miscellaneous
charges as part of the budget process.
b. User charges and fees shall be established based on a percentage of the full cost of providing the
service, unless otherwise provided by statute or regulation.
i. Full cost incorporates direct and indirect costs, including operations and maintenance,
overhead, and charges for the use of capital facilities.
ii. Other factors for fee or charge adjustments may also include the impact of inflation, other cost
increases, the adequacy of the coverage of costs, and current competitive rates.
c. Proposed rate adjustments, user charges and fees shall be presented to the City Council for approval
for each year as part of the Mayor’s proposed Preliminary Biennial Budget to the Council.
d. The City shall rigorously collect all amounts due.
13. Policy on Utility Funds
a. The City shall establish and maintain separate utility operating and capital investment funds and
budgets for each of its utility operations.
b. Utility rate studies shall be conducted every six years to update assumptions and ensure the long‐
term solvency and viability of the City’s Utilities.
c. Utility rates and capital fees shall be reviewed biennially and necessary adjustments made to avoid
major rate increases.
d. The City shall use system development charges, grants and low interest loans to fund capital
projects where possible. Overall, the utilities should maintain a debt to equity ratio of 60/40.
e. Each Utility should fund an amount of the cost equal to the annual “depreciation expense” of capital
assets less debt service principal payments.
f. System Development Charges (SDCs) shall be established at levels to ensure that all customers
seeking to connect to the City’s utility systems shall bear their equitable share of the cost of both
the existing and future systems.
g. Debt financing of utility improvements will be consistent with the utility master plans, council rate
policies and other factors so as to smooth the effect of major improvements on utility rates.
h. The City shall strive to maintain minimum debt service “coverage” with the net revenue (gross
operating revenue of the Utilities less operating and maintenance expenses) of the combined
Utilities being 1.25 ‐ 1.5 times the actual debt and the net revenue of the individual Utility being at
least 1.25 times the actual debt.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 50Executive Summary - Financial Management Policies
i. Capital Contingency as System Reinvestment and Debt Service:
i. Surface Water: 1.25 DSC and approximately $3 million annual system reinvestment
ii. Wastewater: 1.25 DSC and approximately $3 million annual system reinvestment
iii. Water: 1.25 DSC and approximately $4 million annual system reinvestment
j. Bonds Versus Cash Funded Projects
i. All non‐CIP projects should be paid for using rates (programs, system plans, education materials,
etc.)
ii. All system reinvestment, maintenance, replacement and rehabilitation CIPs should be paid for
using rates.
iii. CIPs for new infrastructure, growth, or increased capacity can be paid for using bonds.
14. Policy on Debt Issuance and Management
a. Long‐term borrowing shall be confined to capital investments or similar projects with an extended
life when it is not practical to be financed from current revenues. The City shall not use long‐term
debt to finance current operations.
b. Debt payments shall not extend beyond the estimated useful life of the project being financed. The
City shall keep the average maturity of general obligation bonds at or below fifteen years, unless
special circumstances arise warranting the need to extend the debt schedule.
c. The City shall work to maintain strong ratings on its debt including maintaining open
communications with bond rating agencies concerning its financial condition.
d. With Council approval, interim financing of capital projects may be secured from the debt financing
market place or from other funds through an interfund loan as appropriate in the circumstances.
e. The City may issue interfund loans when appropriate and consistent with a separately adopted City
Council policy on the subject.
f. When issuing debt, the City shall strive to use special assessment, revenue or other self‐supporting
bonds in lieu of general obligation bonds.
g. Long‐term general obligation debt shall be utilized when necessary to acquire land or capital assets
based upon a review of the ability of the City to meet future debt service requirements. The project
to be financed should also be integrated with the City’s long‐term financial plan and Capital
Investment Program.
h. General obligation debt should be used when the related projects are of a benefit to the City as a
whole.
i. General Obligation Bond (Voted):
(a) Every project proposed for financing through general obligation debt should be
accompanied by a full analysis of the future operating and maintenance costs associated
with the project.
ii. Limited Tax General Obligation Bond (Non‐Voted):
(a) The City should avoid issuing general obligation (non‐voted) debt beyond eighty percent
(80%) of its general obligation debt capacity.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 51Executive Summary - Financial Management Policies
i. The City shall use refunding bonds where appropriate when cost savings can be achieved of at least
4% (NPV), restructuring its current outstanding debt and/or improving restrictive bond conditions.
j. The City’s financial team for the issuance of debt shall consist of the Council, Mayor, CAO,
Administrative Services Administrator, applicable department management (related to the projects
to be financed), City Legal Counsel, designated bond counsel, financial advisor and underwriter in
order to effectively plan and fund the City’s capital investment projects.
i. Through a competitive selection process conducted by the Administrative Services
Administrator with consultation with the Mayor, Chief Administrative Officer and Legal Counsel,
the City shall select the most qualified financial advisor / underwriter and bond counsel.
ii. These services shall be regularly monitored by the Administrative Services Administrator.
k. The City shall evaluate the best method of sale for each proposed bond issue.
i. When a negotiated sale is deemed advisable (in consultation with the Mayor and City Council)
the Administrative Services Administrator shall negotiate the most competitive pricing on debt
issues and broker commissions in order to ensure the best value to the City.
ii. When a negotiated sale is used, the City shall use an independent financial advisor to advise the
City’s participants in matters such as structure, pricing and fees.
l. The City shall comply with IRS regulations concerning use of, and reinvestment of bond proceeds.
i. The City shall monitor and comply with IRS regulations with regard to potential arbitrage
earnings. If arbitrage earnings are believed to be above amounts provided by IRS regulations,
the City will set aside earnings in order to pay the appropriate amount to the federal
government as required by IRS regulations.
m. The City shall provide full secondary market disclosure related to outstanding debt.
15. Policy on Post‐Issuance Compliance for Tax‐Exempt Bonds
a. Purpose
The purpose of these post‐issuance compliance policies and procedures ("Compliance Policy") for tax‐
exempt bonds issued by The City of Renton, Washington (the "City") is to ensure that the City will be in
compliance with requirements of the Internal Revenue Code of 1986, as amended (the "Code"), that
must be satisfied with respect to tax‐exempt bonds and other obligations ("bonds") after the bonds are
issued so that interest on the bonds will be and remain tax‐exempt.
b. Responsibility for Monitoring Post‐Issuance Tax Compliance.
The City Council of the City has the overall, final responsibility for monitoring whether the City is in
compliance with post‐issuance federal tax requirements for the City's tax‐exempt bonds. However, the
City Council assigns to the Administrative Services Administrator of the City the primary operating
responsibility to monitor the City's compliance with post‐issuance federal tax requirements for the City's
tax‐exempt bonds.
c. Arbitrage Yield Restriction and Rebate Requirements.
The Administrative Services Administrator shall maintain or cause to be maintained records of:
i. purchases and sales of investments made with bond proceeds (including amounts treated as
"gross proceeds" of bonds under section 148 of the Code) and receipts of earnings on those
investments;
2021/2022 Preliminary Budget City of Renton, Washington
1 - 52Executive Summary - Financial Management Policies
ii. expenditures made with bond proceeds (including investment earnings on bond proceeds) for
the governmental purposes of the bonds, such as for the costs of purchasing, constructing
and/or renovating property and facilities;
iii. information showing, where applicable for a particular calendar year, that the City was eligible
to be treated as a "small issuer" in respect of bonds issued in that calendar year because the City
did not reasonably expect to issue more than $5,000,000 of tax‐exempt bonds in that calendar
year;
iv. calculations that will be sufficient to demonstrate to the Internal Revenue Service ("IRS") upon
an audit of a bond issue that, where applicable, the City has complied with an available spending
exception to the arbitrage rebate requirement in respect of that bond issue;
v. calculations that will be sufficient to demonstrate to the IRS upon an audit of a bond issue for
which no exception to the arbitrage rebate requirement was applicable, that the rebate
amount, if any, that was payable to the United States of America in respect of investments
made with gross proceeds of that bond issue was calculated and timely paid with Form 8038‐T
timely filed with the IRS; and
vi. information and records showing that investments held in yield‐restricted advance refunding or
defeasance escrows for bonds, and investments made with unspent bond proceeds after the
expiration of the applicable temporary period, were not invested in higher‐yielding investments.
d. Restrictions on Private Business Use and Private Loans.
The Administrative Services Administrator shall adopt procedures that are calculated to educate and
inform the principal operating officials of those departments, including utility departments, if any, of the
City (the "users") for which land, buildings, facilities and equipment ("property") are financed with
proceeds of tax‐exempt bonds about the restrictions on private business use that apply to that property
after the bonds have been issued, and of the restriction on the use of proceeds of tax‐exempt bonds to
make or finance any loan to any person other than a state or local government unit. In particular,
following the issuance of bonds for the financing of property, the Administrative Services Administrator
shall provide to the users of the property a copy of this Compliance Policy and other appropriate written
guidance advising that:
i. "private business use" means use by any person other than a state or local government unit,
including business corporations, partnerships, limited liability companies, associations, nonprofit
corporations, natural persons engaged in trade or business activity, and the United States of
America and any federal agency, as a result of ownership of the property or use of the property
under a lease, management or service contract (except for certain "qualified" management or
service contracts), output contract for the purchase of electricity or water, privately sponsored
research contract (except for certain "qualified" research contracts), "naming rights" contract,
"public‐private partnership" arrangement, or any similar use arrangement that provides special
legal entitlements for the use of the bond‐financed property;
ii. under section 141 of the Code, no more than 10% of the proceeds of any tax‐exempt bond issue
(including the property financed with the bonds) may be used for private business use, of which
no more than 5% of the proceeds of the tax‐exempt bond issue (including the property financed
with the bonds) may be used for any "unrelated" private business use‐that is, generally, a
private business use that is not functionally related to the governmental purposes of the bonds;
and no more than the lesser of $5,000,000 or 5% of the proceeds of a tax‐exempt bond issue
may be used to make or finance a loan to any person other than a state or local government
unit;
2021/2022 Preliminary Budget City of Renton, Washington
1 - 53Executive Summary - Financial Management Policies
iii. before entering into any special use arrangement with a nongovernmental person that involves
the use of bond‐financed property, the user must consult with the Administrative Services
Administrator, provide the Administrative Services Administrator with a description of the
proposed nongovernmental use arrangement, and determine whether that use arrangement, if
put into effect, will be consistent with the restrictions on private business use of the bond‐
financed property;
iv. in connection with the evaluation of any proposed nongovernmental use arrangement, the
Administrative Services Administrator should consult with nationally recognized bond counsel to
the City as may be necessary to obtain federal tax advice on whether that use arrangement, if
put into effect, will be consistent with the restrictions on private business use of the bond‐
financed property, and, if not, whether any "remedial action" permitted under section 141 of
the Code may be taken by the City as a means of enabling that use arrangement to be put into
effect without adversely affecting the tax‐exempt status of the bonds that financed the
property; and
v. the Administrative Services Administrator and the user of the property shall maintain records of
such nongovernmental uses, if any, of bond‐financed property, including copies of the pertinent
leases, contracts or other documentation, and the related determination that those
nongovernmental uses are not inconsistent with the tax‐exempt status of the bonds that
financed the property.
e. Records to be Maintained for Tax‐Exempt Bonds.
It is the policy of the City that, unless otherwise permitted by future IRS regulations or other guidance,
written records (which may be in electronic form) will be maintained with respect to each bond issue for
as long as those bonds remain outstanding, plus three years. For this purpose, the bonds include
refunding bonds that refund the original bonds and thereby refinance the property that was financed by
the original bonds. The records to be maintained are to include:
i. the official Transcript of Proceedings for the original issuance of the bonds;
ii. records showing how the bond proceeds were invested, as described in ci above;
iii. records showing how the bond proceeds were spent, as described in cii above, including
purchase contracts, construction contracts, progress payment requests, invoices, cancelled
checks, payment of bond issuance costs, and records of "allocations" of bond proceeds to make
reimbursement for project expenditures made before the bonds were actually issued;
iv. information, records and calculations showing that, with respect to each bond issue, the City
was eligible for the "small issuer" exception or one of the spending exceptions to the arbitrage
rebate requirement or, if not, that the rebate amount, if any, that was payable to the United
States of America in respect of investments made with gross proceeds of that bond issue was
calculated and timely paid with Form 8038‐T timely filed with the IRS, as described in ciii, civ and
cv above; and
v. records showing that special use arrangements, if any, affecting bond‐financed property made
by the City with nongovernmental persons, if any, are consistent with applicable restrictions on
private business use of property financed with proceeds of tax‐exempt bonds and restrictions on
the use of proceeds of tax‐exempt bonds to make or finance loans to any person other than a
state or local government unit, as described in 4 above.
The basic purpose of the foregoing record retention policy for the City's tax‐exempt bonds is to
enable the City to readily demonstrate to the IRS upon an audit of any tax‐exempt bond issue that
the City has fully complied with all federal tax requirements that must be satisfied after the issue
2021/2022 Preliminary Budget City of Renton, Washington
1 - 54Executive Summary - Financial Management Policies
date of the bonds so that interest on those bonds continues to be tax‐exempt under section 103 of
the Code.
f. Identification and Remediation of Potential Violations of Federal Tax Requirements for Tax‐Exempt
Bonds.
i. So long as any of the Issuer’s tax‐exempt bond issues remain outstanding, the Administrative
Services Administrator will periodically consult with the users of the Issuer’s bond‐financed
property to review and determine whether current use arrangements involving that property
continue to comply with applicable federal tax requirements as described in these Compliance
Procedures. This may be accomplished, for example, by periodically meeting with users,
providing questionnaires to users about current use arrangements, or adopting other protocols
reasonable calculated to ensure compliance with applicable federal tax requirements on a
continuing basis. This periodic review may be scheduled, for example, at or before the times
that the Issuer is required to file with Municipal Securities Rulemaking Board the annual
financial information and operating data pursuant to the Issuer’s undertaking, if any, to provide
continuing disclosure with respect to outstanding bond issues.
ii. If at any time during the life of an issue of tax‐exempt bonds, the Issuer discovers a violation of
federal tax requirements applicable to that issue may have occurred, the Administrative Services
Administrator will consult with bond counsel to determine whether any such violation actually
has occurred and, if so, take prompt action to accomplish an available remedial action under
applicable Internal Revenue Service under the Voluntary Closing Agreement Program described
under Notice 2008‐31 or other future published guidance.
g. Education Policy With Respect to Federal Tax Requirements for Tax‐Exempt Bonds.
It is the policy of the City that the Administrative Services Administrator and his or her staff, as well as
the principal operating officials of those departments of the City for which property is financed with
proceeds of tax‐exempt bonds should be provided with education and training on federal tax
requirements applicable to tax‐exempt bonds. The City recognizes that such education and training is
vital as a means of helping to ensure that the City remains in compliance with those federal tax
requirements in respect of its bonds. The City therefore will enable and encourage those personnel to
attend and participate in educational and training programs offered by, among others, the Washington
Municipal Treasurers Association and the Washington Finance Officers Association with regard to the
federal tax requirements applicable to tax‐exempt bonds.
2021/2022 Preliminary Budget City of Renton, Washington
1 - 55Executive Summary - Financial Management Policies
City Funds and Fund Structure
Key Report
000 General A E
001 Community Services A I (000)
003 Streets A I (000)
004 Community Development Block Grant A I (000)
005 Museum A I (000)
098 Economic Development Fund A I (000)
108 Leased City Properties E
Total General Government
SPECIAL REVENUE FUNDS:
110 Special Hotel‐Motel Tax E
125 One Percent for Art E
127 Cable Communications Development E
135 Springbrook Wetlands Bank E
140 Police Seizure Fund E
141 Police CSAM Seizure Fund E
DEBT SERVICE FUNDS:
215 Gen Govt Misc Debt Service E
CAPITAL PROJECT FUNDS (CIP):
303 Community Services Impact Mitigation I (316)
304 Fire Impact Mitigation E
305 Transportation Impact Mitigation I (317)
308 REET 1 Fund E
309 REET 2 Fund E
316 Municipal Facilities CIP E
317 Transportation CIP E
336 New Library Development I (316)
346 Family First I (316)
A. General Government Funds share general revenues. Therefore, no interest shall be charged for loans between funds.
E. External Fund for Reporting Purposes I. Internal Fund for Management Purposes
2021/2022 Preliminary Budget City of Renton, Washington
1 - 56Executive Summary - Financial Management Policies
City Funds and Fund Structure (continued)
ENTERPRISE FUNDS: Key External
Reporting
Internal
Reporting
402 Airport Operations E
403 Solid Waste Utility E
404 Municipal Golf Course System E
405 Water Operations B E
406 Wastewater Operations B I (405)
407 Surface Water Operations B I (405)
416 King County Metro B I (405) (406)
422 Airport Capital Investment I (402)
424 Municipal Golf Course System CIP I (404)
425 Water CIP B I (405)
426 Wastewater CIP B I (405) (406)
427 Surface Water CIP B I (405) (407)
INTERNAL SERVICE FUNDS:
501 Equipment Rental E
502 Insurance E
503 Information Technology I (501)
504 Facilities I (501)
505 Communications I (501)
512 Healthcare Insurance I (502)
522 Leoff1 Retirees Healthcare I (502)
FIDUCIARY FUNDS:
611 Firemen's Pension E
B. Water Utility Funds shall be managed as a system such that balance sheet accounts are merged for management and reporting purposes.
E. External Fund for Reporting Purposes
I. Internal Fund for Management Purposes
2021/2022 Preliminary Budget City of Renton, Washington
1 - 57Executive Summary - Financial Management Policies
2 RENTON RESULTS
Budget Framework
2‐1
Renton Results Overview
2‐4
Safety and Health ‐ Programs, Resources and Results
2‐6
Representative Government ‐ Programs, Resources and Results
2‐11
Livable Community ‐ Programs, Resources and Results
2‐15
Mobility ‐ Programs, Resources and Results
2‐20
Utilities and Environment ‐ Programs, Resources and Results
2‐23
Internal Services ‐ Programs, Resources and Results
2‐29
Revenue, Expenditure and Capital Budgets by City Service Area
2‐35
Reconciliation to Total Budget
2‐42
Introduction
Renton Results began as the City of Renton’s budget framework and performance improvement initiative that originated
in 2007. Our intent was been to clearly inform the community about the various services provided by the City, the costs
of those services, and the results of our efforts. The purpose was also to inform policy decisions and provide transparency
and accountability to our community.
Since then, the Renton Results effort has expanded beyond data collection to include organizational elements such as high
performance leadership development, process improvement, inclusive facilitation and engagement, and more. These
elements are designed to equip and empower employees (at all levels) to bring necessary change and innovation to their
service of both internal and external customers. As the Business Plan goals have changed over time, so has the focus of
the Renton Results effort, demonstrating the City’s ability to be responsive and resilient through change and our
commitment to continuous learning and improvement.
How are we doing?
In the following pages you’ll see the metrics gathered by programs that may demonstrate their productivity and/or
effectiveness. While data alone cannot offer a complete picture of each program, it can help tell the story of the city’s
efforts to serve the community while reflecting the impact of events or circumstances over time.
Who is involved in Renton Results?
All levels of staff are involved in identifying and/or tracking performance measures and data.
City Goals
The City Council adopts a six year strategic plan to focus City efforts in the direction of the City’s vision to be the center of
opportunity in the Puget Sound Region where families and businesses thrive. The current Business Plan can also be
found on our website by searching for Business Plan.
The City’s Mission Statement identifies the following goals towards which all City operations, in partnership and
communication with residents, businesses, and schools are aligned:
•Provide a safe, healthy, vibrant community
•Promote economic vitality and strategically position Renton for the future
•Support planned growth and influence decisions to foster environmental sustainability
•Build an inclusive informed city with equitable outcomes for all in support of social, economic, and racial justice
•Meet service demands and provide high quality customer service
Renton Results
2021/2022 Preliminary Budget City of Renton, Washington
2 - 1Renton Results - Budget Framework
City Service Areas
The City’s budget, through the Renton Results framework, is the mechanism in place to ensure the work of the City is
aligned with the City’s Mission and Business Plan goals. Because City departments perform a wide variety of work, often
partnering with other departments, the true cost of these services can be difficult to identify in a traditionally presented
budget, by fund and/or department, which requires citizens to piece together the overall cost.
To solve this problem, we prepare our budget in a manner that allows us to present the full cost of the services provided
within each of our six service areas: Per our proposed 2021-2022 budget (operating plus capital):
Safety and Health: Seven of our departments operate seventeen programs in support of this City Service Area. It
makes up about 28% of the operating budget and employs about 203 people to perform the work. This is
approximately $474-$487 per person.
Representative Government: Six of our departments operate thirteen programs in support of this City Service
Area. It makes up about 5% of our operating budget and employs 43 people to perform the work. This is
approximately $88-92 per person.
Livable Community: Two of our departments operate seventeen programs in support of this City Service Area. It
makes up about 11% of our operating budget and employs 77 people (excluding seasonal) to perform the work.
This is approximately $208-210 per person.
Mobility: A single department operates twelve programs in support of this City Service Area. It makes up about
9% of our operating budget and employs 68 people (excluding seasonal) to perform the work. This is
approximately $167-169 per person.
Utilities & Environment: Three of our departments operate seventeen programs in support of this City Service
Area. It makes up about 44% of our operating budget and employs 123 people to perform the work. This is
approximately $797-922 per person.
Internal Support: Seven of our departments operate twenty four programs in support of this City Service Area. It
makes up about 4%* of our operating budget and employs 101 people to perform the work. This is approximately
$89-93 per person. *excluding debt, separation benefits and retiree medical.
How much do these services cost per person annually?
The chart below shows a comparison of costs per person at the 2021-2022 proposed service levels by City Service Area.
The total cost in 2021-2022 is about $1,831-$1,966 per person based on current population count of 104,076.
2021/2022 Preliminary Budget City of Renton, Washington
2 - 2Renton Results - Budget Framework
Resource Allocation by City Service Area versus traditional budget
Renton Results program expenses are presented by City Service Area as consolidated costs across departments and funds.
Within Renton Results, we have adjusted for transfers and inter-fund transactions where double counting occurs in
traditional “Fund” based budgeting. As a result, the dollar amounts for Renton Results and the traditional budget are not
the same.
For example, the costs of the City’s internal service funds are shown under “Internal Support” category and are also
included in the direct service areas by those Departments that use these internal services. To compensate for this, we are
deducting the amount that has been accounted for in direct services at the bottom line level to show the net operating
and capital budget only in the Renton Results section.
How much do these services cost in total?
2021/2022 Preliminary Budget City of Renton, Washington
2 - 3Renton Results - Budget Framework
2021-2022 Renton Results
Summary and Detail
Desired Results – Strategies – KPI’s – Programs -
Measures - Resources
As described earlier, the City Service Areas are broad in nature and are supported by a number of City programs across
multiple City departments.
The following pages will provide summary and detailed information for each of our City Service Areas. You will find a
complete list of programs, the proposed budget and performance measurements with results where available. Some of
the terms you will see are defined below.
Desired Results
Each City Service Area is best defined by the associated “I want” statement or the desired Results.
• Safety and Health: I want a safe and healthy community
• Representative Government: I want a responsive and responsible government
• Livable Community: I want access to high quality facilities, services and public resources that enrich the lives of
everyone in the community
• Mobility: I want safe and efficient access to all desired destinations, now and in the future
• Utilities and Environment: I want to live, learn, work and play in a clean and green environment with reliable,
affordable utility service
• Internal Support: I want City departments to have the means to operate efficiently and effectively in a safe and
sustainable manner
Strategies
Strategies answer the question: “How does the City plan to work toward and achieve these desired results. You will find
these listed above each of the summary and performance measure sections of the City Services.
This visual representation of the Safety and Health City Service Area, for example, illustrates the relationship between the
defined strategies and reaching the desired result. Programs within this Service Area are aligned with these strategies.
I want Renton to be a safe and healthy community
Encourage the community to comply with local, state and federal laws
Encouragement of a self reliant community through programs and education
Timely responsiveness and “projection of effort,” when the community cannot help itself
Recovery and restoration of the community after a disaster
2021/2022 Preliminary Budget City of Renton, Washington
2 - 4Renton Results - Renton Results Overview
Programs
Programs are an organizational or work unit of a City department or division that provides a specific service or product to
citizens or other customers. Many employees are assigned and budgeted across multiple programs and many of these
programs work together to provide a product or service to the citizens and other City customers. Not all work performed
by the City is specifically identified as a Program; however, all programs are budgeted based on services provided by the
program’s core mission or purpose.
Program Metrics
Program metrics are tools put into place by the program staff and managers and reviewed by the Administrators and
Executive office in order to assure alignment of efforts within the Departments. As stated before, not all work processes
are captured within Renton Results but rather Program Metrics are select points of data that represent the work
performed in a way that can be a useful illustration of effectiveness or impact when tracked and monitored.
Targets
Program Targets are a guideline or goal for each Program Measure. We work hard to communicate that targets are not
to be used as a “hammer” but rather as a standard which staff can strive to achieve within the framework of their
resources. There are many factors that may influence the results for Programs such as weather, the economy, staff
turnover and demand.
Conclusion
Renton Results is the framework of our budget process that allows for transparent, informed and thoughtful consideration
in the allocation of our resources. It allows decision makers to see the cost of services in a meaningful way and allows
program prioritization and resources allocation to be based on the priorities established by the City’s Mission and Goals.
In addition, the Renton Results effort seeks to develop and support efforts that will enable the City to quickly identify and
respond to opportunities for improvement in processes and service delivery.
Because the Budget by Department and Budget by Fund sections of this document include such transfers and inter-fund transactions the last page of this
section includes a full reconciliation to the Total Budget.
2021/2022 Preliminary Budget City of Renton, Washington
2 - 5Renton Results - Renton Results Overview
2021 2022 202.90 202.90
$ 49,347,522 $ 50,684,751
28% 28%
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's: 180.83 179.33 179.83 179.83 196.33 196.33 202.50 203.50 202.90 202.90
Dollars: 34,613,848$ 35,812,446$ 36,336,698$ 37,824,001$ 40,485,130$ $42,636,579 48,205,345$ 49,645,700$ 49,347,522$ 50,684,751$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDResidents report feeling somewhat or very safe during the day in their neighborhood. next survey 2015 next survey 2015 next survey 2015 90 next survey 2017 90.4 next survey 2021 next survey 2021 TBD
Residents report feeling somewhat or very safe during the night in their neighborhood. next survey 2015 next survey 2015 next survey 2015 69.6 next survey 2017 72.8 next survey 2021 next survey 2021 TBD
Community report feeling somewhat or very safe during the day in the downtown area.next survey 2015 next survey 2015 next survey 2015 81.4 next survey 2017 84 next survey 2021 next survey 2021 TBD
Community report feeling somewhat or very safe during the night in the downtown area.next survey 2015 next survey 2015 next survey 2015 69.6 next survey 2017 72.8 next survey 2021 next survey 2021 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Dollars:4,513,858$ 4,552,469$ 5,235,625$ 5,313,703$ 6,349,491$ 6,600,834$ 8,692,469$ 7,884,503$ 7,864,729$ 7,976,891$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Average response time (in minutes) to Priority I calls. 3.07 3.81 4.64 4.52 4.43 4.61 4.66 4.06 TBDAverage response time (in minutes) to Priority II 7.32 6.50 7.64 8.13 7.62 7.35 6.80 6.59 TBDAverage response time (in minutes) to Priority III 10.48 8.81 10.87 11.75 11.62 10.94 10.73 10.01 TBDAverage response time (in minutes) to Priority IV 21.05 16.01 20.91 23.94 26.08 23.54 23.82 21.99 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:64.0 64.0 63.0 63.0 67.0 67.0 67.0 67.0 67.0 67.0
Dollars:8,982,138$ 9,191,931$ 9,792,900$ 10,159,956$ 9,900,191$ 10,338,556$ 11,225,287$ 12,007,857$ 12,958,172$ 13,392,798$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Average number of training hours per commissioned employee 98 108 117 139 124 108 117 97.6 TBD
Average number of training hours per non‐commissioned employee 25 33 43 16 24 57 18.3 32 TBD
Number of neighborhoods involved in community education through block/business watch 48 43 39 36 39 41 63 63 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:10.5 9.0 8.0 8.0 15.0 15.0 14.0 14.0 13.0 13.0
Dollars:1,675,957$ 1,569,696$ 1,454,208$ 1,505,138$ 2,373,476$ 2,460,047$ 2,406,157$ 2,499,612$ 2,631,945$ 2,688,719$
Note: Year‐over‐year data provided only for reference. Due to department, division, and programmatic reorganizations over this period of time, some information will differ from prior budget documents.
Programs, Resources and Results
The following programs have provided metrics ("Results") to indicate the results of their efforts. Each metric is unigue ‐ some are simply counts of data points,
others are more qualitative indicating customer satisfaction, and many intend to show efficiency and effectiveness. It should be noted for those that are
marked "N/A" indicate a metric for which data is not yet available. This could be due to a number of reasons including changes in staffing and/or information
systems in place to collect the data. These metrics remain in this report as it is the intent of the program to provide the data when possible. The staff within the programs develop their own metrics and provide the data for reporting purposes.
Strategies Renton is using to work toward and achieve this desired result
Encouragement of a self reliant community through programs and education ProposedTimely responsiveness and “projection of effort,” when the community cannot help itself FTE's
Recovery and restoration of the community after a disaster OperatingEncourage the community to comply with local, state and federal laws Percent of Operating
Desired Result: I want a safe and healthy community
City Service Area: Safety and Health
Police Administration, Police Department
The Administration division is responsible for the overall leadership of the Renton Police Department.
Target
minimum of 90 percent
minimum of 90 percent
minimum of 80 percent
minimum of 80 percent
Targetless than 3.5 minutesless than 8 minutesless than 12 minutesless than 21 minutes
Department resources budgeted for this
program
Department resources budgeted for this
program
Patrol Operations, Police Department
Uniformed, first responders to emergency and non‐emergency calls for service. When available, uncommitted time is spent providing pro‐active policing throughout the city to reduce crime and the perception of crime.
Responsible for enforcing laws, arresting offenders, resolving community problems, and improving the quality of life for the residents and visitors of Renton.
Department resources budgeted for this
program
Administrative Services, Police Department
The Administrative Services division consists of three training officers, three community programs coordinators, three school resource officers, one secretary, two police sergeants, and one police commander. The Electronic Home Detention unit is also a part of the Administrative Services division but is administered under a different program.
Target
minimum of 100 hours
minimum of 24 hours
minimum of 50 count
City Resources
budgeted to support the
Safety and Health City Service Area
$0
$10
$20
$30
$40
$50
$60
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposedMillionsAnnual Budgets
180.8 179.3 179.8 179.8
196.3 196.3
202.5 203.5 202.9 202.9
165
170
175
180
185
190
195
200
205
210
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's Budgeted
2021/2022 Preliminary Budget City of Renton, Washington
2 - 6Renton Results - Safety and Health - Programs, Resources and Results
Desired Result: I want a safe and healthy community
City Service Area: Safety and Health
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDPercent of collision incidences resolved by Patrol Services during regular hours of service to reduce
resources needed in Patrol Operations.
84.49 55.42 76.00 50.86 31.80 44.62 100.00 100.00 TBD
Average percent of traffic safety camera notices of violation are provided within fourteen days. 95.72 58.75 100.00 100.00 100.00 100.00 29.65 52.00 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:14.0 14.0 14.0 14.0 14.5 14.5 15.0 15.0 16.0 16.0
Dollars:2,503,671$ 2,538,020$ 2,622,607$ 2,707,749$ 2,997,063$ 3,036,562$ 3,747,418$ 3,860,730$ 4,175,438$ 4,276,359$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDAnnual percent of successful resolution or clearance of assigned cases 82.00 84.19 76.83 83.21 88.00 55.51 68.00 82.00 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:20.0 20.0 20.0 20.0 22.0 22.0 22.0 22.0 24.0 24.0
Dollars:2,639,554$ 2,696,607$ 2,815,279$ 2,940,571$ 3,247,139$ 3,308,069$ 3,516,861$ 3,699,534$ 4,184,172$ 4,326,131$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDNumber of arrests due to Special Operations' identification and investigation of repeat offenders and/or trends of criminal activity. 87 80 58 51 44 95 46 73 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:22.0 22.0 22.0 22.0 21.0 21.0 22.0 22.0 20.0 20.0
Dollars:3,115,313$ 3,177,244$ 3,446,817$ 3,594,363$ 3,227,507$ 3,359,743$ 3,579,522$ 3,797,211$ 3,724,857$ 3,869,265$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDNew Concealed Pistol Licenses will be completed
within 30 days new 2016 new 2016 new 2016 new 2016 1293 1220 1176 1206 TBD
Number of Public Records Requests new 2015 new 2015 new 2015 2359 2504 2686 2855 3596 TBDNumber of Cases processed by staff 13566 14118 14721 15517 16665 16367 16179 14643 TBDNumber of warrants processed by staff 2544 2356 2357 2161 1575 1526 1687 1695 TBD
Number of Citations processed by staff 13924 16867 14550 11766 11462 11438 11047 8629 TBDNumber of Orders process by staff 1671 1441 1432 1438 1630 1644 1679 1587 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:15.4 15.4 15.4 15.4 16.4 16.4 17.4 17.4 17.4 17.4
Dollars:1,403,208$ 1,450,477$ 1,668,902$ 1,776,066$ 1,799,964$ 1,898,169$ 1,968,803$ 2,071,599$ 2,158,266$ 2,267,688$
minimum of 80 percent
minimum of 100 percent
Staff Services, Police Department
number of citationsnumber of orders
Department resources budgeted for this
program
Staff Services division maintains all police department crime reports, traffic collision reports, court orders, federal uniform crime reporting (UCR), missing persons, stolen/recovery stolen vehicles, concealed pistol license (CPL) applications/denials, officer safety entries, Renton Municipal Court warrants, protection orders, ACCESS certification for department members, police public disclosure requests, insurance requests, prosecutor requests, and defense attorney case report requests. Staff Services division receives all electronic reports from mobile data computers deployed with police officers on the street, checks/corrects errors, and then merges officer reports into the police records management system. Receives COPLOGIC online reports from victims referred by dispatch. COPLOGIC reports are processed and the victim is sent a case number for their report once it has been manually
entered into police records management system. Staff Services division must follow strict guidelines from WSP, WACIC/NCIC, and FBI to maintain certification when they make required entries into the state and federal
system. All entries must be audited by a second specialist. All after‐hours calls go through Staff Services for any emergency and non‐emergency requests for other city or police department notifications.
Target
number of licenses
number of requestsnumber of casesnumber of warrants
Target
Patrol Services, Police Department
Uniformed, first responders to emergency and non‐emergency calls for service relating to safe, coordinated, and accessible roadway and neighborhood traffic concerns, animal safety, and parking violations. The Patrol
Services division acts as a support service to Patrol Operations, responding for collision reporting and investigating, clearing the roads, and moving traffic safely through Renton. The division works collaboratively with intra‐
departmental teams to coordinate a traffic plan to safely move hundreds of thousands of vehicles through the city on any given day. The Patrol Services division emphasizes a traffic plan that focuses on traffic safety through engineering, education, and enforcement.
The Patrol Services division handles all serious injury and fatality collision investigations and employs the use of Unmanned Air Systems‐Drone (UAS) technology and software to efficiently map and recreate collisions and
scenes. The division also uses this technology to fly and map crime scenes for Renton and other agency's Investigations divisions for serious crimes and officer involved shootings.
Target
Special Operations, Police Department
The Special Operations division of the Renton Police Department is the primary proactive arm of the department. This includes both uniformed and undercover proactive units. The division is also the lead for the Renton contingent of the Valley Special Weapons and Tactics (SWAT) team.
minimum of 50 count
Department resources budgeted for this
program
Department resources budgeted for this
program
Investigations, Police Department
The Investigations division consists of sixteen detectives, two evidence technicians, two sergeants, one secretary, one domestic violence victim advocate, one crime analyst, and one commander. The Investigations division conducts follow‐up investigations of crimes against persons (assault, homicide, missing persons, rape, robbery, sex offenders, internet crimes against children, domestic violence, and runaways) and property crimes (auto theft, fraud, forgery, burglary, theft, malicious mischief, identity theft, unlawful issuance of bank checks, and pawns). Detectives conduct investigations and submit them to the Prosecutor's Office for charges. Once charges are filed, they prepare the case for trial and assist the Prosecutor's Office.
The Investigations division secretary processes all payables, assists the crime analyst with statistical reports, transcribes tapes for detectives, tracks AFIS records, tracks case dispositions from King County courts, tracks FIRs, coordinates volunteers for second floor reception, and tracks registered sex offenders with the King County Sheriff's Office and the Renton Police Department.
The evidence technicians are responsible for the intake of property and evidence, as well as assisting with criminal investigations at crime scenes and major collisions. Once in the control of the evidence section, the evidence
technicians are responsible for tracking the movement and location of the items. Certain pieces of evidence require special handling and are placed in refrigerators, freezers, or are sent out for special processing by various
entities such as the WSP Crime Lab, AFIS, etc.
Target
minimum of 80 percent
Department resources budgeted for this
program
2021/2022 Preliminary Budget City of Renton, Washington
2 - 7Renton Results - Safety and Health - Programs, Resources and Results
Desired Result: I want a safe and healthy community
City Service Area: Safety and Health
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDProvide Electronic Home Detention (EHD) services to reduce jail costs. EHD referrals and revenue
increases, resulting in a cost savings to the inmate house budget.
$ 1,312,708 $ 1,227,828 $ 1,765,785 $ 2,038,155 $ 2,479,924 $ 2,871,132 $ 4,593,750 $ 5,199,250 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1 1 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Dollars:99,851$ 103,093$ 366,629$ 379,743$ 397,087$ 406,139$ 495,059$ 510,515$ 526,603$ 537,983$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0.00 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:5,583,718$ 6,333,307$ 4,200,000$ 4,500,000$ 4,850,000$ 5,698,750$ 6,237,344$ 6,518,024$ 4,306,301$ 4,306,301$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDDiscovery provided to the Defense Attorney by prosecutors within 20 calendar days of a receipt of a request for discovery and a request is sent out for needed materials from the police and involved
agencies or businesses.
97 100 N/A N/A 100 100 100 100 TBD
Increase the scope and extent of electronic
exchanges of information, including discovery, to the Defense Attorney.new 2015 new 2015 new 2015 N/A 100 100 100 100 TBD
Be prepared for hearings and trials in all cases new 2015 new 2015 new 2015 N/A 100 100 100 100 TBDPrepare complete and adequate discovery in all cases, as measured by motions granted by the court for inadequate discovery.new 2015 new 2015 new 2015 N/A 100 100 100 100 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:6 6 7.0 7.0 8.0 8.0 8.0 8.0 8.0 8.0
Dollars:622,055$ 657,530$ 873,909$ 929,599$ 979,228$ 1,041,806$ 1,112,339$ 1,160,306$ 1,210,931$ 1,254,397$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDPercent of total Emergency Management Accreditation Program (EMAP) standards that are met completely, as a measure of emergency
management excellence.
new 2019 new 2019 new 2019 new 2019 new 2019 new 2019 new 2019 41% TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2.0 2.0 2.0 2.0 3.0 3.0 3.0 3.0 3.0 3.0
Dollars:323,570$ 331,623$ 377,272$ 392,868$ 587,790$ 610,012$ 645,858$ 726,748$ 781,615$ 805,202$
minimum of 600000 dollar
Electronic Home Detention Program, Police Department
The Electronic Home Detention (EHD) program provides an alternative to incarceration for non‐violent offenders. With approval from the sentencing court, offenders are placed in the EHD program at no cost to the agency.
The EHD program eliminates the expense to house inmates in jail. EHD costs are paid for by the offender, which eliminates housing offenders with health restrictions requiring expensive treatment. The EHD program allows
offenders to live at home, go to work, and still provide for their families.
Target
Target
Department resources budgeted for this
program
Auxiliary Services ‐ Jail, Police Department
South Correctional Entity (SCORE) Regional Jail.
Department resources budgeted for this
program
City Attorney Prosecution, City Attorney Department
Department resources budgeted for this
program
minimum of 99 percent
minimum of 95 percent
minimum of 95 percent
minimum of 95 percent
The City Attorney Department ‐ Prosecution Division handles criminal misdemeanor, traffic infraction, impound and code violation matters in the City of Renton Municipal Court and all appeals therefrom. The work load and requirements for Prosecution Division is directly affected by Renton Police Department staffing, the policies and procedures of the presiding judge of the Municipal Court, the number of cases filed or referred to the prosecutors for filing review and directed emphasis enforcement goals. The Prosecution Division continues to review and prosecute declined felony cases, in addition to an overall increase in DUI and DV case referrals.
Department resources budgeted for this
program
Emergency Management, Executive Department
The activities of the program are driven both by mandates and by best practices in the emergency management profession. The primary activities of the program address the legal requirements specified in the WAC and in the grant guidance and the result is development and coordination of emergency plans, design and deployment of required training and exercises, maintenance of certain communication and warning capabilities, public education and relay of emergency information, emergency response through the activation of the Emergency Operations Center, identification and analysis of local hazards, and hazmat response and notification. The ultimate outcome is a more effective and coordinated emergency response on the part of the City, increased disaster resilience of residents and businesses, the engagement of volunteers, and leveraging of public and private
partnerships to serve the community better and more cost‐ effectively during and after a disaster.
No change is proposed to the Emergency Management budget. A recent change in 2019 resulted in shifting one FTE who was partially grant‐underwritten to be fully funded by the city budget. This has continued in 2020 and will be maintained in the 2021‐22 budget.
Target
percent of total
2021/2022 Preliminary Budget City of Renton, Washington
2 - 8Renton Results - Safety and Health - Programs, Resources and Results
Desired Result: I want a safe and healthy community
City Service Area: Safety and Health
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDPermit review for single family applications
completed within 2 weeks 75 40 90 90 51 61 58 45 46
Permit review for commercial applications within 4
weeks 100 100 62 100 90 95 88 87 95
Inspection requests receive response within 24 hours 98 97 97 95 96 93 94 95 94
Completed responses to a customer service questionnaire rate their overall experience as "Good" or better
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:12.5 12.5 13.0 13.0 13.0 13.0 16.0 17.0 16.0 16.0
Dollars:1,440,261$ 1,472,285$ 1,593,442$ 1,687,594$ 1,669,636$ 1,738,620$ 2,238,415$ 2,406,224$ 2,308,971$ 2,395,462$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDCode compliance is achieved within 3 weeks of date of initial request 88 91 90 88 80 81 81 89 TBD
Sites remain in compliance one year after Code Enforcement action.
data not available at this time 95 N/A N/A N/A 78 80 80 TBD
Code compliance is achieved through voluntary
action upon notification of violation 85 95 N/A N/A N/A 83 80 80 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:3 3 3.0 3.0 4.0 4.0 4.0 4.0 4.0 4.0
Dollars:328,729$ 338,602$ 397,253$ 419,537$ 531,790$ 534,908$ 522,600$ 552,391$ 576,561$ 598,859$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDComposite of results from survey of probationer's
understanding of probation process reflected as "Good" or better. 83 81 84 85 88 88 85 84 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1 1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Dollars:99,851$ 103,093$ 120,680$ 126,987$ 126,253$ 130,467$ 138,841$ 144,236$ 148,714$ 153,823$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Number of compliance audits performed annually new 2017 new 2017 new 2017 new 2017 new 2017 500 349 375 TBD
Business License renewals will be issued within one day of receipt of payment. 99 45 85 94.75 87 89.25 92 95 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1.1 1.1 1.1 1.1 1.1 1.1 3.1 3.1 3.0 3.0
Dollars:94,478$ 97,559$ 108,061$ 114,395$ 105,456$ 109,005$ 315,617$ 411,799$ 410,556$ 428,770$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:63,133$ 63,133$ 63,133$ 63,133$ 63,133$ 63,133$ 63,133$ 63,133$ 63,133$ 63,133$
Building Inspection, CED Department
This program provides plan review, building permits and field inspection services for all private and public development building projects within the City of Renton. Permits include building, electrical, plumbing, mechanical,
sprinklers, demolition and signs. Enforcement of the building codes ensures the safety of our residents in the built environment.
Target
minimum of 70 percent
minimum of 95 percent
Department resources budgeted for this
program
minimum of 95 percent
minimum of 95 percent
minimum of 80 percent
minimum of 95 percent
Department resources budgeted for this
program
Probation, Court Services Department
Probation is a period of supervision over an offender, ordered by the court in lieu of serving time in jail. Offenders must follow certain conditions of sentence set forth by the court under the supervision of a Probation Officer.
Target
minimum of 95 percent
Department resources budgeted for this
program
Code Enforcement program, CED Department
The Code Enforcement program ensures compliance with the City's laws and regulations for land use, zoning, building, housing, and environmental health. The City places a high priority on code compliance as a means of
accomplishing adopted community goals, such as maintaining the quality of neighborhoods, avoiding nuisances, and protecting the environment.
Target
minimum of 70 percent
minimum of 80 percent
Community Development Block Grant, Community Services Department
The City of Renton receives Community Development Block Grant (CDBG) funding from the U.S. Department of Housing and Urban Development (HUD). These are federal funds that go from HUD to King County to Renton via an agreement. It is money in/money out at no cost to the City. Funds can be used for public services, community development, economic development, and construction of public facilities. There are very specific and stringent requirements at the federal and county level for what activities the funds can be used.
Since 2015, CDBG funding has been used to promote economic development activities. From 2015‐2019 the City offered the Downtown Commercial Rehabilitation and Façade Improvement Loan Program (FILP) using CDBG
funds. The program was closed out in 2019 after providing $601,497 in matching funds for façade improvements. Funding was then shifted to the Public Facilities and Improvements Program for Downtown/South Renton ("Downtown Streetscapes improvements").
2017 baseline
Department resources budgeted for this
program
Department resources budgeted for this
program
Business Licensing, ASD Department
The Business License and B&O Tax coordinates the review/approval process of over 6,000 business licenses (new and renewals) annually and collects approximately $3 million in business license fees, B&O taxes and penalties.
Approximately $2,000,000 and $2,040,000 for 2019 & 2020 respectively of the business license and tax fees are designated for transportation improvement programs, the remainder go to fund general fund operations. The business data collected from businesses also serves as a local economic indicator, provides tools for business outreach, and other economic development activities.
Target
2021/2022 Preliminary Budget City of Renton, Washington
2 - 9Renton Results - Safety and Health - Programs, Resources and Results
Desired Result: I want a safe and healthy community
City Service Area: Safety and Health
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDIncrease the percentage served in the Housing Repair Assistance Program (HRAP) of the low‐to‐
moderate income, owner‐occupied households that are eligible for the program.
N/A N/A N/A 4% of 5315 N/A N/A N/A N/A TBD
Increase the percentage of total served in HRAP that are non–senior (applicant less than 65 years of age) households.N/A N/A N/A 22 N/A N/A N/A N/A TBD
Increase the total number of Housing Repair services provided. N/A N/A N/A 985 N/A N/A N/A 999 TBD
Number of unduplicated Renton residents served by agencies that are funded by City of Renton.N/A N/A N/A 18136 27122 N/A N/A N/A TBD
Percentage of unduplicated Renton residents served by agencies that are funded by City of Renton.N/A N/A N/A 0.1895 0.2677 N/A N/A N/A TBD
Per capita spending for human services. N/A N/A N/A $ 5.54 $5.60 $5.67 $ 5.67 $5.67 TBDThe percentage of Housing Repair clients that complete surveys whose experience is better or slightly better than expected.95.8 69 69 N/A N/A N/A N/A N/A TBD
Percentage of Housing Repair survey respondents who agree that their health or safety hazard was resolved by doing the repair or service.100 97 98 N/A N/A N/A N/A N/A TBD
Number of unduplicated households served new 2015 new 2015 new 2015 217 N/A N/A N/A N/A TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:4.3 4.3 4.3 4.3 4.3 4.3 4.0 4.0 4.5 4.5
Dollars:1,124,503$ 1,135,777$ 1,199,981$ 1,212,599$ 1,279,927$ 1,301,760$ 1,299,619$ 1,331,278$ 1,316,559$ 1,342,967$
minimum of 80 percent
minimum of 80 percent
number of households
Department resources budgeted for this
program
increase of 0.5%
increase of 3%
increase of 10%
number of residents
percentage of residents
cost per capita
Serving vulnerable/low income, Community Services Department
Helping Renton residents and vulnerable populations be self‐ sufficient, contributing members of society and able to maintain their independence to the best of their abilities is what the Human Services Division is all about.
We provide information and referrals to connect people to services and refer them to 211 for additional assistance. Typical calls cover landlord tenant issues, food assistance, housing repair needs or how to get assistance
with rent or utilities as well as where to find shelter or a place to shower. Renton funds are allocated to agencies that are contractually obligated to serve Renton residents. These agencies help provide resources so children can be ready for school, they provide for basic quality of life needs and help prevent homelessness, as well as addressing domestic violence and sexual assault.
Target
2021/2022 Preliminary Budget City of Renton, Washington
2 - 10Renton Results - Safety and Health - Programs, Resources and Results
2021 2022
43.00 43.00
$ 9,227,611 $ 9,495,456
6% 6%
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's: 40.7 39.7 38.70 38.70 40.18 40.18 42.00 42.00 43.00 43.00
Dollars: 6,071,863$ 6,169,853$ 6,319,972$ 6,576,090$ 7,281,264$ $7,461,413 7,973,392$ 8,195,173$ 9,227,611$ 9,495,456$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDInformation requests/concerns from residents are
acknowledged within three days.90.25 92 97 100 100 100 100 100 TBD
Information requests/concerns are resolved within two weeks.90 95 92 99 92 97.5 90 92 TBD
Residents surveyed rate the value of services for the taxes paid to Renton as "good" or better.next survey 2015 next survey 2015 next survey 2015 51 next survey 2017 51 next survey 2021 next survey 2021 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:3.5 3.5 3.5 3.5 4.0 4.0 4.0 4.0 4.0 4.0
Dollars:868,832$ 890,745$ 985,593$ 1,023,307$ 1,426,801$ 1,508,885$ 1,497,833$ 1,490,587$ 1,525,787$ 1,575,912$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDNumber of Legislative documents (agenda, minutes, ordinances, resolutions, etc) published & available 187 144 142 148 121 140 173 204 TBD
Number of internal documents (contracts including lease agreements, MOU's, etc.) that are executed and recorded 411 601 579 722 725 714 874 693 TBD
Internal Customer service survey indicates Good or
Better customer satisfaction.N/A 86 N/A 87 N/A 85 N/A 87 TBD
Number of Public Records Requests 366 342 453 332 616 678 608 691 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:5 5 5.0 5.0 6.0 6.0 6.0 6.0 6.0 6.0
Dollars:1,016,822$ 1,062,166$ 942,862$ 992,720$ 1,081,537$ 1,119,660$ 1,301,087$ 1,362,852$ 1,433,840$ 1,477,120$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDRoutine legislation review will be performed within seven calendar days of receipt.new 2018 new 2018 new 2018 new 2018 new 2018 new 2018 92 92 TBD
Complete routine contract review within 7 calendar days of receipt.new 2018 new 2018 new 2018 new 2018 new 2018 new 2018 95 95 TBD
Complete routine contract addendums,
amendments and change orders within 2 business new 2018 new 2018 new 2018 new 2018 new 2018 new 2018 95 95 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:3.88 3.9 3.9 3.9 3.9 3.9 4.0 4.0 4.0 4.0
Dollars:577,349$ 594,181$ 654,880$ 693,479$ 677,867$ 700,477$ 719,671$ 746,356$ 792,781$ 816,384$
Desired Result: I want a responsive and responsible government
Note: Year‐over‐year data provided only for reference. Due to department, division, and programmatic reorganizations over this period of time, some information will differ from prior budget documents.
Strategies Renton is using to work toward and achieve this desired result
Policy and program decisions reflecting community values
Advocate community interest in regional, state, and federal forums
Open accessible and consistent (administrative and judicial) decision process
Clear and effective communications
Policy and fiscal accountability
Partnership with community organizations to leverage resources
Proposed
FTE's
Operating
Percent of Operating
Programs, Resources and Results
The following programs have provided metrics ("Results") to indicate the results of their efforts. Each metric is unigue ‐ some are simply counts of data points,
others are more qualitative indicating customer satisfaction, and many intend to show efficiency and effectiveness. It should be noted for those that are
marked "N/A" indicate a metric for which data is not yet available. This could be due to a number of reasons including changes in staffing and/or information
systems in place to collect the data. These metrics remain in this report as it is the intent of the program to provide the data when possible. The staff within the programs develop their own metrics and provide the data for reporting purposes.
City Resources
budgeted to support the
Safety and Health City Service Area
City Attorney Department resources
budgeted for this program
City Attorney Civil, City Attorney Department
The City Attorney Department ‐ Civil Division drafts, reviews, revises and/or edits all legislation for the City; provides legal advice and guidance to all departments, stays current on the law and provides affected City
departments notices of changes in the statutory or case law, helps negotiate and review contracts for all departments, interacts with other legal departments and municipalities on matters of joint interest, including interlocal agreements, and represents the City or oversees outside counsel in civil litigation and hearings (including defense of lawsuits, land use hearings, prosecution of code enforcement matters, and defense/initiation of police department property seizures).
Target
City Service Area: Representative Government
minimum of 90 percent
minimum of 90 percent
minimum of 51 percent
number of documents
number of documents
minimum of80 percent
number of requests
minimum of 95 percent
minimum of 95 percent
minimum of 90 percent
Executive Operations, Executive Department
This program offer consists of the support for resident inquiries and policy development and implementation functions provided by the Mayor's Office. Generally the Mayor's Office provides executive leadership and
management for the City of Renton government to act strategically, implement decisions efficiently and accurately, represent Renton effectively, apply city policies uniformly, and carry out city goals expeditiously.
Target
Target
ASD Department resources budgeted for this
program
Executive Department resources budgeted
for this program
City Clerk, ASD Department
The City Clerk's Office strives to provide consistently high levels of service that advance and strengthen Renton's government so it is prepared to meet the needs of the 21st century. The vision is to fundamentally improve the quality of life for residents and the community at large by providing the best customer service in King County. The mission of the City Clerk's Office is to encourage civic education and participation, and to create a climate and culture of openness and transparency in Renton city government through effective facilitation of the legislative process, and through accountable stewardship of public information and official city records.
The City Clerk's Office also strives to provide the highest quality customer service, understanding and helpfulness to our residents. We hold ourselves accountable by honoring our commitments and responsibilities to our
community and colleagues. We value the diversity and collaboration of opinions and backgrounds and have created an environment that is inclusive of everyone. We ensure that public records and information entrusted to us are preserved and accessible to the highest standards through stewardship and continual innovation.
$0
$2
$4
$6
$8
$10
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposedMillionsAnnual Budgets
40.7 39.7 38.7 38.7
40.2 40.2
42.0 42.0
43.0 43.0
36373839404142
4344
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's Budgeted
2021/2022 Preliminary Budget City of Renton, Washington
2 - 11Renton Results - Representative Government- Programs, Resources and Results
Desired Result: I want a responsive and responsible government
City Service Area: Representative Government
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Department's expenditures are within budget.100 100 100 100 100 100 100 100 TBD
Number of training hours per FTE provided to court employees.86898888TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2.0 2.0 2.0 2.0 2.0 2.0 5.0 5.0 4.0 4.0
Dollars:654,292$ 677,775$ 788,888$ 805,573$ 839,900$ 820,429$ 1,241,332$ 1,296,334$ 1,371,173$ 1,412,717$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:450,000$ 450,000$ 450,000$ 450,000$ 450,000$ 450,000$ 450,000$ 450,000$ 883,000$ 883,000$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDDefendant satisfaction with their understanding of the criminal case process is rated as "Good" or 83 84 84 83 85 83 80 82 TBD
Ongoing Juror Survey's reflect an approval rating that indicates satisfaction and understanding of the jury experience by non‐criminal citizens of Renton. 81 85 82 80 80 84 82 82 TBD
Defendant’s satisfaction with the ability to obtain access to court record information related to
criminal case processing is rated “Good” or better.
new 2015 new 2015 new 2015 87 92 92 90 90 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:7.0 6.0 6.0 6.0 5.0 5.0 5.0 5.0 5.0 5.0
Dollars:738,919$ 690,064$ 727,334$ 760,705$ 669,096$ 697,370$ 624,524$ 647,455$ 676,430$ 703,524$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDCoordinate and leverage civic engagement opportunities to conserve financial resources through the use of volunteers, resulting in annual cost avoidance.
$ 1,368,412 $ 1,423,321 $ 1,229,458 $ 1,179,835 $ 1,267,820 $ 1,480,792 N/A $ 1,268,800 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2.3 2.3 2.3 2.3 2.3 2.3 1.0 1.0 1.0 1.0
Dollars:286,362$ 291,999$ 302,776$ 322,780$ 312,631$ 312,631$ 125,652$ 130,089$ 133,972$ 137,011$
The Volunteer program engages over 5,000 people annually to steward different parts of the City and assist with City‐sponsored programming. A program of the Parks and Trails Division, it functions as a hub to recruit and connect people with different City departments according to their service interests. In the Community Services Department, the Volunteer Coordinator leads service events at Renton parks and annual events such as Arbor & Earth Day, 'Day of Service' and the City‐wide annual Volunteer Appreciation Banquet. This program meets the service demands of a growing community by using best management practices and supporting other divisions
and departments.
VOLUNTEER PROGRAM activities include:CERVIS software ‐ Volunteer Coordinator is software administrator and liaison to IT Division, marketing and volunteer recruitment, communication too, volunteer registration, timekeeping and reporting;Electronic Benefits Transfer (EBT) ‐ backup support, as needed, at Renton Farmers Market;
Events ‐ coordination and facilitation of over 50 City‐wide service and education opportunities;
Recreation Scholarship Program ‐ solicitation for donations for sponsorships to use toward Renton recreation programs;Summer Lunch Program ‐ develop marketing materials, delivery of meals and snacks, coordinate special events and free book giveaways with King County Library System and coordinate recreation activities with AmeriCorps volunteers; in partnership with United Way of King County, Renton School District, community organizations and apartment management.
Target
Community Services Department resources
budgeted for this program
Court Department resources budgeted for
this program
Court Public Defenders, contracted
Renton has a contract with a public defense firm to represent those individuals charged with crimes under the Renton Municipal Code.
Court Department resources budgeted for
this program
Volunteer Program, Community Services Department
Court Administration, Court Services Department
In accordance with Washington State Court Rule #GR 29, the Presiding Judge and as delegated, the Court Services
Director, shall manage and administer the court's business, including:
‐ Supervise the business of the court to ensure the expeditious and efficient processing of cases; ‐ Supervise all Judicial Branch personnel; ‐ Accounting and auditing of revenues and expenditures;
‐ Development and coordination of statistical and management information;
‐ Preparation and filing of daily, weekly, monthly and annual reports as required by statute and court rule; ‐ Act as official spokesperson for the court with the Legislative and Executive branch of government and the community and ‐ Select, train and assign Pro Tem judges
Target
Criminal Case Processing, Court Services Department
Renton Municipal Court is a court of limited jurisdiction, handling all misdemeanor and gross misdemeanor crimes that occur within the city limits of Renton. After a case is filed by the prosecutor or police department, the
court holds a series of hearings (in person or via Zoom) in order to obtain a resolution or disposition to a charge. Detailed information regarding the individuals involved, charges alleged, hearings scheduled, judgments rendered and conditions of sentence imposed are gathered in the court's case management and document management system. Accuracy of information is a paramount responsibility of the court.
Target
Court Department resources budgeted for
this program
minimum of 1260000 dollar
minimum of 8 count
minimum of 80 percent
minimum of 90 percent
minimum of 80 percent
minimum of 99.5 percent
2021/2022 Preliminary Budget City of Renton, Washington
2 - 12Renton Results - Representative Government - Programs, Resources and Results
Desired Result: I want a responsive and responsible government
City Service Area: Representative Government
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDDefendant's satisfaction with the ability to get access
to court information related to infraction processing is rated "Good" or better.87 83 86 87 92 90 88 88 TBD
Resident's satisfaction with understanding the court infraction process.74 78 85 85 86 84 84 82 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:5 5 4.0 4.0 5.0 5.0 5.0 5.0 7.0 7.0
Dollars:516,601$ 528,590$ 474,419$ 494,445$ 585,407$ 611,935$ 641,463$ 662,151$ 906,613$ 945,398$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDPercent of survey responses that rate the City's job of keeping residents informed as "good" or better. Survey not available Survey not available Survey not available 65 Survey not available 67 no data no data TBD
Composite increase in residents' rating for each of the City's various information resources provided by the Communications Department (e‐
communication, print, advertising and media).
Survey not available Survey not available Survey not available 52 Survey not available N/A no data no data TBD
Internal Customer satisfaction rating of
Communications Department services will be "good" or better.
Survey not
available
Survey not
available
Survey not
available
Survey not
available
Survey not
available
Survey not
available no data no data TBD
The percent of the City's Public Relations efforts and advertising covered by local and regional media. 80 N/A N/A N/A 95 N/A no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Dollars:571,172$ 586,817$ 554,982$ 582,520$ 759,814$ 753,724$ 751,422$ 773,442$ 687,797$ 713,771$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0.00 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:40,000$ 40,000$ 40,000$ 40,000$ 40,000$ 40,000$ 40,000$ 40,000$ 40,000$ 40,000$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDAmount of Intergovernmental funding collected by the City to fund programs and projects increases year over year.75 N/A N/A N/A 75 N/A no data no data TBD
Accomplishment or significant progress made on each of the major priorities of the annually adopted
State Legislative Agenda
87.5 N/A N/A N/A 75 N/A no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:62,400$ 62,400$ 62,400$ 62,400$ 70,000$ 70,000$ 166,000$ 166,000$ 166,000$ 166,000$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:see Exec see Exec see Exec see Exec see Exec see Exec see Exec see Exec0.0 0.0
Dollars:see Exec see Exec see Exec see Exec see Exec see Exec see Exec see Exec 97,674$ 97,674$
City Attorney Department resources
budgeted for this program
Channel 21, the city's government access cable channel and the related programming, strives to:
‐ Inform and engage citizens in the governmental, civic and cultural affairs of Renton through compelling use of television and other related media.
‐ Provide opportunities for the public to understand, participate, and influence city government.‐ Offer transparency in the government process by showcasing council meetings and offering open, accessible, and consistent decision processes.‐ Provide programming and content, thereby informing and engaging our residents, and creating a multimedia resource that provides linkages to public information and opportunities for citizens to interact with their government and each other across all media platforms.
Executive Department resources budgeted
for this program
Cable Communications Fund, Executive Department
The intergovernmental relations program coordinates advocacy with regional, state and federal policymakers in order to help advance the City's business plan. Particular priority is placed on maximizing funding opportunities in order to maintain and develop quality infrastructure and promote economic development. The Mayor and Council as well as multiple City staff actively participate in numerous statewide and regional associations, interest groups and coalitions to advance the City's objectives and position the City as an established voice in intergovernmental policymaking. The intergovernmental relations team helps coordinate communication across City
departments to ensure that the City reflects a unified voice and focuses on a strategic agenda for each level of government.
Target
Executive Department resources budgeted
for this program
Hearing Examiner, Contracted; Executive Department
The function of the Hearing Examiner program is to hold hearings and issue decisions and recommendations to the City Council on original land use matters as well as hear appeals by those who wish to appeal the
administrative decisions of the City regarding land use decisions, impoundment cases, and other matters. The Hearing Examiner is also delegated by the Police Chief to hear property forfeitures arising out of illegal drug tti
Executive Department resources budgeted
for this program
Intergovernmental Relations, Executive Department
Infraction Processing, Court Services Department
Court Department resources budgeted for
this program
The role of the Court in this program is "...to secure the just, speedy and inexpensive determination of every infraction case." per Washington State Court Rule IRLJ 3.2. An infraction is a non‐criminal violation of the law
determined by statute or city ordinance. In Renton infractions consist mostly of traffic citations, parking tickets, photo enforcement tickets, impound hearings and building code violations.
Target
minimum of 80 percent
minimum of 80 percent
minimum of 5 percent
minimum of 75 percent
minimum of 65 percent
minimum of 5 percent
minimum of 80 percent
minimum of 80 percent
Citywide Communications, Executive Department
Citywide communications offer a dynamic and integrated one‐stop communications shop. The communications division realignment of the functions leverages the strengths of communications professionals working across all communications platforms. This results in cost savings and efficiencies to the city when staff with similar skill sets can balance out the communications priorities and provide a synergistic approach to content creation and
delivery.
Specifically, the communications program will:‐ Provide effective and strategic communication through clear and concise messaging to the public to protect community during emergencies and emphasize safety and preparedness in advance.‐ Develop and maintain extensive media contacts, answer or direct all media inquiries, coordinate interviews with public officials, and provide informational press releases in a timely and effective manner.
‐ Work closely with all city departments to implement strategic communication strategies that better communicate key issues and city priorities both internally and with the public.
‐ Utilize new and emerging communication technologies to keep the public and city staff well informed.
Target
2021/2022 Preliminary Budget City of Renton, Washington
2 - 13Renton Results - Representative Government - Programs, Resources and Results
Desired Result: I want a responsive and responsible government
City Service Area: Representative Government
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0 8.0
Dollars:289,114$ 295,116$ 335,838$ 348,161$ 368,211$ 376,303$ 414,410$ 429,907$ 512,544$ 526,945$
Legislative Operations, Legislative Department
This program offer consists of assessing the needs of the public and setting priorities; developing and adopting the annual budget, ordinances, resolutions, and policy alternatives to meet those needs, consistent with City
goals and objectives; and provides coordination and evaluation of programs and service objectives.. By City code required to provide a forum for appeals.
Executive Department resources budgeted
for this program
2021/2022 Preliminary Budget City of Renton, Washington
2 - 14Renton Results - Representative Government - Programs, Resources and Results
2021 2022
76.94 76.94
$ 19,840,142 $ 20,357,585
11% 11%
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's: 60.12 60.12 61.80 61.80 64.26 64.26 66.10 67.10 76.94 76.94
Dollars: 13,392,241$ 13,534,361$ 14,926,310$ 15,378,322$ 17,150,795$ $17,190,774 17,409,115$ 18,485,149$ 19,840,142$ 20,357,585$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDPercentage of occupancy rate for Swimming Lesson registrations 88 86 86 79 72 N/A no data no data TBD
Henry Moses Aquatics Center customers rate their
experience and satisfaction as Good to Excellent 99 99 96 97 95 N/A no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1.0 1.0 1.0 1.0 1.0 1.0 1.4 1.4 1.4 1.4
Dollars:774,745$ 777,883$ 774,928$ 786,791$ 867,727$ 873,141$ 937,637$ 949,586$ 963,276$ 975,821$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDAverage Market‐Day booth space occupancy as percentage of available space.new 2015 new 2015 83.00 99.00 96.00 85.00 82.00 83.00 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0.8 0.8 0.5 0.5 0.5 0.5 1.0 1.0 1.3 1.3
Dollars:81,314$ 82,399$ 59,454$ 63,314$ 66,854$ 69,646$ 131,219$ 134,938$ 183,264$ 188,695$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDAverage daily attendance for drop‐in programs at Highlands and North Highlands Neighborhood 67.00 79.00 59.00 78.00 65.00 60.00 no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:11.8 11.8 12.1 12.1 12.1 12.1 6.9 6.9 7.2 7.2
Dollars:3,590,304$ 3,620,605$ 3,815,191$ 3,920,611$ 4,024,733$ 3,954,927$ 3,031,845$ 3,134,428$ 1,877,391$ 1,918,397$
Programs, Resources and Results
The following programs have provided metrics ("Results") to indicate the results of their efforts. Each metric is unigue ‐ some are simply counts of data points,
others are more qualitative indicating customer satisfaction, and many intend to show efficiency and effectiveness. It should be noted for those that are
marked "N/A" indicate a metric for which data is not yet available. This could be due to a number of reasons including changes in staffing and/or information
systems in place to collect the data. These metrics remain in this report as it is the intent of the program to provide the data when possible. The staff within the programs develop their own metrics and provide the data for reporting purposes.
City Resources
budgeted to support the
Safety and Health City Service Area
Note: Year‐over‐year data provided only for reference. Due to department, division, and programmatic reorganizations over this period of time, some information will differ from prior budget documents.
Education and Recreational Activities, Community Services Department
The Educational and Recreational programming offered by the Recreation and Neighborhood Division to the public, through our recreational facilities and parks, includes a wide variety covering the following interest areas:
athletic programming, outdoor programming, health, fitness, and wellness programs, social activities, educational programs, art programs, youth and civic engagement, summer camps, intergenerational programs, adaptive programming, pre‐school programming, and adult and senior programming.
Target
Department resources budgeted for this
program**
minimum of 120 count
Target
Department resources budgeted for this
program
Department resources budgeted for this
program
Farmers Market, Community Services Department
Every Tuesday June through September, the Renton Farmers Market (RFM) is held in Downtown Renton's Piazza Park. An average of over 3,000 people attend the Market each week and have access to more than 60 unique vendors who sell a wide array of fresh, locally grown products, including fruits and vegetables, cut flowers, meats, herbs, baked goods and honey in addition to artisan and craft vendors and Washington wineries and breweries . There is live entertainment each week, as well as a Kids Patch, which allows children and their parents to engage in activities such as art projects.
Master Gardeners are available to help visitors with questions and a Taste of Renton program allows Renton restaurants to showcase their business and menu items and cooking demonstrations featuring market fresh produce. A community booth allows community organizations to share information. To help meet the needs of all of our customers, the RFM accepts Women, Infants and Children (WIC) vouchers as well as Senior Farmers Market Nutrition Program (SFMNP) vouchers that can be used at the markets. Additionally, an EBT (Electronic Benefits Transfer) token program allows shoppers to use SNAP (Supplemental Nutrition Assistance Program) benefits at the Market, and a 'SNAP Market Match' incentive gives those shoppers a dollar‐for‐dollar match of those benefits to be used on fresh produce at the Market.
City Service Area: Livable Community
Aquatics, Community Services Department
The Aquatics Program consists of the seasonal operations and staffing of Henry Moses Aquatic Center (HMAC) the city's owned and operated public water park, and the beach lifeguard program that provides lifeguard o ersite of both p blic beaches located at Gene Co lon Memorial Park and Kenn dale Beach ith p blic safet as its first priorit for the entire program
Target
minimum of 80 percent
minimum of 80 percent
minimum of 95 percent
Proposed
FTE's
Operating
Percent of Operating
Strategies Renton is using to work toward and achieve this desired result:
Encourage and foster a vibrant and diverse economy
Provide or make available diverse learning and enrichment opportunities
Provide clean, safe, healthy and well‐maintained places
Desired Result: I want access to high quality facilities, services and public resources that enrich the lives of everyone in the community
$0
$5
$10
$15
$20
$25
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposedMillionsAnnual Budgets
60.1 60.1 61.8 61.8 64.3 64.3 66.1 67.1 76.9 76.9
0
20
40
60
80
100
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's Budgeted
2021/2022 Preliminary Budget City of Renton, Washington
2 - 15Renton Results - Livable Community - Programs, Resources and Results
City Service Area: Livable Community
Desired Result: I want access to high quality facilities, services and public resources that enrich the lives of everyone in the community
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Average daily attendance at the Senior Center 222.00 261.00 219.00 401.00 394.00 400.00 no data no data TBD
Senior Center customers rate their experience and satisfaction as Good to Excellent 98.00 91.00 93.00 92.00 N/A 99.00 no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:3.3 3.3 3.3 3.3 3.3 3.3 4.7 4.7 4.9 4.9
Dollars:575,965$ 583,607$ 610,795$ 631,561$ 781,973$ 796,164$ 966,961$ 987,099$ 1,067,944$ 1,078,775$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDPercentage of evaluations of services and/or experience rate satisfaction as good or better.98 next survey 2015 next survey 2015 87 N/A N/A no data no data TBD
Maintain or increase the number of officially recognized neighborhoods/ associations participating in the program.69 69 70 74 74 90 no data no data TBD
Estimated percentage of residents served based on households within recognized
neighborhoods/associations.
55 55 55 N/A N/A 42 no data no data TBD
Increase the number of attendees at neighborhood picnics, trainings and forums.0 20 2600 455 3560 no data no data TBD
Participant satisfaction rated good to excellent experience with overall program new 2013 83 N/A 87 N/A no data no data no data TBD
Percent attendees at 4th of July, Renton River Days, and Holiday Lights events that report overall experience satisfaction of 3 or better in a 1‐5 scale.97 96 97.5 96 98 no data no data no data TBD
Number of businesses/public/private relationships engaged & providing support to produce 4th of July, Renton River Days and Holiday Lights events
maintained or increased.
81 75 84 82 78 no data no data no data TBD
Percentage of the TOTAL cost of Holiday Lights,
Renton River Days and 4th of July that is funded by sponsors. new 2015 new 2015 37 32 31 no data no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0.98 0.98 1.5 1.5 1.5 1.5 3.2 3.2 3.9 3.9
Dollars:276,838$ 278,378$ 345,672$ 359,219$ 367,426$ 376,567$ 674,972$ 708,019$ 926,740$ 950,556$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDNumber of visitors and people served by outreach 5199 4671 5571 5887 4747 7988 no data no data TBDPercentage of visitors expressing high satisfaction 86 86 94 100 94 97no datano dataTBDNumber of days in responding to research & photo
orders 6 4 5 3.5 1.5 3 no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Dollars:209,903$ 211,281$ 227,761$ 235,281$ 236,275$ 241,550$ 252,298$ 265,248$ 289,701$ 297,273$
minimum of 3 percent
minimum of 70 percent
less than 7 days
Department resources budgeted for this
program**
minimum of 80 percent
minimum of 60 count
minimum of 30 percent
minimum of 4800 count
Cultural & Community Engagement, Community Services Department
Department resources budgeted for this
program
Senior Activity Center, Community Services Department
The Renton Senior Activity Center connects older adults, and individuals with disabilities to vital community services that help them stay healthy and independent. The Center offers older adults access to multiple services in
one convenient place with a variety of programs and services including meal and nutrition programs, information and assistance, health, fitness, and wellness programs, transportation services, public benefits counseling
through workshops and speakers, volunteer and civic engagement opportunities, field trips, social and recreational activities, educational and arts programs, and adaptive recreational programming (for all ages).
Target
minimum of 80 percent
minimum of 250 count
The Recreation and Neighborhoods Division creates, produces, and executes City coordinated events, non‐city permitted events, cultural programs, neighborhood grants, and engagement with the community. Events that are coordinated by the City are inclusive of all ages, abilities and cultures, promote civic participation, foster community pride and build community connections for all. Examples of city produced events include 4th of July at Coulon, Holiday Lights, Renton River Days (co‐coordinated with Renton River Days Board),summer movie and concert series, bike rodeo, Truck‐or‐Treat, neighborhood events, and other such events, both large and small.
Non‐City permitted events bring revenue and new audiences to the City, to help promote Renton as a progressive, opportunity‐rich city in the Puget Sound region. The Recreation and Neighborhood Division manages this permitting process by leading a multi‐departmental committee to ensure the event is safe for both the public, and reduces risk and mitigates exposure to the city. Over 70 non‐city events are permitted each year, such as Seahawks Training Camp, large scale running events and bike rides, cultural programs, and Return to Renton Annual Car Show.
The Recreation and Neighborhoods Division community engagement efforts serve as on outlet to provide critical and relevant information on a timely basis, and helps facilitate two‐way dialogue between the City of Renton
and its residents. The Division hosts community conversations and solicits public feedback in variety of ways for the purposes of improving and guiding our operations to be a reflection of our community's interests. Another form of community engagement is The City of Renton Neighborhood Grant Program. This program provides engagement opportunities and grant resources for creating vibrant, healthy, and connected communities through collaborative efforts between residents and the City.
Target
Department resources budgeted for this
program
Museum, Community Services Department
The Renton History Museum is the City's only organization dedicated to the preservation, documentation, and education about Renton history in ways that are accessible to diverse people of all ages. Until COVID‐19 the Museum was also Renton's only cultural organization with regular open hours for the public; these will resume after the pandemic has passed. With the support of the Renton Historical Society (RHS), a 501(c)3 nonprofit, the
Museum provides changing and permanent exhibits, classroom curricula, programs, publications, online programming, and research assistance for those interested in local history. The Museum also cares for a collection of
25,000+ objects and over 19,000 historic photos. The Museum provides these services under a formal Museum Management Agreement between the City of Renton and the Renton Historical Society, a 501(c)3 nonprofit.
Target
minimum of 85 percent
minimum of 80 percent
equal to or greater than 72 count
% of residents
2021/2022 Preliminary Budget City of Renton, Washington
2 - 16Renton Results - Livable Community - Programs, Resources and Results
City Service Area: Livable Community
Desired Result: I want access to high quality facilities, services and public resources that enrich the lives of everyone in the community
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDAverage daily attendance for drop‐in programs at Highlands and North Highlands Neighborhood 67 79 59 78 65 60 no data no data TBD
Renton Community Center customers rate their
experience and satisfaction as Good to Excellent N/A919489N/A84no datano dataTBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:see above see above see above see above see above see above 1.7 1.7 1.9 1.9
Dollars:see above see above see above see above see above see above 352,538$ 364,303$ 1,589,398$ 1,641,680$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Overall customer satisfaction rating is good to excellent In cleanliness and appearance of Parks & Trail System 89 93 89 84 N/A 88 N/A 64 TBD
Average number of days to complete Cityworks service requests that are assigned to the Parks Maintenance team via ‘Renton Responds.new 2020 new 2020 new 2020 new 2020 new 2020 new 2020 new 2020 new 2020TBD
Customers surveyed feel safe in parks and trails 82 87 N/A N/A N/A N/A Next Survey 2021 Next Survey 2021 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:22.8 22.8 22.8 22.8 24.8 24.8 24.6 24.6 32.6 32.6
Dollars:4,046,158$ 4,095,896$ 4,722,541$ 4,914,394$ 5,271,700$ 5,242,739$ 5,113,786$ 5,530,737$ 6,428,197$ 6,615,715$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDPercent of market value of lowest‐yielding property per market analysis. new 2013 10 10 10 N/A N/A 1075 3683 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1.5 1.5 1.5 1.5 1.5 1.5 1.0 1.0 1.5 1.5
Dollars:629,657$ 647,061$ 663,404$ 671,980$ 839,996$ 845,755$ 1,007,970$ 1,012,141$ 849,878$ 860,534$
The Parks and Trails Division maintains for public safety and enjoyment 32 developed parks totaling 274 acres, 457 acres of natural areas and 13 miles of developed trails that attract millions of visitors each year. Piazza and
Gateway Parks are activated each year by the Farmers Market for its 4 month season, and the Volunteer program engages over 5,000 people annually to steward different parts of the City . The Division meets the service demands of a growing community by retaining a skilled workforce, using best management practices and supporting other divisions and departments at City‐wide programs and events.
PARKS MAINTENANCE activities include:
Cityworks software ‐ daily work management and reporting systemCourts maintenance ‐ 23 basketball and tennis courtsEvents support ‐ 20 City‐sponsored Special Events like Renton River Days, 4th of July, etc.Green waste and trash removal ‐ over 10,000 cubic yards removed each year
Irrigation maintenance ‐ turf fields and 29 different Right‐of‐Way (ROW) areas
Inspections ‐ 22 playgrounds and one skate board park on routine scheduleLandscaping ‐ six acres of shrub beds weeded and mulched year‐roundSports fields ‐ 1,200 athletic field preparations on 20 reservable sports fieldsTree maintenance ‐ parks, natural areas and street Right‐of‐ Ways; support Urban Forestry Program
Turf management ‐ mow, fertilize, aerate and edge over 180 acres on continuous rotation
Volunteer support ‐ facilitate over 50 projects and events such as Arbor Day/Earth Day
Target
Parks and Trails Program, Community Services Department
minimum of 80 percent
within 10 percent
Fund 108 was created for the purpose of identifying Leased City Properties revenue and expenditures.
Target
Department resources budgeted for this
program
Department resources budgeted for this
program**
Leased Facilities, Community Services Department
minimum of 120 count
minimum of 80 percent
minimum of 80 percent
minimum of 85 percent
Recreational Facilities, Community Services Department
Our Recreation facilities, which includes the Renton Community Center, Highlands Neighborhood Center, along with several smaller neighborhood park buildings (North Highlands, Tiffany, Teasdale, and Kennydale Parks) are
all community assets. The Renton Community Center is a central resource center for the community offering a place where patrons can conduct a wide variety of City business transactions and information. This requires staff
to be versatile and aware of all the City has to offer in addition to knowledge of the Recreation and Neighborhoods Division.
Programming offered to the public at the Renton Community Center includes: adult and youth athletic programming, outdoor programming, information and assistance, health, fitness, and wellness programs, social and recreational activities, educational and arts programs, intergenerational programs, adaptive programming, pre‐school programming, private rentals, public meetings, and special events. The Community Center is a connector
to the City providing a gathering space that is used by the Renton School District, local non‐profits, regional and state government agencies, businesses, and the City of Renton itself. The center does so by providing space for
meetings, celebrations, forums, and trainings.
Our Highlands Neighborhood Center and North Highlands Neighborhood Center provide quality afterschool programming and youth summer camps. The North Highlands Neighborhood Center houses in one wing of the center the Co‐op Sunshine Preschool Program during the school year. The larger portion of the center with the classrooms and gymnasium houses recreational programming during afterschool hours and summer camps. The
Highlands Neighborhood Center in 2017 received a King County Best Starts for Kids grant over 3 years in the amount of $520,560 for its STREAM program (Science, Technology, Recreation, Engineering, Arts, and Math). The
Highlands Neighborhood Center is the backbone of programming by providing space for recreation services, a nutritious snack (lunch during the summer program), and coordination of enrichment activities, for a low‐resource section of the community.
Target
Department resources budgeted for this
program**
2021/2022 Preliminary Budget City of Renton, Washington
2 - 17Renton Results - Livable Community - Programs, Resources and Results
City Service Area: Livable Community
Desired Result: I want access to high quality facilities, services and public resources that enrich the lives of everyone in the community
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDBudget Management ‐ efficiency monitoring ‐
Annual 100 100 100 100 100 100 no data no data TBD
Staff serving on minimum number of local, regional
and state Boards to support grant and educational opportunities. 5 5 N/A 5 5 5 no data no data TBD
No late fees in processing of invoices 85 95 N/A 90 95 95 no data no data TBD
Current information on web site 75 75 N/A 80 85 90 no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2 2 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.0
Dollars:448,556$ 445,032$ 545,712$ 562,434$ 505,154$ 524,771$ 528,906$ 769,204$ 592,057$ 606,402$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDResponses to an interdepartmental survey rate overall experience in working with CED as "good” or better
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time no data no data TBD
CED employees rate CED as a “Good” or better place to work
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time
survey not available at this time no data no data TBD
Number of organizations in which CED staff represents the City in local, regional and statewide organizations focused in areas such as land use,
economic development , building regulation
24 27 27 29 N/A 29 29 29 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2 2 2.5 2.5 1.8 1.8 5.8 5.8 1.8 1.8
Dollars:1,017,853$ 1,006,430$ 1,128,965$ 1,173,838$ 1,285,338$ 1,312,272$ 2,118,182$ 2,254,111$ 1,473,798$ 1,512,849$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDProcess land use applications requiring a decision by
the Hearing Examiner within 12 weeks of receipt of complete application.45.35083767287.50.921TBD
Process land use applications requiring an Administrative Decision within 8 weeks.57.58882847581.50.910.92TBD
Development projects will be rated as adding value, quality, and character to the community by the Planning Commission following land use decisions.new 2017 new 2017 new 2017 new 2017 new 2017 67 No Data No Data TBD
Completed responses to a customer service questionnaire rate their overall experience as
"Good" or better
survey not available at
this time
survey not available at this
time
survey not available at this
time
survey not available at this
time
survey not available at this time
survey not available at this time No Data No Data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:6 6 6.7 6.7 7.6 7.6 8.6 8.6 8.3 8.3
Dollars:676,661$ 696,159$ 844,508$ 904,394$ 1,163,676$ 1,220,824$ 1,135,859$ 1,199,902$ 1,228,210$ 1,279,777$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDEnsure all City of Renton planning laws are current, compliant with state laws (such as GMA, SMA, EPA and Subdivision) and meet the long term vision for the City.
N/Aat this time 100 100 100 100 100 100 100 TBD
Process all requests for annexation within Washington State Law timelines N/Aat this time 100 100 100 100 100 100 100 TBD
Process all proposed amendments to the City's comprehensive plan and development regulations
through the Planning Commission to Council within established timelines
N/A
at this time 100 100 100 100 100 100 100 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:4 4 2.8 2.8 3.0 3.0 3.2 3.2 3.2 3.2
Dollars:529,701$ 545,081$ 444,016$ 468,421$ 523,500$ 543,932$ 538,774$ 559,463$ 603,256$ 624,747$
Target
Department resources budgeted for this
program**
minimum of 80 percent
minimum of 8 count
minimum of 90 percent
minimum of 90 percent
minimum of 100 percent
minimum of 4 count
minimum of 100 percent
Department resources budgeted for this
program
The Long Range Planning division primarily provides for legislative development of policies and regulations that implement Washington State Laws and help to ensure a high quality of life for residents. The regulations relate to land use, environment, and governance and include the Growth Management Act, Shoreline Management Act, State Environmental Policy Act, and the annexation laws related to governance. The program also facilitates
development of the City's Comprehensive Plan and associated Community Plans and works collaboratively with the Planning Commission and Advisory Boards to oversee implementation of those adopted plans.
minimum of 100 percent
minimum of 100 percent
minimum of 100 percent
minimum of 100 percent
minimum of 80 percent
Target
Department resources budgeted for this
program
CED Administration, CED Department
CED Administration provides leadership, resources and regional influence to enable the Department to meet its responsibilities in a manner that is responsive to the needs of its customers and consistent with the City's
Business Plan, Goals and Action Items. CED Administration is responsible for budget development, as well as financial monitoring and reporting for the entire Department.
In addition to the general administration of the Department, the Administrator directly oversees the Economic Development Divsion, the Development Services Division, Long Range Planning, and the Planning Division, serves on the Mayor's Cabinet, and works on numerous special projects within the Department, interdepartmentally, and regionally.
Target
This program provides for review, analysis and the development of written findings and determinations expressed in staff reports for discretionary land use permits, including but not limited to: Plats, Rezones, Conditional
Use Permits, Site Plan Review, Variances, and Shoreline Permits. In addition, this program provides review of building and public works permits, general planning and permitting information to the public at the customer service counter, inspections, and conducts
minimum of 80 percent
minimum of 80 percent
Administration/Com Svcs, Community Services Department
The Mission of the Community Services Department is to promote a more livable community by providing recreation, museum, golf course, human service programs, planning and capital improvement projects, modern parks
and trails, facilities, urban forestry and undisturbed natural areas. We are a department comprised of eight divisions. We are the conduit for Community involvement and overseeing quality of life experiences.
Target
Department resources budgeted for this
program**
Long Range Planning, CED Department
Current Planning, CED Department
2021/2022 Preliminary Budget City of Renton, Washington
2 - 18Renton Results - Livable Community - Programs, Resources and Results
City Service Area: Livable Community
Desired Result: I want access to high quality facilities, services and public resources that enrich the lives of everyone in the community
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDThe City's annual sales tax revenue growth rate (excluding one‐time items)4.71 6 9.4 9 7 N/A no data no data TBD
Continue to diversify Renton’s employment base to ensure no single employment sector exceeds targeted percent of employment base.30 40 N/A 15.6 15.6 N/A no data no data TBD
Annual property tax revenue associated with new construction increases. 1.09 1.13 1.29 2.82 ‐2.12 623987 no data no data TBD
Total number of employees working in Renton (measured by FTE) increases year over year 60 ‐1.4 16 14 ‐2.25 N/A no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2.75 2.75 4.0 4.0 4.0 4.0 1.0 1.0 6.0 6.0
Dollars:446,705$ 455,737$ 604,469$ 648,403$ 751,718$ 772,559$ 138,545$ 136,346$ 1,169,508$ 1,208,842$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDPercent increase grant and intergovernmental
revenues in support of arts and culture in Renton 24 N/A N/A N/A N/A N/A no data no data TBD
Percent increase number of volunteers supporting the Arts & Culture Master Plan 90 N/A N/A N/A N/A N/A no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0.25 0.25 0.3 0.3 0.3 0.3 0.0 0.0 0.0 0.0
Dollars:37,881$ 38,812$ 35,944$ 37,679$ 88,000$ 39,202$ 102,900$ 102,900$ 117,900$ 117,900$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0.00 0.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:50,000$ 50,000$ 102,950$ ‐$ 15,000$ 15,000$ 15,000$ 15,000$ 117,900$ 117,900$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDNumber of successfully completed public art projects through the 1% for Art program (as established by City ordinance) each biennium.0 N/A N/A N/A N/A N/A no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:‐$ ‐$ ‐$ ‐$ 361,724$ 361,724$ 361,724$ 361,724$ 361,724$ 361,724$
Department resources budgeted for this
program**
Arts & Culture, CED Department
The Renton Municipal Arts Commission (RMAC) is administered by the Department of Community and Economic Development. The RMAC is overseen by the Community Services Committee of the Renton City Council .
The RMAC was created by ordinance to serve as an advisory group to the Administration on the development of arts and culture in the City. The primary responsibility of the Commission is to support the ongoing development of arts programs and projects in Renton. Its primary programs include the funding of artists and arts and culture organizations to provide services for the residents of Renton, and oversight and implementation
of the Arts and Culture Master Plan. The Commission provides leadership, supports collaborative efforts that enhance the aesthetic environment of Renton through public art, and promotes cultural opportunities and
experiential arts immersion throughout the community.
Target
Target
Department resources budgeted for this
program**
1% for the Arts, Community & Economic Development Department
The One Percent for Art Fund Program ("Program") provides the opportunity to enhance municipal projects with the addition of public art or artistic treatments. The Program ordinance requires that all Capital Improvement Projects (excluding water and wastewater) include an amount not less than one percent of the actual total project cost to be used for the selection, acquisition, and installation of works of art. A Capital Improvement Project
may also deposit funds into the Program account to be invested in other public art projects.
Department resources budgeted for this
program**
minimum of 1 count
Target
The City of Renton receives Community Development Block Grant (CDBG) funding from the U.S. Department of Housing and Urban Development (HUD). These are federal funds that go from HUD to King County to Renton via an agreement. It is money in/money out at no cost to the City. Funds can be used for public services, community development, economic development, and construction of public facilities. There are very specific and stringent requirements at the federal and county level for what activities the funds can be used.
Since 2015, CDBG funding has been used to promote economic development activities. From 2015‐2019 the City offered the Downtown Commercial Rehabilitation and Façade Improvement Loan Program (FILP) using CDBG funds. The program was closed out in 2019 after providing $601,497 in matching funds for façade improvements. Funding was then shifted to the Public Facilities and Improvements Program for Downtown/South Renton ("Downtown Streetscapes improvements").
CDBG ‐ CED, Community & Economic Development Department
greater than 1.5 percent
minimum of 1 percent
maximum of 40 percent
minimum of 1 percent
minimum of 3 percent
minimum of 3 percent
Department resources budgeted for this
program
Economic Development, CED Department
Mayor Pavone and Renton City Council have set clear direction for economic development in our community. They have made addressing economic development priorities one of their five "key areas of focus." Their policies
are ambitious and meant to position Renton businesses for success and set the stage for future job creation and investment.
2021/2022 Preliminary Budget City of Renton, Washington
2 - 19Renton Results - Livable Community - Programs, Resources and Results
2021 2022
67.71 67.71
$ 15,702,514 $ 16,103,066
9% 9%
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's: 71.39 71.39 70.39 70.39 56.85 56.85 66.31 66.31 67.71 67.71
Dollars: 11,759,816$ 12,022,870$ 13,457,994$ 13,996,424$ 11,722,925$ $11,941,955 14,263,350$ 14,814,122$ 15,702,514$ 16,103,066$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDNo takeoff or landing delay for any aircraft longer than 30 minutes due to inclement weather, routine
surface maintenance operations, the presence of Foreign Object Debris (FOD), or wildlife
30000220TBD
Percent of leaseable airport property that is leased to aviation business and/or aircract owners 90 90 94 96 96 96 90 85 TBD
Total number of airport operations 92761 93785 100544 112335 123013 137788 139041 127336 TBD
Number of reports of bird damage or foreign object damage to aircraft.00002302TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:10.37 10.37 10.4 10.4 3.7 3.7 6.9 6.9 9.0 9.0
Dollars:1,357,977$ 1,391,561$ 1,597,719$ 1,688,986$ 509,857$ 526,723$ 1,748,646$ 1,794,466$ 2,167,840$ 2,250,234$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDArterial Corridor Travel Time new 2015 new 2015 0 0.1 0.1 0.09 0.1 0.1 TBD percent of changePromote public safety by minimizing signal downtime as measured by annual count of new 2015 new 2015 43 60 37 52 50 70 TBD count of failures
Number of pedestrian or bicycle accidents annually new 2015 new 2015 42 44 55 28 25 33 TBD count of
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:10.37 10.4 10.4 10.4 3.7 3.7 6.9 6.9 5.0 5.0
Dollars:1,357,977$ 1,391,561$ 1,597,719$ 1,688,986$ 509,857$ 526,723$ 1,748,646$ 1,794,466$ 1,470,288$ 1,492,867$
Environmental conservation, education and outreach
Programs, Resources and Results
The following programs have provided metrics ("Results") to indicate the results of their efforts. Each metric is unigue ‐ some are simply counts of data points,
others are more qualitative indicating customer satisfaction, and many intend to show efficiency and effectiveness. It should be noted for those that are
marked "N/A" indicate a metric for which data is not yet available. This could be due to a number of reasons including changes in staffing and/or information
systems in place to collect the data. These metrics remain in this report as it is the intent of the program to provide the data when possible. The staff within the programs develop their own metrics and provide the data for reporting purposes.
Desired Results: I want safe and efficient access to all desired destinations, now and in the future
Strategies Renton is using to work toward and achieve this desired result:Proposed
Well maintained neighborhoods, properties and environment FTE's
City Resources
budgeted to support the
Safety and Health City Service Area
Trans Operations Engineering Section, Public Works Department
The Transportation Operations Engineering Section is responsible for the safe and efficient flow of traffic on all City of Renton streets. This group develops traffic engineering solutions and adjusts traffic signal timing in response to citizen requests, accident prone locations, traffic congestion and special events. This Section operates the Traffic Management Center, which observes and controls the traffic signal timing at each of the 136
signalized intersections in the City of Renton. This Section reviews and approves traffic control plans for construction and special events within City right ‐of‐way. The section performs annual traffic counts and speed studies
for the public and maintains proper signal timings throughout the City.
Target
Police Department resources budgeted for
this program
City Service Area: Mobility
Airport Operations, Public Works Department
Airport Operations is the overall daily operation, maintenance and management of the Airport, which includes the planning and construction of the projects in the Airport Capital Improvement Program.
Target
Department resources budgeted for this
program
maximum of 0 count
minimum of 90 percent
number of operations
maximum of 0 count
Manage solid waste Operating
Operate and maintain piped utility infrastructure Percent of Operating
Note: Year‐over‐year data provided only for reference. Due to department, division, and programmatic reorganizations over this period of time, some information will differ from prior budget documents.
$0
$5
$10
$15
$20
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposedMillionsAnnual Budgets71.4 71.4 70.4 70.4
56.9 56.9
66.3 66.3 67.7 67.7
010
2030
4050
6070
80
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's Budgeted
2021/2022 Preliminary Budget City of Renton, Washington
2 - 20Renton Results - Mobility - Porgrams, Resources and Results
Desired Results: I want safe and efficient access to all desired destinations, now and in the future
City Service Area: Mobility
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDAnnual number of feet of sidewalk added or
replaced. new 2015 new 2015 new 2015
2,950 linear feet
approx 7,900 LF (approx) 5,403 LF (aprox) 444 LF (aprox) TBD
Maintain safe bridges by having no load‐restricted bridges.0 0 N/A N/A 1 0 1 N/A TBD
Annual number of projects awarded grants annually to fund Transportation Investment Projects new 2019 new 2019 new 2019 new 2019 new 2019 new 2019 new 2019 6 TBD
Dollars obtained in grants annually to fund Transportation Investment Projects/Programs 7.8 mill 5.96 mill 10.76 mill N/A 6994978 N/A 6414000 5295750 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:10.37 10.37 10.4 10.4 9.5 9.5 10.5 10.5 9.1 9.1
Dollars:1,357,977$ 1,391,561$ 1,597,719$ 1,688,986$ 1,514,969$ 1,561,564$ 1,793,011$ 1,854,222$ 1,551,514$ 1,604,912$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Composite rating by Public Works Department employees in the annual Employee Survey.
survey not available at this time 77.4 N/A N/A N/A N/A N/A N/A TBD
Citizen requests referred to Public Works by the Mayor's Office will be responded to within the
requested time frame.
96 100 95 95 95 95 95 97 TBD
Public Works Administrator will respond to customer inquiries/complaints by the next business day.96 97 97 97 97 97 97 97 TBD
Division's expenditures are within budget.N/Aat this time 100 100 100 100 100 100 100 TBD
City's combined residential utility rates (water, wastewater, surface water, solid waste) shall be in the lower 50 percentile as compared with the rates of our neighboring jurisdictions.
25 lower 25 percentile lower 25 percentile lower 25 percentile lower 25 percentile lower 25 percentile lower 25 percentile lower 25 percentile TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:3 3 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Dollars:479,503$ 488,760$ 395,867$ 413,579$ 406,398$ 418,614$ 425,954$ 479,048$ 497,991$ 511,941$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Develop Transportation workforce by providing training opportunities to staff.new 2015 new 2015 new 2015 new 2015 8hrs/Year 20hrs/year N/A N/A TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2.5 2.5 2.5 2.5 2.5 2.5 2.5 2.5 3.0 3.0
Dollars:631,352$ 648,054$ 830,160$ 856,076$ 763,885$ 787,837$ 821,814$ 888,441$ 1,051,713$ 1,078,813$ Executive Department resources budgeted
for this program
Building the Mobility Network, Public Works Department
The City Council, through a public hearing process and in compliance with state law, annually adopts a program for creating the linked, comprehensive network for mobility which is called the 6‐ Year Transportation
Improvement Program (TIP). The TIP is a multi‐year planning tool that identifies transportation‐related projects and programs which are, or may become, eligible for federal, state and/or local funding. The TIP updates
transportation projects and programs within the City that support the mission and vision of the City, must include new or enhanced bicycle or pedestrian facilities or other applicable changes that promote non‐motorized transit, and reflect the involvement of the public and the City's elected officials. This program is based on mandated City commitments that are in compliance with the state's Growth Management Act (GMA) and requires that the City provide transportation facilities (the mobility network) to serve the projected growth.
Transportation projects include streets, bridges, and trails. Once adequate funding has been obtained for a project, the design process begins. Most of the City's Transportation capital improvement projects are partially
funded with Federal Highway Administration grants. The design of such projects must meet the requirements of the Local Agency Guidelines (LAG) Manual in both process and design. The Washington Department of Transportation Design Manual must be followed as well as various publications of the American Association of State Highway and Transportation Officials. A consultant is acquired following the process set forth in the LAG Manual and used to design and prepare construction documents for the project. The design process includes environmental permitting, compliance with ADA requirements (2011 PROWAG, 36 CFR Part 1190), and right of way acquisition. Acquisition of property for right of way must follow the Uniform Act (23 CFR 710 and 42 USC Ch. 61) and the Washington Department of Transportation Right of Way Manual.
Once the environmental permitting is complete, the Right of Way has been certified, and the plans, specifications, and engineer's estimate have been approved, the project can be advertised for bids. The bidding process is controlled by the LAG Manual, the Washington Department of Transportation Standard Specifications, the APWA General Special Provisions, the Revised Code of Washington, and City of Renton Municipal Code and Policies. Bids are received and evaluated for compliance with the above. The Washington Department of Transportation Local Programs reviews the apparent low bid for compliance with Underutilized Disadvantaged Business Enterprise (UDBE) regulations and the presence of Form FHWA‐1273. Because construction documentation has become so complex and demanding, a consultant is also acquired
Target
Department resources budgeted for this
program
Public Works Administration, Public Works Department
Public Works Administration provides internal support and guidance to ensure City infrastructure is properly operated and maintained, needed infrastructure capital projects are built, the City's Business Plan Goals are met
and City policies and procedures are regularly followed.
Target
Department resources budgeted for this
program
Transportation Systems Admin, Public Works Department
Public Works Transportation Systems Administration provides administrative services, leadership and guidance to enable the Transportation Division to operate, plan, design, construct and maintain the City's transportation
system to ensure the public health and safety of the general public in a skillful, professional and caring manner, enhancing the lives of Renton residents and businesses.
Target
greater than 95 percent
greater than 95 percent
minimum of 100 percent
less than 50 percent
hours per FTE
number of feet
maximum of 0 count
count of projects
Total dollars
greater than 70 percent
2021/2022 Preliminary Budget City of Renton, Washington
2 - 21Renton Results - Mobility - Porgrams, Resources and Results
Desired Results: I want safe and efficient access to all desired destinations, now and in the future
City Service Area: Mobility
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:see above see above see above see above see above see above see above see above 0.3 0.3
Dollars:see above see above see above see above see above see above see above see above 44,310$ 45,739$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5 5.5
Dollars:969,059$ 986,193$ 1,134,631$ 1,174,218$ 1,296,588$ 1,326,694$ 1,154,354$ 1,427,876$ 1,507,572$ 1,558,898$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:9.9 9.9 9.9 9.9 10.9 10.9 10.6 10.6 11.3 11.3
Dollars:2,271,970$ 2,273,726$ 2,215,442$ 2,276,977$ 2,599,438$ 2,647,703$ 1,867,088$ 1,918,320$ 2,009,067$ 2,030,503$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:see above see above see above see above see above see above see above see above 0.5 0.5
Dollars:see above see above see above see above see above see above see above see above 86,689$ 89,129$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:see above see above see above see above see above see above see above see above 0.7 0.7
Dollars:see above see above see above see above see above see above see above see above 242,743$ 246,570$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Reduce or maintain the number of insurance claims against the City resulting from road damage N/A2323N/A4222TBD
Maintain a reasonable Overall Condition Index (Pavement) rating. 70 72 73 N/A N/A 68 N/A 67 TBD
Respond to all emergencies including snow/ice storms within the first hour of receiving the call, limiting the hazards to our citizens, and providing
mobility during all weather conditions.
N/A 100 100 100 100 100 100 100 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:19.4 19.4 19.4 19.4 19.1 19.1 21.5 21.5 21.5 21.5
Dollars:3,334,001$ 3,451,454$ 4,088,735$ 4,208,615$ 4,121,932$ 4,146,097$ 4,703,837$ 4,657,283$ 5,072,787$ 5,193,463$
Bridges, Public Works Department
Bridge condition inspection of all City owned bridges, located within the public right‐of‐way, open to public use. The inventory is presently 27 bridges. This program does not include bridges that fall under the responsibility of Community Services (e.g. bridges in City Parks and/or on City trails). This program does not include bridges located within the City limits that are owned by other agencies such as the Washington State Department of Transportation (WSDOT).
Police Department resources budgeted for
this program
Department resources budgeted for this
program
Street Maintenance, Public Works Department
Street section maintains, repairs, and constructs roadways, alleys, and all rights‐of‐way. Other duties include the control of vegetation, repair of guardrails and safety devices and responds to all emergencies including snow &
ice, flooding, wind storms and earthquakes.
Transit Coordination/Transportation Demand Management, Public Words Department
The Transit Coordination/Transportation Demand Management Program supports actions to reduce single‐occupant vehicle commuting at all major worksites in the City of Renton, which includes helping major employers implement their own programs. The Commute Trip Reduction (CTR) Law was passed by the Washington State Legislature to address traffic congestion, air pollution and fuel consumption. Commute trip reduction laws target worksites with 100 or more full‐time employees who commute during peak hours. Worksites develop and manage their own programs based on transportation demand management (TDM) strategies identified as having the
highest impact for their employees, and locally adopted goals for reducing vehicle trips and miles traveled. TDM describes programs and projects that emphasize using existing transportation infrastructure to enhance
mobility and transportation system efficiency. These projects use techniques like education, incentives and disincentives to reduce the need for vehicles trips, the distance of trips, and to shift to higher occupancy modes like transit and other forms of ridesharing.
Department resources budgeted for this
program**
Public Works Maintenance Administration, Public Words Department
Public Works Maintenance Administration provides clerical, data entry, dispatching, inventory control, purchasing, scheduling and records keeping for all 7 sections at the Maintenance Shops. They are the first line of communication the public has with our maintenance crews. All customer service and emergency related calls come through our Administrative front office. Purchasing controls all inventories for all sections, purchases
products, supplies, vehicles and equipment for the entire city to include Police, Fire, Community Services and Maintenance.
Department resources budgeted for this
program
less than 10 count
greater than or equal to 70 rating
minimum of 90 percent
Transportation Maintenance, Public Words Department
The Transportation Operations Maintenance Section installs , maintains and repairs over 138 traffic signals, 5200 street lights, 90 school beacons, 38 crosswalk flashers, 58 radar signs, 24 Pan/Tilt/Zoom cameras,
communication devices, electronic equipment in government vehicles, Radio systems, traffic management center, Transportation fiber optic and school beacon networks, GIS transportation assets, over 20,800 signs, 1.8 million linear feet/450 lane miles of roadway markings, 3,763 thermal plastic arrows, channelization devices, LED signs, 58 radar signs, graffiti removal, hanging banners and assists with the city's special events. Repairs and manages contracts for damaged city assets. Maintains city art in public right away. The Section is responsible for keeping the City up to date with the most current, efficient hardware and electronic components. The Section responds to citizen complaints and maintenance requests as they arise.
Department resources budgeted for this
program
Target
Department resources budgeted for this
program
Active Transportation, Public Words Department
The Active Transportation Program is an umbrella program that includes planning, designing, and construction phases for CIP expenditures on pedestrian and bicycle networks along City streets are developed with complete
streets principles. Complete streets principles are to plan, design, and operate streets to enable safe and convenient access and travel for all users including pedestrians, bicyclists, transit riders, and people of all ages and
abilities. The City of Renton's Barrier Free Program is also administered under this program. The Barrier Free Program is a federal mandate to make all public facilities within public right‐of‐way accessible to people of all abilities.
2021/2022 Preliminary Budget City of Renton, Washington
2 - 22Renton Results - Mobility - Porgrams, Resources and Results
2021 2022
122.62 122.62
$ 77,407,136 $ 79,091,883
43% 43%
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's: 88.75 88.75 92.75 92.75 100.75 100.75 105.03 105.03 122.62 122.62
Dollars: 57,506,769$ 58,578,999$ 60,803,111$ 62,205,629$ 66,880,266$ $67,792,031 68,451,540$ 69,494,455$ 77,407,136$ 79,091,883$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDInfrastructure project plan review is completed within an average of 3 weeks 90 53 60 75 90 47 54 44 TBD
Completed responses to a customer service questionnaire rate their overall experience as
"Good" or better
survey not available at
this time
survey not available at this
time
survey not available at this
time
survey not available at this
time
survey not available at this
time
survey not available at this time
survey not available at this time
survey not available at this time TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1.0 1.0 1.0 1.0 1.0 1.0 1.4 1.4 14.6 14.6
Dollars:774,745$ 777,883$ 774,928$ 786,791$ 867,727$ 873,141$ 937,637$ 949,586$ 2,318,879$ 2,412,385$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDOverall condition of the golf course is rated good to excellent in customer satisfaction survey 90 92 90 90 N/A N/A no data no data TBD
Overall value of driving range facility is rated good to excellent in customer satisfaction survey 89 99 N/A N/A N/A N/A no data no data TBD
Level of service in pro shop is rated good to excellent in customer satisfaction survey 94 100 N/A N/A N/A N/A no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:9.5 9.5 9.5 9.5 10.5 10.5 9.8 9.8 12.0 12.0
Dollars:2,065,108$ 2,103,697$ 2,165,392$ 2,233,479$ 2,356,042$ 2,623,003$ 2,261,504$ 2,353,249$ 2,566,000$ 2,638,766$
Programs, Resources and Results
The following programs have provided metrics ("Results") to indicate the results of their efforts. Each metric is unigue ‐ some are simply counts of data points,
others are more qualitative indicating customer satisfaction, and many intend to show efficiency and effectiveness. It should be noted for those that are
marked "N/A" indicate a metric for which data is not yet available. This could be due to a number of reasons including changes in staffing and/or information
systems in place to collect the data. These metrics remain in this report as it is the intent of the program to provide the data when possible. The staff within the programs develop their own metrics and provide the data for reporting purposes.
Desired Results: I want to live, learn, work and play in a clean and green environment with reliable, affordable utility service.
Strategies Renton is using to work toward and achieve this desired result:
Well maintained neighborhoods, properties and environment
Manage solid waste
Operate and maintain piped utility infrastructure
Note: Year‐over‐year data provided only for reference. Due to department, division, and programmatic reorganizations over this period of time, some information will differ from prior budget documents.
Proposed
FTE's
Operating
Percent of Operating
Environmental conservation, education and outreach
Compliance with environmental standards and laws
City Resources
budgeted to support the
Safety and Health City Service Area
The Maplewood Golf Course is managed, maintained and operated through an Enterprise Fund, all fees collected support the golf course operations and capital and major projects identified in the adopted Long Range Plan
(2000 ‐ 2015) to ensure a financially solvent facility.The golf course operation includes maintaining 110 acres of developed 18‐hole /par 72 golf course, 80 acres of open space land, an 11,560 sq. ft., 30‐stall driving range/cart storage facility, a fleet of 50 golf carts, maintenance office, maintenance facility with 45 pieces of rolling stock, a 15,508 square foot clubhouse that includes a full service pro shop, restaurant, bar, patio and banquet facilities. The entire facility serves over 300,000 people annually, some of which includes:
Serving 48,000 to 56,000 golfers
Processing 90,000+ driving range tokens/ cards Serving 125,000+ restaurant and bar guests Serving 24,000+ banquet guestsServing 1,500+ people in Clinics/Lessons/ Jr. Camps Hosts four high school golf teams annually
Target
Department resources budgeted for this
program
minimum of 85 percent
minimum of 85 percent
minimum of 85 percent
City Service Area: Utilities & Environment
Development Engineering, CED Department
This program, Development Engineering, provides plan review, construction permits and field inspection services for all private and public utilities, transportation, franchise utilities, storm water, and grading projects within
the City of Renton. Permits include franchise permits for gas, electricity, telephone, communications, and cable. Enforcement of the construction standards and associated codes ensures the safety of our residents in the built
environment. Inspection of newly installed facilities reduces long term maintenance costs, as well as proper operations of the new facilities. Plan review and inspection of new storm drainage facilities ensures proper environmental protection of downstream water resources and minimizes flood hazards to the community. Reviewed projects ensure public safety, the environment and long term maintenance are not compromised. Inspection testing of new water and sewer systems safeguards future users.
Target
Department resources budgeted for this
program
minimum of 95 percent
minimum of 80 percent
Golf Course, Community Services Department
$0
$20
$40
$60
$80
$100
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposedMillionsAnnual Budgets
88.8 88.8 92.8 92.8
100.8 100.8 105.0 105.0
122.6 122.6
0
20
40
60
80
100
120140
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's Budgeted
2021/2022 Preliminary Budget City of Renton, Washington
2 - 23Renton Results - Utilities and Environment - Programs, Resources and Results
Desired Results: I want to live, learn, work and play in a clean and green environment with reliable, affordable utility service.
City Service Area: Utilities & Environment
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDCustomer satisfaction surveys rate the quality of ROW landscaping as average or higher.94 76 77 73 N/A 86 no data no data TBD
Percentage of backlogged tree request work completed new 2017 new 2017 new 2017 new 2017 new 2017 19 no data no data TBD
Customer satisfaction surveys rate the distribution (location) of parks as good or higher.83 75 90 77 N/A 76 no data no data TBD
Customer satisfaction surveys rate the level or trail
connectivity and access in Renton as good or higher.83 74 83 74 N/A 63 no data no data TBD
Customer satisfaction surveys rate the cleanliness
and appearance of Renton’s open space and natural areas as good or higher.87 82 87 84 N/A 73 no data no data TBD
Customer satisfaction surveys rate the range/type of park amenities offered as good or higher.87 86 91 80 N/A 86 no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:3.4 3.4 3.4 3.4 3.4 3.4 4.4 4.4 6.4 6.4
Dollars:696,886$ 717,440$ 837,640$ 890,862$ 854,070$ 873,836$ 1,245,784$ 1,274,515$ 2,064,918$ 2,092,249$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDRespond to citizen inquiries or requests for information within one business day.96 95 96 96 96 95 100 95 TBD
Utility costs at midpoint or less when compared to other local jurisdictions.Yes Yes Yes Yes Yes Yes Yes Yes TBD
Protect Renton’s utility interests in the region by participating in a high percentage of regional
meetings, forums, and advisory groups.
91 90 90 90 90 90 90 90 TBD
Develop Utility Systems workforce by providing
training opportunities to a minimum percentage of staff annually.96 84 72 93 93 90 90 84 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:3 3 3.0 3.0 5.0 5.0 3.5 3.5 3.5 3.5
Dollars:805,441$ 815,842$ 930,125$ 995,954$ 1,734,039$ 1,331,550$ 1,384,975$ 1,526,874$ 1,632,992$ 1,669,661$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDNumber of times the Solid Waste Litter Control Staff works through the entire city per year.N/AN/A8 times per year66767TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1 1 1.0 1.0 2.0 2.0 2.0 2.0 2.0 2.0
Dollars:281,948$ 298,711$ 295,421$ 304,842$ 391,179$ 409,771$ 390,874$ 414,508$ 312,195$ 316,172$
minimum of 95 percent
Yes/No
minimum of 90 percent
minimum of 25 percent
Solid Waste Litter Control, Public Works Department
Solid Waste Litter Control Staff works through the entire city once every three months. 100%TBD
Target
Department resources budgeted for this
program
Utility Systems Administration, Public Works Department
The Utility Administration provides administrative services, leadership and guidance to enable the Utility Systems Division to function in a safe, reliable, and cost‐effective manner.
The Utility Systems Division manages solid waste, and planning, engineering, construction and database functions for the City's water, wastewater, and surface water systems in a manner that ensures public health and
safety, meets all regulatory requirements, protects environmental resources, is financially sound, and supports the City's Business Plan Goals.
Target
Department resources budgeted for this
program
Parks Planning, Urban Forestry and Na Res, Community Services Department
minimum of 80 percent
minimum of 50 percent
minimum of 75 percent
minimum of 4 count
The Parks Planning and Natural Resources Division promotes a healthy and welcoming atmosphere for families and businesses, and maintains for public safety, environmental protection, education and enjoyment 711 acres
of natural areas, 140,000 street, park and natural area trees, and facility and right‐of‐way landscaping at 50 locations.
Current and future population growth needs are met through planning, acquisition, development and major maintenance. Staff leverages budgeted funds and activities with grants, donations, partnerships and volunteers. The Division meets the service demands that contribute to the livability of the community and manages growth through sound urban planning by influencing decisions that impact the community.
Some of these activities include:
‐Sunset Neighborhood Park, Phase 2 projected for completion in September 2020.‐Park Bond Improvement Projects including Kiwanis Park, Philip Arnold Park, Coulon Trestle Bridge Replacement and Coulon North Waterwalk Phase 1 Corrosion Control.‐Leveraging City funding with federal, state and local grants and state legislative appropriations.
‐Parks, Recreation, and Natural Areas Plan development and implementation; Plan certified with State Recreation and Conservation Office.
‐Capital improvements including planning, acquisition, development, and major maintenance.‐Citywide Urban Forestry Program Management (programming, new inventory, management plan, tree planting, training, inspections, volunteer restoration projects, site plan reviews, Arbor Day/Earth Day Event, etc.).
Target
Department resources budgeted for this
program
minimum of 70 percent
minimum of 75 percent
minimum of 75 percent
2021/2022 Preliminary Budget City of Renton, Washington
2 - 24Renton Results - Utilities and Environment - Programs, Resources and Results
Desired Results: I want to live, learn, work and play in a clean and green environment with reliable, affordable utility service.
City Service Area: Utilities & Environment
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDIncrease residential recycling annual tons collected per capita.1‐2 1 N/A1.10.2 7 ‐6TBD
Increase residential organics collection per capita. 5 ‐12 ‐5 N/A 5.80.29‐1.5 5 TBDDecrease solid waste tons disposed per capita.2 ‐1 2 N/A 3.3 0.22 38 ‐4TBDIncrease commercial recycling annual tons collected. 14 1 3 N/A 28 ‐0.47 ‐7 ‐8 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2 2 2.0 2.0 2.5 2.5 2.5 2.5 1.5 1.5
Dollars:15,592,129$ 15,899,898$ 16,044,163$ 16,481,620$ 18,341,316$ 18,678,837$ 18,682,262$ 18,699,955$ 21,815,269$ 22,574,057$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:000000001.01.0
Dollars:00000000 153,841$ 160,266$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Capital Improvement Program completed within schedule and budget.85 64 63 69 98 80 81 93 TBD
Development plan and permit reviews completed within 10 business days of receipt.80 90 85 95 90 100 100 100 TBD
Requests for system information provided within 2 business days.85 100 100 100 100 100 100 100 TBD
Maintain asset inventory – input data within 10 business days receiving approved construction plans
or final as‐built construction plans.
90 95 85 95 90 100 100 100 TBD
Maintain Surface Water NPDES permit compliance in
the Surface Water Utility.100 100 100 90 100 100 100 100 TBD
Maintain a Community Rating System (CRS)
classification rating of 6 or better which results in a 20% (or better) discount on federal flood insurance rates.
66555555TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:8 8 9.0 9.0 9.5 9.5 9.0 9.0 7.8 7.8
Dollars:2,764,213$ 2,908,399$ 3,257,199$ 3,399,537$ 3,517,168$ 3,614,657$ 3,549,076$ 3,652,868$ 3,781,895$ 3,895,504$
minimum of 80 percent
minimum of 80 percent
minimum of 80 percent
minimum of 80 percent
minimum of 100 percent
increase of 2 percent
Solid Waste Education
The Solid Waste Education program supports the waste reduction and recycling goals and objectives of the Section in concordance with the Comprehensive Solid Waste Management Plan for King County and the Local Hazardous Waste Management Plan in King County.
The program provides education and outreach to residents and businesses such as the Waste Prevention Program, the Multifamily Recycling Education Program, and the Business Recycling Education Program, and by
maintaining current information on the website, and other efforts as needed. This program provides useful information to residents and businesses helping them learn about strategies they can implement at home that reduce waste, increase recycling, and improve the quality of life and the environment. The education efforts also support the Section's goals for reducing disposal and have the ability to reduce the financial impact to the Utility through reduced disposal costs.
Residents and businesses are also supported with education via the Section's response to customer calls, online website education, and print media.
Department resources budgeted for this
program
increase of 3 percent
Solid Waste Collection, Public Works Department
The Solid Waste Collection program is a comprehensive program consisting of mandatory collection of residential and commercial garbage, recycling, and organics. Included in the program are in‐house recycling, recycling
events for large or unusual items, a reuse exchange event, and contract management.
Target
Department resources budgeted for this
program
increase of 3 percentreduction of 1 percent
Target
Surface Water Engineering and Planning, Public Works Department
Surface Water Utility Engineering ProgramThe Surface Water Utility Engineering Section is responsible for the planning, design, permitting, and construction of drainage improvement, water quality treatment, and flood control projects; developing policies, watershed management plans/studies and other programs to reduce flooding, property damage, protect public safety, protect surface water quality and habitat, which preserves the recreational and aesthetic uses of the City's streams, lakes, rivers and wetlands. The program is needed to effectively manage the quantity and quality of runoff from existing land use and future growth as allowed by the City's adopted Comprehensive Land Use Plan and manage
regional flood hazards from the Cedar River, Green River, and May Creek. The programs contribute to the livability of the community and provide a healthy environment that promotes a safe and welcoming atmosphere for
businesses and residents. The Surface Water Utility also is required to implement regulatory programs to comply with state and federal regulations related to the National Pollutant Discharge Elimination System (NPDES) Phase II Municipal Stormwater Permit requirements, FEMA floodplain requirements, Endangered Species Act and other regulatory requirements to protect the City's natural environment. The Surface Water Utility Engineering Section also provides customer service to the public, assists other City departments with surface water reviews, and coordinates with other agencies and jurisdictions on regional surface water management programs.
The Section provides technical assistance regarding surface water management design, permitting and support to City departments and divisions including the Community and Economic Development Department, Transportation Division, Community Services Department, Finance Utility Billing Section, and Public Works Maintenance Division. The Section implements the FEMA community rating system program that enables property
Department resources budgeted for this
program
equal to or better than classification
of 6 rating
2021/2022 Preliminary Budget City of Renton, Washington
2 - 25Renton Results - Utilities and Environment - Programs, Resources and Results
Desired Results: I want to live, learn, work and play in a clean and green environment with reliable, affordable utility service.
City Service Area: Utilities & Environment
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:000000001.21.2
Dollars:00000000 235,640$ 240,137$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
The percent increase in cost of pipe system and lift station major maintenance and emergency repairs will not increase substantially over the prior three‐year average.
N/A 10 10 10 10 Met target Met target Met target TBD
Reduce or maintain the number of insurance claims against the City resulting from Surfacewater N/A3N/AN/A2666TBD
Respond to surface water emergencies within one hour.N/A 100 100 100 Met target Met target Met target Met target TBD
Surface water catch basins in all circuits are cleaned in compliance with NPDES Permit requirements new 2015 new 2015 new 2015 new 2015 N/A N/A Met target Met target TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:13.2 13.2 15.2 15.2 15.2 15.2 16.2 16.2 17.2 17.2
Dollars:2,332,169$ 2,587,013$ 2,609,633$ 2,764,002$ 2,969,971$ 3,052,049$ 3,309,260$ 3,467,949$ 3,970,031$ 3,980,789$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Capital Improvement Program completed within schedule and budget.83 54 64 60 60 100 75 83 TBD
Meet Department of Ecology regulations. 100 100 100 100 100 100 100 100 TBD
Manage asset inventory – input data within 10 business days of notice of completion.96 100 100 100 100 100 100 100 TBD
Requests for Wastewater system information provided within 2 business days of receipt.75 100 100 98 100 98 98 100 TBD
Development Plans and permit reviews completed
within 5 business days of receipt.99 100 95 98 98 100 100 100 TBD
Maintain or reduce the number of insurance claims
against the City resulting from grease plug backups.new 2015 new 2015 310210TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:4.5 4.5 5.5 5.5 5.0 5.0 6.0 6.0 6.0 6.0
Dollars:2,643,236$ 2,717,613$ 2,784,635$ 2,878,279$ 3,019,946$ 3,064,545$ 3,402,493$ 3,465,336$ 3,719,570$ 3,808,081$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDThe percent increase in cost of pipe system and lift
station major maintenance and emergency repairs will not increase substantially over the prior three‐year average.
N/A 10 10 N/A 10 10 10 10 TBD
Reduce or maintain the number of insurance claims against the City resulting from Wastewater damage.N/A33N/A3333TBD
Respond to wastewater emergencies within one hour.N/A 100 100 100 Met target Met target Met target Met target TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:6.95 6.95 7.0 7.0 9.0 9.0 11.7 11.7 10.7 10.7
Dollars:1,304,856$ 1,328,754$ 1,564,527$ 1,615,558$ 2,069,394$ 2,128,635$ 2,390,768$ 2,375,905$ 2,464,842$ 2,553,582$
within 100 percent
less than or equal to 6 count
minimum of 90 percent
Surface Water NPDES Education
Target
Department resources budgeted for this
program
minimum of 95 percent
minimum of 100 percent
Surface Water Maintenance, Public Works Department
Surface Water maintains, repairs, and constructs storm water collection systems eliminating flooding issues citywide. Surface Water operates and maintains storm water lift stations. Surface Water also manages vegetation control in City rights‐of‐way and for public works facilities. The Surface Water crew is on call 24 hours a day for all emergencies pertaining to storm water run‐off, pollution control, and flooding.
Target
Target
Department resources budgeted for this
program
minimum of 80 percent
minimum of 80 percent
minimum of 80 percent
number of claims
Wastewater Maintenance, Public Works Department
The Wastewater Maintenance Section maintains, repairs and constructs sewer lines, manhole structures and other structures that aid in the collection of sewage. Additional responsibilities are TV/line inspection and lift station monitoring, repairs and maintenance. Crew is on‐call 24 hours a day for emergency response.
less than or equal to 5 count
NPDES Phase II Municipal Stormwater Permit Public Education, Outreach and Public Involvement and Participation Program
This program consists of the development and implementation of a public education outreach and involvement program as required by the Department of Ecology's National Pollutant Discharge Elimination System (NPDES) Phase II Municipal Stormwater Permit issued in accordance with the Federal Clean Water Act and Washington State Water Pollution Control Law. The NPDES permit requires the Surface Water Utility, in coordination with other City departments, to implement an education and outreach program that is designed to achieve measurable improvements in the public's understanding of surface water management; associated water quality; habitat and flow control problems; and what they can do to solve or reduce the problems. The education and outreach efforts are to be targeted to the general public, businesses, residents, landscapers, property managers,
engineers, contractors, developers, development permit review staff and planners. Additionally, the program needs to measure the understanding and adoption of targeted behaviors for at least one target audience in at
least one subject area. The public involvement and participation has to include ongoing opportunities for public involvement through advisory councils, public hearings, watershed committees, participation in developing rate‐structures, stewardship programs, environmental activities or other similar activities. It shall include providing required state and local public notice as part of the Stormwater Management Program (SWMP) required by the NPDES permit. The NPDES permit required annual report and SWMP must be made available to the public on our website.
Department resources budgeted for this
program
yes/no
Department resources budgeted for this
program
Wastewater Engineering and Planning, Public Works Department
The Wastewater Engineering and Planning program consists of six primary functions to meet the needs of the Wastewater Collection System. The Capital Improvement Program provides for infrastructure needs including sewer mains and lift stations. Planning activities provide the ability to evaluate current operations of the system as well as identify future needs both from growth and aging system replacement. Another critical element to this program is our GIS/Mapping/Hydraulic Modeling functions that provide the data needs and hydraulic analysis for the system. A fats/oil/grease (FOG) and industrial waste element helps to maximize existing system
capacity/ efficiency through a combination of regulatory and educational program methods. Technical assistance to other work groups such as the Wastewater Maintenance Division and the Department of Community and
Economic Development helps to ensure that the system standards are being applied and that the system is well maintained. Customer service functions provide the information needed by our various customers, including, the public, developers, engineers, and other public agencies.
minimum of 80 percent
less than 2 percent
2021/2022 Preliminary Budget City of Renton, Washington
2 - 26Renton Results - Utilities and Environment - Programs, Resources and Results
Desired Results: I want to live, learn, work and play in a clean and green environment with reliable, affordable utility service.
City Service Area: Utilities & Environment
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDCapital Improvement Program completed within
schedule and budget.85 90 85 60 75 75 80 75 TBD
Water quality meets all health‐related and aesthetic
drinking water regulations administered by the State Department of Health as indicated by number of violations.
00000000TBD
Maintain valid Public Water System annual operating permit with highest category ranking.100 100 100 100 100 100 100 100 TBD
Development plans and permit reviews completed within 5 business days of receipt.95 100 95 100 100 100 100 100 TBD
Requests for water system information provided within 2 business days of receipt.90 100 90 90 90 95 95 96 TBD
Maintain asset inventory – input data within 5 days of completion 70 95 95 95 100 100 100 100 TBD
Reduce annual average per capita water
consumption 11000110TBD
Annual percent reduction of water that is not
revenue generating (e.g., pumped, leaks, or otherwise not billed)11000101TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:6 6 6.0 6.0 7.5 7.5 7.5 7.5 7.3 7.3
Dollars:3,503,071$ 3,655,101$ 3,533,158$ 3,705,990$ 3,699,252$ 3,766,207$ 3,968,930$ 4,046,112$ 3,836,594$ 4,018,957$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:000000000.20.2
Dollars:00000000 196,074$ 197,234$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDWater quality to meet or exceed federal and state regulatory requirements.N/A 100 100 100 100 100 100 100 TBD
Restore water service within 4 hours during emergency shut downs.N/A 100 100 100 100 100 100 100 TBD
Drop‐in meters are installed within 5 working days
from the customer's request.N/A 100 100 100 100 100 100 100 TBD
New water service meters are installed within 3 weeks from the customer's request. N/A 100 100 100 100 100 100 100 TBD
Complete (respond and repair) customer requests for service on water leaks within 3 business days.N/A 100 100 100 100 100 100 100 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:25.3 25.3 25.3 25.3 25.3 25.3 26.1 26.1 26.1 26.1
Dollars:5,076,597$ 5,196,183$ 5,418,443$ 5,629,599$ 5,876,341$ 6,008,054$ 6,228,736$ 6,466,489$ 6,908,325$ 7,028,723$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Average Utility Billing aged accounts receivable (over 90 days) as percent of annual billing.0.07 0.0625 0.09 0.08 0.38 0.0047 0.00415 0.003116667 TBD
New Utility Billing accounts will be set up within five business days of notification (via final permit, email, etc.).94 82 97.75 99 98 100 100 96.74166667 TBD
A minimum satisfaction rating from internal Utility Billing customers N/A 80 N/A 80 N/A 79 N/A 84 TBD
Average Utility Billing customer calls will be answered within 5 minutes. [THIS METRIC IN 96 96 97.5 99 100 100 100 100 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:4.9 4.9 4.9 4.9 4.9 4.9 4.9 4.9 5.0 5.0
Dollars:556,250$ 574,037$ 602,159$ 631,145$ 641,448$ 664,454$ 669,799$ 691,551$ 721,659$ 741,720$
minimum of 80 percent
reduction of 1 percent
Department resources budgeted for this
program
Water Maintenance, Public Works Department
Water Maintenance maintains, repairs and constructs all systems used in water distribution, metering and treatment. This includes all main line, meters, reservoirs, well pump stations, telemetry systems and treatment plants citywide. The Water Maintenance crew is on call 24 hours a day to respond to all water related emergencies.
maximum of 0 count
minimum of 100 percent
minimum of 80 percent
Target
Department resources budgeted for this
program
minimum of 98 percent
minimum of 98 percent
minimum of 98 percent
Water Education
This program consists of the development and implementation of a public education program on water conservation and water resources protection in conjunction with the City Water Utility's participation in the regional conservation program managed by the Saving Water Partnership. Washington State Department of Health and Department of Ecology requires the City of Renton, as owner and operator of a public water system, to adopt
and implement a Water Conservation/Water Use Efficiency program and a Wellhead Protection program, to protect and preserve water resources and to reduce water use per capita in all City's water customer classes. Public
Education is one of the recommended elements of the state mandated programs.
Department resources budgeted for this
program
minimum of 80 percent
minimum of 95 percent
minimum of 80 percent
minimum of 95 percent
Water Engineering and Planning, Public Works Department
The Water Utility is responsible for the long‐term planning and development of strategies for securing and developing adequate water supply and infrastructure to meet future water demand from growth in development and
in population with the City's water service area. The Water Utility is also responsible for the planning, design, permitting and construction management of water capital improvement projects and programs to deliver good
quality of safe drinking water at a reasonable cost to our customers and in sufficient and reliable quantity for fire protection to Renton's residences and businesses. The Water Utility also implements mandated regulatory programs to comply with the Safe Drinking Water Act and with other federal and state drinking water regulations and water use efficiency standards.
Target
Department resources budgeted for this
program
minimum of 80 percent
Target
reduction of 1 percent
less than 1 percent
Utility Billing provides billing, customer service, and collection of the City's water, wastewater, and storm water, as well as King County's wastewater treatment charges and contracted garbage services to over 28,530
customers. Collection for water, wastewater, and storm water support the administration, maintenance, and capital improvements to the City's waterworks systems.
The Cashier receipts a wide variety of payments, audits and balances deposits, and issues petty cash.
minimum of 100 percent
Utility Billing and Cashiering, ASD Department
minimum of 98 percent
2021/2022 Preliminary Budget City of Renton, Washington
2 - 27Renton Results - Utilities and Environment - Programs, Resources and Results
Desired Results: I want to live, learn, work and play in a clean and green environment with reliable, affordable utility service.
City Service Area: Utilities & Environment
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:15,126,703$ 15,202,336$ 16,638,722$ 16,638,722$ 17,505,693$ 17,505,693$ 16,922,613$ 17,007,226$ 17,607,838$ 17,695,877$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:918,149$ 740,036$ 728,557$ 627,673$ 408,619$ 357,039$ 355,309$ 353,578$ 351,852$ 319,821$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:3,065,268$ 3,056,056$ 2,618,408$ 2,621,576$ 2,628,060$ 2,840,558$ 2,751,521$ 2,748,753$ 2,748,723$ 2,747,903$ Department resources budgeted for this
program
This is the City's agreement with King County's Wastewater Treatment Division
Department resources budgeted for this
program
The public works trust fund loan debt of the City has been incurred through eight (8) different loans. The debt service for these loans is accounted for in the Waterworks Utility Funds. See the Debt section later in this document for details.
Department resources budgeted for this
program
King County Metro Fund, Public Works
Waterworks Revenue Bond Debt, Public Works
This revenue bond debt of the City has been incurred through six (6) different bond issues. The debt service for all Water/Sewer Revenue Bonds is accounted for in the Waterworks Revenue Bonds Funds. See the Debt
section later in this document for details.
Public Works Trust Fund Loan Debt, Public Works
2021/2022 Preliminary Budget City of Renton, Washington
2 - 28Renton Results - Utilities and Environment - Programs, Resources and Results
2021 2022
100.86 100.86
$ 7,119,965 $ 7,281,030
4% 4%
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's: 71.9 71.9 80.56 80.56 83.06 83.06 91.91 91.91 100.86 100.86
Dollars: 4,005,649$ 2,069,915$ 3,298,238$ 2,097,187$ 5,478,401$ $5,462,608 6,630,885$ 5,970,968$ 7,119,965$ 7,281,030$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDCross‐Departmental Teams will be formed to address Business Plan Goals new 2019 new 2019 new 2019 new 2019 new 2019 new 2019 new 2019 2 TBD
Transparent data collection and reporting new 2021 new 2021 new 2021 new 2021 new 2021 new 2021 new 2021 new 2021 TBD
Internally provided training and Development opportunities are rated Good or Better by attendees new 2019 new 2019 new 2019 new 2019 new 2019 new 2019 new 2019 90 TBD
Training hours/Learning opportunities provided per FTE will increase.new 2019 new 2019 new 2019 new 2019 new 2019 new 2019 new 2019 4,365 TBD
Innovation/Improvement Projects supported will increase.new 2021 new 2021 new 2021 new 2021 new 2021 new 2021 new 2021 new 2021TBD
Employee engagement and satisfaction rates increase, City‐wide.new 2021 new 2021 new 2021 new 2021 new 2021 new 2021 new 2021 new 2021TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:‐‐‐ ‐‐‐ ‐‐‐ ‐‐‐ ‐‐‐ ‐‐‐ 1.0 1.0 1.0 1.0
Dollars:‐‐‐ ‐‐‐ ‐‐‐ ‐‐‐ ‐‐‐ ‐‐‐ 188,865$ 202,676$ 370,980$ 327,460$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1.5 1.5 1.5 1.5 1.6 1.6 1.6 1.6 1.6 1.6
Dollars:400,686$ 403,728$ 420,448$ 428,218$ 439,334$ 444,511$ 446,919$ 453,437$ 465,029$ 470,951$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDAverage customer satisfaction rating of IT services per biannual internal customer survey.N/A 77 N/A 75 NA 72 NA 78 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2 2 3.0 3.0 3.0 3.0 3.0 3.0 2.0 2.0
Dollars:323,131$ 328,479$ 439,829$ 460,921$ 524,688$ 539,281$ 539,014$ 554,838$ 393,408$ 404,108$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:see IT Admin see IT Admin see IT Admin see IT Admin see IT Admin see IT Admin see IT Admin see IT Admin 1.0 1.0
Dollars:see IT Admin see IT Admin see IT Admin see IT Admin see IT Admin see IT Admin see IT Admin see IT Admin 585,241$ 590,782$
Safeguard assets
Equipment and data that is reliable and accessible
Note: Year‐over‐year data provided only for reference. Due to department, division, and programmatic reorganizations over this period of time, some information will differ from prior budget documents.
Programs, Resources and Results
The following programs have provided metrics ("Results") to indicate the results of their efforts. Each metric is unique ‐ some are simply counts of data points,
others are more qualitative indicating customer satisfaction, and many intend to show efficiency and effectiveness. It should be noted for those that are
marked "N/A" indicate a metric for which data is not yet available. This could be due to a number of reasons including changes in staffing and/or information
systems in place to collect the data. These metrics remain in this report as it is the intent of the program to provide the data when possible. The staff within the programs develop their own metrics and provide the data for reporting purposes.
Desired Result: I want City departments to have the means to operate efficiently and effectively in a safe and sustainable manner.
Strategies Renton is using to work toward and achieve this desired result:Proposed
FTE's
Operating
Percent of Operating
Highly qualified, healthy, well‐trained and productive workforce
Functional work environment
Fiscal Support and Accountability
Department resources budgeted for this
program
minimum of 85 percent
Telecommunications, ASD Department
Maintain and support all telecommunication systems, including VOIP phone switches, Voice mail, unified communications, automated call distribution systems. Maintain all staff phone moves, additions, and changes,
coordinate/support new wiring and phone system programming. Other communication services include tracking and maintaining all City cell phones and cellular data services, various connections to voice service provider, long distance services, and various security lines. Although no major capital improvement project is projected for 2021/2022, the number of City's staff using smartphones, data cards, cell phones, and IPad's have increased significantly.
City Resources
budgeted to support the
Safety and Health City Service Area
IT Administration, ASD Department
This program is responsible for the City's Information Technology operations administration and services. This division is responsible for approximately $5.7M yearly budget supporting the City's goals and needs through technology and automation, along with the city‐wide technology needs assessment, project planning, and prioritization is responsible for representation in local and regional technology efforts, oversees 18 FTE's and 3 Interns. The administration staff includes
Target
Department resources budgeted for this
program
Communications ‐ Print and Mail Services, Executive Department
Print and Mail Services exclusively serves the City of Renton. From projects that support the operation of the city to those that contribute to better communication with our community, we are committed to promoting and
enhancing the city with the highest quality printed materials we can provide.
The Print Shop produces the monthly utility bill (also handles the bulk mailing), stationery and business cards, technical handouts, brochures, flyers booklets and forms as well as more elaborate full‐color publications.
Mail Delivery services are responsible for sorting the mail, delivery and pickup of mail to and from the city's external facilities, and coordinating various mailing options such as bulk mail, carrier routes, first class postage, and
more.
Department resources budgeted for this
program
Department resources budgeted for this
program
City Service Area: Internal Support
Organizational Equity, Inclusion, and Development, Executive Department
This program facilitates systemic, team, and individual improvement within and across departments by directly leading city‐wide projects or creating and supporting collaborative efforts that align with our City's Business Plan
Goals.
Target
count of teams
yes/no
minimum of 80%
total hours
new 2021
baseline
$0$1
$2
$3
$4
$5
$6
$7$8
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposedMillionsAnnual Budgets
71.9 71.9
80.6 80.6 83.1 83.1
91.9 91.9
100.9 100.9
0
20
40
60
80
100
120
2013 budget 2014 budget 2015 budget 2016 budget 2017 budgeted 2018 budget 2019 budgeted 2020 budget 2021 proposed 2022 proposed
FTE's Budgeted
2021/2022 Preliminary Budget City of Renton, Washington
2 - 29Renton Results - Internal Services - Programs, Resources and Results
Desired Result: I want City departments to have the means to operate efficiently and effectively in a safe and sustainable manner.
City Service Area: Internal Support
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDAverage customer satisfaction rating of Applications
and Database Services per biannual internal customer survey.N/A 75 N/A 70 NA 68 NA 79 TBD
Average customer satisfaction rating of IT Project management per biannual internal customer survey.N/A 72 N/A 67 NA 64 NA 64 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:4 4 4.0 4.0 6.0 6.0 7.0 7.0 7.0 7.0
Dollars:1,325,742$ 1,290,078$ 1,391,720$ 1,374,484$ 1,938,209$ 1,979,976$ 2,242,039$ 2,256,805$ 2,519,745$ 2,561,310$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Average customer satisfaction rating of Enterprise GIS services per biannual internal customer survey.N/A 81 N/A 78 NA 76 N/A 85 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2 2 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Dollars:323,131$ 328,479$ 439,829$ 460,921$ 524,688$ 539,281$ 539,014$ 554,838$ 539,599$ 559,429$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Average customer satisfaction rating of Service Desk Support per biannual internal customer survey.N/A 82 N/A 84 N/A 79 N/A 86 TBD
Number of service desk tickets recorded N/A N/A N/A 2738 3761 4514 no data no data TBD
Respond to user Service Desk Support calls within expected timeframe.N/A N/A N/A 85 85 83 no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2 2 3.0 3.0 3.0 3.0 4.0 4.0 4.0 4.0
Dollars:536,696$ 542,262$ 613,366$ 582,697$ 609,901$ 626,795$ 766,144$ 794,403$ 736,729$ 770,822$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDAverage customer satisfaction rating of System
Services per biannual internal customer survey.N/A 77 N/A 76 NA 73 N/A 76 TBD
Percent of system availability (network "uptime") as
provided by System Services. 98 99 99 99 97 99 99 99 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:3 3 4.0 4.0 3.0 3.0 4.0 4.0 4.0 4.0
Dollars:474,898$ 485,017$ 626,110$ 659,576$ 599,200$ 614,714$ 817,771$ 842,883$ 866,729$ 902,866$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
A minimum rating for services provided by Finance Administration as measured through a Department Survey.N/A 81 N/A 84 N/A 81 N/A 82 TBD
Maintain or improve the City's credit rating of AA (S&P's) for General Obligation Bonds and AA+ (S&P's) for Revenue Bonds. AA/AA+AA/AA+AA+/AA+AA+/AA+AA+/AA+AA+/AA+AA+/AA+AAA/AA+TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1.5 1.5 1.5 1.5 1.5 1.5 2.5 2.5 2.0 2.0
Dollars:450,211$ 463,022$ 503,301$ 517,068$ 540,693$ 554,698$ 861,698$ 919,985$ 912,744$ 936,213$
minimum of 100 percent
Count
minimum of 90 percent
minimum of 80 percent
minimum of 99.5 percent
minimum of 80 percent
Department resources budgeted for this
program
minimum of 90 percent
minimum of 90 percent
minimum of 80 percent
minimum of 80 percent
Applications and Database Services, ASD Department
System Services, ASD Department
Information Technology Core Systems and Services; This group is responsible for the design, procurement, implementation, configuration, operation, monitoring, and maintenance (Life Cycle) of the City's;
‐ Network infrastructure, including; fiber, twisted pair and wireless networks‐ Connectivity and access to voice/data/video networks and systems among city facilities
Target
Department resources budgeted for this
program
Target
Department resources budgeted for this
program
Enterprise GIS, ASD Department
Enterprise GIS manages the City's Geographic Information System (GIS) and the City's cooperative, multi‐department, enterprise GIS efforts. The Enterprise GIS team provides efficient, high‐quality GIS leadership,
coordination, infrastructure, and services to meet the business needs of our customers and clients within the City and the communities we serve.
Finance Administration, ASD Department
The Administration section manages the Finance Division (total 20.5 FTE, including Administration) of the Finance and Information Technology Department to provide: a high level of support to the City's customers and
operations; customer service; training; monitoring; oversight; accountability; and transparency in order to enhance the efficient use of community resources and maintain high credibility in City financial management.
Target
Department resources budgeted for this
program
Target
Department resources budgeted for this
program
Service Desk Support, ASD Department
The Service Desk program provides 1st and 2nd tier customer support services on all technologies used by City staff. This program is responsible for the purchase, configuration, deployment and support of all computer
workstations, in‐car video equipment, conferencing A/V equipment, mobile devices, printers, scanner and all other edge devices. This group manage the network user accounts, network objects, workstation policies and the
assets inventory and surplus. The Service Desk assists in after hour mission critical IT support requests, (on‐call services).
Target
Applications, data bases and business systems services: This program helps individual departments to improve their business process and City's services through automation. The applications support group helps analyze and
define the business needs, develop functional requirements, coordinate software and vendor evaluation, issue RFPs and system selection process. This group also works with other IT divisions to implement the new systems
by proving the servers, storage systems, security and access controls. Also work with staff to configure, test, train, deploy and support the systems. Current systems implementations include; the asset/work order management Systems for Parks and Facilities, recreation management system, email archival system, and citizen request management systems with emphasis on ability to access the systems remotely and providing public portals.
2021/2022 Preliminary Budget City of Renton, Washington
2 - 30Renton Results - Internal Services - Programs, Resources and Results
Desired Result: I want City departments to have the means to operate efficiently and effectively in a safe and sustainable manner.
City Service Area: Internal Support
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Internal customers of Accounts Payable rate overall customer services as good or better.N/A 84 N/A 83 N/A 81 N/A 82 TBD
External customers of Accounts Payable rate overall customer services as good or better. N/A N/A 99 N/A N/A NA N/A n/a TBD
Internal customers of Accounts Receivable rate overall customer services as good or better.N/A 75 N/A 78 N/A 82 N/A 82 TBD
Vendors will be paid within 45 days of invoice date. 93 92 93 92 91 89 90 92 TBD
Percent of average aged accounts receivable balances over 90 days versus annual billing of non‐intergovernmental customers.new 2014 0.2 N/A N/A 2.50 3 0.08 0.09 TBD
Total dollar amount of Accounts Receivable balances written off annually. $ 15,856 $ - N/A N/A $ 4,400 $ - $ 7,687 $ ‐ TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1.5 1.5 1.5 1.5 1.5 1.5 2.5 2.5 3.7 3.7
Dollars:450,211$ 463,022$ 503,301$ 517,068$ 540,693$ 554,698$ 861,698$ 919,985$ 453,929$ 474,255$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1.3 1.3 1.5 1.5 1.4 1.4 2.5 2.5 3.0 3.0
Dollars:232,377$ 241,773$ 299,175$ 310,234$ 322,848$ 330,195$ 486,618$ 503,443$ 554,958$ 577,174$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0.9 0.9 0.9 0.9 0.9 0.9 0 0 0.0 0.0
Dollars:179,398$ 182,224$ 677,499$ 683,866$ 954,998$ 954,539$ 771,650$ 783,500$ 771,650$ 783,500$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:3.3 3.3 4.1 4.1 3.7 3.7 2.5 2.5 3.0 3.0
Dollars:388,585$ 409,165$ 570,258$ 601,226$ 525,909$ 544,067$ 388,963$ 405,788$ 457,303$ 479,519$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDMinimum rating on overall employee satisfaction
with Payroll services as measured through a departmental survey. N/A 76 N/A 82 N/A 80 N/A 82 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1.5 1.5 1.5 1.5 1.5 1.5 2.0 2.0 2.3 2.3
Dollars:118,159$ 124,461$ 143,283$ 151,195$ 132,673$ 141,169$ 201,976$ 216,986$ 294,008$ 310,835$
minimum of 80 percent
minimum of 80 percent
minimum of 80 percent
minimum of 95 percent
Department resources budgeted for this
program
Asset, Debt, and Treasury Management, Administrative Services Department
Asset Management:
Maintain the list of Capital Assets of the City under Generally Accepted Accounting Principles established by the Governmental Accounting Standards Board.
Debt and Lease Obligations:Maintain the City's obligation to repay outstanding debt and contracted leases in order to stay compliant with bond covenants, contracts, and regulations.
Department resources budgeted for this
program
Target
Department resources budgeted for this
program
Department resources budgeted for this
program
Payroll, ASD Department
Payroll processes semi‐monthly payrolls that include benefit processing for all City employees. The City has 3 labor contracts, as well as 99 non‐represented and management employees, and more than 350 supplemental/seasonal employees. The payroll process requires knowledge of every labor contract to ensure that all special pays for overtime, longevity, and premiums are accurate. In addition to ensuring that wages are accurate, Payroll is responsible for ensuring that medical benefits, retirement, deferred compensation, and various other employee reimbursement programs are filed and paid in a timely manner.
minimum of 80 percent
Accounting and Auditing, ASD Department
The Budget, Accounting, and Reporting section of Finance prepares financial statements that reflect the financial status of the City. These statements are for the use of customers, both internal and external, to evaluate
financial health and ascertain that public assets are being well managed.
Budgeting and Financial Planning, ASD Department
On behalf of the Community and all City Departments, the Budgeting, Accounting and Reporting section of Finance works to encourage stewardship, promote financial accountability, and ensure fiscal compliance with federal, state and local laws by providing financial consulting services for all departments on programmatic issues, such as identifying appropriate fees for service, fiscal contract reviews, financial problem solving, revenue analysis, as well as monitoring and tracking of budgetary line‐items. The Budgeting, Accounting, and Reporting section leads the annual budget process and development of the six‐year Capital Improvement Program (CIP).
Finance Operations, ASD Department
The Operations section of Finance ensures accurate and timely: collection of customer accounts (Accounts Receivable); payment of City bills (Accounts Payable), contract and project accounting for Departments.
Operations are also responsible for filing WA state tax forms such as the combined excise tax return, leasehold tax and unclaimed property.
Target
Department resources budgeted for this
program
less than 1 percent
less than 10000 dollar
2021/2022 Preliminary Budget City of Renton, Washington
2 - 31Renton Results - Internal Services - Programs, Resources and Results
Desired Result: I want City departments to have the means to operate efficiently and effectively in a safe and sustainable manner.
City Service Area: Internal Support
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDHiring Process is rated as "good or excellent" by New Hires and Promoted employees. new 2015 new 2015 new 2015 83 25 97 89 93 TBD
Hiring process is rated as "good or excellent" by Hiring Managers new 2015 new 2015 new 2015 71 N/A 16 86 82 TBD
Percentage of new hires or promotions retained past
their probationary period. new 2015 new 2015 new 2015 89 94 92 94 93 TBD
Number of training courses provided by HR/RM new 2015 new 2015 new 2015 9 10 12 9 8 TBD
Number of business days to recruit and fill non‐civil service positions new 2015 new 2015 new 2015 71 47 45 67 55 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:5 5 6.0 6.0 7.0 7.0 8.0 8.0 7.7 7.7
Dollars:968,935$ 988,962$ 1,198,020$ 1,239,612$ 1,319,084$ 1,364,758$ 1,504,082$ 1,624,358$ 1,654,688$ 1,701,170$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Complete a safety inspection of each City‐owned facility annually 42 78 50 89 45 73 100 87 TBD
Maintain or reduce the annual number of Workers Compensation Claims 120 98 96 98 72 36 55 42 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2.25 2.25 2.3 2.3 2.3 2.3 3.3 3.3 2.8 2.8
Dollars:3,060,354$ 3,100,376$ 3,596,844$ 3,511,859$ 3,573,432$ 3,168,604$ 4,202,884$ 4,231,786$ 3,279,123$ 3,304,171$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Claims processing, Healthcare Management Administrator customer service will result in "good or excellent" rating by employees.N/A N/A 75 75 75 N/A >80 >80 TBD
Maintain or improve participation by employees in Wellness events new 2014 new in 2014 41 46.5 38 > 40% > 40% > 40% TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:1.75 1.75 2.8 2.8 1.8 1.8 1.8 1.8 2.6 2.6
Dollars:12,640,169$ 13,795,876$ 14,656,608$ 15,888,711$ 9,197,238$ 9,668,725$ 12,629,151$ 13,551,651$ 13,943,427$ 15,127,804$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDPerformance evaluations are timely completed and
filed with Human Resources.100 100 75? 33.33 45 100 100 100 TBD
Department expenditures are within budget. 98 100 100 99.75 100 100 100 100 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2 2 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Dollars:673,569$ 435,909$ 472,632$ 485,691$ 506,233$ 520,059$ 561,220$ 597,100$ 607,635$ 629,731$
minimum of 80 percent
minimum of 40 percent
minimum of 98 percent
minimum of 95 percent
minimum of 90 percent
number of courses
number of days
minimum of 100 percent
number of claims
Benefits, HRRM Department
The Benefits division administers and maintains the City's self‐funded medical, dental and vision plan, 457 deferred compensation plans, the DRS retirement plans, life insurance, long term disability insurance, 125 flexible spending plan, and the employee assistance program. The Wellness program provides resources for City employees to develop and maintain a healthy lifestyle. Wellness activities include employee education, wellness competitions, health fair, healthcare screenings, and flu shots. The program also allows employees opportunities for on‐site exercise. Another component to the Benefits division includes administering the City's self‐funded Workers' Compensation program, and managing leaves of absence such as FMLA, and providing accommodation under the ADA.
Target
Department resources budgeted for this
program
City Attorney Administration, City Attorney Department
The City Attorney Department ‐ Administration consists of the City Attorney (1.0 FTE) and an Administrative Assistant (1.0 FTE).
Target
Department resources budgeted for this
program
Target
Department resources budgeted for this
program
HR/RM Administration, HRRM Department
Human Resources (HR) Administration provides programs and services that address recruitment and selection, new hire orientation, classification and compensation, employee and labor relations, grievance processing,
employment policies and laws, training, employee recognition, and human resources/payroll data entry and maintenance. Through these programs and services, City Administrators, directors, managers, and supervisors are
able to stay informed regarding the best practices in recruitment and selection techniques; how to coach and assist in the development, inclusion and retention of a highly skilled and diverse work force; and how to manage effectively within a Union environment.
Target
Department resources budgeted for this
program
Risk Management, HRRM Department
The Risk Management division of the Human Resources and Risk Management Department protects against the loss of or damage to City physical assets such as buildings, property, vehicles, equipment, inventory, and
monetary funds as well as protects the City's non‐monetary assets by promoting the safety and health of employees while working, and the safety of the public while using City facilities.
baseline
baseline
2021/2022 Preliminary Budget City of Renton, Washington
2 - 32Renton Results - Internal Services - Programs, Resources and Results
Desired Result: I want City departments to have the means to operate efficiently and effectively in a safe and sustainable manner.
City Service Area: Internal Support
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBD
Property and Technical Services review of development proposals are processed within two weeks. 9595N/A9598959898TBD
City s property (zoning, right of way, annexations) database is updated within two weeks of notification are updated within two weeks of notification
100 99 N/A 95 98 100 95 98 TBD
The Survey Control Network is fully updated. N/A N/A N/A 60 65 50 50 60 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:2 2 3.7 3.7 4.5 4.5 4.5 4.5 4.5 4.5
Dollars:248,355$ 258,077$ 449,327$ 476,833$ 557,650$ 583,854$ 566,273$ 597,017$ 649,456$ 673,526$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDSquare feet of coverage per employee (IFMA 60th percentile)21832 23141 23141 23141 N/A N/A no data no data TBD
Employee satisfaction survey % positive 76 64 72 78 N/A N/A no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:14 14 14.0 14.0 16.0 16.0 15.8 15.8 22.5 22.5
Dollars:1,223,992$ 1,261,643$ 1,463,447$ 1,540,100$ 1,729,991$ 1,794,981$ 1,761,220$ 1,870,828$ 2,450,152$ 2,566,751$
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDCustomer service survey satisfaction ‐ turnaround
time 80 48 51 57 N/A N/A no data no data TBD
Customer service survey ‐ timeliness of response 78 52 57 63 N/A N/A no data no data TBD
Number of Helpdesk Projects complete 1737 2158 2384 2756 N/A N/A no data no data TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:9.5 9.5 9.5 9.5 8.5 8.5 12.0 12.0 11.0 11.0
Dollars:3,006,530$ 2,808,811$ 3,454,553$ 3,386,845$ 2,961,064$ 2,965,198$ 3,697,189$ 3,710,575$ 3,718,018$ 3,790,456$
minimum of 95 percent
Department resources budgeted for this
program
Facilities Technical Maintenance, Community Services Department
Facilities Technical Maintenance Group provides the following services: Building systems repair and maintenance ‐ 52 buildings, 839,304 square feet: o Control systemso Heating/Ventilation/Air Conditioning (HVAC) and Indoor Air Quality (IAQ)
o Safety, Security, Fire Protection Systems, including Closed Circuit TV(CCTV) and Locks o Electrical distribution systems
o Roof and surfaces maintenanceo Prioritized individual service requests from all levels of employees o Employee moves, adds, and changes
Target
Department resources budgeted for this
program
minimum of 75 percent
number of projects (data)
Custodial Services, Community Services Department
The Custodial Maintenance Group provides high quality services benchmarked per IFMA (International Facility Management Association), BOMA (Building Owners and Managers Association), and GSA (General Services
Administration) standards.
Target
maximum of 20424 count
minimum of 78 percent
minimum of 74 percent
Technical and Property Services, CED Department
The Technical Services and Property Services work group is an internal support group responsible for a variety of mapping, land surveying and technology support functions, relating to the work of several departments.
Specifically these functions include: development and maintenance of the City's right of way monumentation, including the City's coordinated Survey Control Network, review of all subdivision survey documents and the
review and preparation of legal descriptions for various land /property activities, responsible for address management within City limits, management of bonds and cash sureties, development and maintenance of the City's LAND & PLANNING GIS geodatabases, the preparation of maps, geographic and demographic analyses, and reports, and providing technical support, including process development, implementation, integration and documentation for the City's permit system as well as other departmental software systems.
Target
Department resources budgeted for this
program
minimum of 95 percent
minimum of 70 percent
2021/2022 Preliminary Budget City of Renton, Washington
2 - 33Renton Results - Internal Services - Programs, Resources and Results
Desired Result: I want City departments to have the means to operate efficiently and effectively in a safe and sustainable manner.
City Service Area: Internal Support
Performance Metrics and Data 2012
results
2013
results
2014
results
2015
results
2016
results
2017
Results
2018
Results
2019
Results
2020
TBDMinimize the number of unscheduled repairs for City vehicles and motarized equipment fleet as as percent of the total repairs.N/A 10 N/A N/A 23 7.57 0.18 7.43 TBD
Minimize “comeback” repairs, as a percentage of the
total repairs new 2015 new 2015 new 2015 new 2015 4.6 5.39 4.51 0.59 TBD
Turn‐around time, percentage of work orders completed in less than 72 hours new 2015 new 2015 new 2015 new 2015 71 71 71 68 TBD
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:10.9 10.9 10.9 10.9 10.9 10.9 9.0 9.0 9.0 9.0
Dollars:2,755,598$ 2,853,224$ 2,925,894$ 2,992,979$ 3,041,000$ 3,092,437$ 2,848,476$ 2,914,180$ 2,900,803$ 2,951,187$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:1,490,000$ 1,041,000$ 2,831,000$ 1,473,000$ 4,367,000$ 2,538,000$ 4,176,000$ 1,804,000$ 2,057,000$ 1,419,417$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:see above see above see above see above see above see above see above see above 1.2 1.2
Dollars:see above see above see above see above see above see above see above see above 182,140$ 187,171$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
FTE's:0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Dollars:240,475$ 225,475$ 210,475$ 200,475$ 210,475$ 200,475$ 210,475$ 200,475$ 210,475$ 200,475$
2013 budget 2014 budget 2015 budget 2016 budget 2017 budget 2018 budget 2019 budget 2020 budget 2021 proposed 2022 proposed
Dollars:(27,505,553)$ (29,961,148)$ (34,588,681)$ (35,846,391)$ (29,638,600)$ (28,258,406)$ (34,638,454)$ (34,540,570)$ (34,455,003)$ (35,420,053)$
less than or equal to 10 percent
less than or equal to 5 percent
minimum of 80 percent
Department resources budgeted for this
program
Department resources budgeted for this
program
Fire Pension, Administrative Services Department
The Firemen's Pension Fund is a closed system with membership limited to firefighters employed prior to March 1, 1970, when the LEOFF Retirement System was established. This plan provides retirement and disability
benefits, annual cost‐of‐living adjustments, and death benefits to plan members and beneficiaries.
Fleet Services provides safe, reliable vehicles and equipment for Maintenance, Police, Fire, Community Services, and City Hall. They provide quick, complete repairs of all vehicles and equipment, and perform preventative
maintenance to reduce the number of repairs and ensure safe reliable operation. They also provide in and out service of new and old equipment and vehicles, record and schedule fuel deliveries and internal coordination
with other divisions citywide on vehicle purchases.
Department resources budgeted for this
program
Internal Service Fund/Interfund Transactions only, Non departmental
Services provided through internal business units (Internal Service Funds). Expenditures are deducted to show the net impact on City's resources.
Fleet Services provides safe, reliable vehicles and equipment for Maintenance, Police, Community Services, and City Hall. They provide quick, complete repairs of all vehicles and equipment, and perform preventative
maintenance to reduce the number of repairs and ensure safe reliable operation. They also provide in and out service of new and old equipment and vehicles, record and schedule fuel deliveries and internal coordination
with other divisions citywide on vehicle purchases.
Target
Department resources budgeted for this
program
Fleet Services Capital Recovery, Public Works Department
Fleet Services Operation & Maintenance, Public Works Department
Transportation Operations Maintenance Section, Public Words Department
The Transportation Operations Maintenance Section installs and maintains 933 VHF/800MHZ radios , vehicle remote modems (VRM), GPS, laptop trays, warning lights and other electronic devices in all City‐owned vehicles. All maintenance of this equipment, including the equipment installed in Police Department vehicles, is under the responsibility of the Transportation Maintenance Operations Section . The Section also maintains all of the
City's FCC licenses including the maintenance of the City's VHF radio system. The Section also assists other divisions, such as Information Technology with fiber optic infrastructure, such as splicing, maintenance, cable
installation and troubleshooting. In addition, we assist other departments with sign fabrication and provide traffic control for special events and emergency road closures.
Department resources budgeted for this
program**
2021/2022 Preliminary Budget City of Renton, Washington
2 - 34Renton Results - Internal Services - Programs, Resources and Results
FTE Tot Exp $ Tot Rev $ FTE Tot Exp $ Tot Rev $
Administrative Services Business Licensing 3.00 410,556 ‐ 3.00 428,770 ‐
City Attorney City Attorney Prosecution 8.00 1,210,931 ‐ 8.00 1,254,397 ‐
Community and Economic
Development Building Inspection 16.00 2,308,971 3,446,556 16.00 2,395,462 4,409,169
Community and Economic
Development Code Enforcement program 4.00 576,561 ‐ 4.00 598,859 ‐
Community Services CDBG ‐ Community Services ‐ 63,133 63,133 ‐ 63,133 63,133
Community Services Serving vulnerable/low income 4.50 1,316,559 20,000 4.50 1,342,967 20,000
Court Services Probation 1.00 148,714 93,000 1.00 153,823 93,000
Executive Emergency Management for the COR 3.00 781,615 ‐ 3.00 805,202 ‐
Police Auxiliary Services ‐ Jail ‐ 4,306,301 ‐ ‐ 4,306,301 ‐
Police Patrol Operations 67.00 12,958,172 ‐ 67.00 13,392,798 ‐
Police Staff Services 17.40 2,158,266 ‐ 17.40 2,267,688 ‐
Police Police Administration 4.00 7,864,729 ‐ 4.00 7,976,891 ‐
Police Investigations 24.00 4,184,172 ‐ 24.00 4,326,131 ‐
Police Administrative Services 13.00 2,631,945 225,000 13.00 2,688,719 225,000
Police Patrol Services 16.00 4,175,438 2,042,326 16.00 4,276,359 2,042,326
Police Special Operations 20.00 3,724,857 ‐ 20.00 3,869,265 ‐
Police Electronic Home Detention Program 2.00 526,603 251,941 2.00 537,983 365,045
202.90 49,347,522 6,141,956 202.90 50,684,751 7,217,673
FTE Tot Exp $Tot Rev $FTE Tot Exp $Tot Rev $
Community Services CIP General Gov't (Safey & Health)‐ ‐ ‐ 0.00 ‐ ‐
‐ ‐ ‐ 0.00 ‐ ‐
202.90 49,347,522 6,141,956 202.90 50,684,751 7,217,673
Revenue, Expenditure and Capital Budgets by
City Service Area
City Service Area: Safety and Health
Department Program Name 2021 proposed 2022 proposed
Total Capital FTE and $
See the CIP Section of this document for detailed information of the budgeted Capital Projects.
Total Operating and Capital FTE and $
Total Safety and Health
Capital Programs
City Service Area 2021 proposed 2022 proposed
2021/2022 Preliminary Budget City of Renton, Washington
2 - 35Renton Results - Revenue, Expenditure and Capital Budgets by City Service Area
FTE Tot Exp $ Tot Rev $ FTE Tot Exp $ Tot Rev $
Administrative Services City Clerk 6.00 1,433,840 ‐ 6.00 1,477,120 ‐
Administrative Services Hearing Examiner ‐ 40,000 ‐ ‐ 40,000 ‐
City Attorney City Attorney Civil 4.00 792,781 ‐ 4.00 816,384 ‐
Community Services Volunteer Program 1.00 133,972 ‐ 1.00 137,011 ‐
Court Services Court Administration 4.00 1,371,173 35,000 4.00 1,412,717 35,000
Court Services Criminal Case Processing 5.00 676,430 208,382 5.00 703,524 208,382
Court Services Infraction Processing 7.00 906,613 1,639,467 7.00 945,398 1,639,467
Executive Cable Communication Fund ‐ 97,674 97,674 ‐ 97,674 97,674
Executive Citywide Communications 4.00 687,797 689,742 4.00 713,771 715,678
Executive Court Public Defenders ‐ 883,000 ‐ ‐ 883,000 ‐
Executive Executive Operations 4.00 1,525,787 ‐ 4.00 1,575,912 ‐
Executive Intergovernmental Relations ‐ 166,000 ‐ ‐ 166,000 ‐
Legislative Legislative Operations 8.00 512,544 ‐ 8.00 526,945 ‐
43.00 9,227,611 2,670,265 43.00 9,495,456 2,696,201
43.00 9,227,611 2,670,265 43.00 9,495,456 2,696,201
Total Representative Gov't FTE and $
Total Operating and Capital FTE and $
Revenue, Expenditure and Capital Budgets by
City Service Area
City Service Area: Representative Government
Department Program Name 2021 proposed 2022 proposed
2021/2022 Preliminary Budget City of Renton, Washington
2 - 36Renton Results - Revenue, Expenditure and Capital Budgets by City Service Area
FTE Tot Exp $ Tot Rev $ FTE Tot Exp $ Tot Rev $
Community and Economic De Arts & Culture ‐ 117,900 ‐ ‐ 117,900 ‐
Community and Economic De Current Planning 8.34 1,228,210 98,000 8.34 1,279,777 100,940
Community and Economic De Long Range Planning 3.20 603,256 ‐ 3.20 624,747 ‐
Community and Economic De One Percent for Art Fund Program ‐ 117,900 117,900 ‐ 117,900 117,900
Community Services Administration/Com Svcs 2.00 592,057 ‐ 2.00 606,402 ‐
Community Services Aquatics 1.40 963,276 367,936 1.40 975,821 407,636
Community & Economic Development CED Administration 1.80 1,473,798 ‐ 1.80 1,512,849 ‐
Community Services Cultural & Community Engagement 3.90 926,740 48,367 3.90 950,556 210,176
Community & Economic Development Economic Development 6.00 1,169,508 ‐ 6.00 1,208,842 ‐
Community and Economic De CDBG ‐ Community & Economic Development ‐ 361,724 361,724 ‐ 361,724 361,724
Community Services Education and Recreational Activities 7.15 1,877,391 425,161 7.15 1,918,397 469,305
Community Services Farmers Market 1.25 183,264 9,955 1.25 188,695 34,404
Community Services Leased Facilities 1.50 849,878 535,565 1.50 860,534 790,321
Community Services Museum 1.00 289,701 ‐ 1.00 297,273 ‐
Community Services Parks and Trails Program 32.60 6,428,197 10,000 32.60 6,615,715 10,000
Community Services Recreational Facilities 1.90 1,589,398 153,271 1.90 1,641,680 376,678
Community Services Senior Activity Center 4.90 1,067,944 128,000 4.90 1,078,775 128,000
76.94 19,840,142 2,255,879 76.94 20,357,585 3,007,084
FTE Tot Exp $Tot Rev $ FTE Tot Exp $ Tot Rev $
Community Services CIP ‐ General Gov't (Livable Community)‐ 1,716,048 1,616,000 ‐ 1,299,646 1,462,840
Community Services Parks Impact Mitigation Fund ‐ 316,000 ‐ ‐ ‐ ‐
‐ 2,032,048 1,616,000 0.00 1,299,646 1,462,840
76.94 21,872,190 3,871,879 76.94 21,657,231 4,469,924
Revenue, Expenditure and Capital Budgets by
City Service Area
City Service Area: Livable Community
Department Program Name 2021 proposed 2022 proposed
Total Capital FTE and $
See the CIP Section of this document for detailed information of the budgeted Capital Projects.
Total Operating and Capital FTE and $
Total Livable Community FTE and $
Capital Programs
City Service Area 2021 proposed 2022 proposed
2021/2022 Preliminary Budget City of Renton, Washington
2 - 37Renton Results - Revenue, Expenditure and Capital Budgets by City Service Area
FTE Tot Exp $ Tot Rev $ FTE Tot Exp $ Tot Rev $
Public Works Active Transportation Program 0.25 44,310 ‐ 0.25 45,739 ‐
Public Works Airport Operations 9.00 2,167,840 2,224,767 9.00 2,250,234 2,561,767
Public Works Bridges 0.53 86,689 ‐ 0.53 89,129 ‐
Public Works Building the Mobility Network 9.07 1,551,514 360,000 9.07 1,604,912 360,000
Public Works Public Works Administration 2.00 497,991 ‐ 2.00 511,941 ‐
Public Works Public Works Maintenance Administration 5.45 1,507,572 ‐ 5.45 1,558,898 ‐ Public Works Street Maintenance 21.46 5,072,787 763,432 21.46 5,193,463 763,432
Public Works Trans Operations Engineering Section 4.95 1,470,288 ‐ 4.95 1,492,867 ‐
Public Works Transit Coordination/Transportation Demand Mgmnt 0.70 242,743 40,000 0.70 246,570 40,000
Public Works Transportation Maintenance 11.30 2,009,067 ‐ 11.30 2,030,503 ‐
Public Works Transportation Systems Admin 3.00 1,051,713 ‐ 3.00 1,078,813 ‐
Total Mobility FTE and $67.71 15,702,514 3,388,199 67.71 16,103,066 3,725,199
FTE Tot Exp $Tot Rev $ FTE Tot Exp $ Tot Rev $
Public Works T Airport Capital Improvement Program ‐ 827,000 827,000 ‐ 677,000 490,000
Public Works T Transportation CIP ‐ 675,250 2,200,000 ‐ 583,000 2,200,000
Public Works T Transportation Impact Mitigation Fund ‐ 200,000 200,000 ‐ 200,000 200,000
1,702,250 3,227,000 0.00 1,460,000 2,890,000
67.71 17,404,764 6,615,199 67.71 17,563,066 6,615,199
Revenue, Expenditure and Capital Budgets by
City Service Area
City Service Area: Mobility
Department Program Name 2021 proposed 2022 proposed
Total Capital FTE and $
Note: The first letter(s) of the CIP description title identifies the type of project. A = Airport, T = Transportation See the CIP Section of this document for detailed information of the budgeted Capital Projects.
Total Operating and Capital FTE and $
Capital Programs
City Service Area 2021 proposed 2022 proposed
2021/2022 Preliminary Budget City of Renton, Washington
2 - 38Renton Results - Revenue, Expenditure and Capital Budgets by City Service Area
FTE Tot Exp $ Tot Rev $ FTE Tot Exp $ Tot Rev $
Community and Economic Dev.Development Engineering 14.63 2,318,879 507,015 14.63 2,412,385 507,015
Community Services Golf Course 12.00 2,566,000 2,833,175 12.00 2,638,766 2,912,455
Administrative Services Utility Billing and Cashiering 5.00 721,659 ‐ 5.00 741,720 ‐
Community Services Parks Planning, Urban Forestry and Na Res 6.40 2,064,918 241,357 6.40 2,092,249 249,680
Public Works King County Metro Fund ‐ 17,607,838 17,607,838 ‐ 17,695,877 17,695,877
Public Works Solid Waste Collection 1.50 21,815,269 22,636,694 1.50 22,574,057 23,104,011
Public Works Solid Waste Education 1.00 153,841 ‐ 1.00 160,266 ‐
Public Works Solid Waste Litter Control 2.00 312,195 4,692 2.00 316,172 4,692
Public Works Surface Water Engineering and Planning 7.80 3,781,895 11,337,487 7.80 3,895,504 5,518,690
Public Works Surface Water Maintenance 17.24 3,970,031 10,700 17.24 3,980,789 10,700
Public Works Surface Water NPDES Education 1.20 235,640 ‐ 1.20 240,137 ‐
Public Works Utility Systems Administration 3.50 1,632,992 ‐ 3.50 1,669,661 ‐
Public Works Wastewater Engineering and Planning 6.00 3,719,570 9,012,746 6.00 3,808,081 6,815,573
Public Works Wastewater Maintenance 10.73 2,464,842 19,740 10.73 2,553,582 19,740
Public Works Water Education 0.20 196,074 ‐ 0.20 197,234 ‐
Public Works Water Engineering and Planning 7.30 3,836,594 16,502,325 7.30 4,018,957 15,416,948
Public Works Water Maintenance 26.12 6,908,325 10,078 26.12 7,028,723 10,078
Public Works Public Works Trust Fund Loan Debt ‐ 351,852 ‐ ‐ 319,821 ‐
Public Works Waterworks Revenue Bond Debt ‐ 2,748,723 ‐ ‐ 2,747,903 ‐
122.62 77,407,136 80,723,847 122.62 79,091,883 72,265,459
FTE Tot Exp $Tot Rev $ FTE Tot Exp $ Tot Rev $
Public Works SW Surface Water CIP ‐ 1,326,049 1,081,525 ‐ 7,766,170 7,306,099
Public Works T W Water CIP ‐ 1,460,000 1,460,000 ‐ 3,680,000 3,680,000
Public Works WW Wastewater CIP ‐ 2,754,000 2,754,000 ‐ 5,343,000 5,343,000
Community Services Golf Course MM ‐ 68,100 68,100 ‐ 72,200 72,200
‐ 5,608,149 5,363,625 0.00 16,861,370 16,401,299
122.62 83,015,285 86,087,472 122.62 95,953,253 88,666,758
Revenue, Expenditure and Capital Budgets by
City Service Area
City Service Area: Utilities and Environment
Department Program Name 2021 proposed 2022 proposed
Total Capital FTE and $
Note: The first letter(s) of the CIP description title identifies the type of project. W = Water, WW = Wastewater, SW = Surface Water
See the CIP Section of this document for detailed information of the budgeted Capital Projects.
Total Operating and Capital FTE and $
Total Utilities and Environment FTE and $
Capital Programs
City Service Area 2021 proposed 2022 proposed
2021/2022 Preliminary Budget City of Renton, Washington
2 - 39Renton Results - Revenue, Expenditure and Capital Budgets by City Service Area
FTE Tot Exp $ Tot Rev $ FTE Tot Exp $ Tot Rev $
Administrative Services Finance Administration 2.00 912,744 ‐ 2.00 936,213 ‐
Administrative Services Finance Operations 3.67 453,929 ‐ 3.67 474,255 ‐
Administrative Services Accounting and Auditing 3.00 554,958 ‐ 3.00 577,174 ‐
Administrative Services Asset, Debt, and Treasury Management ‐ 771,650 ‐ ‐ 783,500 ‐
Administrative Services Budgeting and Financial Planning 3.00 457,303 ‐ 3.00 479,519 ‐
Administrative Services Payroll 2.33 294,008 ‐ 2.33 310,835 ‐
Administrative Services Fire Pension ‐ 210,475 385,000 ‐ 200,475 290,000
City Attorney City Attorney Administration 2.00 607,635 ‐ 2.00 629,731 ‐
Community and Economic
De Technical and Property Services 4.53 649,456 ‐ 4.53 673,526 ‐
Executive Organizational Equity, Inclusion, and Development 1.00 370,980 ‐ 1.00 327,460 ‐
Human Resources and Risk HR/RM Administration 7.70 1,654,688 ‐ 7.70 1,701,170 ‐
Public Works Trans Operations Internal Support Services 1.20 182,140 ‐ 1.20 187,171 ‐
Administrative Services IT Administration 2.00 393,408 396,061 2.00 404,108 407,152
Administrative Services Applications and Database Services 7.00 2,519,745 2,520,523 7.00 2,561,310 2,563,298
Administrative Services Enterprise GIS 3.00 539,599 539,768 3.00 559,429 559,857
Administrative Services Service Desk Support 4.00 736,729 740,918 4.00 770,822 775,690
Administrative Services System Services 4.00 866,729 866,980 4.00 902,866 903,555
Administrative Services Telecommunications 1.00 585,241 585,405 1.00 590,782 591,233
Community Services Custodial Services 22.50 2,450,152 2,385,869 22.50 2,566,751 2,568,494
Community Services Facilities Technical Maintenance 11.00 3,718,018 3,606,861 11.00 3,790,456 3,610,976
Executive Communication ‐ Print and Mail Services 1.63 465,029 464,990 1.63 470,951 470,922
Human Resources and Risk Risk Management 2.75 3,279,123 3,511,775 2.75 3,304,171 3,539,243
Human Resources and Risk Benefits 2.55 13,943,427 15,143,476 2.55 15,127,804 16,236,884
Public Works Fleet Services Capital Recovery ‐ 2,057,000 3,652,287 ‐ 1,419,417 3,413,371
Public Works Fleet Services Operation & Maintenance 9.00 2,900,803 2,890,488 9.00 2,951,187 2,940,243
Non‐Departmental Internal Service Fund/Interfund Transactions only*(34,455,003) (34,455,003) (35,420,053) (35,420,053)
Total Internal Services FTE and $100.86 7,119,965 3,235,398 100.86 7,281,030 3,450,865
FTE Tot Exp $Tot Rev $ FTE Tot Exp $ Tot Rev $
Community Services CIP General Gov't (Internal Services)‐ 1,738,386 1,086,185 ‐ 1,156,316 1,000,000
Administrative Services IT Capital ‐ 786,000 936,246 ‐ 777,000 927,594
‐ 2,524,386 2,022,431 0.00 1,933,316 1,927,594
Total Operating and Capital FTE and $100.86 9,644,350 5,257,829 100.86 9,214,346 5,378,459
Revenue, Expenditure and Capital Budgets by
City Service Area
City Service Area: Internal Support
Department Program Name 2021 proposed 2022 proposed
Total Capital FTE and $
* Services provided through internal business units (Internal Service Funds). Both revenues and expenditures are deducted to show the net impact on City's resources.
Capital Programs
City Service Area 2021 proposed 2022 proposed
*The program costs below are budgeted in support of the Internal Support City Service Area goals; however the costs are allocated to (and budgeted) within other programs so they will
be excluded from the total for this City Service Area.
2021/2022 Preliminary Budget City of Renton, Washington
2 - 40Renton Results - Revenue, Expenditure and Capital Budgets by City Service Area
FTE Tot Exp $ Tot Rev $ FTE Tot Exp $ Tot Rev $
Non‐Departmental Other City Svc ‐ Employee Separation Pay ‐ 782,516 ‐ ‐ 782,516 ‐
Non‐Departmental Association Dues and Contracted Services ‐ 186,070 ‐ ‐ 183,948 ‐
Non‐Departmental Fire Impact Mitigation Fund ‐ 436,987 99,000 ‐ 500,634 99,000
Non‐Departmental General Governmental Fund Transfers ‐ 4,520,375 3,480,375 ‐ 2,763,100 1,723,200
Non‐Departmental General Government Debt ‐ 7,153,019 551,618 ‐ 4,341,920 545,244
Non‐Departmental Indirect Cost Transfer Multi Depts ‐ ‐ 3,830,617 ‐ ‐ 3,951,261
Non‐Departmental LEOFF 1 Medical Obligation ‐ 2,624,684 ‐ ‐ 2,624,684 ‐
Non‐Departmental REET 1 Fund ‐ 2,865,000 2,250,000 ‐ 2,315,000 2,300,000
Non‐Departmental REET 2 Fund ‐ 3,248,025 2,250,000 ‐ 2,750,625 2,300,000
Internal Service Fund/Interfund Transactions only ‐ 34,455,003 34,455,003 0.00 35,420,053 35,420,053
Total Transfers and Interfund Transactions 0.00 56,271,679 46,916,613 0.00 51,682,480 46,338,758
FTE Tot Exp $ Tot Rev $ FTE Tot Exp $ Tot Rev $
Revenue General Governmental Fund Revenues ‐ 2,211,723 83,974,659 ‐ 2,211,723 90,515,484
Revenue Non‐GG Fund Revenues ‐ ‐ 372,500 ‐ ‐ 372,500
‐ 2,211,723 84,347,159 0.00 2,211,723 90,887,984
Total Other Programs ‐ 58,483,402 131,263,771 0.00 53,894,203 137,226,742
Revenue, Expenditure and Capital Budgets by
City Service Area
City‐Wide Transfers and Other Interfund Transactions
Department Program Name
2021 Poposed 2022 Proposed
Total City‐Wide Revenue Estimates
City‐Wide Revenue Estimate
Department Program Name
2021 Poposed 2022 Proposed
2021/2022 Preliminary Budget City of Renton, Washington
2 - 41Renton Results - Revenue, Expenditure and Capital Budgets by City Service Area
FTE Tot Exp $Tot Rev $FTE Tot Exp $Tot Rev $
202.90 49,347,522 6,141,956 202.90 50,684,751 7,217,673
43.00 9,227,611 2,670,265 43.00 9,495,456 2,696,201
76.94 19,840,142 2,255,879 76.94 20,357,585 3,007,084
67.71 15,702,514 3,388,199 67.71 16,103,066 3,725,199
122.62 77,407,136 80,723,847 122.62 79,091,883 72,265,459
100.86 7,119,965 3,235,398 100.86 7,281,030 3,450,865
614.03 178,644,890 98,415,544 614.03 183,013,771 92,362,481
FTE Tot Exp $Tot Rev $FTE Tot Exp $Tot Rev $
‐ ‐ ‐ 0.00 ‐ ‐
‐ ‐ ‐ 0.00 ‐ ‐
‐ 2,032,048 1,616,000 0.00 1,299,646 1,462,840
‐ 1,702,250 3,227,000 0.00 1,460,000 2,890,000
‐ 5,608,149 5,363,625 0.00 16,861,370 16,401,299
‐ 2,524,386 2,022,431 0.00 1,933,316 1,927,594
‐ 11,866,832 12,229,056 0.00 21,554,332 22,681,733
FTE Tot Exp $Tot Rev $FTE Tot Exp $Tot Rev $
‐ 56,271,679 46,916,613 0.00 51,682,480 46,338,758
‐ 2,211,723 84,347,159 0.00 2,211,723 90,887,984
‐ 58,483,402 131,263,771 0.00 53,894,203 137,226,742
Grand Totals 614.03 248,995,124 241,908,372 614.03 258,462,306 252,270,955
Safety & Health
Reconciliation to Budget by Fund and Department
Below will reconcile the Programs within Renton Results with the Total Adopted Budget
Total Operating FTE and $
Operating Programs
City Service Area 2021 Poposed 2022 Proposed
Representative Government
Livable Community
Mobility
Utilities & Environment
Internal Support
Total Capital FTE and $
Capital Programs
City Service Area 2021 Poposed 2022 Proposed
Safety & Health
Representative Government
Livable Community
Mobility
Utilities & Environment
Internal Support
City‐Wide Revenue Estimate
Total Other
Other
City Service Area 2021 Poposed 2022 Proposed
Transfers and Interfund Transactions
2021/2022 Preliminary Budget City of Renton, Washington
2 - 42Renton Results - Reconciliation to Total Budget
This page is intentionally left blank
2021/2022 Preliminary Budget City of Renton, Washington
2 - 43
3 BUDGET BY DEPARTMENT
Legislative
3‐1
Executive
3‐6
City Attorney
3‐24
Court Services
3‐28
Administrative Services (AS)
3‐32
Community and Economic Development (CED)
3‐41
Community Services
3‐58
Human Resources and Risk Management (HR&RM)
3‐81
Other City Services
3‐88
Police
3‐90
Public Works (PW)
3‐104
Legislative
Randy Corman
Councilmember
Ed Prince
Councilmember
Ryan McIrvin
Councilmember
Ruth Pérez
Councilmember
Valerie O’Halloran
Councilmember
Kim‐Khánh Văn
Councilmember
Angelina Benedetti
Councilmember
Council Liaison
2021/2022 Preliminary Budget City of Renton, Washington
3 - 1Budget by Department - Legislative
Legislative
Mission
The City Council assesses the needs of the public and sets priorities; develops and adopts the annual budget, ordinances,
resolutions, and policy alternatives to meet those needs, consistent with City goals and objectives; and provides coordination
and evaluation of programs and service objectives.
City Councilmembers Names and Terms
Councilmember Position # Term Service
Began Term Expires
Randy Corman 1 4 years 1994 12/31/2021
Ryan McIrvin 4 4 years 2016 12/31/2023
Angelina Benedetti 2 4 years 2020 12/31/2021
Ruth Pérez 6 4 years 2014 12/31/2021
Kim‐Khánh Văn 7 4 years 2020 12/31/2023
Ed Prince 5 4 years 2012 12/31/2023
Valerie O’Halloran 3 4 years 2020 12/31/2023
List of Legislative Renton Results Decision Packages:
Legislative Performance Measures:
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 377,512 414,410 359,238 429,907 420,924 512,544 526,945 19.2% 2.8%
Position Summary 8.00 8.00 8.00 8.00 8.00 8.00 8.00 0.0% 0.0%
2021 Proposed 2022 Proposed
Package # Description FTE Tot Exp $Tot Rev $ FTE Tot Exp $Tot Rev $
200001.0012 Legislative Operations 8.00 512,544 ‐ 8.00 526,945 ‐
Total 8.00 512,544$ ‐$ 8.00 526,945$ ‐$
City Service Area City Service Area Strategies Performance Measures 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results
Policy and program decisions
reflecting community values
Community Rates the City as heading in
the right directions (survey rate fair,
good or excellent)
64%* N/A 58%*‐‐‐next survey
2021
Policy and fiscal accountability
Cost of government per capita
(General Gov’t Funds, Budgeted
Expenditures/population)
$1,851 $1,851 $1,514 $1,608
(budgeted)
$1,644
(budgeted)
Representative
Government
* Residential Surveys are conducted every three‐four years
2021/2022 Preliminary Budget City of Renton, Washington
3 - 2Budget by Department - Legislative
Highlight of Budget Changes:
Personnel Benefits increased by $28K in 2021 due to projected increased in medical/dental benefits.
Regular Salaries have increased by $50,000 due to a position reclassification.
Interfund Payments increased by $5K in 2021 due to projected increases in Information Services maintenance &
operations.
2019/2020 Accomplishments
Adopted/Authorized the following:
Ordinance authorizing collection of existing sales and use tax to be used for affordable housing purposes.
Execution of the 2020 National League of Cities (NLC) Census Grant to accept $15,000 for Census 2020 work.
Execution of the Water Quality Grant Agreement to accept $277,500 in grant funds for the Burnett Avenue South
and Williams Avenue South Water Quality Retrofit Project.
Execution of a grant with the Washington State Department of Commerce to accept $100, 000 in grant funds to be
utilized to address the Renton community’s critical housing needs.
Execution of a grant agreement with King County Flood Control Zone District to accept up to $499,658 for the
Lower Cedar River Flood Risk Reduction Feasibility Study project.
Approval of the Sunset Neighborhood Center Capital Grant agreement with the Renton Housing Authority (RHA)
for a $400,000 grant to assist with renovation costs for the former Renton Highlands Library.
Approval of a Washington State Military Department Public Assistance Grant Agreement in order to receive 75% or
more of eligible non‐insurance covered damages sustained by the City during the storm period January 20 through
February 10, 2020.
Execution of an Interlocal Agreement with Puget Sound Emergency Radio Network (PSERN), which implements a
new public safety radio system and defines agencies' roles and responsibilities
Execution of grant agreements in order to receive up to $65,000 in grant funds to supplement the City's domestic
violence victim advocate program.
Approval of a 100‐percent waiver of eligible development and impact fees for the Habitat for Humanity La Fortuna
Phase II development
Approval of the Multi‐Family Housing Property Tax Exemption Agreement with the Renton Housing Authority,
which addresses the terms and conditions for the Willowcrest Townhomes affordable homeownership project to
receive a partial property tax exemption for twelve years
Approval of a grant agreement with the State Department of Commerce, in order to receive $605,640 in grant
funds for the Gene Coulon Memorial Beach Park Play Equipment Replacement project
Approval of the proposed May Creek Corridor acquisition, and the execution of a Purchase and Sales Agreement
Approval of an agreement with King County Flood Control District to accept $125,000 in grant funds for the
Monroe Ave NE Storm System Improvement project
Expenditure Budget by Division ‐ Legislative
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 192,505 195,064 191,640 197,629 233,050 247,080 251,873 25.0% 1.9%
Personnel Benefits 94,892 99,659 96,500 104,817 104,817 132,763 140,743 26.7% 6.0%
Supplies 1,537 2,000 3,541 2,000 1,400 2,000 2,000 0.0% 0.0%
Other Services & Charges 24,279 63,316 13,186 63,316 23,316 63,316 63,316 0.0% 0.0%
Interfund Payments 64,300 54,371 54,371 62,145 58,341 67,385 69,013 8.4% 2.4%
Total 377,512 414,410 359,238 429,907 420,924 512,544 526,945 19.2% 2.8%
Staffing Levels by Division ‐ Legislative
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 8.00 8.00 8.00 8.00 8.00 8.00 8.00 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 3Budget by Department - Legislative
Execution of a contract amendment for the Airport Master Plan
Agreement to provide professional design and construction administration support services for site improvements
to Kiwanis Park
Professional Services Agreement to provide professional design and construction administration support services
for the replacement of the Trestle Bridge at Gene Coulon Memorial Beach Park
Agreement to provide professional design and construction administration support services for the North
Waterwalk Improvements at Gene Coulon Memorial Beach Park
An ordinance to adopt the 2019/2020 Biennial Budget
An amendment to the 2019/2020 Fee Schedule
Approval and ratification of the Standstill Agreement with DevCo in order to attempt, in good faith, to establish a
Development Agreement for the Solera project
Axecution of the Water Quality Grant Agreement WQC‐2020‐Renton‐00016 with the Department of Ecology to
accept $187,500 in grant funds for the Stormwater Facility Retrofit Study project
The application for a $412,500 grant to assist with the design of the removal of the Panther Creek fish barrier at
the Talbot Road South crossing
A Local Agency Agreement for the obligation of an additional $1 million in grant funds for the Williams Ave S and
Wells Ave S Conversion project
The 2019 Title IV Docket 14
Approval of utility billing adjustments due to water leaks in excess of $17,000
An ordinance authorizing a franchise agreement with ExteNet System, Inc. as a purveyor of telecommunication
network for small cell technology
An engineering services agreement for the Kennydale Lakeline Sewer System Improvement project
An ordinance finalizing the City‐initiated Sunset Lane NE Improvement Project latecomer agreement for utility
systems and transportation/street improvements
The 2020 Comprehensive Plan Map Amendments and concurrent rezones
A Real Estate Disposition and Development Agreement (related to the 200 Mill Building) with Cosmos International
Corp.
An ordinance to advance economic recovery for businesses in Renton, by providing no‐fee Economic Recovery
Revocable Right‐of‐Way Permits until Phase 4 of the Safe Start Plan, or December 31, 2020 whichever occurs first;
and allowance for Economic Recovery Signs until December 31, 2020
Execution of an agreement for the obligation of grant funding in the amount of $3,150,000 to accomplish the NE
Sunset Blvd (SR 900) Corridor Improvements project
Award the bid for the Williams Ave S and Wells Ave S Conversion project
Execution of a professional services agreement to complete a City‐wide Housing Action Plan
Held a public hearing to solicit public input regarding the City of Renton 2021/2022 Biennial Budget
A resolution to establish a program funding and implementation plan for the City's CARES Act Relief Funds
Execution of an Interagency Agreement to receive $3,141,000 in Coronavirus Relief Funds to assist individuals,
businesses, and the City respond to the COVID‐19 health crisis
Execution of an Agreement with the Federal Aviation Administration for the obligation of CARES Act grant funding,
in the amount of $69,000, for airport operational and maintenance expenses
Execution of a Local Agency Agreement for obligation of $3 million in grant funding, and approval of all subsequent
to accomplish the Rainier Ave S Corridor Improvements Phase 4 project
Execution of a contract for the construction phase of the Renton Elementary and Middle School Crossing project
2021/2022 Preliminary Budget City of Renton, Washington
3 - 4Budget by Department - Legislative
Position Listing ‐ Legislative
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
Legislative Services/City Council
E09 City Council Members (Elected)7.007.007.007.007.007.007.00
M19 City Council Liaison 0.000.000.000.000.001.001.00
M17 City Council Liaison 1.001.001.001.001.000.000.00
8.00 8.00 8.00 8.00 8.00 8.00 8.00
Grade Title
Total Legislative Services
2021/2022 Preliminary Budget City of Renton, Washington
3 - 5Budget by Department - Legislative
____________________________________________________________________________________
Executive
MAYOR
Armondo Pavone
13.63 FTEs
CHIEF ADMINISTRATIVE
OFFICER
12.63 FTEs
Public Defender
(contracted)
Mayor's Office
3 FTEs
Mayor Support
Comprehensive Plan and
Annual Budget Oversight
Organizational Equity,
Inclusion & Development
Intergovernmental
Relations
Deputy Public Affairs
Administrator
Preeti Shridhar
5.63 FTEs
Equity & Inclusion Hotel/Motel Advisory
Committee
Communications
4.63 FTEs
Media Relations
Graphic Design/Multi‐
Media
Website
Print and Mail
Cable Channel 21
Emergency Management
Deborah Needham
3 FTEs
Emergency Management
Staff
2021/2022 Preliminary Budget City of Renton, Washington
3 - 6Budget by Department - Executive
____________________________________________________________________________________
Executive
Mission
Provide executive leadership and management for the City of Renton government to act strategically, implement decisions
efficiently and accurately, apply city policies uniformly, and achieve city goals expeditiously.
The Executive Department includes Mayor’s Office; Public Affairs – Equity and Inclusion; Intergovernmental Relations;
Organizational Equity, Inclusion, and Development; Communications; and Emergency Management. All these groups work in
concert to accomplish the mission of the department in support of the goals of the City.
List of Executive Renton Results Decision Packages:
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 4,041,124 4,146,897 4,583,261 4,262,890 5,119,790 4,977,882 5,039,971 16.8% 1.2%
Position Summary 13.63 13.63 14.63 13.63 14.63 13.63 13.63 0.0% 0.0%
2021 Proposed 2022 Proposed
Package #Description FTE Tot Exp $Tot Rev $ FTE Tot Exp $Tot Rev $
200003.0044 Intergovernmental Relations ‐ 166,000 ‐ ‐ 166,000 ‐
200003.0045 Executive Operations 4.00 1,525,787 ‐ 4.00 1,575,912 ‐
200003.0046 Citywide Communications 4.00 687,797 689,742 4.00 713,771 715,678
200003.0047 Court Public Defenders ‐ 883,000 ‐ ‐ 883,000 ‐
200003.0048 Cable Communication Fund ‐ 97,674 97,674 ‐ 97,674 97,674
600003.0014 Communication ‐ Print and Mail Services 1.63 465,029 464,990 1.63 470,951 470,922
600003.0015 Organizational Equity, Inclusion, and Developmen 1.00 370,980 ‐ 1.00 327,460 ‐
100009.0049 Emergency Management for the COR 3.00 781,615 ‐ 3.00 805,202 ‐
Total 13.63 4,977,882$ 1,252,406$ 13.63 5,039,971$ 1,284,274$
2021/2022 Preliminary Budget City of Renton, Washington
3 - 7Budget by Department - Executive
____________________________________________________________________________________
Executive Performance Measures:
Highlight of Budget Changes:
Regular Salaries increased by $67K in 2021 due to scheduled increases.
Personnel Benefits increased by $105K in 2021 due to projected increases in medical/dental rates as well as the
new Washington State Sick Leave.
Other Services and Charges increased by $517K in 2021 due to the Court Public Defenders budget being doubled.
Interfund Payments increased by $125K in 2021 due to increased costs in Information Services, Communications,
and Facilities.
City Service Area City Service Area Strategies Performance Measures 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results
Safety and Health
Encouragement of a self
reliant community through
programs and education.
Number of Emergency Management
Accreditation Program (EMAP) standards
successfully met as an indication of
emergency preparedness.
new 2019 new 2019 new 2019 new 2019 25
Information requests/concerns from
residents are acknowledged within
three days.
100% 100% 100% 100% 100%
Information requests/concerns are
resolved within two weeks.99% 92% 97% 90% 92%
Percent of survey respondents who rate
the value of services for the taxes paid
to Renton as "good" or better.
51%
(2015 Survey)‐‐‐51%
(2017 Survey)‐‐‐next survey
2021
Advocate community interest
in regional, state, and federal
forums
Accomplishment or significant progress
made on each of the major priorities of
the annually adopted State Legislative
Agenda
‐‐‐N/A 75% no data no data
Training hours/Learning opportunities
provided per FTE will increase.‐‐‐‐‐‐‐‐‐new 2019 4,365 hours
Internally provided development
opportunities are rated Good or Better
by attendees
‐‐‐ ‐‐‐ ‐‐‐new 2019 90%
Functional work environment
Cross‐Departmental Teams will be
formed to address Business Plan
Priorities
‐‐‐ ‐‐‐ ‐‐‐new 2019 2
Policy and program decisions
reflecting community values
Representative
Government
Highly qualified, healthy, well
trained, and productive
workforceInternal Support
2021/2022 Preliminary Budget City of Renton, Washington
3 - 8Budget by Department - Executive
____________________________________________________________________________________
Expenditure Budget by Division ‐ Executive
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Mayor's Office 2,073,371 2,302,698 2,559,087 2,309,263 2,562,066 2,945,767 2,952,372 27.6% 0.2%
Communications 1,377,098 1,198,341 1,402,446 1,226,879 1,827,772 1,250,500 1,282,396 1.9% 2.6%
Emergency Management 590,655 645,858 621,727 726,748 729,951 781,615 805,202 7.5% 3.0%
Total 4,041,124 4,146,897 4,583,261 4,262,890 5,119,790 4,977,882 5,039,971 16.8% 1.2%
Expenditure Budget by Category ‐ Executive
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,338,931 1,483,876 1,430,672 1,537,389 1,607,278 1,555,512 1,604,982 1.2% 3.2%
Part‐Time Salaries 42,144 16,000 36,681 16,000 0 16,000 16,000 0.0% 0.0%
Overtime 17,096 23,535 18,233 23,535 23,535 23,535 23,535 0.0% 0.0%
Personnel Benefits 494,906 555,357 535,903 584,845 606,342 641,230 678,060 9.6% 5.7%
Supplies 44,494 73,334 64,505 73,334 114,252 71,609 71,609 ‐2.4% 0.0%
Other Services and Charges 1,504,028 1,348,647 1,890,194 1,302,341 2,194,881 1,819,216 1,769,216 39.7%‐2.7%
Intergovernmental Services 30000000N/AN/A
Capital Outlay 0 40,000 0 40,000 58,438 40,000 40,000 0.0% 0.0%
Interfund Payments 599,494 606,148 607,074 685,446 477,564 810,780 836,569 18.3% 3.2%
Transfer Out 0 0 0 0 37,500 0 0 N/A N/A
Total 4,041,124 4,146,897 4,583,261 4,262,890 5,119,790 4,977,882 5,039,971 16.8% 1.2%
Staffing Levels by Division ‐ Executive
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Mayor's Office 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.0% 0.0%
Communications 5.63 5.63 6.63 5.63 6.63 5.63 5.63 0.1% 0.0%
Emergency Management 3.00 3.00 3.00 3.00 3.00 3.00 3.00 0.0% 0.0%
Total FTE 13.63 13.63 14.63 13.63 14.63 13.63 13.63 0.0% 0.0%
Intermittent FTE 1.17 0.38 1.05 0.38 0.00 0.38 0.38 0.0% 0.0%
Temp/Intermit Pay & Ben 48,571$ 16,000$ 43,872$ 16,000$ ‐$ 16,000$ 16,000$ 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 9Budget by Department - Executive
____________________________________________________________________________________
Mayor’s Office
2019/2020 Accomplishments
• Supported the Mayor and Council, with input from departments, in continuous refinement of the city’s business
plan.
• Addressed citizen concerns in an accurate, sensitive, and timely manner.
• Ensured achievement of the city’s goals and objectives by appropriately placing authority, assigning accountability,
and monitoring performance.
• Provided strategic leadership and oversight for the city’s annual budget, comprehensive plan, and business and
operational plans.
• Assessed the character of city services and programs and prepared recommendations to City Council to guide
decisions on level of effort and resource allocation.
• Strengthened relationships with senior elected and appointed leadership of King County and suburban cities.
2021/2022 Goals
• Support the Mayor and Council, and coordinate input of Department Administrators in continuous refinement of
the city’s business plan.
• Ensure achievement of the city’s goals and objectives by appropriately placing authority, assigning accountability,
and monitoring performance.
• Provide strategic leadership and oversight for the city’s annual budget, comprehensive plan, and business and
operational plans through 2020.
• Assess the character of city services and programs and prepare recommendations to City Council to guide decisions
on level of effort and resource allocation.
• Ensure that citizen concerns are addressed accurately, sensitively, and in a timely manner.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 10Budget by Department - Executive
____________________________________________________________________________________
Public Affairs – Equity and Inclusion
2019/2020 Accomplishments
Implemented citywide programs and services to build an inclusive city with opportunities for all and accomplished the
following:
Targeted ethnic media and provided news releases and regular information to over 13 different ethnic media
groups.
Used the Equity Lens to achieve equitable outcomes for ASD in Contracting and Vendor services.
Hired staff under the assisted employment job coach program.
Updated and expanded online resource tools and Inclusion web page.
Inclusion Training at Quarterly Managers meeting on countering implicit bias in hiring.
Strengthened Mayor’s Inclusion Task Force with new members to represent additional community groups, and
worked with them to provide city programs and services, outreach and civic engagement; new members included
Muslim, Somali, Chinese‐American and youth communities.
Established work plan focus areas for Task Force to include the following key priorities: Connecting Communities;
Economic Vitality; Engage Youth, Safe Spot Safety Campaign.
Met monthly with Task Force members and worked on various key issues including input on policy, hiring
opportunities, healthcare, equitable housing conditions, emergency preparedness, budget, career fair and Renton
Multicultural Festival.
Created a pictorial display of the Mayor’s Inclusion Task Force members on the 7th floor of City Hall.
Expanded partnership with Renton African‐American Pastors (RAAP) group; hosted several successful community
events and dialogues with police and community.
Hosted several forums including Black History Month: Realizing the Dream, Police/Community Relations,
Police/Community Forums.
Hosted second annual Renton Juneteenth Event (2019).
Met as needed with Latino Community Forum (Latino community representatives).
Formed a Vietnamese/Chinese Community Forum to establish and enhance relationships and trust between
community members and police.
Developed regional connections and partnerships.
Worked with the Regional Equity Convening group to plan and implement their first planning Retreat, which
resulted in new vision for the group shown by the name changing to Governing for Racial Equity and Inclusion.
Served on the core planning team for Governing for Racial Equity bi‐monthly meeting.
Launched a GREI virtual event quarterly series for elected and staff of all member organizations.
Presented the workshop, A Virtual Tour of African American Historical Sites, at the Renton History Museum.
Revised and updated Citywide Diversity and Inclusion training (mandatory) to reflect the updated Renton Business
Plan.
Updated website with language options and improved usability.
Utilized onsite interpreters and telephone Language Line (translation service), which is available for customer
interactions with staff.
Expanded Social Media to engage hard‐to‐reach populations.
Participated in community engagement programs in HR and PD (career fairs, Coffee with a Cop, etc.).
Increased participation in various job/career Fairs (RTC, RSD).
Conducted an Inclusion check‐in with Administrators and published results.
Launched the Renton Census 2020 Campaign:
o Developed a comprehensive Census 2020 Campaign plan.
o Created branding for the Census 2020 campaign and developed Census campaign and literature materials
in multiple languages.
o Applied for and were awarded four grants to support Census 2020 activities in Renton: Washington State
Office of Financial Management, Washington Census Equity Fund (Philanthropy Northwest), Washington
Census Alliance and National League of Cities.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 11Budget by Department - Executive
____________________________________________________________________________________
o Formed a Renton Census Complete Count Committee made up of community partners in support of
Census 2020.
o Provided training on the importance of Census 2020 for all front‐line staff.
o Recruited, trained and provided stipends to 31 Renton Census Ambassadors to educate and engage the
city’s historically under‐counted residents in participating in Census 2020.
o Purchased Census 2020 ads in a variety of ethnic print and social media forums.
o Sponsored a series of community wide Census 2020 events, while following COVID‐19 social distancing
guidelines, to encourage completion of Census surveys.
o Sponsored creative events/activities to engage participation in Census 2020: pre‐COVID Census Movie
Night, Reyes Magos (Epiphany Celebration), Pankaj Udhas (Asian Community event), gift card raffles, art
contests for children, distribution of Census Care Packages in historically under‐counted communities.
o Collaborated with community organizations hosting events and food giveaways to promote Census 2020.
o Created Census videos in multiple languages to post on the city website.
o Hired a temporary Census Program manager to coordinate activities from December 2019 to June 2020.
Assisted in drafting the first Asian American Recognition Day/Month in April 2020.
In June 2020 raised the Pride Flag at City Hall for the second consecutive year.
Assisted Mayor and City Council in updating the goal of Inclusion in the Renton Business Plan.
2021/2022 Goals
Continue to prioritize and implement citywide programs and services to build an inclusive, informed city with opportunities
for all with the following focus:
Implement 2019‐20 work plan that addresses Inclusion priorities and strategies.
Create key indicators to measure progress; develop sample dashboard to assess advancement.
Continue to build and strengthen the relationship with the Mayors Inclusion Task Force and work with them to
provide fully inclusive city programs, services, and outreach plus enhance civic engagement. Invite new members to
participate.
Build on relationship with RAAP; host several community forums and events; conduct UNITY forum.
Debrief and review plan for 2019 Juneteenth Event
Continue working on partnerships with Latino and Asian communities to enhance community / police relations
Build new partnership with Vietnamese and Chinese community
Create charter and establish work plan with Latino community
Continue work with Renton’s inclusion and equity lens and formalize process to adopt the lens; develop written
guidelines for when and how the equity lens will be used; train administrators on equity lens. Create written record
of equity lens implementation examples.
Support next phase of HR Inclusion Tactical Plan
Support ASD Inclusion Tactical Plan
Create updated Inclusion Brochure
Provide refresher training on use of language line and evaluate use of instant video conferencing for translation
services, especially ASL.
Host 2019 Career Fair and implement strategies to expand applicant pool and employment opportunities.
Continue to improve access and information sharing with social media and targeted communications, and building
relationships with ethnic media.
Continue to build on training and workshops on inclusion and equity, and build capacity within the City to co‐
facilitate the ongoing workshops through a train‐the‐trainer curriculum.
Host Renton Multicultural Festival in partnership with stakeholders and community leaders.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 12Budget by Department - Executive
____________________________________________________________________________________
Intergovernmental Relations
2019/2020 Accomplishments
Successfully advocated the City’s adopted Regional, State, and Federal Legislative Agendas, including active
participation with regional and statewide associations such as Sound Cities Association (SCA) and Association of
Washington Cities (AWC), regular communications with Congressman Adam Smith and others within the
Washington Congressional Delegation, and frequent collaboration with County Councilmembers Dave Upthegrove
and Reagan Dunn and their staffs. Accomplishments include:
Renton Specific – Regional
o $5 million through county lodging tax funds for Renton Housing Authority (2018‐19).
o Inclusion of $4 million in the 2019 King County Parks levy for extending the Soos Creek Trail, as well as a grant
funding program that would allocate dollars for the Henry Moses Aquatics Center.
o $200,000 for a citywide Access to Transit study with King County Metro, which helped the City land a recent
$1.5 million grant for transit improvements.
o 4Culture funding for the Renton Historical Museum and new seats at the Renton Civic Theatre.
o Helped secure monies and assistance through the Flood Control Zone District including an expedited
replacement schedule for the Black River Pump Station and $1.98 million for high‐use engines replacement in
2020; $472,000 for Madsen Creek flood reduction; and 2024‐25 funding for Lower Cedar River dredging.
o $500,000 in King County COVID‐19 relief monies for mitigating the impacts of county emergency facilities
inside cities, allowing Renton, Renton Regional Fire Authority, and area businesses to receive mitigation
funding.
Renton‐Specific – State
$206,000 Capital Budget allocation for relocation of Renton’s homeless‐feeding program and cold‐weather
shelter (2020).
Secured $101,000 funding (Office of Financial Management: $80,000, and Washington Census Alliance:
$21,000) for the 2020 Complete Census Count.
Passage of EHB 2797 to allow Renton, Kirkland, and other cities an extension through December 2021 to
potentially run an affordable housing levy and maximize SHB 1406 affordable housing monies (VETOED by
Governor, however).
Additional operating budget funds for Basic Law Enforcement Academy class—up to 21 classes.
Protected $6.7 million in RapidRide I Line funds against potential Initiative 976 cuts in State Transportation
Budget.
Acquisition of $20 million for N. 8th Street Direct Connector design and early right‐of‐way, and passage of
tolling authorization bill (ESSB 5825) in 2019 Session to allow 405 Renton‐to‐Bellevue project to proceed on
time and schedule.
Key role in securing 2019 passage of SHB 1406; which includes a state sales tax credit over 20 years to build
and rehabilitate affordable housing, providing $236,380 a year to Renton for 20 years.
$610,000 in 2019‐21 Capital Budget for Coulon Park playground replacement and drainage improvements.
$500,000 in 2019‐21 Capital Budget for early construction work on Renton Connector.
$210,000 in 2019‐21 Transportation Budget for I‐405/44th landscaping, signage, lighting, etc.
Helped secure Operating Budget funds to increase “BLEA” classes up to 19/year.
Helped secure Operating Budget provisions that, for the first time, directs the Department of Corrections to
negotiate an increased payment to the SCORE Jail for providing beds to DOC offenders.
$1 million in 2019‐21 Capital Budget for Multi‐Use Service Center (former Highlands library building) in
Renton.
Helped secure passage of 2SHB 1166 to expedite rape test kit processing by Washington State Patrol, which
helps local law enforcement with solving criminal cases; bill accompanied by $10.3 million in funding.
Helped secure $3 million for mental health co‐responder program in 2019‐21 Operating Budget; provides
grant funds to pair law enforcement officers with mental health professionals.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 13Budget by Department - Executive
____________________________________________________________________________________
Renton‐Specific – Federal
Part of statewide lobbying effort on “CARES Act” (COVID‐19 relief) by local governments throughout
Washington – resulted in State of Washington allocating nearly $300 million to cities and counties throughout
Washington State. Renton CARES Act allocation equaled $3.141 million.
2021/2022 Goals
• Develop, adopt and advocate legislative priorities and policies for Renton before 2021‐22 state, federal and regional
legislative bodies.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 14Budget by Department - Executive
____________________________________________________________________________________
Organizational Equity, Inclusion, and Development
2019/2020 Accomplishments
Provided over 4,000 staff hours of in‐house training and development in 2019 and over 4,000 at mid‐year 2020 in the
following areas:
Leadership
o High Performing Organization (HPO) training:
Two 3‐day workshops for over 70 attendees including administrators, directors, and managers
Ongoing continuing education for cohorts and formation of pilot‐teams
o Workshops on Mentorship, Leadership Self‐Awareness, and Emotional Intelligence:
Mentorship program launched
Regular, facilitated ad hoc learning and peer‐to‐peer mentoring opportunities
Specialized coaching skills workshop for police field training officers to address emotional intelligence
development of new officers in alignment with Renton values and social expectations
o Renton Results Library provided self‐service resources, available to all staff in support of self‐directed and
team learning on a variety of leadership, culture, race, equity, and self‐development topics.
o Expand emphasis in equity, inclusion, and antiracism in 2020 in response to updated business plan:
Centralized and accessible location for online resources and learning opportunities
Guided learning and self‐directed learning opportunities available to all staff
Regional engagement in conversations about race and equity
o Mental Health:
Provided resources and workshops to aid in coping with stress of multiple crises and to identify and
support those requiring intervention
Facilitation and Engagement Practices
o Full‐day workshop on Deliberative Engagement to solve “Wicked Problems.”
45+ staff and 45+ others from across the region/state
o Liberating Structures in support of creative and inclusive problem solving.
o IAP2 Public Engagement Basics
o Formed a cross‐departmental team to improve community engagement efforts citywide.
o Formed a cross‐departmental team to implement an online platform designed to assesses perceptions of city
services, community priorities, concerns, and impact of our engagement practices
Process Improvement
o Project Management Basics in support of effectively leading or participating in project work
40‐hour Project Management fundamentals course provided to near fifty staff.
o Lean Belting Program to expand our capacity for process improvement efforts in all departments.
32‐hour course (Yellow Belt) covering lean tools and best practices for process improvement.
40‐hour course (Green Belt) covering lean tools, best practices, and facilitation of lean projects.
o Cross‐departmental team now available to work together as a cross‐departmental team capable of tackling
systemic processes and problems of varying size and complexity.
Organizational Awareness
o Centralized information and resources made easily accessible on the Renton Results SharePoint site for all
employees.
o Internal training (Renton 101) designed to increase competency of our internal processes, tools, and systems.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 15Budget by Department - Executive
____________________________________________________________________________________
One to three trainings offered per week; these sessions are available to all employees and are made
possible by coordinating with subject matter experts (primarily our internal support teams) to
provide the content; sessions are often recorded and available for self‐directed learning.
This model proved to be a critical support during our rapid shift to teleworking and innovation
necessitated by the COVID‐pandemic.
o Internal Communications (Renton 101):
Renton 101 venue used to share critical information to all employees during the COVID‐pandemic.
o Ad hoc group facilitation:
Multiple teams and groups meet regularly (monthly, weekly, quarterly) for discussion, information
exchange, and relationship building across departments and levels of the organization.
o Employee Orientation:
An all‐department effort that introduces new employees to our values, expectations, and aspirations
while demonstrating our commitment to supporting their success as an employee and making a
connection between their work and our Business Plan.
Regional Leadership in Equity
o NW Women’s Leadership Academy (NWWLA)
Provided leadership, development, and logistical support for this competitive statewide program that
offers a nine‐month leadership curriculum for women seeking top management positions in local and
county governments.
Three of our staff have participated in the first two cohorts held to date.
2021/2022 Goals
Expand upon innovations that improve accessibility and inclusivity of our city services, many developed during the
pandemic, in support of each goal of our Business Plan.
Lead and support collaborations that will result in improvements, innovations and efficiencies to build resilience
during challenging economic times.
Support continued adaptation to tele‐workforce through training on tools and communications; increasing virtual
management skills that will support this model for those employees where it will continue as a possibility and
beneficial to balance/quality of life while reducing traffic congestion and physical office space requirements.
Expand leadership development deeper into the organization, building upon the HPO model for collaborative
leadership, inclusive engagement, data literacy, and process improvement.
Increase visibility of an Equity Lens in our process improvement and engagement efforts.
Membership and active participation in regional Government Alliance of Race and Equity (GARE), NW Women’s
Leadership Academy and other organizations whose mission is to bring equity, inclusion, antiracism, and opportunity
to the forefront.
Improve the effectiveness of our cross‐departmental teams through mastery of data literacy, storytelling, inclusive
and creative facilitation, and inclusive engagement efforts that invite dialogue and results in transformative change.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 16Budget by Department - Executive
____________________________________________________________________________________
Expenditure Budget by Category ‐ Mayor's Office
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 535,053 644,466 651,224 667,763 665,718 678,785 701,799 1.7% 3.4%
Personnel Benefits 175,963 228,082 217,525 240,273 233,486 261,392 276,493 8.8% 5.8%
Supplies 1,148 8,600 9,814 8,600 8,100 7,100 7,100 ‐17.4% 0.0%
Other Services and Charges 895,341 972,596 1,231,570 925,596 1,366,407 1,442,246 1,392,246 55.8%‐3.5%
Interfund Payments 465,866 448,954 448,954 467,031 288,355 556,244 574,734 19.1% 3.3%
Total 2,073,371 2,302,698 2,559,087 2,309,263 2,562,066 2,945,767 2,952,372 27.6% 0.2%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Mayor's Office
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 17Budget by Department - Executive
____________________________________________________________________________________
Communications
Support the City of Renton’s Business Plan, the City Council’s vision, and the strategic goals for the city.
Mission
Provide Renton residents with critical and relevant information on a timely basis.
Make residents aware of opportunities to be involved with their community.
Position Renton as a unique urban center and destination—a great place to shop, work, live, learn and play.
Facilitate a productive, two‐way dialogue between city government and residents.
Enhance communications at and among all levels of city government and ensure coordinated and
consistent communications.
Build an informed inclusive city with opportunities for all.
2019/2020 Accomplishments
Developed and implemented effective communications strategies on key issues.
Continued to explore ways to adapt communications to the new “digital democracy” and the new technology of
communications.
Expanded electronic communications to enhance the flow of relevant and timely information to the public.
Updated and published Communications Guidelines manual for publications, design, and printing.
Worked on over 160 different projects or campaigns citywide, varying from simple to extensive. These projects
included press releases, copywriting, photography, videography, social media graphics for multiple platforms,
website graphics, newsletters, posters, banners, flyers, rack cards, promotional items and more.
Encouraged and provided training and professional development opportunities for Communications staff.
Continued to improve on employee update system through ORG ALL email groups and SharePoint.
Streamlined online job request system on SharePoint; created links to communications project list, job order
requests, and job status.
Implemented internal department liaison model to better understand citywide marketing and promotional
opportunities
Standardized the information displays in the city hall lobby.
Provided photography/videography coverage for city events and initiatives; present at all city council meetings.
Website:
o Continued to update and improve the city website; continued to train staff in content production.
o Continued to reduce the amount of printed materials and directed visitors to the website for information.
o Continued to utilize Siteimprove to scan website for broken links, comply with ADA requirements and highlight
typographical errors.
Media Relations:
o Averaged about one news release per week with 100% of them published in the Renton Reporter and all posted
or shared on social media; broadened subject matter to include human services initiatives and COVID‐19
announcements and updates.
o Received regional press including television coverage for major stories.
o Developed an ethnic media list and used it for targeted outreach.
Video:
o Live streamed videos of various city events.
o Implemented video technology plan for Channel 21 and enhanced operations and productions for more robust
cable programming and video streaming.
o Continued in‐house operation of Channel 21, covering all council meetings and developing more robust
programming options.
o Invested in new video technologies (cameras, lights, microphones, mixers) to better showcase city activities.
Social Media
o Worked with all departments to expand city social media presence and actively engage and inform the public,
using venues such as Facebook, Twitter, Instagram, YouTube, Flickr, Nextdoor and LinkedIn.
o Increased Facebook page likes from 9,348 to 12,485
2021/2022 Preliminary Budget City of Renton, Washington
3 - 18Budget by Department - Executive
____________________________________________________________________________________
o Increased Twitter followers from 5,834 to 8,561.
o Increased Instagram followers from 894 to 1,830.
o Increased use of paid ads on social media for targeting specific communities.
o Developed and curated a citywide social media calendar allowing staff to submit content.
o Contracted with ArchiveSocial for retention of city social media accounts.
Highlight of Events and Initiatives:
o Worked closely with Census Program Manager to increase awareness of, and response to, the 2020 Census.
Contributions include graphics, marketing materials in seven languages, videography, photography, social media
content, and dedicated webpages. Renton’s response rate was the best among all cities in South King County
and fourth best in the state for cities with populations over 100,000. It also far surpassed the 2010 response
rate (67.0%).
o Worked with departments to host several key events including Renton Career Fair, Community Forums with
Renton African‐American Pastors Group (RAAP), Unity March, ribbon cuttings, dedications, groundbreakings,
and other events.
o Provided successful communications support for civic celebrations including Clam Lights, 4th of July, River Days,
Cruz the Loop, Farmers Market, Memorial Day, Multicultural Festival, Pooch Plunge, Bark in the Park, and
numerous volunteer activities.
o Designed and distributed marketing materials for the Family First Community Center, including a brochure,
banner and display boards for fundraising meetings.
o Debuted “Renton Responds,” a web‐based app allowing residents to report issues of concern.
Newsletters & Readerboard:
o Continued to produce two citywide weekly electronic newsletters—Our Renton Weekly and This Week from the
Mayor—for distribution to the public via email to over 20,000 addresses. During the first few months of the
COVID‐19 pandemic, the mayor’s newsletter was produced daily, then went to three times a week and two
times a week before returning to a weekly publication.
o Produced seven issues of Renton CityNews (2019 name, now “Our Renton”) in 2019. COVID‐19 outbreak limited
2020 to one edition (January). Issues were emailed to families in apartments and condominiums via the
Washington Multifamily Housing Association. Issues were also distributed via utility bills.
o Effectively used the readerboard at Renton Community Center to promote programs, meetings and
opportunities. Returned the readerboard at Fire Station 13 to the control of Renton Regional Fire Authority.
o Updated key contact lists to utilize in GovDelivery for more effective communications.
Print Shop:
o Continued to streamline print shop processes, improve customer service, and reduce costs for printed materials
throughout all city departments.
o Provided effective mail delivery to all city staff, while ensuring cost‐effective, uninterrupted outgoing mail
service.
o In conjunction with utility billing, implemented needed updates to utility bill (barcodes and format) to facilitate
banking and postal discount requirements.
o More Print Shop services include wide format banners, posters, PDF inserts to electronic utility bills, variable
date software and mail process. These services, for city departments plus REACH, CISR and other city affiliates,
have increased the Print Shop workload.
2021/2022 Goals
Continue to enhance and improve the city’s website; investigate opportunities in contract to redesign.
Develop and implement an effective internal communications publication.
Research and stay apprised of emerging technologies that serve to improve communication with public.
Establish citywide social media policy and implement best practices for effective social media use.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 19Budget by Department - Executive
Continue with strong media relations and achieve regional and local coverage on key issues.
Help coordinate and promote key community events.
Continue to implement more video on website and in social media postings.
Continue to streamline print operations and move toward more effective electronic communications by reducing
the number of non‐essential printed materials.
Enhance Channel 21 operations and productions for more robust cable programming and video streaming.
Continue to implement unified graphic design standards and “branding” throughout all city departments and
modernize the look of all city publications.
Develop and implement strategic communication strategy for public outreach for key issues and programs
throughout the city.
Publish an inclusion brochure to explain the program and highlight activities.
Continue to prepare and train for possible large‐scale emergencies.
Maintain good communication with the general public via newsletters, website, local and regional media, and other
social media outlets.
Continue to provide high quality printed materials in a timely, cost‐efficient manner.
Continue to provide effective mail delivery to all city staff, while ensuring cost‐effective, outgoing mail service.
Expenditure Budget by Category ‐ Communications
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 506,319 529,369 484,943 545,972 599,935 546,601 563,754 0.1% 3.1%
Part‐Time Salaries 42,144 16,000 36,681 16,000 0 16,000 16,000 0.0% 0.0%
Overtime 43003,0790000N/AN/A
Personnel Benefits 205,650 212,387 205,335 223,348 251,632 248,281 262,990 11.2% 5.9%
Supplies 31,487 61,734 36,955 61,734 77,652 61,734 61,734 0.0% 0.0%
Other Services and Charges 584,495 335,884 632,487 335,884 817,112 335,884 335,884 0.0% 0.0%
Intergovernmental Services 30000000N/AN/A
Capital Outlay 0 40,000 0 40,000 40,000 40,000 40,000 0.0% 0.0%
Interfund Payments 6,543 2,967 2,967 3,941 3,941 2,000 2,034 ‐49.3% 1.7%
Transfer Out 000037,50000N/AN/A
Total 1,377,098 1,198,341 1,402,446 1,226,879 1,827,772 1,250,500 1,282,396 1.9% 2.6%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Communications
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 5.63 5.63 6.63 5.63 6.63 5.63 5.63 0.1% 0.0%
Intermittent FTE 1.17 0.38 1.05 0.38 0.00 0.38 0.38 0.0% 0.0%
Temp/Intermit Pay & Ben 48,571$ 16,000$ 43,872$ 16,000$ ‐$ 16,000$ 16,000$ 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 20Budget by Department - Executive
Emergency Management
Mission
Fostering a culture of preparedness and community self‐sufficiency.
Working inclusively with our diverse community to coordinate effective disaster response.
Preparing our whole community to be uniquely resilient through adversity and recovery.
2019/2020 Accomplishments
• Negotiated and completed a Department of Homeland Security facility security assessment at no cost to the city,
saving over $50,000 in comparable services provided by the private sector.
• Provided mutual aid to other jurisdictions for significant emergency events in the region, including working in
regional command centers for severe snowstorm response and COVID‐19 response.
• Coordinated the Emergency Operations Center response to the February 2019 snowstorm, providing important
logistics and communications support to other departments.
• Monitored flooding conditions in at‐risk neighborhoods during the February 2020 flooding, and coordinated the
Emergency Operations Center response.
• Coordinated the city’s interdepartmental and interagency response to COVID‐19 impacts, including operational
measures, logistics support, policy development, and public messaging and information support in conjunction
with Communications Division (ongoing).
• Collaborated with all departments/divisions to write and publish a dynamic emergency response and recovery plan
for COVID‐19 (not addressed in pre‐existing plans or procedures), including the plan to reopen city services safely
and appropriately, which has been emulated by neighboring jurisdictions.
• Developed and delivered training on COVID‐19 safety measures, made available to all staff, on topics such as: face
covering regulations, Public Health 101, return‐to‐work expectations.
• Conducted three Preliminary Damage Assessments and participated in two Federal Emergency Management
Agency (FEMA) applicant briefings to initiate disaster reimbursements to the city following a qualifying event.
• Completed final recovery of all reimbursement monies available for disaster damages/projects related to the 2009
flooding disaster.
• Actively pursuing FEMA reimbursement for over $7 million of damages incurred in the February 2020 flooding
(ongoing).
• Conducted a comprehensive 5‐year review and update of the Hazard Mitigation Plan.
• Partially revised and updated the Continuity of Operations Plan (COOP).
• Designed and delivered a Continuity of Operations Essential Function Workshop for Administrators, identifying
essential function tiers.
• Designed and conducted multi‐agency airport response exercise to a multiple plane crash event at the municipal
airport.
• Updated the Volunteer Reception Center plan and expanded the city’s Community Point of Distribution (CPOD)
capability, which during a disaster can quickly mobilize and deploy volunteers, and rapidly distribute supplies to
residents.
• Coordinated 40 amateur radio individual volunteers with the Renton Emergency Communications Service (RECS)
who served 911 hours of service to the city maintaining and testing communication systems for use in an
emergency.
• Coordinated the Renton Emergency Preparedness Academy (REPA), providing 13 classes to residents and
businesses in appropriate emergency/disaster actions adding new partners.
• Conducted customized general preparedness presentations for community groups and businesses.
• Conducted Community Emergency Response Team (CERT) trainings, providing preparedness training to 23
residents to become first responders in their own neighborhoods after a major disaster.
• Facilitated several Disaster Mental Health First Aid courses for staff, public, and volunteers to prepare them to
recognize and appropriately respond to mental health emergencies in the community.
• Delivered high‐level presentations at multiple professional conferences/forums and other large public audiences,
including an Emergency Management 101 in Leavenworth at the statewide Mayors Exchange.
• Facilitated multiple additional emergency management training classes to staff and volunteers.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 21Budget by Department - Executive
• Supported the Information Technology Business Impact Analysis assessment process and supported the project
through grant funding.
• Secured grant funding to pay for installation of an uninterrupted power source (UPS system) for airport crash gates
and other important equipment for other departments.
• Contributed to regional efforts, including King County Emergency Management Advisory Committee, King County
Emergency Management Assistance Teams, Regional Planning Work Group, Regional Policy Work Group, Regional
Catastrophic Planning Work Group, Regional Public Outreach Work Group, Regional Mass Care Work Group,
Regional Critical Infrastructure Work Group, Complex Coordinated Terrorist Attack (CCTA) Planning Work Group,
Zone 3 (CERT).
• Participated in the citywide Community Engagement Team, IT Steering Committee, and Safety Committee.
• Contributed to Renton Results by developing and delivering several trainings to city staff and managers and
actively participating in organizational health offerings.
• Maintained National Incident Management System compliance, retaining grant eligibility.
• Met all requirements for and maintained professional certifications and memberships for staff.
2021/2022 Goals
Revise the Comprehensive Emergency Management Plan.
Conduct an After Action Review of the city’s COVID‐19 response and pandemic planning.
Complete revision of Continuity of Operations Plan.
Conduct annual review of the Hazard Mitigation Plan.
Facilitate and participate in Community‐specific Integrated Emergency Management Course conducted by FEMA
with 75 city employees and community partners.
Conduct one additional disaster exercise in 2022.
Migrate training to online platform delivery to increase accessibility and participation.
Expenditure Budget by Category ‐ Emergency Management
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 297,559 310,041 294,505 323,654 341,625 330,126 339,429 2.0% 2.8%
Overtime 16,667 23,535 15,154 23,535 23,535 23,535 23,535 0.0% 0.0%
Personnel Benefits 113,293 114,888 113,043 121,224 121,224 131,557 138,576 8.5% 5.3%
Supplies 11,859 3,000 17,736 3,000 28,500 2,775 2,775 ‐7.5% 0.0%
Other Services and Charges 24,193 40,167 26,136 40,861 11,361 41,086 41,086 0.6% 0.0%
Interfund Payments 127,085 154,227 155,153 214,474 185,268 252,536 259,801 17.7% 2.9%
Total 590,655 645,858 621,727 726,748 729,951 781,615 805,202 7.5% 3.0%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Emergency Management
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Total FTE 3.00 3.00 3.00 3.00 3.00 3.00 3.00 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 22Budget by Department - Executive
Executive Department Position Listing
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
Mayor’s Office
E10 Mayor (Elected) 1.001.001.001.001.001.001.00
M53 Chief Administrative Officer 1.001.001.001.001.001.001.00
M34 Organizational Development Manager1 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M19 Executive Assistant 0.000.000.000.001.001.001.00
M17 Executive Assistant 1.001.001.001.000.000.000.00
N09 Admin Secretary 1 0.000.000.000.001.001.001.00
N07 Secretary II 1.00 1.00 1.00 1.00 0.00 0.00 0.00
5.00 5.00 5.00 5.00 5.00 5.00 5.00
Communications
M45 Deputy Public Affairs Administrator 1.001.001.001.001.001.001.00
M26 Communications Manager 1.001.001.001.001.001.001.00
A17 Web Specialist 1.001.001.001.001.001.001.00
A13 Print & Mail Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A12 Communications Specialist I 1.001.001.001.001.001.001.00
A03 Print & Mail Assistant 0.000.000.000.000.630.630.63
A01 Office Assistant I 0.630.630.630.630.000.000.00
M27 Censuse Program Manager 0.000.001.000.001.000.000.00
5.63 5.63 6.63 5.63 6.63 5.63 5.63
Emergency Management
M38 Emergency Management Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A21 Emergency Management Coordinator 2.002.002.002.002.002.002.00
3.00 3.00 3.00 3.00 3.00 3.00 3.00
Total Executive Department 13.63 13.63 14.63 13.63 14.63 13.63 13.63
1Organizational Development Manager was originally added to Administrative Services and then moved to Executive
2Emergency Management division moved to Executive department following the formation of the Renton Regional Fire Authority in mid‐2016
Grade Title
Total Mayor’s Office
Total Communications Division
Total Emergency Management Division2
2021/2022 Preliminary Budget City of Renton, Washington
3 - 23Budget by Department - Executive
CITY ATTORNEY
Shane Moloney
14 FTEs
Civil
4 FTEs
Criminal
8 FTEs
Administrative Support
1 FTE
City Attorney
2021/2022 Preliminary Budget City of Renton, Washington
3 - 24Budget by Department - City Attorney
City Attorney
Mission
Provide quality legal representation to the City and its employees in a timely, effective and positive manner.
Description
The City Attorney Department provides legal advice (to the City Council, administration, boards and commissions), prepares
legislation, brings and defends lawsuits, and prosecutes cases in the Renton Municipal Court.
List of City Attorney Renton Results Decision Packages:
City Attorney Performance Measures:
Highlight of Budget Changes:
Regular Salaries increased by $40,242 in 2022 due to planned Cost of Living Adjustments (COLA).
Personnel Benefits increased by $98,651 and $43,290 in 2021 and 2022 respectively, due to projected increase in
medical and dental rates.
Interfund Payments increased by $5,633 in 2022 due to increased payments to IT to support higher technology
costs.
2018201920192020202020212022ChangeChange
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 2,216,692 2,393,230 2,353,520 2,503,762 2,421,421 2,611,347 2,700,512 4.3% 3.4%
Position Summary 13.88 14.00 14.00 14.00 14.00 14.00 14.00 0.0% 0.0%
2021 Proposed 2022 Proposed
Package #Description FTE Tot Exp $Tot Rev $FTETot Exp $Tot Rev $
100006.0008 City Attorney Prosecution 8.00 1,210,931 ‐ 8.00 1,254,397 ‐
200006.0008 City Attorney Civil 4.00 792,781 ‐ 4.00 816,384 ‐
600006.0009 City Attorney Administration 2.00 607,635 ‐ 2.00 629,731 ‐
Total 14.00 2,611,347$ ‐$ 14.00 2,700,512$ ‐$
City Service
Area City Service Area Strategies Performance Measures 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results
Discovery provided to the Defense
Attorney by prosecutors within 20
calendar days
100.0% 100.0% 100.0% 100.0% 100.0%
Representative
Government Policy and fiscal accountability
Routine legislation and contract review
will be performed within one week of
receipt.
97.5% 99.4% 98.7% 92‐95% 92‐95%
Timely responsiveness and
“projection of effort,” when
the community cannot help
itself.
Safety and
Health
2021/2022 Preliminary Budget City of Renton, Washington
3 - 25Budget by Department - City Attorney
2019‐2020 Accomplishments
Achieved substantial budget savings in anticipation of COVID‐19 related revenue shortfalls;
Transitioned to full time teleworking seamlessly with minimal impacts on service levels during the COVID‐19 public
health crisis;
Participated fully in the Shared Work program with a limited reduction of service levels;
Successfully completed the City’s first Rule 9 internship program in 2019 (shelved in 2020 due to COVID‐19);
Worked closely with the Municipal Court, other City departments, and outside agencies to develop a potential
community court program;
Worked closely with the Municipal Court, SCORE, and the public defense firm to develop successful virtual hearing
procedures during the COVID19 public health crisis;
Assisted and advised the City in maintaining continuity of services during COVID‐19 crisis;
Successfully assisted the City with risk management and defense of claims.
2021‐2022 Goals
Continue to work closely with other City departments to support the City during the COVID‐19 public health crisis;
Manage large backlog of work created by COVID ‐19 related reduced staffing, court closures, and increasing work‐
loads that are necessitated by a combination of City growth, response to the COVID‐19 emergency, and increased
involvement in risk management;
Assist with developing a procedure for safely conducting jury trials during the COVID‐19 public health crisis;
Assist in the implementation of community/diversionary court programs to the extent budget allows;
Reinstate the City’s Rule 9 program to the extent budget allows;
Continue to increase efficiencies through use of technology and proactive representation of City clients;
Remain flexible and capable of redirecting resources in light of the dynamic challenges faced by the City.
Expenditure Budget by Division ‐ City Attorney
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
City Attorney 2,216,692 2,393,230 2,353,520 2,503,762 2,421,421 2,611,347 2,700,512 4.3% 3.4%
Total 2,216,692 2,393,230 2,353,520 2,503,762 2,421,421 2,611,347 2,700,512 4.3% 3.4%
Expenditure Budget by Category ‐ City Attorney
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,428,017 1,520,982 1,499,261 1,575,872 1,559,276 1,582,487 1,622,729 0.4% 2.5%
Part‐Time Salaries 0 15,870 7,658 16,560 0 16,560 16,560 0.0% 0.0%
Personnel Benefits 573,522 619,097 624,255 652,888 634,648 751,539 794,829 15.1% 5.8%
Supplies 1,054 3,550 979 3,550 3,550 3,550 3,550 0.0% 0.0%
Other Services and Charges 28,223 49,450 32,937 49,450 41,465 49,450 49,450 0.0% 0.0%
Interfund Payments 185,876 184,281 184,281 205,442 182,481 207,761 213,394 1.1% 2.7%
Transfers Out 004,1500000N/AN/A
Total 2,216,692 2,393,230 2,353,520 2,503,762 2,421,421 2,611,347 2,700,512 4.3% 3.4%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ City Attorney
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 13.88 14.00 14.00 14.00 14.00 14.00 14.00 0.0% 0.0%
Intermittent FTE 0.000.420.200.430.000.430.43‐0.1% 0.0%
Temp/Intermit Pay & Ben ‐$ 17,306$ 8,412$ 18,060$ ‐$ 18,049$ 18,049$ ‐0.1% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 26Budget by Department - City Attorney
City Attorney Department Position Listing
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
City Attorney
M49 City Attorney 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M42 Senior Assistant City Attorney 2.00 2.00 2.00 2.00 2.00 2.00 2.00
M38 Chief Prosecuting Attorney 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M35 Assistant City Attorney 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M29 Prosecuting Attorney 3.00 3.00 3.00 3.00 3.00 3.00 3.00
A17 Paralegal 1.88 2.00 2.00 2.00 2.00 2.00 2.00
N14 Administrative Assistant 1.00 1.00 1.00 1.00 0.00 0.00 0.00
N16 Administrative Assistant to Legal 0.00 0.00 0.00 0.00 1.00 1.00 1.00
A10 Legal Assistant 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Total City Attorney Department 13.88 14.00 14.00 14.00 14.00 14.00 14.00
Grade Title
2021/2022 Preliminary Budget City of Renton, Washington
3 - 27Budget by Department - City Attorney
MUNICIPAL COURT
JUDGES
Terry L. Jurado &
Kara Murphy Richards
17 FTEs
COURT SERVICES
Bonnie Woodrow
15 FTEs
Infraction Processing
6 FTEs
Criminal Case Processing
6 FTEs
Probation
1 FTE
Court Security Officer
1 FTE
Court Services
2021/2022 Preliminary Budget City of Renton, Washington
3 - 28Budget by Department - Court Services
Court Services
Mission
The mission of the Renton Municipal Court, as an independent and impartial branch of government, is to provide objective,
accessible and timely resolution of all cases appropriately coming before the Court, the protection of the rights of all
individuals and the dignified and fair treatment of all parties. The Renton Municipal Court is a contributing partner working
toward a safe and vital community.
Description
The Renton Municipal Court is a Court of Limited Jurisdiction that handles parking citations, traffic and non‐traffic
infractions, photo enforcement citations, and misdemeanor and gross misdemeanor cases charged within the City limits.
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 2,222,633 2,646,159 2,406,014 2,750,176 2,706,695 3,102,930 3,215,462 12.8% 3.6%
Position Summary 14.00 16.00 17.00 16.00 17.00 17.00 17.00 6.3% 0.0%
List of Court Services Renton Results Decision Packages:
2021 Proposed 2022 Proposed
Package # Description FTE Tot Exp $Tot Rev $ FTE Tot Exp $Tot Rev $
100002.0016 Probation 1.00 148,714 93,000 1.00 153,823 93,000
200002.0027 Criminal Case Processing 5.00 676,430 208,382 5.00 703,524 208,382
200002.0028 Infraction Processing 7.00 906,613 1,639,467 7.00 945,398 1,639,467
200002.0029 Court Administration 4.00 1,371,173 35,000 4.00 1,412,717 35,000
Total 17.00 3,102,930$ 1,975,849$ 17.00 3,215,462$ 1,975,849$
2021/2022 Preliminary Budget City of Renton, Washington
3 - 29Budget by Department - Court Services
Court Services Performance Measures:
City Service Area City Service Area Strategies Performance Measures 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results
Safety and
Health
Encourage the community to
comply with local, state and
federal laws.
Composite of results from survey of
probationer's understanding of
probation process reflected as "Good" or
better.
85% 88% 88% 85% 84%
Defendant satisfaction with their
understanding of the criminal case
process is rated as "Good" or better.
83%85% 83% 80% 82%
Defendant’s satisfaction with the ability
to obtain access to court record
information related to criminal case
processing is rated “Good” or better.
87% 92% 92% 90% 90%
Ongoing Juror Survey's reflect an
approval rating that indicates
satisfaction and understanding of the
jury experience by non‐criminal citizens
of Renton.
80% 80% 84% 82% 82%
Defendant's satisfaction with the ability
to get access to court information
related to infraction processing is rated
"Good" or better.
87% 92% 90% 88% 88%
Resident's satisfaction with
understanding the court infraction
process.
85% 86% 84% 84% 82%
Open accessible and
consistent (administrative and
judicial) decision process
Representative
Government
Highlight of Budget Changes:
Regular Salaries and Personnel Benefits increased by $274K in 2021 due to adding 1.0 FTE Elected Municipal Court
Judge (authorized in 2020) and medical/dental increases.
Part‐Time Salaries decreased by $20K in 2021 to help offset the 1.0 FTE Elected Municipal Court Judge.
Overtime decreased by $8K in 2021 due to moving funds to Regular Salaries to help offset the 1.0 FTE Elected
Municipal Court Judge.
Other Services and Charges increased by $20K in 2021 due to increasing the security officer budget.
Interfund Payments increased by $79K in 2021 due to overall city‐wide increased Information Technology and
Facilities costs.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 30Budget by Department - Court Services
Expenditure Budget by Division ‐ Court Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Court Services 2,222,633 2,646,159 2,406,014 2,750,176 2,706,695 3,102,930 3,215,462 12.8% 3.6%
Total 2,222,633 2,646,159 2,406,014 2,750,176 2,706,695 3,102,930 3,215,462 12.8% 3.6%
Expenditure Budget by Category ‐ Court Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,094,754 1,275,247 1,189,522 1,320,587 1,480,694 1,552,614 1,604,988 17.6% 3.4%
Part‐Time Salaries 54,568 129,000 64,854 129,000 0 109,000 109,000 ‐15.5% 0.0%
Overtime 2,992 8,000 117 8,000 50 0 0 ‐100.0% N/A
Personnel Benefits 523,078 645,900 538,587 685,658 723,057 727,473 772,165 6.1% 6.1%
Supplies 4,236 7,700 5,103 7,700 7,700 7,700 7,700 0.0% 0.0%
Other Services and Charges 128,780 121,716 128,988 121,716 106,856 149,716 149,716 23.0% 0.0%
Interfund Payments 413,502 458,596 458,596 477,515 388,339 556,427 571,893 16.5% 2.8%
Transfer Out 724020,2480000N/AN/A
Total 2,222,633 2,646,159 2,406,014 2,750,176 2,706,695 3,102,930 3,215,462 12.8% 3.6%
Staffing Levels by Division ‐ Court Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 14.00 16.00 17.00 16.00 17.00 17.00 17.00 6.3% 0.0%
Intermittent FTE 1.593.231.893.230.002.752.75‐14.9% 0.0%
Temp/Intermit Pay & Ben 66,122$ 134,500$ 78,796$ 134,500$ ‐$ 114,500$ 114,500$ ‐14.9% 0.0%
2019/2020 Accomplishments
Moved in‐person hearing process to Zoom virtual platform due to Covid‐19 health concerns
Added additional judge to address caseload issues
Added additional staff due to increased photo enforcement caseload
Developed an online public portal with interactive court forms
Enhanced OCourt forms and expanded Laserfiche workflows for increased efficiency.
Added additional attorney/client conference rooms for increased privacy during negotiation process.
2021/2022 Goals
Improve use of Zoom for virtual hearing process
Continue growth in use of Renton Results for meaningful budgets and recognizable results
Continue ongoing staff training to keep pace with changes in laws, ordinances and court rules
Upgrade OCourt programs to enhance digital process for filing and hearing requests online
Expand online public portal with additional interactive forms and e‐filing ability
Address probation department staffing needs and explore Community Court benefits.
Court Services Department Position Listing
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
Court Services
E11 Municipal Court Judge (Elected) 1.00 1.00 2.00 1.00 2.00 2.00 2.00
M38 Court Services Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M22 Court Services Supervisor 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A18 Probation Officer 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A15 Judicial Specialist (Lead) 0.00 0.00 0.00 0.00 1.00 1.00 1.00
A10 Judicial Specialist/Trainer 1.00 1.00 1.00 1.00 0.00 0.00 0.00
A12 Judicial Specialist II 0.00 0.00 3.00 0.00 3.00 3.00 3.00
A08 Judicial Specialist 7.00 9.00 6.00 9.00 6.00 6.00 6.00
A04 Court Security Officer 1.00 1.00 1.00 1.00 1.00 1.00 1.00
14.00 16.00 17.00 16.00 17.00 17.00 17.00Total Court Services Division
Grade Title
2021/2022 Preliminary Budget City of Renton, Washington
3 - 31Budget by Department - Court Services
*The Utility Billing positions (4 FTEs) are funded by utility rate revenues (vs. General Fund).
ADMINISTRATOR
Jan Hawn
49 FTEs
FINANCEKari Roller
21 FTEs
Operations
Payroll
Accounts Payable
Accounts Receivable
Utility Billing*
Cash Receipting
Tax & Licensing Budget & Accounting
Budget
Financial Reporting
General Accounting
INFORMATION
TECHNOLOGY
Mehdi Sadri
20 FTEs
Enterprise GIS Implementation
Development Support
Systems Services
Communication and
Data Center
Operations
Network Services
Application Services
Application
Implementation
Development
Support and
Maintenance
Service Desk
End‐user Support
City Clerk
Jason Seth
6 FTEs
Records Management
and Imaging
Legislative and
Administration
Support
Public Information
Services
Voter Registrations
and Elections
Hearing Examiner
(contracted)
Administrative
Support
1 FTE
Administrative Services
2021/2022 Preliminary Budget City of Renton, Washington
3 - 32Budget by Department - Administrative Services
Administrative Services
Mission
Provide systems and processes that enable efficient, effective, and accountable management and operations; provide
transparent, timely and accessible city records and information; are compliant with laws and regulations.
Core Businesses Services
The Administrative Services Department provides financial management and information technology services by providing
timely and accurate financial information; efficient and reliable technologies; and preservation of current and historical
records, and the City Clerk additionally serves as the Clerk of the City Council and as the City’s Public Records Officer.
List of Renton Results Decision Packages:
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 11,250,461 11,778,561 11,166,538 12,130,423 13,324,625 13,324,625 12,688,572 13,015,899 4.6% 2.6%
Position Summary 45.00 48.00 48.00 48.00 49.00 49.00 49.00 49.00 2.1% 0.0%
2021 Proposed 2022 Proposed
Package #Description FTE Tot Exp $Tot Rev $ FTE Tot Exp $Tot Rev $
100004.0010 Business Licensing 3.00 410,556 ‐ 3.00 428,770 ‐
200011.0010 Hearing Examiner ‐ 40,000 ‐ ‐ 40,000 ‐
200012.0016 City Clerk 6.00 1,433,840 ‐ 6.00 1,477,120 ‐
500004.0008 Utility Billing and Cashiering 5.00 721,659 ‐ 5.00 741,720 ‐
600004.0105 Payroll 2.33 294,008 ‐ 2.33 310,835 ‐
600004.0106 System Services 4.00 866,729 866,980 4.00 902,866 903,555
600004.0107 Telecommunications 1.00 585,241 585,405 1.00 590,782 591,233
600004.0108 Service Desk Support 4.00 736,729 740,918 4.00 770,822 775,690
600004.0109 Finance Operations 3.67 453,929 ‐ 3.67 474,255 ‐
600004.0110 Applications and Database Services 7.00 2,519,745 2,520,523 7.00 2,561,310 2,563,298
600004.0111 Enterprise GIS 3.00 539,599 539,768 3.00 559,429 559,857
600004.0112 Accounting and Auditing 3.00 554,958 ‐ 3.00 577,174 ‐
600004.0113 Budgeting and Financial Planning 3.00 457,303 ‐ 3.00 479,519 ‐
600004.0114 Asset, Debt, and Treasury Management ‐ 771,650 ‐ ‐ 783,500 ‐
600004.0115 IT Administration 2.00 393,408 396,061 2.00 404,108 407,152
600004.0116 Finance Administration 2.00 912,744 ‐ 2.00 936,213 ‐
600004.0117 IT Capital ‐ 786,000 936,246 ‐ 777,000 927,594
700005.0015 Fire Pension ‐ 210,475 385,000 ‐ 200,475 290,000
Total 49.00 12,688,572$ 6,970,901$ 49.00 13,015,899$ 7,018,379$
2021/2022 Preliminary Budget City of Renton, Washington
3 - 33Budget by Department - Administrative Services
Performance Measures:
City Service Area City Service Area Strategies Performance Measures 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results
Business License renewals will be issued
within one day of receipt of payment. 95% 87% 89% 92% 82%
Number of compliance audits performed
annually.new 2017 new 2017 500 349 159
Opportunities for the public
to engage and influence City
government
Number of Legislative documents
(agenda, minutes, ordinances,
resolutions, etc) published & available
148 121 140 173 204
Number of Public Records Requests 332 616 678 608 691
Number of internal documents
(contracts including lease agreements,
MOU's, etc.) that are executed and
recorded
722 725 714 874 693
Utility Billing customer calls will be
answered within 5 minutes.99% 100% 100% 100% 100%
Average Utility Billing aged accounts
receivable (over 90 days) as percent of
annual revenue.
0.08% 0.38% 0.0047% 0.42% 0.31%
New Utility Billing accounts will be set
up within five business days of
notification (via final permit, email,
etc.).
99% 98% 100% 100% 97%
Percent of system availability (network
"uptime") as provided by System
Services.
99% 97% 99% 99% 99%
Safeguard public interests
and assets
Maintain or improve the City's credit
rating of AA (S&P's) for General
Obligation Bonds and AA+ (S&P's) for
Revenue Bonds.
AA+/AA+ AA+/AA+ AA+/AA+ AA+/AA+ AAA/AA+
Safety and
Health
Encourage the community to
comply with local, state and
federal laws.
Representative
Government
Internal Support
Functional work
environment
Operate and maintain
utilities
Utilities and
Environment
Policy and fiscal
accountability
2021/2022 Preliminary Budget City of Renton, Washington
3 - 34Budget by Department - Administrative Services
Highlight of Budget Changes:
Part‐time Salaries decreased $20,000 in 2021 as temporarily increased IT help desk assistance required with the
addition of new employees City‐wide and IT equipment in the new Police take‐home vehicles in 2019 and 2020 has
ended.
Supplies decreased $68,611 in 2021 as additional IT small equipment purchases related to new employees City‐wide
and IT equipment in the new Police take‐home vehicles added in 2019 and 2020 has ended.
Other Services and Charges increased $423,722 in 2021 due to increased costs of IT service contracts, additional
licenses and applications, and due to the reclassification of voter registration costs previously included in
Intergovernmental Services.
Intergovernmental Services decreased $266,000 in 2021 as they were reclassified to Other Services and Charges in
response to the State Auditor’s Office removing the Intergovernmental classification from the BARS manual.
Interfund Payments increased by $63,602 in 2021 due to increased Finance and City Clerk payments to IT to support
the increased technology costs.
Expenditure Budget by Division ‐ Administrative Services
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Fund/Dept Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Finance 4,150,211 4,383,622 4,089,396 4,631,749 4,513,286 4,513,286 4,787,282 4,932,463 3.4% 3.0%
Information Technology 5,825,309 6,053,852 5,790,915 6,095,823 7,635,416 7,635,416 6,427,451 6,566,316 5.4% 2.2%
City Clerk 1,274,941 1,341,087 1,286,227 1,402,852 1,175,923 1,175,923 1,473,840 1,517,120 5.1% 2.9%
Total 11,250,461 11,778,561 11,166,538 12,130,423 13,324,625 13,324,625 12,688,572 13,015,899 4.6% 2.6%
Expenditure Budget by Category ‐ Administrative Services
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 4,016,609 4,305,205 4,061,290 4,541,842 4,538,866 4,538,866 4,771,513 4,939,498 5.1% 3.5%
Part‐Time Salaries 48,146 58,716 32,102 65,716 34,841 34,841 38,716 45,716 ‐41.1% 18.1%
Overtime 35,067 51,000 35,841 51,000 36,000 36,000 51,000 51,000 0.0% 0.0%
Personnel Benefits 1,925,950 2,178,178 2,009,597 2,333,777 2,243,333 2,243,333 2,521,431 2,665,667 8.0% 5.7%
Supplies 496,263 642,424 528,707 607,224 999,224 999,224 559,724 558,613 ‐7.8%‐0.2%
Other Services and Charges 3,374,891 3,368,317 3,568,362 3,306,667 3,862,311 3,862,311 3,730,389 3,731,501 12.8% 0.0%
Intergovernmental Services 261,695 266,000 0 266,000 0 0 0 0 ‐100.0% N/A
Capital Outlay 469,498 340,000 359,367 340,000 1,068,500 1,068,500 334,000 325,000 ‐1.8%‐2.7%
Interfund Payments 436,810 568,721 568,721 618,197 541,551 541,551 681,799 698,903 10.3% 2.5%
Transfer Out 185,532 0 2,55100000N/AN/A
Total 11,250,461 11,778,561 11,166,538 12,130,423 13,324,625 13,324,625 12,688,572 13,015,899 4.6% 2.6%
Staffing Levels by Division ‐ Administrative Services
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Finance 20.50 21.50 21.50 21.50 22.50 22.50 22.00 22.00 2.3% 0.0%
Information Technology 18.50 20.50 20.50 20.50 20.50 20.50 21.00 21.00 2.4% 0.0%
City Clerk 6.006.006.006.006.006.006.006.000.0%0.0%
Total FTE 45.00 48.00 48.00 48.00 49.00 49.00 49.00 49.00 2.1% 0.0%
Intermittent FTE 1.411.530.961.700.960.961.051.22‐38.1% 16.0%
Temp/Intermit Pay & Ben 58,590$ 63,813$ 40,048$ 70,813$ 39,938$ 39,938$ 43,813$ 50,813$ ‐38.1% 16.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 35Budget by Department - Administrative Services
Finance
Mission
The Finance Division is responsible for a broad range of services and information for both internal and external customers.
Core operational services include cash receipting, utility billing, business taxing and licensing, payroll, accounts payable, and
accounts receivable. The Finance Division is also responsible for accounting and financial reporting including the
development of the biennial budget and preparation of the City’s annual financial statements, which are audited by the
Washington State Auditor’s Office.
2019/2020 Accomplishments
Received awards for excellence in financial reporting and budgeting from the Government Finance Officers
Association (GFOA).
Implemented the state approved online filing portal of File Local for B&O tax and business license renewal as well as
transitioned to a new system of record for the tax and licensing work group.
Re‐organized the finance division to include four distinct work groups of budget and financial reporting, finance
operations, tax and licensing and utility billing.
Expanded the City’s inclusion in purchasing program by gathering additional information on over 2000 City vendors.
Expanded the use of Laserfiche for electronically filing utility billing and tax and licensing records.
2021/2022 Goals
Thoroughly review and audit various internal controls for various functions throughout the City and create
specialized training and user manuals to ensure City assets and resources are properly protected.
Continue to collaborate with IT to expand the use of Laserfiche for electronically filing cash receipting and payroll
records.
Continue receiving “clean” financial audits from the Washington State Auditor’s Office.
Enhance commitment and focus on external customer service, particularly to the underserved and vulnerable
population.
Continue refinement of Renton Results efforts through improvements in performance data collection.
Continue to receive awards for excellence in financial reporting and budgeting from the Government Finance
Officers Association (GFOA).
Expenditure Budget by Category ‐ Finance
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,714,694 1,761,979 1,621,706 1,892,121 1,840,074 1,840,074 1,949,375 2,017,396 3.0% 3.5%
Part‐Time Salaries 00000000N/AN/A
Overtime 1,048 21,000 96 21,000 21,000 21,000 21,000 21,000 0.0% 0.0%
Personnel Benefits 958,344 1,069,615 963,448 1,157,842 1,102,371 1,102,371 1,214,473 1,278,547 4.9% 5.3%
Supplies 6,518 11,975 4,683 11,975 11,975 11,975 11,975 11,975 0.0% 0.0%
Other Services and Charges 1,029,895 1,121,698 1,100,328 1,123,548 1,157,521 1,157,521 1,121,698 1,123,548 ‐0.2% 0.2%
Interfund Payments 280,545 397,355 397,355 425,263 380,345 380,345 468,761 479,997 10.2% 2.4%
Transfer Out 159,166 0 1,78100000N/AN/A
Total 4,150,211 4,383,622 4,089,396 4,631,749 4,513,286 4,513,286 4,787,282 4,932,463 3.4% 3.0%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Finance
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 20.50 21.50 21.50 21.50 22.50 22.50 22.00 22.00 2.3% 0.0%
Intermittent FTE 0.000.000.000.000.000.000.000.00N/AN/A
Temp/Intermit Pay & Ben ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ N/A N/A
2021/2022 Preliminary Budget City of Renton, Washington
3 - 36Budget by Department - Administrative Services
Information Technology
Mission
Information Technology Division (ITD) in support of the Council’s vision and priorities and in partnership with the city
departments provides comprehensive IT solutions and services to all departments, focusing on optimizing city’s operations
and enhancing services through automation. ITD’s core services include technology innovations and maintenance in support
of Network Infrastructure, Business applications systems, Geographic Information Systems, customers and end‐user devices
and business and operations administration.
2019/2020 Accomplishments
Established Information Technology governance, Advisory and Steering committees
Implemented enterprise Citizen Request Management system
Implemented Work Order Management Systems for Public Works, Parks and Natural Resources and Facilities
Implemented Recreation Management System
Implemented Business Tax and License System with integration to FileLocal
Implemented online permitting portal
Implemented an integration between EnerGov and Laserfiche
Implemented new email archival / e‐discovery system
Implemented new GIS field editing service for PW Transportation Maintenance
Implemented NeoGov Onboarding and performance management systems
Implemented new Police Parking Citation System
Implemented new HVAC Control systems for City Hall and Pavilion
Implemented Digital Signage displays at the Golf Course, RCC and Sr. Center
Implemented new remote access appliance to allow employees to telework
Implemented new Lighting Analysis software for Transportation Engineering
Implemented vehicle turning analysis software for Transportation Engineering
Upgraded PW Automated Meter Read system
Expanded the use and integrate with enterprise document management system
Expanded connectivity (fiber) through collaborating with CED, WSDOT, 5G vendors and local and regional partners
Supported RRFA technology transition
Evaluated 3D augmented reality viewer capability for PW‐Utilities
Evaluated/Implemented POC for network redundancy options via wireless connectivity
Evaluated and implemented options for mobile device services cost containment
Upgraded the phone system and added a new SIP trunk
Virtualized most servers in our DMZ network
Conducted an IT Security Assessment that resulted in the following projects to improve the City’s security posture:
o Duo Multi‐Factor Authentication
o Palo Alto network firewall replacement
o Conducted an IT Business Impact Analysis (BIA)
2021/2022 Goals
Update ITD policies, procedures and Service Level Agreements
Upgrade email exchange system and increase redundancy
Support new technology trends towards Smart Cities, Internet of Things (IOT), Intelligent Transportation Systems
(ITS), and Drones.
Migrate Microsoft M365 cloud computing strategies
Continue to implement security improvements to the City’s infrastructure and business systems.
Follow up on Business Impact Analyses study
Develop a Disaster Recovery Plan
2021/2022 Preliminary Budget City of Renton, Washington
3 - 37Budget by Department - Administrative Services
Expenditure Budget by Category ‐ Information Technology
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,813,611 2,025,136 1,933,527 2,107,190 2,206,125 2,206,125 2,224,846 2,305,089 5.6% 3.6%
Part‐Time Salaries 48,146 58,716 32,102 65,716 34,841 34,841 38,716 45,716 ‐41.1% 18.1%
Overtime 34,019 30,000 35,746 30,000 15,000 15,000 30,000 30,000 0.0% 0.0%
Personnel Benefits 733,689 858,575 805,287 909,940 909,940 909,940 993,063 1,053,685 9.1% 6.1%
Supplies 485,409 623,455 520,074 588,255 983,155 983,155 540,755 540,755 ‐8.1% 0.0%
Other Services and Charges 2,238,063 2,116,418 2,103,260 2,052,918 2,416,051 2,416,051 2,266,071 2,266,071 10.4% 0.0%
Intergovernmental Services2,0620000000N/AN/A
Capital Outlay 469,498 340,000 359,367 340,000 1,068,500 1,068,500 334,000 325,000 ‐1.8%‐2.7%
Interfund Payments 812 1,552 1,552 1,804 1,804 1,804 0 0 ‐100.0% N/A
Total 5,825,309 6,053,852 5,790,915 6,095,823 7,635,416 7,635,416 6,427,451 6,566,316 5.4% 2.2%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Information Technology
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 18.50 20.50 20.50 20.50 20.50 20.50 21.00 21.00 2.4% 0.0%
Intermittent FTE 1.41 1.53 0.96 1.70 0.96 0.96 1.05 1.22 ‐38.1% 16.0%
Temp/Intermit Pay & Ben 58,590$ 63,813$ 40,048$ 70,813$ 39,938$ 39,938$ 43,813$ 50,813$ ‐38.1% 16.0%
Fund 503 ‐ Information Technology Fund
Department Capital (Costs charged directly to identified department): 2021 2022
Network and Enterprise Infrastructure
59,000$ 59,000$
Enterprise Capital (costs allocated city‐wide based on weighted point system) :
Core systems replacement 315,000 315,000
Annual Equipment Replacement 442,000 442,000
Total IT Capital Projects/Programs 816,000$ 816,000$
Desktops, laptops, mobile devices, copeirs, printers, scanners, projectors
License increases and miscellaneous new software purchases
Replacement of servers, storage, backup systems, network devices, switches, routers, and access points.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 38Budget by Department - Administrative Services
City Clerk
Mission
The Office of the City Clerk is dedicated to supporting governance and the legislative process, maintaining and preserving the
City’s official records, assisting and informing the public, coordinating elections, and carrying out the official duties and
sovereign authority of the City Clerk with integrity, as required by law and policy, and to meet the needs of the citizens, the
elected officials, and City administrative staff.
2019/2020 Accomplishments
Submitted the 2019 Joint Legislative Audit & Review Committee (JLARC) report, used to inform the state of the City’s
compliance with the Public Records Act two months prior to the State deadline.
Reorganized the City Clerk Division, effectively modernizing Division operations in order to comply with modern
federal, state, and local laws, to meet the evolving needs of residents and staff, and to align division work with the
City’s Business Plan.
Automated digital records‐keeping processes via Laserfiche for several additional key lines of business across the
City.
Enhanced digital recording procedures for certain document types with the King County Recorder’s Office.
Enhanced City Clerk Policy and Procedures including Records Management and Public Records Processing policies.
Trained volunteer board and commission members on the Public Records Act, the Open Public Meetings Act, and
records retention requirements.
Implemented new email archive system that streamlined email search and disclosure procedures.
In partnership with the Human Resources and Risk Management Department, successfully hired and trained the
City’s first supported employment employee.
2021/2022 Goals
Scan all permanent, vital, and historical records into Laserfiche for long‐term maintenance.
Fully implement the RMS functionality of Laserfiche by end of 2022.
Develop and implement a Five‐Year Strategic Plan for the City Clerk Division.
Enhance the City Clerk Division’s Records and Information Management (RIM) (paper records) program by
developing and implementing a 10‐Step program that reduces costs and improves the efficiency of record keeping,
establishes criteria for digitizing records to reduce storage costs, provides adequate protection for City records, and
preserves City records that have historical value.
Continually upgrade Laserfiche in the pursuit of improving internal and external access to City records, while at the
same time reducing the number of public records requests received annually.
Enhance Hearing Examiner calendaring in order to simplify the process for staff and residents.
Update all City Clerk policies in order to remain aligned with City, State, and Federal law, as well as City internal
practices.
Update the City’s Purchasing and Contracting policy using the Renton Equity Lens.
Expenditure Budget by Category ‐ City Clerk
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 488,304 518,090 506,058 542,531 492,666 492,666 597,292 617,013 10.1% 3.3%
Personnel Benefits 233,917 249,988 240,861 265,996 231,022 231,022 313,896 333,435 18.0% 6.2%
Supplies 4,335 6,994 3,951 6,994 4,094 4,094 6,994 5,883 0.0%‐15.9%
Other Services and Charges 106,933 130,201 364,774 130,201 288,739 288,739 342,620 341,882 163.1%‐0.2%
Intergovernmental Services 259,633 266,000 0 266,000 0000‐100.0% N/A
Interfund Payments 155,453 169,814 169,814 191,130 159,402 159,402 213,038 218,906 11.5% 2.8%
Transfer Out 26,366077000000N/AN/A
Total 1,274,941 1,341,087 1,286,227 1,402,852 1,175,923 1,175,923 1,473,840 1,517,120 5.1% 2.9%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ City Clerk
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Total FTE 6.006.006.006.006.006.006.006.000.0%0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 39Budget by Department - Administrative Services
Administrative Services Position Listing
2018 2019 2019 2020 2020 2021 2022
Grade Title Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
Finance Division
M49 Administrative Services Administrator 0.50 0.50 0.50 0.50 0.50 0.50 0.50
M38 Fiscal Services Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M33 Budget & Accounting Manager 0.00 0.00 0.00 0.00 1.00 1.00 1.00
M30 Financial Services Manager 1.00 1.00 1.00 1.00 0.00 0.00 0.00
M28 Financial Operations Manager 0.00 0.00 0.00 0.00 1.00 1.00 1.00
M28 Tax & Licensing Manager 0.00 0.00 1.00 0.00 1.00 1.00 1.00
M25 Financial Operations Supervisor 1.00 1.00 1.00 1.00 0.00 0.00 0.00
M25 Senior Finance Analyst 4.00 4.00 3.00 4.00 3.00 3.00 3.00
M25 Tax Auditor 1.00 1.00 0.00 1.00 0.00 0.00 0.00
N16 Finance Analyst III 0.00 1.00 2.00 1.00 2.00 2.00 2.00
N16 Administrative Assistant to ASD 0.00 0.00 0.00 0.00 1.00 0.50 0.50
N14 Administrative Assistant 1.00 1.00 1.00 1.00 0.00 0.00 0.00
N13 Tax & Licensing Auditor I 0.00 0.00 1.00 0.00 1.00 1.00 1.00
N13 Payroll Technician II 2.00 2.00 1.00 2.00 2.00 2.00 2.00
A19 Accounting Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A09 Accounting Assistant IV 4.00 4.00 4.00 4.00 4.00 4.00 4.00
A07 Accounting Assistant III 4.00 4.00 4.00 4.00 4.00 4.00 4.00
Total Regular Staffing 20.50 21.50 21.50 21.50 22.50 22.00 22.00
Total Finance Division 20.50 21.50 21.50 21.50 22.50 22.00 22.00
Information Technology Division
M49 Administrative Services Administrator 0.50 0.50 0.50 0.50 0.50 0.50 0.50
M38 Information Technology Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M30 Application Support Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M30 GIS Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
N16 Administrative Assistant to ASD 0.00 0.00 0.00 0.00 0.00 0.50 0.50
A32 Network Systems Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A30 Client Technology Services and Support Supervisor 0.00 0.00 1.00 0.00 1.00 1.00 1.00
A29 Senior Systems Analyst 0.00 0.00 2.00 0.00 2.00 2.00 2.00
A28 Senior Network Systems Specialist 0.00 0.00 0.00 0.00 3.00 3.00 3.00
A27 Senior Business Systems Analyst 0.00 0.00 3.00 0.00 3.00 3.00 3.00
A26 Systems Analyst/Programmer 0.00 0.00 1.00 0.00 1.00 1.00 1.00
A25 Senior Network Systems Specialist 3.00 3.00 3.00 3.00 0.00 0.00 0.00
A25 Senior Systems Analyst 2.00 2.00 0.00 2.00 0.00 0.00 0.00
A24 Service Desk Supervisor 1.00 1.00 0.00 1.00 0.00 0.00 0.00
A24 Network Systems Specialist 0.00 0.00 0.00 0.00 1.00 1.00 1.00
A23 Business Systems Analyst 3.00 3.00 0.00 3.00 0.00 0.00 0.00
A23 GIS Analyst II 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A22 Systems Analyst/Programmer 1.00 1.00 0.00 1.00 0.00 0.00 0.00
A21 Network Systems Specialist 0.00 1.00 1.00 1.00 0.00 0.00 0.00
A17 Senior Service Desk Technician 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A13 Service Desk Technician 1.00 2.00 2.00 2.00 2.00 2.00 2.00
Total Regular Staffing 18.50 20.50 20.50 20.50 20.50 21.00 21.00
Total Information Technology Division 18.50 20.50 20.50 20.50 20.50 21.00 21.00
City Clerk Division
M38 City Clerk/Public Records Officer 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M27 Deputy City Clerk/Enterprise Content Manager 0.00 0.00 0.00 0.00 1.00 1.00 1.00
M24 Deputy City Clerk/Enterprise Content Manager 1.00 1.00 1.00 1.00 0.00 0.00 0.00
M24 Deputy City Clerk/Public Records Officer 0.00 0.00 0.00 0.00 1.00 1.00 1.00
A20 Assistant Public Records Officer 1.00 1.00 1.00 1.00 0.00 0.00 0.00
A17 Public Records Specialist 0.00 0.00 0.00 0.00 1.00 1.00 1.00
A15 City Clerk Specialist II 0.00 0.00 0.00 0.00 2.00 2.00 2.00
A11 City Clerk Specialist 2.00 2.00 2.00 2.00 0.00 0.00 0.00
A11 Public Records Specialist 1.00 1.00 1.00 1.00 0.00 0.00 0.00
6.00 6.00 6.00 6.00 6.00 6.00 6.00
Total Administrative Services 45.00 48.00 48.00 48.00 49.00 49.00 49.00
Total City Clerk Division
2021/2022 Preliminary Budget City of Renton, Washington
3 - 40Budget by Department - Administrative Services
ADMINISTRATOR
Chip Vincent
58.5 FTEs
Development Services
Rob Shuey
20 FTEs
Building Inspection
Code Compliance
Permit Services
Planning
Vanessa Dolbee
27.5 FTEs
Current Planning
Development Engineering
Property and Technical
Services
Economic Development
Cliff Long
6 FTEs
Economic Development
Long Range Planning
Angie Mathias
3 FTEs
Long Range Planning
Administrative Support
1 FTE
Planning Commission
Municipal Arts Commission
City Center Community
Planning Advisory Board
Benson Hill Community
Plan Advisory Board
Community and Economic Development
2021/2022 Preliminary Budget City of Renton, Washington
3 - 41Budget by Department - Community and Economic Development
Community and Economic Development
Mission
Enhance the vitality and livability of the Renton community by promoting a prosperous economy and quality neighborhoods,
through economic development, sound urban planning, and streamlined land use regulation.
Core Businesses and Services
The Department of Community & Economic Development (CED) initiates and leads economic development, land use planning
and permitting, and regulation of all aspects of the development process, while working with residents, the business
community and other community organizations to enhance the economic prosperity, vitality, and livability for the Renton
community.
In addition, CED manages the City’s intergovernmental relations, advocating for Renton’s interests at the county, regional,
state, and federal levels, coordinates the Renton Community Marketing Campaign, which is funded in part by the City’s
Lodging Tax, and provides staff support for the City’s Planning and Municipal Arts Commissions.
Coordination and collaboration amongst the three CED divisions, Economic Development, Planning & Development Services,
and its 12 programs is essential, as each has an important role to play in achieving the Vision, Mission and Goals of the City.
CED plays a leadership role in the fulfillment of a significant number of the City's Business Plan Goals and Action Items. Most
of the five Business Plan Goals are directly related to the work of CED's programs.
List of Community and Economic Development Renton Results Decision Packages:
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 8,234,874 9,793,958 8,982,230 10,341,490 15,322,541 10,926,162 11,303,970 5.7% 3.5%
CIP Budget Summary 64,762 0 105,900 0 738,560 0 0 N/A N/A
Position Summary 54.50 57.50 57.50 58.50 58.50 58.50 58.50 0.0% 0.0%
2021 Proposed 2022 Proposed
Package # Description FTE Tot Exp $Tot Rev $ FTE Tot Exp $Tot Rev $
100007.0016 Building Inspection 16.00 2,308,971 3,446,556 16.00 2,395,462 4,409,169
100007.0017 Code Enforcement program 4.00 576,561 ‐ 4.00 598,859 ‐
100020.0025 CDBG ‐ 361,724 361,724 ‐ 361,724 361,724
300007.0056 Economic Development 6.00 1,169,508 ‐ 6.00 1,208,842 ‐
300007.0057 Current Planning 8.34 1,228,210 98,000 8.34 1,279,777 100,940
300007.0058 Arts & Culture ‐ 117,900 ‐ ‐ 117,900 ‐
300007.0059 CED Administration 1.80 1,473,798 ‐ 1.80 1,512,849 ‐
300007.0060 Long Range Planning 3.20 603,256 ‐ 3.20 624,747 ‐
300007.0061 One Percent for Art Fund Program ‐ 117,900 117,900 ‐ 117,900 117,900
500007.0009 Development Engineering 14.63 2,318,879 507,015 14.63 2,412,385 507,015
600007.0008 Technical and Property Services 4.53 649,456 ‐ 4.53 673,526 ‐
Total 58.50 10,926,162$ 4,531,195$ 58.50 11,303,970$ 5,496,748$
2021/2022 Preliminary Budget City of Renton, Washington
3 - 42Budget by Department - Community and Economic Development
Community and Economic Development Performance Measures:
City Service Area Strategies Performance Measures 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results
Permit review for single family
applications completed within 2 weeks 51% 61% 58% 45% 46%
Permit review for commercial
applications within 4 weeks 90% 95% 88% 87% 95%
Inspection requests receive response
within 24 hours 96% 93% 94% 95% 94%
Encourage the community to
comply with local, state and
federal laws
Code compliance is achieved through
voluntary action upon notification of
violation
N/A N/A 80% 80% 80%
Advocate community interest
in regional, state, and federal
forums
Number of organizations in which CED
staff represents the City in local,
regional and statewide organizations
focused in areas such as land use,
economic development , building
regulation
29 29 29 29 29
The City's annual sales tax revenue
growth rate (excluding one‐time items)9.0% 7.0% N/A no data no data
Annual property tax revenue associated
with new construction increases. 2.82%‐2.12% N/A no data no data
Process land use applications requiring a
decision by the Hearing Examiner within
12 weeks of receipt of complete
application.
76% 72% 88% 92% 100%
Process land use applications requiring
an Administrative Decision within 8
weeks
84% 75% 82% 91% 92%
Compliance with
environmental standards and
laws
Infrastructure project plan review is
completed within an average of 3 weeks 75% 90% 47% 54% 44%
Functional work environment
Property and Technical Services review
of development proposals are processed
within two weeks.
95% 98% 95% 98% 98%
Timely responsiveness and
“Projection of effort” when
the community cannot help
itself
Encourage and foster a vibrant
and diverse economy
Manage growth in a manner
consistent with community
values.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 43Budget by Department - Community and Economic Development
Highlight of Budget Changes:
Regular Salaries increased by $187,106 in 2021 due to reclassification of various positions after the 2019/2020
budget was adopted
Personnel Benefits increased by $198,176 in 2021 due to increase in employer‐paid taxes and retirement
contribution as a direct result of the increase in salaries, in addition to projected increase in medical and dental rates
Shifted budget between other categories to better align budget to where the money is actually being spent
Interfund Payments increased by $29,000 in 2022 due to increase in Equipment Rental costs
Transfer Out increased to $117,900 in 2021 to fund the City Arts Program
Expenditure Budget by Division ‐ Community & Economic Development
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Administration 1,347,568 1,507,929 1,598,892 1,501,451 1,560,726 1,619,213 1,659,266 7.8% 2.5%
Economic Development 833,055 1,378,153 1,257,984 1,418,452 6,790,842 1,649,132 1,688,466 16.3% 2.4%
Planning 3,843,116 4,395,090 3,802,894 4,670,028 4,370,938 4,772,285 4,961,916 2.2% 4.0%
Development Services 2,211,136 2,512,785 2,322,460 2,751,559 2,600,034 2,885,532 2,994,321 4.9% 3.8%
Operating Total 8,234,874 9,793,958 8,982,230 10,341,490 15,322,541 10,926,162 11,303,970 5.7% 3.5%
CIP 64,762 0 105,900 0 738,560 0 0 N/A N/A
Total 8,299,636 9,793,958 9,088,130 10,341,490 16,061,101 10,926,162 11,303,970 5.7% 3.5%
Expenditure Budget by Category ‐ Community & Economic Development
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 4,626,575 5,303,606 4,828,127 5,654,139 5,523,718 5,841,245 6,038,395 3.3% 3.4%
Part‐Time Salaries 48,060045,9900000N/AN/A
Overtime 50,131 52,517 44,095 52,517 10,164 52,117 52,117 ‐0.8% 0.0%
Personnel Benefits 1,820,831 2,171,721 1,916,343 2,362,799 2,263,691 2,560,974 2,712,632 8.4% 5.9%
Supplies 16,377 81,650 37,537 81,650 54,950 34,750 34,750 ‐57.4% 0.0%
Other Services and Charges 612,089 933,144 592,050 928,071 2,504,242 1,060,036 1,060,036 14.2% 0.0%
Capital Outlay 926 15,000 194,508 15,000 1,070,404 15,000 15,000 0.0% 0.0%
Interfund Payments 1,053,132 1,146,320 1,146,320 1,247,315 1,079,873 1,244,140 1,273,140 ‐0.3% 2.3%
Transfer Out 6,754 90,000 177,261 0 2,815,499 117,900 117,900 100.0% 0.0%
Operating Total 8,234,874 9,793,958 8,982,230 10,341,490 15,322,541 10,926,162 11,303,970 5.7% 3.5%
CIP 64,762 0 105,900 0 738,560 0 0 N/A N/A
Total 8,299,636 9,793,958 9,088,130 10,341,490 16,061,101 10,926,162 11,303,970 5.7% 3.5%
Staffing Levels by Division ‐ Community & Economic Development
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Administration 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.0% 0.0%
Economic Development 4.005.006.005.006.006.006.0020.0%0.0%
Planning 29.50 31.50 30.50 31.50 30.50 30.50 30.50 ‐3.2% 0.0%
Development Services 19.00 19.00 19.00 20.00 20.00 20.00 20.00 0.0% 0.0%
Total FTE 54.50 57.50 57.50 58.50 58.50 58.50 58.50 0.0% 0.0%
Intermittent FTE 1.350.001.270.000.040.000.00N/AN/A
Temp/Intermit Pay & Ben 56,070$ ‐$ 52,729$ ‐$ 1,528$ ‐$ ‐$ N/A N/A
2021/2022 Preliminary Budget City of Renton, Washington
3 - 44Budget by Department - Community and Economic Development
Administration Division
Mission
Provide leadership, resources, and regional influence to enable the Department to meet its responsibilities in a manner that
is responsive to the needs of its customers and consistent with the City's Business Plan Goals.
2019/2020 Accomplishments
Maintained extremely high level of service and exceeded most performance goals.
Participated in numerous state, countywide and regional policy boards and commissions.
2021/2022 Goals
Continue to work within CED and all city departments to maximize employee satisfaction and performance and find
additional organizational and system improvements, innovations and efficiencies.
Expenditure Budget by Category ‐ Administration
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 250,212 257,686 258,358 265,835 273,505 273,696 278,940 3.0% 1.9%
Personnel Benefits 104,323 109,783 110,339 115,897 115,897 126,700 133,815 9.3% 5.6%
Other Services and Charges 0 0 825 0 850 0 0 N/A N/A
Interfund Payments 986,279 1,050,460 1,050,460 1,119,719 989,334 1,100,917 1,128,611 ‐1.7% 2.5%
Transfer Out 6,754 90,000 177,261 0 181,140 117,900 117,900 100.0% 0.0%
Operating Total 1,347,568 1,507,929 1,598,892 1,501,451 1,560,726 1,619,213 1,659,266 7.8% 2.5%
CIP 64,762 0 105,900 0 738,560 0 0 N/A N/A
Total 1,412,329 1,507,929 1,704,792 1,501,451 2,299,286 1,619,213 1,659,266 7.8% 2.5%
Staffing Levels by Division ‐ Administration
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 45Budget by Department - Community and Economic Development
Economic Development Division
Mission
Enhance the vitality and livability of the Renton community by promoting a prosperous and diverse economy.
2019/2020 Accomplishments
Continued to work with Cosmos Development for project on 200 Mill property.
Completed the design phase of Streetscape enhancements and wayfinding plan per the Council adopted Civic Core
Vision and Action Plan.
Continued focus and oversight of Lodging Tax Fund and new opportunities for tourism promotion and Renton
Community Marketing Campaign.
Successfully partnered with Port of Seattle for economic development marketing.
Continued enhancement of three state of the art websites for downtown, visitors, and economic development in
Renton.
Facebook ad campaign to promote Renton events yielded 4,102,303 impressions and 27,057 clicks.
Digital Ad Word Campaign on Renton Workforce yielded 4,137,192 impressions and 12,854 clicks.
YouTube Channel to promote the City of Renton and our local businesses and events yielded 194 hours of viewed
content during 3,112 views.
Continued to strengthen ongoing business recruitment working with many companies to locate or expand.
Continued to foster redevelopment efforts in the South Lake Washington area, including working with The Landing
and its tenants.
Strengthened working relationship with the Renton Downtown Partnership in promoting downtown revitalization
through Downtown clean‐up efforts, community events and small business support through active participation on
the board of directors and event committees.
Provided support for existing small businesses in the Downtown through public workshops and façade improvement
incentives.
Support the development of a robust, community‐focused ecosystem on the Eastside through collaboration with
Startup 425 that served to help entrepreneurs and small businesses in three areas – Customer Discovery; Financial
Literacy; Professional Network Development.
Participated in the interdepartmental team for the Rainier/Grady Junction Subarea Plan and promoted quality
mixed‐use and commercial redevelopment in the area with property owners and potential developers.
Continued to facilitate the Sunset Area Transformation Resource Council and work with partner organizations to
implement as much of the Sunset Area Transformation Plan as possible.
Continued to work with the City interdepartmental team to implement as much of the Sunset Area Community
Revitalization Plan, as possible.
Worked with the Renton Housing Authority (RHA) and Neighborhood House to help secure an additional
$1,020,000 in public and private grants for the renovation of the former Renton Highlands Library for the new
Sunset Neighborhood Center (previously referred to as the Sunset Multi‐Service and Career Development Center).
Worked with RHA, Neighborhood House, HealthPoint, Valley Cities, and the St. Vincent de Paul Society (Centro
Rendu) to help complete the design and begin the renovation of the former Renton Highlands Library for the
Sunset Neighborhood Center – now scheduled to open in late‐2020.
Partnered with RHA and Homestead Community Land Trust to help secure $1,517,000 in additional public and
private funding for the Willowcrest Townhomes (previously referred to as the Sunset Crest Townhomes), 12 new
affordable homeownership units in the Sunset Area. The project, located adjacent to RHA’s Glennwood
Townhomes affordable rental housing, started construction in April 2020 and is scheduled to be completed in
summer 2021.
Partnered with RHA to help secure $5,700,000 in local public funds for Sunset Oaks, a new 60‐unit affordable
rental housing development project in the Sunset Area. The project, located adjacent to the Sunset Neighborhood
Park, started construction in May 2020 and is scheduled to be completed in summer 2021. The Sunset Oaks
project is RHA’s fourth replacement housing project for the former Sunset Terrace public housing project.
Work with the Renton School District, the Community Center for Education Results, and other partners to help hire
staff and support the development and implementation of the Renton Innovation Zone Partnership to enhance
2021/2022 Preliminary Budget City of Renton, Washington
3 - 46Budget by Department - Community and Economic Development
educational opportunities and support for students at Highlands Elementary School and all three elementary
schools in the Skyway/West Hill community.
Participated in CED’s efforts to work with Quadrant Homes to establish an approved Solera Master Plan for the
proposed mixed‐use redevelopment project at the Greater Hi‐Lands Shopping Center. Worked with subsequent
developers, including DevCo which purchased the shopping center property in spring 2020, to promote
redevelopment of the property.
Participated in CED’s efforts to work with iCap Equity to support the construction of the Sunset Terrace
Apartments adjacent to the Renton Highlands Library. The 108‐unit market‐rate rental apartment project, located
adjacent to the Renton Highlands Library, is scheduled to start construction in July 2020 and be completed in the
fall of 2021.
Worked with the Housing Development Consortium, King County, and other South King County jurisdictions to
establish the South King Housing & Homelessness Partners (SKHHP) in early‐2019. Worked with the partners to
hire the SKHHP Executive Manager and create and begin to implement the SKHHP work plan for 2020‐2021.
Worked with Microsoft and Challenge Seattle to advocate for additional resources and creative partnerships to
support more low and moderate income housing in Renton.
Participated in CED’s efforts to work with Taylor Morris Homes to utilize the City’s affordable housing density
bonus to create seven affordable townhomes for low and moderate income households at the 50‐unit Earlington
Village project, adjacent to the Skyway community. Worked with Current Planning staff, the developer, and/or
Homestead Community Land Trust to establish various agreements for Homestead to assist in the sale, marketing,
and stewardship of the Earlington Village affordable homes and other future for‐sale affordable housing density
bonus homes in the City.
Completed the first two years of CED’s initial three‐year AmeriCorps VISTA project and expanded the number of
volunteers from four to nine. The expanded placements include four volunteers at the City (three in CED and one
in Community Service), plus one volunteer each at RHA, Neighborhood House, the Renton School District,
Communities in Schools of Renton – Tukwila, and the St. Vincent de Paul Society (Centro Rendu).
Partnered with the King County Housing Authority, RHA, and Rebuilding Together Seattle to complete the
weatherization, exterior façade, and other improvements on a WWII‐era duplex in the Sunset Area as a
demonstration project.
Partnered with the Renton Innovation Zone, HUD Region X, and other organizations to pursue the development of
a HUD EnVision Center in the Skyway/West Hill community. The Center would focus on four pillars: economic
empowerment, educational advancement, health and wellness, and character and leadership.
Arts & Culture (Activities of the Renton Municipal Arts Commission)
• Activated and enhanced public buildings and civic spaces through the acquisition, stewardship, and presentation of
the City’s Art Collection, including the popular installation of Erasmus the rooftop dragon and contracting for the
creation of the Renton Loop for installation in 2020.
• Acquired and updated technology to maximize efficiency, accessibility to and maintenance of the City’s art
collection through Collector’s System inventory software.
Supported efforts to bring art into the neighborhoods and parks with the installation of utility box wraps in Sunset
and downtown, a mini mural project on the street signs along Burnett Linear Park, and collaboration with the
South Renton and Benson Hill neighborhoods on community art projects, including the launch of the popular
hydrant art program.
• Collaboration with regional partners to promote and preserve culture in the vibrant communities south of Seattle.
• Participation and membership in the South King County Cultural Coalition and King County Local Arts Agency
meetings to encourage sharing and the promotion of best practices in building leaders and resources in and for the
arts.
• Loan of City‐owned art for an exhibit at the Tacoma Museum of Art celebrating Northwest Public Art of the 1930s.
• Supporting Renton’s arts institutions with $13,150 distributed to local nonprofits offering public programming and
instruction in the arts.
• Supporting a diversity of cultural arts programming throughout Renton with more than $24,567 distributed to local
organizations offering free, or reduced price programming to the public.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 47Budget by Department - Community and Economic Development
• Supporting Renton artists and arts organizations to create public art and providing opportunities for the
community to participate in the creation of art including the 800 ft community‐inspired fence project on Sunset
Blvd, utility box wraps designed by local students and the community‐painted mural on Carco Theatre.
Created three additional utility box wraps in the Sunset/Highlands community, including one by RHA adjacent to
the Kirkland Avenue Townhomes affordable rental housing project.
Housing Programs
Secured $100,000 grant from the Department to complete a Housing Action Plan. Currently working to create the
5‐year plan focused on residential density and development
Worked to build and implement Rental Registration Program, adopted in 2019; hired two program staff; created
registration process and outreach materials; currently working to build tracking and enforcement system for full
2021 operations
Creation of a housing landing page (rentonwa.gov/housing) and three ancillary housing websites
(rentonwa.gov/rentalregistration; rentonwa.gov/hap; rentonwa.gov/renter) for housing programs and resources
2021/2022 Goals
Continue to foster redevelopment efforts at the 200 Mill property as a downtown catalyst project.
Complete the construction of phase one of the Civic Core Streetscape.
Complete the installation of the Downtown Wayfinding plan per the Civic Core Plan. (This will be done this year,
2020, by December)
Design and Engineer phase two of the Civic Core Streetscape.
Continue to work with public works projects and help execute effective business outreach and problem solving
during the intersection projects at Wells and Williams.
Attract new businesses and new development to Renton to increase employment opportunities, sales and
property tax revenue, and continue to promote Renton as a top location for investment.
Continue to foster redevelopment efforts in the South Lake Washington area, including working with the property
owners and other City departments in this emerging district. Work to stimulate additional development adjacent
to The Landing.
Continue to support progress at Southport, moving forward on redevelopment of portions of Puget Sound Energy
property, assisting with hotel and tenant recruitment.
Utilize existing incentives to continue to foster a diverse array of increased affordable and market‐rate housing
opportunities in Renton. Work with Microsoft, Challenge Seattle, the Housing Development Consortium, King
County, and others to increase the amount of public and private funds available to support low and moderate‐
income housing in Renton.
Participate in the interdepartmental team to help complete the Rainier/Grady Junction Subarea Plan and promote
quality mixed‐use and commercial redevelopment in the area with property owners and potential developers.
Continue to facilitate the Sunset Area Transformation Resource Council and work with partner organizations to
implement as much of the Sunset Area Transformation Plan as possible.
Participate in the Renton Innovation Zone Partnership (RIZP) with other organizations to continue to address the
RIZP Implementation Plan to enhance educational opportunities and support for students at Highlands Elementary
School and all three elementary schools in the Skyway/West Hill community.
Work with DevCo to implement the Solera Master Plan for the mixed‐use redevelopment project at the Greater Hi‐
Lands Shopping Center, including both affordable and market‐rate rental housing and for‐sale townhomes.
Coordinate CED’s nine‐member AmeriCorps VISTA project with four volunteers at the City (three in CED and one in
Community Services), plus one volunteer each at RHA, Neighborhood House, the Renton School District,
Communities in Schools of Renton – Tukwila, and the St. Vincent de Paul Society (Centro Rendu).
Partner with the Renton Innovation Zone, HUD Region X, and other organizations to develop and implement a HUD
EnVision Center in the Skyway/West Hill community. The Center would focus on four pillars: economic
empowerment, educational advancement, health and wellness, and character and leadership.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 48Budget by Department - Community and Economic Development
Arts & Culture
• Support the City’s arts and culture programming as ambassadors and information providers (sending out regular e‐
newsletters and growing the audience on social media channels through regular posts and engagement with the
community).
• Motivate and ignite creativity and encourage artistic production through social media, using Facebook and other
relevant platforms and presenting art opportunities throughout the year, establishing the Arts Commission as the
go‐to for art related activities in Renton.
• Bringing people together and inspiring civic pride and neighborhood identity through art by continuing to
collaborate with the Neighborhood program and neighborhood associations in the installation of art at a local
level.
• Expand and grow the City’s public art programs with diverse artists participating (facilitating storefront art walks
and rotational window displays to celebrate and provide opportunities for local artists).
• Provide quarterly educational workshops to featuring topics such as grant writing for artists, how to curate an
exhibit/solo show, resources for filming in Renton.
• Connect the dots between local artists and art organizations through the creation of an inventory of the groups
and organizations providing art classes and instruction; performances and exhibits and when/where they meet in
order to best serve the community as an art resource.
Continue to collaborate with Economic Development Division and the Downtown Partnership to revitalize
Downtown Renton.
Advocate for and support art and placemaking projects in Downtown Renton, Sunset Area, and Benson Hill.
Housing Programs
• Continue to work with the City interdepartmental team to implement as much of the Sunset Area Community
Revitalization Plan as possible. Work with the Renton Housing Authority (RHA) to promote redevelopment of the
balance of the former Sunset Terrace public housing property.
• Work with RHA, Neighborhood House, HealthPoint, Valley Cities, and the St. Vincent de Paul Society (Centro
Rendu) to help launch and operate the Sunset Neighborhood Center at the former Renton Highlands Library.
• Work with developers to support the successful construction of market‐rate and affordable housing projects in the
Sunset Area, including RHA’s 60‐unit Sunset Oaks affordable rental housing project, Homestead Community Land
Trust’s 12‐unit Willowcrest Townhomes affordable homeownership project, and iCap Equity’s 108‐unit Sunset
Terrace Apartments market‐rate rental apartments.
• Assist RHA with efforts to design and secure financing for the Sunset Gardens project, a proposed affordable
elderly/veterans project with approximately 75 rental housing units at their current headquarters site in the
Sunset Area. Current plans include the affordable housing, plus structured parking, new RHA office space, and
space for ancillary supportive services for seniors.
• Work with the South King Housing & Homelessness Partners (SKHHP) to establish a housing capital fund to
leverage additional resources to support more affordable housing projects in South King County (SKC) and help
implement the SKHHP work plan to preserve the existing affordable housing stock and increase the available
options for Renton and other SKC residents to access affordable housing.Adopt the Housing Action Plan and begin
implementation of 5‐year actions.
• Fully implement and enforce the Rental Registration Program; hire Code Compliance officer to assist with
enforcement and tracking
2021/2022 Preliminary Budget City of Renton, Washington
3 - 49Budget by Department - Community and Economic Development
Expenditure Budget by Category ‐ Economic Development
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 336,767 512,612 479,854 539,995 651,299 656,176 680,195 21.5% 3.7%
Part‐Time Salaries 27,650012,1910000N/AN/A
Overtime 4701090000N/AN/A
Personnel Benefits 129,915 217,048 189,634 229,964 289,041 260,463 275,778 13.3% 5.9%
Supplies 4,979 5,950 21,304 5,950 62,450 9,450 9,450 58.8% 0.0%
Other Services and Charges 332,771 627,543 360,384 627,543 2,140,989 708,043 708,043 12.8% 0.0%
Capital Outlay 926 15,000 194,508 15,000 1,070,404 15,000 15,000 0.0% 0.0%
Transfer Out 00002,576,65900N/AN/A
Total 833,055 1,378,153 1,257,984 1,418,452 6,790,842 1,649,132 1,688,466 16.3% 2.4%
Staffing Levels by Division ‐ Economic Development
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 4.00 5.00 6.00 5.00 6.00 6.00 6.00 20.0% 0.0%
Intermittent FTE 0.79 0.00 0.34 0.00 0.00 0.00 0.00 N/A N/A
Temp/Intermit Pay & Ben 33,051$ ‐$ 14,261$ ‐$ ‐$ ‐$ ‐$ N/A N/A
2021/2022 Preliminary Budget City of Renton, Washington
3 - 50Budget by Department - Community and Economic Development
Planning Division
Mission
Direct Renton’s growth based on community values, promoting a high quality of life for residents and prosperity for
businesses, through sound planning, zoning, and development, while ensuring predictability for customers.
2019/2020 Accomplishments
Long Range Planning
Worked with the Planning Commission, who held 30 meetings, including 13 public hearings, to review and make
recommendations regarding development regulations, policies, and goals of the City.
Adopted policies and regulations for 26 docket items, including streamlining permitting for Accessory Dwelling Units,
improved standards for Street Trees, and ensuring quality Mixed Use projects in the Commercial Arterial Zone.
Adopted 4 Comprehensive Plan Land Use Map Amendments and Concurrent Rezones.
Submitted a winning grant application to the Department of Commerce to develop the City’s first Housing Action
Plan.
Worked with the City Center Community Plan Advisory Board to implement priority actions of the City Center
Community Plan.
Worked with the Benson Hill Community Plan Advisory Board to establish goals, implementation actions, and work
program items for the Benson Hill Community Plan Advisory Board.
Worked to establish Base Plans so that residents can utilize pre‐approved and designed plans for Accessory Dwelling
Units at no or little cost.
Processed three annexations adding approximately 41.5 acres of land and welcoming approximately 79 new
residents to the City.
Provided on‐going oversight and support to the Planning Commission, City Center Community Plan Advisory Board,
and Benson Hill Community Plan Advisory Board.
Staffed the Interjurisdictional Team (IJT) to the Growth Management Planning Council as work to update the
Countywide Planning Policies and the Land Capacity Analysis was being conducted.
Current Planning
Met established timeline performance measures for: pre‐application requests, new commercial & single family
building permit reviews, administrative land use decisions, and land use decisions requiring Hearing Examiner review
and public hearings.
Maintained our excellent reputation for expedited land use permit review, one of the fastest jurisdictions in King
County.
Continued to engage the community on large development projects such as Solara, assisted living facilities including
Merrill Gardens, Weatherly Inn, and Chateau Velley, Chick‐fil‐A, Top Golf, Family First Community Center, Stoneway
Redevelopment (Cedar River Apartments), Allura at Tiffany Park, and Quendall Terminals.
Conducted 73 development pre‐application meetings with applicants.
Staffed 15 land use public hearings for large development projects.
Processed 135 SEPA (environmental review) and Land Use Permits, including Planned Urban Developments for
Willowcrest Townhomes and the Canopy residential subdivision; conducted Site Plan Review for Weatherly Inn,
Walker Auto Dealership, King County Parks Maintenance Shops, Top Golf, Family First Community Center, CITC
Headquarters, Penney Lofts, Kiddie Research Daycare, 4th Dimension Mixed Use, La Fortuna, Logan Place, and Solera
(redevelopment of the Greater Hilands Shopping Center); Subdivisions for units lot townhomes including Sapphire
on Talbot, Jefferson Highlands, and Emerald Highlands, and various applications for single family subdivisions, non‐
profit organizations, religious institutions, and wireless communication permits throughout the City.
Continued to provide excellent customer service at the Planning Customer Service Counter, assisting an average of
318 customers per month.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 51Budget by Department - Community and Economic Development
Assisted in the coordination and advancement of affordable housing thought bonus density review and working
closely with the Renton Housing Authority, Habitat for Humanity, and Low Income Housing Institute on advancing
development projects in Renton.
Continued advancing permit review and submittal from in‐person to electronic submittal options and on‐line
payments.
Adapted quickly to remote permit intake, project review, public hearings, and customer service to ensure all our
services were maintained and provided to the public during the COVID‐19 Pandemic Governor’s ‘Stay Home, Stay
Healthy’ Order and ‘Safe Start’ Order.
Drafted and adopted an emergency ordinance to extend the period of validity of permits for an additional 6 months
due to supply chain delays and restrictions on construction sites.
Drafted and adopted an emergency ordinance to allow businesses to temporarily expand into portions of the right‐
of‐way and parking areas to comply with the Governor’s ‘Safe Start’ order, and to allow for the display of certain
temporary signs through the remainder of 2020.
Property/Technical Services
Provided development reviews and achieve excellent customer service within established timelines.
Updated the City’s GIS Land Info data source and continue to add requested information for the staff and public.
Continued to improve function, process and training associated with EnerGov permit tracking software and newer
applications for our department and others within the City.
Updated the City’s addressing database and provide accurate addressing data in support of the LUCA 2020 Census.
Added 17,000 addresses for apartments and condominium communities, which will provide a more complete
account for future communications.
Continued to provide project management and technical support for Electronic Plan Submittal for staff and
applicants. The overall project name is CED Electronic Roadmap and is a 3‐year process with over 25 projects for the
realization of fully electronic permitting and review.
Completed the transition from Mybuildingpermit.com to Renton Permitting Portal to save the City $100,000 in
annual membership costs.
Supported staff and public during the transition of working remotely for online permitting and finding new ways to
meet our expectations.
Worked with various City departments to find ways to provide CED information electronically and easy for the public
and other interest groups.
Public Works Plan Review and Inspection
Completed public works plan review for construction permits associated with development projects in a timely
manner resulting in over $10 Million in permitted public civil infrastructure per budget year.
Met established timeline performance measures for: pre‐application requests, new commercial & single family
building permit reviews, and land use reviews.
Further streamlined the Franchise Permitting Process ensuring timely and consistent reviews reducing review time
by 50 percent while averaging approximately 420 franchise permits per year.
Increased coordination between the City and the Franchise Permit Holds to better facilitate construction work within
the City for both Public and Private Projects.
Ensured timely and thorough inspections of all public works and private development projects. Provide inspection‐
related documentation for the projects in compliance with grant reporting requirements resulting in over 4,400
permit inspections, 1,250 hours of Capital Improvement project inspection, and over 50 days of nighttime inspection
in 2019 alone.
Provided high quality coordination between the City and External Applicants and Agencies such as Washington State
Department of Transportation (WSDOT) on the Direct Connector Project as well as the ongoing I‐405 Renton to
Bellevue project.
Continued advancing permit review and submittal from in‐person to electronic submittal options and on‐line
payments.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 52Budget by Department - Community and Economic Development
Adapted quickly to remote permit intake, review, and customer service as well as maintained permit inspections to
ensure all our services were maintained and provided to the public during the COVID‐19 Pandemic ‘Stay Home,Stay
Healthy’ Order and Safe Start Order.
2021/2022 Goals
Long Range Planning
Amend City develop regulations to implement the Comprehensive Plan
Continue to refine and streamline development regulations to ensure they are easier to understand and administer
Process annexations as residents and property owners express a desire to become a part of Renton
Continue to implement the Sunset Area Community Investment Strategy; work with the Renton Housing Authority
to redevelop public housing projects in Sunset; collaborate with Community Services (Parks) and Public Works
(Transportation and Utilities) to further revitalization of the Sunset Area
Continue to provide support to the Planning Commission, City Center Community Plan Advisory Board, and Benson
Hill Community Plan Advisory Board
Current Planning
Meet or exceed department goals for timely review of pre‐application requests, permit applications, and land use
decisions.
Provide high quality development review to reduce impacts to the community and ensure new development adds
value, quality, and character to the City.
Continue to engage the community on large scale development projects.
Provide excellent customer service to internal and/or external customers.
Property/Technical Services
Work on establishing a plan to maintain current and accurate survey network as we prepare for the 2022 National
Datum change
Provide GIS mapping support to CED and other customers to present Citywide data to the public in accurate, usable,
and easy to understand methods.
Continue working with various groups to determine data that can be communicated to the public in a spatial or map
based product.
Meet or exceed department goals for timely review of development applications and customer service response.
Develop and maintain GIS databases and other data / information sources to support ongoing operations within CED
and other City departments.
Provide Project management and technical support for electronic plan submittal for City staff, applicants and the
public by way of technical expertise, support and training to reviewers.
Realize the CED Electronic Roadmap through the combined efforts of various departments within CED to be fully
electronic and accessible to the public.
Public Works Plan Review and Inspection
Meet or exceed departmental goals for timely review of public works plan review of construction permits, and land
use and pre‐application submittals.
Ensure timely and thorough inspections of all public works and private development projects. Provide inspection‐
related documentation for the projects in compliance with grant reporting requirements.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 53Budget by Department - Community and Economic Development
Expenditure Budget by Category ‐ Planning
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 2,601,981 2,932,223 2,610,418 3,106,098 2,966,342 3,107,538 3,217,445 0.0% 3.5%
Part‐Time Salaries 20,41004,7590000N/AN/A
Overtime 40,209 42,517 38,896 42,517 9,020 42,117 42,117 ‐0.9% 0.0%
Personnel Benefits 989,068 1,149,441 979,508 1,234,999 1,071,685 1,326,626 1,405,614 7.4% 6.0%
Supplies 4,352 63,450 9,562 63,450 ‐15,025 13,050 13,050 ‐79.4% 0.0%
Other Services and Charges 158,201 174,175 126,467 174,175 249,492 194,975 194,975 11.9% 0.0%
Interfund Payments 28,895 33,284 33,284 48,789 31,724 87,979 88,715 80.3% 0.8%
Total 3,843,116 4,395,090 3,802,894 4,670,028 4,370,938 4,772,285 4,961,916 2.2% 4.0%
Staffing Levels by Division ‐ Planning
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 29.50 31.50 30.50 31.50 30.50 30.50 30.50 ‐3.2% 0.0%
Intermittent FTE 0.550.000.130.000.000.000.00N/AN/A
Temp/Intermit Pay & Ben 23,019$ ‐$ 5,549$ ‐$ ‐$ ‐$ ‐$ N/A N/A
2021/2022 Preliminary Budget City of Renton, Washington
3 - 54Budget by Department - Community and Economic Development
Development Services Division
Mission
Create and maintain a safe and pleasant physical environment by ensuring compliance with codes and land use regulations
and assisting the public and the development community through the regulatory process.
2019/2020 Accomplishments
Building Permit Review and Inspection
Building Inspectors have responded to an average of 80 inspection requests per day.
Inspection requests are being completed within 24 hours more than 94% of the time.
Permit staff are completing an average of 24 building permit applications for single‐family homes each month.
Permit staff are completing an average of 21 building permit applications for commercial and multi‐family projects
each month.
The Division is issuing an average of over 4650 permits each year resulting in a total construction valuation of over
$227 million.
The City is no longer utilizing MBP (MyBuildingPermit.com) and now uses the City CSS (Citizen Self‐Service) portal to
process permits.
Number of inspections requested through our CSS Portal is currently at 64%.
Online permit applications applied for through our CSS Portal is currently at 79.50%
Educating the public how to use the City CSS and online applications.
The Division has successfully made the transition to LaserFiche as a document storage database for all plans.
The department has completed the transition from paper to electronic plan review with all reviews being performed
on Blue Beam, while continuing to educate the public how to submit plans electronically.
The permit counter served an average of over 34 walk‐in customers at permit center each day.
The department added a Permit Services Manager position to oversee permit service counter productivity and
quality.
Staff continue to monitor the city website and update all forms and instructional materials as necessary.
Code Compliance
The team has inspected and processed average of over 600 code cases annually.
The inspectors make contact with the customer requesting assistance from code enforcement within one working
day of receiving the request 80 percent of the time.
The team continues to exceed department goals by achieving resolution to code compliance requests through
voluntary action more than 80% of the time. Code compliance resolution was achieved within 15 days from
complaint on average.
The City has employed Renton Responds (see click fix) to enable citizens to easily report violations. Requests from
Renton Responds account for approx. 75% of complaints.
Code compliance inspectors conducted complaint based inspections from private citizen requests. All sites with
verified code compliance violations in the last year were checked at least once to verify continued compliance.
Entering 100% of cases into EnerGov database.
• Code compliance inspectors work with other city departments regarding homeless camps, illegal dumping, fire
damaged structures and other violations that require multiple department collaboration. Working with King County,
Department of Ecology, Burlington Northern Railroad, Washington State Department of Transportation and other
outside agencies as needed.
• Reviewed and processed and average of 321 business license applications in 2019/2020.
Adapted quickly to remote permit intake, review, and customer service as well as maintained permit inspections to
ensure all our services were maintained and provided to the public during the COVID‐19 Pandemic ‘Stay Home, Stay
Healthy’ Order and Safe Start Order.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 55Budget by Department - Community and Economic Development
2021/2022 Goals
Building Permit Review and Inspection
Strive to meet or exceed departmental goals for timely review of building applications.
Streamline Renton’s permitting system using EnerGov and the City CSS to allow for more efficient permit processing.
These systems allow for improved on‐line permitting, improved inspection request capability, and status inquiry for
customers.
Continue to work on reducing the number of permits types for more efficient process.
Work with IT to upgrade the City CSS portal to allow public to submit applications single family and limited
commercial projects.
Continue to refine and update forms and instructional materials for website.
Continue using LaserFiche for a central document database.
Encourage additional education, trainings and certifications of permit technicians, plan reviewers, building
inspectors and code compliance inspectors.
Continue to streamline building permit application, plan submittal and screening process for over the counter
permits.
Code Compliance
• Strive to meet or exceed departmental goals for timely response to customer complaints.
• Work to meet or exceed departmental goals for timely resolution of code compliance complaints and voluntary
compliance.
• As Renton Police Department has eliminated the Graffiti Abatement Coordinator position, Code Compliance will
proactively enforce the abatement of graffiti within the City of Renton.
Add a Code Compliance Inspector position to support Healthy Housing Initiative when the program is initiated.
Expenditure Budget by Category ‐ Development Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,437,616 1,601,085 1,479,497 1,742,211 1,632,572 1,803,835 1,861,815 3.5% 3.2%
Part‐Time Salaries 0027,3900000N/AN/A
Overtime 9,874 10,000 5,090 10,000 1,144 10,000 10,000 0.0% 0.0%
Personnel Benefits 597,525 695,449 636,862 781,939 787,067 847,185 897,424 8.3% 5.9%
Supplies 7,046 12,250 6,672 12,250 7,525 12,250 12,250 0.0% 0.0%
Other Services and Charges 121,117 131,426 104,374 126,353 112,912 157,018 157,018 24.3% 0.0%
Interfund Payments 37,958 62,576 62,576 78,807 58,814 55,244 55,814 ‐29.9% 1.0%
Total 2,211,136 2,512,785 2,322,460 2,751,559 2,600,034 2,885,532 2,994,321 4.9% 3.8%
Staffing Levels by Division ‐ Development Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 19.00 19.00 19.00 20.00 20.00 20.00 20.00 0.0% 0.0%
Intermittent FTE 0.000.000.740.000.040.000.00N/AN/A
Temp/Intermit Pay & Ben ‐$ ‐$ 30,989$ ‐$ 1,528$ ‐$ ‐$ N/A N/A
2021/2022 Preliminary Budget City of Renton, Washington
3 - 56Budget by Department - Community and Economic Development
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
Administration Division
M49 Community & Economic Development Admin 1.00 1.00 1.00 1.00 1.00 1.00 1.00
N16 Administrative Assistant to CED 0.00 0.00 0.00 0.00 1.00 1.00 1.00
N14 Administrative Assistant 1.00 1.00 1.00 1.00 0.00 0.00 0.00
Total Administration Division 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Economic Development Division
M38 Economic Development Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M33 Community Development and Housing Mana 0.00 0.00 1.00 0.00 1.00 1.00 1.00
M32 Economic Development Manager 2.00 2.00 1.00 2.00 1.00 1.00 1.00
M27 Housing Programs Manager 0.00 0.00 1.00 0.00 1.00 1.00 1.00
A20 Economic Development Specialist 0.00 1.00 1.00 1.00 0.00 0.00 0.00
A09 Admin Secretary I 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Economic Development Division 4.00 5.00 6.00 5.00 6.00 6.00 6.00
Planning Division
M38 Planning Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M33 Long Range Planning Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M33 Current Planning Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M33 Property & Technical Services Manager 0.00 0.00 1.00 0.00 1.00 1.00 1.00
M29 Property & Technical Services Manager 1.00 1.00 0.00 1.00 0.00 0.00 0.00
A28 Senior Planner 3.50 3.50 4.50 3.50 4.50 4.50 4.50
A23 GIS Analys II 0.00 0.00 1.00 0.00 1.00 1.00 1.00
A21 GIS Analyst I 1.00 1.00 0.00 1.00 0.00 0.00 0.00
A21 Associate Planner 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A17 Assistant Planner 0.00 0.00 1.00 0.00 1.00 1.00 1.00
A16 Assistant Planner 2.00 3.00 0.00 3.00 0.00 0.00 0.00
A15 Planning Technician 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A09 Admin Secretary I 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M33 Development Engineering Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M30 Assistant Development Engineering Manager 0.00 0.00 0.00 0.00 1.00 1.00 1.00
A29 Civil Engineer III 3.00 3.00 3.00 3.00 3.00 3.00 3.00
A26 Construction Inspection Supervisor 1.00 1.00 1.00 1.00 0.00 0.00 0.00
A26 Civil Engineer II 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A23 Engineering Specialist III 0.00 0.00 1.00 0.00 1.00 1.00 1.00
A21 Construction Inspector 5.00 6.00 6.00 6.00 6.00 6.00 6.00
A19 Engineering Specialist II 2.00 2.00 0.00 2.00 0.00 0.00 0.00
A18 Dev Services Representative 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A13 Engineering Specialit I 0.00 0.00 1.00 0.00 1.00 1.00 1.00
Total Planning Division 29.50 31.50 30.50 31.50 30.50 30.50 30.50
Building Division
A09 Administrative Secretary I 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A22 Lead Code Compliance Inspector 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A19 Code Compliance Inspector 2.00 2.00 2.00 2.00 2.00 2.00 2.00
M33 Building Official 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M28 Permit Services Manager 0.00 0.00 0.00 0.00 1.00 1.00 1.00
M22 Permit Center Supervisor 0.00 1.00 1.00 1.00 0.00 0.00 0.00
A23 Building Plan Reviewer 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A21 Building Inspector/Electrical 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A21 Building Inspector/Combination 4.00 5.00 5.00 6.00 6.00 6.00 6.00
A21 Building Inspector/Combination ‐ LT 1.00 0.00 0.00 0.00 0.00 0.00 0.00
A13 Permit Services Specialist 0.00 0.00 0.00 0.00 4.00 4.00 4.00
A10 Permit Technician 5.00 4.00 4.00 4.00 0.00 0.00 0.00
Total Building Division 19.00 19.00 19.00 20.00 20.00 20.00 20.00
Total Community & Economic Development 54.50 57.50 57.50 58.50 58.50 58.50 58.50
Grade Title
2021/2022 Preliminary Budget City of Renton, Washington
3 - 57Budget by Department - Community and Economic Development
Community Services
ADMINISTRATOR
Kelly Beymer
(115 FTEs)
Facilities
Jeff Minisci
35 FTEs
Leased City
Properties
Capital Investment
Properties
Facilities
Maintenance
Serivces
Golf Course
Doug Mills
12 FTEs
Golf Course
Maintenance
Professional Services
Capital
Investment
Projects
Human Services
Guy Williams
4.50 FTEs
Housing Repair
Assistance Program
Community
Developement Block
Grant (CDBG)
Human Services
Advisory Committee
Museum
Elizabeth Stewart
1FTE
Renton Historical
Society Board
Parks & Trails
Cailin Hunsaker
34.85 FTEs
Parks Maintenance
Volunteer Program
Farmer's Market
Parks Planning &
Natural Resources
Leslie Betlach
6.40 FTEs
Urban Forestry and
Natural Resoures
Planning, Aquisition,
and Development
Capital Investment
Projects
Recreation &
Neighborhoods
Maryjane Van Cleave
19.25 FTEs
Recreation Services
Renton Community
Center
Renton Senior
Activity Center
Senior Advisory
Board
Neighborhood
Program
Special Events
Committee
Renton Sister Cities
Association
Administrative
Support
1 FTE
Parks Commission
2021/2022 Preliminary Budget City of Renton, Washington
3 - 58Budget by Deparment - Community Services
Community Services
Mission
Promote and support a more livable Renton community by providing recreation, museum, human services programs,
neighborhood and special events opportunities, golf course and modern parks and facilities, and undisturbed natural
areas.
Core Businesses and Services
Facilities
The Facilities Division develops and maintains City buildings and manages the delivery of building‐related services to the
public and the City workforce in a safe, customer‐focused manner.
Parks and Golf Course
The Parks and Golf Course Division provides a safe, clean, attractive, accessible, and well‐maintained environment for the
public’s enjoyment of active and passive recreational opportunities along with natural resource and wildlife preservation
and stewardship.
Parks Planning and Natural Resources
The Parks Planning and Natural Resources Division provides a comprehensive and interrelated system of parks, recreation,
open spaces, and trails that respond to locally‐based needs, values and conditions, provides an appealing and harmonious
environment, and protects the integrity and quality of the surrounding natural systems; create a sustainable and exemplary
urban forest.
Recreation & Neighborhoods
The Recreation & Neighborhoods Division promotes and supports a more livable community by providing opportunities for
the public to participate in diverse recreational, cultural, athletic, and aquatic programs and activities. In addition, the
Recreation & Neighborhoods Division provides leadership, guidance, and resources which connect and engage residents,
neighborhoods, businesses, and the City through diverse opportunities for partnerships, volunteers, special events, sister
cities, farmers markets, and neighborhood programs.
Human Services
The Human Services Division, in partnership with the community, helps provide services, resources, and opportunities so
that residents have food, clothing, and shelter, are healthy and safe, and develop to their fullest capacity.
Renton History Museum
The Renton History Museum is the City’s only organization dedicated to the preservation, documentation and education
about the City’s heritage. With the support of the Renton Historical Society, the Museum cares for a collection of over
90,000 objects and 14,000 historic photos. The Museum also provides changing and permanent exhibits, programs,
publications, and classroom outreach about local history.
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 23,110,919 23,712,402 24,220,344 24,866,443 23,285,489 27,080,597 27,765,179 8.9% 2.5%
CIP Budget Summary 8,240,294 8,520,357 15,034,794 5,521,680 33,099,360 3,838,533 2,528,162 ‐30.5%‐34.1%
Position Summary 93.50 96.00 99.50 97.00 116.50 115.00 115.00 18.6% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 59Budget by Deparment - Community Services
List of Community Services Renton Results Decision Packages:
2021 Proposed 2022 Proposed
Package # Description FTE Tot Exp $Tot Rev $ FTE Tot Exp $Tot Rev $
100020.0024 Serving vulnerable/low income 4.50 1,316,559 20,000 4.50 1,342,967 20,000
100020.0025 CDBG ‐ 63,133 63,133 ‐ 63,133 63,133
200020.0011 Volunteer Program 1.00 133,972 ‐ 1.00 137,011 ‐
300020.0143 Museum 1.00 289,701 ‐ 1.00 297,273 ‐
300020.0144 Administration/Com Svcs 2.00 592,057 ‐ 2.00 606,402 ‐
300020.0145 Aquatics 1.40 963,276 367,936 1.40 975,821 407,636
300020.0146 Leased Facilities 1.50 849,878 535,565 1.50 860,534 790,321
300020.0147 Cultural & Community Engagement 3.90 926,740 48,367 3.90 950,556 210,176
300020.0148 Parks and Trails Program 32.60 6,428,197 10,000 32.60 6,615,715 10,000
300020.0149 Education and Recreational Activities 7.15 1,877,391 425,161 7.15 1,918,397 469,305
300020.0150 Senior Activity Center 4.90 1,067,944 128,000 4.90 1,078,775 128,000
300020.0151 Farmers Market 1.25 183,264 9,955 1.25 188,695 34,404
300020.0152 Recreational Facilities 1.90 1,589,398 153,271 1.90 1,641,680 376,678
500020.0024 Golf Course 12.00 2,566,000 2,833,175 12.00 2,638,766 2,912,455
500020.0025 Parks Planning, Urban Forestry and Na Res 6.40 2,064,918 241,357 6.40 2,092,249 249,680
600020.0049 Custodial Services 22.50 2,450,152 2,385,869 22.50 2,566,751 2,568,494
600020.0050 Facilities Technical Maintenance 11.00 3,718,018 3,606,861 11.00 3,790,456 3,610,976
Total Operating 115.00 27,080,597 10,828,650 115.00 27,765,179 11,851,258
360020.0050 CIP ‐ General Gov't ‐ 1,716,048 1,616,000 ‐ 1,299,646 1,462,840
560020.0013 Golf Course MM ‐ 68,100 68,100 ‐ 72,200 72,200
660020.0010 CIP General Gov't ‐ 1,738,386 1,086,185 ‐ 1,156,316 1,000,000
760020.0004 Parks Impact Mitigation Fund ‐ 316,000 ‐ ‐ ‐ ‐
Total CIP ‐ 3,838,533 2,770,285 ‐ 2,528,162 2,535,040
Total 115.00 30,919,130$ 13,598,935$ 115.00 30,293,341$ 14,386,298$
2021/2022 Preliminary Budget City of Renton, Washington
3 - 60Budget by Deparment - Community Services
Community Services Performance Measures:
Highlight of Budget Changes:
Regular and Part‐Time Salaries include the following changes effective 2020, made after the 2019/2020 budget
was adopted:
o Removed 1 FTE CS Deputy Administrator
o Added 1 FTE Golf Pro Shop Assistant
o Added 1 FTE Golf Course Maintenance Worker
o Added 1 FTE Golf Course Apprentice
o Added 6 FTEs Facilities Custodians
o Added 6 FTEs Parks Maintenance Assistant
o Added 2 FTEs Parks Maintenance Worker
o Removed 8 PERS eligible positions from Parks and Trails
o Reduced overall Part‐Time budget for the Golf Course
o Reduced overall Part‐Time budget for Facilities
Transfers Out includes the following change:
o The Golf Course has reduced its operating transfer out to its capital investment project fund for the next
budget cycle in accordance with its projected expenditures
o The Custodian assigned to the Golf Course is no longer charging salary directly to the 404 fund and is being
paid for through interfund transfers
Capital Improvement Projects includes the following changes:
o Priority on Capital Projects have shifted to focus on Bond Funded projects reducing overall spending
o Excess fund balance in the capital fund has been shifted out to help offset COVID19 costs reducing overall
spending and resources
o Urban Forestry budget has been moved into the 001 operating fund
Debt Service includes the following changes:
o Interfund loan was fully paid off in 2020
City Service Area City Service Area Strategies Performance Measures 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results
Value of volunteer service $ 1,179,835 $ 1,267,820 $1,480,792 $1,586,000 $1,268,800
Per capita spending for human services. $ 5.54 $ 5.60 5.67$ 5.67$ 5.67$
Daily Attendance at Senior Center 401 394 400 no data no data
Maintain or increase the number of
officially recognized neighborhoods/
associations participating in the
program.
74 74 90 no data no data
Protection of open
space/acquisition
Overall customer satisfaction rating is
good to excellent In cleanliness and
appearance of Parks & Trail System
84% N/A 88% N/A 64%
Safeguard public interests and
assets
Average number of days to complete
Cityworks service requests that are
assigned to the Parks Maintenance team
via ‘Renton Responds.
new 2020 new 2020 new 2020 new 2020 new 2020
Representative
Government
Partnership with community
organizations to leverage
resources
Internal
Support
Encourage and foster a strong
sense of community
Livable
Community
Utilities and
Environment
2021/2022 Preliminary Budget City of Renton, Washington
3 - 61Budget by Deparment - Community Services
Expenditure Budget by Division ‐ Community Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Administration 510,454 528,906 594,844 753,194 520,919 592,057 606,402 ‐21.4% 2.4%
Facilities 6,233,520 6,450,456 6,376,296 6,591,217 6,092,647 7,018,047 7,217,741 6.5% 2.8%
Parks & Trails 5,026,203 5,414,681 5,249,860 5,841,621 5,103,016 6,783,681 6,980,785 16.1% 2.9%
Recreation & Neigh 6,280,121 6,239,574 6,432,140 6,434,094 4,879,722 6,394,894 6,534,037 ‐0.6% 2.2%
Human Services/CDBG 1,421,280 1,363,310 1,478,729 1,399,246 1,644,515 1,418,644 1,447,001 1.4% 2.0%
Museum 245,590 252,298 253,008 265,248 225,195 289,701 297,273 9.2% 2.6%
Golf Course 2,279,597 2,261,417 2,321,138 2,353,168 2,404,682 2,566,000 2,638,766 9.0% 2.8%
Parks Plan and Nat Res 1,114,153 1,201,760 1,514,329 1,228,657 2,414,791 2,017,574 2,043,175 64.2% 1.3%
Operating Total 23,110,919 23,712,402 24,220,344 24,866,443 23,285,489 27,080,597 27,765,179 8.9% 2.5%
CIP 8,240,294 8,520,357 15,034,794 5,521,680 33,099,360 3,838,533 2,528,162 ‐30.5%‐34.1%
Total 31,351,213 32,232,759 39,255,138 30,388,123 56,384,848 30,919,130 30,293,341 1.7%‐2.0%
Expenditure Budget by Category ‐ Community Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 6,881,152 7,808,526 7,438,556 8,330,438 8,554,056 9,335,039 9,642,488 12.1% 3.3%
Part‐Time Salaries 1,791,614 1,713,254 1,831,182 1,700,894 349,403 1,249,472 1,234,472 ‐26.5%‐1.2%
Overtime 97,026 31,596 130,230 31,596 21,496 31,596 31,596 0.0% 0.0%
Personnel Benefits 3,374,833 3,941,575 3,642,573 4,210,377 4,048,537 5,081,348 5,363,398 20.7% 5.6%
Supplies 1,288,202 1,225,551 1,335,565 1,165,851 1,194,782 1,108,907 1,108,907 ‐4.9% 0.0%
Other Services and Charges 5,325,552 4,948,365 5,647,910 4,938,318 5,443,330 5,439,130 5,436,580 10.1% 0.0%
Intergovernmental Services15,67711,050012,050000‐100.0% N/A
Capital Outlay 797 20,000 25,041 20,000 20,000 20,000 20,000 0.0% 0.0%
Debt Service 175,000 175,000 175,000 175,000 175,000 0 0 ‐100.0% N/A
Interfund Payments 3,971,629 3,765,485 3,781,018 4,205,919 3,399,885 4,747,005 4,855,538 12.9% 2.3%
Transfer Out 189,440 72,000 213,269 76,000 79,000 68,100 72,200 ‐10.4% 6.0%
Operating Total 23,110,919 23,712,402 24,220,344 24,866,443 23,285,489 27,080,597 27,765,179 8.9% 2.5%
CIP 8,240,294 8,520,357 15,034,794 5,521,680 33,099,360 3,838,533 2,528,162 ‐30.5%‐34.1%
Total 31,351,213 32,232,759 39,255,138 30,388,123 56,384,848 30,919,130 30,293,341 1.7%‐2.0%
Staffing Levels by Division
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Administration 2.00 2.00 2.00 3.00 2.00 2.00 2.00 ‐33.3% 0.0%
Facilities 25.25 28.75 29.00 28.75 35.00 35.00 35.00 21.7% 0.0%
Neigh, Res, and Events 0.00 0.00 0.00 0.00 0.00 0.00 0.00 N/A N/A
Parks & Trails 27.00 27.00 26.85 27.00 34.85 34.85 34.85 29.1% 0.0%
Recreation & Neigh 19.17 19.17 19.75 19.17 19.75 19.25 19.25 0.4% 0.0%
Human Services/CDBG 4.33 4.33 4.50 4.33 4.50 4.50 4.50 3.9% 0.0%
Library 0.000.000.000.000.000.000.00N/AN/A
Museum 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.0% 0.0%
Golf Course 9.75 9.75 9.00 9.75 12.00 12.00 12.00 23.1% 0.0%
Parks Plan and Nat Res 5.004.007.404.007.406.406.4060.0%0.0%
Total FTE 93.50 96.00 99.50 97.00 116.50 115.00 115.00 18.6% 0.0%
Intermittent FTE 51.91 48.36 53.12 48.06 10.63 37.03 36.67 ‐23.0%‐1.0%
Temp/Intermit Salaries and Ben 2,159,458$ 2,011,750$ 2,209,602$ 1,999,390$ 442,277$ 1,540,483$ 1,525,483$ ‐23.0%‐1.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 62Budget by Deparment - Community Services
Administration Division
Mission
Provide leadership, guidance, and resources to allow the various divisions within the department to perform their
respective functions in accordance with the City Business Plan, Administration and Council policy directives, and the
general needs of the populations they serve.
2019/2020 Accomplishments
Reviewed Capital Projects to meet community needs and budget opportunities.
Continued to address level of service through 2019 – 2020 budget.
Held management team retreat on continued leadership development in 2019.
Offered intra‐departmental staff training to use new city website and Sharepoint management for
increased workflow efficiency, relevancy, and branding.
Ongoing, continue to build stronger intra‐departmental partnerships to ensure and improve efficiency,
collaboration and responsible use of time, funds, and resources.
Completed development and implementation of the Community Services Marketing Plan.
Began to review and update annual divisional customer satisfaction surveys.
Completed design of Family First Community Center to construct in 2021.
Coordinates spring and fall employee recognition events in 2019
Completion of major capital projects, including Phase 2 Construction of Sunset Neighborhood Park,
Fire Station 15 and City Hall elevator replacement project
Began implementation of Council approved funding ($14.5 million) to address Parks maintenance
projects backlog
Continued to identify alternate funding opportunities through grants, partnerships and sponsors
Established COVID‐19 plan to reopen City Hall
2021/2022 Goals
Complete construction of the Family First Community Center
Identify and construct a more permanent Human Service provider facility to include feeding
program, severe weather shelter, and hygiene unit.
Complete identified Bond projects
Complete division revision to surveys supporting Renton Results
Continue to provide opportunities of engagement with all types of the city’s diverse communities
Continue to work through the ‘new normal’ to provide innovative, creative, efficient processes,
programs and events
Update all division work manuals
Provide staff training opportunities
Continue to identify alternative funding opportunities through grants, partnerships and sponsors.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 63Budget by Deparment - Community Services
Expenditure Budget by Category ‐ Administration Division
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 231,081 246,565 247,246 405,873 271,065 272,232 277,407 ‐32.9% 1.9%
Personnel Benefits 90,575 96,657 91,931 152,511 102,926 105,974 110,992 ‐30.5% 4.7%
Supplies 4,575 42,744 6,531 42,744 22,744 7,200 7,200 ‐83.2% 0.0%
Other Services and Charges 13,063 0 70,106 0 315 35,544 35,544 100.0% 0.0%
Interfund Payments 166,576 142,940 142,940 152,066 123,869 171,107 175,259 12.5% 2.4%
Transfer Out 4,584036,0900000N/AN/A
Operating Total 510,454 528,906 594,844 753,194 520,919 592,057 606,402 ‐21.4% 2.4%
CIP 8,220,118 8,520,357 14,927,611 5,449,680 33,027,360 3,770,433 2,455,962 ‐30.8%‐34.9%
Total 8,730,572 9,049,263 15,522,455 6,202,874 33,548,279 4,362,490 3,062,364 ‐29.7%‐29.8%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Administration Division
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 2.00 2.00 2.00 3.00 2.00 2.00 2.00 ‐33.3% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 64Budget by Deparment - Community Services
Facilities Division
Mission
Develop and maintain City buildings and manage the delivery of building‐related services to the public and the City
workforce in a safe, customer‐focused manner.
2019/2020 Accomplishments
Implemented a building component replacement plan that provides a plan, schedule and cost of replacing all
major building components over the next six (6) years.
Developed and implement an energy plan and programs that would reduce the City’s energy costs.
Improved energy efficiency through hiring an Energy Services Company (ESCO) to provide an energy audit and
implement energy and water efficiency projects.
Completed construction of Fire Station 15
Developed and implement a preventative maintenance plan and program for all major City buildings that includes
major building equipment and systems.
Completed Elevator Moderation of City Hall.
Designed and replaced City Hall Main Air Handling Unit.
2021/2022 Goals
Develop and implement a business plan with performance measures for Facilities that increases business
performance by improving customer‐focus, delivery of services, operations, and functionality (space)
Plan, develop and implement a customer engagement process and program to increase customer knowledge of
and satisfaction with Facilities services.
Develop and implement Service Level Agreements (SLA) for all major buildings.
Develop and implement a staff position progression/succession plan.
Develop and implement workplace guidelines and standards handbook that incorporates best practices, space
designs, technology solutions and process improvement.
Develop and implement mobility and technology initiatives to increase operational efficiency, reduce travel time
and increase workforce capacity.
Implement citywide Lease Review procedures.
Implement consistent standards for Cell Tower Leases.
Replace City Hall Fire Pump, Boilers, Generators, IT Server Room.
Replace Renton Community Center Chiller and Audio video equipment.
Replace all lighting in the downtown parking garage with LED lighting.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 65Budget by Deparment - Community Services
Expenditure Budget by Category ‐ Facilities Division
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,556,423 2,088,634 1,805,012 2,224,944 2,163,341 2,544,309 2,646,400 14.4% 4.0%
Part‐Time Salaries 283,86385,996190,10788,636000‐100.0% N/A
Overtime 43,934 10,000 75,625 10,000 10,000 10,000 10,000 0.0% 0.0%
Personnel Benefits 807,431 1,153,007 956,131 1,230,466 1,170,030 1,493,481 1,589,711 21.4% 6.4%
Supplies 504,928 409,908 546,814 330,908 341,608 309,508 309,508 ‐6.5% 0.0%
Other Services and Charges 2,676,708 2,459,865 2,542,077 2,452,368 2,162,402 2,528,086 2,528,086 3.1% 0.0%
Intergovernmental Services3,054000000N/AN/A
Capital Outlay 0010,9010000N/AN/A
Debt Service 175,000 175,000 175,000 175,000 175,000 0 0 ‐100.0% N/A
Interfund Payments 75,179 68,046 69,409 78,894 70,266 132,663 134,036 68.2% 1.0%
Transfer Out 107,00005,2200000N/AN/A
Total 6,233,520 6,450,456 6,376,296 6,591,217 6,092,647 7,018,047 7,217,741 6.5% 2.8%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Facilities
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Facilities 24.25 27.25 27.50 27.25 33.50 33.50 33.50 22.9% 0.0%
Leased City Properties 1.00 1.50 1.50 1.50 1.50 1.50 1.50 0.0% 0.0%
Total FTE 25.25 28.75 29.00 28.75 35.00 35.00 35.00 21.7% 0.0%
Intermittent FTE 8.492.255.832.310.000.000.00‐100.0% N/A
Temp/Intermit Pay & Ben 353,186$ 93,481$ 242,347$ 96,121$ ‐$ ‐$ ‐$ ‐100.0% N/A
2021/2022 Preliminary Budget City of Renton, Washington
3 - 66Budget by Deparment - Community Services
Parks and Trails Division
Mission
We enhance the quality of life in the City of Renton by providing exceptional park environments, opportunities to build
community through volunteering, and access to healthy food choices.
2019/2020 Accomplishments
Provided training and opportunities for staff to stay current with certifications and licensing.
Led interdepartmental efforts to patrol, post and clear encampment sites on City‐owned properties.
Continued interdepartmental efforts to maintain irrigation networks at planting strips in the City.
Provided interdepartmental support for City‐hosted events such as Arbor Day/Earth Day, July 4 Celebration and
Renton River Days. (2019)
Implemented Cityworks software to manage Parks maintenance activities.
Implemented CERVIS software for City‐sponsored volunteer activities with five (5) departments.
Updated informational signage at Coulon Park and along the Cedar River Trail.
Collaborated with King County and partner agencies to create a new brand for the Eastside Rail Corridor.
Collaborated with King County Parks to construct the Lake to Sound Trail, Segment A.
Partnered with United Way and Renton School District to facilitate sites and recreation programs for the Summer
Lunch Program.
Installed a TRACK Trail at Cedar River Trail Park.
Oversaw gardening activities at the Downtown and North Highlands Community Gardens.
Performed two (2) farm visits to ensure farm integrity.
Increased use of Supplemental Nutrition Assistance Program/Fresh Bucks at the Renton Farmers Market.
2021/2022 Goals
Achieve at least an 80% good to excellent rating through customer satisfaction surveys for cleanliness and
appearance in developed Parks and Trails.
Provide training and opportunities for staff to stay current with certifications and licensing.
Lead interdepartmental efforts to patrol, post and clear encampment sites on City‐owned properties.
Provide interdepartmental support for City‐hosted events such as Arbor Day/Earth Day, July 4 Celebration and
Renton River Days.
Incorporate ‘Business Intelligence’ with Cityworks work management software.
Update informational signage at Coulon Park and along the Cedar River Trail.
Collaborate with King County and partner agencies to create a wayfinding plan for the Eastrail.
Install a FitLot outdoor fitness area as part of Renton’s ‘Age‐Friendly City’ designation.
Complete repairs to the Cedar River embankment that is next to the Cedar River Trail.
Incorporate ‘Business Intelligence’ with CERVIS software for City‐sponsored volunteer activities.
Partner with United Way and Renton School District to facilitate the Summer Lunch Program.
Install one (1) new TRACK Trail in the Renton Parks system.
Implement a ‘Renton Outdoors’ recreation program to highlight City parks.
Participate in one (1) new regional/national park promotion, such as “BioBlitz” (National Recreation and Park
Association) or “National Trails Day” (American Hiking Society).
Increase participation in the Supplemental Nutrition Assistance Program/Fresh Bucks at the Renton Farmers
Market.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 67Budget by Deparment - Community Services
Expenditure Budget by Category ‐ Park & Trails
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,890,393 2,005,374 1,952,063 2,091,039 2,118,492 2,585,707 2,677,435 23.7% 3.5%
Part‐Time Salaries 229,756 318,232 267,154 318,232 5,201 45,023 45,023 ‐85.9% 0.0%
Overtime 19,997 13,076 20,019 13,076 12,076 13,076 13,076 0.0% 0.0%
Personnel Benefits 832,703 879,418 868,706 924,668 878,418 1,415,797 1,494,835 53.1% 5.6%
Supplies 178,726 238,874 202,526 238,874 200,434 238,874 238,874 0.0% 0.0%
Other Services and Charges 747,898 742,709 701,965 742,709 697,451 742,709 742,709 0.0% 0.0%
Intergovernmental Services1,17050050000‐100.0% N/A
Capital Outlay 0000000N/AN/A
Interfund Payments 1,125,559 1,216,948 1,237,428 1,512,973 1,190,944 1,742,495 1,768,833 15.2% 1.5%
Total 5,026,203 5,414,681 5,249,860 5,841,621 5,103,016 6,783,681 6,980,785 16.1% 2.9%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Park & Trails
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 27.00 27.00 26.85 27.00 34.85 34.85 34.85 29.1% 0.0%
Intermittent FTE 6.79 8.79 7.82 8.79 0.15 2.22 2.22 ‐74.7% 0.0%
Temp/Intermit Pay & Ben 282,303$ 365,702$ 325,448$ 365,702$ 6,421$ 92,493$ 92,493$ ‐74.7% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 68Budget by Deparment - Community Services
Golf Course Division – Maplewood Golf Course
Mission
Provide a safe, clean, attractive, accessible, and well‐maintained environment for the public’s enjoyment of active and
passive recreational opportunities along with natural resource and wildlife preservation and stewardship.
2019 / 2020 Accomplishments
Re‐Carpeted Club House
Replaced overhead netting west of Driving rage and #18 vertical netting
o (Collapsed due to heavy snowfall in February)
Rebuilt #3 championship tee box (enlarged, regraded, trimmed trees for increase light & air flow)
Removed diseased tree and widened #16 fairway (Green now visible from tee box)
Added new set of tees (Yellow – Junior / Family)
Added new security cameras in Pro‐Shop
Replaced “static” signage behind Pro‐Shop counter with two (2) 65” Digital Signage Displays (Improved rate and
marketing information)
Added 86” Digital Signage Display in Clubhouse Lobby (Increased GC and Restaurant Marketing)
Continued use/leverage of Text Marketing Database (Over 1,900 members)
Replaced hitting stall heaters in lower level of Driving Range (15) and added individual timers
Maintained facility during Covid19 shut‐down (41 days)
Established appropriate sanitizing procedures for facility for re‐opening.
Prepared Pro‐Shop, Driving Range and Golf Course for re‐opening under guidelines provided by Governor Inslee;
o Prepared walk‐up window with Plexiglas shield for initial opening (no Pro‐Shop access)
o Installed tempered glass shield on Pro‐Shop counter, and had walls erected in Pro‐Shop Lobby to limit
access in expanded phase of opening
Altered operational procedures to coincide with phased re‐opening approaches (twosomes to foursomes, single
riders to shared carts, etc.)
2021 / 2022 Goals
Fire protection re‐piping: replace exposed sprinkler pipe in the lower level driving range hitting stalls
Replace driving range lighting with new LED fixtures
Rebuild/rewire upper level driving range hitting stall heaters
Fire protection re‐piping: replace exposed sprinkler pipe in the cart barn storage
Renovate tee boxes (#3, #6, #7, #12, #18)
Secure golf course with additional fencing and gates
Continue to build marketing programs in conjunction with Concessionaire
Achieve a minimum 85% good to excellent rating for Golf Course conditions, value of Driving Range and level of
service in the Pro‐Shop
Provide timely updates to website and lobby signage to include activities, projects, events and promotions
Provide multiple Junior Golf Camps throughout each year
Establish Junior Academy Program
Conduct annual Open House each year
2021/2022 Preliminary Budget City of Renton, Washington
3 - 69Budget by Deparment - Community Services
Expenditure Budget by Category ‐ Golf Course
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 758,166 786,088 795,381 812,300 853,470 943,357 972,233 16.1% 3.1%
Part‐Time Salaries 256,411 255,500 281,044 255,500 174,468 174,468 174,468 ‐31.7% 0.0%
Overtime 13,813 1,020 5,192 1,020 1,020 1,020 1,020 0.0% 0.0%
Personnel Benefits 419,223 434,559 419,370 455,421 483,234 554,247 583,745 21.7% 5.3%
Supplies 365,163 302,200 346,608 321,500 321,500 321,500 321,500 0.0% 0.0%
Other Services and Charges 142,079 121,050 132,271 121,050 133,050 133,050 133,050 9.9% 0.0%
Intergovernmental Services11,28511,000012,000000‐100.0% N/A
Capital Outlay 797 20,000 14,140 20,000 20,000 20,000 20,000 0.0% 0.0%
Interfund Payments 242,660 258,000 251,690 278,377 341,940 350,258 360,550 25.8% 2.9%
Transfer Out 70,000 72,000 75,443 76,000 76,000 68,100 72,200 ‐10.4% 6.0%
Operating Total 2,279,597 2,261,417 2,321,138 2,353,168 2,404,682 2,566,000 2,638,766 9.0% 2.8%
CIP 20,176 0 107,184 72,000 72,000 68,100 72,200 ‐5.4% 6.0%
Total 2,299,773 2,261,417 2,428,322 2,425,168 2,476,682 2,634,100 2,710,966 8.6% 2.9%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Golf Course
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Administration 2.75 2.75 2.00 2.75 2.00 2.00 2.00 ‐27.3% 0.0%
Maintenance 4.00 4.00 4.00 4.00 5.00 5.00 5.00 25.0% 0.0%
Pro‐Shop/Driving Range 3.00 3.00 3.00 3.00 5.00 5.00 5.00 66.7% 0.0%
Total FTE 9.75 9.75 9.00 9.75 12.00 12.00 12.00 23.1% 0.0%
Intermittent FTE 7.56 7.51 8.28 7.51 5.56 5.56 5.56 ‐25.9% 0.0%
Temp/Intermit Pay & Ben 314,533$ 312,500$ 344,450$ 312,500$ 231,468$ 231,468$ 231,468$ ‐25.9% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 70Budget by Deparment - Community Services
Parks Planning and Natural Resources Division
Mission
Provides a comprehensive and interrelated system of parks, recreation, open spaces, and trails that respond to locally‐
based needs, values and conditions, provide an appealing and harmonious environment, protect the integrity and quality of
the surrounding natural systems, and create a sustainable and exemplary urban forest.
2019/2020 Accomplishments
Accepted the 12th Tree City USA certification and the 10th Growth Award (Sterling Award recognizing Renton for
10 consecutive growth awards and being a leader in community forestry).
Completed and incorporated the 2019 Forestry Canopy Cover Assessment into management planning.
Adopted the Parks, Recreation and Natural Areas Plan; plan certified with the State Recreation and Conservation
Office (RCO).
Adopted the Trails and Bicycle Master Plan with the Transportation Division; plan certified with the State RCO.
Completed citywide update to the tree inventory database.
Completed Phase II Sunset Neighborhood Park. Administered $4.8 million in federal, state and local grants.
Acquired May Creek Corridor parcel; recommended for $305,000 King County Conservation Futures grant award.
Secured $605,000 State Legislative Direct Appropriation Grant for Coulon Playground Replacement.
Applied to WA RCO for a $500,000 Land and Water Conservation Fund grant for Coulon Park Trestle Bridge project.
Completed structural assessment and repair work at the Cedar River Trail Trestle Bridge.
Completed Coulon Park structural repairs at eight locations.
Replaced aging play equipment at Teasdale, Tiffany and Cedar River Trail Parks.
Completed 30% design for four Bond Projects (Coulon North Waterwalk Phase 1, Coulon Trestle Bridge
Replacement, Philip Arnold Park and Kiwanis Park).
Initiated play equipment replacements at Coulon Park and Liberty Park.
Completed feasibility study for future Ron Regis Park restroom facility and maintenance shed.
Completed over 1,000 work orders, inspected 3,700 trees, trimmed 700 trees and planted 200 trees.
Adopted Forestry Ordinance in coordination with the Community and Economic Department.
Coordinated with WSDOT on the Renton to Bellevue Project, Seattle Public Utilities Broodstock Collection Facility,
King County Parks Soos Creek Trail and Boeing Company Sam Chastain Trail Easement.
Staffed and trained three new managers and two new capital project coordinators.
2021/2022 Goals
Renew 10‐year Urban Forest Management Plan, including annual tree planting initiative and tree risk
management program.
Apply for Tree City USA Certification and Growth Award; apply for the Society of Municipal Arborists accreditation.
Complete design and construction documents, secure permits, bid and construct planned improvements for four
Bond Projects (Coulon North Waterwalk Phase 1, Coulon Trestle Bridge, Philip Arnold Park and Kiwanis Park).
Replace play equipment at Liberty, Coulon, Cascade, Kennydale Beach, Maplewood and Glencoe Parks.
Commence parks, trails, and natural areas monument, directional and informational sign program.
Complete structural reviews for Coulon Park and system‐wide park bridges.
Complete interim repairs to Coulon Rose Wall as identified in 2020 structural assessment.
Renovate Teasdale Park and Senior Activity Center Bocce Ball courts for improved safety.
Continue to explore options for creating an in‐house forestry crew.
Initiate conversation on citywide approach to ADA transition planning.
Formalize grant agreement with King County for May Creek acquisition and State RCO for Coulon Trestle Bridge
replacement; administer grant funding.
Continue Inter‐agency coordination with WSDOT on Renton to Bellevue Project, Seattle Public Utilities Broodstock
Collection Facility, King County Parks Soos Creek Trail and the Boeing Company Sam Chastain Trail easement.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 71Budget by Deparment - Community Services
Expenditure Budget by Category ‐ Parks Planning and Natural Resources
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 482,234 473,954 516,855 488,527 838,638 739,360 753,922 51.3% 2.0%
Personnel Benefits 155,415 147,991 163,295 154,488 318,778 236,487 245,711 53.1% 3.9%
Supplies 1,190 4,827 3,428 4,827 4,827 4,827 4,827 0.0% 0.0%
Other Services and Charges 392,031 535,463 789,900 535,463 1,207,061 960,463 960,463 79.4% 0.0%
Capital Outlay 0000000N/AN/A
Interfund Payments 83,023 39,525 39,525 45,352 45,488 76,437 78,252 68.5% 2.4%
Total 1,114,153 1,201,760 1,514,329 1,228,657 2,414,791 2,017,574 2,043,175 64.2% 1.3%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Parks Planning and Natural Resources
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 5.004.007.404.007.406.406.4060.0%0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 72Budget by Deparment - Community Services
Recreation and Neighborhoods Division
Mission
To create an active, vibrant and connected community through quality programming, grants and services that are
responsive to a diverse community and sustained by leveraging City resources and innovation.
2019/2020 Accomplishments
• Completed the replacement, configuration, and public launch of the recreation software Perfect Mind. The prior
recreation software had been in place for 20 years.
• Completed the first ever Recreation and Neighborhoods Strategic Plan, which includes updating the City’s Cost‐
Recovery policy, a full market analysis of city offered recreation programming, and use of recreation facilities to
increase equitable distribution of services that utilize City subsidies and resources.
• Improved customer service and access to information by creating two more “full service counters” at the
Highlands Neighborhood Center, and the Renton Senior Activity Center to mirror the full service capabilities that
had only been available at the Renton Community Center.
• Increased community engagement in the Benson‐Cascade planning area by dedicating an America Corp Vista
employee for 15 months, to create community conversations and experiences that builds relationship between
residents and the City, such as the completion of the “Benson Mural.”
• Executed Grants: STREAM – King County Best Starts for Kids three‐year cycle has been completed, and extended by
King County for an additional year. Executed two king County Veterans Human Services Levy Grants and obtained a
third to assist towards the citywide senior initiative “Age‐Friendly Renton”, an AARP and World Health
Organization designation.
2021/2022 Goals
Leveraging technology, the division will continue to assess business processes that should move to fully automated
and executable online experiences for customers, utilizing Perfect Mind recreation software. For the 2021/2022
budget cycle we will be:
o Converting the boat launch permitting to an online process
o Creating an online and mobile check‐in and out process for patrons and recreation building usage
o Utilizing Energov to create online application and communication portals for Neighborhood Program Grants
and Special Event Permit applications.
Finalize and implement our Age‐Friendly Renton action plan, focusing on up to eight of the domains, along with
other city departments and divisions, and community partners.
Equity and inclusivity goals:
o Expand the Neighborhood Program’s grant opportunities, by removing the barrier of homeownership as a
requirement. The expansion would open the grant opportunities to all Renton residents, not just
homeowners, making the program more inclusive and equitable to access, allowing everyone to apply for
funds to assist in beautifying and connecting neighbors.
o Create a formal field allocation process for sport field and gymnasium access with Renton residency as a
priority, equity of gender access, and opportunity for emerging sports and organizations who serve vulnerable
populations to have access.
Update the recreation programming fee schedule based on the recommendations, and market analysis conducted
through the completed Cost Recovery Policy update and council adoption.
Execute the following grants:
o AARP FitLot Senior Programming Grant, with the installation of the FitLot outdoor exercise equipment AARP is
also providing grant funding to provide instructor lead exercise programming to activate it. This grant will
allow the programming to be offered to adults, 18 + for free.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 73Budget by Deparment - Community Services
o King County Best Starts for Kids, STREAM Team, out‐of‐school program. Execute a 4th year of the program at
the recommendation and request of King County due to the performance and success of the program, and
serving over 100 youth on a daily basis.
Expenditure Budget by Category ‐ Recreation & Neighborhoods
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,501,513 1,709,932 1,630,126 1,792,923 1,754,303 1,715,702 1,764,969 ‐4.3% 2.9%
Part‐Time Salaries 1,003,062 1,037,705 1,077,479 1,022,705 165,234 1,014,160 999,160 ‐0.8%‐1.5%
Overtime 19,023 7,500 28,069 7,500 ‐1,600 7,500 7,500 0.0% 0.0%
Personnel Benefits 860,222 997,642 929,719 1,047,481 816,323 1,028,641 1,077,430 ‐1.8% 4.7%
Supplies 219,270 211,348 215,629 211,348 288,019 211,348 211,348 0.0% 0.0%
Other Services and Charges 588,817 454,335 633,488 451,785 406,708 404,335 401,785 ‐10.5%‐0.6%
Intergovernmental Services 168000000N/AN/A
Interfund Payments 2,080,190 1,821,113 1,821,113 1,900,351 1,447,735 2,013,208 2,071,844 5.9% 2.9%
Transfer Out 7,856 0 96,517 0 3,000 0 0 N/A N/A
Total 6,280,121 6,239,574 6,432,140 6,434,094 4,879,722 6,394,894 6,534,037 ‐0.6% 2.2%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Recreation & Neighborhoods
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Recreation Services 19.17 19.17 19.75 19.17 19.75 19.25 19.25 0.4% 0.0%
Total FTE 19.17 19.17 19.75 19.17 19.75 19.25 19.25 0.4% 0.0%
Intermittent FTE 28.53 29.36 30.73 29.00 4.78 28.80 28.44 ‐0.7%‐1.3%
Temp/Intermit Salaries and Ben 1,186,683$ 1,221,571$ 1,278,406$ 1,206,571$ 198,847$ 1,198,026$ 1,183,026$ ‐0.7%‐1.3%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 74Budget by Deparment - Community Services
Human Services Division
Mission
Provide information and referrals to resources and services through community partnerships, that promote safety, health
and security and are inclusive, integrated, and respectful of cultural and linguistic differences; that foster equity and dignity
as well as social, emotional support for vulnerable and marginalized residents in the City of Renton.
2019/2020 Accomplishments
Successfully started the monthly Homelessness Community Resource Event with community partners to provide
resources and medical services at a one‐stop location to those experiencing homelessness.
Over 95% of agencies funded by our RFP process, correctly completed and submitted their invoices and service
reports by due date (with the exception of Covid‐19 related issues).
Collaborated successfully with other King County cities on aligning and improving common Human Services
processes and products (application forms, performance reports, contracts, and monitoring visits).
After implementation of the new Housing Repair Assistance Program client database software, we made necessary
changes to focus on customer service and include client feedback.
Completed multiple manufactured home siding replacement program projects with Habitat for Humanity.
Established additional community partners, like Rotary and Club 21, on the repair or replacement of appliances for
low‐income residents.
Application review and technical assistance provided to multiple agencies via Zoom meetings with those
requesting in‐depth assistance with their funding applications.
Renton specific eligibility reviews completed on over one‐hundred applications for funding, while financial reviews
were completed on 97 City of Renton specific applications for funding.
Completed administrators’ review on over 200 applications as part of the work needed for South King County
funding cycle.
Meeting federal guidelines on spending of 2019 CDBG funds and paperwork/reports submitted for reimbursement,
including HRAP’s completion of the CDBG contract with King County using HUD dollars.
Partnership with Rod Kirkwood to provide 100+ low‐income Renton homeowners with a new installed home
appliance. Approximately $55K spent over the past two years.
Coordinated with community organizations and others that serve the homeless on the One Night Count
including Coordinated Entry, Renton Ecumenical Association of Churches, and ARISE rotating shelter
2021/2022 Goals
Establish and complete a succession plan with staff to determine needs and future direction.
Create additional funding streams to support the Human Services Strategic Plan of developing an enhanced
homeless shelter and supporting the annual agency funding cycle.
Work in conjunction with the Community and Economic Development department to enhance the human services
element of the comprehensive plan.
Continue to work with IT on tweaking a new database for the Housing Repair Program.
Ensure that 90% of all 2021‐2022 contracts are completed and signed with DocuSign by April 10, 2021.
Establish a working timeline with the Community and Economic Development department to use Community
Development Block Grants to fund economic development projects for façade improvements.
Create a new bi‐annual survey of contracted agencies for the regional funding application in 2022.
Start a demonstration project with Habitat for Humanity and King County Housing Authority to rehabilitate the
siding on manufactured homes owned by low‐income older adults.
Continue to host and expand the Community Homeless Resource Events with community partners.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 75Budget by Deparment - Community Services
Expenditure Budget by Category ‐ Human Services/CDBG
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 369,514 403,413 397,067 417,415 455,926 435,085 448,708 4.2% 3.1%
Personnel Benefits 177,361 200,645 180,870 212,354 247,474 211,052 223,892 ‐0.6% 6.1%
Supplies 14,350 15,650 14,029 15,650 15,650 15,650 15,650 0.0% 0.0%
Other Services and Charges 764,955 634,943 778,103 634,943 836,343 634,943 634,943 0.0% 0.0%
Interfund Payments 95,101 108,659 108,659 118,884 89,123 121,913 123,807 2.5% 1.6%
Total 1,421,280 1,363,310 1,478,729 1,399,246 1,644,515 1,418,644 1,447,001 1.4% 2.0%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Human Services/CDBG
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Human Services 3.83 3.83 4.00 3.83 4.00 4.00 4.00 4.4% 0.0%
CDBG 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.0% 0.0%
Total FTE 4.33 4.33 4.50 4.33 4.50 4.50 4.50 3.9% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 76Budget by Deparment - Community Services
Renton History Museum
Mission Statement
The Renton History Museum is the City’s only organization dedicated to the preservation, documentation, and education
about the City’s heritage in ways that are accessible to diverse people of all ages. With the support of the Renton Historical
Society, the Museum cares for a collection of over 10,000 objects, 15,000 archival documents, and over 19,000 historic
photos. The Museum also provides changing, traveling, and permanent exhibits, classroom curricula, programs, publications,
and research assistance for those interested in local history. Staff at the Museum serve as also resources for historic
preservation and interpretation projects in Renton.
2019/2020 Accomplishments
Researched, wrote, and designed a series of exhibits for the Low Income Housing Institute, installed at June
Leonard Place on Whitworth Avenue in downtown Renton.
Organized and mounted 7 temporary exhibits, on topics ranging from Dungeons & Dragons players to the
centennial of women’s suffrage to glamourous fashions from our collection.
Developed and implemented a calendar of 34 programs in 2019, including our first Pride event and programs
associated with the Dungeons & Dragons exhibit for neurodiverse visitors.
Provided the Museum Manager as a Special Commissioner to the King County Landmarks Board to further historic
preservation work in Renton.
Replaced exterior signage—banners, letters, door canopy, and monumental sign—to create a more welcoming
exterior.
Upgraded offsite storage furniture to improve collections care.
Conducted and transcribed 20 oral histories with diverse narrators that included founding members of Renton’s
chapter of the National Organization of Women, restaurant‐ and café‐owners, Japanese and Japanese Americans
living in Renton.
Provided four internship opportunities that included two M.A. thesis projects exhibits with UW Museology
students.
Applied for and received grants from 4Culture, the Washington State Historical Society “Votes for Women”
program, Tulalip Tribal Foundation, King County Council, and CARES Act Paycheck Protection Program.
Partnered with Sunset Transformation Group and the Division of Community and Economic Development, Low
Income Housing Institute, King County Library System (KCLS), Renton Downtown Partnership, the Renton
Municipal Arts Commission, South King County Cultural Coalition, Cultural Access Washington, Washington
Museum Association, Kent Valley Artists Group, and the American Association for State and Local History.
Expanded membership benefits for higher level members, adding a fifth newsletter.
Expanded our social media presence to include Facebook, Twitter, Instagram, and Pinterest.
Conducted a survey of volunteers on reopening after Coronavirus.
2021/2022 Goals
Conduct an IMLS CARES‐funded initiative with the UW Museology Program to plan to expand and improve
Museum’s online offerings based on community needs and interests.
Create and implement online exhibit components for future exhibits.
Host Facing the Inferno, a major traveling exhibit on wildfire and climate change.
Develop a values statement to guide the Museum’s work with external partners.
Revise the Museum’s Photo Reproduction Policy.
Recarpet north gallery, with the assistance of the Facilities Division.
Obtain new track lighting system for galleries with the assistance of the Facilities Division.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 77Budget by Deparment - Community Services
Expenditure Budget by Category ‐ Museum
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 91,826 94,566 94,806 97,417 98,821 99,287 101,413 1.9% 2.1%
Part‐Time Salaries 18,521 15,821 15,398 15,821 4,500 15,821 15,821 0.0% 0.0%
Personnel Benefits 31,902 31,657 32,551 32,988 31,354 35,669 37,082 8.1% 4.0%
Interfund Payments 103,340 110,254 110,254 119,022 90,520 138,924 142,957 16.7% 2.9%
Total 245,590 252,298 253,008 265,248 225,195 289,701 297,273 9.2% 2.6%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Museum
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.0% 0.0%
Intermittent FTE 0.55 0.44 0.46 0.44 0.13 0.44 0.44 0.0% 0.0%
Temp/Intermit Pay & Ben 22,752$ 18,496$ 18,952$ 18,496$ 5,541$ 18,496$ 18,496$ 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 78Budget by Deparment - Community Services
Community Services Position Listing (1 of 2)
2018 2019 2019 2020 2020 2020 2021 2022
Grade Title Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed
Administration Division
M49 Community Services Administrator 1.001.001.001.001.001.001.001.00
M45 Community Services Deputy Administrator 0.000.000.001.000.000.000.000.00
N14 Administrative Assistant 1.001.001.001.001.001.001.001.00
Total Administration Division 2.00 2.00 2.00 3.00 2.00 2.00 2.00 2.00
Facilities Division
Facilities
M38 Facilities Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M28 Facilities Manager 1.001.001.001.001.001.001.001.00
A28 Capital Project Coordinator 1.002.002.002.002.002.002.002.00
A25 Facilities Coordinator 0.000.500.500.500.500.500.500.50
A21 Custodial Maintenance Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A21 Facilities Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A19 HVAC Systems Technician 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A19 Electrical Technician 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A15 Facilities Technician II 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A13 Facilities Technician I 3.003.003.003.003.003.003.003.00
A11 Lead Maintenance Custodian 2.002.002.002.003.003.003.003.00
A09 Administrative Secretary I 1.001.501.001.501.001.001.001.00
A07 Maintenance Custodian 3.253.254.003.254.004.004.004.00
A01 Custodian 7.00 8.00 8.00 8.00 13.00 13.00 13.00 13.00
Total Facilities 24.25 27.25 27.50 27.25 33.50 33.50 33.50 33.50
Leased City Properties
A25 Facilities Coordinator 0.000.500.500.500.500.500.500.50
A13 Facilities Technician I 1.001.001.001.001.001.001.001.00
Total Leased City Properties 1.00 1.50 1.50 1.50 1.50 1.50 1.50 1.50
Total Facilities Division 25.25 28.75 29.00 28.75 35.00 35.00 35.00 35.00
Parks & Trails Division
Parks
M38 Parks and Trails Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M28 Parks Maintenance Manager 1.001.001.001.001.001.001.001.00
A21 Park Maintenance Supervisor 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A16 Lead Park Maintenance Worker 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A12 Park Maintenance Worker III 9.00 9.00 9.00 9.00 8.00 8.00 8.00 8.00
A09 Administrative Secretary I 1.001.000.601.000.600.600.600.60
A08 Park Maintenance Worker II 5.00 5.00 5.00 5.00 8.00 8.00 8.00 8.00
A04 Park Maintenance Worker I 4.004.004.004.004.004.004.004.00
A03 Parks Maintenance Assistant 0.000.000.000.006.006.006.006.00
A18 Recreation Program Coordinator 1.001.001.001.001.001.001.001.00
A16 Program Assistant 0.000.000.250.000.250.250.250.25
A18 Farmers Market Coordinator 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Parks & Trails Division 27.00 27.00 26.85 27.00 34.85 34.85 34.85 34.85
Golf Course Division
Golf Course Administration
M29 Golf Course Manager 1.001.001.001.001.001.001.001.00
A09 Golf Course Operations Assistant 1.001.001.001.001.001.001.001.00
A07 Maintenance Custodian 0.750.750.000.750.000.000.000.00
Total Golf Administration 2.75 2.75 2.00 2.75 2.00 2.00 2.00 2.00
Golf Course Maintenance
M22 Golf Course Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A16 Lead Golf Course Maintenance Worker 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A15 Grounds Equipment Mechanic 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A04 Golf Course Maintenance Worker I 0.000.000.000.001.001.001.001.00
A12 Golf Course Maintenance Worker III 1.001.001.001.001.001.001.001.00
Total Golf Maintenance 4.00 4.00 4.00 4.00 5.00 5.00 5.00 5.00
Pro‐Shop/Driving Range
M22 Golf Professional 1.00 1.00 0.00 1.00 0.00 0.00 0.00 0.00
M25 Golf Professional 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
N11 Assistant Golf Professional 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A03 Golf Course Apprentice 0.00 0.00 0.00 0.00 1.00 1.00 1.00 1.00
A04 Pro Shop Assistant 1.001.001.001.002.002.002.002.00
Total Pro‐Shop/Driving Range 3.00 3.00 3.00 3.00 5.00 5.00 5.00 5.00
Total Golf Course Division 9.75 9.75 9.00 9.75 12.00 12.00 12.00 12.00
2021/2022 Preliminary Budget City of Renton, Washington
3 - 79Budget by Deparment - Community Services
Community Services Position Listing (1 of 2)
2018 2019 2019 2020 2020 2020 2021 2022
Grade Title Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed
Parks Planning and Natural Resources Division
M38 Parks Planning & Natural Resources Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M32 Urban Forestry and Natural Resources Mgr 1.001.001.001.001.001.001.001.00
M32 Parks Planning Manager 0.000.001.000.001.001.001.001.00
M32 Capital Projects Manager 0.000.001.000.001.001.001.001.00
A09 Administrative Secretary I 0.000.000.400.000.400.400.400.40
A28 Capital Project Coordinator 2.002.001.002.001.001.001.001.00
A28 Capital Project Coordinator LT 1.00 0.00 2.00 0.00 2.00 2.00 1.00 1.00
Total Parks Planning and Natural Resources Division 5.00 4.00 7.40 4.00 7.40 7.40 6.40 6.40
Recreation & Neighborhoods Division
Recreation Services
M38 Recreation and Neighborhood Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M29 Recreation and Neighborhoods Manager 1.001.001.001.001.001.001.001.00
M23 Recreation Supervisor 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
A18 Recreation Program Coordinator 6.006.006.006.006.006.006.006.00
A09 Administrative Secretary I 0.340.341.000.341.001.001.001.00
A16 Program Assistant 0.500.500.500.500.500.500.500.50
A14 Recreation Systems Technician 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A11 Recreation Specialist 1.001.001.251.001.251.250.750.75
A07 Recreation Assistant 3.003.000.003.000.000.000.000.00
A09 Recreation Assistant 0.000.003.000.003.003.003.003.00
M22 Community Relation & Events Coordinator 1.001.001.001.001.001.001.001.00
A25 Neighborhood Coordinator 1.001.001.001.001.001.001.001.00
A09 Administrative Secretary I 0.330.330.000.330.000.000.000.00
Total Recreation & Neighborhoods Division 19.17 19.17 19.75 19.17 19.75 19.75 19.25 19.25
Human Services Division
Human Services
M29 Human Services Manager 1.001.001.001.001.001.001.001.00
A20 Housing Repair Coordinator 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A20 Human Services Coordinator 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
A09 Administrative Secretary I 0.330.330.500.330.500.500.500.50
A13 Facilities Technician I 1.001.001.001.001.001.001.001.00
Total Human Services 3.83 3.83 4.00 3.83 4.00 4.00 4.00 4.00
Community Development Block Grants (CDBG)
A20 Human Services Coordinator 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Total CDBG 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Total Human Services Division 4.33 4.33 4.50 4.33 4.50 4.50 4.50 4.50
Museum Division
M22 Museum Manager 1.001.001.001.001.001.001.001.00
Total Museum Division 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Department Regular Staffing 93.50 96.00 99.50 97.00 116.50 116.50 115.00 115.00
Total Community Services Department 93.50 96.00 99.50 97.00 116.50 116.50 115.00 115.00
2021/2022 Preliminary Budget City of Renton, Washington
3 - 80Budget by Deparment - Community Services
ADMINISTRATOR
Ellen Bradley‐Mak
13 FTEs
EMPLOYEE RELATIONS
Kim Gilman
4 FTEs
Recruitment and Selection
Classification and
Compensation
Investigations and
Compliance
Employee/Labor Relations
Unemployment
BENEFITS
Wendy Rittereiser
4 FTEs
Personnel Benefits
Retiree Benefits
Wellness Program
FMLA
Workers' Compensation
Claims
RISK MANAGEMENT
Kelsey Ternes
2 FTEs
Property and Casualty
Programs
Subrogation Claims
Workplace Health and
Safety
ADA Facilities Compliance
Administrative Support
3 FTE
Employee Training and
Development
Human Resources and Risk Management
2021/2022 Preliminary Budget City of Renton, Washington
3 - 81Budget by Department - Human Resources and Risk Management
Human Resources and Risk Management
Mission
The Human Resources and Risk Management (HRRM) Department works in partnership with Administrators and their teams,
with individual employees and groups, and with employee representatives and the community to provide programs and
services that create a positive, inclusive and productive work environment that empowers all employees to serve the needs
of our residents.
Description
The department provides a comprehensive array of programs, including Recruitment and Selection, Classification and
Compensation, Employee/Labor Relations, Employee Training and Development, Property/Liability, Workplace Health and
Safety, and Employee Benefits. Services are provided primarily to internal customers (i.e., all city departments). For a more
detailed description, see our program descriptions.
Additionally, in response to the COVID‐19 pandemic, HRRM is developing programs and procedures to support staff in
continuing operations, maintaining a safe working environment, and implementing budget mitigation strategies.
List of HR&RM Renton Results Decision Packages:
HR&RM Performance Measures:
2018201920192020202020212022ChangeChange
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 15,947,023 18,336,117 15,975,510 19,407,795 23,108,294 18,877,237 20,133,146 ‐2.7% 6.7%
Position Summary 12.00 13.00 13.00 13.00 13.00 13.00 13.00 0.0% 0.0%
2021 Proposed 2022 Proposed
Package #Description FTE Tot Exp $Tot Rev $FTETot Exp $Tot Rev $
600014.0041 HR/RM Administration 7.70 1,654,688 ‐ 7.70 1,701,170 ‐
600014.0042 Risk Management 2.75 3,279,123 3,511,775 2.75 3,304,171 3,539,243
600014.0043 Benefits 2.55 13,943,427 15,143,476 2.55 15,127,804 16,236,884
Total 13.00 18,877,237$ 18,655,251$ 13.00 20,133,146$ 19,776,127$
City Service Area City Service Area Strategies Performance Measures 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results
Highly qualified, healthy, well
trained, and productive
workforce
Number of training courses provided by
HR/RM 9101298
Percentage of new hires or promotions
retained past their probationary period. 89% 94% 92% 94% 93%
Functional work environment Number of business days to recruit and
fill non‐civil service positions 71 47 45 67 55
Complete a safety inspection of each
City‐owned facility annually 89% 45% 73% 100% 87%
Maintain or reduce the annual number
of Workers Compensation Claims 98 72 36 55 42
Safeguard public interests and
assets
Internal Support
2021/2022 Preliminary Budget City of Renton, Washington
3 - 82Budget by Department - Human Resources and Risk Management
Highlight of Budget Changes:
Regular Salaries increased by $60,742 in 2021 due to reclassification of various positions after the 2019/2020
budget was adopted.
Personnel Benefits increased by $1.2M in 2022 due to projected increases in overall medical/dental claims and
premiums.
Other Services and Charges increased by $24,958 and $36,419 in 2021 and 2022 respectively, mostly due to
increase in Broker Fees.
Interfund Payments increased by $35,648 in 2021 due to increased payments for IT, Facilities and Indirect costs.
Transfer Out decreased by $900K in 2021 due to transferring all of the remaining portion of the Annexation Sales
Tax Reserve to the General Fund in 2020.
Expenditure Budget by Division ‐ Human Resources and Risk Management
2018 2019 2019 2020 2020 2021 2022 Change Change
Fund/Dept Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Employee Relations 1,268,733 1,506,283 1,438,605 1,626,606 1,530,267 1,656,832 1,703,366 1.9% 2.8%
Benefits 11,635,221 12,629,200 11,330,595 13,551,677 13,748,148 13,943,516 15,127,856 2.9% 8.5%
Risk Management 3,043,070 4,200,634 3,206,310 4,229,512 7,829,878 3,276,889 3,301,923 ‐22.5% 0.8%
Total 15,947,023 18,336,117 15,975,510 19,407,795 23,108,294 18,877,237 20,133,146 ‐2.7% 6.7%
Expenditure Budget by Category ‐ Human Resources and Risk Management
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,120,729 1,224,515 1,245,981 1,316,256 1,391,527 1,376,998 1,420,825 4.6% 3.2%
Part‐Time Salaries 17,794 25,102 22,244 25,102 3,102 25,102 25,102 0.0% 0.0%
Personnel Benefits 12,033,510 13,295,379 11,361,071 14,247,630 14,463,630 14,499,564 15,665,062 1.8% 8.0%
Supplies 32,795 36,284 30,295 36,284 20,328 36,284 36,284 0.0% 0.0%
Other Services and Charges 2,395,386 2,537,029 2,080,992 2,548,199 2,431,663 2,573,157 2,609,576 1.0% 1.4%
Intergovernmental Services3,4893,73103,840000‐100.0% N/A
Interfund Payments 334,204 314,077 325,577 330,484 298,043 366,132 376,297 10.8% 2.8%
Transfer Out 9,117 900,000 909,352 900,000 4,500,000 0 0 ‐100.0% N/A
Total 15,947,023 18,336,117 15,975,510 19,407,795 23,108,294 18,877,237 20,133,146 ‐2.7%6.7%
Staffing Levels by Division ‐ Human Resources and Risk Management
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Employee Relations 7.00 8.00 8.00 8.00 8.00 7.70 7.70 ‐3.8% 0.0%
Benefits 1.75 1.75 1.75 1.75 1.75 2.55 2.55 45.7% 0.0%
Risk Management 3.25 3.25 3.25 3.25 3.25 2.75 2.75 ‐15.4% 0.0%
Total FTE 12.00 13.00 13.00 13.00 13.00 13.00 13.00 0.0% 0.0%
Intermittent FTE 0.50 0.60 0.61 0.60 0.07 0.60 0.60 0.0% 0.0%
Temp/Intermit Pay & Ben 20,612$ 25,102$ 25,398$ 25,102$ 3,102$ 25,102$ 25,102$ 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 83Budget by Department - Human Resources and Risk Management
Employee Relations Division
Mission
Provide a broad range of candidate and employee services in a timely, responsive and reliable manner to attract and retain
an effective and inclusive workforce necessary to provide services to our community members.
2019/2020 Accomplishments
Implemented action steps that were laid out in the 2017 HR Inclusion Tactical Plan, and made progress towards
hiring a more diverse workforce in terms of gender and racial ethnicity.
Reviewed and revised personnel policies and job descriptions, as well as created new policies to adapt to changing
times.
Provided Success Signals trainings to teams citywide to enhance communication skills.
Developed a Supported Employment Program and made our first hire in August, 2019.
Completed a Market Study of benchmarked Non‐Represented wages and benefits in 2020.
Implemented new technologies to streamline HR operations and enhance the onboarding experience. Also
implemented a new Performance Evaluation System.
2021/2022 Goals
Negotiate Successor Union Contracts with all three bargaining groups.
Continue to revise and create personnel policies, procedures, and job descriptions to address and adapt to the
changing needs of our workforce.
Based on budget resources, revisit the findings of the Market Study of Non‐Represented Positions.
Explore and implement an electronic system for personnel files, eliminating the need for paper files.
Continue to implement strategies as laid out in the 2020 HR Inclusion Tactical Plan and measure progress.
Expenditure Budget by Category ‐ Employee Relations Division
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 643,292 701,459 724,523 764,403 812,505 779,787 800,597 2.0% 2.7%
Part‐Time Salaries 17,794 25,102 13,450 25,102 3,102 25,102 25,102 0.0% 0.0%
Personnel Benefits 249,343 294,219 286,552 337,557 337,557 336,496 355,611 ‐0.3% 5.7%
Supplies 18,809 21,828 17,099 21,828 8,828 21,828 21,828 0.0% 0.0%
Other Services and Charges 98,677 207,663 120,116 207,663 130,663 207,663 207,663 0.0% 0.0%
Interfund Payments 239,611 256,013 267,513 270,054 237,613 285,956 292,566 5.9% 2.3%
Total 1,268,733 1,506,283 1,438,605 1,626,606 1,530,267 1,656,832 1,703,366 1.9% 2.8%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Employee Relations Division
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 7.00 8.00 8.00 8.00 8.00 7.70 7.70 ‐3.8% 0.0%
Intermittent FTE 0.50 0.60 0.37 0.60 0.07 0.60 0.60 0.0% 0.0%
Temp/Intermit Pay & Ben 20,612$ 25,102$ 15,503$ 25,102$ 3,102$ 25,102$ 25,102$ 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 84Budget by Department - Human Resources and Risk Management
Benefits Division
Mission
Provide a comprehensive, cost effective employee benefit package and wellness program that serves to attract and retain a
qualified staff and promote a healthy, productive workforce. Encourage full and appropriate utilization of benefits through
employee outreach and training. Manage the programs and ensure efficient, consistent, and accountable service by city
staff and vendors, and compliance with all applicable laws and policies.
2019/2020 Accomplishments
Conducted an RFP and replaced the city’s long‐time broker for the health insurance plans. Completed onboarding
with the new broker, including updates with the Renton Employee Health Plan Board (REHP).
Hired a new Senior Benefits Analyst to replace a retiring employee. Completed onboarding and a review and
update of procedures.
Reviewed and updated the city’s leave policies, replacing seven policies with one new comprehensive policy;
conducted training for supervisors, and provided information to employees.
Implemented the State’s new Paid Family Leave program, including updating the city’s leave policies, working with
payroll to make necessary updates, and providing training for supervisors and employees.
Developed retirement planning workshops for LEOFF and PERS, and conducted nine workshops, with 107 total
participants attending.
Completed an audit of benefits enrollment and files, and addressed any discrepancies or missing documents.
Based on COVID‐19: Amended benefit plans to cover testing and treatment at no cost without prior approval;
updated eligibility rules during COVID‐related leave; implemented a one‐month health plan rate holiday as a cost
saving measure; and implemented a voluntary separation incentive program.
2021/2022 Goals
Conduct a compliance audit of the self‐funded insurance plans with the new broker, taking any corrective action
that is necessary.
Update and communicate procedures to support the return to work, including accommodating high‐risk workers,
and those requiring leave for illness or childcare.
Review city policies related to benefits, and update as needed.
Expenditure Budget by Category ‐ Benefits Division
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 192,252 196,736 206,137 204,849 212,196 301,131 308,058 47.0% 2.3%
Personnel Benefits 10,902,387 11,891,949 10,584,216 12,792,669 13,008,669 13,047,361 14,184,800 2.0% 8.7%
Supplies 13,663 7,500 13,196 7,500 7,500 7,500 7,500 0.0% 0.0%
Other Services and Charges 428,836 471,220 468,982 482,390 459,354 507,348 543,767 5.2% 7.2%
Intergovernmental Services3,4893,73103,840000‐100.0% N/A
Interfund Payments 94,593 58,064 58,064 60,430 60,430 80,176 83,731 32.7% 4.4%
Transfer Out 0000000N/AN/A
Total 11,635,221 12,629,200 11,330,595 13,551,677 13,748,148 13,943,516 15,127,856 2.9% 8.5%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Benefits Division
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 1.751.751.751.751.752.552.5545.7%0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 85Budget by Department - Human Resources and Risk Management
Risk Management Division
Mission
Provide a safe environment for our employees and community members, minimize the city’s risk of unexpected financial
losses, and protect the city’s assets by identifying, analyzing, and implementing loss prevention and safety programs and
developing effective channels of communication through excellent customer service.
2019/2020 Accomplishments
Collected funds owed to the city from responsible third parties for damage to city property.
Utilized the city’s property and liability insurance broker, Alliant Insurance Services, to improve property and liability
self‐insurance programs when financially advantageous to the city.
Reviewed and updated safety and risk management‐related policies and procedures.
2021/2022 Goals
Provide safety and risk management support to city of Renton departments to proactively identify, assess, mitigate
risks, and ultimately save the city from human and monetary assets losses.
Protect the city from catastrophic losses through the purchasing and managing of excess insurance through the city’s
property and liability insurance broker, Alliant.
Continue collecting funds owed to the city from responsible third parties for damage to city property.
Review and update safety and risk management‐related policies and procedures.
Expenditure Budget by Category ‐ Risk Management Division
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 285,185 326,321 315,321 347,005 366,827 296,080 312,171 ‐14.7% 5.4%
Personnel Benefits 881,780 1,109,211 490,302 1,117,405 1,117,405 1,115,707 1,124,651 ‐0.2% 0.8%
Supplies 323 6,956 0 6,956 4,000 6,956 6,956 0.0% 0.0%
Other Services and Charges 1,867,872 1,858,146 1,491,894 1,858,146 1,841,646 1,858,146 1,858,146 0.0% 0.0%
Transfer Out 7,910 900,000 900,000 900,000 4,500,000 0 0 ‐100.0% N/A
Total 3,043,070 4,200,634 3,206,310 4,229,512 7,829,878 3,276,889 3,301,923 ‐22.5% 0.8%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Risk Management Division
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 3.25 3.25 3.25 3.25 3.25 2.75 2.75 ‐15.4% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 86Budget by Department - Human Resources and Risk Management
Human Resources and Risk Management Position Listing
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
Employee Relations
M49 Human Resources/Risk Management Administrator 0.500.500.500.500.500.500.50
M36 HR Labor Relations & Compensation Manager 1.001.001.001.001.001.001.00
M25 Senior Employee Relations Analyst 0.000.003.000.003.003.003.00
M25 Senior Benefits Analyst 0.000.000.500.000.500.200.20
M22 Senior Human Resources Analyst 2.502.500.002.500.000.000.00
M20 Human Resources Analyst 1.001.000.001.000.000.000.00
N16 Administrative Assistant to Human Resources 0.000.000.000.001.001.001.00
N14 Administrative Assistant 1.001.001.001.000.000.000.00
N13 Human Resources Specialist 0.00 0.00 0.00 0.00 1.00 1.00 1.00
N11 Human Resources Assistant 1.001.001.001.000.000.000.00
N01 Office Specialist 0.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Employee Relations 7.008.008.008.008.007.707.70
Benefits
M49 Human Resources/Risk Management Administrator 0.250.250.250.250.250.250.25
M30 Human Resources Benefits Manager 1.001.001.001.001.001.001.00
M25 Senior Benefits Analyst 0.000.000.500.000.501.301.30
M22 Senior Human Resources Analyst 0.500.500.000.500.000.000.00
Total Benefits 1.75 1.75 1.75 1.75 1.75 2.55 2.55
Risk Management
M49 Human Resources/Risk Management Administrator 0.250.250.250.250.250.250.25
M30 Risk Manager 1.001.001.001.001.001.001.00
M25 Senior Benefits Analyst 0.000.001.000.001.000.500.50
M23 Risk Management Analyst 0.000.000.000.000.001.001.00
M20 Human Resources Analyst 1.001.000.001.000.000.000.00
M20 Risk Management Analyst 1.001.001.001.001.000.000.00
Total Risk Management 3.25 3.25 3.25 3.25 3.25 2.75 2.75
Total Human Resources and Risk Management 12.00 13.00 13.00 13.00 13.00 13.00 13.00
Grade Title
2021/2022 Preliminary Budget City of Renton, Washington
3 - 87Budget by Department - Human Resources and Risk Management
Other City Services
Mission
Provide for miscellaneous payments that benefit all City departments.
Overview of Other City Services
The Finance Division manages this accounting department. The primary activity is to receive revenue and to make property
and liability payments to the insurance fund, interfund payments, intergovernmental payments, limited general obligations
debt payments, and employee termination payments.
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 9,760,840 13,005,849 37,172,488 12,662,115 35,568,953 23,591,412 17,973,516 86.3%‐23.8%
CIP Budget Summary 142,975 128,576 128,576 113,808 113,808 436,987 500,634 284.0% 14.6%
List of Other City Services Renton Results Decision Packages:
2021 Proposed 2022 Proposed
Package # Description FTE Tot Exp $Tot Rev $ FTE Tot Exp $Tot Rev $
600004.0104 General Government Debt ‐ 7,153,019 551,618 ‐ 4,341,920 545,244
600005.0036 Other City Svc ‐ Employee Separation Pay ‐ 782,516 ‐ ‐ 782,516 ‐
600005.0037 LEOFF 1 Medical Obligation ‐ 2,624,684 ‐ ‐ 2,624,684 ‐
600005.0038 Association Dues and Contracted Services ‐ 186,070 ‐ ‐ 183,948 ‐
700005.0016 Indirect Cost Transfer Multi Depts ‐ ‐ 3,830,617 ‐ ‐ 3,951,261
900005.0015 General Governmental Fund Revenues ‐ 2,211,723 83,974,659 ‐ 2,211,723 90,515,484
900005.0016 Non‐GG Fund Revenues ‐ ‐ 372,500 ‐ ‐ 372,500
900005.0017 General Governmental Fund Transfers ‐ 4,520,375 3,480,375 ‐ 2,763,100 1,723,100
900005.0018 REET 1 Fund ‐ 2,865,000 2,250,000 ‐ 2,315,000 2,300,000
900005.0019 REET 2 Fund ‐ 3,248,025 2,250,000 ‐ 2,750,625 2,300,000
Total Operating ‐ 23,591,412 96,709,769 ‐ 17,973,516 101,707,589
760009.0005 Fire Impact Mitigation Fund ‐ 436,987 99,000 ‐ 500,634 99,000
Total CIP ‐ 436,987 99,000 ‐ 500,634 99,000
Total ‐ 24,028,399$ 96,808,769$ ‐ 18,474,150$ 101,806,589$
Highlight of Budget Changes:
Shifted $2.3M in reserves to Other City Services
Reclassified $89K from Intergovernmental Services to Other Services and Charges due to the State Auditor’s Office
removing the Intergovernmental classification from the BARS manual
Debt Service decreased by $2.8M in 2022 due to the 2010 GO DT Parking Refunding Bond being paid off in 2021
Transfer Out increased by $8.4M in 2021 due to the change in how property taxes and B&O taxes are recorded.
These taxes are now directed to the General Fund and transferred out to other funds.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 88Budget by Department - Other City Services
Expenditure Budget by Division ‐ Other City Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Other City Services 4,064,656 6,212,181 30,357,614 5,863,679 28,406,567 16,438,393 13,631,596 180.3%‐17.1%
Ltd Tax General Obligation Bond 5,696,184 6,793,668 6,814,874 6,798,436 7,162,386 7,153,019 4,341,920 5.2%‐39.3%
Operating Total 9,760,840 13,005,849 37,172,488 12,662,115 35,568,953 23,591,412 17,973,516 86.3%‐23.8%
CIP 142,975 128,576 128,576 113,808 113,808 436,987 500,634 284.0% 14.6%
Total 9,903,815 13,134,425 37,301,064 12,775,923 35,682,761 24,028,399 18,474,150 88.1%‐23.1%
Expenditure Budget by Category ‐ Other City Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 180,895 369,364 182,442 369,364 369,364 369,364 369,364 0.0% 0.0%
Personnel Benefits 2,637,545 3,030,336 2,639,295 3,037,836 2,037,836 3,037,836 3,037,836 0.0% 0.0%
Other Services and Charges 49,066 82,845 176,710 80,481 169,651 2,383,738 2,381,374 2861.9%‐0.1%
Intergovernmental Services 112,638 86,806 0 89,170 0 0 0 ‐100.0% N/A
Debt Service 5,696,184 6,793,668 6,814,874 6,798,436 7,162,386 7,153,019 4,341,920 5.2%‐39.3%
Interfund Payments 26,513 15,830 15,830 18,828 18,828 14,055 14,297 ‐25.4% 1.7%
Transfer Out 1,058,000 2,627,000 27,343,337 2,268,000 25,810,888 10,633,400 7,828,725 368.8%‐26.4%
Operating Total 9,760,840 13,005,849 37,172,488 12,662,115 35,568,953 23,591,412 17,973,516 86.3%‐23.8%
CIP 142,975 128,576 128,576 113,808 113,808 436,987 500,634 284.0% 14.6%
Total 9,903,815 13,134,425 37,301,064 12,775,923 35,682,761 24,028,399 18,474,150 88.1%‐23.1%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 89Budget by Department - Other City Services
.
Police ChiefEd VanValey
163.4 FTEs
Deputy ChiefJohn Schuldt
54 FTEs
Patrol Services
17 FTEs
Animal Control
Parking Enforcement
Traffic
Special Operations
20 FTEs
Directed Enforcement Team
Special Enforcement Team
Graffiti Abatement
Coordinator
Administrative Services
15 FTEs
Training
School Resource Officers
Community
Programs
Electronic Home Detention
Professional Standards
Volunteer Program
Deputy Chief
Kevin Keyes
107.4 FTEs
Patrol Operations
66 FTEs
Patrol Officers
Investigations
24 FTEs
Detectives
Evidence Technicians
Domestic Violence
Victim Advocate
Crime Analyst
Staff Services
17.4 FTEs
Front Counter
Records
Administrative Support1 FTEs Chaplains
Police
2021/2022 Preliminary Budget City of Renton, Washington
3 - 90Budget by Department - Police
Police
Mission
Working together to provide professional and unbiased law enforcement services to our community.
Description
The department assumes a leadership role in the community in addressing crime and safety‐related concerns. This role
involves implementing proactive and reactive measures to reduce both the fear of crime and actual crime in our community.
List of Police Renton Results Decision Packages:
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 39,735,236 41,868,922 43,145,496 42,849,585 43,435,597 43,435,597 42,530,483 43,642,136 ‐0.7% 2.6%
Position Summary 161.90 163.40 163.40 163.40 163.40 163.40 163.40 163.40 0.0% 0.0%
2021 Proposed 2022 Proposed
Package # Description FTE Tot Exp $Tot Rev $ FTE Tot Exp $Tot Rev $
100008.0111 Auxiliary Services ‐ Jail ‐ 4,306,301 ‐ ‐ 4,306,301 ‐
100008.0112 Patrol Operations 67.00 12,958,172 ‐ 67.00 13,392,798 ‐
100008.0113 Staff Services 17.40 2,158,266 ‐ 17.40 2,267,688 ‐
100008.0114 Police Administration 4.00 7,864,729 ‐ 4.00 7,976,891 ‐
100008.0115 Investigations 24.00 4,184,172 ‐ 24.00 4,326,131 ‐
100008.0116 Administrative Services 13.00 2,631,945 225,000 13.00 2,688,719 225,000
100008.0117 Patrol Services 16.00 4,175,438 2,042,326 16.00 4,276,359 2,042,326
100008.0118 Special Operations 20.00 3,724,857 ‐ 20.00 3,869,265 ‐
100008.0119 Electronic Home Detention Program 2.00 526,603 251,941 2.00 537,983 365,045
Total 163.40 42,530,483$ 2,519,267$ 163.40 43,642,136$ 2,632,371$
2021/2022 Preliminary Budget City of Renton, Washington
3 - 91Budget by Department - Police
Police Performance Measures:
Highlight of Budget Changes:
Overtime increased by $600k in 2021 to more accurately reflect actual costs.
Intergovernmental Services shifted to Other Services and Charges due to a change in accounting guidance.
Interfund Payments increased by $80k in 2021 due to City‐Wide increases to Information Systems costs.
Personnel Benefits increased by $730k due to projected increases in medical/dental, FMLA implementation, and
COLA increases.
Regular Salaries increased by $482k due to cost of living adjustments and scheduled increases.
City Service Area City Service Area Strategies Performance Measures 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results
Average response time (in minutes) to
Priority I calls.4.52 4.43 4.61 4.66 4.06
Average response time (in minutes) to
Priority II calls.8.13 7.62 7.35 6.90 6.59
Average response time (in minutes) to
Priority III calls.11.75 11.62 10.94 10.73 10.01
Average response time (in minutes) to
Priority IV calls.23.94 26.08 23.54 23.82 21.99
Residents report feeling somewhat or
very safe during the day in their
neighborhood.
92%*‐‐‐92%*‐‐‐next survey
2021
Residents report feeling somewhat or
very safe during the night in their
neighborhood.
60%*‐‐‐67%*‐‐‐next survey
2021
Community report feeling somewhat or
very safe during the day in the
downtown area.
80%*‐‐‐86%*‐‐‐next survey
2021
Community report feeling somewhat or
very safe during the night in the
downtown area.
33%*‐‐‐42%*‐‐‐next survey
2021
Annual percent of successful resolution
or clearance of assigned cases 83% 88% 106% 68% 82%
Number of Cases processed by staff 15,517 16,665 16,367 16,179 14,643
Number of warrants processed by staff 2,161 1,575 1,526 1,687 1,695
Number of Citations processed by staff 11,766 11,462 11,438 11,047 8,629
Number of Public Records Requests
processed by staff 2,359 1,630 2,686 2,855 3,596
* Residential Surveys are conducted every three‐four years
Timely responsiveness and
“Projection of effort” when
the community cannot help
itself
Encourage the community to
comply with local, state and
federal laws
Safety and
Health
Encouragement of a self
reliant community through
programs and education
2021/2022 Preliminary Budget City of Renton, Washington
3 - 92Budget by Department - Police
Expenditure Budget by Division ‐ Police
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Administration 13,526,062 14,960,113 14,491,723 14,334,987 13,841,725 13,841,725 12,174,530 12,286,692 ‐15.1% 0.9%
Patrol Operations 11,484,596 11,225,287 12,153,539 12,007,857 11,928,609 11,928,609 12,847,927 13,277,670 7.0% 3.3%
Special Operations 3,683,084 3,579,522 3,947,058 3,797,211 5,039,188 5,039,188 3,835,102 3,984,393 1.0% 3.9%
Patrol Services 3,025,296 3,657,418 3,774,605 3,974,971 3,817,101 3,817,101 4,175,438 4,276,359 5.0% 2.4%
Investigations 3,426,069 3,513,361 3,883,265 3,696,034 3,864,854 3,864,854 4,180,672 4,322,631 13.1% 3.4%
Administrative Services 2,792,712 2,978,017 3,053,793 2,969,335 2,924,260 2,924,260 3,158,548 3,226,702 6.4% 2.2%
Staff Services 1,797,417 1,955,203 1,841,513 2,069,189 2,019,860 2,019,860 2,158,266 2,267,688 4.3% 5.1%
Total 39,735,236 41,868,922 43,145,496 42,849,585 43,435,597 43,435,597 42,530,483 43,642,136 ‐0.7% 2.6%
Expenditure Budget by Category ‐ Police
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 15,356,266 16,651,437 16,557,638 17,488,015 17,429,333 17,429,333 17,970,465 18,548,230 2.8% 3.2%
Part‐Time Salaries 6,334 8,000 14,709 8,000 8,000 8,000 8,000 8,000 0.0% 0.0%
Overtime 2,071,469 681,397 2,074,037 681,797 1,227,147 1,227,147 1,281,397 1,281,797 87.9% 0.0%
Personnel Benefits 5,874,124 6,381,420 6,347,900 6,764,878 6,577,923 6,577,923 7,494,646 7,988,673 10.8% 6.6%
Supplies 506,213 588,000 612,118 539,541 1,135,352 1,135,352 539,541 539,541 0.0% 0.0%
Other Services and Charges 1,904,834 1,825,061 10,949,559 1,824,661 11,565,543 11,565,543 9,223,625 9,223,225 405.5% 0.0%
Intergovernmental Services8,751,2929,194,02209,610,2870000‐100.0% N/A
Capital Outlay 33,897010,56900000N/AN/A
Interfund Payments 4,020,750 4,949,585 4,956,999 5,932,406 4,646,155 4,646,155 6,012,809 6,052,670 1.4% 0.7%
Transfer Out 960,058 1,590,000 1,617,467 0 9,030 9,030 0 0 N/A N/A
Total 39,485,236 41,868,922 43,140,996 42,849,585 42,598,484 42,598,484 42,530,483 43,642,136 ‐0.7% 2.6%
Staffing Levels by Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Administration 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0.0% 0.0%
Patrol Operations 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 0.0% 0.0%
Special Operations 22.00 22.00 22.00 22.00 20.00 20.00 20.00 20.00 ‐9.1% 0.0%
Patrol Services 14.50 15.00 15.00 16.00 16.00 16.00 16.00 16.00 0.0% 0.0%
Investigations 22.00 22.00 22.00 22.00 24.00 24.00 24.00 24.00 9.1% 0.0%
Admin Services 16.00 16.00 16.00 15.00 15.00 15.00 15.00 15.00 0.0% 0.0%
Staff Services 16.40 17.40 17.40 17.40 17.40 17.40 17.40 17.40 0.0% 0.0%
Total FTE 161.90 163.40 163.40 163.40 163.40 163.40 163.40 163.40 0.0% 0.0%
Intermittent FTE 0.18 0.23 0.39 0.23 0.23 0.23 0.23 0.23 0.0% 0.0%
Temp/Intermit Salaries and Ben 7,331$ 9,400$ 16,212$ 9,400$ 9,400$ 9,400$ 9,400$ 9,400$ 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 93Budget by Department - Police
Administration Division
Mission
Provide leadership and guidance that allows the divisions within the Department to perform their respective functions in
accordance with our Vision, Mission, and Goals, and to meet the needs of the public we serve while maintaining fiscally
responsible practices.
2019/2020 Accomplishments
Successfully transitioned leadership, continuing the momentum and success of the Department as a regional leader.
Strengthened outreach efforts through personal interaction and social media, reinforcing our commitment to the
community.
Planned for the future succession of the Department by providing growth opportunities for current leaders and
identifying and developing future leaders through mentorship and training.
2021/2022 Goals
Continue to meet the needs of the public we serve while maintaining fiscally responsible practices.
Increase engagement and outreach with the goal of interacting with a broader spectrum of the community.
Evaluate Department effectiveness through polling of populous to be more efficient at serving their needs and
building confidence in our organization.
Expenditure Budget by Category ‐ Administration Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 569,456 599,608 606,436 617,632 639,924 639,924 627,255 639,703 1.6% 2.0%
Overtime 4230000000N/AN/A
Personnel Benefits 171,643 168,144 182,339 176,063 176,063 176,063 195,467 205,122 11.0% 4.9%
Supplies 4,113 4,390 2,369 4,390 4,390 4,390 4,390 4,390 0.0% 0.0%
Other Services and Charges 50,853 40,400 8,707,942 40,400 9,668,887 9,668,887 7,438,964 7,438,964 18313.3% 0.0%
Intergovernmental Services 8,742,894 9,194,022 0 9,610,287 0 0 0 0 ‐100.0% N/A
Capital Outlay 21,85703,64300000N/AN/A
Interfund Payments 3,004,765 3,363,549 3,371,528 3,886,215 3,343,431 3,343,431 3,908,454 3,998,513 0.6% 2.3%
Transfer Out 960,058 1,590,000 1,617,467 0 9,030 9,030 0 0 N/A N/A
Total 13,526,062 14,960,113 14,491,723 14,334,987 13,841,725 13,841,725 12,174,530 12,286,692 ‐15.1% 0.9%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Administration Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Commissioned 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 0.0% 0.0%
Non‐Commissioned 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.0% 0.0%
Total FTE 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 94Budget by Department - Police
Patrol Operations Division
Mission
The Patrol Operations Division is a 66 member team responsible for the safety and security of Renton residents, businesses,
and visitors. Through 24‐hours a day, 7‐days a week coverage, officers respond to all 911 calls for service within the city,
proactively patrol problem areas, and work with the community to improve relationships, resolve issues, and educate the
public.
2019/2020 Accomplishments
Implemented a drone program to enhance officer safety and increase Patrol efficiency.
Enhanced less lethal munitions options by integrating 40 MM rifles in patrol, with a majority of the division now
equipped with this equipment.
Equipped uniformed personnel with additional safety equipment/active shooter kits (ballistic helmet and plate
carrier) for response to high‐risk emergencies.
Built relationships with the community through increased use of social media.
Implemented quarterly training for Patrol that focuses on tactics and building cohesive response squads. This
project is ongoing and was unfortunately put on hold due to COVID19 protocols.
2021/2022 Goals
Develop and participate in inclusive engagement opportunities to open lines of communication to better
understand the needs of our community members.
Build trust with the community through transparency and accountability.
Hold offenders within our community accountable for their criminal activity to ensure the public’s ability to feel
safe in our city.
Lower our annual average response time to priority calls.
Re‐institute quarterly training for Patrol that is focused on tactics and building a cohesive response to public need.
Find creative and innovative ways to remain fiscally responsible without jeopardizing the services we provide to
the community.
Expenditure Budget by Category ‐ Patrol Operations Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 7,109,753 7,251,860 7,386,303 7,635,160 7,776,270 7,776,270 7,593,649 7,841,392 ‐0.5% 3.3%
Overtime 967,307 304,300 896,103 304,300 533,673 533,673 550,473 550,473 80.9% 0.0%
Personnel Benefits 2,583,845 2,562,514 2,730,862 2,721,639 2,721,639 2,721,639 3,074,128 3,298,430 13.0% 7.3%
Supplies 70,422 72,459 87,046 23,000 23,000 23,000 23,000 23,000 0.0% 0.0%
Other Services and Charges 24,571 35,845 54,915 35,845 21,500 21,500 35,845 35,845 0.0% 0.0%
Interfund Payments 728,697 998,309 998,309 1,287,913 852,527 852,527 1,570,832 1,528,530 22.0%‐2.7%
Total 11,484,596 11,225,287 12,153,539 12,007,857 11,928,609 11,928,609 12,847,927 13,277,670 7.0% 3.3%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Patrol Operations Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Commissioned 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 0.0% 0.0%
Total FTE 67.00 67.00 67.00 67.00 67.00 67.00 67.00 67.00 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 95Budget by Department - Police
Special Operations Division Goals
Mission
The Special Operations Division is comprised of two units that work independently to proactively address quality of life
issues within the City. The Special Enforcement Team (SET) is a plain clothes unit that specializes in long term
investigations, targeting/arresting repeat criminal offenders involved in various crimes. The Directed Enforcement Team
(DET) is the uniformed unit within the Division. DET works in conjunction with citizens, businesses, and other department
work groups to proactively address issues that negatively impact the community. DET primarily specializes in short term
investigations, utilizing community outreach and proactive methods to address criminal activity and promote safety.
2019/2020 Accomplishments
Successfully investigated and participated in a regional effort to reduce criminal activity associated with the sexual
exploitation of minors, which resulted in numerous arrests and asset forfeiture.
Successfully investigated a large‐scale promotion of prostitution case covering three counties (King, Pierce, and
Snohomish), which has now been taken up by federal prosecutors.
Successfully targeted numerous repeat offenders in an effort to reduce crime, with the assistance of crime analysis
information.
Successfully participated in numerous community outreach and engagement events.
2021/2022 Goals
Continue working with community groups and other City departments to address quality of life issues regarding the
homeless population and nuisance abatement.
Increase investigation of sexual predators who target minors.
Reduce the impact of drugs in our community by targeting all levels of drug use and distribution.
Continue targeting prolific criminal offenders using long term and covert investigation methods.
Continue participation in community engagement and outreach events.
Expenditure Budget by Category ‐ Special Operations Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,967,367 2,331,653 2,213,146 2,427,995 2,261,551 2,261,551 2,431,609 2,505,418 0.1% 3.0%
Part‐Time Salaries 6,334 8,000 14,709 8,000 8,000 8,000 8,000 8,000 0.0% 0.0%
Overtime 295,468 76,830 331,499 76,830 202,224 202,224 207,124 207,124 169.6% 0.0%
Personnel Benefits 742,845 924,163 844,283 975,798 909,130 909,130 1,044,792 1,109,000 7.1% 6.1%
Supplies 56,317 40,500 127,641 40,500 751,602 751,602 40,500 40,500 0.0% 0.0%
Other Services and Charges 184,006 50,900 261,943 50,900 47,650 47,650 50,900 50,900 0.0% 0.0%
Capital Outlay 12,04006,92600000N/AN/A
Interfund Payments 168,707 147,476 146,911 217,188 147,930 147,930 52,177 63,451 ‐76.0% 21.6%
Transfer Out 250,000 0 0 0 711,102 711,102 0 0 N/A N/A
Total 3,683,084 3,579,522 3,947,058 3,797,211 5,039,188 5,039,188 3,835,102 3,984,393 1.0% 3.9%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Special Operations Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Commissioned 22.00 22.00 22.00 22.00 20.00 20.00 20.00 20.00 ‐9.1% 0.0%
Total FTE 22.00 22.00 22.00 22.00 20.00 20.00 20.00 20.00 ‐9.1% 0.0%
Intermittent FTE 0.18 0.23 0.39 0.23 0.23 0.23 0.23 0.23 0.0% 0.0%
Temp/Intermit Pay & Ben 7,331$ 9,400$ 16,212$ 9,400$ 9,400$ 9,400$ 9,400$ 9,400$ 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 96Budget by Department - Police
Patrol Services Division
Mission
The mission of the Patrol Services Division is to provide a safer city and increase quality of life for all residents and visitors
through traffic education, enforcement, and engineering. The Division also operates animal control services throughout the
city. The primary goal of the Division is the reduction of traffic related deaths, personal injury, and property damage due to
traffic collisions.
2019/2020 Accomplishments
Utilization of Unmanned Air Systems (drones) for investigation and reconstruction of fatality and serious collisions,
reducing overtime hours and road closure times.
Despite staffing challenges, the Patrol Services Division investigated about 70% of all reported collisions.
Increased partnerships with regional shelters for animal adoption services.
Implemented a second full‐time parking enforcement officer, extending coverage throughout the city.
Filled an open sergeant position that had previously been vacant.
Verified 100% of all photo enforcement violations within the required 14‐day time frame.
2021/2022 Goals
Investigate 80% of all reported collisions during service hours.
Maintain a 100% clearance rate for all major collision investigations.
Effectively respond to all traffic, parking, and animal control complaints.
Consistently enforce traffic laws with a concentration on empirically validated problem areas.
Continue to verify 100% of all photo enforcement violations within the required 14‐day time frame.
Continue high visibility and enforcement action regarding animal control complaints within Renton city parks.
Expenditure Budget by Category ‐ Patrol Services Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,147,027 1,393,577 1,314,363 1,570,236 1,536,934 1,536,934 1,711,017 1,764,164 9.0% 3.1%
Overtime 178,263 78,247 274,934 78,647 121,759 121,759 154,859 155,259 96.9% 0.3%
Personnel Benefits 503,178 638,508 566,417 720,796 676,565 676,565 753,945 800,124 4.6% 6.1%
Supplies 50,476 28,500 46,394 28,500 28,500 28,500 28,500 28,500 0.0% 0.0%
Other Services and Charges 1,083,906 1,327,400 1,376,811 1,327,000 1,324,000 1,324,000 1,327,400 1,327,000 0.0% 0.0%
Interfund Payments 62,446 191,186 191,186 249,792 129,343 129,343 199,717 201,312 ‐20.0% 0.8%
Total 3,025,296 3,657,418 3,774,605 3,974,971 3,817,101 3,817,101 4,175,438 4,276,359 5.0% 2.4%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Patrol Services Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Commissioned 11.00 11.00 11.00 12.00 12.00 12.00 12.00 12.00 0.0% 0.0%
Non‐Commissioned 3.50 4.00 4.00 4.00 4.00 4.00 4.00 4.00 0.0% 0.0%
Total FTE 14.50 15.00 15.00 16.00 16.00 16.00 16.00 16.00 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 97Budget by Department - Police
Investigation Division
Mission
The Investigations Division is a 22 member team made up of commissioned and non‐commissioned personnel who
have specialized skills related to the investigation and follow‐up of most felony cases, as well as those cases that may
be complex or sensitive. The Investigations Division is also responsible for the collection, preservation, and
dissemination of evidence. The Division collects, analyzes, and distributes crime information for the city. The Division
also advocates for the rights of victims of domestic violence. Members of the Division work with the prosecutor’s
office and other law enforcement agencies to ensure successful prosecution of offenders.
2019/2020 Accomplishments
Achieved a case clearance ratio of 76%.
Moved one detective to full time forensic responsibilities in order to handle the increasing demands that
technology places on law enforcement investigations.
Invested in several cutting edge forensic and technology tools to assist in investigating crime (GrayKey, FRED
forensic computer, enterprise level storage).
Joined the Seattle Internet Crimes Against Crimes (ICAC) Taskforce. The ICAC Taskforce is a national network of 61
coordinated task forces representing over 4.500 federal, state, and local law enforcement and prosecutorial
agencies who are engaged in proactive and reactive investigations and prosecutions of persons involved in child
abuse and exploitation involving the Internet.
2021/2022 Goals
Clear a minimum of 80% of the cases assigned, with efforts to progressively increase that rate through added
technologies.
Identify and train an additional detective in forensic technology.
Fully staff the Division and adjust workloads to allow the investigation of a backlog of cold cases.
Remain fiscally responsible while seeking advanced training opportunities that were lost due to budget constraints
in 2020.
Expenditure Budget by Category ‐ Investigation Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 2,099,631 2,226,347 2,354,250 2,321,543 2,306,084 2,306,084 2,625,555 2,707,934 13.1% 3.1%
Overtime 312,884 117,416 331,623 117,416 204,510 204,510 204,510 204,510 74.2% 0.0%
Personnel Benefits 811,786 876,612 883,160 927,968 879,492 879,492 1,053,345 1,114,815 13.5% 5.8%
Supplies 56,852 46,000 24,866 46,000 80,880 80,880 46,000 46,000 0.0% 0.0%
Other Services and Charges 92,244 63,836 106,217 63,836 146,000 146,000 63,836 63,836 0.0% 0.0%
Intergovernmental Services8,3980000000N/AN/A
Interfund Payments 44,275 183,150 183,150 219,271 121,877 121,877 187,426 185,536 ‐14.5%‐1.0%
Transfer Out 0 0 0 0 126,011 126,011 0 0 N/A N/A
Total 3,426,069 3,513,361 3,883,265 3,696,034 3,864,854 3,864,854 4,180,672 4,322,631 13.1% 3.4%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Investigation Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Commissioned 17.00 17.00 17.00 17.00 19.00 19.00 19.00 19.00 11.8% 0.0%
Non‐Commissioned 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 0.0% 0.0%
Total FTE 22.00 22.00 22.00 22.00 24.00 24.00 24.00 24.00 9.1% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 98Budget by Department - Police
Administrative Services Division
Mission
The Administrative Services Division is dedicated to providing the Renton Police Department and Renton citizens the highest
quality recruitment services, training, and equipment, as well as building strong relationships with the community through
community programs, social media, and media relations.
2019/2020 Accomplishments
Organized the 2019 National Night Out event, which was a multi‐neighborhood program. Began planning for the
2020 National Night Out event. However, the event did not happen due to the COVID19 shutdown.
Utilized Electronic Home Detention services, generating over $333,337 in revenue in 2019.
The Renton Police Department volunteer program provided in excess of 5,000 hours of service in 2019,
including citizen fingerprinting, vacation house checks, document filing, and disabled parking enforcement. Due
to COVID19 concerns and City Hall being closed, our volunteer program was halted for most of 2020.
Expanded the Department’s social media presence by moving into several social media platforms and increasing
the number of people involved with building social media content. In 2020, moved to on‐line community
engagements due to concerns of in person functions as a result of COVID19.
Hired and on‐boarded seven employees in 2019 and four employees so far in 2020.
Facilitated 13,355.65 hours of training to Department members in 2019 and over 5,000 hours so far in 2020.
Started a Peer Support program in 2019, assisting over a dozen employees.
Started a mentorship program in 2019, assigning tenured employees to new hires to assist them through the hiring
and training process.
Conducted a Commander promotional process in 2019, and a Sergeant promotional process in 2020.
Hosted the city’s first gun lock giveaway in 2019.
Hosted the Renton School District’s first Educator Law Enforcement Academy in 2019.
School resource officers held Teen Academies, introducing Renton teens to law enforcement.
Oversaw the completion of the 4th floor training facility and acquisition/installation of a training simulator.
2021/2022 Goals
Continue to expand a regionally recognized social media program for the Police Department, expanding our ability
to conduct on‐line community engagements.
Recruit, hire, and train Department employees with a goal of being fully staffed by the end of 2022.
Through diligent and continual research of the latest industry standards, provide cutting edge training and
equipment to all Renton Police Department members.
Evaluate new platforms for engagement opportunities in order to reach a broader spectrum of our population.
Expand our training capabilities, offering regional instruction.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 99Budget by Department - Police
Expenditure Budget by Category ‐ Administrative Services Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,409,814 1,578,762 1,548,891 1,571,761 1,622,945 1,622,945 1,630,136 1,676,490 3.7% 2.8%
Overtime 140,241 52,530 108,839 52,530 76,594 76,594 76,594 76,594 45.8% 0.0%
Personnel Benefits 532,161 621,029 595,108 612,236 612,236 612,236 696,834 737,509 13.8% 5.8%
Supplies 261,014 383,151 318,177 384,151 233,981 233,981 384,151 384,151 0.0% 0.0%
Other Services and Charges 437,624 276,630 416,863 276,630 327,456 327,456 276,630 276,630 0.0% 0.0%
Interfund Payments 11,859 65,915 65,915 72,027 51,048 51,048 94,203 75,328 30.8%‐20.0%
Total 2,792,712 2,978,017 3,053,793 2,969,335 2,924,260 2,924,260 3,158,548 3,226,702 6.4% 2.2%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Administrative Services Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Commissioned 10.00 10.00 10.00 9.00 9.00 9.00 9.00 9.00 0.0% 0.0%
Non‐Commissioned 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 0.0% 0.0%
Total FTE 16.00 16.00 16.00 15.00 15.00 15.00 15.00 15.00 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 100Budget by Department - Police
Staff Services Division
Mission
The Staff Services Division is dedicated to providing 24‐hours a day, 7‐days a week support to Renton Police officers and the
citizens of Renton. As the Police Department’s information gateway, Staff Services strives to provide excellent customer
service by processing all police reports, managing public records requests, and responding to questions from the public in an
accurate and timely manner.
2019/2020 Accomplishments
Developed a process for retention review of expired Police Department records and trained staff on the new process.
Eliminated over 6,700 expired records to date.
Trained three specialists to process Concealed Pistol Licenses (CPL) and firearm transfer requests, reducing wait
times and improving the denial review process.
On‐boarded and trained two new specialists.
2021/2022 Goals
Select and train approved fourth records specialist.
Reduce the need for supervisors to process public records requests by increasing juvenile records training for
records staff.
Implement a process for review and elimination of expired jail records.
Develop additional subject matter experts in order to offer CPL services one additional day per week.
Purchase and implement GovQA Court Order module in order to streamline court order entry and management
process.
Expenditure Budget by Category ‐ Staff Services Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt Adj Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 1,053,218 1,269,630 1,134,249 1,343,688 1,285,625 1,285,625 1,351,244 1,413,129 0.6% 4.6%
Overtime 176,885 52,074 131,038 52,074 88,387 88,387 87,837 87,837 68.7% 0.0%
Personnel Benefits 528,666 590,449 545,731 630,377 602,798 602,798 676,135 723,672 7.3% 7.0%
Supplies 7,018 13,000 5,626 13,000 13,000 13,000 13,000 13,000 0.0% 0.0%
Other Services and Charges 31,630 30,050 24,869 30,050 30,050 30,050 30,050 30,050 0.0% 0.0%
Total 1,797,417 1,955,203 1,841,513 2,069,189 2,019,860 2,019,860 2,158,266 2,267,688 4.3% 5.1%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Staff Services Division
2018 2019 2019 2020 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Adj Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Non‐Commissioned 16.40 17.40 17.40 17.40 17.40 17.40 17.40 17.40 0.0% 0.0%
Total FTE 16.40 17.40 17.40 17.40 17.40 17.40 17.40 17.40 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 101Budget by Department - Police
Police Department Position Listing (1 of 2)
2018 2019 2019 2020 2020 2021 2022
Grade Title Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
Administration
Commissioned Officers
M49 Police Chief 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M46 Police Deputy Chief 0.00 0.00 0.00 0.00 2.00 2.00 2.00
M45 Police Deputy Chief 2.00 2.00 2.00 2.00 0.00 0.00 0.00
Total Commissioned Officers 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Non‐Commissioned Personnel
N16 Administrative Assistant 0.0 0.0 0.0 0.0 1.0 1.0 1.0
N14 Administrative Assistant 1.00 1.00 1.00 1.00 0.00 0.00 0.00
Total Non‐Commissioned 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Administration Division 4.00 4.00 4.00 4.00 4.00 4.00 4.00
Patrol Operations
Commissioned Officers
M38 Commander 0.00.00.00.02.02.02.0
M37 Commander 2.00 2.00 2.00 2.00 0.00 0.00 0.00
PC61 Sergeant 8.00 8.00 8.00 8.00 8.00 8.00 8.00
PC60 Police Officer – Patrol 56.00 56.00 56.00 56.00 56.00 56.00 56.00
Total Commissioned Officers 66.00 66.00 66.00 66.00 66.00 66.00 66.00
Non‐Commissioned Personnel
PN51 Police Secretary 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Non‐Commissioned 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Patrol Operations Division 67.00 67.00 67.00 67.00 67.00 67.00 67.00
Special Operations
Commissioned Officers
M38 Commander 0.00.00.00.01.01.01.0
M37 Commander 1.00 1.00 1.00 1.00 0.00 0.00 0.00
PC61 Sergeant 3.00 3.00 3.00 3.00 3.00 3.00 3.00
PC60 Police Officer – Patrol 17.00 17.00 17.00 17.00 16.00 16.00 16.00
PC60 Police Officer ‐ VNET 1.00 1.00 1.00 1.00 0.00 0.00 0.00
Total Commissioned Officers 22.00 22.00 22.00 22.00 20.00 20.00 20.00
Non‐Commissioned Personnel
Total Non‐Commissioned 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total Special Operations Division 22.00 22.00 22.00 22.00 20.00 20.00 20.00
Patrol Services
Commissioned Officers
M38 Commander 0.00.00.00.01.01.01.0
M37 Commander 1.00 1.00 1.00 1.00 0.00 0.00 0.00
PC61 Sergeant 1.00 1.00 1.00 2.00 2.00 2.00 2.00
PC60 Police Officer – Traffic 9.00 9.00 9.00 9.00 0.00 0.00 0.00
PC59 Police Officer 0.00 0.00 0.00 0.00 9.00 9.00 9.00
Total Commissioned Officers 11.00 11.00 11.00 12.00 12.00 12.00 12.00
Non‐Commissioned Personnel
PN52 Animal Control Officer 2.00 2.00 2.00 2.00 2.00 2.00 2.00
PN51 Parking Enforcement Officer 0.00 0.00 0.00 0.00 1.00 1.00 1.00
PN50 Parking Enforcement Officer 1.50 2.00 2.00 2.00 1.00 1.00 1.00
Total Non‐Commissioned 3.50 4.00 4.00 4.00 4.00 4.00 4.00
Total Patrol Services Division 14.50 15.00 15.00 16.00 16.00 16.00 16.00
2021/2022 Preliminary Budget City of Renton, Washington
3 - 102Budget by Department - Police
Police Department Position Listing (2 of 2)
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
Investigations
Commissioned Officers
M38 Commander 0.00.00.00.01.01.01.0
M37 Commander 1.00 1.00 1.00 1.00 0.00 0.00 0.00
PC61 Sergeant 2.00 2.00 2.00 2.00 2.00 2.00 2.00
PC60 Police Officer/Detectives 14.00 14.00 14.00 14.00 0.00 0.00 0.00
PC59 Police Officer 0.00 0.00 0.00 0.00 16.00 16.00 16.00
Total Commissioned Officers 17.00 17.00 17.00 17.00 19.00 19.00 19.00
Non‐Commissioned Personnel
PN61 Domestic Violence Victim Advocate 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PN54 Crime Analyst 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PN53 Evidence Technician 2.00 2.00 2.00 2.00 2.00 2.00 2.00
PN51 Police Secretary 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Non‐Commissioned 5.00 5.00 5.00 5.00 5.00 5.00 5.00
Total Investigations Division 22.00 22.00 22.00 22.00 24.00 24.00 24.00
Administrative Services
Commissioned Officers
M38 Commander 0.0 0.0 0.0 0.0 1.0 1.0 1.0
M37 Commander 1.00 1.00 1.00 1.00 0.00 0.00 0.00
PC61 Sergeant 2.00 2.00 2.00 2.00 2.00 2.00 2.00
PC60 Police Officer – WSCJTS 1.00 1.00 1.00 0.00 0.00 0.00 0.00
PC60 Police Officer – SRO 1 3.00 3.00 3.00 3.00 0.00 0.00 0.00
PC60 Police Officer – Training 3.00 3.00 3.00 3.00 0.00 0.00 0.00
PC59 Police Officer 0.00 0.00 0.00 0.00 6.00 6.00 6.00
Total Commissioned Officers 10.00 10.00 10.00 9.00 9.00 9.00 9.00
Non‐Commissioned Personnel
PN54 Police Community Program Coordinator 3.00 3.00 3.00 3.00 3.00 3.00 3.00
PN51 Police Secretary 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PN56 Electronic Home Detention Jailer 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Total Non‐Commissioned Personnel 6.00 6.00 6.00 6.00 6.00 6.00 6.00
Total Administrative Services Division 16.00 16.00 16.00 15.00 15.00 15.00 15.00
Staff Services
Commissioned Officers
Total Commissioned Officers 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Non‐Commissioned Personnel
M30 Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PN58 Police Service Specialist Supervisor 2.00 2.00 2.00 2.00 2.00 2.00 2.00
PN57 Police Service Specialist Lead 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PN62 Police Service Specialist 12.40 13.40 13.40 13.40 13.40 13.40 13.40
Total Non‐Commissioned 16.40 17.40 17.40 17.40 17.40 17.40 17.40
Total Staff Services Division 16.40 17.40 17.40 17.40 17.40 17.40 17.40
Total Commissioned Officers 129.00 129.00 129.00 129.00 129.00 129.00 129.00
Total Non‐Commissioned Personnel 32.90 34.40 34.40 34.40 34.40 34.40 34.40
Total Police Department 161.90 163.40 163.40 163.40 163.40 163.40 163.40
1 Added SRO officers to Renton High Schools with school district paying a portion of salary
Grade Title
2021/2022 Preliminary Budget City of Renton, Washington
3 - 103Budget by Department - Police
*Utility Systems Division funds the four (4) FTE’s that are managed in the Finance Division of the Administrative Services (AS)
Department. See AS Department page for FTE count and Budget.
ADMINISTRATOR
Martin Pastucha
162.50 FTEs
AIRPORT DIVISION
Airport Director Vacant
9 FTEs
MAINTENANCE DIVISION
Michael Stenhouse
92 FTEs
Street
Solid Waste
Water
Wastewater
Surface Water
Fleet
TRANSPORTATION SYSTEMS
Jim Seitz
31 FTEs
Maintenance
Operations
Planning and Programming
Design
UTILITY SYSTEMS*
Ronald Straka
28.5 FTEs
Solid Waste
Water
Wastewater
Surface Water
Administrative Support
1 FTE
Public Works
2021/2022 Preliminary Budget City of Renton, Washington
3 - 104Budget by Department - Public Works
Public Works
Mission
The Public Works Department manages and maintains Renton’s utility and transportation systems in a skillful, professional,
and caring manner so as to improve the lives of our residents and business customers.
Description
The department develops, builds, and maintains streets and sidewalks; develops, builds and maintains water, wastewater,
and surface water utility infrastructures; coordinates collection of garbage; operates the airport and the city’s vehicle fleet.
List of Public Works Renton Results Decision Packages:
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Operating Budget Summary 81,886,874 85,396,426 87,942,730 84,587,503 82,918,834 90,578,138 91,867,605 7.1% 1.4%
CIP Budget Summary 18,810,367 42,660,208 23,471,059 37,825,035 132,596,396 7,242,299 18,249,170 ‐80.9% 152.0%
Position Summary 155.00 162.00 162.50 162.00 162.50 162.50 162.50 0.3% 0.0%
Package #Description FTE Tot Exp $Tot Rev $ FTE Tot Exp $Tot Rev $
400015.0007 Public Works Administration 2.00 497,991 ‐ 2.00 511,941 ‐
400019.0013 Public Works Maintenance Administration 5.45 1,507,572 ‐ 5.45 1,558,898 ‐
400019.0014 Street Maintenance 21.46 5,072,787 763,432 21.46 5,193,463 763,432
500019.0028 Water Maintenance 26.12 6,908,325 10,078 26.12 7,028,723 10,078
500019.0029 Wastewater Maintenance 10.73 2,464,842 19,740 10.73 2,553,582 19,740
500019.0030 Surface Water Maintenance 17.24 3,970,031 10,700 17.24 3,980,789 10,700
500019.0031 Solid Waste Litter Control 2.00 312,195 4,692 2.00 316,172 4,692
600019.0015 Fleet Services Operation & Maintenance 9.00 2,900,803 2,890,488 9.00 2,951,187 2,940,243
600019.0016 Fleet Services Capital Recovery ‐ 2,057,000 3,652,287 ‐ 1,419,417 3,413,371
400016.0193 Airport Operations 9.00 2,167,840 2,224,767 9.00 2,250,234 2,561,767
400016.0194 Transportation Maintenance 11.30 2,009,067 ‐ 11.30 2,030,503 ‐
400016.0195 Transportation Systems Admin 3.00 1,051,713 ‐ 3.00 1,078,813 ‐
400016.0196 Building the Mobility Network 9.07 1,551,514 360,000 9.07 1,604,912 360,000
400016.0197 Trans Operations Engineering Section 4.95 1,470,288 ‐ 4.95 1,492,867 ‐
400016.0198 Bridges 0.53 86,689 ‐ 0.53 89,129 ‐
400016.0199 Active Transportation Program 0.25 44,310 ‐ 0.25 45,739 ‐
400016.0200 Transit Coordination/Transportation Demand Ma 0.70 242,743 40,000 0.70 246,570 40,000
600016.0007 Trans Operations Internal Support Services 1.20 182,140 ‐ 1.20 187,171 ‐
500018.0190 Waterworks Revenue Bond Debt ‐ 2,748,723 ‐ ‐ 2,747,903 ‐
500018.0191 King County Metro Fund ‐ 17,607,838 17,607,838 ‐ 17,695,877 17,695,877
500018.0192 Public Works Trust Fund Loan Debt ‐ 351,852 ‐ ‐ 319,821 ‐
500018.0193 Solid Waste Collection 1.50 21,815,269 22,636,694 1.50 22,574,057 23,104,011
500018.0194 Utility Systems Administration 3.50 1,632,992 ‐ 3.50 1,669,661 ‐
500018.0195 Water Engineering and Planning 7.30 3,836,594 16,502,325 7.30 4,018,957 15,416,948
500018.0196 Wastewater Engineering and Planning 6.00 3,719,570 9,012,746 6.00 3,808,081 6,815,573
500018.0197 Surface Water Engineering and Planning 7.80 3,781,895 11,337,487 7.80 3,895,504 5,518,690
500018.0198 Surface Water NPDES Education 1.20 235,640 ‐ 1.20 240,137 ‐
500018.0199 Water Education 0.20 196,074 ‐ 0.20 197,234 ‐
500018.0200 Solid Waste Education 1.00 153,841 ‐ 1.00 160,266 ‐
Total Operating 162.50 90,578,138 87,073,274 162.50 91,867,605 78,675,122
2021/2022 Preliminary Budget City of Renton, Washington
3 - 105Budget by Department - Public Works
Package #DescriptionFTETot Exp $Tot Rev $FTETot Exp $Tot Rev $
460016.0093 T Airport Capital Improvement Program ‐ 827,000 827,000 ‐ 677,000 490,000
460016.0094 T Transportation CIP ‐ 675,250 2,200,000 ‐ 583,000 2,200,000
760016.0011 T Transportation Impact Mitigation Fund ‐ 200,000 200,000 ‐ 200,000 200,000
560018.0142 T W Water CIP ‐ 1,460,000 1,460,000 ‐ 3,680,000 3,680,000
560018.0143 SW Surface Water CIP ‐ 1,326,049 1,081,525 ‐ 7,766,170 7,306,099
560018.0144 WW Wastewater CIP ‐ 2,754,000 2,754,000 ‐ 5,343,000 5,343,000
Total CIP ‐ 7,242,299 8,522,525 ‐ 18,249,170 19,219,099
Total 162.50 97,820,437$ 95,595,799$ 162.50 110,116,775$ 97,894,221$
Note: The first letter(s) of the CIP description title identifies the type of project.
A = Airport, T = Transportation, W = Water, WW = Wastewater, SW = Surface Water
2021/2022 Preliminary Budget City of Renton, Washington
3 - 106Budget by Department - Public Works
Public Works Performance Measures:
City Service Area City Service Area Strategies Performance Measures 2015 Results 2016 Results 2017 Results 2018 Results 2019 Results
Comprehensive mobility
network that connects to the
public to desired destinations
No takeoff or landing delay for any
aircraft longer than 30 minutes due to
inclement weather, routine surface
maintenance operations, the presence
of Foreign Object Debris (FOD), or
wildlife
00220
Maintain a reasonable Overall Condition
Index (Pavement) rating.72 72 68 ‐‐‐67
Promote public safety by minimizing
signal downtime as measured by annual
count of failures/callouts.
60 37 52 50 70
Maintain safe bridges by having no load‐
restricted bridges.01013
Change in Arterial Corridor Travel Time 10% 10%‐9%10% 10%
Increase residential recycling annual
tons collected per capita.‐3%1%20%
Increase residential organics collection
per capita.‐0.51% 5.8% 0.29% 1.5%5%
Restore water service within 4 hours
during emergency shut downs.100% 100% 100% 100% 100%
Development Plans and permit reviews
completed within 5 business days of
receipt.
100% 100% 100% 100% 100%
Requests for Wastewater system
information provided within 2 business
days.
98% 100% 98% 98% 100%
Maintain 20% or greater discount on
federal flood insurance rates by
maintaining a low Community Rating
System (CRS) classification rating.
55555
Maintain Surface Water NPDES permit
compliance in the City.90% 100% 100% 100% 100%
Minimize “comeback” repairs, as a
percentage of the total repairs new 2016 23% 5.39% 4.51% 0.59%
Turn‐around time, percentage of work
orders completed in less than 72 hours new 2016 71% 71% 71% 68%
Equipment and data that is
reliable and accessible
Internal
Support
Mobility
Utilities and
Environment
Well‐maintained condition of
the mobility infrastructure
Efficient and safe operation of
Manage solid waste
Operate and maintain piped
utility infrastructure
Compliance with
environmental standards and
laws
2021/2022 Preliminary Budget City of Renton, Washington
3 - 107Budget by Department - Public Works
Highlight of Budget Changes:
Airport division created (formerly under the Transportation Division)
Transfers out decreased due to reduced fuel tax revenue collection
Part‐time salaries decrease in 2021; Transportation department reallocated to professional services
Intergovernmental Services decreased and Other Services and Charges increased in 2021 and 2022 due to a Budget
Accounting and Reporting expense code change
Capital improvement projects decrease from 2020 to 2021 due to project completions and a lower number of new
projects
2021/2022 capital improvement project spending includes:
o $1,504,000 – Airport division improvements
o $1,658,250 – Transportation division improvements
o $22,329,219 – Utility division improvements
2021/2022 capital outlay spending includes vehicle/equipment replacements for 2021 and 2022
General Fund allocation of $1.5M of Real Estate Excise Tax and $500K of Business and Occupation Tax (in 2021 and
2022) for Transportation department’s capital improvements
Interfund payments includes increases to different internal service funds to account for increases in operation
costs to support Public Work functions
2021/2022 Preliminary Budget City of Renton, Washington
3 - 108Budget by Department - Public Works
Expenditure Budget by Division ‐ Public Works
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Administration 417,786 425,954 424,466 479,048 442,549 497,991 511,941 4.0% 2.8%
Maintenance Services 40,645,508 42,160,918 42,448,738 40,535,417 39,180,053 42,801,392 42,698,107 5.6%‐0.2%
Transportation Services 6,220,779 6,894,559 8,324,225 7,165,449 7,059,187 6,638,464 6,775,702 ‐7.4% 2.1%
Utility Systems 32,878,493 34,094,566 34,952,759 34,493,477 34,385,857 38,472,451 39,631,621 11.5% 3.0%
Airport 1,724,308 1,820,429 1,792,543 1,914,113 1,851,188 2,167,840 2,250,234 13.3% 3.8%
Operating Total 81,886,874 85,396,426 87,942,730 84,587,503 82,918,834 90,578,138 91,867,605 7.1% 1.4%
CIP 18,810,367 42,660,208 23,471,059 37,825,035 132,596,396 7,242,299 18,249,170 ‐80.9% 152.0%
Total 100,697,241 128,056,634 111,413,789 122,412,538 215,515,229 97,820,437 110,116,775 ‐20.1% 12.6%
Expenditure Budget by Category ‐ Public Works
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 11,639,997 12,915,544 12,465,756 13,481,889 13,331,188 13,714,088 14,096,816 1.7% 2.8%
Part‐Time Salaries 99,597 151,003 141,259 160,567 47,258 85,244 94,808 ‐46.9% 11.2%
Overtime 258,770 209,580 265,915 209,580 207,351 209,580 209,580 0.0% 0.0%
Personnel Benefits 5,193,081 5,883,170 5,586,239 6,236,169 6,086,304 6,706,945 7,098,078 7.5% 5.8%
Supplies 2,970,733 3,190,433 3,233,157 3,189,933 3,082,421 3,194,633 3,194,633 0.1% 0.0%
Other Services and Charges 35,995,003 36,327,331 44,911,691 36,405,494 42,665,743 48,120,022 49,159,836 32.2% 2.2%
Intergovernmental Services 7,521,681 7,443,625 0 7,443,625 1,423,152 0 0 ‐100.0% N/A
Capital Outlay 4,143,193 4,284,923 4,796,724 1,912,923 2,132,923 2,165,923 1,528,340 13.2%‐29.4%
Debt Service 3,553,938 3,626,830 3,625,929 3,622,331 3,622,331 3,620,575 3,587,724 0.0%‐0.9%
Interfund Payments 7,818,988 8,662,557 8,352,266 9,250,880 7,708,974 10,593,288 10,647,555 14.5% 0.5%
Transfer Out 967,585 881,000 2,771,252 760,000 760,000 0 0 ‐100.0% N/A
Operating Total 80,162,566 83,575,996 86,150,187 82,673,391 81,067,646 88,410,298 89,617,370 6.9% 1.4%
CIP 18,810,367 42,660,208 23,471,059 37,825,035 132,596,396 7,242,299 18,249,170 ‐80.9% 152.0%
Total 98,972,933 126,236,204 109,621,246 120,498,426 213,664,041 95,652,597 107,866,540 ‐20.6% 12.8%
Staffing Levels by Division ‐ Public Works
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Administration 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.0% 0.0%
Maintenance Services 88.00 92.00 92.00 92.00 92.00 92.00 92.00 0.0% 0.0%
Transportation Services 28.50 30.50 31.00 30.50 31.00 31.00 31.00 1.6% 0.0%
Utility Systems 27.50 28.50 28.50 28.50 28.50 28.50 28.50 0.0% 0.0%
Airport 9.00 9.00 9.00 9.00 9.00 9.00 9.00 0.0% 0.0%
Total FTE 155.00 162.00 162.50 162.00 162.50 162.50 162.50 0.3% 0.0%
Intermittent FTE 2.67 3.68 3.84 3.91 1.14 2.10 2.33 ‐46.3% 10.9%
Temp/Intermit Pay & Ben 110,984$ 153,216$ 159,625$ 162,780$ 47,258$ 87,457$ 97,021$ ‐46.3% 10.9%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 109Budget by Department - Public Works
Administration Division
Mission
Provide leadership, resources and regional influence to enable the department to meet its responsibilities in a manner that
is responsive to the needs of customers and the community consistent with the city’s Business Plan goals in a fiscally
responsible manner.
2019/2020 Accomplishments
Continued to partner with Sound Transit and WSDOT to implement regional projects that benefit Renton residents
and the region.
Completed staff reorganization and hired new positions to improve processes, including the creation of a new
Airport Division, which was previously the Airport Section under the Transportation Systems Division, and the
reclassification of the Airport Manager to an Airport Director. In addition a Senior Traffic Maintenance Worker
classification was created to facilitate transition from raised pavement markers to painted lane lines.
2021/2022 Goals
Provide for successful transition of Airport to a separate division.
Develop performance measurement to document work efforts.
Manage budget preparations and monitoring.
Manage personnel administration and work on providing effective resolution of human resource issues in support
of department divisions.
Continue the pursuit of grants and advocate for state and federal dollars to enhance our transportation system.
Development and adoption of strategy to partner with the Federal Aviation Administration on designation of the
Renton Airport.
Continue development and implementation of Utility Master Plans for the Water, Wastewater and Surface Water
utilities.
Expenditure Budget by Category ‐ Administration
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 250,212 257,665 258,358 265,834 273,482 273,720 278,941 3.0% 1.9%
Personnel Benefits 91,551 96,261 94,098 101,194 101,194 104,109 109,139 2.9% 4.8%
Supplies 772 800 512 800 800 800 800 0.0% 0.0%
Other Services and Charges 1,683 1,650 1,920 1,650 1,650 1,650 1,650 0.0% 0.0%
Interfund Payments 73,568 69,578 69,578 109,570 65,423 117,712 121,411 7.4% 3.1%
Total 417,786 425,954 424,466 479,048 442,549 497,991 511,941 4.0% 2.8%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Administration
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Total FTE 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 110Budget by Department - Public Works
Airport Division
Mission
Operate the Renton Municipal Airport in a safe and fiscally responsible manner in support of general, business and
manufacturing aviation users through the administration of leases, fees and user charges, the implementation of Capital
Improvement programs and in accordance with Federal Aviation Administration policies and procedures.
2019/2020 Accomplishments
Completed staff reorganization and hired new positions to improve processes.
Completed full scale emergency exercise, identified delinquencies and implemented more efficient procedures.
Completed 100% design for sewer lift station at the north entrance.
Completed Cedar River lighting upgrades to improve sustainability of the Airport.
Completed request for proposal for the 300 Rainier Avenue Project.
Initiated a rates and fees study to increase revenue and better align associated operating costs.
Completed a proposed layout and pre‐design report for the creation of additional general aviation tie down
parking spots in the southeast corner of the Airport property.
Continued advocacy for continued federal funding for the staff at the Renton Air Traffic Control Tower as needed.
Completed construction of East Perimeter Road vehicle traffic speed table and crosswalk.
2021/2022 Goals
Complete construction of the Control Tower Seismic Retrofit and First Floor Remodel projects.
Complete preliminary engineering for the Taxiway Alpha Rehabilitation Project.
Complete repair and mitigation for the Cedar River Flood event.
Complete construction of the Lake Washington Shoreline Mitigation Project.
Complete update to the Airport Layout Plan.
Complete the annual reporting for the Sustainability Management Plan.
Hold quarterly Renton Airport Advisory Committee meetings.
Complete the plans and specifications for the creation of additional general aviation tie downs in the northwest
corner of the Airport property.
Continue advocating for ongoing federal funding for the staff at the Renton Air Traffic Control Tower as needed.
Complete a request for information or request for proposal for development of the southeast corner of the
Airport.
Expenditure Budget by Category ‐ Airport
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 642,631 734,900 690,770 783,773 794,707 803,443 847,467 2.5% 5.5%
Part‐Time Salaries 80,491 21,918 57,486 21,918 4,247 17,680 17,680 ‐19.3% 0.0%
Overtime 43,831 40,000 44,178 40,000 20,000 40,000 40,000 0.0% 0.0%
Personnel Benefits 268,142 295,069 291,693 313,374 290,732 437,214 467,350 39.5% 6.9%
Supplies 45,763 45,000 22,068 45,000 43,500 35,630 35,630 ‐20.8% 0.0%
Other Services and Charges 347,523 358,374 368,228 358,374 387,238 440,150 440,150 22.8% 0.0%
Intergovernmental Services4,140000000N/AN/A
Interfund Payments 277,967 325,168 318,121 351,674 310,765 393,723 401,957 12.0% 2.1%
Transfer Out 13,820000000N/AN/A
Operating Total 1,724,308 1,820,429 1,792,543 1,914,113 1,851,188 2,167,840 2,250,234 13.3% 3.8%
CIP 284,611 925,000 439,259 525,000 5,997,236 827,000 677,000 57.5%‐18.1%
Total 2,008,919 2,745,429 2,231,802 2,439,113 7,848,424 2,994,840 2,927,234 22.8%‐2.3%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 111Budget by Department - Public Works
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Airport
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Administration 2.00 2.00 2.00 2.00 2.00 2.00 2.00 0.0% 0.0%
Operation 7.00 7.00 7.00 7.00 7.00 7.00 7.00 0.0% 0.0%
Total FTE 9.00 9.00 9.00 9.00 9.00 9.00 9.00 0.0% 0.0%
Intermittent FTE 2.39 1.20 1.83 1.20 0.23 0.64 0.64 ‐47.1% 0.0%
Temp/Intermit Pay & Ben 99,575$ 50,000$ 76,041$ 50,000$ 9,687$ 26,458$ 26,458$ ‐47.1% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 112Budget by Department - Public Works
Maintenance Services Division
Mission
Support the operating sections of the Public Works Maintenance Division:
Provide planning, budgeting, goal setting and management.
Provide purchasing and inventory support.
Establish effective liaison and project coordination.
Perform administrative, customer service contact and record systems management.
2019/2020 Accomplishments
Street Maintenance
85% of the citizens contacting the division rate our service as satisfactory.
A street Overall Condition Index (OCI) rating of 70 or above was maintained.
Within the resources provided, kept Renton’s rights‐of‐way as clean as possible.
Continued increased litter collection along city streets.
Water Maintenance
High‐quality water is provided in sufficient quantity.
Ensure security, maintain reservoirs, valves, pressure reducing valves, etc.
Wastewater Maintenance
Surface water flooding and sewer overflows are minimized.
Maintain ponds, pipes, culverts, effect repairs, CCTV of pipes to develop repair and replacement plans.
Fleet Maintenance
Ensure safe, available and reliable vehicles and equipment.
Replace approximately 50 vehicles annually.
2021/2022 Goals
Street Maintenance
Within the resources provided, keep Renton’s rights‐of‐way as clean as possible.
85% of the citizens contacting the division rate our service as satisfactory.
A Street Overall Condition Index (OCI) rating of 70 is maintained through preventative maintenance and asphalt
repairs.
Water Maintenance
High quality water is provided in sufficient quantity.
Wastewater and Surface Water Maintenance
Surface water flooding and sewer overflows are minimized.
Fleet Maintenance
Ensure safe, available and reliable vehicles and equipment for the city’s use.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 113Budget by Department - Public Works
Expenditure Budget by Category ‐ Maintenance Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 6,312,845 6,947,553 6,722,479 7,242,630 7,089,707 7,316,404 7,539,112 1.0% 3.0%
Part‐Time Salaries 0 27,694 0 37,258 37,258 27,694 37,258 ‐25.7% 34.5%
Overtime 191,771 160,011 211,431 160,011 160,011 160,011 160,011 0.0% 0.0%
Personnel Benefits 3,085,050 3,469,885 3,275,391 3,676,801 3,522,774 3,850,509 4,079,769 4.7% 6.0%
Supplies 2,706,991 2,921,033 2,960,116 2,921,033 2,825,033 2,921,033 2,921,033 0.0% 0.0%
Other Services and Charges 19,063,775 19,283,239 19,435,993 19,365,352 19,321,487 19,965,964 20,054,003 3.1% 0.4%
Intergovernmental Services3,431000000N/AN/A
Capital Outlay 4,143,193 4,284,923 4,779,703 1,912,923 2,132,923 2,165,923 1,528,340 13.2%‐29.4%
Interfund Payments 4,878,213 4,935,580 4,647,626 5,219,409 4,090,860 6,393,854 6,378,581 22.5%‐0.2%
Transfer Out 260,240131,000416,0000000N/AN/A
Total 40,645,508 42,160,918 42,448,738 40,535,417 39,180,053 42,801,392 42,698,107 5.6%‐0.2%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Maintenance Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Administration 5.45 5.45 5.45 5.45 5.45 5.45 5.45 0.0% 0.0%
Street/Solid Waste 21.46 23.46 23.46 23.46 23.46 23.46 23.46 0.0% 0.0%
Water 26.12 26.12 26.12 26.12 26.12 26.12 26.12 0.0% 0.0%
Wastewater/Surface Water 25.97 27.97 27.97 27.97 27.97 27.97 27.97 0.0% 0.0%
Fleet 9.00 9.00 9.00 9.00 9.00 9.00 9.00 0.0% 0.0%
Total FTE 88.00 92.00 92.00 92.00 92.00 92.00 92.00 0.0% 0.0%
Intermittent FTE 0.000.670.000.900.900.670.90‐25.7% 34.5%
Temp/Intermit Pay & Ben ‐$ 27,694$ ‐$ 37,258$ 37,258$ 27,694$ 37,258$ ‐25.7% 34.5%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 114Budget by Department - Public Works
Transportation Systems Division
Mission
To plan, design, construct, operate and maintain the city’s transportation system to assure the health and safety of the
general public in a skillful, professional and caring manner that enhances the lives of its residents and business customers.
The division aggressively pursues mobility improvements that benefit Renton and the region consistent with the city’s
Business Plan goals.
2019/2020 Accomplishments
Design
Completed 60% design and the environmental process, and began the right‐of‐way acquisition process on the
Rainier Avenue North Phase 4 Project.
Completed design and construction documents, and right‐of‐way acquisition on the expanded Duvall Avenue NE
Roadway (NE 7th Street to Sunset Blvd NE) Improvements Project.
Completed the 2018 and 2019 Overlay Program projects.
Completed environmental work, began right‐of‐way acquisition process and continued channelization plan
approval process on the NE Sunset Blvd (SR 900) Corridor Improvements Project.
Completed design, environmental and right‐of‐way processes for the Lake Washington Loop Trail Project.
Completed 2019 and 2020 bridge inspections.
Continued supporting the Sidewalk Repair and Maintenance Program.
Continued implementing the Walkway Program.
Completed construction on the Renton Avenue South Pavement Preservation Project.
Completed the environmental permitting, project, street and railroad crossing design, Boeing electrical ductwork
design and continued right‐of‐way negotiations with The Boeing Company, BNSF and SECO for the Park Avenue
North Extension Project.
Completed the right‐of‐way acquisition process and final plans and construction documents and began
construction on the Williams Avenue South and Wells Avenue South Conversion Project.
Completed design, environmental and right‐of‐way acquisition on the Houser Way Complete Streets Project.
Began design on the Bronson Way Bridge Seismic Retrofit and Painting Project.
Began design on the Houser Way Bridge Seismic Retrofit and Painting Project.
Began design on the Williams Avenue Bridge Seismic Retrofit and Painting Project.
Completed reconstruction of pedestrian ramps on South Grady Way.
Completed design and environmental process and luminaire supplier on the Highlands to Landing Pedestrian
Lighting Project.
Completed consultant selection and began design on SW 43rd Street Resurfacing (SR 167 to west City Limits)
Project.
Completed consultant selection and began design on the Renton Connector (South 2nd Street to South 5th Street)
Project.
Operations
Reviewed and responded to over 350 citizen traffic operations related requests.
Prepared over 230 work orders from citizen requests for traffic calming and safety concerns.
Maintained traffic count program with permanent count locations and other count locations as needed and MS2
count data support module with Midwestern Solutions, Inc.
Maintained traffic collision data files through MS2 Crash Program with Midwestern Solutions, Inc.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 115Budget by Department - Public Works
Supported the Transportation Design Section reviewing plans and modify signal timing to facilitate city initiated
capital projects.
Reviewed over 300 traffic control plans for Transportation Operations approval.
Consulted with the Community and Economic Development Department to perform private development reviews
for street lighting, roadways, pedestrian ramps and traffic signals improvements.
Managed development of design plans and installation of a traffic signal for Oakesdale Avenue SW and SW 41st
Street.
Managed traffic calming program for installation of speed radar signs at 30 locations on a rotation basis on streets
with speeding problems.
Managed WSDOT safety grant for the school crosswalk improvements, including wheelchair ramps and rectangular
flashing beacons at Maplewood Heights and Sierra Heights elementary schools, McKnight Middle School and
Hazen High School.
Prepared plans for installation of two school speed zone flashing beacons at Nelsen Middle School.
Updated and continued to monitor guardrail program with standards and project list.
Installed 200 feet of guardrail for two locations along South 55th Street (Snake Hill).
Prepared and maintained a priority list for installing flashing yellow arrows for left‐turns at signalized intersections
at SW Grady Way and Oakesdale Avenue SW.
Continued support of King County Metro Rapid Ride “I” Line Implementation.
Developed several neighborhood traffic calming safety improvements using 55 rotating radar signs and rumble
chips.
Installed new rectangular rapid flashing beacons for pedestrian crossings at 5 Renton elementary schools, and one
general pedestrian location.
Installed new speed radar signs at 30 locations on several streets to enhance traffic calming.
Maintained and updated the Synchro traffic signal analysis program for improving signal timing operations.
Supported the Transportation Design Section and modified signal timing to facilitate city initiated capital projects.
Updated Signal and Signing Standard Plans 116, 117.1, 117.2, 117.3, 117.4, 117.5, 121, 132 and 134.
Reviewed and approved plans for construction for the Red Light Running Camera and School Zone Speed Camera
projects.
Maintenance
Responded to and replaced 51 damaged or stolen street fixtures, poles and copper wire.
Completed an annual inspection of street lights and identified those that require vegetation trimming to ensure
illumination of the roadway and sidewalks. Approximately 200 trees obstructing traffic signs, traffic signals and
street lights are trimmed annually by city staff and urban forestry.
Installed and maintained radios for city vehicles and radios for the Renton Regional Fire Authority vehicles and fire
stations.
Assisted Facilities in completion of the Transportation Maintenance Facility Expansion Project.
Continued participation in the Graffiti Abatement Program.
Completed preventative maintenance programs on signal cabinets, signal heads LED signal heads, communications
systems, uninterruptible power supplies, school zone flashers, Opticom systems, signal loops street lighting and
monitor malfunction units for the Transportation Division.
Completed annual check, programming and maintenance for 86 school zone flashers prior to each school year.
Installed 100 miles of painted pavement markings.
Installed 10,000 raised pavement markers.
Installed 200 new or replacement signs through regular maintenance and work orders.
Performed retro‐reflectivity checks of all signage.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 116Budget by Department - Public Works
Reviewed and responded to 276 citizen traffic related requests.
Supported the Transportation Operations Section and completed new work order requests.
Supported the Airport with lighting and electrical issues.
Supported Community Services on 14 special events.
Replaced all signal indications in six intersections.
Consulted with the Community and Economic Development Department to perform private development reviews
for street lighting, roadways, pedestrian ramps and traffic signals improvements.
Maintained the transportation fiber optic network.
Installed 67 radios and GPS equipment in city vehicles.
Repaired 169 street lighting outages.
Responded to and repaired 142 traffic signal malfunctions.
Planning and Programming
• Prepared and annually updated Six‐Year Transportation Improvement Plan.
• Provided project coordination and budgetary oversight of approximately 39 projects and programs with the
adopted 2019 and 2020 transportation capital investment plan (CIP) budgets.
• Pursued grants and funding opportunities for multi‐modal transportation projects. Between August 2018 and July
2020, completed 9 grant applications and obtained over $17,188,750 million in grant offers.
• Facilitated grant obligation processes to ensure grant award acceptance by City Council.
• Coordinated the annual submittal of Title VI reports to WSDOT.
• Finalized the adoption of the Renton Trails and Bicycle Master Plan.
• Led the analysis to try to create a Pavement Management Dashboard with reporting capability. Vendor selection
completed and work is underway.
• Participated with King County Metro on a King County Budget Proviso, “The Renton Transit Study.”
• Participated with King County Metro on the development of the Renton Kent Auburn Area Mobility Plan that was
in preparation for creating a single transit route connecting the three cities by replacing existing routes 169 and
180 with the bus rapid transit route, RapidRide I Line.
• Participated in WSDOT and Sound Transit I‐405 project activities and provided internal coordination.
• Began the update to the city’s ADA Transition Plan within the public rights‐of‐way.
• Continued the self‐evaluation process of the ADA Transition Plan that includes inventory of assets in city’s GIS
system.
• Actively participated in regional forums (RTC, PSRC, ETP, SCATBd, RPEC) and other discussions on transportation
funding packages to ensure Renton’s interests are represented regionally.
• Participated in the update of the Transportation Chapter of the Countywide Planning Policies which will guide the
development of 2024 comprehensive plans.
• Continued to partner with Sound Transit and WSDOT to implement regional projects that benefit Renton residents
and the region.
• Began work on the Network Mobility Evaluation to aid in the city’s Comprehensive Plan update.
• Reviewed and provided comments as provided guidance to Community and Economic Development on private
development applications and traffic impact studies.
• Continued to work with commute trip reduction (CTR) sites within Renton, including holding multiple coordinated
CTR meetings with adjacent jurisdictions to implement state mandated CTR law requirements.
• Coordinated with King County Metro Transit and Sound Transit personnel to respond to citizen comments
concerning transit service.
• Completed several small capital projects including the installation of ADA compliant ramps and short sections of
sidewalk in various parts of the city.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 117Budget by Department - Public Works
• Continued the work on a Non‐motorized Access Assessment of all school locations that was started with
cooperation from the Renton School District.
2021/2022 Goals
Design
Complete construction of and close out the Williams Avenue South and Wells Avenue South Conversion Project.
Complete design and construction of the Houser Way South Complete Streets Project.
Complete design and construction documents, environmental documentation, right‐of‐way acquisition and
advertise and begin construction of the Rainier Avenue North Phase 4 Project.
Advertise and complete construction of the Duvall Avenue NE Roadway Improvements (NE 4th Street to Sunset
Blvd. NE) Project.
Complete design and construction of the 2019 and 2020 Pedestrian Ramp Project of the Overlay Program and
design and construct the 2021 and 2022 street overlay projects.
Complete design and construction documents for the first phase of and complete right‐of‐way acquisition for the
NE Sunset Blvd (SR 900) Corridor Project.
Complete the Lake Washington Loop Trail Project construction.
Complete bridge inspections, report, and design standards. Identify funding sources for bridge repair,
rehabilitation and replacement projects not eligible for FHWA BRAC funding and complete seismic retrofit and
painting projects on the Bronson Way, Houser Way and Williams Avenue bridges. Obtain funding, select a
consultant and complete a type, size and location report on the 148th Avenue NE Bridge over May Creek.
Continue to support the Sidewalk Repair and Maintenance Program.
Continue to implement the Walkway Program.
Project closeout on the Renton Avenue South Pavement Preservation Project.
Complete right‐of‐way acquisition and begin construction for the Park Avenue North Extension Project.
Complete design and construction documents, environmental and right‐of‐way acquisition for the SW 43rd Street
Resurfacing (SR 167 to west City Limits) Project.
Close out Grady Way project.
Complete construction and close out the Highlands to Landing Pedestrian Lighting Project.
Complete design and environmental on the Renton Connector (South 2nd Street to South 5th Street) Project.
Select consultant, begin design, complete environmental on the South 2nd Street Conversion Project.
Operations
Review and respond to over 300 citizen traffic operations related requests.
Prepare over 200 work orders from citizen requests for traffic calming and safety concerns.
Maintain traffic count program with permanent count locations and other count locations as needed and MS2
count data support module with Midwestern Solutions, Inc.
Maintain traffic collision data files through MS2 Crash Program with Midwestern Solutions, Inc.
Maintain and update when appropriate the Synchro traffic signal analysis program for improving signal timing
operations with support from travel time monitoring system results.
Support the Transportation Design Section and modify signal timing to facilitate city initiated capital projects.
Review over 250 traffic control plans for Transportation Operations approval.
Consult with the Community and Economic Development Department to perform private development reviews for
street lighting, roadways, pedestrian ramps and traffic signals improvements.
Manage development of plans and installation of a traffic signal for Oakesdale Avenue SW and SW 41st Street.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 118Budget by Department - Public Works
Manage traffic calming program for installation of speed radar signs on a rotation basis on streets with speeding
problems.
Manage WSDOT safety grant for the school crosswalk improvements, including wheelchair ramps and rectangular
flashing beacons at Maplewood Heights and Sierra Heights elementary schools, McKnight Middle School and
Hazen High School.
Prepare plans for installation of school speed zone flashing beacons at various schools.
Update guardrail program with standards and project list.
Prepare a priority list for installing flashing yellow arrows for left‐turns at signalized intersections.
Develop and implement additional traffic calming devices to address speeding issues on residential streets.
Maintenance
Respond and replace damaged or stolen street fixtures, poles and copper wire.
Complete an annual inspection of street lights and identify those that require vegetation trimming to insure
illumination of the roadway and sidewalks.
Install two new signal cabinets.
Install and maintain radios for city vehicles.
Continue participation in the Graffiti Abatement Program.
Complete preventative maintenance programs on signal cabinets, signal heads LED signal heads, communications
systems, uninterruptible power supplies, school zone flashers, Opticom systems, signal loops street lighting and
monitor malfunction units for the Transportation Division.
Complete annual check and maintenance for school zone flashers prior to each school year.
Install 100 miles of painted pavement markings.
Refresh thermal plastic in intersection.
Maintain channelization devices.
Fabricate traffic signs in house.
Install 200 new or replacement signs through regular maintenance and work orders.
Perform retro‐reflectivity checks of signage.
Review and respond to citizen traffic related requests.
Support the Transportation Operations Section and complete new work order requests.
Support the Airport with lighting and electrical issues.
Support the Information Technology Division with fiber splicing, troubleshooting and installing radios.
Support Community Services on special events.
Replace all signal indications in 16 intersections.
Consult with the Community and Economic Development Department to perform private development reviews
and inspections for street lighting, roadways, pedestrian ramps, signage channelization, and traffic signal
improvements.
Conduct project plan reviews for the Transportation Division and Community and Economic Development
Department.
Participate in fiber optic projects.
Manage small works contracts to replace knocked down poles and signals as needed.
Replace damaged assets as needed.
Manage the transportation fiber optic network.
Create VPN for transportation fiber optic network.
Install all radios and GPS equipment in city vehicles.
Repair street lighting outages.
Respond to and repair traffic signal malfunctions.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 119Budget by Department - Public Works
Upgrade traffic signals as needed by replacing two signal cabinets annually.
Install flashing yellow arrows in traffic signals at the intersection of SW Grady Way and Oakesdale Avenue SW.
Maintain adaptive signal control systems.
Upgrade approximately 10 traffic signal controllers annually.
Program, repair and maintain 86 school beacons.
Participate in radar sign program.
Planning and Programming
• Begin developing the framework for a Transit Master Plan and the Walkway Master Plan.
• Continue update and maintenance of curb ramp data for the city’s transition plan.
• Continue the Network Mobility Evaluation Study and develop recommendations for action steps for the
Comprehensive Plan Update.
• Complete creation of the Pavement Management Dashboard. Facilitate the development of cross‐division
processes to better align Transportation Systems and Maintenance to assess current needs and system wide
performance measures.
• Continue to participate in WSDOT and Sound Transit I‐405 project activities and provide internal coordination.
• Provide project coordination and financial oversight of all projects and programs within the adopted
transportation capital investment budgets.
• Aggressively pursue grants and funding opportunities for multi‐modal transportation projects.
• Actively participate in regional forums (RTC, PSRC, ETP, SCATBd, RPEC) and other discussions on transportation
funding packages to ensure Renton’s interests are represented regionally.
• Review and provide comments on private development applications and traffic impact studies.
• Continue to work with existing commute trip reduction (CTR) sites within Renton to implement state mandated
CTR law requirements.
• Work with newly CTR eligible sites to help them establish CTR programs.
• Coordinate with King County Metro Transit and Sound Transit personnel to respond to citizen comments
concerning transit service.
• Complete small capital projects which include short segments of sidewalk or crosswalk upgrades to meet ADA
compliance.
• Work with the Community and Economic Development Department to update the transportation element of
several city planning documents.
• Participate with King County Metro on the implementation of the RapidRide I Line and any improvement to transit
service in Renton.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 120Budget by Department - Public Works
Expenditure Budget by Category ‐ Transportation Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 2,524,951 2,868,473 2,768,598 2,994,067 3,065,409 3,093,283 3,172,961 3.3% 2.6%
Part‐Time Salaries 77,347 65,759 110,591 65,759 10,000 0 0 ‐100.0% N/A
Overtime 66,184 45,932 52,004 45,932 45,932 45,932 45,932 0.0% 0.0%
Personnel Benefits 1,096,266 1,251,157 1,181,506 1,328,195 1,366,167 1,413,635 1,493,527 6.4% 5.7%
Supplies 234,219 226,502 253,161 226,002 223,252 230,702 230,702 2.1% 0.0%
Other Services and Charges 876,331 959,524 885,576 956,824 945,974 1,019,483 1,017,483 6.5%‐0.2%
Intergovernmental Services 544000000N/AN/A
Interfund Payments 648,937 727,212 728,881 788,670 642,453 835,429 815,097 5.9%‐2.4%
Transfer Out 696,000 750,000 2,343,908 760,000 760,000 0 0 ‐100.0% N/A
Operating Total 6,220,779 6,894,559 8,324,225 7,165,449 7,059,187 6,638,464 6,775,702 ‐7.4% 2.1%
CIP 7,139,290 22,155,208 8,867,878 19,220,035 47,110,755 875,250 783,000 ‐95.4%‐10.5%
Total 13,360,069 29,049,767 17,192,102 26,385,484 54,169,941 7,513,714 7,558,702 ‐71.5% 0.6%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Transportation Services
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Administration 2.50 2.50 3.00 2.50 3.00 3.00 3.00 20.0% 0.0%
Planning 3.50 3.50 3.50 3.50 3.50 3.55 3.55 1.4% 0.0%
Design 6.00 7.00 7.00 7.00 7.00 7.00 7.00 0.0% 0.0%
Operations 5.00 5.00 5.00 5.00 5.00 4.95 4.95 ‐1.0%0.0%
Maintenance 11.50 12.50 12.50 12.50 12.50 12.50 12.50 0.0% 0.0%
Total FTE 28.50 30.50 31.00 30.50 31.00 31.00 31.00 1.6% 0.0%
Intermittent FTE 2.09 1.63 2.96 1.63 0.24 0.05 0.05 ‐96.7% 0.0%
Temp/Intermit Pay & Ben 86,992$ 67,972$ 123,221$ 67,972$ 10,000$ 2,213$ 2,213$ ‐96.7% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 121Budget by Department - Public Works
Utility Systems Division
Mission
Manage the planning, engineering, construction, and database functions for the city’s solid waste, water, wastewater and
surface water utility sections, in a manner that ensures public health and safety, meets all regulatory requirements, protects
environmental resources, is financially sound and supports the city’s Business Plan goals.
2019/2020 Accomplishments
Water Utility Engineering
Completed the construction of the Kennydale 1.3 million gallon reservoir and site utility improvements. Selected
an artist/contractor to recommend to City Council for execution of the mural.
Started construction of the Kennydale transmission main improvements.
Completed the design and bid documents for the new Highlands transmission mains.
Completed the design of the new Highlands six million gallon reservoir and building permit application.
Completed the design and began construction of the water main improvements for the Downtown Utility
Improvements Project in coordination with the Wastewater and Surface Water utilities.
Completed the design for the roof replacement for the Maplewood Water Treatment Plant.
Completed the final draft of the 2019 Water System Plan Update and SEPA review.
Provided technical assistance to the city’s Planning Division and Transportation Systems Division on the review of
the design and construction of the water improvements associated with private development projects and capital
roadway improvement projects, including Duvall Avenue NE, Rainier Avenue South, and Williams Avenue South and
Wells Avenue South Conversion.
Provided technical assistance to WSDOT on its I‐405 improvement related to the I‐405 Renton to Bellevue
Widening Express Toll Lanes project, including the relocation of city‐owned water mains in WSDOT’s right‐of‐way.
Continued the maintenance and update of the drinking water quality monitoring database, water system GIS and
hydraulic model to meet regulatory compliance requirements.
Continued implementation of regulatory requirement programs including development and publication of annual
water quality report, aquifer protection program, water conservation and water use efficiency program and
cross‐connection control program.
Wastewater Utility Engineering
Completed design and began construction of the sanitary sewer main replacement for the South 2nd Street and
South 3rd Street corridors as part of the Downtown Utility Improvement Project in coordination with the Water and
Surface Water utilities.
Completed design and permitting for the Thunder Hills Sewer Interceptor Rehabilitation Project.
Completed construction of the first phase of improvements for the Sanitary Sewer Lift Stations and Force Mains
Project to bring each station up to current operational standards.
Completed replacement of the Falcon Ridge sanitary sewer lift station.
Completed the CCTV update and integration into the city’s GIS and CityWorks maintenance management software.
Initiated design of the replacement of the Kennydale Lakeline Sewer transmission line.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 122Budget by Department - Public Works
Surface Water Utility Engineering
Completed Year 2 and Year 3 mitigation monitoring, reporting and maintenance work that is required by the state
and federal permits for the Cedar River Maintenance Dredge (Gravel Removal) Project, which is 100% funded by an
interlocal agreement with the King County Flood Control District that provided $13,171,131 for the project.
Completed design, permitting and construction of the 2019 program to install fences around utility maintained
storm water facilities that do not have fences as part of the Storm Water Facility Fencing Project.
Initiated Phase 3 of the Cedar River 205 Levee Recertification Project, which consists of the design and permitting
of the levee improvements required for certification after securing $5 million of funding from the King County
Flood Control District.
Completed the design, permitting and construction of the Small Drainage Program projects including Victoria Hills
and Lake Youngs Court SE Storm Improvement Project and the cleaning of the Madsen Creek/149th Avenue SE
Sediment Trap Facility.
Completed the Madsen Creek Sedimentation Basin and Maplewood Sedimentation Basin Cleaning Project
construction in the summers of 2019 and 2020.
Completed the annual Mosquito Abatement Program for treatment of upland areas in the Talbot Hill area adjacent
to the Panther Creek Wetlands and city maintained storm water facilities.
Completed the final year of the 10‐year Springbrook Creek Wetland and Habitat Mitigation Bank Project
establishment period. A total of 43.61 credits have been released for the city and WSDOT. The city currently has
20.55 credits available for use on city projects or sale to private development projects.
Continued implementation of the Storm Water Facility Transfer Program to accept maintenance of existing storm
water facilities in residential plats with public streets. A total of 115 facilities have been transferred to the city for
maintenance.
Completed the construction of the Renton Hill Storm System Improvement Project in coordination with the city’s
Water Utility and Wastewater Utility improvements.
Completed the design of the storm system improvements to be included in the Downtown Utility Improvement
Project.
Completed a hydrologic and hydraulic analysis of Madsen Creek and identified short‐term and long‐term
improvements to reduce the risk of flooding to neighboring properties. This effort was funded by a $472,000
Flood Reduction Grant from the King County Flood Control District. An additional $615,000 was secured from the
District to fund the design and construction of short‐term improvements.
Obtained a $230,000 Ecology Water Quality grant for the construction of the Heather Downs Detention Pond Water
Quality Retrofit Project, and a $70,000 King County Waterworks grant for construction.
Completed the design of the NE 16th Street/Jefferson Avenue NE Storm Water Green Connections Project, which is
partially funded by a $2,075,095 Ecology Water Quality grant for the design, permitting and construction.
Completed the design of the SE 172nd Street/125th Avenue North Storm System Improvement Project to improve
storm system infrastructure and install water quality treatment, partially funded by a $250,000 Ecology Water
Quality grant.
Provided technical assistance to the Development Engineering Section on the review and permitting of new
construction to ensure projects meet the city’s adopted Surface Water Design Standards and the Municipal NPDES
Storm Water Permit requirements.
Provided technical assistance to the Transportation Division on various transportation improvement projects
including Rainier Avenue South/North Phase 4, Williams Avenue South and Wells Avenue South Conversion, Lake
Washington Loop Trail, Duvall Avenue NE (NE 7th Street to Sunset Blvd NE), Oakesdale Avenue SW and SW 41st
Street and NE Sunset Blvd Corridor Improvements. Also conducted technical reviews to WSDOT on the Renton to
Bellevue I‐405 widening and HOT lanes project following the selection of the design‐build contractor and the
submittal of design plans to the city.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 123Budget by Department - Public Works
Continued to meet regulatory requirements of the NPDES Phase II Municipal Storm Water Permit. Initiated
implementation of the recent 2019‐2024 NPDES Phase II permit requirements in coordination with other city
departments and jurisdictions.
Completed a verification review and continued to meet annual recertification reporting requirements associated
with FEMA’s Community Rating System, which enables property owners that purchase flood insurance from FEMA
to get a 25% reduction on their flood insurance premium rates.
Completed an update of the Surface Water Utility’s master plan (system plan) to define future programs and
resources needed to maintain the level of service and meet regulatory requirements.
Initiated the Monroe Avenue NE Storm System Improvement project and completed an alternatives analysis to
identify the most adequate site for a new infiltration facility that would serve as a drainage outlet to the system’s
245‐acre sub basin. Surface Water secured a $125,000 Flood Reduction Grant from the King County Flood Control
District to partially fund this effort.
Initiated the development of the policy, legal instrument, credit pricing framework and purchase and sale
agreement needed to sell city wetland mitigation bank credits from the Springbrook Creek Wetland and Habitat
Mitigation Bank and generate income to the city. This effort is expected to be completed by December 2020.
Secured an Ecology Water Quality grant in the amount of $277,500 to partially fund the design and permitting of
the Burnett Avenue South and Williams Avenue South Storm System Improvement Project design efforts started
in 2020.
Secured an Ecology Water Quality grant in the amount of $177,500 to partially fund the Storm water Facility
Retrofit Study started in 2020.
Solid Waste Utility
In collaboration with Republic Services, provided comprehensive and reliable recycling, organics and garbage
collection and account management services to the city’s residents and businesses thereby improving overall
sanitation of the city in addition to reducing the city’s overall contribution of waste to landfill.
Developed and implemented a new waste prevention campaign to encourage residents and businesses to prevent
waste and recycle. The campaign produced four waste prevention videos featured and promoted through social
media, Solid Waste Utility webpages, and the city’s YouTube channel.
Completed a Sustainable Materials Management Strategic Plan, a plan that informs solid waste goals and programs
as they relate to zero waste of resources.
Provided in‐house recycling opportunities for staff and the public including food waste composting and recyclables
as well as collection and recycling of batteries, printer cartridges and Styrofoam generated within city facilities and
at city sponsored events including the Farmer’s Market and city Community Gardens.
Implemented the Multifamily Recycling Education and Outreach Program. Created a new multifamily recycling
database to track outreach efforts as well as changes in property participation. Developed new multifamily
guidelines for residents, redesigned and improved instructional posters, container labels and other collateral
material. Provided onsite technical assistance at properties including workshops for residents and training for onsite
managers.
Coordinated with King County and other regional partners, and supported city adoption of the 2019 Comprehensive
Solid Waste Management Plan King County, a plan that sets goals and objectives for regional solid waste
management, including Renton, over a 6 to 20 year period.
Implemented three Special Recycling Events to provide opportunities for residents to recycle materials not collected
at the curb.
Implemented the Reuse it! Renton, Stop and Swap event open to community residents with a purpose to prevent
waste to landfill by providing opportunities for people to drop off or take away free reusable materials such as
furniture, hobby materials, exercise and sporting equipment, building materials and more.
Collaborated with regional recycling partners to develop and implement strategies to decrease contamination in
recycling and organics collection programs. Updated residential and commercial recycling guidelines to reflect
changes in regional recycling practices to discourage contamination of collection container materials.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 124Budget by Department - Public Works
In 2020 provided critical education and outreach to customers related to COVID‐19 via social media channels, city
Republic Services websites and contributions to newsletter to communicate changes in material preparation and
collection safety standards.
Advocated for expansion of King County Cedar Hills Landfill to provide disposal options through 2046 and selection
of one of two onsite locations for the development of its support facilities. Provided written comment to King County
addressing significant adverse impacts of potential selection of the Renton offsite location for development of the
landfill support facilities.
2021/2022 Goals
Water Utility Engineering
Complete the construction of the Kennydale transmission main improvements.
Start construction of the Highlands transmission mains improvements.
Obtain the building permit for the Highlands 6 million gallon reservoir, complete the project bid documents and start
construction.
Complete the construction of the replacement of the water mains in the South 2nd Street and South 3rd Street
corridors as part of the Downtown Utility Improvement Project
Complete the roof replacement for the Maplewood Water Treatment Plant.
Complete the replacement of the water filter media for the Maplewood Water Treatment Plant.
Complete the construction of the water main replacement in NE 16th Street in conjunction with the Jefferson
Avenue NE Storm Water Green Connections Project, and in Duvall Avenue NE in conjunction with the transportation
improvement project.
Complete the relocation of water mains in conjunction with the I‐405 Renton to Bellevue corridor widening project
by WSDOT.
Complete the design of the emergency power generator and equipment upgrades for the South Talbot Hill and West
Hill pump stations.
Obtain the Department of Health’s approval of the 2019 Water System Plan Update.
Continue the implementation of the Regional Water Conservation and Water Use Efficiency programs including
public education and outreach in coordination with Seattle Public Utilities and the Saving Water Partnership.
Wastewater Utility Engineering
Complete construction of the replacement/rehabilitation of the existing sanitary sewer mains in the South 2nd Street
and South 3rd Street corridors as part of the Downtown Utility Improvement Project with the Water and Surface
Water utilities.
Complete design and permitting to replace the Kennydale Lakeline Sanitary Sewer System, including coordination
with property owners, constructability review, and cost analysis to install individual lift stations.
Complete design and construction of Phase 1b of improvements for the Sanitary Sewer Lift Stations and Force Mains
which includes the Baxter, Cottonwood, Devil’s Elbow and East Valley Lift Stations and associated force mains.
Design and construct the second phase of improvements for the Sanitary Sewer Lift Stations and Force Mains, which
includes Lake Washington Beach, Kensington, Long, Talbot Crest, Liberty, Wedgewood and Westview Lift Stations
and associated force mains.
Complete rehabilitation/replacement of the Thunder Hills Interceptor.
Complete construction support for the replacement of the Airport Lift Station.
Surface Water Utility Engineering
Complete the design of a permanent drainage solution to replace the temporary overflow outfalls from Monroe
Avenue NE to the gravel pit at 301 Monroe Avenue North.
Continue to implement the ongoing mitigation monitoring, maintenance, reporting and permit compliance work
associated with the Cedar River Gravel Removal (Maintenance Dredge) Project.
Complete construction of the storm system improvements as part of the Downtown Utility Improvement Project.
Complete construction of the Heather Downs Detention Pond Water Quality Retrofit Project.
Complete construction of the near term improvements identified for the Madsen Creek Improvement Project.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 125Budget by Department - Public Works
Complete construction of the NE 16th Street/Jefferson Avenue NE Storm Water Green Connections Project.
Complete the Madsen Creek Sedimentation Basin Cleaning Project construction in 2021 and 2022.
Complete the Maplewood Creek Sedimentation Basin Cleaning Project in 2021 and 2022, if needed.
Complete design, permitting and construction of the annual program to install fences around utility maintained
storm water facilities that do not have fences as part of the Storm Water Facility Fencing Project in 2021 and 2022.
Complete the design, permitting and preparation of construction plans and specifications for the levee
improvements necessary to recertify the Cedar River Section 205 Levees and get them accredited by FEMA as
providing protection from the 100 year event.
Complete the design, permitting, and construction of upgrades needed to the Rainier Avenue South and Oakesdale
Avenue SW Pump Stations.
Complete the storm water facility transfer, to the extent possible, of the remaining privately maintained existing
storm water facilities in single residential plats with public streets, which are eligible to be maintained by the city by
2022.
Implement programs and activities needed to meet the regulatory requirements of the 2019‐2024 NPDES Phase II
Municipal Storm Water Permit.
Coordinate and provide timely technical reviews to WSDOT on the Renton to Bellevue I‐405 Widening and HOT
project. Identify collaboration opportunities for the drainage improvements and fish passage improvements along
the SW 23rd Street Panther Creek channel.
Complete the design and permitting of the drainage improvements and water quality retrofits along Burnett Avenue
South and Williams Avenue South.
Complete the Storm Water Facility Retrofit Study to identify future opportunities for water quality retrofits to
existing city‐owned flow control facilities.
Complete the design, permitting and replacement or rehabilitation of the existing storm water outfall at 200 Mill
Avenue South by the end of 2022.
Solid Waste Utility
In coordination with Republic Services, continue to provide comprehensive recycling, organics and garbage
collection and account management services to city residents and businesses to improve livability and overall
sanitation of the city, as well as reduce overall environmental impacts of solid waste to landfill.
Provide waste prevention and recycling education, outreach and other technical assistance to multifamily property
owners/managers and residents to improve overall onsite solid waste management.
Implement a residential reuse event that promotes waste prevention and special recycling events that promote
recycling of materials with limited local recycling opportunities to increase diversion of materials from the landfill.
Continue to provide and expand in‐house recycling opportunities and employee education for food waste
composting, batteries, printer cartridges and other recyclable materials at city facilities. Provide waste prevention
and recycling assistance to city staff planning in‐house events.
Implement a recycling and composting quality assurance and monitoring program in collaboration with Republic
Services that seeks to decrease contaminants in customer containers and improve the overall quality of materials
delivered to the material recovery facility and Cedar Grove Composting, in order to improve the overall viability of
recycle markets and sustain city programs that support zero waste of resources.
Develop and implement city policies that support regional and state policies with goals to reduce overall waste to
landfills.
Continue to implement the Clean Sweep program that provides each single‐family customer the opportunity to
dispose of junk from their homes for no additional fee.
Continue to represent the city and its solid waste and environmental interests through participation in regional
forums such as the Metropolitan Solid Waste Advisory Committee, the Regional Recycling Task Force and other
opportunities that arise.
Continue to provide support for expansion of the King County Cedar Hills Landfill to provide disposal services through
2046. Should the county select Renton for development of its landfill support facilities, coordinate with the city’s
Community and Economic Development Department to ensure proper permitting and mitigation measures are in
place to protect the interests of the city and its impacted neighborhoods.
2021/2022 Preliminary Budget City of Renton, Washington
3 - 126Budget by Department - Public Works
Expenditure Budget by Category ‐ Utility Systems
2018 2019 2019 2020 2020 2021 2022 Change Change
Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
Regular Salaries 2,551,989 2,841,853 2,716,321 2,979,358 2,902,591 3,030,681 3,105,802 1.7% 2.5%
Part‐Time Salaries 22,250 57,550 30,668 57,550 0 57,550 57,550 0.0% 0.0%
Overtime 815 3,637 2,481 3,637 1,408 3,637 3,637 0.0% 0.0%
Personnel Benefits 920,214 1,065,868 1,035,244 1,129,979 1,096,169 1,338,692 1,415,644 18.5% 5.7%
Supplies 28,751 42,098 19,369 42,098 33,336 42,098 42,098 0.0% 0.0%
Other Services and Charges 16,053,214 16,082,918 24,588,202 16,081,668 22,396,632 27,132,925 28,086,700 68.7% 3.5%
Intergovernmental Services 7,517,706 7,443,625 0 7,443,625 1,423,152 0 0 ‐100.0% N/A
Capital Outlay 0017,0210000N/AN/A
Debt Service 3,553,938 3,626,830 3,625,929 3,622,331 3,622,331 3,620,575 3,587,724 0.0%‐0.9%
Interfund Payments 2,218,270 2,930,187 2,906,181 3,133,231 2,910,238 3,246,293 3,332,466 3.6% 2.7%
Transfer Out 11,345011,3430000N/AN/A
Operating Total 32,878,493 34,094,566 34,952,759 34,493,477 34,385,857 38,472,451 39,631,621 11.5% 3.0%
CIP 11,386,465 19,580,000 14,163,923 18,080,000 79,488,405 5,540,049 16,789,170 ‐69.4% 203.1%
Total 44,264,958 53,674,566 49,116,682 52,573,477 113,874,262 44,012,500 56,420,791 ‐16.3% 28.2%
Staffing Levels (Full‐Time Equivalent Employees ‐ FTE) ‐ Utility Systems
2018 2019 2019 2020 2020 2021 2022 Change Change
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed 2020‐2021 2021‐2022
Solid Waste 3.38 3.38 3.38 3.38 3.38 3.38 3.38 0.0% 0.0%
Water 8.38 8.38 8.38 8.38 8.38 8.38 8.38 0.0% 0.0%
Wastewater 5.88 6.88 6.88 6.88 6.88 6.88 6.88 0.0% 0.0%
Surface Water 9.88 9.88 9.88 9.88 9.88 9.88 9.88 0.0% 0.0%
Total FTE 27.50 28.50 28.50 28.50 28.50 28.50 28.50 0.0% 0.0%
Intermittent FTE 0.58 1.38 0.88 1.38 0.00 1.38 1.38 0.0% 0.0%
Temp/Intermit Pay & Ben 23,992$ 57,550$ 36,404$ 57,550$ ‐$ 57,550$ 57,550$ 0.0% 0.0%
2021/2022 Preliminary Budget City of Renton, Washington
3 - 127Budget by Department - Public Works
2021‐2022 Vehicle Acquisitions/Replacements (Sheet 1 of 2)
Dept Assigned
Equipment
Number Make Model Description Original Cost
Year
Purchased Life
2021 Replacement
Cost
2022 Replacement
Cost
CED Inspection/Permits B130 Chevy Trailblazer Utility Vehicle Small 22,321 2008 8 37,000 ‐
CED Inspection/Permits B136A Chevy Trailblazer Utility Vehicle Small 22,186 2008 8 37,000 ‐
CS Admin B120 Ford Supreme 14 Pass Bus With Lift 50,054 2006 8 70,000 ‐
CS Admin B121 Ford Supreme 14 Pass Bus With Lift 50,054 2006 8 70,000 ‐
CS Parks C213 Dodge 3500 Flatbed dump 24,183 2002 15 50,000 ‐
CS Parks C247 Ford F250 Pickup 3/4 Ton 21,538 2008 10 ‐ 32,000
CS Parks C250 Ford F250 Pickup 3/4 Ton 21,538 2008 10 ‐ 32,000
CS Parks D092 Ford F550 Stakebed dump 31,532 1999 15 60,000 ‐
CS Parks D097 Ford F550 Flatbed 33,844 2000 15 60,000 ‐
CS Parks D106 Ford F450 Bucket truck 70,142 2001 15 170,000 ‐
CS Parks D107 Chevy 3500 Dump Stakebed dump 31,536 2003 10 60,000 ‐
CS Parks D118 Ford F350 Dump 1 Ton 34,873 2008 10 ‐ 45,000
CS Parks D119 Ford F350 Dump 1 Ton 30,236 2008 10 ‐ 45,000
CS Parks P009 LNCN Welder Arc Welder 1,600 1995 10 5,500 ‐
CS Parks P015 HWRD Roto Tiller Roto Tiller 2,649 1995 15 16,000 ‐
CS Parks P038 MTRO Turf Cleaner Turf Cleaner 2,375 1995 5 6,000 ‐
CS Parks P039 MTRO Turf Cleaner Turf Cleaner 2,375 1995 5 6,000 ‐
CS Parks P079 SPLT Spray Tank Spray Tank 1,088 1995 8 3,500 ‐
CS Parks P084 SPLT Spray Tank Spray Tank 1,039 1995 8 3,500 ‐
CS Parks P112 FRYS Trailer Trailer 3,547 2000 15 10,000 ‐
CS Parks P117 BROY 5054X2 Roto Tiller 5,731 1999 10 10,000 ‐
CS Parks P118 BROY 5054X2 Roto Tiller 2,394 1999 10 10,000 ‐
CS Parks P119 BROY 5054X2 Roto Tiller 6,172 1999 10 10,000 ‐
CS Parks P122 JNDR Loader Tiller Tractor 27,047 2002 10 35,000 ‐
CS Parks P125 TORO Sandpro Rotary Mower 13,577 2003 5 30,000 ‐
CS Parks P127 FRYS Trailer Arc Welder 3,152 2003 15 7,000 ‐
CS Parks P130 JNDR Progator Pro Gator 16,439 2004 10 20,000 ‐
Police Admin B145A Ford Escape Gas/Elect Hybrid 27,513 2008 8 40,000 ‐
Police Animal Control C260 Ford F250 Pickup 28,164 2012 8 150,000 ‐
Police Investigations A457 DMCH Avenger Standard 22,715 2008 4 48,000 ‐
Police Investigations B114 Ford Escape Utility Vehicle Small 24,538 2005 8 40,000 ‐
Police Investigations C251 Ford F250 Pickup 3/4 Ton 25,741 2008 10 ‐ 70,000
Police Patrol Svc B184 Chevy Tahoe Util Veh Full 41,334 2014 4 ‐ 70,000
Police Patrol Svc B185 Chevy Tahoe Util Veh Full 44,115 2014 4 ‐ 70,000
Police Patrol Svc B186 Chevy Tahoe Util Veh Full 44,114 2014 4 ‐ 70,000
Police Patrol Svc B188 Chevy Tahoe Util Veh Full 44,131 2014 4 ‐ 70,000
Police Patrol Svc B192 Chevy Tahoe Util Veh Full 30,997 2014 4 ‐ 70,000
Police Traffic B118 Ford Explorer Utility Vehicle Small 22,728 2006 8 70,000 ‐
Police Undercover U018 Dodge Van Van Pass 45,000 2013 6 ‐
PW Airport C234 Ford F150 Pickup 1/2 Ton 18,165 2007 8 35,000 ‐
PW Solid Waste Maint D122A Ford F550 Dump 1 Ton 46,010 2008 10 ‐ 60,000
PW Street Maint C253 Chevy Silverado Pickup 1/2 Ton 24,044 2008 10 ‐ 40,000
PW Street Maint D085 Ford F450 Truck 1 Ton 30,370 1997 15 60,000 ‐
PW Street Maint D096 Freight FLD120SD Dumptruck 10yd 128,206 2001 15 240,000
PW Street Maint D123 Ford F550 Flatbed 1 Ton 42,675 2008 10 ‐ 60,000
PW Street Maint E109 Ingersol DD34HF Vibrator 46,761 2005 10 112,000 ‐
PW Street Maint S208 MNRO MSPV‐96‐50‐32 Sander/Spreader 8,367 2008 10 ‐ 20,000
PW Street Maint S209A AMER 3911 Snow Plow 8,767 2008 10 ‐ 15,000
PW Street Maint S210A AMER 3911 Snow Plow 8,767 2008 10 ‐ 15,000
PW Surface Water Maint C217 Ford F250 Pickup 24,946 2002 8 60,000 ‐
Water Maint D114 Ford F550 Service Body crane 29,372 10 100,000
Fund 501 ‐ Equipment Rental Fund
2021‐2022 Vehicle Acquisitions/Replacements
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Department - Public Works 3 - 128
2021‐2022 Vehicle Acquisitions/Replacements (Sheet 2 of 2)
Dept Assigned
Equipment
Number Make Model Description Original Cost
Year
Purchased Life
2021 Replacement
Cost
2022 Replacement
Cost
PW Surface Water Maint D101 Ford F450 Flatbed 30,307 2000 15 120,000 ‐
PW Surface Water Maint D120A Ford F550 Dump 1 Ton 42,152 2008 10 ‐ 60,000
PW Surface Water Maint E012 KNWH T800 Vactor 417,165 2013 5 ‐
PW Surface Water Maint S125 Bean Sprayer Sprayer 1,000 1985 5 5,500 ‐
PW Trans System Maint C248 Ford F250 Pickup 24,930 2008 10 40,000 ‐
PW Trans System Maint C252 Ford F350 Pickup 1 Ton 22,045 2008 10 40,000 ‐
PW Trans System Maint S057 UTIL Pole Trl Trailer Stake 370 1968 15 25,000 ‐
PW Waste Water Maint D108 Ford F550 Stakebed dump 34,290 2004 10 60,000 ‐
PW Waste Water Maint New New New Truck 1 Ton ‐ ‐ 10 95,000 ‐
PW Waste Water Maint S153 TKLT Trailer Trailer 40 Ton 2,164 1992 15 ‐
PW Water Maint B097 WORK Grumman Step Van 33,727 2001 8 60,000 ‐
PW Water Maint B141 DMCH Sprinter Step Van 43,377 2008 10 ‐ 55,527
PW Water Maint B142 DMCH Sprinter Step Van 43,377 2008 10 ‐ 55,527
PW Water Maint B148A Chevy Trailblazer SUV 22,186 2008 10 38,000
PW Water Maint C254 Chevy Silverado Pickup 1/2 Ton 24,682 2008 10 ‐ 32,364
PW Water Maint D100 Ford F550 Stakebed dump 39,428 2000 10 60,000 ‐
PW Water Maint E123 Case 580SM Backhoe 96,714 2008 10 ‐ 154,000
PW Water Maint S191 Deere 345 Rotary Mower 6,892 2002 5 30,000
PW Water Maint S218 Deere X720 Mower 9,652 2011 5 20,000
Total:2,057,000$ 1,419,417$
Fund 501 ‐ Equipment Rental Fund
2021‐2022 Vehicle Acquisitions/Replacements
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Department - Public Works 3 - 129
Public Works Position Listing (Sheet 1 of 4)
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
Public Works Administration
Public Works Administration
M49 Public Works Administrator 1.00 1.00 1.00 1.00 1.00 1.00 1.00
N16 Administrative Assistant to PW Dept 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Administration Division 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Airport Division
Airport Administration
M38 Airport Director 0.00 0.00 0.00 0.00 0.00 1.00 1.00
M33 Airport Manager 1.00 1.00 1.00 1.00 1.00 0.00 0.00
A31 Assistant Airport Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Airport Administration 2.00 2.00 2.00 2.00 2.00 2.00 2.00
Airport Operation
A29 Civil Engineer III 0.00 0.00 0.00 0.00 0.00 1.00 1.00
A26 Civil Engineer II 1.00 1.00 1.00 1.00 1.00 0.00 0.00
A23 Airport Operations and Maintenance Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A20 Business Coordinator 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A13 Airport Operations Specialist 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A11 Airport Maintenance Worker 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A09 Admin Secretary I 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Airport Division 7.00 7.00 7.00 7.00 7.00 7.00 7.00
Total Airport Division 9.00 9.00 9.00 9.00 9.00 9.00 9.00
Transportation Systems Division
Administration
M38 Transportation Systems Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A09 Administrative Secretary I 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A07 Secretary II 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Total Administration 2.50 2.50 3.00 2.50 3.00 3.00 3.00
Transportation Planning
M33 Transportation Planning Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M33 Transportation Operations Manager 0.00 0.00 0.00 0.00 0.00 0.05 0.05
A29 Program Development Coordinator II 0.00 0.00 0.00 0.00 0.00 1.00 1.00
A29 Civil Engineer III 0.50 0.50 0.50 0.50 0.50 0.50 0.50
A25 Program Development Coordinator I 1.00 1.00 1.00 1.00 1.00 0.00 0.00
A24 Transportation Planner 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Transportation Planning 3.50 3.50 3.50 3.50 3.50 3.55 3.55
Transportation Design
M33 Transportation Design Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A32 Principal Civil Engineer‐Transportation 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A29 Civil Engineer III 3.00 4.00 4.00 4.00 4.00 4.00 4.00
A09 Administrative Secretary I 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Transportation Design 6.00 7.00 7.00 7.00 7.00 7.00 7.00
Transportation Operations
M33 Transportation Operations Manager 1.00 1.00 1.00 1.00 1.00 0.95 0.95
M27 Transportation Maintenance Assistant Manager 0.00 0.00 0.00 0.00 0.00 0.00 0.00
A29 Civil Engineer III 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A23 Engineering Specialist III 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Total Transportation Operations 5.00 5.00 5.00 5.00 5.00 4.95 4.95
Transportation Maintenance
M30 Transportation Maintenance Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A25 Signal/Electronics Sys Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A21 Signal/Electronics Sys Tech III 2.00 2.00 2.00 2.00 2.00 4.00 4.00
Grade Title
2021/2022 Preliminary Budget City of Renton, Washington
3 - 130Budget by Department - Public Works
Public Works Position Listing (Sheet 2 of 4)
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
A21 Traffic Signage and Marking Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A17 Signal/Electronics System Technician II 3.00 3.00 3.00 3.00 3.00 1.00 1.00
A15 Senior Traffic Maintenance Worker 0.00 0.00 0.00 0.00 0.00 1.00 1.00
A12 Traffic Maintenance Worker II 3.00 3.00 3.00 3.00 3.00 0.00 0.00
A08 Traffic Maintenance Worker I 0.00 1.00 1.00 1.00 1.00 3.00 3.00
A09 Administrative Secretary I 0.00 0.00 0.00 0.00 0.00 0.50 0.50
A07 Secretary II 0.50 0.50 0.50 0.50 0.50 0.00 0.00
Total Transportation Maintenance 11.50 12.50 12.50 12.50 12.50 12.50 12.50
Total Transportation Systems Division 28.50 30.50 31.00 30.50 31.00 31.00 31.00
Utility Systems Division
Water Utility Systems
M38 Utility Systems Director 0.25 0.25 0.25 0.25 0.25 0.25 0.25
M33 Utility Engineering Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A32 Utility/GIS Engineer 1.00 1.00 1.00 1.00 1.00 0.00 0.00
A29 Civil Engineer III 3.00 3.00 3.00 3.00 3.00 4.00 4.00
A23 Engineering Specialist III 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A19 Engineering Specialist II 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A15 Senior Program Specialist 0.75 0.75 0.75 0.75 0.75 0.75 0.75
A09 Administration Secretary I 0.25 0.25 0.25 0.25 0.25 0.25 0.25
A07 Secretary II 0.13 0.13 0.13 0.13 0.13 0.13 0.13
Total Water Utility Systems 8.38 8.38 8.38 8.38 8.38 8.38 8.38
Wastewater Utility Systems
M38 Utility Systems Director 0.25 0.25 0.25 0.25 0.25 0.25 0.25
M33 Utility Engineering Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A29 Civil Engineer III 2.00 3.00 3.00 3.00 3.00 3.00 3.00
A23 Engineering Specialist III 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A19 Engineering Specialist II 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A15 Senior Program Specialist 0.25 0.25 0.25 0.25 0.25 0.25 0.25
A09 Administrative Secretary I 0.25 0.25 0.25 0.25 0.25 0.25 0.25
A07 Secretary II 0.13 0.13 0.13 0.13 0.13 0.13 0.13
Total Waste Water Utility Systems 5.88 6.88 6.88 6.88 6.88 6.88 6.88
Surface Water Utility Systems
M38 Utility Systems Director 0.25 0.25 0.25 0.25 0.25 0.25 0.25
M33 Utility Engineering Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A29 Civil Engineer III 5.00 5.00 5.00 5.00 5.00 5.00 5.00
A26 Civil Engineer II 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A23 Engineering Specialist III 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A15 Senior Program Specialist 0.25 0.25 0.25 0.25 0.25 0.25 0.25
A09 Admin Secretary I 0.25 0.25 0.25 0.25 0.25 0.25 0.25
A07 Secretary II 0.13 0.13 0.13 0.13 0.13 0.13 0.13
Total Surface Water Utility Systems 9.88 9.88 9.88 9.88 9.88 9.88 9.88
Solid Waste Utility Systems
M38 Utility Systems Director 0.25 0.25 0.25 0.25 0.25 0.25 0.25
A15 Senior Program Specialist 1.25 1.25 1.25 1.25 1.25 1.25 1.25
A09 Administrative Secretary I 0.25 0.25 0.25 0.25 0.25 0.25 0.25
A07 Secretary II 0.13 0.13 0.13 0.13 0.13 0.13 0.13
M25 Solid Waste Coordinator 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A13 Program Specialist 0.50 0.50 0.50 0.50 0.50 0.50 0.50
Total Solid Waste Utility Systems 3.38 3.38 3.38 3.38 3.38 3.38 3.38
Total Utility Systems Division 27.50 28.50 28.50 28.50 28.50 28.50 28.50
Grade Title
2021/2022 Preliminary Budget City of Renton, Washington
3 - 131Budget by Department - Public Works
Public Works Position Listing (Sheet 3 of 4)
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
Maintenance Services Division
Maintenance Administration
M38 Maintenance Services Director 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M30 Waste Water/Special Operations Manager 0.45 0.45 0.45 0.45 0.45 0.45 0.45
A17 Maintenance Buyer 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A09 Administrative Secretary I 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A08 Purchasing Assistant 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A05 Office Assistant III 1.00 1.00 1.00 1.00 1.00 0.00 0.00
A14 Asset Management Systems Technician 0.00 0.00 0.00 0.00 0.00 1.00 1.00
Total Maintenance Administration 5.45 5.45 5.45 5.45 5.45 5.45 5.45
Streets/Solid Waste Maintenance Services
M30 Street Maintenance Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A23 Street Maintenance Services Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A23 Pavement Management Technician 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A16 Lead Maintenance Services Worker 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A12 Maintenance Services Worker III/Street 8.36 10.36 10.36 10.36 10.36 11.36 11.36
A08 Maintenance Services Worker II/Street 6.00 6.00 6.00 6.00 6.00 5.00 5.00
A04 Solid Waste Maintenance Worker 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A08 Maintenance Service Worker II/Utility Locator 0.10 0.10 0.10 0.10 0.10 0.10 0.10
Total Streets/Solid Waste Maintenance Services 21.46 23.46 23.46 23.46 23.46 23.46 23.46
Waste Water Maintenance Services
M30 Waste Water/Special Operations Manager 0.25 0.25 0.25 0.25 0.25 0.25 0.25
A23 Wastewater Maint Svcs Supervisor (Waste/Surface Water)0.50 0.50 0.50 0.50 0.50 0.50 0.50
A16 Lead Maintenance Services Worker 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A15 Lift Station Technician 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A12 Maintenance Svc Worker III (Waste/Surface Water)5.45 7.45 7.45 7.45 7.45 5.45 5.45
A08 Maintenance Svc Worker II (Waste/Surface Water)0.00 0.00 0.00 0.00 0.00 2.00 2.00
A08 Maintenance Svc Worker II / Utility Locator 0.53 0.53 0.53 0.53 0.53 0.53 0.53
Surface Water Maintenance Services
M30 Waste Water/Special Operations Manager 0.20 0.20 0.20 0.20 0.20 0.20 0.20
A23 Wastewater Maint Services Supervisor (Waste/Surface Water)0.50 0.50 0.50 0.50 0.50 0.50 0.50
A16 Lead Maintenance Services Worker 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A12 Maintenance Service Worker III (Waste/Surface Water)11.71 11.71 11.71 11.71 11.71 12.71 12.71
A08 Maintenance Service Worker II (Waste/Surface Water)1.00 1.00 1.00 1.00 1.00 0.00 0.00
A08 Maintenance Service Worker II/Utility Locator 0.83 0.83 0.83 0.83 0.83 0.83 0.83
Total Waste Water/Surface Water Maintenance Service 25.97 27.97 27.97 27.97 27.97 27.97 27.97
Water Maintenance Services
M33 Water Maintenance Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
M30 Waste Water/Special Operations Manager 0.10 0.10 0.10 0.10 0.10 0.10 0.10
A26 Water Utilities Maintenance Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A25 Lead Electrical/Control Systems Technician 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A21 Water Maintenance Services Supervisor 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A19 Water Utility Instrumentation Scada Technician 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A17 Water Quality/Treatment Plant Operator 3.00 3.00 3.00 3.00 3.00 3.00 3.00
A16 Lead Maintenance Services Worker 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A15 Water Utility Maintenance Technician 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A12 Maintenance Services Worker III 8.48 8.48 8.48 8.48 8.48 7.48 7.48
Grade Title
2021/2022 Preliminary Budget City of Renton, Washington
3 - 132Budget by Department - Public Works
Public Works Position Listing (Sheet 4 of 4)
2018 2019 2019 2020 2020 2021 2022
Authorized Orig Bdgt Authorized Orig Bdgt Authorized Proposed Proposed
A08 Maintenance Services Worker II 2.00 2.00 2.00 2.00 2.00 2.00 2.00
A08 Maintenance Svc Worker II/Utility Locator 1.54 1.54 1.54 1.54 1.54 1.54 1.54
A07 Water Meter Technician 3.00 3.00 3.00 3.00 3.00 3.00 3.00
A21 Water Meter Technician Services Supervisor 0.00 0.00 0.00 0.00 0.00 1.00 1.00
Total Water Maintenance Services 26.12 26.12 26.12 26.12 26.12 26.12 26.12
Equipment Maintenance Services
M30 Fleet Manager 1.00 1.00 1.00 1.00 1.00 1.00 1.00
A19 Lead Vehicle and Equipment Mechanic 2.00 2.00 2.00 2.00 2.00 1.00 1.00
A15 Vehicle and Equipment Mechanic 5.00 5.00 5.00 5.00 5.00 6.00 6.00
A11 Fleet Management Technician 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Total Equipment Maintenance Services 9.00 9.00 9.00 9.00 9.00 9.00 9.00
Total Maintenance Services Division 88.00 92.00 92.00 92.00 92.00 92.00 92.00
Total Public Works Department 155.00 162.00 162.50 162.00 162.50 162.50 162.50
Grade Title
2021/2022 Preliminary Budget City of Renton, Washington
3 - 133Budget by Department - Public Works
4 DEBT MANAGEMENT
Overview
4‐1
Outstanding Debt
4‐2
Computation of Limitation of Indebtness & Debt Service to Maturity by Funding Sources
4‐3
Debt Service Coverage Ratio
4‐4
General Obligation Debt
4‐5
Waterworks Debt
4‐7
DEBT MANAGEMENT
OVERVIEW
The City of Renton’s long‐term debt consists of General Obligation (GO) Bonds backed by the full faith
and credit of the City, and Revenue Bonds backed by user fee revenues. The City is in compliance with
all Washington State debt limitation statutes and bond covenants. The following table represents the
bond ratings for each type of debt for which ratings are given:
Type of Bonds Issued (Latest Year) Standard & Poor’s
Water & Sewer Revenue Bonds AA+
Limited GO Bonds AAA
REVENUE DEBT:
The City of Renton’s Revenue debt consists of Water/Sewer Revenue Bonds and Public Works Trust
Fund (PWTF) Loans. As of January 1, 2020, there was $21.6 million in principal outstanding which are:
Water/Sewer Revenue Bonds $20.0 million and PWTF Loan $1.6 million.
GENERAL OBLIGATION DEBT:
Under RCW 39.36.020(2), the public may vote to approve bond issues for general government
purposes in an amount not to exceed 2.5% of the value of all taxable property within the City.
Within the 2.5% limit, the City Council may approve bond issues not to exceed 1.5% of the City’s
assessed valuation. Prior to the passage of new legislation in 1994, the statutory limit on
councilmanic (non‐voted or limited general obligation (LTGO)) debt for general government
purposes was 0.75% of assessed valuation. Another 0.75% of councilmanic debt was available
only for lease‐purchase contracts (RCW 35.43.200). Now, these two components have been
combined and can be used for any municipal purpose, including using the entire 1.5% for bonds.
The voter approved capacity is generally referred to as unlimited tax general obligation (UTGO)
debt, which requires 60% voter approval and the election must have a voter turnout of at least
40% of those who voted in the last State general election. With this vote, the voter approves
additional property tax be levied above and beyond the constitutional and statutory caps on
property tax.
In addition to these general purpose debt capacity, RCW 39.36.030(4) also allow voter to approve
park facilities and utility bond issues, each limited to 2.5% of the City’s assessed valuation.
At the end of 2020, the City’s has $57.7 million limited general obligation debt (Council approved debt)
outstanding and an available capacity of $242.9 million. The City no longer has unlimited general
obligation debt outstanding at this time and therefore has the full voter approved capacity of $1.445
billion available.
2021/2022 Preliminary Budget City of Renton, Washington
Debt Management - Overview 4 - 1
DEBT MANAGEMENT
OVERVIEW
Interest Issue Maturity Total Amt Outstanding
Item Rates Date Date Issued 1/1/2020 Issued Redeemed 12/31/2020
General Obligation Bonds:
Limited GO
2010 GO DT Parking Refunding (01)3.00%‐4.50% 05/11/10 12/01/21 6,170,000 3,125,000 ‐ 1,530,000 1,595,000
2011 GO Library Bonds 2.00%‐5.00% 08/02/11 12/01/22 16,715,000 4,460,000 ‐ 1,780,000 2,680,000
2013 GO Qualified Energy Conservation Bonds 3.22% 07/01/13 07/01/28 3,200,000 1,935,000 ‐ 215,000 1,720,000
2015 (A) GO S LK WA Infr Refunding (2006) (BQ) 3.00%‐4.00% 05/13/15 12/01/28 8,825,000 8,825,000 ‐ 275,000 8,550,000
2015 (B) GO S LK WA Infr Refunding (2006) (Tax)0.50%‐2.07% 05/13/15 12/01/20 3,695,000 635,000 ‐ 635,000 ‐
2019 LTGO Parks Bonds 3.00%‐5.00% 04/09/19 12/01/38 12,960,000 12,695,000 ‐ 425,000 12,270,000
2019 LTGO LRF Bonds (Transportation)3.00%‐5.00% 04/09/19 12/01/43 7,885,000 7,600,000 ‐ 180,000 7,420,000
Subtotal Limited GO 59,450,000 39,275,000 ‐ 5,040,000 34,235,000
Other Miscellaneous debt
2009 FD 40 Loan for acquisition of FS13 3.75% 03/01/09 09/01/28 6,798,085 3,673,817 ‐ 365,922 3,307,894
2009 (A) SCORE LTGO 4.00%‐5.00% 11/04/09 01/01/22 2,953,800 ‐ ‐ ‐ ‐
2009 (B) SCORE BABS 3.00%‐6.62% 11/04/09 01/01/39 28,090,800 ‐ ‐ ‐ ‐
2019 SCORE Ref LTGO 3.00%‐5.00% 12/11/19 12/01/38 20,912,128 20,912,128 747,520 20,164,608
Subtotal Miscellaneous 58,924,058 24,585,945 ‐ 1,113,442 23,472,502
Total General Obligation Debt 118,374,058 63,860,945 ‐ 6,153,442 57,707,502
Water/Sewer Revenue Bonds:
2012 Water/Sewer Refunding 2.00%‐3.00% 12/07/12 12/01/27 9,190,000 8,690,000 ‐ 280,000 8,410,000
2016 Water/Sewer Refunding (2008A)1.73% 10/20/16 12/01/27 9,385,000 7,705,000 ‐ 800,000 6,905,000
2017 Water/Sewer Refunding (2007 & 2007 Ref) 1.85% 09/06/17 12/01/22 6,283,168 3,645,000 ‐ 1,205,000 2,440,000
Total Revenue Bonds 24,858,168 20,040,000 ‐ 2,285,000 17,755,000
Water/Sewer Public Works Trust Fund Loans:
Maplewood Wtr Treatment Improvements 0.50% 01/22/02 07/01/21 567,831 60,603 ‐ 30,301 30,302
Construct CT Pipeline for Wells 0.50% 11/05/02 07/01/22 814,527 128,612 ‐ 42,870 85,742
Maplewood Wtr Treatment Improvements 0.50% 07/01/04 06/30/24 5,150,000 1,363,235 ‐ 272,647 1,090,588
Total Public Works Trust Fund Loans 6,532,358 1,552,450 ‐ 345,818 1,206,632
Total WaterWorks Obligations 31,390,526 21,592,450 ‐ 2,630,818 18,961,632
Total Outstanding Debt 149,764,584 85,453,395 ‐ 8,784,260 76,669,134
2021/2022 Preliminary Budget City of Renton, Washington
Debt Management - Outstanding Debt 4 - 2
DEBT MANAGEMENT
OVERVIEW
Computation of Limitation of Indebtness
December 31, 2020
General purpose Parks and Utility
Non‐Voted Voted Open Space Purpose
(Limited GO)(Unlimited GO) Voted Voted
20,038,161,673$ x 1.50% 1.00% * 2.50% 2.50%
Non Voted Debt Limits 300,572,425
Voted Limits 200,381,617 500,954,042 500,954,042
Less General Obligation Bonds Outstanding (57,707,502)
Add Cash on hand for Debt Service ‐
Available Debt Capacity by Purpose $242,864,923 $200,381,617 $500,954,042 $500,954,042
Total Voted Capacity $1,445,154,623
*With the assent of three‐fifths of the voters the total general obligation debt may not exceed 2.5% of the
assessed value.
2019 AV (2020 Tax Base):
Debt Service Requirement to Maturity Long Term Debt Summary as of December 31, 2020 (Dollars in Thousands)
General Obligation Waterworks Revenue Waterworks PWTF Total
Year Total Principal Interest Total Principal Interest Total Principal Interest Total Principal Interest
2021 8,750 6,379 2,371 2,748 2,330 418 352 346 6 11,849 9,055 2,795
2022 5,939 3,854 2,085 2,747 2,375 372 320 316 4 9,006 6,544 2,461
2023 5,064 3,145 1,919 2,810 2,485 325 275 273 3 8,149 5,902 2,247
2024 5,057 3,268 1,789 2,808 2,545 263 274 273 1 8,139 6,085 2,054
2025 5,052 3,399 1,653 2,805 2,605 200 ‐ ‐ ‐ 7,857 6,004 1,853
2026 5,042 3,533 1,509 2,810 2,675 135 ‐ ‐ ‐ 7,852 6,208 1,644
2027 5,046 3,688 1,358 2,808 2,740 68 ‐ ‐ ‐ 7,855 6,428 1,427
2028 4,861 3,660 1,201 ‐ ‐ ‐ ‐ ‐ ‐ 4,861 3,660 1,201
2029 3,066 2,011 1,055 ‐ ‐ ‐ ‐ ‐ ‐ 3,066 2,011 1,055
2030 3,066 2,111 954 ‐ ‐ ‐ ‐ ‐ ‐ 3,066 2,111 954
2031 3,060 2,212 849 ‐ ‐ ‐ ‐ ‐ ‐ 3,060 2,212 849
2032 3,065 2,316 748 ‐ ‐ ‐ ‐ ‐ ‐ 3,065 2,316 748
2033 3,066 2,410 656 ‐ ‐ ‐ ‐ ‐ ‐ 3,066 2,410 656
2034 3,061 2,501 559 ‐ ‐ ‐ ‐ ‐ ‐ 3,061 2,501 559
2035 3,064 2,605 459 ‐ ‐ ‐ ‐ ‐ ‐ 3,064 2,605 459
2036 3,067 2,712 355 ‐ ‐ ‐ ‐ ‐ ‐ 3,067 2,712 355
2037 3,064 2,804 259 ‐ ‐ ‐ ‐ ‐ ‐ 3,064 2,804 259
2038 3,060 2,884 175 ‐ ‐ ‐ ‐ ‐ ‐ 3,060 2,884 175
2039 499 410 89 ‐ ‐ ‐ ‐ ‐ ‐ 499 410 89
2040 497 425 72 497 425 72
2041 495 440 55 495 440 55
2042 498 460 38 498 460 38
2043 499 480 19 499 480 19
Total 77,937$ 57,708$ 20,230$ 19,536$ 17,755$ 1,781$ 1,221$ 1,207$ 14$ 98,694$ 76,669$ 22,025$
2021/2022 Preliminary Budget City of Renton, Washington
Debt Management - Computation of Limitation of
Indebtness & Debt Service to Maturity by Funding Sources 4 - 3
DEBT MANAGEMENT
OVERVIEW
Waterworks Utility Debt Service Coverage Ratio:
Per bond covenants, the City must maintain certain debt service coverage as protection of bond holders’
interest against default. The City historically maintained a debt service coverage ratio substantially higher than
the required 1.25 times. The proposed budget will continue to meet the debt service coverage ratio.
2021 Debt Service Coverage Ratio Calculation for Waterworks
Utility
Total Revenues 59,796,439
Total Expenses1 44,118,716
Amount Available for Debt Service 15,677,723
Total Debt Service 3,620,575
DEBT SERVICE RATIO 4.33
1Less debt service and transfers to capital
2022 Debt Service Coverage Ratio Calculation for Waterworks
Utility
Total Revenues 61,816,705
Total Expenses1 44,863,748
Amount Available for Debt Service 16,952,957
Total Debt Service 3,587,724
DEBT SERVICE RATIO 4.73
1Less debt service and transfers to capital
2021/2022 Preliminary Budget City of Renton, Washington
Debt Management - Debt Service Coverage Ratio 4 - 4
DEBT MANAGEMENT
GENERAL OBLIGATION DEBT
CITY OF RENTON GENERAL OBLIGATION DEBT
2009 King County Fire District #40 Loan. Has an average interest rate of 3.75% and is related to the Fire District
#40 asset transfer as a result of the Benson Hill annexation. The debt service is accounted for in Fund (215).
2010 Refunding (refund 2001) Bonds. Has an average interest rate of 3.75% for purposes of advance refunding
the serial bond portion of the 2001 Series B Downtown Parking Facility Bonds with an average interest rate of
5.11%. This resulted in a positive cash flow difference of $335,632. Debt Service is accounted for in Fund (215).
2011 Library Bonds. Has an average interest rate of 3.72% and was issued to finance all or a portion of the
costs of acquiring land for and constructing, improving, and equipping two new public library facilities and
repairing, renovating and improving existing library facilities; providing the form and terms of the bond. Debt
Service is accounted for in Fund (215).
2013 Qualified Energy Conservation Bonds (QECB). Has an average interest rate of 3.22% and was issued to
finance all or a portion of the costs of constructing, improving, and equipping street light improvements;
providing the form and terms of the bond. Debt Service is accounted for in Fund (215).
2015 A & B Refunding (refund 2006) Bonds. Has an interest rate of 0.5%‐4.0% for purposes of partially
refunding the 2006 South Lake Washington Infrastructure Bonds with an average interest rate of 4.85%. This
resulted in a reduction in the aggregate debt service payments of $2,160,145 and a present value gain of
$1,883,765. Debt Service is accounted for in Fund (215).
2019 South Correctional Entity Regional Jail (SCORE) Refunding Bonds A & B. Issued to refund the outstanding
balance of the 2009 SCORE Bonds A & B used for the acquisition, construction and equipping for the operation
of the South Correctional Entity Regional Jail (SCORE), a facility located in Des Moines, Washington. The City
of Renton, along with the City of Auburn, Burien, Des Moines, Federal Way, Seatac, and Tukwila are owners of
the Center and each are responsible for their percentage of the total obligation. The City of Renton’s portion
is $30,426,681. Debt Service for these bonds is accounted for in the General Government Miscellaneous Debt
Service Fund (215).
2019 Parks Bonds. Has an interest rate of 3.0%‐5.0% and was issued to finance all or a portion of the costs of
improving parks, trails and recreational facilities in the City. Debt Service is accounted for in Fund (215).
2019 Local Revitalization Financing (LRF) bonds. Has an interest rate of 3.0%‐5.0% and was issued to finance
all or a portion of the costs of public infrastructure improvements in the South Lake Washington Revitalization
Area. Debt Service is accounted for in Fund (215).
2021/2022 Preliminary Budget City of Renton, Washington
Debt Management - General Obligation Debt 4 - 5
DEBT MANAGEMENT
GENERAL OBLIGATION DEBT
Year Total LTGO *
Fire Station
13
Downtown
Parking
2011 LTGO
Library
2013 LTGO
QECB
S. Lk Wa.
Infra Ref (A)
LTGO Parks
Bonds
LTGO LRF
Bonds
SCORE 2019
REF LTGO
2021 7,148,519 500,635 1,666,775 1,999,000 270,384 1,248,025 964,600 499,100 1,601,413
2022 4,337,421 500,635 855,750 263,461 1,250,625 967,350 499,600 1,601,987
2023 3,462,248 500,635 ‐ 256,538 1,241,625 963,850 499,600 1,601,331
2024 3,455,125 500,635 ‐ 249,615 1,241,425 964,350 499,100 1,601,495
2025 3,449,652 500,635 ‐ 242,692 1,244,625 963,600 498,100 1,602,396
2026 3,441,079 500,635 ‐ 235,769 1,241,475 966,600 496,600 1,601,270
2027 3,444,281 500,635 ‐ 228,846 1,247,100 968,100 499,600 1,602,089
2028 3,260,684 332,661 ‐ 221,923 1,241,150 968,100 496,850 1,600,553
2029 1,465,200 ‐ ‐ ‐ 966,600 498,600 1,600,758
2030 1,463,200 ‐ ‐ ‐ 963,600 499,600 1,602,499
2031 1,458,950 ‐ ‐ ‐ 964,100 494,850 1,601,475
2032 1,462,750 ‐ ‐ ‐ 965,100 497,650 1,601,782
2033 1,464,750 ‐ ‐ ‐ 964,900 499,850 1,601,290
2034 1,459,950 ‐ ‐ ‐ 963,500 496,450 1,600,881
2035 1,463,550 ‐ ‐ ‐ 965,900 497,650 1,600,471
2036 1,465,150 ‐ ‐ ‐ 966,900 498,250 1,602,028
2037 1,462,350 ‐ ‐ ‐ 965,350 497,000 1,601,290
2038 1,458,500 ‐ ‐ ‐ 963,050 495,450 1,601,065
2039 498,600 ‐ ‐ ‐ ‐ 498,600 ‐
2040 497,200 ‐ ‐ ‐ ‐ 497,200 ‐
2041 495,200 ‐ ‐ ‐ ‐ 495,200 ‐
2042 497,600 ‐ ‐ ‐ ‐ 497,600 ‐
2043 499,200 ‐ ‐ ‐ ‐ 499,200 ‐
Totals 49,111,157 3,837,104 1,666,775 2,854,750 1,969,228 9,956,050 17,375,550 11,451,700 28,826,071
* Excludes SCORE Bonds which will be repaid through SCORE jail service charges.
2021/2022 Preliminary Budget City of Renton, Washington
Debt Management - General Obligation Debt 4 - 6
DEBT MANAGEMENT
WATERWORKS UTILITY DEBT
WATERWORKS DEBT SUMMARY
As of January 1, 2021, the City has $19 million in total principal revenue bond debt outstanding. This revenue
bond debt of the City has been incurred through two (2) different bond categories:
Waterworks Revenue Bond debt, for various water/sewer projects, has $17.8 million in outstanding
principal debt.
Public Works Trust Fund Loans, received for specific water sewer projects from the State of Washington,
have $1.2 million in outstanding principal debt.
All Water/Wastewater/Surface Water debt service is accounted for in the Waterworks Utility Funds (Water
405, Wastewater 406, and Surface Water 407).
REVENUE BONDS
2012 Water/Sewer Revenue Refunding Bonds (Ordinance #5672) were issued in the amount of $9,190,000
and dated December 7, 2012. The average interest rate is 2.5%. These bonds were issued for the purpose of
refunding a portion of the 2004 Water/Sewer Revenue Bonds.
2016 Water/Sewer Revenue Refunding Bonds (Ordinance #5812) were issued in the amount of $9,385,000
and dated October 20, 2016. The average interest rate is 1.73%. These bonds were issued for the purpose of
refunding a portion of the 2008 (A) Water/Sewer Revenue Bonds (Exempt).
2017 Water/Sewer Revenue Refunding Bonds (Ordinance #5846) were issued in the amount of $6,283,168
and dated September 6, 2017. The average interest rate is 1.85%. These bonds were issued for the purpose
of partially refunding the 2007 Water/Sewer Revenue Bonds and 2007 Water/Sewer Revenue Refunding Bonds
(02).
PUBLIC WORKS TRUST FUND LOANS
2002 Maplewood Water Treatment Improvement (CAG 01‐175). This loan was to fund the costs to eliminate
quality problems in water from the Maplewood wellfield wells.
2002 CT Pipeline for Wells RW‐1, RW‐2 and RW‐3 (CAG 02‐082) loan is to construct the CT detention pipeline
for wells RW‐1, RW‐2 and RW‐3 at Liberty Park.
2004 Maplewood Drinking Water Treatment Improvement (CAG 04‐053) loan is to construct the drinking
water treatment improvements at Maplewood.
2021/2022 Preliminary Budget City of Renton, Washington
Debt Management - Waterworks Debt 4 - 7
DEBT MANAGEMENT
WATERWORKS UTILITY DEBT
Year
Total Revenue
Bonds
2012 W/S
Refunding
(2004)
2016 W/S
Refunding
(2008A)
2017 W/S
Refunding
(2007 & 2007
Ref) PWTF Loans
2021 2,747,523 547,300 944,457 1,255,767 351,851
2022 2,746,705 548,450 945,184 1,253,071 319,821
2023 2,809,952 1,704,300 1,105,652 ‐ 275,374
2024 2,808,293 1,705,200 1,103,093 ‐ 274,010
2025 2,805,024 1,704,750 1,100,274 ‐ ‐
2026 2,810,145 1,707,950 1,102,195 ‐ ‐
2027 2,808,421 1,704,650 1,103,771 ‐ ‐
Totals 19,536,062$ 9,622,600$ 7,404,624$ 2,508,838$ 1,221,056$
2021/2022 Preliminary Budget City of Renton, Washington
Debt Management - Waterworks Debt 4 - 8
5 CAPITAL INVESTMENT PROGRAM
City Wide Narrative
5‐1
City Wide Summary
5‐5
General Government
5‐6
Transportation
5‐79
Airport
5‐109
Golf Course
5‐121
Water
5‐129
Wastewater
5‐153
Surface Water
5‐163
2021/2022 Preliminary Budget City of Renton, Washington
Capital Investment Program ‐ City Wide Narrative
I. Capital Investment Program Policy
Overview
The projects listed in the 2021 – 2026 Capital Investment Program (“CIP”) are consistent with the adopted 2021‐
22 Biennial Budget. The budget serves to specify the amount of funds available for capital investment projects
by general category (e.g. wastewater utility, surface water utility, transportation, etc.) during 2021‐22, whereas
the CIP focuses on life basis cost of each project, over a full six year period. In addition to identifying each capital
project by category, the CIP includes the annual capital‐related costs, the projected operating budget impacts,
and the funding sources for each project.
Not all of the City’s capital spending is included in the 6‐year CIP. Operating equipment purchases and
replacements, such as mobile equipment and computers, are financed through the Equipment Replacement
Reserve revolving fund or through systematic replacements in the operating budget. Similarly, small projects for
operating facilities, such as recreation centers, senior activities center, and the City Hall, have been incorporated
into internal service charges and have been funded with operating budget since 2011.
As the biennium progresses, some projects become higher priorities while others are delayed, depending on a
variety of circumstances. In some instances additional funding becomes available from cost savings on other
projects, third party funding (grants, inter‐local agreements), or when existing capital projects are carried over
into the new fiscal year due to scheduled delays. In these cases the budget can be amended and the City
Council, in coordination with City administration, take action to approve specific projects and adjust the
schedule for existing projects so total capital expenditures don’t exceed the original budget, unless there is
additional funding to offset the increased costs.
Background
Renton’s businesses and citizens have made a considerable investment for resources in buildings, parks, streets,
sewers, water systems, equipment, and other capital investments. These assets are used by the public and by
city staff to provide daily services. Therefore, it is the City’s responsibility to properly plan, design, construct, and
maintain these assets and facilities in order to ensure they are safe, long‐lasting, and provide a welcoming and
usable space for generations of use. The CIP represents the City’s near term investment priorities, its plan to
preserve past investments, and provide adequate facilities for the future. While the focus of our CIP is limited to
the larger, multi‐year projects that require more time and policy discussion to initiate. The CIP includes projects
meeting the following criteria:
1. A useful life greater than 2 years
2. New and expanded physical facilities/assets including the study, planning, and design phases 3. System‐wide or subarea studies and planning efforts
4. Large scale renovation and replacement of existing facilities over $25,000
5. The acquisition of new capital facilities or assets
6. The purchase of major pieces of equipment which are not identified in the Equipment
Rental/Reserve Fund; or require multiple‐year financing
7. Equipment purchases associated with newly acquired facilities
5 - 1
2021/2022 Preliminary Budget City of Renton, Washington
Capital Investment Program ‐ City Wide Narrative
II. Procedure for Capital Investment Program
1. Initiation
Requesting Department:
1. Creates a list of the various capital investment projects to be considered
2. Verifies that projects meet the definitions of the previously defined CIP Policy
3. Identifies all recommended or likely source of funding for each project
4. Assess each project’s operating budget impact, including long‐term maintenance costs
5. Creates a request for each project which includes: a project description, the funding source(s), and long‐term
operating impact
6. Prioritizes each request using the CIP Evaluation Criteria
7. Submits request to the Administrative Services Department
2. Reviews
Mayor / Chief Administrative Officer / Administrative Services Administrator:
1. Reviews prioritized Capital Investment Requests
2. Prepares a bi‐annual Capital Investment Plan recommendation
3. Presents the Budget and Capital Investment Plan to the City Council
City Council:
1. Conducts a workshop at mid‐year preparatory to the development and submittal of the Mayor’s proposed biennial
budget, to consider any priorities or projects of interest
2. Holds a public hearing to review the recommended CIP as part of the budget process
3. Conducts workshops to review the Mayor’s recommendations and make changes as necessary
4. Adopts the Capital Investment Program as part of the biennial budget
3. Implementation
Department:
1. Monitors all CIP projects approved in the City’s adopted biennial budget
2. If estimated project cost exceeds appropriation, obtain council approval for updated project cost information
3. Obtain Council approval when cumulative change orders on any particular contract exceed 10% of the approved
initial contract
4. Work with Administrative Services Department to provide quarterly progress updates to the Council
Administrative Services Department:
5. Monitors the CIP and budgets and provides periodic status reports to the City Council
4. Closeout
Department:
1. Issue the Notice of Completion to the Administrative Services Department
2. Submit project completion documents and obtain authorization to release retainage from the City Council
3. Create budget proposals for impacts on the operating budget
Administrative Services Department:
1. Reconciles total revenues and expenditures for each CIP
2. Capitalize project, as appropriate
3. Release retainage once authorization from the City Council and all applicable State agencies has been received
4. Coordinate project audits
5 - 2
2021/2022 Preliminary Budget City of Renton, Washington
Capital Investment Program ‐ City Wide Narrative
III. Criteria for Evaluating Projects
The City Council reviewed and adopted updated criteria in evaluating and prioritizing CIP projects in 2013. The new
prioritization matrix considers two dimensions of each project 1) importance and 2) urgency and timing. The following are
the considerations to make for each dimension:
1. Importance
Community Safety and Health – Preservation of public health, safety, or mission critical program/operation
Compliance with Laws and Regulations – Required/mandated by court, federal, or state government laws/regulations
Promoting Economic Development – Urban and neighborhood renewal, job attraction/retention, and growth in general City
revenue
Community Value – Preserve and protect natural resources and the environment, provide fair and equitable access, existing
user demand and participation, and improve workforce and customer satisfaction
Financial Stewardship – Maximize return on investment through grants or other leveraged resources, reduce ongoing costs,
consolidation of duplicative/overlapping services and costs, avoidance of more costly investment alternatives, or
generation of net revenue
Consistency with Adopted Plans – comprehensive plans; business plans; community plans; Transportation Improvement
Plan; Parks, Recreation, and Natural Areas Plan; and other planning documents
2. Urgency and Timing
Urgent/Immediate Safety – Includes city services for the protection of community safety and health for persons and
property. The city should prioritize those projects that need immediate attention
External Resource Timing – To maximize the impact of city resources, the city has been actively seeking external grants or private investments for projects. The availability and timing of external funding can influence when the city can implement
a project that is important to the community
Coordinate Internal Resource Timing – This leverages internal resources and reduces service interruptions during the
construction
Maintain Service Level – Under the Growth Management Act, the city is required to provide increased capacity in infrastructure concurrent to growth in order to maintain service levels. This is also an important expectation of the
community
Improve Service Level – While improving service level may be the least “urgent”, certain projects of higher importance to
the community may be implemented sooner than other projects that have a higher urgency but low community importance
5 - 3
2021 – 2022 Preliminary Budget City of Renton, Washington
This page is intentionally left blank
5 - 4
2021‐ 2022 Preliminary Budget City of Renton, Washington
CAPITAL INVESTMENT PROGRAM ‐ SUMMARY
2021 through 2026
C I T Y W I D E S U M M A R Y
Departments
Actual
through
2019
2020 2021 2022 2023 2024 2025 2026 Thereafter Project
Total
General Government 12,793 11,037 18,523 3,688 10,059 9,800 3,415 4,980 24,480 98,775
Transportation 28,829 19,656 37,535 10,387 6,978 6,521 8,620 1,780 120,306
Airport 5,471 6,867 4,827 11,362 11,986 792 1,740 654 ‐ 43,699
Golf Course ‐ 72 68 72 336 140 200 150 1,038
Water Utility 30,006 5,928 13,152 12,745 12,910 6,270 4,330 4,330 89,671
Wastewater Utility 4,933 2,011 15,986 8,900 4,200 4,200 4,200 4,200 2,000 50,630 Surface Water Utility 27,176 4,440 10,705 14,077 3,305 4,670 4,785 7,005 76,163
Total 109,208 50,011 100,796 61,231 49,774 32,393 27,290 23,099 26,480 480,282
Resources
Actual
through
2019
2020 2021 2022 2023 2024 2025 2026 Thereafter Project
Total
Arterial Street Revenue 6,220 6,220
Business License/B&O Tax 17,143 6,342 5,179 1,582 1,290 815 865 1,550 34,766
Fuel Tax 1,250 710 1,424 700 700 700 700 6,184
Golf Course Revenues 72 68 72 336 140 200 150 1,038
Grants/Contribution 19,357 19,041 32,365 23,156 16,848 5,290 8,295 570 2,500 127,422
Impact Fees 1,044 682 2,289 500 400 50 550 500 3,000 9,015
Interest Income 588 117 534 163 40 40 40 40 375 1,937
Lease Income 5,164 5,274 827 677 1,136 792 740 654 15,264
Mitigation Funds Received 143 539 1,799 2,481
Property Taxes 4,384 3,681 15,473 217 6,230 6,735 500 2,200 200 39,620
REET 2,977 1,961 3,324 1,308 1,689 1,625 1,425 440 17,605 32,354
Road/Street Maint Charges 14 14
Sale of Density Rights 224 500 500 1,200 1,350 900 1,000 800 6,474
Transportation Impact Mitigation 956 1,094 1,298 1,280 575 796 330 330 6,659 User Fee 49,968 10,274 35,716 31,776 19,330 14,060 12,745 14,965 2,000 190,834
Total 109,208 50,011 100,796 61,231 49,774 32,393 27,290 23,099 26,480 480,282
Project funding Status:
Actual
through
2019
2020 2021 2022 2023 2024 2025 2026 Thereafter Project
Total
Secured 103,208 48,418 82,084 40,522 9,685 2,220 70 70 ‐ 286,277
Anticipated** ‐ 1,593 18,712 20,709 40,089 30,173 27,220 23,029 26,480 188,005
Total Project Funding 103,208 50,011 100,796 61,231 49,774 32,393 27,290 23,099 26,480 474,282
**Expenditures utilizing anticipated funding are not included in the adopted budget.
Estimated
Estimated
Capital Investment Program ‐ City Wide Summary 5 - 5
2021‐2022 Preliminary Budget City of Renton, Washington
Projects Priority Type*
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Regis Park Athletic Field Expansion 1 N 93 100 ‐ ‐ ‐ ‐ ‐ ‐ 8,700 8,893
Sunset EIS Park 2 N 7,699 3,907 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 11,606 Sunset Park ‐ Art 3 N ‐ 224 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 224
Liberty Park Improvements 4 SP 21 250 276 ‐ ‐ ‐ ‐ ‐ 3,150 3,697
Sport Court Repairs ‐ Teasedale Basketball 5 SP ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150
Parking Lot and Drive Repairs ‐ Renton Sr. A 6SP ‐ ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ 90 Transportation Landscape 7 N ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 90
Irrigation Renovation, Automation and Con 8SP 3 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 15
Coulon Park ‐ Lighting Repairs 9 SP 71 34 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 106
Playground Replacement ‐ Coulon Park Play 10 SP ‐ 300 306 ‐ ‐ ‐ ‐ ‐ ‐ 606 Coulon ‐ Trestle Bridge 11 SP/N ‐ 350 1,193 ‐ ‐ ‐ ‐ ‐ ‐ 1,543
Coulon ‐ Waterwalk 12 SP ‐ 400 1,241 1,500 ‐ ‐ 100 2,375 2,375 7,991
Kiwanis 13 SP/N 0 500 5,675 ‐ ‐ ‐ ‐ ‐ ‐ 6,176 Philip Arnold Park Improvements 14 SP/N 104 600 5,505 ‐ ‐ ‐ ‐ ‐ 2,150 8,359 MM Structural Reviews & Repair ‐ Park Brid 15 SP ‐ ‐ ‐ 20 ‐ ‐ ‐ ‐ ‐ 20
Structural Reviews ‐ Coulon Park 16 SP ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ ‐ 125
Playground Replacement ‐ Cascade Park 17 SP ‐ ‐ 175 ‐ ‐ ‐ ‐ ‐ ‐ 175 Playground Replacement ‐ Kennydale Beac 18 SP ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150 Coulon Park ‐ Turf Replacement 19 SP ‐ 26 25 25 25 25 25 25 ‐ 176
Sport Court Repairs ‐ Bocce Ball Court 20 SP ‐ ‐ 65 ‐ ‐ ‐ ‐ ‐ ‐ 65
Playground Replacement ‐ Maplewood Par 21 SP ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150 Playground Replacement ‐ Glencoe Park 22 SP ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150 Park Entry Signage ‐ Systemwide 23 ED ‐ ‐ ‐ 18 40 40 40 40 375 553
Coulon Park ‐ Swim Beach 24 SP ‐ ‐ 250 ‐ 100 350 1,000 1,000 ‐ 2,700
Coulon Park ‐ Bulkhead (Rosewall) Repairs 25 SP ‐ 12 ‐ ‐ 14 ‐ ‐ 15 1,250 1,291 MM Structural Reviews & Repair ‐ Cedar Ri 26 SP 189 580 ‐ ‐ 50 ‐ ‐ 25 750 1,594 Trails and Bicycle Master Plan 27 N ‐ ‐ ‐ ‐ 130 ‐ ‐ ‐ ‐ 130
Sport Court Repairs ‐ Talbot Hill Tennis and 28 SP ‐ ‐ ‐ ‐ 35 150 ‐ ‐ ‐ 185
Coulon ‐ Shoreline Erosion 29 SP ‐ ‐ ‐ ‐ 80 150 800 ‐ ‐ 1,030 Playground Replacement ‐ Earlington Park 30 SP ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
Playground Replacement ‐ Kennydale Lions 31 SP ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
Paths, Walks, Patios and Boardwalks ‐ Ceda 32 SP ‐ ‐ ‐ ‐ 110 ‐ ‐ ‐ ‐ 110
Ballfield Renovation ‐ Liberty Park 33 SP ‐ ‐ ‐ ‐ 250 150 ‐ ‐ ‐ 400 Lighting System Upgrades ‐ Liberty Park Te 34 ED ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Lighting System Upgrades ‐ Liberty Park Ska 35 ED ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Boundary, Topographic & Site Survey ‐ Jone 36 SP ‐ ‐ ‐ ‐ 100 ‐ ‐ ‐ ‐ 100
MM Shoreline and Bank Stabilization ‐ Jone 37 SP ‐ ‐ 183 ‐ 300 ‐ ‐ ‐ ‐ 483 Parking Lot and Drive Repairs ‐ Tiffany Park 38 SP ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Parks, Recreation and Natural Areas Plan 39 N ‐ ‐ ‐ ‐ ‐ 235 ‐ ‐ ‐ 235
May Creek Park 40 N ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ 3,350 3,550 Paths, Walks, Patios and Boardwalks ‐ Jone 41 SP ‐ ‐ ‐ ‐ ‐ 75 ‐ ‐ ‐ 75 Playground Replacement ‐ Highlands Park 42 SP ‐ ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ 175
Playground Replacement ‐ Heritage Park 43 SP ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ ‐ 200
Lighting System Upgrades ‐ Ron Regis Park 44 ED ‐ ‐ ‐ ‐ ‐ 150 ‐ ‐ ‐ 150 ADA Transition Plan ‐ Parks and Recreation 45 N ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200 Parking Lot and Drive Repairs ‐ Talbot Hill R 46 SP ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
Playground Replacement ‐ Burnett Linear P 47 SP ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
Playground Replacement ‐ Jones Park 48 SP ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200 Sport Court Repairs ‐ Highlands Park Tennis 49 SP ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125 Playground Replacement ‐ Windsor Hill Par 50 SP ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
Sport Court Repairs ‐ Kennydale Lions Park 51 SP ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80 80
May Creek Trail South 52 N ‐ ‐ ‐ ‐ ‐ ‐ ‐ 500 500 1,000
FACILITIES ‐
City Hall Elevator Modernization 1 SP 1,408 2,080 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,487
Boathouse 2 ED 64 323 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 388
City Hall Major HVAC and Fire Component 3 SP 2,091 500 1,800 ‐ ‐ ‐ ‐ ‐ ‐ 4,391 Renton Community Center Major HVAC Co 4 SP ‐ ‐ 600 600 ‐ ‐ ‐ ‐ ‐ 1,200
City Wide Security System Upgrades 5 SP 58 100 140 100 ‐ ‐ ‐ ‐ ‐ 398
RCC Building Updates 6 ED ‐ ‐ ‐ 1,000 ‐ ‐ ‐ ‐ ‐ 1,000
Renton Community Center Audio and Vide 7ED ‐ ‐ 200 ‐ ‐ ‐ ‐ ‐ ‐ 200 Family First Center 8 N 991 649 500 ‐ 6,500 6,500 ‐ ‐ ‐ 15,140
City Hall Heat Pump and VAT Replacement 9 SP ‐ ‐ ‐ ‐ 950 950 ‐ ‐ ‐ 1,900
Sr. Center Court and Fountain Renovation 10 SP ‐ ‐ ‐ ‐ 400 ‐ ‐ ‐ ‐ 400 City Shops Roof Replacement 11 SP ‐ ‐ ‐ ‐ ‐ 400 400 ‐ ‐ 800 City Shops HVAC and Generator Replaceme 12 SP ‐ ‐ ‐ ‐ ‐ ‐ 500 ‐ ‐ 500
Roof Replacement Parks Maintenance Shop 13 SP ‐ ‐ ‐ ‐ 250 ‐ ‐ ‐ ‐ 250
Coulon Maintenance Building HVAC Replac 14 SP ‐ ‐ ‐ ‐ ‐ 50 ‐ ‐ ‐ 50 North Highlands and Highlands HVAC Repla 15 SP ‐ ‐ ‐ ‐ ‐ ‐ 550 ‐ ‐ 550 HMAC Upgrades and Repairs 16 ED ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 ‐ 1,000
City Hall Electrical 17 ED ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 800 800
Total Expenditures 12,793 11,037 18,523 3,688 10,059 9,800 3,415 4,980 24,480 98,775
*Project Types: ED = Correcting Existing Deficiencies; SP = System Preservation; N = New Facilities to Accommodate Growth
GENERAL GOVERNMENT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
SUMMARY BY COUNCIL PRIORITY
ESTIMATED
Capital Investment Program ‐ General Government 5 - 6
2021‐2022 Preliminary Budget City of Renton, Washington
Projects
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
REET 2,182 1,530 3,324 1,308 1,689 1,625 1,425 440 17,605 31,128
Impact Fees 1,044 682 2,289 500 400 50 550 500 3,000 9,015 Grants/Contributions 2,587 3,647 606 300 ‐ ‐ ‐ ‐ 2,500 9,640
Property Taxes 3,392 1,905 9,564 217 6,230 6,735 500 2,200 200 30,944
B&O Taxes 3,130 2,932 2,151 700 500 ‐ ‐ 800 ‐ 10,213 Sale of Density Rights ‐ 224 500 500 1,200 1,350 900 1,000 800 6,474 Interest 458 117 89 163 40 40 40 40 375 1,362
Total Resources 12,793 11,037 18,523 3,688 10,059 9,800 3,415 4,980 24,480 98,775
Project Funding Status:Secured 12,793 11,037 17,923 3,088 500 ‐ ‐ ‐ ‐ 45,341
Anticipated**‐ ‐ 600 600 9,559 9,800 3,415 4,980 24,480 53,434
Total Project Funding 12,793 11,037 18,523 3,688 10,059 9,800 3,415 4,980 24,480 98,775
**Expenditures utilizing anticipated funding are not included in the adopted budget.
Reconciliation to Adopted Budget:Project Funding Secured 42,702 LTCP Sal/Benefits 2021/2022
Previously Appropriated
Appropriations To‐Date 38,089
Additional Appropriations Needed 4,612
Additional Appropriations:
2021 Adopted Budget 2,351
2022 Adopted Budget 2,261
Total Additional Appropriations 4,612
‐
ESTIMATED
Capital Investment Program ‐ General Government 5 - 7
2021 ‐2022 Preliminary Budget City of Renton, Washington
PARKS
5 - 8
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:1
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design 93 100 ‐ ‐ ‐ ‐ ‐ ‐ 1,200 1,393
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 7,500 7,500
Total Expenditures 93 100 ‐ ‐ ‐ ‐ ‐ ‐ 8,700 8,893
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET 1 100 ‐ ‐ ‐ ‐ ‐ ‐ 6,700 6,801 Impact Fees 20 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 1,020 Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 1,000 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest 72 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 72
Total Resources 93 100 ‐ ‐ ‐ ‐ ‐ ‐ 8,700 8,893
Project Funding Status:
Secured 93 100 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 193 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8,700 8,700
Total Project Funding 93 100 ‐ ‐ ‐ ‐ ‐ ‐ 8,700 8,893
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
ESTIMATED
ESTIMATED
TOTAL
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Phase I improvements were completed in 2000 (lighted dirt soccer field, lighted basketball court & turf softball field, & parking). Environmental regulations constrain future development proposed to include a lighted turf ballfield and
soccer fields, restroom with potable water & additional parking. A Feasibility Study to determine the viability of locating a restroom with potable water and sewer within the current footprint of the existing building footprint was completed in 2020 as well as determining a viable location for a new maintenance shed. Potable water will need to be serviced by the Cedar River Water and Sewer District (Agreement has been formalized) and brought under SR 169.
Sewer will need to connect to King County Metro. As the majority of the park is in the floodplain, this project will need to phased in over time in the future.
Rationale
The majority of the park is located within the floodplain constraining development. Potable water will need to be brought under SR 169 via Cedar River Water and Sewer District. This project will need to be phased in over time using multiple financial resources.
Description and Scope
Regis Park Athletic Field ExpansionDevelopmentPreviously Approved
Capital Investment Program ‐ General Goverment 5 - 9
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:2
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions 3,799 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,799 Construction 3,899 3,907 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 7,807
Total Expenditures 7,699 3,907 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 11,606
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET 2,099 1,120 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,219 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions 2,587 2,788 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 5,375 Property Taxes 2,912 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,912 B&O Taxes 100 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 100 Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 7,699 3,907 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 11,606
Project Funding Status:
Secured 7,699 3,907 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 11,606 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 7,699 3,907 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 11,606
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ 57 210 210 210 210 210 210 210 1,527
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Sunset EIS ParkDevelopmentExtension of Previously Approved
Construction of Phase II (final phase) of a new 3.2 acre neighborhood park. Phase II improvements include a water feature, gazebo, arbors, 2 children's play areas, fitness area, picnic facilities, completion of the looped walk system and art.
Estimate completion is late 2020/early 2021.
Rationale
Identified in the Sunset Area Investment Strategy and the EIS to support planned growth, meet service demands, and provide for a vibrant community. This project significantly increases recreation opportunities and the quality of life for those in the community.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 10
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:3
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ 224 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 224 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ 224 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 224
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ 224 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 224 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 224 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 224
Project Funding Status:Secured ‐ 224 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 224
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ 224 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 224
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ 5 5 5 5 5 5 5 5 40
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Sunset Park ‐ ArtSystem Preservation
In Progress
As part of the new Sunset Neighborhood Park a significant art feature, centrally located, and celebrating the area's history will be installed. The art selection has been in partnerhsip with the Community and Economic Development Department and the Arts Commission.
RationaleThe art installation celebrates the Sunset Area's culture and history and provides opportunities for the public to enjoy outdoor visual arts.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 11
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:4
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design 21 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 400 421
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ 250 276 ‐ ‐ ‐ ‐ ‐ 2,750 3,276
Total Expenditures 21 250 276 ‐ ‐ ‐ ‐ ‐ 3,150 3,697
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ 250 276 ‐ ‐ ‐ ‐ ‐ 3,150 3,676 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest 21 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 21
Total Resources 21 250 276 ‐ ‐ ‐ ‐ ‐ 3,150 3,697
Project Funding Status:
Secured 21 250 276 ‐ ‐ ‐ ‐ ‐ ‐ 547 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,150 3,150
Total Project Funding 21 250 276 ‐ ‐ ‐ ‐ ‐ 3,150 3,697
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Liberty Park ImprovementsDevelopmentPreviously Approved
2020 improvements will replace and enhance the existing 23 year old playground; playgrounds typically have a lifespan of 15 years. Future imprpovements will include a mini‐master plan from the library to the skate park focusing on
pedestrian connectivity, movement and accessibility, the picnic facilities, restroom, skate park and riverfront habitat.
Rationale
Replacing the playground creates a safe place for children to play in the City's first and oldest park. This project supports planned growth, a vibrant community and meets service demands. Identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 12
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:5
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150
Total Expenditures ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150
Project Funding Status:
Secured ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Sport Court Repairs ‐ Teasedale Basketball CourtMaintenance and PreservationPreviously Approved
Projects include safety repairs, replacement, resurfacing, reconstruction, seal‐coating, patching, drainage improvements and re‐striping existing surfaces for 17 tennis courts, 13 basketball courts, pickleball and bocce ball courts throughout
the system. The Teasdale basketball court wIll be renovated in 2020 due to significant cracking, pitting and heaving.
Rationale
This project improves safety of those active visitors and improves the overall quality of user experience. This project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 13
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:6
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ 90
Total Expenditures ‐ ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ 90
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ 90 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ 90
Project Funding Status:
Secured ‐ ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ 90 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ 90
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Parking Lot and Drive Repairs ‐ Renton Sr. Activity Center Maintenance and PreservationPreviously Approved In Progress
Parking lot and driveway reconstruction activities to include resurfacing, sealcoating, patching, curb repairs/replacement, drainage improvements and re‐striping. 2020/2021 repairs are schedule for the Renton Sr. Activity Center.
Rationale
Park visitors need a safe, accessible place to park while visiting all the parks around the city. Keeping up the parking lots and drives improves safety and increases the quality of their experience. This project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 14
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:7
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 90
Total Expenditures ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 90
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 90
Total Resources ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 90
Project Funding Status:Secured ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 90
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 90
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ 10 10 25 25 25 25 25 25 170
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Transportation LandscapeSystem Preservation
In Progress
Department of Ecology grant funded ROW raingarden projects, secured and managed by the Surface Water Utility, do not allow, or fund irrigation for the plant materials. The 16th and Jefferson project was awarded a DOE grant, and irrigation design and construction will be funded by this capital item. On‐going irrigation maintenance will be provided by Community Services Parks and Trails Division and the ongoing plant maintenance will be provided by Community
Services Parks Planning and Natural Resource under contracted services. Raingarden maintenance will be completed by Public Works.
RationaleThe installation of irrigation ensures plant viability and a thriving landscape enhancing the visual quality of the City's ROW's and eco‐system benefits.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 15
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Irrigation Renovation, Automation and Conservation Priority Number:8
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction 3 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 15
Total Expenditures 3 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 15
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest 3 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 15
Total Resources 3 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 15
Project Funding Status:
Secured 3 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 15 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 3 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 15
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Maintenance and PreservationPreviously Approved
This project upgrades and/or replaces outdated irrigation systems & water saving devices that have outlived their useful life; repairs are on‐going. Replacement will result in reduced water consumption with more effective water delivery
and reduced maintenance costs.
Rationale
Maintain current assets and conserves water resources.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 16
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:9
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction 71 34 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 106
Total Expenditures 71 34 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 106
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET 54 34 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 89 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest 17 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 17
Total Resources 71 34 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 106
Project Funding Status:
Secured 71 34 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 106 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 71 34 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 106
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Coulon Park ‐ Lighting RepairsMaintenance and PreservationPreviously Approved
Project includes replacing incandescent lights with energy saving LED lights. This project is complete.
Rationale
Projects contribute toward providing a safe, healthy, and vibrant community, meeting service demands and providing high quality customer service. Identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 17
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:10
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ 300 306 ‐ ‐ ‐ ‐ ‐ ‐ 606
Total Expenditures ‐ 300 306 ‐ ‐ ‐ ‐ ‐ ‐ 606
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ 300 306 ‐ ‐ ‐ ‐ ‐ ‐ 606 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 300 306 ‐ ‐ ‐ ‐ ‐ ‐ 606
Project Funding Status:Secured ‐ 300 306 ‐ ‐ ‐ ‐ ‐ ‐ 606
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ 300 306 ‐ ‐ ‐ ‐ ‐ ‐ 606
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Coulon Park PlaygroundSystem Preservation
In Progress
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). The 17 year old Coulon Park playground play equipment and safety surfacing is scheduled for replacement in 2020/2021.
RationaleRemoving and replaccing the 17 year old equipment and safety surfacing will provide a safe and healthy play area in the City's most highly used park. This project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 18
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:11
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ 350 1,193 ‐ ‐ ‐ ‐ ‐ ‐ 1,543
Total Expenditures ‐ 350 1,193 ‐ ‐ ‐ ‐ ‐ ‐ 1,543
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ 350 1,193 ‐ ‐ ‐ ‐ ‐ ‐ 1,543 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 350 1,193 ‐ ‐ ‐ ‐ ‐ ‐ 1,543
Project Funding Status:Secured ‐ 350 1,193 ‐ ‐ ‐ ‐ ‐ ‐ 1,543
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ 350 1,193 ‐ ‐ ‐ ‐ ‐ ‐ 1,543
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Coulon ‐ Trestle BridgeSystem Preservation
In Progress
As minor repairs were being completed in 2019 it was discovered that the support structure was severely compromised structurally. Interim repairs to extend the life of the bridge for another 3 to 5 years were then completed, with a recommendation to replace the bridge. The new bridge will be a clear span bridge with light penetrating decking with a viewpoint. In water piles will be removed. The connection for park user and maintenance personnel will be
maintained with this bridge replacement.
RationaleThe current repairs are interim extending the life to approximately 2022 ‐ 2024. The support structure is original to approximately the turn of the century, and cannot be rehabilitated. This is the only connection for park users and
maintenance crews from the north end of the park to the south end of the park. Removed piles and light penetrating decking will improve salmon habitat.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 19
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:12
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ 400 ‐ ‐ ‐ ‐ 100 2,375 2,375 5,250 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 1,241 1,500 ‐ ‐ ‐ ‐ ‐ 2,741
Total Expenditures ‐ 400 1,241 1,500 ‐ ‐ 100 2,375 2,375 7,991
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ 983 ‐ ‐ 100 375 2,375 3,833 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ 209 300 ‐ ‐ ‐ ‐ ‐ 509 Property Taxes ‐ 400 1,032 217 ‐ ‐ ‐ 1,200 ‐ 2,849 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ 800 ‐ 800 Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 400 1,241 1,500 ‐ ‐ 100 2,375 2,375 7,991
Project Funding Status:Secured ‐ 400 1,241 1,500 ‐ ‐ ‐ ‐ ‐ 3,141
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ 100 2,375 2,375 4,850
Total Project Funding ‐ 400 1,241 1,500 ‐ ‐ 100 2,375 2,375 7,991
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Coulon ‐ WaterwalkSystem Preservation
In Progress
A 2020 underwater dive and structural assessment indicated that the piles supporting the north waterwalk have a maximum 5 year life span remaining due to corrosion. Phases I and 2 will be fully designed during Phase 1. Phase 1 construction will sleeve the piles to extend the life for another 30 years. Future Phase 2 construction will remove 50% of the concrete decking and all wood timber in the State DNR Lease Area as required by the lease. Light penetrating
decking will be installed on the waterwalk and the floating picnic pads. The pilot house will be repainted.
RationaleThe piles supporting the north waterwalk have a maximum 5 year life span remaining due to corrosion. Phase 1 repairs extend the life for another 30 years. The City's lease agreement with the State Department of Natural Resources for
the waterwalk in the Inner Harbor Area stipulates that by 2028 50% of the total area of the waterwalk and floating picnic pads are required to be replaced with light penetrating decking. In addition, all wood must be removed and replaced with plastic lumber by 2028.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 20
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:13
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 0 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 0 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ 500 5,675 ‐ ‐ ‐ ‐ ‐ ‐ 6,175
Total Expenditures 0 500 5,675 ‐ ‐ ‐ ‐ ‐ ‐ 6,176
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ 1,568 ‐ ‐ ‐ ‐ ‐ ‐ 1,568 Impact Fees ‐ ‐ 316 ‐ ‐ ‐ ‐ ‐ ‐ 316 Grants/Contributions ‐ ‐ 91 ‐ ‐ ‐ ‐ ‐ ‐ 91 Property Taxes 0 500 3,700 ‐ ‐ ‐ ‐ ‐ ‐ 4,201 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 0 500 5,675 ‐ ‐ ‐ ‐ ‐ ‐ 6,176
Project Funding Status:Secured 0 500 5,675 ‐ ‐ ‐ ‐ ‐ ‐ 6,176
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 0 500 5,675 ‐ ‐ ‐ ‐ ‐ ‐ 6,176
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ 150 100 100 100 100 100 650
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
KiwanisSystem Preservation
In Progress
Kiwanis Park is a 50+ year old park. Improvements include replacing the playground, repaving the parking lot, replacing the non‐functioning storm drainage system, making the park fully accessible (ADA compliant), adding a new looped walkway, removing the activity building, adding a portland loo, adding a picnic shelter and a parent plaza, completing basketball court improvements, installing a sythetic turf infield with new backstop and covered dugouts, improving the
tennis courts, and adding site amenities.
RationaleUpdates to Kiwanis Park will make the park safe and accessible for all visitors as well as improve the quality of life for those visiting the park. Programming of the ballfield will be greatly expanded as well as for the soccer fields. This project
was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 21
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:14
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 150 150
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction 104 600 5,505 ‐ ‐ ‐ ‐ ‐ 2,000 8,209
Total Expenditures 104 600 5,505 ‐ ‐ ‐ ‐ ‐ 2,150 8,359
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ 575 ‐ ‐ ‐ ‐ ‐ 1,150 1,725 Impact Fees ‐ 41 1,473 ‐ ‐ ‐ ‐ ‐ 500 2,014 Grants/Contributions ‐ 559 ‐ ‐ ‐ ‐ ‐ ‐ 500 1,059 Property Taxes 104 ‐ 3,457 ‐ ‐ ‐ ‐ ‐ ‐ 3,561 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 104 600 5,505 ‐ ‐ ‐ ‐ ‐ 2,150 8,359
Project Funding Status:
Secured 104 600 5,505 ‐ ‐ ‐ ‐ ‐ ‐ 6,209 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,150 2,150
Total Project Funding 104 600 5,505 ‐ ‐ ‐ ‐ ‐ 2,150 8,359
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ 25 50 50 50 50 50 50 325
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Philip Arnold Park ImprovementsDevelopmentExtension
Philip Arnold Park is a 50+ year old park. Improvements include replacing and expanding the playground, repaving the parking lot, replacing the non‐functioning storm drainage system, making the park fully accessible (ADA compliant), a
new looped walkway, removing the activity building and abandoned restroom facility, adding a portland loo, replacing the picnic shelter and adding one new shelter, adding a parent plaza, completing basketball court improvements, and adding site amenities. A future phase includes design and construction of renovated ballfield for year round use.
Rationale
Updates to Phillip Arnold Park will make the park safe and accessible for all visitors as well as improve the quality of life for those visiting the park. The project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 22
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:15
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ 20 ‐ ‐ ‐ ‐ ‐ 20
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ 20 ‐ ‐ ‐ ‐ ‐ 20
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ 20 ‐ ‐ ‐ ‐ ‐ 20
Total Resources ‐ ‐ ‐ 20 ‐ ‐ ‐ ‐ ‐ 20
Project Funding Status:
Secured ‐ ‐ ‐ 20 ‐ ‐ ‐ ‐ ‐ 20 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ ‐ 20 ‐ ‐ ‐ ‐ ‐ 20
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
MM Structural Reviews & Repair ‐ Park BridgesMaintenance and PreservationPreviously Approved
In order to maintain City assets, structural reviews are completed every 3 to 5 years on every major outdoor park structure to include bridges, retaining walls, boardwalks, etc. Identified repairs are then programmed and executed. The
bridges at Ron Regis Park, Springbrook Trail Boardwalk, Riverview Park and Kennydale Beach park are scheduled to have structural inspections on a 5‐year rotation
Rationale
Structural reviews and repairs are a significant aspect of keeping the city's outdoor park structures safe and operating, driving public safety and quality of life in the parks throughout the city.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 23
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:16
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ ‐ 125
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ ‐ 125
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ ‐ 125
Total Resources ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ ‐ 125
Project Funding Status:
Secured ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ ‐ 125 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ ‐ 125
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Structural Reviews ‐ Coulon ParkMaintenance and PreservationPreviously Approved
On‐going 5‐year structural reviews and underwater dive assessments have been occuring since 2012. 2022 is scheduled for the third assessment. The assessments and dives identify structural components that have deteriorated and/or are
deteriorating do to an aging over‐water and in‐water facility. The assessments recommend immediate, short‐term and long‐term repairs in order for the City to keep the park safe and operational.
Rationale
Structural reviews and underwater dive assessments have identified several critical repairs and replacements in order for the City to maintain this highly utilized park in a safe condition. Phase 1 is over 50 years old and phase 2 is 38 years old. Assessment findings are programmed into future capital repairs.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 24
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:17
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 175 ‐ ‐ ‐ ‐ ‐ ‐ 175
Total Expenditures ‐ ‐ 175 ‐ ‐ ‐ ‐ ‐ ‐ 175
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ 175 ‐ ‐ ‐ ‐ ‐ ‐ 175 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 175 ‐ ‐ ‐ ‐ ‐ ‐ 175
Project Funding Status:Secured ‐ ‐ 175 ‐ ‐ ‐ ‐ ‐ ‐ 175
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ 175 ‐ ‐ ‐ ‐ ‐ ‐ 175
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). Cascade Park was annexed to the City from King County in 2008 The existing playground is between 15 and 20 years old (as of 2020).
RationaleRemoving and replacing the 15 ‐ 20 year old play equipment and safety surfacing will provide a safe and healthy play area in the Benson Hill Community Planning area. Playgrounds typically have a lifespan of 15 years.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Cascade ParkSystem Preservation
New
Capital Investment Program ‐ General Goverment 5 - 25
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:18
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150
Total Expenditures ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150
Project Funding Status:Secured ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ 150
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). The play equipment at the beach park is used extensively and several components have been removed due to extensive wear and tear. The existing playground is between 15 and 20 years old (as of 2020).
Rationale Removing and replacing the 15 ‐ 20 year old play equipment will provide a safe and healthy play area at this highly utilized beach park. Playgrounds typically have a lifespane of 15 years. This project was identified in the Parks, Trails and
Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Kennydale Beach ParkSystem Preservation
Previously Approved
Capital Investment Program ‐ General Goverment 5 - 26
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:19
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ 26 25 25 25 25 25 25 ‐ 176
Total Expenditures ‐ 26 25 25 25 25 25 25 ‐ 176
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ 26 25 25 25 25 25 25 ‐ 176 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 26 25 25 25 25 25 25 ‐ 176
Project Funding Status:
Secured ‐ 26 25 25 ‐ ‐ ‐ ‐ ‐ 76 Anticipated*‐ ‐ ‐ ‐ 25 25 25 25 ‐ 100
Total Project Funding ‐ 26 25 25 25 25 25 25 ‐ 176
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Coulon Park ‐ Turf ReplacementMaintenance and PreservationPreviously Approved
Due to ongoing, extensive, heavy park use, the turf requires replacement in identified areas on an annual basis.
Rationale
Turf maintenance is a primary aspect of keeping Coulon Park a beautiful and reputable park in the city, as well as maintaining the level of enjoyment for its visitors.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 27
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:20
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 65 ‐ ‐ ‐ ‐ ‐ ‐ 65
Total Expenditures ‐ ‐ 65 ‐ ‐ ‐ ‐ ‐ ‐ 65
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ 65 ‐ ‐ ‐ ‐ ‐ ‐ 65 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 65 ‐ ‐ ‐ ‐ ‐ ‐ 65
Project Funding Status:Secured ‐ ‐ 65 ‐ ‐ ‐ ‐ ‐ ‐ 65
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ 65 ‐ ‐ ‐ ‐ ‐ ‐ 65
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ 10 10 10 10 10 10 60
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Sport Court Repairs ‐ Bocce Ball CourtMaintenance and Preservation
Previously Approved
Projects include safety repairs, replacement, resurfacing, reconstruction, seal‐coating, patching, drainage improvements and re‐striping existing surfaces for 17 tennis courts, 13 basketball courts, pickleball and bocce ball courts throughout the system. The Bocce Ball court renovation at the Renton Sr Activity Center is scheduled for 2021.
RationaleThis project improves safety of those active visitors and improves the overall quality of user experience. The last renovation occurred in the mid‐1990's; the synthetic turf has worn through and the seems have frayed. This project was
identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 28
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:21
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150
Total Expenditures ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150
Project Funding Status:Secured ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). The play equipment at Maplewood Park is over 15 years old (as of 2020) and has several locations where the plasticized coating has worn off and rust is appearing due to age.
RationaleRemoving and replacing the 15+ year old play equipment and safety surfacing, will provide a safe and healthy play area at this highly used neighborhood park. Playgrounds typically have a lifespan of 15 years. This project was identified in
the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Maplewood ParkSystem Preservation
Previously Approved
Capital Investment Program ‐ General Goverment 5 - 29
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:22
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150
Total Expenditures ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150
Project Funding Status:Secured ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ ‐ 150 ‐ ‐ ‐ ‐ ‐ 150
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). The Glencoe Park playground is between 15 and 20 years old (as of 2020).
RationaleRemoving and replacing the 15 ‐ 20 year old play equipment and safety surfacing will provide a safe and healthy play area in this neighborhood park. Playgrounds typically have a lifespan of 15 years.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Glencoe ParkSystem Preservation
New
Capital Investment Program ‐ General Goverment 5 - 30
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:23
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ 18 40 40 40 40 375 553
Total Expenditures ‐ ‐ ‐ 18 40 40 40 40 375 553
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ 18 40 40 40 40 375 553
Total Resources ‐ ‐ ‐ 18 40 40 40 40 375 553
Project Funding Status:
Secured ‐ ‐ ‐ 18 ‐ ‐ ‐ ‐ ‐ 18 Anticipated*‐ ‐ ‐ ‐ 40 40 40 40 375 535
Total Project Funding ‐ ‐ ‐ 18 40 40 40 40 375 553
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ 10 10 10 10 10 10 60
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Park Entry Signage ‐ SystemwideSystem PreservationNew
New park entry, directional and informational signage will be installed as part of the Kiwanis Park and Philip Arnold Park renovations. Consistent signage throughout the system will help users identify all facilities as a City of Renton
improvement and provide users with information and direction to park amenities. New signage will be installed over an approximate 10 year timeframe.
Rationale
Existing Park Entry signage was designed and installed in the mid‐1980's. The signage is outdated, deteriorating, dates and ages the City's parks, trails, natural areas and recreational amenities; the appearance is uninviting. No locations have directional and informational signage to guide the user.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 31
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:24
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ 250 ‐ 100 350 ‐ ‐ ‐ 700 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ 1,000 1,000 ‐ 2,000
Total Expenditures ‐ ‐ 250 ‐ 100 350 1,000 1,000 ‐ 2,700
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ 250 ‐ 100 350 500 ‐ ‐ 1,200 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ 500 1,000 ‐ 1,500 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 250 ‐ 100 350 1,000 1,000 ‐ 2,700
Project Funding Status:Secured ‐ ‐ 250 ‐ ‐ ‐ ‐ ‐ ‐ 250
Anticipated*‐ ‐ ‐ ‐ 100 350 1,000 1,000 ‐ 2,450
Total Project Funding ‐ ‐ 250 ‐ 100 350 1,000 1,000 ‐ 2,700
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Coulon Park ‐ Swim BeachSystem Preservation
In Progress
The promende walk along the swim beach is cracking and subsiding. The support wall for the promenade is being undercut for unknown reasons. Both issues are creating a non‐ADA compliant walk and erosion into the water at the beach area. Geotechnical, structural, and hydraulic studies will need to be accomplished to determine the causes and future corrective actions which may also include mitigation. This is a phased project.
RationaleImprovements will prevent the walk from falling into the lake and create an ADA comliant, safe walking surface free of cracks at the City's most highly used park. Improvements will also preserve the park and enhance water quality.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 32
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Coulon Park ‐ Bulkhead (Rosewall) Repairs Priority Number:25
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ 12 ‐ ‐ 14 ‐ ‐ 15 250 291
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 1,000
Total Expenditures ‐ 12 ‐ ‐ 14 ‐ ‐ 15 1,250 1,291
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 14 ‐ ‐ 15 1,250 1,279 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 12 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 12 ‐ ‐ 14 ‐ ‐ 15 1,250 1,291
Project Funding Status:
Secured ‐ 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 12 Anticipated*‐ ‐ ‐ ‐ 14 ‐ ‐ 15 1,250 1,279
Total Project Funding ‐ 12 ‐ ‐ 14 ‐ ‐ 15 1,250 1,291
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Maintenance and PreservationNew
The timber retaining wall at Coulon Park near the sailing float is tilting and was identified for future repairs in the 2017 structural assessment report. A geotechnical and structural report was completed in 2020 with recommendations to
measure the wall angle and complete ongoing structural assessments every three years. A minor repair will be completed in 2021. The 2020 report estimates the life span between another 6‐10 years with replacement between 2026 and 2030.
Rationale
This project is essential to keeping the upland portion of the park intact (the wall is holding up the developed portion of the park). The project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 33
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:26
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ 15 ‐ ‐ 50 ‐ ‐ 25 ‐ 90
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction 189 565 ‐ ‐ ‐ ‐ ‐ ‐ 750 1,504
Total Expenditures 189 580 ‐ ‐ 50 ‐ ‐ 25 750 1,594
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET 27 ‐ ‐ ‐ 50 ‐ ‐ 25 750 852 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ 565 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 565 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest 162 15 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 177
Total Resources 189 580 ‐ ‐ 50 ‐ ‐ 25 750 1,594
Project Funding Status:
Secured 189 580 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 769 Anticipated*‐ ‐ ‐ ‐ 50 ‐ ‐ 25 750 825
Total Project Funding 189 580 ‐ ‐ 50 ‐ ‐ 25 750 1,594
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
MM Structural Reviews & Repair ‐ Cedar River Trestle BridgeMaintenance and PreservationPreviously Approved
In order to maintain City assets, structural reviews are completed every 3 to 5 years on every major outdoor park structure to include bridges, waterwalks, retaining walls, fishing piers, docks, ramps, wave breaks, etc. Identified repairs are
then programmed and executed. The Cedar River Trestle Bridge timber inspections are scheduled every three years and the steel steel truss inspections every five years. 2023 includes both the timber and steel truss inspections and geotechnical report. 2026 includes the timber inspection. The in‐progress 2020 structural repairs are based upon these structural reviews. As identified, on going reviews will monitor the left bank for slabbinig potentially necessitating
future bank armoring.
Rationale
Structural reviews and repairs are a significant aspect of keeping the city's outdoor park structures safe and operating, driving public safety and quality of life in the parks throughout the city.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 34
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:27
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ 130 ‐ ‐ ‐ ‐ 130
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ 130 ‐ ‐ ‐ ‐ 130
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ 130 ‐ ‐ ‐ ‐ 130 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 130 ‐ ‐ ‐ ‐ 130
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ 130 ‐ ‐ ‐ ‐ 130
Total Project Funding ‐ ‐ ‐ ‐ 130 ‐ ‐ ‐ ‐ 130
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Trails and Bicycle Master PlanPlanningPreviously Approved
Update to the 2019 Trails and Bicycle Master Plan which expires in January 2025. In order to maintain grant eligibility (parks and trails), the plan is required to be updated and certified every six years; the City also uses the plan to obtain
transportation grants. The planning process includes extensive public outreach to meet public need and demand for the non‐motorized network. Public Works contributes 50% of the cost for consultant services; the figure below represents 50% of the total budget amount required.
Rationale
A current, state certified plan is required for grant application eligibility. The planning process is typically 18 months once a contract has been negotiated.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 35
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:28
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ 35 ‐ ‐ ‐ ‐ 35 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ 150 ‐ ‐ ‐ 150
Total Expenditures ‐ ‐ ‐ ‐ 35 150 ‐ ‐ ‐ 185
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 35 150 ‐ ‐ ‐ 185 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 35 150 ‐ ‐ ‐ 185
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ 35 150 ‐ ‐ ‐ 185
Total Project Funding ‐ ‐ ‐ ‐ 35 150 ‐ ‐ ‐ 185
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ 10 10 10 30
Projects include safety repairs, replacement, resurfacing, reconstruction, seal‐coating, patching, drainage improvements and re‐striping existing surfaces for 17 tennis courts, 13 basketball courts, pickleball and bocce ball courts throughout the system. The Talbot Hill Park pickleball and tennis courts require leveling, resurfacing, and striping. As these courts are constructed over an existing reservoir, structural consultant pre‐work is required.
RationaleThis project improves safety of those active visitors and improves the overall quality of user experience. The courts, constructed in the 1980's, have never been refurbished. This project was identified in the Parks, Trails and Community
Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Sport Court Repairs ‐ Talbot Hill Tennis and Pickleball CourtsMaintenance and Preservation
Previously Approved
Capital Investment Program ‐ General Goverment 5 - 36
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:29
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ 80 150 ‐ ‐ ‐ 230
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ 800 ‐ ‐ 800
Total Expenditures ‐ ‐ ‐ ‐ 80 150 800 ‐ ‐ 1,030
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 80 150 800 ‐ ‐ 1,030 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 80 150 800 ‐ ‐ 1,030
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ 80 150 800 ‐ ‐ 1,030
Total Project Funding ‐ ‐ ‐ ‐ 80 150 800 ‐ ‐ 1,030
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Coulon ‐ Shoreline ErosionCross‐CategoryNew
Investigate and develop solution to shoreline erosion located north of IVARs and extending to the north end of the park. Geotechnical and structural assessments required in order to develop plans for construction along with
environmental permitting. This is a phased project.
Rationale
Project maintains park asset, improves lake water quality and salmon habitat, and maintains a safe area to recreate along the Lake Washington shoreline. The project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 37
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:30
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
Total Expenditures ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
Total Project Funding ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness).
Rationale
The Earlington Park playground is over 20 years old as of 2020; the typical lifespan is 15 years. Removing and replacing this play equipment and safety surfacing will provide a safe and healthy play area in this highly visited neighborhood
park.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Earlington ParkSystem Preservation
New
Capital Investment Program ‐ General Goverment 5 - 38
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:31
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
Total Expenditures ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
Total Project Funding ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ ‐ 175
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). The Kennydale Lions Park playground is 15 years old as of 2020 (installed 2005).
RationaleRemoving and replacing this 15 year old play equipment (as of 2020) and safety surfacing will provide a safe and healthy play area in this highly visited neighborhood park. The typical life span for play equipment is 15 years.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Kennydale Lions ParkSystem Preservation
New
Capital Investment Program ‐ General Goverment 5 - 39
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:32
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ 110 ‐ ‐ ‐ ‐ 110
Total Expenditures ‐ ‐ ‐ ‐ 110 ‐ ‐ ‐ ‐ 110
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 110 ‐ ‐ ‐ ‐ 110 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 110 ‐ ‐ ‐ ‐ 110
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ 110 ‐ ‐ ‐ ‐ 110
Total Project Funding ‐ ‐ ‐ ‐ 110 ‐ ‐ ‐ ‐ 110
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Work includes ADA accessibility improvements and additions, and safety repairs and replacements to include heaving, broken, and settling pathways, trails, sidewalks, patios and boardwalks. The Cedar River Trail, constructed in 1995, is cracking and breaking. The portion from the Off‐Leash dog park to Ron Regis Park is proposed to be renovated.
RationaleThis project helps ensure that the Cedar River Trail is safe and accessible to all members of the community. This project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Paths, Walks, Patios and Boardwalks ‐ Cedar River TrailMaintenance and Preservation
Previously Approved
Capital Investment Program ‐ General Goverment 5 - 40
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:33
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ 250 150 ‐ ‐ ‐ 400
Total Expenditures ‐ ‐ ‐ ‐ 250 150 ‐ ‐ ‐ 400
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 250 150 ‐ ‐ ‐ 400 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 250 150 ‐ ‐ ‐ 400
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ 250 150 ‐ ‐ ‐ 400
Total Project Funding ‐ ‐ ‐ ‐ 250 150 ‐ ‐ ‐ 400
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ 25 25 50 50 50 200
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Ballfield Renovation ‐ Liberty ParkMaintenance and Preservation
Previously Approved
Older ballfields require periodic major renovations to maintain infrastructure & safety, increase playability, & decrease staff time in field preparation. Work includes drainage, grading, turf, material replacement, backstop replacements & upgrades, player bench repairs & upgrades, & bleacher upgrades & replacements. The Liberty Park 1 ballfield is scheduled for in‐field and out‐field improvements in 2023 and dugout and backstop improvements in 2024.
RationaleImprovement ensures a safe and playable experience in this highly utilized park. Identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 41
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Lighting System Upgrades ‐ Liberty Park Tennis Courts Priority Number:34
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Total Project Funding ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Maintenance and PreservationPreviously Approved
Description and Scope
Projects include replacing lights, poles and electrical systems that have outlived their useful life and replacing them with new poles and LED lights for reduced energy costs.
Rationale
New lighting decreases energy cost, increases the safety for park visitors during dusk and evening hours, and extends the amount of time the park can be utilized by its visitors. The Liberty Park tennis courts are the most highly used in the park system. This project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 42
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:35
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Total Expenditures ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Total Project Funding ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Lighting System Upgrades ‐ Liberty Park Skate ParkMaintenance and Preservation
Previously Approved
Projects include replacing lights, poles and electrical systems that have outlived their useful life and replacing them with new poles and LED lights for reduced energy costs.
Rationale
New lighting decreases energy cost, increases the safety for park visitors during dusk and evening hours, and extends the amount of time the park can be utilized by its visitors.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 43
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:36
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ 100 ‐ ‐ ‐ ‐ 100
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ 100 ‐ ‐ ‐ ‐ 100
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ 100 ‐ ‐ ‐ ‐ 100 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 100 ‐ ‐ ‐ ‐ 100
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ 100 ‐ ‐ ‐ ‐ 100
Total Project Funding ‐ ‐ ‐ ‐ 100 ‐ ‐ ‐ ‐ 100
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Boundary, Topographic & Site Survey ‐ Jones ParkMaintenance and PreservationPreviously Approved
Many parks throughout the system do not have current boundary, topographic and site surveys reflecting existing conditions. Surveys provide the baseline information for future maintenance and development projects as well as define
park boundaries to minimize encroachment. Jones Park survey concides with the proposed shoreline bank stabilization (2023) and future walkway/pathway (2024) improvements.
Rationale
Surveys are an essential component to the development, re‐development and maintenance of park assets.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 44
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:37
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ 183 ‐ 300 ‐ ‐ ‐ ‐ 483
Total Expenditures ‐ ‐ 183 ‐ 300 ‐ ‐ ‐ ‐ 483
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 300 ‐ ‐ ‐ ‐ 300 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ 183 ‐ ‐ ‐ ‐ ‐ ‐ 183 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 183 ‐ 300 ‐ ‐ ‐ ‐ 483
Project Funding Status:
Secured ‐ ‐ 183 ‐ ‐ ‐ ‐ ‐ ‐ 183 Anticipated*‐ ‐ ‐ ‐ 300 ‐ ‐ ‐ ‐ 300
Total Project Funding ‐ ‐ 183 ‐ 300 ‐ ‐ ‐ ‐ 483
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
MM Shoreline and Bank Stabilization ‐ Jones ParkMaintenance and PreservationPreviously Approved
Major maintenance is necessary in order to maintain City assets and infrastructure in a safe, accessible, and operational manner. Along bodies of water, environmental design and permitting considerations are incorporated into the
project. Jones Park bank stabilization is programed for 2023 where the existing bank and walkway have been undercut due to erosion.
Rationale
Project provides safe access along the Cedar River and maintains the park asset which is currently being undercut. Bank stabilization will be salmon friendly and benefit the environment. This project was identified in the Parks, Trails and Community Facilities Initiative and requires additional funding.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 45
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:38
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Total Expenditures ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
Total Project Funding ‐ ‐ ‐ ‐ 125 ‐ ‐ ‐ ‐ 125
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Parking lot and driveway reconstruction activities to include resurfacing, sealcoating, patching, curb repairs/replacement, drainage improvements and re‐striping. The Tiffany Park parking lot is significantly cracked/alligatored and requires repaving and re‐striping.
RationalePark visitors need a safe, accessible place to park while visiting all the parks around the city. Maintaining the parking lots and drives improves safety and increases the quality of their experience. This project was identified in the Parks,
Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Parking Lot and Drive Repairs ‐ Tiffany Park Maintenance and Preservation
Previously Approved
Capital Investment Program ‐ General Goverment 5 - 46
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:39
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ 235 ‐ ‐ ‐ 235
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ 235 ‐ ‐ ‐ 235
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ 235 ‐ ‐ ‐ 235 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 235 ‐ ‐ ‐ 235
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ 235 ‐ ‐ ‐ 235
Total Project Funding ‐ ‐ ‐ ‐ ‐ 235 ‐ ‐ ‐ 235
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Parks, Recreation and Natural Areas PlanPlanningPreviously Approved
This Plan is a 20‐year vision for parks, recreation, and natural areas and is the blueprint for planning, acquisition, development and major maintenance. Current & future needs, level of service, policy language, implementation strategies,
& an investment program are included. The Plan is updated every 6 years to maintain grant eligibility and extensive community involvement is fostered. The 2020 adopted plan expires in January, 2026.
Rationale
A current, state certified plan is required for grant application eligibility. The planning process is typically 18 months once a contract has been negotiated.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 47
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:40
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ 350 550
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,000 3,000
Total Expenditures ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ 3,350 3,550
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ 1,350 1,550 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 1,000 Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 1,000 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ 3,350 3,550
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ 3,350 3,550
Total Project Funding ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ 3,350 3,550
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 75 75
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
May Creek ParkDevelopmentNew
The City acquired a 10‐acre parcel in 1994 with a Washington Wildlife and Recreation Program (WWRP) grant administered by the state Recreation and Conservation Office. The terms of the grant agreement stipulate development as per the
grant application. Additional parcels, contiguous to the acquisition, have since been donated expanding the park property. The project will be phased and Phase I improvements will include a master plan for the entire property as well a survey and environmental studies. Design and construction documents will be prepared for Phase 1 construction which will include parking, a looped trail, signage and site amenities. Phase 1 construction will occur in 2027/2028 in order to
meet the grant funding requirements. Future phases will be programmed based upon the adopted master plan.
Rationale
The City was notified by the State Recreation and Conservation Office (RCO) in 2019 that this grant funded project was out of compliance for development ‐ as per the grant agreement. Phase 1 improvements will bring the project into compliance without jeapardizing participation in future grant application cycles with the RCO.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 48
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:41
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ 75 ‐ ‐ ‐ 75
Total Expenditures ‐ ‐ ‐ ‐ ‐ 75 ‐ ‐ ‐ 75
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ 75 ‐ ‐ ‐ 75 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 75 ‐ ‐ ‐ 75
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ 75 ‐ ‐ ‐ 75
Total Project Funding ‐ ‐ ‐ ‐ ‐ 75 ‐ ‐ ‐ 75
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Work includes ADA accessibility improvements and additions, and safety repairs and replacements to include heaving, broken, and settling pathways, trails, sidewalks, patios and boardwalks. The walkways within Jones Park are cracked and heaved.
RationaleThis project helps ensure that Jones Park is safe and accessible to all members of the community. This project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Paths, Walks, Patios and Boardwalks ‐ Jones ParkMaintenance and Preservation
Previously Approved
Capital Investment Program ‐ General Goverment 5 - 49
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:42
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ 175
Total Expenditures ‐ ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ 175
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ 175 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ 175
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ 175
Total Project Funding ‐ ‐ ‐ ‐ ‐ 175 ‐ ‐ ‐ 175
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). The Highlands Park playground is 20 years old.
Rationale
The Highlands Park playground is 20 years old (as of 2020); the typical lifespan is 15 years. Removing and replacing this play equipment and safety surfacing will provide a safe and healthy play area in this highly visited neighborhood park
in the Sunset Revitalization Area.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Highlands ParkSystem Preservation
New
Capital Investment Program ‐ General Goverment 5 - 50
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:43
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ ‐ 200
Total Expenditures ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ ‐ 200
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ ‐ 200 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ ‐ 200
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ ‐ 200
Total Project Funding ‐ ‐ ‐ ‐ ‐ 200 ‐ ‐ ‐ 200
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Heritage ParkSystem PreservationNew
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). The Heritage Park playground was installed in 2007.
Rationale
The Heritage Park playground is 13 years old (as of 2020); the typical lifespan is 15 years. Removing and replacing this play equipment and safety surfacing will provide a safe and healthy play area in this highly visited neighborhood park.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 51
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:44
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ 150 ‐ ‐ ‐ 150
Total Expenditures ‐ ‐ ‐ ‐ ‐ 150 ‐ ‐ ‐ 150
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ 150 ‐ ‐ ‐ 150 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 150 ‐ ‐ ‐ 150
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ 150 ‐ ‐ ‐ 150
Total Project Funding ‐ ‐ ‐ ‐ ‐ 150 ‐ ‐ ‐ 150
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Lighting System Upgrades ‐ Ron Regis ParkMaintenance and PreservationPreviously Approved
Projects include replacing lights, poles and electrical systems that have outlived their useful life and replacing them with new poles and LED lights for reduced energy costs. The park lighting at the basketball court and park entry will be
upgraded.
Rationale
New lighting decreases energy cost, increases the safety for park visitors during dusk and evening hours, and extends the amount of time the park can be utilized by its visitors. This project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 52
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:ADA Transition Plan ‐ Parks and Recreation Buildings Priority Number:45
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
RegulatoryPreviously Approved
Description and Scope
Title II of the Americans with Disabilities Act (ADA) of 1990 prohibits all state and local governments from discriminating on the basis of disability. A comprehensive evaluation of parks and park facilities will be conducted to determine
what types of access barriers exist for individuals with disabilities. This plan will be used to help guide future planning and implementation of necessary accessibility improvements.
Rationale
This project helps ensure that the city parks are accessible to all members of the community in a safe way, improving the quality of life for all.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 53
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:46
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Parking lot and driveway reconstruction activities to include resurfacing, sealcoating, patching, curb repairs/replacement, drainage improvements and re‐striping. The Talbot Hill Reservoir parking lot is significantly cracked and alligatored and requires repaving and re‐striping. The curbs are broken into pieces.
RationalePark visitors need a safe, accessible place to park while visiting all the parks around the city. This project improves safety and increases the quality of their experience.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Parking Lot and Drive Repairs ‐ Talbot Hill Reservoir Park Maintenance and Preservation
Previously Approved
Capital Investment Program ‐ General Goverment 5 - 54
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:47
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Burnett Linear ParkSystem PreservationNew
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). The Burnett Linear Park playground was installed in 2006.
Rationale
The typical life span for play equipment is 15 years. Removing and replacing this play equipment and safety surfacing installed in 2006 will provide a safe and healthy play area in this highly utilized neighborhood park in the downtown core.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 55
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:48
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 200
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Jones ParkSystem PreservationNew
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). The Jones Park playground was installed in 2005.
Rationale
Removing and replacing this play equipment equipment and safety surfacing installed in 2005 will provide a safe and healthy play area in this highly utilized neighborhood park. The typical lifespan is 15 years.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 56
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:49
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 125
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Projects include safety repairs, replacement, resurfacing, reconstruction, seal‐coating, patching, drainage improvements and re‐striping existing surfaces for 17 tennis courts, 13 basketball courts, pickleball and bocce ball courts throughout the system. The Highlands Park tennis courts require resurfacing and striping.
RationaleThis project improves safety of those active visitors and improves the overall quality of user experience. This project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Sport Court Repairs ‐ Highlands Park Tennis CourtsMaintenance and Preservation
Previously Approved
Capital Investment Program ‐ General Goverment 5 - 57
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:50
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 175 175
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Playground Replacement ‐ Windsor Hill ParkSystem PreservationPreviously Approved
Projects include removing and replacing 15 year old, and older, playground equipment & support amenities, that have outlived their play value (safety & effectiveness). The Windor HIll Park playground was installed in 2004.
Rationale
Removing and replacing this play equipment equipment and safety surfacing installed in 2004 will provide a safe and healthy play area in this highly utilized neighborhood park. Playgrounds typically have a lifespan of 15 years. This project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Goverment 5 - 58
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:51
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80 80
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80 80
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80 80 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80 80
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80 80
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80 80
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
Projects include safety repairs, replacement, resurfacing, reconstruction, seal‐coating, patching, drainage improvements and re‐striping existing surfaces for 17 tennis courts, 13 basketball courts, pickleball and bocce ball courts throughout the system. The Kennydale Lions Basketball Court requires resurfacing and striping.
RationaleThis project improves safety of those active visitors and improves the overall quality of user experience. This project was identified in the Parks, Trails and Community Facilities Initiative.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Sport Court Repairs ‐ Kennydale Lions ParkMaintenance and Preservation
Previously Approved
Capital Investment Program ‐ General Goverment 5 - 59
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:52
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ 500 500 1,000
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ 500 500 1,000
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ 500 500 1,000 Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Sale of Density Rights ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ ‐ 500 500 1,000
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ 500 500 1,000
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ ‐ 500 500 1,000
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
The City completed the final remaining acquisition on the south side of May Creek located between Lake Washington Blvd. and I‐405. This project will restore the natural habitat (remove invasive species) to increase benefits to salmonids as well as install a soft surface trail for users to enjoy nature in an urban environment. A connection to the existing soft surface trail on the north side of May Creek (over the creek) is planned for the future .
RationaleThe survey completed as part of the adopted 2020 Parks, Recreation and Natural areas plan indicated that 72% of those surveyed want to restore natural areas. The survey also indicated that 56% regularly walk or hike on a trail in a
natural area, with 46% of the population requesting more investment for these recreation facilities.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
May Creek Trail SouthDevelopment
New
Capital Investment Program ‐ General Goverment 5 - 60
2021 ‐2022 Preliminary Budget City of Renton, Washington
FACILITIES
5 - 61
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:1
Project Category: Maintenance and Preservation
Status:Extension of Previously Approved
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance 1,408 2,080 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,487 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 1,408 2,080 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,487
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET 1,023 641 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,664 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes 384 1,439 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,823 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1,408 2,080 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,487
Project Funding Status:Secured 1,408 2,080 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,487
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 1,408 2,080 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,487
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
TOTAL
ESTIMATED
ESTIMATED
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeGeneral Contractor cost for lobby and penthouse code updates. Generator Design Generator construction.
RationaleElevator Modernization is already under contract and construction has begun. This request is for additional funds to complete the project. Completion of this project is imperative to keeping City Hall functioning so that the City may achieve its
goals.
City Hall Elevator Modernization
Capital Investment Program ‐ General Government 5 - 62
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Boathouse Priority Number:2
Project Category: System Preservation
Status:In Progress
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance 64 323 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 388 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 64 323 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 388
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ 79 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 79 Property Taxes ‐ 245 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 245 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest 64 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 64
Total Resources ‐ 323 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 388
Project Funding Status:Secured 64 323 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 388 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 64 323 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 388
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
TOTAL
ESTIMATED
ESTIMATED
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
The proposed work consists of engineering design, and bidding and construction phase support for demolition, repairs and installation of a new float. The existing north float will be removed and demolished. The existing south float will be shifted east and have supplemental floatation installed to account for necessary freeboard adjustment. The old south float will be connected, via a new gangway, to a new float placed in the location of the old south float.
Rationale
The current float is sinking
Capital Investment Program ‐ General Government 5 - 63
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:3
Project Category: Maintenance and Preservation
Status:Extension of Previously Approved
500000
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ 50 50 ‐ ‐ ‐ ‐ ‐ ‐ 100 Major Maintenance 2,091 450 1,750 ‐ ‐ ‐ ‐ ‐ ‐ 4,291 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 2,091 500 1,800 ‐ ‐ ‐ ‐ ‐ ‐ 4,391
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ 500 ‐ ‐ ‐ ‐ ‐ ‐ 500 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes 2,091 500 911 ‐ ‐ ‐ ‐ ‐ ‐ 3,502 B&O Taxes ‐ ‐ 386 ‐ ‐ ‐ ‐ ‐ ‐ 386
Interest ‐ ‐ 3 ‐ ‐ ‐ ‐ ‐ ‐ 3
Total Resources 2,091 500 1,800 ‐ ‐ ‐ ‐ ‐ ‐ 4,391
Project Funding Status:Secured 2,091 500 1,800 ‐ ‐ ‐ ‐ ‐ ‐ 4,391
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 2,091 500 1,800 ‐ ‐ ‐ ‐ ‐ ‐ 4,391
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
TOTAL
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Major HVAC items are at the end of life and must be replaced before complete failure. This project replaces Major HVAC Components and Fire systems at City Hall. It also replaces City Hall Boilers and AC cooling units for IT server room, along with replacement of the City Hall Fire Pump. Replace backup generator for City Hall
RationaleCity Hall boilers are the main source of heat for City Hall. The fire pump provides fire protection to all floors of city hall. The units are essential to the continuing function and safety of City Hall operations, especially IT operations. Completion of this
project is imperative to keeping City Hall functioning so that the City may achieve its goals.
Description and Scope
City Hall Major HVAC and Fire Component Replacement ‐ Phase 2
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Government 5 - 64
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Renton Community Center Major HVAC Component Replacement Priority Number:4
Project Category: Maintenance and Preservation
Status:Previously Approved
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ 600 600 ‐ ‐ ‐ ‐ ‐ 1,200 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ 600 600 ‐ ‐ ‐ ‐ ‐ 1,200
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ 600 600 ‐ ‐ ‐ ‐ ‐ 1,200 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 600 600 ‐ ‐ ‐ ‐ ‐ 1,200
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ 600 600 ‐ ‐ ‐ ‐ ‐ 1,200
Total Project Funding ‐ ‐ 600 600 ‐ ‐ ‐ ‐ ‐ 1,200
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
TOTAL
ESTIMATED
ESTIMATED
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeMajor HVAC items are at the end of life and must be replaced before complete failure. This project replaces major HVAC components at Renton Community Center, replacing fourteen air handler units and one chiller.
RationaleThe fourteen air handler unit and chiller is the main source of fresh air and cooling for the Renton Community Center. Completion of this project is imperative to keeping the Renton Community Center functioning.
Capital Investment Program ‐ General Government 5 - 65
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:5
Project Category: Development
Status:Previously Approved
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management 58 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 58 Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ 100 140 100 ‐ ‐ ‐ ‐ ‐ 340
Total Expenditures 58 100 140 100 ‐ ‐ ‐ ‐ ‐ 398
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes 58 100 140 100 ‐ ‐ ‐ ‐ ‐ 398 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 58 100 140 100 ‐ ‐ ‐ ‐ ‐ 398
Project Funding Status:Secured 58 100 140 100 ‐ ‐ ‐ ‐ ‐ 398
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 58 100 140 100 ‐ ‐ ‐ ‐ ‐ 398
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
TOTAL
ESTIMATED
ESTIMATED
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeUpgrade current Avigilon and Lenel security systems and install security cameras, badging, and alarm systems.
RationaleAs safety concurs continue to grow, the faculties division is receiving more requests from departments to add cameras and panic buttons to help protect city assets and investments. A security alarm system creates a safer working environment,
particularly employees work late shifts or odd hours.
City Wide Security System Upgrades
Capital Investment Program ‐ General Government 5 - 66
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:RCC Building Updates Priority Number:6
Project Category: Maintenance and Preservation
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ 200 ‐ ‐ ‐ ‐ ‐ 200
Project Management ‐ ‐ ‐ 100 ‐ ‐ ‐ ‐ ‐ 100 Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ 700 ‐ ‐ ‐ ‐ ‐ 700
Total Expenditures ‐ ‐ ‐ 1,000 ‐ ‐ ‐ ‐ ‐ 1,000
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ 500 ‐ ‐ ‐ ‐ ‐ 500 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ 500 ‐ ‐ ‐ ‐ ‐ 500 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ 1,000 ‐ ‐ ‐ ‐ ‐ 1,000
Project Funding Status:Secured ‐ ‐ ‐ 1,000 ‐ ‐ ‐ ‐ ‐ 1,000 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ ‐ 1,000 ‐ ‐ ‐ ‐ ‐ 1,000
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
TOTAL
ESTIMATED
ESTIMATED
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and Scope
Remodel RCC to aline with current programs and customer needs.
Rationale
Bring the building up to speed to meet modern aesethic standards as well as accommodate new program for citizens.
Capital Investment Program ‐ General Government 5 - 67
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Renton Community Center Audio and Video Systems Priority Number:7
Project Category: Cross‐Category
Status:Previously Approved
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ 20 ‐ ‐ ‐ ‐ ‐ ‐ 20 Project Management ‐ ‐ 50 ‐ ‐ ‐ ‐ ‐ ‐ 50 Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ 130 ‐ ‐ ‐ ‐ ‐ ‐ 130
Total Expenditures ‐ ‐ 200 ‐ ‐ ‐ ‐ ‐ ‐ 200
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ 114 ‐ ‐ ‐ ‐ ‐ ‐ 114
Interest ‐ ‐ 86 ‐ ‐ ‐ ‐ ‐ ‐ 86
Total Resources ‐ ‐ 200 ‐ ‐ ‐ ‐ ‐ ‐ 200
Project Funding Status:Secured ‐ ‐ 200 ‐ ‐ ‐ ‐ ‐ ‐ 200
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ 200 ‐ ‐ ‐ ‐ ‐ ‐ 200
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
TOTAL
ESTIMATED
ESTIMATED
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeAV and sound upgrades are needed for the Renton Community Center. Upgrade audio and video to state‐of‐the‐art commercial entertainment system. Install smart TVs, wireless routers, and projectors throughout the community center to have wireless and Bluetooth connectivity.
RationaleThe banquet room and the class rooms have high volume of use by both the public and City use for training, workshops along with both private and public meetings . Currently the systems in place have numerous complications and compatibility
issues. The expectation from users is to have compatible equipment with various platforms and wireless pairing ability. This would increase usability of renters and City users, and ultimately make the community center more competitive in the rental market.
Capital Investment Program ‐ General Government 5 - 68
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:8
Project Category: Development
Status:Previously Approved
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design 826 349 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,175 Project Management 165 300 500 ‐ 500 500 ‐ ‐ ‐ 1,965 Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ 6,000 6,000 ‐ ‐ ‐ 12,000
Total Expenditures 991 649 500 ‐ 6,500 6,500 ‐ ‐ ‐ 15,140
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 376 ‐ ‐ ‐ 6,000 6,500 ‐ ‐ ‐ 12,876 Property Taxes 496 649 500 ‐ 500 ‐ ‐ ‐ ‐ 2,145 B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest 119 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 119
Total Resources 872 649 500 ‐ 6,500 6,500 ‐ ‐ ‐ 15,140
Project Funding Status:Secured 991 649 500 ‐ 500 ‐ ‐ ‐ ‐ 2,640 Anticipated*‐ ‐ ‐ ‐ 6,000 6,500 ‐ ‐ ‐ 12,500
Total Project Funding 991 649 500 ‐ 6,500 6,500 ‐ ‐ ‐ 15,140
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
The need for a community center in the Benson Hill area was identified as a top priority in the 2013 Benson Hill Community Plan. The FFCC will achieve this long‐standing goal by utilizing unique public/non‐profit partnerships.
TOTAL
ESTIMATED
ESTIMATED
Rationale
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Family First Center
Description and ScopeThe City intends to construct the approximately 21,500 square foot Family First Community Center to meet the great need for a community center in the Benson Hill area. The center will provide recreational, fitness, health and educational programming overseen and operated by Doug Baldwin’s Family First Community Center foundation, HealthPoint CHC and the Renton School District.
Capital Investment Program ‐ General Government 5 - 69
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:9
Project Category: Maintenance and Preservation
Status:New Request
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ 950 950 ‐ ‐ ‐ 1,900 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ 950 950 ‐ ‐ ‐ 1,900
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ 950 950 ‐ ‐ ‐ 1,900
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 950 950 ‐ ‐ ‐ 1,900
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ 950 950 ‐ ‐ ‐ 1,900
Total Project Funding ‐ ‐ ‐ ‐ 950 950 ‐ ‐ ‐ 1,900
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeVAT and Heat Pumps help maintain proper cooling and heat operations, as the temperature in the space is satisfied, a VAT box closes to limit the flow of cool air into the space. As the temperature increases in the space, the box opens to bring the temperature back down. This project would replace over 150 variable air terminals and heat pumps throughout out City Hall.
RationaleVAT and Heat Pumps are crucial components of the HVAC system. Without these we would not be able to control air flow, heat or cooling of the HVAC system. Completion of this project is imperative to keeping City Hall functioning so that the City
may achieve its goals.
City Hall Heat Pump and VAT Replacement
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Government 5 - 70
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:10
Project Category: Maintenance and Preservation
Status:New Request
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ 400 ‐ ‐ ‐ ‐ 400 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ 400 ‐ ‐ ‐ ‐ 400
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ 400 ‐ ‐ ‐ ‐ 400 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 400 ‐ ‐ ‐ ‐ 400
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ 400 ‐ ‐ ‐ ‐ 400
Total Project Funding ‐ ‐ ‐ ‐ 400 ‐ ‐ ‐ ‐ 400
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeJoint project with parks to replace and repair the existing sport court and fountain. Current condition of the sport courts has left it unusable and the fountain also needs major maintenance.
RationaleThe senior center is a focal point for the City's senior community. Addressing the goal to increase quality of life, this project would refurbish the sport court and fountain at the senior center to renew the beauty and functionality of this space, for
visitors and passerby alike.
Sr. Center Court and Fountain Renovation
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Government 5 - 71
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:11
Project Category: Maintenance and Preservation
Status:New Request
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ 400 400 ‐ ‐ 800 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ 400 400 ‐ ‐ 800
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ 400 400 ‐ ‐ 800
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 400 400 ‐ ‐ 800
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ 400 400 ‐ ‐ 800
Total Project Funding ‐ ‐ ‐ ‐ ‐ 400 400 ‐ ‐ 800
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeThe roof is over 20 years old and has reached its end of life. This project replaces the roofs at city shops that were identified in the facilities condition assessment.
RationaleFacilities condition assessment found multiple water leaks throughout city shops building that is causing interior mold and mildew issues. Roof leaks pose a fire threat from shorted wire and can compromise structural integrity. This project
addresses the safety concern at the city shops that are key in the continuing function of the city.
City Shops Roof Replacement
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Government 5 - 72
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:City Shops HVAC and Generator Replacement Priority Number:12
Project Category: Maintenance and Preservation
Status:New Request
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ 500 ‐ ‐ 500 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ 500 ‐ ‐ 500
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ 500 ‐ ‐ 500
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ 500 ‐ ‐ 500
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ 500 ‐ ‐ 500
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ 500 ‐ ‐ 500
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeReplace HVAC and generator at city shops that were identified in the facilities condition assessment.
RationaleEquipment identified in the FCA will be reaching end of life. HVAC units are the only source of fresh air, heating, and cooling. Without HVAC unit public works building will have to be shut down. Backup Generators are essential in an emergency
event where power has been lost to the building to keep operations continuing. Addressing this issue is key to the continuing operation of these facilities.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Government 5 - 73
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Roof Replacement Parks Maintenance Shop and Parks Outbuilding Priority Number:13
Project Category: Maintenance and Preservation
Status:New Request
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ 250 ‐ ‐ ‐ ‐ 250 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ 250 ‐ ‐ ‐ ‐ 250
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ 250 ‐ ‐ ‐ ‐ 250
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 250 ‐ ‐ ‐ ‐ 250
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ 250 ‐ ‐ ‐ ‐ 250
Total Project Funding ‐ ‐ ‐ ‐ 250 ‐ ‐ ‐ ‐ 250
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeThe roof is over 20 years old and has reached its end of life. This project replaces the roof that was identified in the facilities condition assessment as end of life.
RationaleFacilities condition assessment found multiple water leaks throughout the parks maintenance shop and parks outbuildings that is causing interior mold and mildew issues. Roof leaks pose a fire threat from shorted wire and can compromise
structural integrity. Addressing this issue is key to the continuing operation of these facilities.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Government 5 - 74
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Coulon Maintenance Building HVAC Replacement Priority Number:14
Project Category: Maintenance and Preservation
Status:New Request
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ 50 ‐ ‐ ‐ 50 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ 50 ‐ ‐ ‐ 50
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ 50 ‐ ‐ ‐ 50 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 50 ‐ ‐ ‐ 50
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ 50 ‐ ‐ ‐ 50
Total Project Funding ‐ ‐ ‐ ‐ ‐ 50 ‐ ‐ ‐ 50
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeReplace HVAC equipment that was identified in the facilities condition assessment as end of life.
RationaleHVAC units are the only source of fresh air, heating and cooling. Without the HVAC unit Parks maintenance building will have to be shut down. Therefore, this project is imperative to keeping the maintenance building operating, which ultimately
helps sustain the quality of the park itself.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Government 5 - 75
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:North Highlands and Highlands HVAC Replacement Priority Number:15
Project Category: Maintenance and Preservation
Status:New Request
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ 550 ‐ ‐ 550 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ 550 ‐ ‐ 550
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ 550 ‐ ‐ 550 Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ 550 ‐ ‐ 550
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ 550 ‐ ‐ 550
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ 550 ‐ ‐ 550
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeReplace HVAC equipment that was identified in the facilities condition assessment as end of life.
RationaleHVAC units are the only source of fresh air, heating and cooling. Without the HVAC unit North highlands and Highlands will have to be shut down. Therefore, this project is imperative to keeping these buildings operating.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Government 5 - 76
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:16
Project Category: Maintenance and Preservation
Status:Extension of Previously Approved Project
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 ‐ 1,000 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 ‐ 1,000
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 ‐ 1,000
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 ‐ 1,000
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 ‐ 1,000
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,000 ‐ 1,000
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeAll items are noted in the FCA and are at the end of their life. Without the upgrades and repairs we will not be able to keep the pool open. This project replaces pump motors pool tiles and splash pad along with HVAC upgrades.
RationaleThe HMAC is a pivotal recreation location for the community and its continued operating will continue to build the quality of life for the community. This project is essential in its continued, safe operation.
HMAC Upgrades and Repairs
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Government 5 - 77
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:17
Project Category: Maintenance and Preservation
Status:New Request
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 800 800 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 800 800
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 800 800
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 800 800
Project Funding Status:Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 800 800
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 800 800
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Description and ScopeReplace end of life electrical panels transformer breakers and other associated components
RationaleThe City Hall needs a functioning electrical network to continue operations.
City Hall Electrical
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ General Government 5 - 78
2021/2022 Preliminary Budget City of Renton, Washington
Projects Priority Type*
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Rainier Ave S/N Phase 4 ‐ S 3rd Street to NW 3rd Pl 1 D 1,704 1,896 8,105 6,800 2,053 3,451 ‐ ‐ ‐ 24,009 Street Overlay 2 M 11,471 1,706 ‐ ‐ 500 500 500 500 ‐ 15,177
Arterial Rehabilitation Program 3 M 1,763 ‐ ‐ ‐ 200 200 200 200 ‐ 2,563 Bronson Way Bridge ‐ Seismic Retrofit and Painting 4 M 9 611 2,380 ‐ ‐ ‐ ‐ ‐ ‐ 3,000
Duvall Ave NE ‐ NE 7th St to Sunset Blvd NE 5 M 997 855 6,055 ‐ ‐ ‐ ‐ ‐ ‐ 7,907 S 7th Street Corridor Improvements ‐ Oakesdale Ave SW to Burnett Ave S 6 D ‐ 135 500 50 500 840 840 ‐ ‐ 2,865
Williams Ave S and Wells Ave S Conversion Project 7 C 1,378 6,585 3,800 ‐ ‐ ‐ ‐ ‐ ‐ 11,763
NE Sunset Boulevard (SR 900) Corridor Improvements 8 M 556 1,395 3,395 ‐ ‐ ‐ ‐ ‐ ‐ 5,346
South 2nd Street Conversion Project 9 D 1 10 1,541 ‐ ‐ ‐ ‐ ‐ ‐ 1,552
Houser Way Intersection and Pedestrian Improvements 10 D 185 715 100 ‐ ‐ ‐ ‐ ‐ ‐ 1,000 Houser Way Bridge‐ Seismic Retrofit and Painting 11 M 9 591 70 2,624 ‐ ‐ ‐ ‐ ‐ 3,294
Renton Connector 12 C 1 90 1,503 ‐ ‐ ‐ ‐ ‐ ‐ 1,594 Lake Washington Loop Trail 13 D 902 679 2,322 ‐ ‐ ‐ ‐ ‐ ‐ 3,903
Park Avenue North Extension 14 D 980 1,803 5,909 ‐ ‐ ‐ ‐ ‐ ‐ 8,692
Traffic Safety Program 15 M 1,485 261 60 60 60 60 60 60 ‐ 2,106
Roadway Safety and Guardrail Program 16 M 391 54 35 35 35 35 35 35 ‐ 655
Intersection Safety & Mobility Program 17 M 1,077 387 60 60 120 120 120 120 ‐ 2,064 Intelligent Transportation Systems (ITS) Program 18 M 462 160 60 60 150 150 150 150 ‐ 1,342
Barrier Free Transition Plan Implementation 19 M 73 85 35 35 35 100 100 100 ‐ 563 Williams Ave N Bridge Repair 20 M 9 281 250 130 2,610 ‐ ‐ ‐ ‐ 3,280
Traffic Operation Devices Program 21 M 863 245 100 100 120 120 120 120 ‐ 1,788 Sidewalk Rehabilitation and Replacement Program 22 M 1,782 100 ‐ ‐ 75 100 150 150 ‐ 2,357
Bridge Inspection & Repair Program 23 M 446 237 50 50 100 100 100 100 ‐ 1,183
Arterial Circulation Program 24 M 952 100 35 35 50 75 75 75 ‐ 1,397
Arterial Rehabilitation ‐ SW 43rd St Pavement Preservation 25 M 0 220 875 263 ‐ ‐ ‐ ‐ ‐ 1,358
Walkway Program 26 M 654 217 50 50 120 120 120 120 ‐ 1,451 I‐405/44th Gateway Signage & Green‐Scaping 27 D ‐ 58 210 ‐ ‐ ‐ ‐ ‐ ‐ 268
Project Development & Pre‐Design Program 28 M 679 130 35 35 50 50 50 50 ‐ 1,079 Nile Ave NE Bridge Repair 29 C ‐ 50 ‐ ‐ 200 500 6,000 ‐ ‐ 6,750
Total Expenditures 28,829 19,656 37,535 10,387 6,978 6,521 8,620 1,780 ‐ 120,306
*Project Types: A = Acquisition, C = Cross Category, D = Development, M = Maintenance, P = Planning, R = Regulatory, ED = Correcting Existing Deficiencies; SP = System Preservation; N = New Facilities to Accommodate Growth
Projects
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
REET 795 431 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,226
Mitigation Funds 143 539 1,799 ‐ ‐ ‐ ‐ ‐ ‐ 2,481
Grants/Contributions 4,269 11,696 23,632 8,225 4,913 4,210 6,725 ‐ ‐ 63,670
Road/Street Maint Charges 14 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 14 Transportation Impact Mitigation 956 1,094 1,298 1,280 575 796 330 330 ‐ 6,659
Lease Income 47 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 47 Arterial Street Revenue 6,220 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6,220
Property Taxes 992 1,776 5,909 ‐ ‐ ‐ ‐ ‐ ‐ 8,677
B&O Taxes 14,013 3,410 3,028 882 790 815 865 750 ‐ 24,553
Fuel Tax 1,250 710 1,424 ‐ 700 700 700 700 ‐ 6,184
Interest 130 ‐ 445 ‐ ‐ ‐ ‐ ‐ ‐ 575
Total Resources 28,829 19,656 37,535 10,387 6,978 6,521 8,620 1,780 ‐ 120,306
Project Funding Status:
Secured 28,829 19,656 23,423 963 ‐ ‐ ‐ ‐ ‐ 72,871
Anticipated**‐ ‐ 14,112 9,424 6,978 6,521 8,620 1,780 ‐ 47,435
Total Project Funding 28,829 19,656 37,535 10,387 6,978 6,521 8,620 1,780 ‐ 120,306
**Expenditures utilizing anticipated funding are not included in the adopted budget.
Reconciliation to Adopted Budget:Project Funding Secured 72,875
Appropriations To‐Date 71,617
Additional Appropriations Needed 1,258
Additional Appropriations:
2021 Adopted Budget 675 2022 Adopted Budget 583
Total Additional Appropriations 1,258
SUMMARY BY COUNCIL PRIORITY
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Transportation 5 - 79
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:1
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 1,704 1,296 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,000 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ 600 2,900 ‐ ‐ ‐ ‐ ‐ ‐ 3,500
Construction ‐ ‐ 5,205 6,800 2,053 3,451 ‐ ‐ ‐ 17,509
Total Expenditures 1,704 1,896 8,105 6,800 2,053 3,451 ‐ ‐ ‐ 24,009
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ 77 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 77
Grants/Contributions 1,473 1,640 6,987 5,700 1,808 2,985 ‐ ‐ ‐ 20,593
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation 231 179 1,118 1,100 245 466 ‐ ‐ ‐ 3,339
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1,704 1,896 8,105 6,800 2,053 3,451 ‐ ‐ ‐ 24,009
Project Funding Status:
Secured 1,704 1,896 2,900 ‐ ‐ ‐ ‐ ‐ ‐ 6,500 Anticipated* ‐ ‐ 5,205 6,800 2,053 3,451 ‐ ‐ ‐ 17,509
Total Project Funding 1,704 1,896 8,105 6,800 2,053 3,451 ‐ ‐ ‐ 24,009
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Phase 4 of the Rainier Ave Corridor Improvements will extend previous corridor improvements from S 3rd St to 1,000 feet north of Airport Way (NW 3rd Pl). Project elements include extending southbound BAT lane
from S 2nd St to S 3rd St, pedestrian improvements with streetscaping, pedestrian actuated traffic signal (HAWK), transit facility upgrades, access management, and a segment of a regional ped/bike path trail (Lake
Washington Loop Trail). Construction will be implemented in phases. Phase 4A is S 3rd St to S Tobin St. Phase 4B is from S Tobin St to NW 3rd Pl. Partial funding has been identified for each phase of construction. The
City plans to pursue additional construction funds for phase 4A in this years WSDOT Regional Mobility Grant competition as well as State funding through TIB. Phase 4B of construction will be funded through a combination of STP funds awarded in 2020 ($4,793,000) and mitigation.
Rationale
Rainier Ave is a critical corridor in central Renton with existing operational problems and in need of infrastructure enhancements to provide greater ease of non‐motorized and transit‐based travel. It also provides
improved access to the Renton Airport and Boeing's Renton Plant. Improvements will enhance traffic flow and reduce accidents, increasing public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Rainier Ave S/N Phase 4 ‐ S 3rd Street to NW 3rd Pl
DevelopmentExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 80
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:2
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 16 4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 20 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 11,455 1,702 ‐ ‐ 500 500 500 500 ‐ 15,157
Total Expenditures 11,471 1,706 ‐ ‐ 500 500 500 500 ‐ 15,177
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET 80 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 126 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 126
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue 6,220 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6,220 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 4,335 996 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 5,331
Fuel Tax 700 710 ‐ ‐ 500 500 500 500 ‐ 3,410 Interest 10 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 10
Total Resources 11,471 1,706 ‐ ‐ 500 500 500 500 ‐ 15,177
Project Funding Status:
Secured 11,471 1,706 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 13,177 Anticipated* ‐ ‐ ‐ ‐ 500 500 500 500 ‐ 2,000
Total Project Funding 11,471 1,706 ‐ ‐ 500 500 500 500 ‐ 15,177
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
TOTAL
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
This program funds the resurfacing and repairing of neighborhood (local), collector streets and alleyways. Installation of ADA‐compliant curb ramps is incorporated into the overlay program in accordance to federal
requirements. The 2018 "Pavement Management Program State of the Streets Report" rated the average Pavement Condition Index (PCI) as 67, prepared by a Consultant. The work for the overlay was separated
into concrete work and pavement work. Due to the current state of the economy because of the COVID 19 pandemic, fuel tax projections were estimated at 50% of the previous budget cycle. Because of this we do
not plan to transfer in the fuel tax revenues to this program and will reassess actual revenues received during Q1 and Q2 of 2021. If revenues received are higher than current projections we will transfer the additional revenues to this program. The current projected revenues will be assigned to the Streets Maintenance fund. Years 2023‐2026 are based off of historical revenues and show the intent to fund this program
once resources become available.
Rationale
Asphalt concrete pavement (ACP) overlay and slurry seal of streets provide for improved driving surface and are highly cost‐effective ways of avoiding expensive repairs and reconstruction. The Pavement
Management System and biennial survey of roadway conditions greatly improve the efficiency of the Overlay Program, ultimately improving public safety and quality of life.
Street Overlay
Maintenance and PreservationExtension of Previously Approved Project
Description and Scope
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Transportation 5 - 81
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:3
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 1 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 80 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 1,682 ‐ ‐ ‐ 200 200 200 200 ‐ 2,482
Total Expenditures 1,763 ‐ ‐ ‐ 200 200 200 200 ‐ 2,563
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 1,513 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,513
Fuel Tax 250 ‐ ‐ ‐ 200 200 200 200 ‐ 1,050 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1,763 ‐ ‐ ‐ 200 200 200 200 ‐ 2,563
Project Funding Status:
Secured 1,763 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,763 Anticipated*‐ ‐ ‐ ‐ 200 200 200 200 ‐ 800
Total Project Funding 1,763 ‐ ‐ ‐ 200 200 200 200 ‐ 2,563
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
ESTIMATED
ESTIMATED
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Arterial Rehabilitation Program
Maintenance and PreservationExtension of Previously Approved Project
This program funds the resurfacing and repairing of principal and minor arterial streets. Installation of ADA‐compliant curb ramps is incorporated into the Overlay Program in accordance to federal requirements. This program provides the City match for federally funded pavements restoration projects. This program is largely funded through Fuel Tax revenue. Currently finance projections are estimated at 50% less than the prior
budget cycle. The current year projection is being assigned to the Streets Maintenance fund and we will reassess actual revenue received during Q1 and Q2 of 2021 to see if additional revenues have been received
so we can fund this program. Years 2023‐2026 show our intent to fund this program once resources become available.
Rationale
The Overlay Program (TIP #1) concentrates to a great degree on maintaining residential streets for public safety and quality of life, where relatively small traffic volumes and less truck and bus traffic make standard
asphalt overlays a long term means of maintenance. Arterial streets can often deteriorate rather quickly and often require more costly rehabilitation measures and/or costly temporary repairs to avoid more
extensive deterioration.
TOTAL
Description and Scope
Capital Investment Program ‐ Transportation 5 - 82
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:4
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 9 611 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 620 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 2,380 ‐ ‐ ‐ ‐ ‐ ‐ 2,380
Total Expenditures 9 611 2,380 ‐ ‐ ‐ ‐ ‐ ‐ 3,000
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 9 611 2,380 ‐ ‐ ‐ ‐ ‐ ‐ 3,000
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 9 611 2,380 ‐ ‐ ‐ ‐ ‐ ‐ 3,000
Project Funding Status:
Secured 9 611 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 620 Anticipated* ‐ ‐ 2,380 ‐ ‐ ‐ ‐ ‐ ‐ 2,380
Total Project Funding 9 611 2,380 ‐ ‐ ‐ ‐ ‐ ‐ 3,000
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The project will also perform a seismic analysis and retrofit along with other
improvements. The Bronson Way Bridge was built by WSDOT in 1939. Ownership was transferred to the City in January 2018 as part of the SR‐900 turn back agreement. It is a three span bridge that crosses over the
Cedar River. The main span is carried by steel girders. The girders are coated with paint to protect the streel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the
girders. The existing paint is failing. The bridge is located in a zone of moderate to high liquefaction susceptibility during seismic events.
Rationale
The main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the girders. The
existing paint is failing. The bridge is located in a zone of moderate to high liquefaction susceptibility during seismic events and therefore this project is focused on public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Bronson Way Bridge ‐ Seismic Retrofit and Painting
Maintenance and PreservationNew Request
Capital Investment Program ‐ Transportation 5 - 83
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:5
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 974 513 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,487 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions 23 142 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 165
Construction ‐ 200 6,055 ‐ ‐ ‐ ‐ ‐ ‐ 6,255
Total Expenditures 997 855 6,055 ‐ ‐ ‐ ‐ ‐ ‐ 7,907
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ 320 1,799 ‐ ‐ ‐ ‐ ‐ ‐ 2,118
Grants/Contributions 402 535 4,256 ‐ ‐ ‐ ‐ ‐ ‐ 5,192
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation 595 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 595
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 997 855 6,055 ‐ ‐ ‐ ‐ ‐ ‐ 7,907
Project Funding Status:
Secured 997 855 6,055 ‐ ‐ ‐ ‐ ‐ ‐ 7,907 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 997 855 6,055 ‐ ‐ ‐ ‐ ‐ ‐ 7,907
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Reconstruction/resurfacing of roadway, including new pavement, curb, gutter, sidewalk, street lights, storm drainage, channelization and bike lanes from NE 7th St to Sunset Blvd NE.
Rationale
Complete roadway improvements, bicycle lanes and sidewalks on Duvall Ave NE, from NE 7th St to Sunset Blvd NE. Condition of the existing roadway pavement requires road reconstruction in segments of the
roadway. Project will enhance safety for pedestrians, bicyclists and vehicular along this corridor.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Duvall Ave NE ‐ NE 7th St to Sunset Blvd NE
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 84
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:6
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ 135 500 ‐ ‐ ‐ ‐ ‐ ‐ 635 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ 50 ‐ ‐ ‐ ‐ ‐ 50
Construction ‐ ‐ ‐ ‐ 500 840 840 ‐ ‐ 2,180
Total Expenditures ‐ 135 500 50 500 840 840 ‐ ‐ 2,865
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ 500 ‐ 500 725 725 ‐ ‐ 2,450
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ 135 ‐ 50 ‐ 115 115 ‐ ‐ 415
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 135 500 50 500 840 840 ‐ ‐ 2,865
Project Funding Status:
Secured ‐ 135 ‐ 50 ‐ ‐ ‐ ‐ ‐ 185 Anticipated*‐ ‐ 500 ‐ 500 840 840 ‐ ‐ 2,680
Total Project Funding ‐ 135 500 50 500 840 840 ‐ ‐ 2,865
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
S 7th Street Corridor Improvements ‐ Oakesdale Ave SW to Burnett Ave S
DevelopmentExtension of Previously Approved Project
This project develops S/SW 7th St as a key east‐west bicycle route into the downtown: between Oakesdale Ave S and Burnett Ave S. This project will install a multi‐use path on S 7th St, between Shattuck and Burnett Ave S, and install intersection improvements at multiple intersections along the corridor from Shattuck Ave S to Oakesdale Ave SW. The intersection improvements from Shattuck Ave S westward along this corridor
will improve bicycle facilities and intersection operations to provide upgraded signage to bicyclists and will help simplify bicycle movements through complex intersections. Bicycle improvements include push‐button
activation, green bike lanes through conflict/crossing zones, and pavement markings. This project will also upgrade an existing marked crosswalk with flashing beacons with higher visibility technology. In 2019, Sound Transit awarded $1M toward design and construction toward the multi‐use trail between Shattuck and Talbot. In 2020, $1.45M of STP FHWA funds was awarded for FY 2024 for construction of the multi‐use
path between Shattuck and Burnett Ave S and intersection improvements.
Rationale
This segment of the S 7th St corridor connects Talbot Rd S (SR 515) with Rainier Ave S (SR 167). This segment of S 7th St is part of a designated east‐west pedestrian/bike route through the City's commercial core
and an important link between regional trails. The South Renton Neighborhood Study has identified South 7th St as needing streetscape improvements. The Trails and Bicycle Master Plan Update identified SW 7th
St/S 7th St as a good alternate/parallel route as the L2S Trail (TIP #20‐34) is developed. With the expansion of the South Renton Transit Center and Bus Rapid Transit (BRT) implementation, S 7th St is an important non‐motorized link to the downtown core.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Transportation 5 - 85
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:7
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 1,300 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,300 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions 78 23 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 101
Construction ‐ 6,562 3,800 ‐ ‐ ‐ ‐ ‐ ‐ 10,362
Total Expenditures 1,378 6,585 3,800 ‐ ‐ ‐ ‐ ‐ ‐ 11,763
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET 612 334 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 946
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 319 6,215 1,000 ‐ ‐ ‐ ‐ ‐ ‐ 7,534
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 447 36 931 ‐ ‐ ‐ ‐ ‐ ‐ 1,414
Fuel Tax ‐ ‐ 1,424 ‐ ‐ ‐ ‐ ‐ ‐ 1,424 Interest ‐ ‐ 445 ‐ ‐ ‐ ‐ ‐ ‐ 445
Total Resources 1,378 6,585 3,800 ‐ ‐ ‐ ‐ ‐ ‐ 11,763
Project Funding Status:
Secured 1,378 6,585 3,800 ‐ ‐ ‐ ‐ ‐ ‐ 11,763 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 1,378 6,585 3,800 ‐ ‐ ‐ ‐ ‐ ‐ 11,763
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The project provides pedestrian and bicyclists facilities and enhancements, traffic operation and circulation improvements in Downtown. The improvements include adding signalized raised intersections with bulb
outs, lighting, street furniture, streetscape, bike racks, signage and converting Williams Ave S and Wells Ave S to two‐way traffic operations.
Rationale
This project is one of the strategies identified in the City Center Community Plan. The project enhances downtown Renton as a destination area, while improving circulation, reducing traffic speeds and enhancing
pedestrian safety. A feasibility study, including a Downtown Circulation Traffic Analysis for the conversion to two‐way operations was completed.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Williams Ave S and Wells Ave S Conversion Project
Cross‐CategoryExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 86
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:8
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 556 1,145 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,701 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ 250 3,395 ‐ ‐ ‐ ‐ ‐ ‐ 3,645
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 556 1,395 3,395 ‐ ‐ ‐ ‐ ‐ ‐ 5,346
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET 103 97 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 453 861 3,150 ‐ ‐ ‐ ‐ ‐ ‐ 4,464
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ 250 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 250
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ 187 245 ‐ ‐ ‐ ‐ ‐ ‐ 432
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 556 1,395 3,395 ‐ ‐ ‐ ‐ ‐ ‐ 5,346
Project Funding Status:
Secured 556 1,395 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,951 Anticipated* ‐ ‐ 3,395 ‐ ‐ ‐ ‐ ‐ ‐ 3,395
Total Project Funding 556 1,395 3,395 ‐ ‐ ‐ ‐ ‐ ‐ 5,346
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This project addresses pedestrian, transit and bicycle needs through key improvements such as channelization, traffic signal modifications, signal treatments, possible queue jumps, access management through
installation of medians. Construction will be implemented in phases.
Rationale
This corridor has strong potential for non‐motorized and transit usage. The Sunset area is experiencing residential and retail growth. The Sunset Area Planned Action EIS prepared in 2011 delineated transportation
needs along Sunset Blvd from N Park Dr to Monroe Ave NE (estimated at $33M) to help improve public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
NE Sunset Boulevard (SR 900) Corridor Improvements
Maintenance and PreservationPreviously Approved
Capital Investment Program ‐ Transportation 5 - 87
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:9
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 1 10 1,541 ‐ ‐ ‐ ‐ ‐ ‐ 1,552 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 1 10 1,541 ‐ ‐ ‐ ‐ ‐ ‐ 1,552
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 1 8 1,332 ‐ ‐ ‐ ‐ ‐ ‐ 1,341
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 0 2 209 ‐ ‐ ‐ ‐ ‐ ‐ 211
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1 10 1,541 ‐ ‐ ‐ ‐ ‐ ‐ 1,552
Project Funding Status:
Secured 1 10 1,541 ‐ ‐ ‐ ‐ ‐ ‐ 1,552 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 1 10 1,541 ‐ ‐ ‐ ‐ ‐ ‐ 1,552
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The South 2nd Street Conversion Project will convert an existing 4–lane one‐way roadway to a roadway with one through‐lane in each direction between Main Ave South and Rainier Ave South. This project also
includes pedestrian and bicycle facilities, traffic operations improvements, and transit upgrades that will provide better traffic operation and circulation for all modes of transportation. Transit facility upgrades
include new Rapid Ride stops and a transit queue jump at the new traffic signal at the Shattuck intersection.
Rationale
This project is one of the strategies identified in the City Center Community Plan as well as the Downtown Civic Core Action Plan. The project enhances downtown Renton as a destination area, while improving
circulation and enhancing pedestrian safety and environment.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
South 2nd Street Conversion Project
DevelopmentNew Request
Capital Investment Program ‐ Transportation 5 - 88
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:10
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 161 39 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 200 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions 24 76 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 100
Construction ‐ 600 100 ‐ ‐ ‐ ‐ ‐ ‐ 700
Total Expenditures 185 715 100 ‐ ‐ ‐ ‐ ‐ ‐ 1,000
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ 400 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 400
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 185 315 100 ‐ ‐ ‐ ‐ ‐ ‐ 600
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 185 715 100 ‐ ‐ ‐ ‐ ‐ ‐ 1,000
Project Funding Status:
Secured 185 715 100 ‐ ‐ ‐ ‐ ‐ ‐ 1,000 Anticipated* ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 185 715 100 ‐ ‐ ‐ ‐ ‐ ‐ 1,000
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This project will fund construction of new curb, gutter and sidewalk (including curb extensions), driveway and ADA improvements along Houser Way between Williams Ave S and Wells Ave S.
Rationale
To enhance safety for pedestrians and bicyclists crossing at this intersection.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Houser Way Intersection and Pedestrian Improvements
DevelopmentPreviously Approved
Capital Investment Program ‐ Transportation 5 - 89
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:11
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 9 591 20 ‐ ‐ ‐ ‐ ‐ ‐ 620 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ 50 ‐ ‐ ‐ ‐ ‐ ‐ 50
Construction ‐ ‐ ‐ 2,624 ‐ ‐ ‐ ‐ ‐ 2,624
Total Expenditures 9 591 70 2,624 ‐ ‐ ‐ ‐ ‐ 3,294
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 8 529 50 2,413 ‐ ‐ ‐ ‐ ‐ 2,999
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 1 62 20 211 ‐ ‐ ‐ ‐ ‐ 294
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 9 591 70 2,624 ‐ ‐ ‐ ‐ ‐ 3,294
Project Funding Status:
Secured 9 591 20 ‐ ‐ ‐ ‐ ‐ ‐ 620 Anticipated* ‐ ‐ 50 2,624 ‐ ‐ ‐ ‐ ‐ 2,674
Total Project Funding 9 591 70 2,624 ‐ ‐ ‐ ‐ ‐ 3,294
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The project will also perform a seismic analysis and retrofit and replace/upgrade
the bridge rails along with other improvements. The Houser Way Bridge was built by the City of Renton in 1960. It is a three span bridge that crosses over the Cedar River.
Rationale
The main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the girders. The
existing paint is failing. The bridge is located in a zone of moderate to high liquefaction susceptibility during seismic events. The bridge rail has been damaged. Addressing all these concerns in the interest of public
safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Houser Way Bridge‐ Seismic Retrofit and Painting
Maintenance and PreservationNew Request
Capital Investment Program ‐ Transportation 5 - 90
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:12
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 1 90 1,503 ‐ ‐ ‐ ‐ ‐ ‐ 1,594 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 1 90 1,503 ‐ ‐ ‐ ‐ ‐ ‐ 1,594
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ 80 1,420 ‐ ‐ ‐ ‐ ‐ ‐ 1,500
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 1 10 83 ‐ ‐ ‐ ‐ ‐ ‐ 94
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1 90 1,503 ‐ ‐ ‐ ‐ ‐ ‐ 1,594
Project Funding Status:
Secured 1 90 1,503 ‐ ‐ ‐ ‐ ‐ ‐ 1,594 Anticipated* ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 1 90 1,503 ‐ ‐ ‐ ‐ ‐ ‐ 1,594
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The Renton Connector project will install a continuous non‐motorized facility along Burnett Ave S. between S. 2nd St and S. 5th St via separated walkways, protected bicycle lanes (cycle track), and a multi‐use path.
This project will also include reduced travel lanes, landscaped medians, and reconfigured public parking areas in order to provide opportunities to incorporate art, play spaces, and resting areas along the connector.
Intersection improvements will include traffic signalization improvements and curb ramp upgrades to ADA standards.
Rationale
As a key element of the Downtown Civic Core Vision and Action Plan, The Renton Connector is a new urban trail, or "greenway", that creates a signature Civic Core and Downtown green spine and regional trail
connection between the Cedar River Trail, Lake to Sound Trail, Lake Washington Loop Trail, and the Eastside Rail Corridor for pedestrians and cyclists between the Cedar River, City Hall and the South Renton Transit
Center to the South improving the overall quality of life for the city's residents.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Renton Connector
Cross‐CategoryNew Request
Capital Investment Program ‐ Transportation 5 - 91
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:13
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 902 9 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 911 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ 670 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 670
Construction ‐ ‐ 2,322 ‐ ‐ ‐ ‐ ‐ ‐ 2,322
Total Expenditures 902 679 2,322 ‐ ‐ ‐ ‐ ‐ ‐ 3,903
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 773 574 2,124 ‐ ‐ ‐ ‐ ‐ ‐ 3,471
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income 47 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 47
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 82 105 198 ‐ ‐ ‐ ‐ ‐ ‐ 385
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 902 679 2,322 ‐ ‐ ‐ ‐ ‐ ‐ 3,903
Project Funding Status:
Secured 902 679 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,581 Anticipated*‐ ‐ 2,322 ‐ ‐ ‐ ‐ ‐ ‐ 2,322
Total Project Funding 902 679 2,322 ‐ ‐ ‐ ‐ ‐ ‐ 3,903
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The Lake Washington Loop Trail project consists of phases 3‐5 of pedestrian and bicycle facility improvements that complete a gap in the Lake Washington trail system. Phase 3 improvements include a cycle track
and separated sidewalk, upgrading existing curb ramps to ADA standards, signage and pavement markings, and upgrades to an existing traffic signal. This project also includes 30% design of Phase 4 and 5
(approximately 0.9 mi). Phase 4 includes improvements from the Airport Way/Rainier Ave N intersection to 1,000 ft. north along Rainier Ave S. Phase 5 will connect phase 4 to the northern city limit. The City was
awarded the following grants: TAP = $346,000 (2013); STP Non‐motorized = $575,000 (2015); Pedestrian and Bike = $426,000 (2015); STP = $1,694,278; Pedestrian and Bike Safety = $430,000. Construction has implemented in phases., with phases 1 and 2 completed. Phase 3 (Logan Ave N/Cedar River to Rainier Ave N) design is underway and construction is anticipated to begin in 2020. Phase 4 design and construction will
be completed as part of the Rainier Ave S Corridor Improvements Phase 4B project.
Rationale
The project will separate pedestrians and bicyclists from the vehicular traffic, enhancing safety and encouraging residents to use active transportation modes.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Lake Washington Loop Trail
DevelopmentExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 92
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:14
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 889 603 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,492 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 91 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 91
Land Acquisitions ‐ 1,200 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,200
Construction ‐ ‐ 5,909 ‐ ‐ ‐ ‐ ‐ ‐ 5,909
Total Expenditures 980 1,803 5,909 ‐ ‐ ‐ ‐ ‐ ‐ 8,692
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes 980 1,776 5,909 ‐ ‐ ‐ ‐ ‐ ‐ 8,665 B&O Taxes ‐ 27 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 27
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 980 1,803 5,909 ‐ ‐ ‐ ‐ ‐ ‐ 8,692
Project Funding Status:
Secured 980 1,803 5,909 ‐ ‐ ‐ ‐ ‐ ‐ 8,692 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 980 1,803 5,909 ‐ ‐ ‐ ‐ ‐ ‐ 8,692
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The project will extend Park Ave N to the north of Logan Ave N, to provide access to Southport, PSE property and The Boeing Company. Improvements include bicycle and pedestrian facilities, illumination,
landscaping.
Rationale
With the additional development growth in the North Renton area, which includes The Landing and the Southport residential/hotel/office development, this project will construct improvements to improve
accessibility to help drive economic development in the area.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Park Avenue North Extension
DevelopmentPreviously Approved
Capital Investment Program ‐ Transportation 5 - 93
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:15
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 92 20 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 112 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 363 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 363
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 1,030 241 60 60 60 60 60 60 ‐ 1,631
Total Expenditures 1,485 261 60 60 60 60 60 60 ‐ 2,106
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 664 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 664
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation 70 261 60 60 60 60 60 60 ‐ 691
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 701 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 701
Fuel Tax 50 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 50 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1,485 261 60 60 60 60 60 60 ‐ 2,106
Project Funding Status:
Secured 1,485 261 60 60 ‐ ‐ ‐ ‐ ‐ 1,866 Anticipated* ‐ ‐ ‐ ‐ 60 60 60 60 ‐ 240
Total Project Funding 1,485 261 60 60 60 60 60 60 ‐ 2,106
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This ongoing yearly program provides funding for special small‐scale traffic safety improvements that are identified and require materials, labor or equipment. This program includes converting school zone signs to
electronic operation, installation of pedestrian safety traffic signals including Rectangular Rapid Flashing Beacons (RRFB), and Hawk hybrid beacon signals, bulb‐outs and radar speed signs for traffic calming.
Rationale
Historically, this level of traffic safety improvements are required on an annual basis. This program budgets for safety projects to address these needs. Projects are typically identified through citizen concerns,
analysis of accident records or observation by City Traffic Operations personnel, improving both public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Traffic Safety Program
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 94
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:16
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 102 3 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 105 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 11 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 11
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 278 51 35 35 35 35 35 35 ‐ 539
Total Expenditures 391 54 35 35 35 35 35 35 ‐ 655
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 141 54 35 35 35 35 35 35 ‐ 405
Fuel Tax 250 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 250 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 391 54 35 35 35 35 35 35 ‐ 655
Project Funding Status:
Secured 391 54 35 35 ‐ ‐ ‐ ‐ ‐ 515 Anticipated*‐ ‐ ‐ ‐ 35 35 35 35 ‐ 140
Total Project Funding 391 54 35 35 35 35 35 35 ‐ 655
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This program will provide guardrail improvements each year and improve the safety of the roadside environment.
Rationale
This program will implement roadside safety improvements including barrier systems and hazardous object removal improving overall public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Roadway Safety and Guardrail Program
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 95
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:17
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 125 45 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 170 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 126 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 126
Land Acquisitions 6 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6
Construction 820 342 60 60 120 120 120 120 ‐ 1,762
Total Expenditures 1,077 387 60 60 120 120 120 120 ‐ 2,064
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds 143 142 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 285
Grants/Contributions 8 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges 14 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 14
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ 245 60 60 120 120 120 120 ‐ 845
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 912 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 912
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1,077 387 60 60 120 120 120 120 ‐ 2,064
Project Funding Status:
Secured 1,077 387 60 60 ‐ ‐ ‐ ‐ ‐ 1,584 Anticipated* ‐ ‐ ‐ ‐ 120 120 120 120 ‐ 480
Total Project Funding 1,077 387 60 60 120 120 120 120 ‐ 2,064
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This program will install new traffic signals, software systems to improve traffic signal timing operations, tactics central signal system upgrades or make improvements to existing signals identified by the
Transportation Systems' Traffic Signal Priority List. The Priority List is determined by citizen concerns, intersection safety, mobility needs, and intersections that meet MUTCD traffic signal warrants.
Rationale
Historically, one traffic signal is designed and constructed every two‐three years to meet public safety and mobility needs. This program budgets for projects needed to meet increasing demand, and the need for
signalized traffic control. Elements used to prioritize project intersections may include vehicular approach volumes, accident analysis, signal‐warrant analysis, and pedestrian volume.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Intersection Safety & Mobility Program
Maintenance and PreservationCross‐Category
Capital Investment Program ‐ Transportation 5 - 96
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:18
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 44 10 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 54 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 155 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 155
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 263 150 60 60 150 150 150 150 ‐ 1,133
Total Expenditures 462 160 60 60 150 150 150 150 ‐ 1,342
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation 60 160 60 60 150 150 150 150 ‐ 940
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 402 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 402
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 462 160 60 60 150 150 150 150 ‐ 1,342
Project Funding Status:
Secured 462 160 60 60 ‐ ‐ ‐ ‐ ‐ 742 Anticipated*‐ ‐ ‐ ‐ 150 150 150 150 ‐ 600
Total Project Funding 462 160 60 60 150 150 150 150 ‐ 1,342
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Provides for improvements to the operational efficiency of the roadway system, including development and implementation of signal coordination programs, Adaptive Signal Control, installation of fiber
communication, PTZ cameras, Radar signs, LED signs, transit signal priority, Intelligent Traffic Systems (ITS) Master Plan and signal improvements such as protective/permissive phasing.
Rationale
Improving the capacity and efficiency of the existing roadway system is a very cost effective element of the transportation program and improving public safety and quality of life. Installing fiber communication
creates higher bandwidths so PTZ cameras can be installed. Fiber optic communication provides the Traffic Management Center with real time traffic conditions, adaptive signal control and ability to view video
detection systems. The goal is to have fiber installed to all 135 traffic signals.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Intelligent Transportation Systems (ITS) Program
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 97
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:19
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 4 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 10 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 10
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 59 85 35 35 35 100 100 100 ‐ 549
Total Expenditures 73 85 35 35 35 100 100 100 ‐ 563
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 73 85 35 35 35 100 100 100 ‐ 563
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 73 85 35 35 35 100 100 100 ‐ 563
Project Funding Status:
Secured 73 85 35 35 ‐ ‐ ‐ ‐ ‐ 228 Anticipated*‐ ‐ ‐ ‐ 35 100 100 100 ‐ 335
Total Project Funding 73 85 35 35 35 100 100 100 ‐ 563
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This program provides funding for designing and building features on an "as needed" basis in response to individual requests to improve access for individuals with special needs. A project list has been developed
based upon sites identified in the Transition Plan section of the City of Renton Comprehensive Citywide Sidewalk Study.
Rationale
This program implements projects that support the City's effort to transition pedestrian facilities within the right‐of‐way into conformity with provisions contained in the Americans with Disabilities Act (ADA)
Guidelines. A programmatic approach is required to ensure compliance with federal law and ultimately help make all pedestrian facilities safe for the public.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Barrier Free Transition Plan Implementation
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 98
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:20
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 9 281 200 130 ‐ ‐ ‐ ‐ ‐ 620 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ 50 ‐ ‐ ‐ ‐ ‐ ‐ 50
Construction ‐ ‐ ‐ ‐ 2,610 ‐ ‐ ‐ ‐ 2,610
Total Expenditures 9 281 250 130 2,610 ‐ ‐ ‐ ‐ 3,280
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 8 243 223 112 2,405 ‐ ‐ ‐ ‐ 2,992
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 1 38 27 18 205 ‐ ‐ ‐ ‐ 289
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 9 281 250 130 2,610 ‐ ‐ ‐ ‐ 3,280
Project Funding Status:
Secured 9 281 200 130 ‐ ‐ ‐ ‐ ‐ 620 Anticipated* ‐ ‐ 50 ‐ 2,610 ‐ ‐ ‐ ‐ 2,660
Total Project Funding 9 281 250 130 2,610 ‐ ‐ ‐ ‐ 3,280
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The Williams Ave Bridge was built by the City of Renton in 1954. It is a three span bridge that crosses over the Cedar River. The project will remove the existing paint from the steel girders, repair corrosion damage
and apply a new protective paint system. The project will also perform a seismic analysis and retrofit along with other improvements to improve public safety.
Rationale
The main span is carried by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the girders. The
existing paint is failing. The bridge is located in a zone of moderate to high liquefaction susceptibility during seismic events.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Williams Ave N Bridge Repair
Maintenance and PreservationPreviously Approved
Capital Investment Program ‐ Transportation 5 - 99
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:21
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 62 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 62 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 608 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 608
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 193 245 100 100 120 120 120 120 ‐ 1,118
Total Expenditures 863 245 100 100 120 120 120 120 ‐ 1,788
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes 12 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 12 B&O Taxes 851 245 100 100 120 120 120 120 ‐ 1,776
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 863 245 100 100 120 120 120 120 ‐ 1,788
Project Funding Status:
Secured 863 245 100 100 ‐ ‐ ‐ ‐ ‐ 1,308 Anticipated* ‐ ‐ ‐ ‐ 120 120 120 120 ‐ 480
Total Project Funding 863 245 100 100 120 120 120 120 ‐ 1,788
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The City of Renton owns and operates 135 traffic signals, 4800+ street lights, 700+ lane miles and 12,000+ signs. This program replaces failed video detection cameras, signal heads, signal cabinets, UPS batteries and
LED indications as needed based on the findings from yearly maintenance programs. This program also provides for new/replacement of signs that are obsolete, faded or that do not meet retro reflectivity
requirements, replacement of damaged luminaire and signal poles. This program also replaces pavement markings and failed C‐curbing with a more maintenance friendly composite curbing.
Rationale
Most of Renton's traffic signals and UPS systems require extensive maintenance and replacement programs to keep traffic signals operating as efficiently as possible. Signage requires a maintenance program to
maintain retro reflectivity requirements. Pavement deterioration has increased the number of failed loops throughout the City and as loops fail they are replaced with video detection cameras and associated
equipment greatly increasing public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Traffic Operation Devices Program
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 100
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:22
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 156 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 156 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 1,626 100 ‐ ‐ 75 100 150 150 ‐ 2,201
Total Expenditures 1,782 100 ‐ ‐ 75 100 150 150 ‐ 2,357
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 1,662 100 ‐ ‐ 75 100 150 150 ‐ 2,237
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest 120 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 120
Total Resources 1,782 100 ‐ ‐ 75 100 150 150 ‐ 2,357
Project Funding Status:
Secured 1,782 100 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,882 Anticipated*‐ ‐ ‐ ‐ 75 100 150 150 ‐ 475
Total Project Funding 1,782 100 ‐ ‐ 75 100 150 150 ‐ 2,357
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This program provides for the replacement of existing curb and gutter, sidewalks, and curb ramps where such facilities have deteriorated or have been damaged.
Rationale
In order to address deficiencies and provide safe and convenient non‐motorized facilities for pedestrians in neighborhoods, the City must have a program to analyze, repair or replace damaged or deteriorated curb
and gutter, sidewalks, and curb ramps. There are some places where curb ramps do not exist or are not to current ADA standards and they will be upgraded through this program. This program greatly increases
public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Sidewalk Rehabilitation and Replacement Program
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 101
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:23
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 140 97 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 237 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 301 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 301
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 5 140 50 50 100 100 100 100 ‐ 645
Total Expenditures 446 237 50 50 100 100 100 100 ‐ 1,183
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 23 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 23
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 423 237 50 50 100 100 100 100 ‐ 1,160
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 446 237 50 50 100 100 100 100 ‐ 1,183
Project Funding Status:
Secured 446 237 50 50 ‐ ‐ ‐ ‐ ‐ 782 Anticipated*‐ ‐ ‐ ‐ 100 100 100 100 ‐ 400
Total Project Funding 446 237 50 50 100 100 100 100 ‐ 1,182
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The Transportation Division inspects 27 bridge structures owned by the City of Renton, every two years. The purpose of these inspections is to monitor the condition of bridge elements in order to identify structural
deficiencies in need of repair. The goals of the program are to keep the bridges open and safe for public use, preserve bridge infrastructure by maximizing the useful lie through active maintenance, retrofitting and
rehabilitation, and replace bridges with reliable new structures when repair or rehabilitation is not feasible.
Rationale
Per Federal Regulations, the City is required to perform a bridge condition inspection for all bridges, located in the public right‐of‐way and open for public use, that span 20‐ft or more. WSDOT recommends condition
inspections be performed on all short span and pedestrian bridges, located with the public right‐of‐way and open for public use. In order to qualify for Federal Highway Administration (FHWA) bridge funding, the
City must stay in compliance with the Federal Regulations.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Bridge Inspection & Repair Program
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 102
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:24
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 461 100 35 35 50 75 75 75 ‐ 906 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 491 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 491
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 952 100 35 35 50 75 75 75 ‐ 1,397
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 952 100 35 35 50 75 75 75 ‐ 1,397
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 952 100 35 35 50 75 75 75 ‐ 1,397
Project Funding Status:
Secured 952 100 35 35 ‐ ‐ ‐ ‐ ‐ 1,122 Anticipated*‐ ‐ ‐ ‐ 50 75 75 75 ‐ 275
Total Project Funding 952 100 35 35 50 75 75 75 ‐ 1,397
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This program provides for the short and long‐range planning and traffic analyses required to evaluate and update proposed transportation improvements projects, to assess the impacts of new development
proposals, and to recommend local and regional transportation system improvements for all modes of travel. This program also covers programmatic activities to maintain eligibility for grant funding, such as
assuring that project specifications and management comply with current State and Federal standards and regulations, Title VI reporting and ADA Transition Plan implementation. This program will also provide
coordination with the I‐405 project team, to assure it provides the maximum benefits and minimum problems for Renton's transportation system.
Rationale
State and Federal government regulations and legislation, the Growth Management Act (GMA), and the Puget Sound Regional Council Vision 2040 highlight the increasing importance of making sure that local and
regional transportation plans are coordinated to the benefit of Renton make ongoing multi‐modal planning a high priority need. In order to meet the City's Business Plan Goals, transportation will play a key role with
public and private partnerships to promote economic vitality.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Arterial Circulation Program
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 103
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:25
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ 220 125 ‐ ‐ ‐ ‐ ‐ ‐ 345 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 750 263 ‐ ‐ ‐ ‐ ‐ 1,013
Total Expenditures ‐ 220 875 263 ‐ ‐ ‐ ‐ ‐ 1,358
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ 220 875 263 ‐ ‐ ‐ ‐ ‐ 1,358
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 220 875 263 ‐ ‐ ‐ ‐ ‐ 1,358
Project Funding Status:
Secured 0 220 875 263 ‐ ‐ ‐ ‐ ‐ 1,358 Anticipated* ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 0 220 875 263 ‐ ‐ ‐ ‐ ‐ 1,358
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This project will resurface the roadway from the western city limits to the SR 167 Ramps, except where there are existing concrete panels. This project will also upgrade all intersection ramps to current ADA
standards as well as install and replace all delineation to City of Renton standards. Also included in this project are the adjustment or evaluation for replacement of existing features affected by resurfacing such as
monuments, catch basins, or drainage grates.
Rationale
This principal arterial and T‐1 truck route is a major east‐west corridor that serves and directly connects to the Sounder Station. SW 43rd St connects directly to SR 167 and is used as a main access to Valley Medical
Center, IKEA, and other major employment centers. Resurfacing this roadway will improve the overall condition of the pavement and the project will extend the pavement life (12‐15 years) of this key east‐west
South County corridor aiding economic development and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Arterial Rehabilitation ‐ SW 43rd St Pavement Preservation
Maintenance and PreservationNew Request
Capital Investment Program ‐ Transportation 5 - 104
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:26
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 81 60 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 141 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 573 157 50 50 120 120 120 120 ‐ 1,310
Total Expenditures 654 217 50 50 120 120 120 120 ‐ 1,451
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 654 217 50 50 120 120 120 120 ‐ 1,451
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 654 217 50 50 120 120 120 120 ‐ 1,451
Project Funding Status:
Secured 654 217 50 50 ‐ ‐ ‐ ‐ ‐ 971 Anticipated*‐ ‐ ‐ ‐ 120 120 120 120 ‐ 480
Total Project Funding 654 217 50 50 120 120 120 120 ‐ 1,451
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This program provides for the design and construction of non‐motorized transportation facilities for pedestrians as well as provide City match funding for larger federal and state funded projects. This fund can also
be used as City/local match for grant applications.
Rationale
Providing safe and convenient non‐motorized facilities is an integral part of a complete transportation network. Specific improvements will respond to the needs of school children, the aged and persons with
disabilities, and support increased use of transit greatly improving the quality of life for all citizens.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Walkway Program
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 105
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:27
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ 58 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 58 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 210 ‐ ‐ ‐ ‐ ‐ ‐ 210
Total Expenditures ‐ 58 210 ‐ ‐ ‐ ‐ ‐ ‐ 268
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ 210 ‐ ‐ ‐ ‐ ‐ ‐ 210
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ 58 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 58
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 58 210 ‐ ‐ ‐ ‐ ‐ ‐ 268
Project Funding Status:
Secured ‐ 58 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 58 Anticipated*‐ ‐ 210 ‐ ‐ ‐ ‐ ‐ ‐ 210
Total Project Funding ‐ 58 210 ‐ ‐ ‐ ‐ ‐ ‐ 268
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This project will install major entry signage, enhanced landscaping, lighting and electrical features as part of the I‐405/NE 44th St Interchange project.
Rationale
To create a unique gateway for the city as part of the WSDOT I‐405 Renton to Bellevue Widening and Express Toll Lanes project.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
I‐405/44th Gateway Signage & Green‐Scaping
DevelopmentNew Request
Capital Investment Program ‐ Transportation 5 - 106
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:28
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 679 130 35 35 50 50 50 50 ‐ 1,079 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 679 130 35 35 50 50 50 50 ‐ 1,079
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 3 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes 676 130 35 35 50 50 50 50 ‐ 1,076
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 679 130 35 35 50 50 50 50 ‐ 1,079
Project Funding Status:
Secured 679 130 35 35 ‐ ‐ ‐ ‐ ‐ 879 Anticipated*‐ ‐ ‐ ‐ 50 50 50 50 ‐ 200
Total Project Funding 679 130 35 35 50 50 50 50 ‐ 1,079
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Perform critical activities needed for the development of transportation projects that will best serve the needs of Renton and be eligible for grant applications. Also provides for the monitoring of active grant
projects for compliance with State and Federal laws, regulations and specifications.
Rationale
Other critical activities to develop future capital improvement projects consist of, but are not limited to, project scoping, cost estimates, pre‐design, inter‐local agreements, analyses of existing and projected
transportation problems, local and regional mobility goals and deficiency analysis.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Project Development & Pre‐Design Program
Maintenance and PreservationExtension of Previously Approved Project
Capital Investment Program ‐ Transportation 5 - 107
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:29
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ 50 ‐ ‐ 200 500 ‐ ‐ ‐ 750 Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ 6,000 ‐ ‐ 6,000
Total Expenditures ‐ 50 ‐ ‐ 200 500 6,000 ‐ ‐ 6,750
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Mitigation Funds ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ 200 500 6,000 ‐ ‐ 6,700
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Road/Street Maint Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Zoning/Subdivision Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Judgement/Settlement Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Capital Asset Sale ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Loss/Impairment Compensation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Transportation Impact Mitigation ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Insurance Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Arterial Street Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1% Art Revenue ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ B&O Taxes ‐ 50 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 50
Fuel Tax ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 50 ‐ ‐ 200 500 6,000 ‐ ‐ 6,750
Project Funding Status:
Secured ‐ 50 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 50 Anticipated* ‐ ‐ ‐ ‐ 200 500 6,000 ‐ ‐ 6,700
Total Project Funding ‐ 50 ‐ ‐ 200 500 6,000 ‐ ‐ 6,750
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The Nile Ave NE Bridge was built by King County in 1951. Ownership was transferred to the City in 2009 as part of the MacKay Annexation (Ord #5456). It is a single span bridge that crosses over May Creek. The
initial phase of this project will evaluate replacement options with a type, size and location (TS&L) study.
Rationale
The bridge is 17 years beyond its original design lift of 50 years. It will very likely need to be replaced or significantly retrofitted within the next 10 years. The main span is comprised of precast concrete girders. The
girders are supported on treated timber piles with a timber caps. Some of the timber piles are showing signs of deterioration. This project addresses the public safety needs of users of this bridge.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
TRANSPORTATION CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Nile Ave NE Bridge Repair
Cross‐CategoryNew Request
Capital Investment Program ‐ Transportation 5 - 108
2021/2022 Preliminary Budget City of Renton, Washington
Projects Priority Type*
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Airport Office Renovation 1 M, SP 549 2,763 4,000 ‐ ‐ ‐ ‐ ‐ ‐ 7,312 Major Facility Maintenance 2 M, SP 1,902 357 250 250 250 250 150 150 ‐ 3,559
Pavement Management Program 3 M, SP 594 256 250 150 436 242 150 150 ‐ 2,228 Maintenance Dredging and Shoreline Mitigation 4 M, SP 1,273 1,060 75 ‐ ‐ ‐ ‐ ‐ ‐ 2,408 Taxiway Alpha Rehabilitation 5 D 6 1,115 202 8,912 9,300 ‐ ‐ ‐ ‐ 19,535
Master Plan 6 C 794 104 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 897 Snow Removal Equipment 7 M, SP 88 767 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 855
Surface Water System Rehabilitation 8 M, SP 266 44 50 50 ‐ ‐ ‐ ‐ ‐ 411 Environmental Impact Study 9C ‐ 400 ‐ 2,000 2,000 ‐ ‐ ‐ ‐ 4,400 Airport Maintenance Facility 10 M, SP ‐ ‐ ‐ ‐ ‐ 300 1,300 254 ‐ 1,854
Airport North Entrance & Parking Lot Rehab 11 M, SP ‐ ‐ ‐ ‐ ‐ ‐ 140 100 ‐ 240
Total Expenditures 5,471 6,867 4,827 11,362 11,986 792 1,740 654 ‐ 43,699
*Project Types: A = Acquisition, C = Cross Category, D = Development, M = Maintenance, P = Planning, R = Regulatory, ED = Correcting Existing Deficiencies; SP = System Preservation; N = New Facilities to Accommodate Growth
Projects
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Grants/Contributions 354 1,593 4,000 10,685 10,850 ‐ 1,000 ‐ ‐ 28,482 Lease Income 5,117 5,274 827 677 1,136 792 740 654 ‐ 15,217
Total Resources 5,471 6,867 4,827 11,362 11,986 792 1,740 654 ‐ 43,699
Project Funding Status:
Secured 5,471 5,274 827 677 ‐ ‐ ‐ ‐ ‐ 12,249 Anticipated**‐ 1,593 4,000 10,685 11,986 792 1,740 654 ‐ 31,450
Total Project Funding 5,471 6,867 4,827 11,362 11,986 792 1,740 654 ‐ 43,699
**Expenditures utilizing anticipated funding are not included in the adopted budget.
Reconciliation to Adopted Budget:Project Funding Secured 12,249
Appropriations To‐Date 10,744
Additional Appropriations Needed 1,504
Additional Appropriations:
2021 Adopted Budget 827 2022 Adopted Budget 677
Total Additional Appropriations 1,504
SUMMARY BY COUNCIL PRIORITY
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 109
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:1
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance 293 2,763 4,000 ‐ ‐ ‐ ‐ ‐ ‐ 7,056
Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Construction 256 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 256
Total Expenditures 549 2,763 4,000 ‐ ‐ ‐ ‐ ‐ ‐ 7,312
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ 4,000 ‐ ‐ ‐ ‐ ‐ ‐ 4,000 Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income 549 2,763 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,312 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 549 2,763 4,000 ‐ ‐ ‐ ‐ ‐ ‐ 7,312
Project Funding Status:Secured 549 2,763 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,312
Anticipated*‐ ‐ 4,000 ‐ ‐ ‐ ‐ ‐ ‐ 4,000
Total Project Funding 549 2,763 4,000 ‐ ‐ ‐ ‐ ‐ ‐ 7,312
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
ESTIMATED
ESTIMATED
TOTAL
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
The Airport Administrative Office is located in the Control Tower building. The Tower was originally built in 1961. The overall project has two components. The first component is to seismically upgrade the entire
structure. This upgrade will likely include an exterior steel frame brace wrapping the building's exterior. The second component of the project is to remodel and add square footage to the bottom floor of the Tower
where the administrative offices are located. The building was originally built to only house Air Traffic Control staff, and in 1989, the Airport Administrative Office was established on the ground floor housing 1.5
FTE City employees. Additional airport staff have been added since then, for a current total of 5.5 FTEs. The Airport office is not air‐tight and regularly allows jet fumes to permeate the offices. The building electrical panels need to be updated, and the water pipes in the building are a concern. The building does not meet ADA standards. All of these issues will be addressed in the 100% design and construction. We
are currently seeking a $4 Million hazard mitigation grant from FEMA for the repairs.
Rationale
Having a modernized office will improve efficiency and reflect positively on customers coming in to visit the offices. Overall, this project should have a positive impact on the reputation of the airport as a whole, helping build eminence for the city.
Airport Office Renovation
Maintenance and PreservationPreviously Approved
Description and Scope
Capital Improvement Program ‐ Airport 5 - 110
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:2
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 293 357 250 250 250 250 150 150 ‐ 1,950 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 1,609 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,609
Total Expenditures 1,902 357 250 250 250 250 150 150 ‐ 3,559
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income 1,902 357 250 250 250 250 150 150 ‐ 3,559 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1,902 357 250 250 250 250 150 150 ‐ 3,559
Project Funding Status:
Secured 1,902 357 250 250 ‐ ‐ ‐ ‐ ‐ 2,759 Anticipated*‐ ‐ ‐ ‐ 250 250 150 150 ‐ 800
Total Project Funding 1,902 357 250 250 250 250 150 150 ‐ 3,559
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Major Facility Maintenance
Maintenance and PreservationPreviously Approved
Ongoing program to maintain and repair airport‐owned structures and facilities. Includes snow plowing exercises, major building repairs ‐ new hangar doors, hangar roofs, HVAC systems, electrical upgrades, and
pavement repair. The City continues to add old existing structures to its ownership. Some of these buildings need major, unscheduled repairs to maintain the investment in the facility. The budget for the
Fire/Water System and the Air side/Land side Separation projects has been rolled over to the Major Facility Maintenance project. The replacement to the sewer lift station at the north entrance is currently under
design and the cost for construction (2020‐2021) is approximately $328,000.
Rationale
Maintaining the airport facility as a whole is imperative to the overall customer service and operations of the airport and reflects positively on the city as a whole.
TOTAL
Description and Scope
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 111
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:3
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 365 256 250 150 436 242 150 150 ‐ 1,999 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 229 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 229
Total Expenditures 594 256 250 150 436 242 150 150 ‐ 2,228
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income 594 256 250 150 436 242 150 150 ‐ 2,228 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 594 256 250 150 436 242 150 150 ‐ 2,228
Project Funding Status:
Secured 594 256 250 150 ‐ ‐ ‐ ‐ ‐ 1,250 Anticipated*‐ ‐ ‐ ‐ 436 242 150 150 ‐ 978
Total Project Funding 594 256 250 150 436 242 150 150 ‐ 2,228
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Pavement Management Program
Maintenance and PreservationPreviously Approved
This project covers a variety of pavement repairs using the 2018 Airport Pavement Management Plan as a scheduling guideline. The Airport's taxiways and ramp areas are in need of rehabilitation in places due to
cracked and crumbling pavement. Annual repairs ensure the integrity of the surface areas used by Boeing jets and general aviation aircraft and help to prevent foreign object damage from crumbling pavement.
The Airport CIP budget 6 ‐year plan funds this program as high‐priority areas are identified.
Rationale
Pavement management is key to establishing a safe and aesthetic operating area that will continue to provide a place for current and new customers to enjoy the airport.
TOTAL
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 112
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:4
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 737 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 737 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 536 918 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,454
Total Expenditures 1,273 1,060 75 ‐ ‐ ‐ ‐ ‐ ‐ 2,408
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 354 993 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,347
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income 919 67 75 ‐ ‐ ‐ ‐ ‐ ‐ 1,061 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1,273 1,060 75 ‐ ‐ ‐ ‐ ‐ ‐ 2,408
Project Funding Status:
Secured 1,273 67 75 ‐ ‐ ‐ ‐ ‐ ‐ 1,415 Anticipated*‐ 993 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 993
Total Project Funding 1,273 1,060 75 ‐ ‐ ‐ ‐ ‐ ‐ 2,408
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Maintenance Dredging and Shoreline Mitigation
Maintenance and PreservationPreviously Approved
The Seaplane dock and ramp saw significant sediment buildup and debris accumulation during the heavy rainfall in February of 2020. This project is funded at 75% by FEMA and an additional 12.5% by the state. We
also intend to incorporate the seaplane ramp work into this project. The Seaplane Base Launch Ramp consists of a concrete approach ramp and wood plank ramp, pilings, and bulkhead that are in need of
replacement. The area along the bulkhead and around the pilings has been eroded over time due to wave action from Lake Washington. Part of this project will be to widen the 1950's era launch ramp to
accommodate newer seaplanes that are having difficulty using the narrow ramp.
Rationale
This project is necessary for preservation of that natural areas surrounding the end of the airport by Lake Washington and the Cedar River. Preservation of these areas is important for both environmental and
safety purposes.
TOTAL
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 113
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:5
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ 1,115 202 ‐ ‐ ‐ ‐ ‐ ‐ 1,317 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 6 ‐ ‐ 7,412 9,300 ‐ ‐ ‐ ‐ 16,718
Total Expenditures 6 1,115 202 8,912 9,300 ‐ ‐ ‐ ‐ 19,535
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ 8,885 9,050 ‐ ‐ ‐ ‐ 17,935
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income 6 1,115 202 27 250 ‐ ‐ ‐ ‐ 1,600 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 6 1,115 202 8,912 9,300 ‐ ‐ ‐ ‐ 19,535
Project Funding Status:
Secured 6 1,115 202 27 ‐ ‐ ‐ ‐ ‐ 1,350 Anticipated*‐ ‐ ‐ 8,885 9,300 ‐ ‐ ‐ ‐ 18,185
Total Project Funding 6 1,115 202 8,912 9,300 ‐ ‐ ‐ ‐ 19,535
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Taxiway Alpha Rehabilitation
DevelopmentPreviously Approved
From 2017 thru 2019, this program will fund a major reconstruction and rehabilitation of Taxiway Alpha. Taxiway Alpha is the major parallel taxiway that supports all GA aircraft operations on the west side of the
airfield and also is used by Boeing 737 jets under tow. The existing pavement is showing stress, cracking, and rutting. The project will likely include areas of total reconstruction and other areas of pavement repairs.
The project will also seek to upgrade Airport lighting to LED, infield drainage along Taxiway Alpha, painting, and other taxiway system upgrades. We anticipate the design and evaluation phase in 2021.
Rationale
The rehabilitation of taxiway alpha will allow the airport to meet the growing demands from its various customers. This major reconstruction would be a big boost to the airport's notoriety and the reputation of the
city as well.
TOTAL
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 114
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:6
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 730 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 730 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 64 104 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 168
Total Expenditures 794 104 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 897
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income 794 104 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 897 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 794 104 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 897
Project Funding Status:
Secured 794 104 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 897 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 794 104 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 897
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Master Plan
Cross‐CategoryExtension of Previously Approved Project
This project covers a variety of Master Plan related expenses. The Airport is currently contesting the D‐III designation, so the scope of Engineering, Planning, and Legal services is included. Anticipated expenses
include reconfigurations and analysis of the effects of the designations up to and including the completion of the Master Plan.
Rationale
The Seattle ADO has determined the Master Plan process as a necessity at Renton Municipal Airport. The Airport is executing this project to remain in compliance and to secure eligibility in future AIP funding.
TOTAL
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 115
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:7
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 88 767 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 855 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 88 767 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 855
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ 600 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 600
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income 88 167 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 255 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 88 767 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 855
Project Funding Status:
Secured 88 167 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 255 Anticipated*‐ 600 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 600
Total Project Funding 88 767 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 855
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Snow Removal Equipment
Maintenance and PreservationExtension of Previously Approved Project
The Airport needs to maintain airfield snow and ice removal equipment to ensure that aircraft can operate safely to and from the airport unrestricted during winter months. The current rotary snow sweeper
equipment was purchased used in 2014 and has become unreliable. The airport needs to replace this equipment with a new serviceable equipment.
Rationale
The snow removal equipment is necessary to keep airport operations safe and functioning during winter months. Keeping service levels high at all times ensures greater customer satisfaction and increases the
reputation of the airport and the city.
TOTAL
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 116
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:8
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 140 44 50 50 ‐ ‐ ‐ ‐ ‐ 285 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 126 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 126
Total Expenditures 266 44 50 50 ‐ ‐ ‐ ‐ ‐ 411
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income 266 44 50 50 ‐ ‐ ‐ ‐ ‐ 411 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 266 44 50 50 ‐ ‐ ‐ ‐ ‐ 411
Project Funding Status:
Secured 266 44 50 50 ‐ ‐ ‐ ‐ ‐ 411 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 266 44 50 50 ‐ ‐ ‐ ‐ ‐ 411
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Surface Water System Rehabilitation
Maintenance and PreservationPreviously Approved
The majority of the Airport's drainage system, installed in the 1950's, has exceeded its design life, and is failing in some locations. This project will replace components of the drainage system on the Airport.
Rationale
The storm water systems at the airport need to be operating at full capacity to ensure the continued operations of the facility.
TOTAL
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 117
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:9
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ 400 ‐ 200 ‐ ‐ ‐ ‐ ‐ 600 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ 1,800 2,000 ‐ ‐ ‐ ‐ 3,800
Total Expenditures ‐ 400 ‐ 2,000 2,000 ‐ ‐ ‐ ‐ 4,400
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ 1,800 1,800 ‐ ‐ ‐ ‐ 3,600
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ 400 ‐ 200 200 ‐ ‐ ‐ ‐ 800 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 400 ‐ 2,000 2,000 ‐ ‐ ‐ ‐ 4,400
Project Funding Status:
Secured ‐ 400 ‐ 200 ‐ ‐ ‐ ‐ ‐ 600 Anticipated*‐ ‐ ‐ 1,800 2,000 ‐ ‐ ‐ ‐ 3,800
Total Project Funding ‐ 400 ‐ 2,000 2,000 ‐ ‐ ‐ ‐ 4,400
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Environmental Impact Study
Cross‐CategoryExtension of Previously Approved Project
Pending the completion of the Master Plan these funds are to be utilized for the Airport's contribution to the Environmental Impact Study (EIS). This includes contracting and consulting services established by the
FAA.
Rationale
The size and magnitude of the proposed Master Plan necessitates implementation of an EIS to ensure minimal impacts.
TOTAL
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 118
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:10
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ 1,000 ‐ ‐ 1,000 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ 254 ‐ 254
Total Expenditures ‐ ‐ ‐ ‐ ‐ 300 1,300 254 ‐ 1,854
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ 1,000 ‐ ‐ 1,000
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ 300 300 254 ‐ 854 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 300 1,300 254 ‐ 1,854
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ 300 1,300 254 ‐ 1,854
Total Project Funding ‐ ‐ ‐ ‐ ‐ 300 1,300 254 ‐ 1,854
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Airport Maintenance Facility
Maintenance and PreservationPreviously Approved
The airport maintenance crew has grown significantly in both staff size and in equipment inventory. This level of service ensures the adequate operational standards of the Airport are being met. Currently,
equipment is stored in a number of areas on the Airport, causing inefficiency in work production. In 2016, with aviation‐use ramp space at a premium, it is desirable for the airport to relocate the maintenance shop
to a place that is more suited to equipment handling and to free up the 790 parcel for use by an aviation‐related operator. This project is intended to develop a suitable site for the new maintenance shop that is
large enough to house the existing 2 FTEs and 6 PTEs, breakroom, workshop, and equipment storage.
Rationale
This project is needed in order to provide staff with the facility they need to be able to perform their duties safely and efficiently, ultimately improving the overall customer experience of the airport's clientele.
TOTAL
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 119
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:11
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ 140 100 ‐ 240 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ 140 100 ‐ 240
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
REET ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Impact Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Water Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Lease Income ‐ ‐ ‐ ‐ ‐ ‐ 140 100 ‐ 240 Property Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
B&O Taxes ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ 140 100 ‐ 240
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ ‐ 140 100 ‐ 240
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ 140 100 ‐ 240
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
AIRPORT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Airport North Entrance & Parking Lot Rehab
Maintenance and PreservationPreviously Approved
The north entrance, to the airport, is located off of Rainier Avenue North at the NW corner of the Airport. Recently, airport staff have removed rotting wood signage and structures from this entrance and have
placed temporary signage. This project will reshape and upgrade this entrance to mirror the recent upgrades at the airport's main entrance off Shattuck Avenue. New concrete walls, signage, lighting, and
landscaping are all anticipated as part of this upgrade. In addition, Airport staff will seek to add parking along the west side of west perimeter road in the vicinity as general parking for the Airport's tenants.
Rationale
This project addresses major safety and security concerns to the overall operations of the airport.
TOTAL
ESTIMATED
ESTIMATED
Capital Improvement Program ‐ Airport 5 - 120
2021‐2022 Preliminary Budget City of Renton, Washington
Projects Priority Type*
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Driving Range Major Maintenance 1 SP ‐ ‐ 43 24 16 ‐ ‐ ‐ ‐ 83
Driving Range Netting Replacement 2 SP ‐ ‐ ‐ ‐ 180 ‐ ‐ ‐ ‐ 180 Golf Course Major Maintenance 3 SP ‐ 72 ‐ ‐ 110 80 50 ‐ ‐ 312
Fairway Protective Netting Maintenance 4 SP ‐ ‐ ‐ ‐ 30 30 ‐ ‐ ‐ 60 Golf Course Major Maintenance 5 SP ‐ ‐ ‐ ‐ ‐ 30 150 150 ‐ 330
Equipment Plan 6 SP ‐ 25 48 73
Total Expenditures ‐ 72 68 72 336 140 200 150 ‐ 1,038
*Project Types: ED = Correcting Existing Deficiencies; SP = System Preservation; N = New Facilities to Accommodate Growth
Projects
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Golf Course Revenue ‐ 72 68 72 336 140 200 150 ‐ 1,038
General Fund Sources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 72 68 72 336 140 200 150 ‐ 1,038
Project Funding Status:Secured ‐ 72 68 72 ‐ ‐ ‐ ‐ ‐ 212
Anticipated** ‐ ‐ ‐ ‐ 336 140 200 150 ‐ 826
Total Project Funding ‐ 72 68 72 336 140 200 150 ‐ 1,038
**Expenditures utilizing anticipated funding are not included in the adopted budget.
Reconciliation to Adopted Budget:
Project Funding Secured 212 Appropriations To‐Date 72
Additional Appropriations Needed 140
Additional Appropriations:
2021 Adopted Budget 68
2022 Adopted Budget 72
Total Additional Appropriations 140
SUMMARY BY COUNCIL PRIORITY
GENERAL GOVERNMENT CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Maplewood Golf Course 5 - 121
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:1
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ 43 24 16 ‐ ‐ ‐ ‐ 83 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ 43 24 16 ‐ ‐ ‐ ‐ 83
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
Golf Course Revenue ‐ ‐ 43 24 16 ‐ ‐ ‐ ‐ 83 General Fund Sources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 43 24 16 ‐ ‐ ‐ ‐ 83
Project Funding Status:
Secured ‐ ‐ 43 24 ‐ ‐ ‐ ‐ ‐ 67 Anticipated*‐ ‐ ‐ ‐ 16 ‐ ‐ ‐ ‐ 16
Total Project Funding ‐ ‐ 43 24 16 ‐ ‐ ‐ ‐ 83
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
2021 ‐ Fire protection re‐piping: replace exposed sprinkler pipe in the lower level hitting stalls ($18,100), replace driving range lighting with new LED fixtures ($20,000), rebuild/rewire upper level hitting stall heaters ($5,000). 2022 ‐ Fire protection re‐piping: replace exposed sprinkler pipe in the cart barn storage ($24,200). 2023 ‐ Fire protection re‐piping: replace exposed sprinkler pipe in upper level hitting stalls
($15,800).
Rationale
The driving range draws in a large volume of customers annually and upkeeping its condition is important to keep quality and reputation levels high for the community.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Driving Range Major MaintenanceCross‐Category
Capital Investment Program ‐ Maplewood Golf Course 5 - 122
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:2
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ 180 ‐ ‐ ‐ ‐ 180 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ 180 ‐ ‐ ‐ ‐ 180
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
Golf Course Revenue ‐ ‐ ‐ ‐ 180 ‐ ‐ ‐ ‐ 180 General Fund Sources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 180 ‐ ‐ ‐ ‐ 180
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ 180 ‐ ‐ ‐ ‐ 180
Total Project Funding ‐ ‐ ‐ ‐ 180 ‐ ‐ ‐ ‐ 180
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
The protective neeting around the driving range is in need of replacement due to the constant need for repairs when high winds tear our panels. Holes in the netting allow for balls to escape and potentially create a safety issue for patrons on hole #1. 14% ($~25K) will be covered by Public Works as a result of the proximity of the water pump and treatment buildings.
Rationale
The driving range draws in a large volume of customers annually and upkeeping its condition is important to keep quality and reputation levels high for the community.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Driving Range Netting ReplacementCross‐Category
Capital Investment Program ‐ Maplewood Golf Course 5 - 123
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:3
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ 72 ‐ ‐ 110 80 50 ‐ ‐ 312 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ 72 ‐ ‐ 110 80 50 ‐ ‐ 312
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Golf Course Revenue ‐ 72 ‐ ‐ 110 80 50 ‐ ‐ 312
General Fund Sources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 72 ‐ ‐ 110 80 50 ‐ ‐ 312
Project Funding Status:Secured ‐ 72 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 72
Anticipated*‐ ‐ ‐ ‐ 110 80 50 ‐ ‐ 240
Total Project Funding ‐ 72 ‐ ‐ 110 80 50 ‐ ‐ 312
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
The Maplewood Golf Course has the following activities that would be considered major maintenance, necessary to maintain the golf course, driving range, and building facilities. They do not add to the infrastructure, but ensure continued life and usability of the entire facility. 2023 ‐ Replace walk‐in cooler in kitchen ($30K), kitchen wall improvements behind sink ($10K), replace Club House HVAC system ($70K).
2024 ‐ Replace/reseal kitchen floor ($40K), update security cameras throughout facility ($40K). 2025 ‐ Replace bar top ($50K).
Rationale
By keeping the golf course appearance and quality in a well‐maintained state helps build eminence for the city as a sign of a high quality of life for its residents and outside visitors.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Golf Course Major MaintenanceMaintenance and Preservation
Extension of Previously Approved Request
Capital Investment Program ‐ Maplewood Golf Course 5 - 124
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:5
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ 30 30 ‐ 60 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ 30 30 ‐ ‐ ‐ 60
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
Golf Course Revenue ‐ ‐ ‐ ‐ 30 30 ‐ ‐ ‐ 60 General Fund Sources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ 30 30 ‐ ‐ ‐ 60
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ 30 30 ‐ 60
Total Project Funding ‐ ‐ ‐ ‐ 30 30 ‐ ‐ ‐ 60
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
2023 ‐Replace worn netting panels #7 fairway ($30K). 2024 ‐Replace worn netting panels #10 fairway ($30K)
Rationale
This project is necessary to protect cars and pedestrians on holes bordering the highway.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Fairway Protective Netting MaintenanceCross‐Category
Capital Investment Program ‐ Maplewood Golf Course 5 - 125
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:6
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ 30 150 150 ‐ 330 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ 30 150 150 ‐ 330
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
Golf Course Revenue ‐ ‐ ‐ ‐ ‐ 30 150 150 ‐ 330 General Fund Sources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 30 150 150 ‐ 330
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ 30 150 150 ‐ 330
Total Project Funding ‐ ‐ ‐ ‐ ‐ 30 150 150 ‐ 330
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
2024 ‐ Widen cart path, rebuild putting green complex with kiosk ($30K). 2025 ‐Reconstruct 10th & 16th greens ($150K). 2026 ‐Reconstruct 13th & 15th greens ($150K).
Rationale
By keeping the golf course appearance and quality in a well‐maintained state helps build eminence for the city as a sign of a high quality of life for its residents and outside visitors.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Golf Course Major MaintenanceCross‐Category
Capital Investment Program ‐ Maplewood Golf Course 5 - 126
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:11
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ 25 48 ‐ ‐ ‐ ‐ ‐ 73
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ 25 48 ‐ ‐ ‐ ‐ ‐ 73
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Golf Course Revenue ‐ ‐ 25 48 ‐ ‐ ‐ ‐ ‐ 73
General Fund Sources ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 25 48 ‐ ‐ ‐ ‐ ‐ 73
Project Funding Status:Secured ‐ ‐ 25 48 ‐ ‐ ‐ ‐ ‐ 73
Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ ‐ 25 48 ‐ ‐ ‐ ‐ ‐ 73
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐
Replace existing rolling stock as it reaches end of useful life, and/or ages were cost of repairs are no longer justified. 2021 ‐ Acquire two (2) new light weight utility carts ($25K). 2022 ‐ Acquire one (1) new fairway mower ($48K).
Rationale
Rolling stock / equipment is required for the on‐going maintenance of the golf course for the enjoyment of the patrons using the facility.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
GG ‐ PARKS CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Equipment PlanCross‐Category
Capital Investment Program ‐ Maplewood Golf Course 5 - 127
2021 – 2022 Preliminary Budget City of Renton, Washington
This page is intentionally left blank
5 - 128
2021/2022 Preliminary Budget City of Renton, Washington
Projects Priority Type*
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Kennydale 320‐Reservoir 1 D 5,510 3,400 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8,910 Downtown Water Main Improvements 2 M, SP 751 745 730 2,025 1,000 1,000 1,000 1,000 ‐ 8,251 Water System Plan Update 3 R 1,108 110 290 ‐ ‐ ‐ ‐ ‐ ‐ 1,508 Highlands 435‐Zone Reservoirs 4 D 2,025 110 6,380 6,890 8,080 1,640 ‐ ‐ ‐ 25,125 Highlands Water Main Improvements 5 M, SP 734 28 1,072 200 200 200 200 200 ‐ 2,834 Emergency Response Projects 6 M, SP 161 ‐ 100 100 100 100 100 100 ‐ 761 WSDOT I‐405 Water Relocations 7 M, SP 175 250 300 ‐ ‐ ‐ ‐ ‐ ‐ 725 Water Main Replacement 8 M, SP 8,327 60 1,500 1,500 1,500 1,500 1,500 1,500 ‐ 17,387 Maplewood Filter Media Replacement 9 M, SP 4 270 130 ‐ ‐ ‐ ‐ ‐ ‐ 404 Maplewood Water Treatment Plant Improvements 10 M, SP ‐ 400 420 ‐ ‐ ‐ ‐ ‐ ‐ 820 Duvall Ave NE Water Main Improvements 11 M, SP 148 360 100 ‐ ‐ ‐ ‐ ‐ ‐ 608 Telemetry Improvements 12 M, SP 1,114 30 100 100 100 100 100 100 ‐ 1,744 PRV's Replacement 13 M, SP 123 80 300 300 300 300 300 300 ‐ 2,003 Reservoir Recoating 14 M, SP 580 ‐ 200 200 200 200 200 200 ‐ 1,780 Emergency Power to Water Facilities 15 M, SP 394 ‐ 300 300 300 300 300 300 ‐ 2,194 Water Pump Station Rehabilitation 16 M, SP 162 ‐ 400 400 400 400 400 400 ‐ 2,562 Automatic Meter Reading Conversion 17 M, SP 6,248 85 150 50 50 50 50 50 ‐ 6,733 Water System Security 18 M, SP 71 ‐ 50 50 50 50 50 50 ‐ 371 Rainier Ave S Phase 4 Water Main Improvements 19 M, SP 2,108 ‐ 300 300 300 300 ‐ ‐ ‐ 3,308 Aquifer Monitoring and Management 20 R 166 ‐ 30 30 30 30 30 30 ‐ 346 Bronson Way, Houser Way and Williams Ave Bridges Water Main Replacement 21 M, SP ‐ ‐ 200 200 200 ‐ ‐ ‐ ‐ 600 Water Main Oversizing 22 D 96 ‐ 100 100 100 100 100 100 ‐ 696
Total Expenditures 30,006 5,928 13,152 12,745 12,910 6,270 4,330 4,330 ‐ 89,671
*Project Types: A = Acquisition, C = Cross Category, D = Development, M = Maintenance, P = Planning, R = Regulatory, ED = Correcting Existing Deficiencies; SP = System Preservation; N = New Facilities to Accommodate Growth
Projects
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Water Collection Fees 30,006 5,928 13,152 12,745 12,910 6,270 4,330 4,330 ‐ 89,671
Total Resources 30,006 5,928 13,152 12,745 12,910 6,270 4,330 4,330 ‐ 89,671
Project Funding Status:Secured 30,006 5,928 13,152 12,745 8,100 1,640 ‐ ‐ ‐ 71,571 Anticipated**‐ ‐ ‐ ‐ 4,810 4,630 4,330 4,330 ‐ 18,100
Total Project Funding 30,006 5,928 13,152 12,745 12,910 6,270 4,330 4,330 ‐ 89,671
**Expenditures utilizing anticipated funding are not included in the adopted budget.
Reconciliation to Adopted Budget:Project Funding Secured 71,571 Appropriations To‐Date 66,431
Additional Appropriations Needed 5,140
Additional Appropriations:2021 Adopted Budget 1,460 2022 Adopted Budget 3,680
Total Additional Appropriations 5,140
SUMMARY BY COUNCIL PRIORITY
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 129
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:1
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ 63 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 63
Project Management ‐ 110 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 110 Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 5,510 3,227 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8,737
Total Expenditures 5,510 3,400 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8,910
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 5,510 3,400 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8,910 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 5,510 3,400 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8,910
Project Funding Status:
Secured 5,510 3,400 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8,910 Anticipated* ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 5,510 3,400 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8,910
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Kennydale 320‐ReservoirDevelopment
Previously Approved
This project consists of the design and construction of a new 1.3 million‐gallon reservoir to be located on city‐owned property next to the new Kennydale Fire Station 15. The reservoir will provide operational flexibility of the water system and supply redundancy and reliability. The project also includes the construction of transmission mains and pressure reducing valve stations. Construction of the new reservoir and related water mains will be completed by the end of 2020.
Rationale
The need for the Kennydale reservoir was identified in both the 2006 and 2012 Water Comprehensive Plans to provide sufficient water storage to accommodate current and future growth in population, development
and redevelopment projects in the Kennydale area. This project is in coordination with the city's goals of economic development, public safety and quality of life.
TOTAL
Description and Scope
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 130
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:2
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ 150 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 150
Project Management ‐ 35 50 25 ‐ ‐ ‐ ‐ ‐ 110 Major Maintenance ‐ 560 680 2,000 1,000 1,000 1,000 1,000 ‐ 7,240 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 751 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 751
Total Expenditures 751 745 730 2,025 1,000 1,000 1,000 1,000 ‐ 8,251
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 751 745 730 2,025 1,000 1,000 1,000 1,000 ‐ 8,251 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 751 745 730 2,025 1,000 1,000 1,000 1,000 ‐ 8,251
Project Funding Status:
Secured 751 745 730 2,025 ‐ ‐ ‐ ‐ ‐ 4,251 Anticipated*‐ ‐ ‐ ‐ 1,000 1,000 1,000 1,000 ‐ 4,000
Total Project Funding 751 745 730 2,025 1,000 1,000 1,000 1,000 ‐ 8,251
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Downtown Water Main ImprovementsMaintenance and Preservation
Previously Approved
This program consists of the replacement of old and undersized water mains in downtown Renton with larger water mains to provide fire flow capacity for development and redevelopment projects in the downtown area. The prioritization and selection of pipes are based on several factors including degree of fire flow deficiency; frequency of leaks and breaks; remaining useful life of the pipes; and coordination with other construction projects such as scheduled street overlays. This program reduces the likelihood of system failures, unplanned service interruptions and claims for damages against the City. The program includes water
main improvements in Wells Ave S. and Williams Ave S. roadway improvements project by the Transportation Department in 2020 and the Downtown Utility Improvements Project for S 2nd and S 3rd St two‐way street
conversion in 2021‐2022. Water main improvements in other downtown streets from 2023 to 2026 will be identified and coordinated with other Transportation and Utility capital projects.
Rationale
This program reduces the likelihood of system failures, unplanned service interruptions and claims for damages against the City. This project was identified as a city priority to assist in revitalizing the downtown area.
This project is in coordination with the city's goals of economic development, public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 131
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:3
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ 80 210 ‐ ‐ ‐ ‐ ‐ ‐ 290
Project Management ‐ 30 80 ‐ ‐ ‐ ‐ ‐ ‐ 110 Major Maintenance 706 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 706 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 402 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 402
Total Expenditures 1,108 110 290 ‐ ‐ ‐ ‐ ‐ ‐ 1,508
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 1,108 110 290 ‐ ‐ ‐ ‐ ‐ ‐ 1,508 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1,108 110 290 ‐ ‐ ‐ ‐ ‐ ‐ 1,508
Project Funding Status:
Secured 1,108 110 290 ‐ ‐ ‐ ‐ ‐ ‐ 1,508 Anticipated* ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 1,108 110 290 ‐ ‐ ‐ ‐ ‐ ‐ 1,508
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Water System Plan UpdateRegulatory
Previously Approved
This program consists of the update of the Water System Comprehensive Plan in accordance to the Department of Health’s requirements. The purpose of the water system plan is to present recommended facility improvements and policy criteria to be used to maintain and operate a potable municipal water supply system that is adequate, safe and reliable. The update of the 2019 Water System Plan will be completed in 2020 and the update of the Emergency Response Plan will be completed in 2021 within six months of the update of the Water System Plan as required by the State Department of Health's regulations.
Rationale
This update is a regulatory requirement. This plan supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 132
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:4
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ 70 50 ‐ ‐ ‐ ‐ ‐ ‐ 120
Project Management ‐ 40 80 90 80 20 ‐ ‐ ‐ 310 Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 2,025 ‐ 6,250 6,800 8,000 1,620 ‐ ‐ ‐ 24,695
Total Expenditures 2,025 110 6,380 6,890 8,080 1,640 ‐ ‐ ‐ 25,125
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 2,025 110 6,380 6,890 8,080 1,640 ‐ ‐ ‐ 25,125 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 2,025 110 6,380 6,890 8,080 1,640 ‐ ‐ ‐ 25,125
Project Funding Status:
Secured 2,025 110 6,380 6,890 8,080 1,640 ‐ ‐ ‐ 25,125 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 2,025 110 6,380 6,890 8,080 1,640 ‐ ‐ ‐ 25,125
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Highlands 435‐Zone ReservoirsDevelopment
Previously Approved
This project consists of the design and construction of a new 6.3 million‐gallon ground‐level concrete reservoir to replace an existing 60 year‐old tank that has developed leaks and is susceptible to damages during a major seismic event. The improvements include the replacement of approximately one mile of 24‐inch and 12‐inch diameter transmission water mains in NE 12th Street from Monroe Ave NE to Edmonds Ave NE. The design of the reservoir and water main improvements was completed in 2020. Construction of the transmission mains is scheduled for 2021 and construction of the reservoir will occur in 2022 to 2024.
Rationale
The new and seismic‐resilient reservoir will increase water storage capacity for fire protection and for domestic uses and will provide additional capacity to meet water demand from growth in population and in
development projects in the Highlands. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 133
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:5
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ 23 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 23
Project Management ‐ 5 30 ‐ ‐ ‐ ‐ ‐ ‐ 35 Major Maintenance ‐ ‐ 1,042 200 200 200 200 200 ‐ 2,042 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 734 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 734
Total Expenditures 734 28 1,072 200 200 200 200 200 ‐ 2,834
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 734 28 1,072 200 200 200 200 200 ‐ 2,834 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 734 28 1,072 200 200 200 200 200 ‐ 2,834
Project Funding Status:
Secured 734 28 1,072 200 ‐ ‐ ‐ ‐ ‐ 2,034 Anticipated* ‐ ‐ ‐ ‐ 200 200 200 200 ‐ 800
Total Project Funding 734 28 1,072 200 200 200 200 200 ‐ 2,834
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Highlands Water Main ImprovementsMaintenance and Preservation
Previously Approved
This program consists of the design and construction of the replacement of old and undersized water mains in the Renton Highlands with larger water mains to provide fire flow capacity for development and redevelopment projects in the Highlands area. Construction of the water main improvements in Jefferson Ave NE and in NE 16th St is scheduled for spring 2021 as part of the Surface Water Utility's NE 16th St‐Jefferson Ave NE stormwater green connections CIP project. Water main improvements in other streets in the Highlands from 2023 to 2026 will be identified and coordinated with other Transportation and Utility capital projects
This program reduces the likelihood of system failures, unplanned service interruptions, and claims for damages against the city of Renton.
Rationale
This project was identified as a city priority to assist in revitalizing the Highlands area. This project is in coordination with the city's goals of economic development, public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 134
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:6
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance 78 ‐ 100 100 100 100 100 100 ‐ 678 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 83 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 83
Total Expenditures 161 ‐ 100 100 100 100 100 100 ‐ 761
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 161 ‐ 100 100 100 100 100 100 ‐ 761 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 161 ‐ 100 100 100 100 100 100 ‐ 761
Project Funding Status:
Secured 161 ‐ 100 100 ‐ ‐ ‐ ‐ ‐ 361 Anticipated* ‐ ‐ ‐ ‐ 100 100 100 100 ‐ 400
Total Project Funding 161 ‐ 100 100 100 100 100 100 ‐ 761
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
ESTIMATED
ESTIMATED
TOTAL
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
This program provides a reserve fund for the Water Utility to respond to emergency events that cause damages or failures of water system infrastructure that are not anticipated as part of the budget process. Unplanned projects or actions resulting from emergencies and unforeseen conditions includes pipe failures, structural damages to water facilities and equipment and water contamination incidents.
Rationale
This program provides funding for the Water Utility to take corrective actions regarding unplanned and minor failures of the water system. These projects will be identified as the need arises. The projects selected will
be in support of the city’s goals of promoting public safety and quality of life.
Emergency Response ProjectsMaintenance and Preservation
Previously Approved
Description and Scope
Capital Investment Program ‐ Water 5 - 135
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:7
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ 20 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 20 Major Maintenance 28 230 300 ‐ ‐ ‐ ‐ ‐ ‐ 558 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 147 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 147
Total Expenditures 175 250 300 ‐ ‐ ‐ ‐ ‐ ‐ 725
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 175 250 300 ‐ ‐ ‐ ‐ ‐ ‐ 725 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 175 250 300 ‐ ‐ ‐ ‐ ‐ ‐ 725
Project Funding Status:
Secured 175 250 300 ‐ ‐ ‐ ‐ ‐ ‐ 725 Anticipated* ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 175 250 300 ‐ ‐ ‐ ‐ ‐ ‐ 725
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
WSDOT I‐405 Water RelocationsMaintenance and Preservation
Previously Approved
This program consists of the relocation of existing city water mains within the state's right‐of‐way to accommodate WSDOT's I‐405 Renton to Bellevue corridor widening and express toll lanes project. The project includes the relocation of the water main at I‐405/May Creek bridge in 2020 and the installation of a new 12‐inch water line within the new NE 44th St at grade roadway in 2021.
Rationale
The city of Renton is legally obligated under franchise permits from the state to relocate its water mains to accommodate the state's project. This project supports the city's goals of promoting public safety and quality
of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 136
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:8
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ 250 250 250 250 250 250 ‐ 1,500
Project Management ‐ ‐ 50 50 50 50 50 50 ‐ 300 Major Maintenance ‐ ‐ 1,200 1,200 1,200 1,200 1,200 1,200 ‐ 7,200 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 8,327 60 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 8,387
Total Expenditures 8,327 60 1,500 1,500 1,500 1,500 1,500 1,500 ‐ 17,387
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 8,327 60 1,500 1,500 1,500 1,500 1,500 1,500 ‐ 17,387 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 8,327 60 1,500 1,500 1,500 1,500 1,500 1,500 ‐ 17,387
Project Funding Status:
Secured 8,327 60 1,500 1,500 ‐ ‐ ‐ ‐ ‐ 11,387 Anticipated*‐ ‐ ‐ ‐ 1,500 1,500 1,500 1,500 ‐ 6,000
Total Project Funding 8,327 60 1,500 1,500 1,500 1,500 1,500 1,500 ‐ 17,387
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Water Main Replacement Maintenance and Preservation
Previously Approved
This program consists of the replacement of aging and undersized water mains throughout the water distribution system that has reached its useful life. The improvements will increase flow capacity for firefighting to neighborhoods and improve water quality and reduces the likelihood of system failures, unplanned service interruptions and claims for damages against the City. The prioritization and selection of pipes are based on several factors including risk of failure, frequency of leaks and breaks and potential for cost savings or reduced neighborhood impacts by coordinating with other construction projects such as scheduled street overlays
and roadway improvement projects. This investment funds water main replacement at a rate of one mile per year.
Rationale
This program maintains the target service levels and meets regulatory requirements for water quality and for fire protection. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 137
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:9
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ 20 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 20 Major Maintenance 0 250 130 ‐ ‐ ‐ ‐ ‐ ‐ 380 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 4 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 4
Total Expenditures 4 270 130 ‐ ‐ ‐ ‐ ‐ ‐ 404
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 4 270 130 ‐ ‐ ‐ ‐ ‐ ‐ 404 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 4 270 130 ‐ ‐ ‐ ‐ ‐ ‐ 404
Project Funding Status:
Secured 4 270 130 ‐ ‐ ‐ ‐ ‐ ‐ 404 Anticipated* ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 4 270 130 ‐ ‐ ‐ ‐ ‐ ‐ 404
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Maplewood Filter Media ReplacementMaintenance and Preservation
Previously Approved
This program consists of the scheduled replacement of the two filter media, greensand and granular activated carbon media, used at the city's Maplewood Water Treatment Facility. The filter media needs to be replaced about every seven years. The replacement of the two filter media is scheduled for winter 2020 and/or spring 2021.
Rationale
The replacement of the filter media used for water treatment is needed to maintain and provide drinking water quality that meets regulatory requirements. This project supports the city's goals of promoting public
safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 138
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:10
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ 85 10 ‐ ‐ ‐ ‐ ‐ ‐ 95
Project Management ‐ 5 10 ‐ ‐ ‐ ‐ ‐ ‐ 15 Major Maintenance ‐ 310 400 ‐ ‐ ‐ ‐ ‐ ‐ 710 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ 400 420 ‐ ‐ ‐ ‐ ‐ ‐ 820
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees ‐ 400 420 ‐ ‐ ‐ ‐ ‐ ‐ 820 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 400 420 ‐ ‐ ‐ ‐ ‐ ‐ 820
Project Funding Status:
Secured ‐ 400 420 ‐ ‐ ‐ ‐ ‐ ‐ 820 Anticipated* ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ 400 420 ‐ ‐ ‐ ‐ ‐ ‐ 820
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This program consists of the design and construction for the replacement of a leaky roof at the Maplewood Water Treatment Plant. The roof has experienced significant leaking problems in recent years and can potentially cause damages to the internal electrical and mechanical equipment. The design work will be completed in 2020 and construction is scheduled in the fall 2020 or spring 2021.
Rationale
This program extends the useful life of existing water treatment plant, reduces maintenance cost and meets the target service level. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Maplewood Water Treatment Plant ImprovementsMaintenance and Preservation
Previously Approved
Capital Investment Program ‐ Water 5 - 139
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:11
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ 360 100 ‐ ‐ ‐ ‐ ‐ ‐ 460 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 148 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 148
Total Expenditures 148 360 100 ‐ ‐ ‐ ‐ ‐ ‐ 608
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 148 360 100 ‐ ‐ ‐ ‐ ‐ ‐ 608 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 148 360 100 ‐ ‐ ‐ ‐ ‐ ‐ 608
Project Funding Status:
Secured 148 360 100 ‐ ‐ ‐ ‐ ‐ ‐ 608 Anticipated* ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 148 360 100 ‐ ‐ ‐ ‐ ‐ ‐ 608
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This project consists of the relocation and replacement of existing water mains in Duvall Ave NE with new and larger size water mains as part of the city's transportation improvements and widening of Duvall Ave NE from NE 4th St to Sunset Blvd NE. The project will increase the water system capacity for fire protection for existing properties and for future development and redevelopment projects along Duvall Ave NE. Construction of the project is scheduled to start in Fall 2020. This program reduces the likelihood of system failures, unplanned service interruptions and claims for damages against the city of Renton.
Rationale
This project was identified as a city priority to assist in revitalizing the Rainier Avenue corridor. This project is in coordination with the city's goals of economic development, public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Duvall Ave NE Water Main ImprovementsMaintenance and Preservation
Extension of Previously Approved Project
Capital Investment Program ‐ Water 5 - 140
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:12
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance 86 30 100 100 100 100 100 100 ‐ 716 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 1,028 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,028
Total Expenditures 1,114 30 100 100 100 100 100 100 ‐ 1,744
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 1,114 30 100 100 100 100 100 100 ‐ 1,744 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1,114 30 100 100 100 100 100 100 ‐ 1,744
Project Funding Status:
Secured 1,114 30 100 100 20 ‐ ‐ ‐ ‐ 1,364 Anticipated* ‐ ‐ ‐ ‐ 80 100 100 100 ‐ 380
Total Project Funding 1,114 30 100 100 100 100 100 100 ‐ 1,744
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Telemetry ImprovementsMaintenance and Preservation
Previously Approved
This project consists of the systematic replacement and upgrades of the telemetry system needed to operate the city's water system. The project includes the design, reconfiguration, programming, installation of hardware and software and functional testing of the telemetry system at various water facilities and at the city's operation and maintenance headquarters. The project includes the development of a SCADA Master Planto identify capital improvements necessary to improve and add reliability to the current system.
Rationale
Upgrades to the telemetry equipment, hardware and software are needed to operate and maintain the water system and to prevent failures or interruption of communication between all water facilites and the master
telemetry system. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 141
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:13
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ 80 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 80
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ 300 300 300 300 300 300 ‐ 1,800 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 123 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 123
Total Expenditures 123 80 300 300 300 300 300 300 ‐ 2,003
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 123 80 300 300 300 300 300 300 ‐ 2,003 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 123 80 300 300 300 300 300 300 ‐ 2,003
Project Funding Status:
Secured 123 80 300 300 ‐ ‐ ‐ ‐ ‐ 803 Anticipated* ‐ ‐ ‐ ‐ 300 300 300 300 ‐ 1,200
Total Project Funding 123 80 300 300 300 300 300 300 ‐ 2,003
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
PRV's ReplacementMaintenance and Preservation
Previously Approved
This program consists of the rehabilitation and replacement of old pressure reducing valves (PRV) throughout the water distribution system. Safety improvements, PRV meters, and telemetry improvements are included as part of the PRV's rehabilitation. The timely repair and replacement of old water system assets reduces operation and maintenance costs and extends the useful life of the assets. The pre‐design report will be completed in 2020 and will identify and prioritize the schedule for the replacement of the 44 PRV stations.
Rationale
This program reduces the likelihood of water system failures, unplanned service interruptions and damage claims to the city of Renton. The selected PRV's will be chosen based on the prioritized need. This project
supports the city’s goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 142
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:14
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance 9 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 9 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 571 ‐ 200 200 200 200 200 200 ‐ 1,771
Total Expenditures 580 ‐ 200 200 200 200 200 200 ‐ 1,780
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 580 ‐ 200 200 200 200 200 200 ‐ 1,780 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 580 ‐ 200 200 200 200 200 200 ‐ 1,780
Project Funding Status:
Secured 580 ‐ 200 200 ‐ ‐ ‐ ‐ ‐ 980 Anticipated* ‐ ‐ ‐ ‐ 200 200 200 200 ‐ 800
Total Project Funding 580 ‐ 200 200 200 200 200 200 ‐ 1,780
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Reservoir RecoatingMaintenance and Preservation
Previously Approved
This program consists of the design and construction for the recoating of the interior and exterior surfaces of the existing steel water reservoirs for protection from corrosion and to extend the useful life of the structures. The project also includes the design and installation of seismic upgrade and retrofit, safety features and security upgrades. The Highlands 565‐reservoir, the Rolling Hills 590‐reservoir and the West Hill reservoirs are scheduled to be re‐coated externally and internally from 2021 to 2026.
Rationale
This program extends the useful life of existing water reservoirs, reduces maintenance cost and meets the target service level. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 143
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:15
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ 300 300 300 300 300 300 ‐ 1,800 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 394 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 394
Total Expenditures 394 ‐ 300 300 300 300 300 300 ‐ 2,194
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 394 ‐ 300 300 300 300 300 300 ‐ 2,194 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 394 ‐ 300 300 300 300 300 300 ‐ 2,194
Project Funding Status:
Secured 394 ‐ 300 300 ‐ ‐ ‐ ‐ ‐ 994 Anticipated* ‐ ‐ ‐ ‐ 300 300 300 300 ‐ 1,200
Total Project Funding 394 ‐ 300 300 300 300 300 300 ‐ 2,194
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Emergency Power to Water FacilitiesMaintenance and Preservation
Previously Approved
This project consists of the design, purchase and installation of on‐site emergency power generators to the city's water pump stations, well pumps and water treatment facilities. A pre‐design report was completed in 2020 and has identified the need and priority to install emergency power generators for the West Hill, S. Talbot Hill and Monroe Avenue pump stations from 2021 to 2026.
Rationale
Emergency generators are needed to provide power supply to operate the city's water facilities during periods of commercial power outage and in emergency events. This project supports the city's goals of promoting
public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 144
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:16
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ 400 400 400 400 400 400 ‐ 2,400 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 162 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 162
Total Expenditures 162 ‐ 400 400 400 400 400 400 ‐ 2,562
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 162 ‐ 400 400 400 400 400 400 ‐ 2,562 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 162 ‐ 400 400 400 400 400 400 ‐ 2,562
Project Funding Status:
Secured 162 ‐ 400 400 ‐ ‐ ‐ ‐ ‐ 962 Anticipated* ‐ ‐ ‐ ‐ 400 400 400 400 ‐ 1,600
Total Project Funding 162 ‐ 400 400 400 400 400 400 ‐ 2,562
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Water Pump Station Rehabilitation Maintenance and Preservation
Previously Approved
This program consists of the design and construction for the rehabilitation of the city’s twelve water pump stations to extend the useful life of the stations. The rehabilitation work includes replacing mechanical and electrical equipment and resolving building structural deficiencies and life/safety issues as needed. The Mt Olivet, Highlands and West Hill pump stations have been identified and prioritized to be rehabilitated in 2021 to 2026.
Rationale
This program reduces the likelihood of failures of water pump stations and unplanned service interruptions for fire protection and for domestic uses. This project supports the city's goals of promoting public safety and
quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 145
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:17
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance 3,144 85 150 50 50 50 50 50 ‐ 3,629 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 3,104 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,104
Total Expenditures 6,248 85 150 50 50 50 50 50 ‐ 6,733
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 6,248 85 150 50 50 50 50 50 ‐ 6,733 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 6,248 85 150 50 50 50 50 50 ‐ 6,733
Project Funding Status:
Secured 6,248 85 150 50 ‐ ‐ ‐ ‐ ‐ 6,533 Anticipated* ‐ ‐ ‐ ‐ 50 50 50 50 ‐ 200
Total Project Funding 6,248 85 150 50 50 50 50 50 ‐ 6,733
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Automatic Meter Reading ConversionMaintenance and Preservation
Previously Approved
This program consists of the replacement and upgrade of software needed for the operation of the Advanced Metering Infrastructure (AMI) system that is used to read the existing 18,000 city water meters. The program includes the installation of additional radio repeater stations to provide reliable communication and data transfer throughout the system. The AMI system improves meter reading efficiency, captures water usage data, enhances water conservation activities including leak detection, and provides timely, accurate billing and water usage information to our customers.
Rationale
Due to the aging computer server the AMI system needs to be replaced. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 146
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:18
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ 50 50 50 50 50 50 ‐ 300 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 71 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 71
Total Expenditures 71 ‐ 50 50 50 50 50 50 ‐ 371
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 71 ‐ 50 50 50 50 50 50 ‐ 371 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 71 ‐ 50 50 50 50 50 50 ‐ 371
Project Funding Status:
Secured 71 ‐ 50 50 ‐ ‐ ‐ ‐ ‐ 171 Anticipated* ‐ ‐ ‐ ‐ 50 50 50 50 ‐ 200
Total Project Funding 71 ‐ 50 50 50 50 50 50 ‐ 371
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Water System SecurityMaintenance and Preservation
Previously Approved
This project consists of the planning, design and installation of security improvements on existing water facilities based on the findings and recommendations of the security vulnerability assessment of the city's water system. Improvements includes security fencing, motion detection and activated lighting, intrusion alarms, closed‐circuit television and remote card access to water facilities.
Rationale
This program provides safety measures to prevent security breaches that can damage water facilities or compromise the operation of the water system. This project supports the city's goals of promoting public safety
and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 147
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:19
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ 300 300 300 300 ‐ ‐ ‐ 1,200 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 2,108 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,108
Total Expenditures 2,108 ‐ 300 300 300 300 ‐ ‐ ‐ 3,308
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 2,108 ‐ 300 300 300 300 ‐ ‐ ‐ 3,308 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 2,108 ‐ 300 300 300 300 ‐ ‐ ‐ 3,308
Project Funding Status:
Secured 2,108 ‐ 300 300 ‐ ‐ ‐ ‐ ‐ 2,708 Anticipated* ‐ ‐ ‐ ‐ 300 300 ‐ ‐ ‐ 600
Total Project Funding 2,108 ‐ 300 300 300 300 ‐ ‐ ‐ 3,308
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Rainier Ave S Phase 4 Water Main ImprovementsMaintenance and Preservation
Extension of Previously Approved Project
This project consists of the relocation and replacement of existing water mains in Rainier Avenue South with new and larger size water mains as part of the city's transportation improvements and widening of the Phase 4 of Rainier Avenue South corridor. The project will increase the water system capacity for fire protection for existing properties and for future development and redevelopment projects along the Rainier Avenue corridor. Construction of the water main improvements will occur as part of the construction of the roadway improvements by the Transportation Division. This program reduces the likelihood of system failures,
unplanned service interruptions and claims for damages against the city of Renton.
Rationale
This project was identified as a city priority to assist in revitalizing the Rainier Avenue corridor. This project is in coordination with the city's goals of economic development, public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 148
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:20
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance 29 ‐ 30 30 30 30 30 30 ‐ 209 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 137 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 137
Total Expenditures 166 ‐ 30 30 30 30 30 30 ‐ 346
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 166 ‐ 30 30 30 30 30 30 ‐ 346 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 166 ‐ 30 30 30 30 30 30 ‐ 346
Project Funding Status:
Secured 166 ‐ 30 30 ‐ ‐ ‐ ‐ ‐ 226 Anticipated* ‐ ‐ ‐ ‐ 30 30 30 30 ‐ 120
Total Project Funding 166 ‐ 30 30 30 30 30 30 ‐ 346
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Aquifer Monitoring and ManagementRegulatory
Extension of Previously Approved Project
This program consists of the repair and improvements to the city's water monitoring wells that are used for early detection of contaminants entering the groundwater supply before they reach the production wells. Thisprogram reduces the risk of potential contamination of the city's drinking water supply wells from unauthorized releases of hazardous chemicals or from accidental chemical spills that can impact the drinking water quality of the city's water supply wells. The project includes the installation of submersible pumps in the monitoring wells for collection of water samples.
Rationale
This program meets the regulatory requirements for water monitoring wells to maintain the city's drinking water quality. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 149
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:21
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ 50 50 50 ‐ ‐ ‐ ‐ 150 Major Maintenance ‐ ‐ 150 150 150 ‐ ‐ ‐ ‐ 450 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ 200 200 200 ‐ ‐ ‐ ‐ 600
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees ‐ ‐ 200 200 200 ‐ ‐ ‐ ‐ 600 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 200 200 200 ‐ ‐ ‐ ‐ 600
Project Funding Status:
Secured ‐ ‐ 200 200 ‐ ‐ ‐ ‐ ‐ 400 Anticipated* ‐ ‐ ‐ ‐ 200 ‐ ‐ ‐ ‐ 200
Total Project Funding ‐ ‐ 200 200 200 ‐ ‐ ‐ ‐ 600
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This program consists of the design and construction for the replacement of old water mains located under the Bronson Way, Houser Way and Williams Ave bridges in conjunction with the seismic retrofit and painting of the bridges by the city’s Transportation Division. The water mains have reached their useful life and are susceptible to damages during a major seismic event. The replacement of the water mains will occur as part of the seismic upgrade and repainting of each bridge that will be done by the Transportation Division.
Rationale
This program maintains the target service levels and meets regulatory requirements for water quality and for fire protection. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Bronson Way, Houser Way and Williams Ave Bridges Water Main ReplacementMaintenance and Preservation
TBD
Capital Investment Program ‐ Water 5 - 150
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:22
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Major Maintenance ‐ ‐ 100 100 100 100 100 100 ‐ 600 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 96 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 96
Total Expenditures 96 ‐ 100 100 100 100 100 100 ‐ 696
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Bond Proceeds (RePmt Funding Src Only)‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Water Collection Fees 96 ‐ 100 100 100 100 100 100 ‐ 696 Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 96 ‐ 100 100 100 100 100 100 ‐ 696
Project Funding Status:
Secured 96 ‐ 100 100 ‐ ‐ ‐ ‐ ‐ 296 Anticipated* ‐ ‐ ‐ ‐ 100 100 100 100 ‐ 400
Total Project Funding 96 ‐ 100 100 100 100 100 100 ‐ 696
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Water Main OversizingDevelopment
Previously Approved
This program consists of the city's cost‐sharing and/or reimbursement to private developers for the installation of larger size water mains than what would normally be required to serve the properties being developed. The Water Utility requires the oversizing of the water mains in designated mixed‐used, commercial and industrial areas, to meet the requirements of the city's Comprehensive Land Use Plan and Water System Plan.
Rationale
This program provides equitable cost compensation to private developers who are required by the Water Utility to upsize new water main extensions to meet the city's long‐term planning needs. This project is in
coordination with the city's goals of economic development, public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Water 5 - 151
2021 – 2022 Preliminary Budget City of Renton, Washington
This page is intentionally left blank
5 - 152
2021‐2022 Preliminary Budget City of Renton, Washington
Projects Priority Type*
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:
Downtown Sewer Replacement/Rehabilitation 1 C 740 930 4,700 4,700 ‐ ‐ ‐ ‐ ‐ 11,070
Thunder Hills Interceptor Repl/Rehab 2 M, SP 883 ‐ 3,110 ‐ ‐ ‐ ‐ ‐ ‐ 3,993
Kennydale Lakeline Sewer Upgrade 3 M, SP 2 248 3,150 2,000 2,000 2,000 2,000 2,000 2,000 15,400 Lift Station Rehabilitation 4 M, SP 842 477 1,282 ‐ ‐ ‐ ‐ ‐ ‐ 2,601 Forcemain Rehab‐Replacement 5 M, SP 775 170 1,721 ‐ ‐ ‐ ‐ ‐ ‐ 2,666 Sanitary Sewer Rehab/Replacement 6 M, SP 147 ‐ 1,050 2,000 2,000 2,000 2,000 2,000 ‐ 11,197 Miscellaneous/Emergency Projects 7 M, SP 1,131 185 200 200 200 200 200 200 ‐ 2,516 Wastewater Operations Master Plan 8 R 414 1 773 ‐ ‐ ‐ ‐ ‐ ‐ 1,188
Total Expenditures 4,933 2,011 15,986 8,900 4,200 4,200 4,200 4,200 2,000 50,630
*Project Types: A = Acquisition, C = Cross Category, D = Development, M = Maintenance, P = Planning, R = Regulatory, ED = Correcting Existing Deficiencies; SP = System Preservation; N = New Facilities to Accommodate Growth
Projects
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Grants/Contributions 23 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 23
Wastewater Collection Fees 4,910 2,011 15,986 8,900 4,200 4,200 4,200 4,200 2,000 50,607
Total Resources 4,933 2,011 15,986 8,900 4,200 4,200 4,200 4,200 2,000 50,630
Project Funding Status:Secured 4,933 2,011 15,986 8,900 ‐ ‐ ‐ ‐ ‐ 31,830 Anticipated**‐ ‐ ‐ ‐ 4,200 4,200 4,200 4,200 2,000 18,800
Total Project Funding 4,933 2,011 15,986 8,900 4,200 4,200 4,200 4,200 2,000 50,630
**Expenditures utilizing anticipated funding are not included in the adopted budget.
Reconciliation to Adopted Budget:
Project Funding Secured 31,830
Appropriations To‐Date 23,733
Additional Appropriations Needed 8,097
Additional Appropriations:
2021 Adopted Budget 2,754
2022 Adopted Budget 5,343
Total Additional Appropriations 8,097
SUMMARY BY COUNCIL PRIORITY
WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Waste Water 5 - 153
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:1
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 740 800 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,540
Project Management ‐ 40 350 350 ‐ ‐ ‐ ‐ ‐ 740
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ 90 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 90
Construction ‐ ‐ 4,350 4,350 ‐ ‐ ‐ ‐ ‐ 8,700
Total Expenditures 740 930 4,700 4,700 ‐ ‐ ‐ ‐ ‐ 11,070
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Wastewater Collection Fees 740 930 4,700 4,700 ‐ ‐ ‐ ‐ ‐ 11,070
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 740 930 4,700 4,700 ‐ ‐ ‐ ‐ ‐ 11,070
Project Funding Status:
Secured 740 930 4,700 4,700 ‐ ‐ ‐ ‐ ‐ 11,070 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 740 930 4,700 4,700 ‐ ‐ ‐ ‐ ‐ 11,070
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Downtown Sewer Replacement/Rehabilitation
Cross‐Category
Previously Approved
Replace and rehabilitate the existing sanitary sewer mains in the downtown area associated with the proposed one‐way to two‐way conversion of S. 2nd Street and S. Third Street. The project consists of the installation or
rehabilitation of approximately 7,300 linear feet of 8‐inch to 15‐inch sewer main. The project will give the Wastewater Utility the opportunity to correct capacity issues and portions of our system with inadequate slopes
and sags. Design will be completed in 2020, with construction occurring through 2022.
Rationale
This project was identified as a city priority to assist in revitalizing the downtown area. This project is in coordination with the city's goals of economic development, public safety and quality of life.
TOTAL
Description and Scope
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Waste Water 5 - 154
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:2
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 880 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 880
Project Management ‐ ‐ 31 ‐ ‐ ‐ ‐ ‐ ‐ 31
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 3 ‐ 3,079 ‐ ‐ ‐ ‐ ‐ ‐ 3,082
Total Expenditures 883 ‐ 3,110 ‐ ‐ ‐ ‐ ‐ ‐ 3,993
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Wastewater Collection Fees 883 ‐ 3,110 ‐ ‐ ‐ ‐ ‐ ‐ 3,993
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 883 ‐ 3,110 ‐ ‐ ‐ ‐ ‐ ‐ 3,993
Project Funding Status:
Secured 883 ‐ 3,110 ‐ ‐ ‐ ‐ ‐ ‐ 3,993 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 883 ‐ 3,110 ‐ ‐ ‐ ‐ ‐ ‐ 3,993
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Thunder Hills Interceptor Repl/Rehab
Maintenance and Preservation
Previously Approved
The Thunder Hills Interceptor was constructed in 1965 to serve a portion of the Rolling Hills neighborhood and follows Thunder Hills Creek. Erosion along the creek has compromised the sewer interceptor in various
locations. The proposed project will install approximately 1,205 LF of 12‐inch HDPE main and 845 LF of cured in place pipe liner to improve the functioning and longevity of the interceptor. The project will also improve
maintenance access with the installation of a new turnaround, a new access road, and rebuilding an existing access. Permits have been obtained which require some of the work to occur in the summer months. Easements for the proposed work are currently being obtained with the goal of going to construction in 2021.
Rationale
This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Waste Water 5 - 155
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:3
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 2 208 3,000 1,960 ‐ ‐ ‐ ‐ ‐ 5,170
Project Management ‐ 40 40 40 40 40 40 40 40 320
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ 110 ‐ ‐ ‐ ‐ ‐ ‐ 110
Construction ‐ ‐ ‐ ‐ 1,960 1,960 1,960 1,960 1,960 9,800
Total Expenditures 2 248 3,150 2,000 2,000 2,000 2,000 2,000 2,000 15,400
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Wastewater Collection Fees 2 248 3,150 2,000 2,000 2,000 2,000 2,000 2,000 15,400
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 2 248 3,150 2,000 2,000 2,000 2,000 2,000 2,000 15,400
Project Funding Status:
Secured 2 248 3,150 2,000 ‐ ‐ ‐ ‐ ‐ 5,400 Anticipated*‐ ‐ ‐ ‐ 2,000 2,000 2,000 2,000 2,000 10,000
Total Project Funding 2 248 3,150 2,000 2,000 2,000 2,000 2,000 2,000 15,400
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
ESTIMATED
ESTIMATED
TOTAL
WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
The Kennydale Lakeline Sewer consists of over 5,200 linear feet of 8‐inch sewer main serving 55 homes with 31 laterals, a flush station at its south end, and Lake Washington No. 2 Lift Station at its north end. An analysis
of the lakeline was completed 2018, which indicated the main is near the end of it's useful life. Several options were presented to improve the functioning of the sewer including replacement of the lake line and individual
grinder pumps for each house. We are currently working with a consultant and property owners to select the best alternative and proceed with preliminary design.
Rationale
Due to the aging Kennydale Lakeline Sewer System the sewer needs to be upgraded. This project supports the city's goals of promoting public safety and quality of life.
Kennydale Lakeline Sewer Upgrade
Maintenance and Preservation
Previously Approved
Description and Scope
Capital Investment Program ‐ Waste Water 5 - 156
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:4
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 842 150 150 ‐ ‐ ‐ ‐ ‐ ‐ 1,142
Project Management ‐ 20 20 ‐ ‐ ‐ ‐ ‐ ‐ 40
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ 35 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 35
Construction ‐ 272 1,112 ‐ ‐ ‐ ‐ ‐ ‐ 1,384
Total Expenditures 842 477 1,282 ‐ ‐ ‐ ‐ ‐ ‐ 2,601
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Wastewater Collection Fees 842 477 1,282 ‐ ‐ ‐ ‐ ‐ ‐ 2,601
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 842 477 1,282 ‐ ‐ ‐ ‐ ‐ ‐ 2,601
Project Funding Status:
Secured 842 477 1,282 ‐ ‐ ‐ ‐ ‐ ‐ 2,601 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 842 477 1,282 ‐ ‐ ‐ ‐ ‐ ‐ 2,601
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Lift Station Rehabilitation
Maintenance and Preservation
Previously Approved
The Wastewater Utility currently operates 20 lift stations throughout the city. Rehabilitation of a lift station often includes replacement of pumps, improving telemetry, updating controls, improving safety and ensuring a
redundant power supply is available. Seven of the lift stations were rehabilitated in the 2019 ‐ 2020 CIP as part of Phase 1a. Phases 1b and 2 will rehabilitate 11 additional lift stations throughout the city. Design of the
remaining 11 sites has started with construction expected in 2021.
Rationale
The individual lift stations will be chosen based on the prioritized need to rehabilitate the lift stations. This project supports the city’s goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Waste Water 5 - 157
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:5
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 775 150 150 ‐ ‐ ‐ ‐ ‐ ‐ 1,075
Project Management ‐ 20 20 ‐ ‐ ‐ ‐ ‐ ‐ 40
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 1,551 ‐ ‐ ‐ ‐ ‐ ‐ 1,551
Total Expenditures 775 170 1,721 ‐ ‐ ‐ ‐ ‐ ‐ 2,666
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Wastewater Collection Fees 775 170 1,721 ‐ ‐ ‐ ‐ ‐ ‐ 2,666
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 775 170 1,721 ‐ ‐ ‐ ‐ ‐ ‐ 2,666
Project Funding Status:
Secured 775 170 1,721 ‐ ‐ ‐ ‐ ‐ ‐ 2,666 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 775 170 1,721 ‐ ‐ ‐ ‐ ‐ ‐ 2,666
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Forcemain Rehab‐Replacement
Maintenance and Preservation
Previously Approved
The Wastewater Utility currently operates 5.2 miles of force mains associated with its 20 lift stations throughout the city. As the city rehabilitates lift stations, the accompanying force mains are also upgraded for ease of
maintenance and longevity of the system. Upgrades often include the addition of an access ports to allow for easier maintenance and repairs to the force main itself when necessary. Design of the remaining 11 lift
stations along with their respective force mains has started with construction expected in 2021.
Rationale
This program will replace/rehabilitate the force mains identified in 2016, starting with those in the highest need first. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Waste Water 5 - 158
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:6
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 147 ‐ 210 200 200 200 200 200 ‐ 1,357
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 840 1,800 1,800 1,800 1,800 1,800 ‐ 9,840
Total Expenditures 147 ‐ 1,050 2,000 2,000 2,000 2,000 2,000 ‐ 11,197
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Wastewater Collection Fees 147 ‐ 1,050 2,000 2,000 2,000 2,000 2,000 ‐ 11,197
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 147 ‐ 1,050 2,000 2,000 2,000 2,000 2,000 ‐ 11,197
Project Funding Status:
Secured 147 ‐ 1,050 2,000 ‐ ‐ ‐ ‐ ‐ 3,197 Anticipated*‐ ‐ ‐ ‐ 2,000 2,000 2,000 2,000 ‐ 8,000
Total Project Funding 147 ‐ 1,050 2,000 2,000 2,000 2,000 2,000 ‐ 11,197
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Sanitary Sewer Rehab/Replacement
Maintenance and Preservation
New Request
This project includes development of standard plans and specifications associated with trenchless technologies. The new standards will be used to rehabilitate sewer mains on our next project in the old war housing and
Presidents Park neighborhoods. These neighborhoods were selected based on Operations and Maintenance inspection of the sewer mains using CCTV. The CCTV program will be used to identify future projects. The
preferred rehabilitation method is cured in place pipe (CIPP). This method uses a fabric liner impregnated with a resin that cures hard when heated. If the repair is too extensive for CIPP, the sewer main is excavated and replaced with a new main.
Rationale
The individual projects will be identified based on the need to either repair, rehabilitate or replace the sewer mains. The projects selected will be in support of the city’s goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Waste Water 5 - 159
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:7
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 274 ‐ 20 20 20 20 20 20 ‐ 394
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 255 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 255 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 602 185 180 180 180 180 180 180 ‐ 1,867
Total Expenditures 1,131 185 200 200 200 200 200 200 ‐ 2,516
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 23 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 23 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Wastewater Collection Fees 1,107 185 200 200 200 200 200 200 ‐ 2,492
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 1,131 185 200 200 200 200 200 200 ‐ 2,516
Project Funding Status:
Secured 1,131 185 200 200 ‐ ‐ ‐ ‐ ‐ 1,716 Anticipated*‐ ‐ ‐ ‐ 200 200 200 200 ‐ 800
Total Project Funding 1,131 185 200 200 200 200 200 200 ‐ 2,516
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Miscellaneous/Emergency Projects
Maintenance and Preservation
Previously Approved
Funds to allow the Wastewater Utility the ability to address small or emergency projects that are not anticipated as part of the budget process. Past examples include repair of a collapsed sewer main and replacement of
failed lift station pumps.
Rationale
These miscellaneous and emergency projects will be identified as the need arises. The projects selected will be in support of the city’s goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Waste Water 5 - 160
2021‐2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:8
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 3 1 773 ‐ ‐ ‐ ‐ ‐ ‐ 777
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance 301 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 301 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 111 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 111
Total Expenditures 414 1 773 ‐ ‐ ‐ ‐ ‐ ‐ 1,188
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Wastewater Collection Fees 414 1 773 ‐ ‐ ‐ ‐ ‐ ‐ 1,188
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 414 1 773 ‐ ‐ ‐ ‐ ‐ ‐ 1,188
Project Funding Status:
Secured 414 1 773 ‐ ‐ ‐ ‐ ‐ ‐ 1,188 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 414 1 773 ‐ ‐ ‐ ‐ ‐ ‐ 1,188
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
WASTEWATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Wastewater Operations Master Plan
Regulatory
Previously Approved
The Wastewater Operations Master Plan (OMP) is a continuation of the Long Range Wastewater Master Plan. There are two primary purposes of the OMP; 1) to document current procedures and programs into an O&M
manual, review existing programs for effectiveness and compliance with potential future regulatory requirements; and 2) analyze and recommend program improvements in accordance with the city’s long‐term goals and
objectives, and assist with the development of an improvement implementation strategy.
Rationale
This plan supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Waste Water 5 - 161
2021 – 2022 Preliminary Budget City of Renton, Washington
This page is intentionally left blank
5 - 162
2021/2022 Preliminary Budget City of Renton, Washington
Projects Priority Type*
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Expenditures
Expenditures:Monroe Ave NE & NE 2nd St Infiltration System Improvements 1 ED 25 225 650 5,450 ‐ ‐ ‐ ‐ ‐ 6,350 Downtown Storm System Improvements 2 ED 886 750 3,050 2,230 ‐ ‐ ‐ ‐ ‐ 6,917
Madsen Creek Improvement Project 3 M, SP 475 140 450 156 ‐ ‐ ‐ ‐ ‐ 1,221 Jefferson Ave NE Green Connections Project 4 D 314 415 1,777 ‐ ‐ ‐ ‐ ‐ ‐ 2,506 Cedar River Gravel Removal (Maintenance Dredge) Project 5 M, SP 10,564 1,000 1,000 902 ‐ 500 500 500 ‐ 14,966 Cedar River 205 Project Levee Recertification Project 6 R 822 370 320 2,570 1,020 580 70 70 ‐ 5,822 Heather Downs Detention Pond Retrofit 7 M, SP 137 208 800 ‐ ‐ ‐ ‐ ‐ ‐ 1,145
Stormwater Facility Retrofit Study 8 P ‐ 75 225 ‐ ‐ ‐ ‐ ‐ ‐ 300
Burnett Ave S and Williams Ave S Water Quality Retrofit Project 9D 2 30 225 213 ‐ ‐ ‐ ‐ ‐ 470 SE 172nd St and 125th Ave N Storm System Improvement Project 10 D 207 233 20 ‐ ‐ 1,500 1,500 ‐ ‐ 3,460 SW 23rd Street Drainage and Fish Passage Improvements 11 M, SP ‐ ‐ 350 250 150 20 510 500 ‐ 1,780 Maplewood Creek Sedimentation Facility Maintenance 12 M, SP 553 95 95 95 95 100 100 100 ‐ 1,233 Madsen Creek Sedimentation Cleaning 13 M, SP 377 84 75 75 75 80 80 80 ‐ 926
Rainier Ave and Oakesdale Ave Pump Station Upgrades 14 M, SP 125 80 142 375 ‐ ‐ ‐ ‐ ‐ 723 Springbrook Creek Wetland and Habitat Mitigation Bank 15 D 762 70 40 50 ‐ ‐ ‐ ‐ ‐ 922 Stormwater Facility Fencing Project 16 M, SP 485 5 140 140 100 100 100 100 ‐ 1,170 Small Drainage Projects Program 17 M, SP 2,024 100 584 200 400 400 400 400 ‐ 4,508 Surface Water Utility GIS 18 R 928 125 110 110 115 115 115 115 ‐ 1,734
Talbot Hill Area Mosquito Abatement Program 19 R 532 90 85 85 85 90 90 90 ‐ 1,147
CMP Storm System Replacement Program 20 ED 10 10 210 370 ‐ ‐ ‐ ‐ ‐ 600 Hardie Ave SW‐SW 7th St Storm System Improvements 21 ED 7,471 2 ‐ 450 1,150 135 ‐ ‐ ‐ 9,208 NE Sunset Blvd & Union Ave NE Storm System Improvements 22 ED ‐ ‐ ‐ ‐ ‐ 350 250 1,650 ‐ 2,250 SW 43rd Street/Lind Ave SW Storm System Improvements 23 ED ‐ ‐ ‐ ‐ ‐ 300 500 3,200 ‐ 4,000 East Valley Road Storm System Improvements 24 ED ‐ ‐ ‐ ‐ ‐ ‐ 400 150 ‐ 550
Surface Water Utility System Plan 25 R 298 172 ‐ ‐ ‐ ‐ 120 ‐ ‐ 590
Ginger Creek/Cascade Park Basin Plan 26 P ‐ ‐ ‐ ‐ ‐ 350 ‐ ‐ ‐ 350 Cedar River Flood Risk Reduction Feasibility Study 27 P ‐ 15 210 210 65 ‐ ‐ ‐ ‐ 500 WSDOT Limited Access ROW Runoff Impact Mitigation Program 28 R ‐ 96 96 96 ‐ ‐ ‐ ‐ ‐ 289 Miscellaneous/Emergency Storm Projects 29 M, SP 177 50 50 50 50 50 50 50 ‐ 527
Total Expenditures 27,176 4,440 10,705 14,077 3,305 4,670 4,785 7,005 ‐ 76,163
*Project Types: A = Acquisition, C = Cross Category, D = Development, M = Maintenance, P = Planning, R = Regulatory, ED = Correcting Existing Deficiencies; SP = System Preservation; N = New Facilities to Accommodate Growth
Projects
Actual
through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:
Grants/Contributions 12,124 2,105 4,127 3,946 1,085 1,080 570 570 ‐ 25,606
System Development Charges 177 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 177 Surfacewater Collection Fees 14,875 2,335 6,578 10,131 2,220 3,590 4,215 6,435 ‐ 50,378
Total Resources 27,176 4,440 10,705 14,077 3,305 4,670 4,785 7,005 ‐ 76,161
Project Funding Status:
Secured 27,176 4,440 10,705 14,077 1,085 580 70 70 ‐ 58,203 Anticipated**‐ ‐ ‐ ‐ 2,220 4,090 4,715 6,935 ‐ 17,960
Total Project Funding 27,176 4,440 10,705 14,077 3,305 4,670 4,785 7,005 ‐ 76,163
**Expenditures utilizing anticipated funding are not included in the adopted budget.
Reconciliation to Adopted Budget:
Project Funding Secured 58,203 Appropriations To‐Date 49,111
Additional Appropriations Needed 9,092
Additional Appropriations:2021 Adopted Budget 1,326 2022 Adopted Budget 7,766
Total Additional Appropriations 9,092
SUMMARY BY COUNCIL PRIORITY
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 163
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:1
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 25 200 600 400 ‐ ‐ ‐ ‐ ‐ 1,225
Project Management ‐ 25 50 50 ‐ ‐ ‐ ‐ ‐ 125
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ 5,000 ‐ ‐ ‐ ‐ ‐ 5,000
Total Expenditures 25 225 650 5,450 ‐ ‐ ‐ ‐ ‐ 6,350
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 17 108 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 125 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 8 117 650 5,450 ‐ ‐ ‐ ‐ ‐ 6,225
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 25 225 650 5,450 ‐ ‐ ‐ ‐ ‐ 6,350
Project Funding Status:
Secured 25 225 650 5,450 ‐ ‐ ‐ ‐ ‐ 6,350 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 25 225 650 5,450 ‐ ‐ ‐ ‐ ‐ 6,350
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The project includes the design and construction of an additional infiltration system to provide increased drainage capacity to a 245‐acre basin in the Renton Highlands. This basin does not have an adequate connection to
a downstream conveyance system or waterbody and solely relied on infiltration through perforated pipes near the city's Maintenance Shops prior to the construction of temporary overflow outfalls to the gravel pit at 301
Monroe Ave N owned by Segale Properties. The city has a temporary easement, last renewed in 2018, to discharge stormwater to the Segale gravel pit through two overflow pipes installed in 1996 and 2007. The city anticipates that the easement agreement will be terminated in the near future as Segale is in the process of filling the pit, to redevelop the property to multi‐family dwellings or mixed use commercial. The city is in the
process of evaluating alternatives for a permanent drainage solution that replaces the temporary overflow pipes, and is identifying grant opportunities to help fund this project. Planning level efforts will conclude in 2020,
and design efforts will start in 2021. Construction will need to be completed prior to the filling of the site.
Rationale
The project will help protect businesses and residential areas from flooding with a permanent solution in lieu of a temporary easement granted to the city by a business owner. This project supports the city's goal of
promoting public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Monroe Ave NE & NE 2nd St Infiltration System Improvements
Correcting Existing Deficiencies
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 164
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:2
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 886 500 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,386
Project Management ‐ 50 50 50 ‐ ‐ ‐ ‐ ‐ 150
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ 200 3,000 2,180 ‐ ‐ ‐ ‐ ‐ 5,380
Total Expenditures 886 750 3,050 2,230 ‐ ‐ ‐ ‐ ‐ 6,917
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 886 750 3,050 2,230 ‐ ‐ ‐ ‐ ‐ 6,917
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 886 750 3,050 2,230 ‐ ‐ ‐ ‐ ‐ 6,917
Project Funding Status:
Secured 886 750 3,050 2,230 ‐ ‐ ‐ ‐ ‐ 6,917 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 886 750 3,050 2,230 ‐ ‐ ‐ ‐ ‐ 6,917
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Downtown Storm System Improvements
Correcting Existing Deficiencies
Previously Approved
Downtown Storm System Improvements consist of replacing undersized and aging stormwater pipes along S 2nd St, S 3rd St and their cross streets between Rainier Ave S and Mills Ave S. These improvements are part of
the Downtown Utilities Improvement Project managed by the Utilities Division and the Wells Ave S and Williams Ave S conversion project managed by the Transportation Division. These utility improvements are needed to
support re‐development and new development in the downtown core and will provide better service for existing and future development. These projects are the first steps to support coordinated efforts by the city to improve intersections, add signals, and convert S 2nd St and S 3rd St to two‐way operations, as guided by the 2018 Downtown Civic Core Vision and Action Plan. Construction of these utility improvements started in 2020
and is expected to continue through spring 2022.
Rationale
This project replaced undersized and aging drainage systems in the Downtown core in support of the City's 2018 Civic Core Vision and Action Plan and future transportation improvements. This project supports the city's
goals of economic development, public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 165
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:3
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 475 120 30 141 ‐ ‐ ‐ ‐ ‐ 766
Project Management ‐ 20 20 15 ‐ ‐ ‐ ‐ ‐ 55
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 400 ‐ ‐ ‐ ‐ ‐ ‐ 400
Total Expenditures 475 140 450 156 ‐ ‐ ‐ ‐ ‐ 1,221
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 361 140 450 156 ‐ ‐ ‐ ‐ ‐ 1,107 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 114 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 114
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 475 140 450 156 ‐ ‐ ‐ ‐ ‐ 1,221
Project Funding Status:
Secured 475 140 450 156 ‐ ‐ ‐ ‐ ‐ 1,221 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 475 140 450 156 ‐ ‐ ‐ ‐ ‐ 1,221
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This project will address flooding problems associated with Madsen Creek, where it crosses SR‐169 and discharges to the Cedar River. Flooding has occurred along SR‐169 near Wonderland Estates Manufactured Home
Park, along 149th Avenue SE and in Ron Regis Park. The King County Flood Control District awarded the city a $472,000 flood reduction grant for hydrologic and hydraulic analysis, surveying, environmental analysis and
preliminary design to solve the flooding problems. The planning level effort was completed in March 2020. The design and construction of alternative solution elements identified in the planning effort will be funded through a Capital Improvement Plan grant from the District in the amount of $615,000.
Rationale
This project will construct near‐term and long‐term improvements to reduce the risk of flooding from Madsen Creek onto adjacent properties. This project supports the city's goal of promoting public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Madsen Creek Improvement Project
Maintenance and Preservation
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 166
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:4
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 314 100 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 414
Project Management ‐ 15 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 15
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ 300 1,777 ‐ ‐ ‐ ‐ ‐ ‐ 2,077
Total Expenditures 314 415 1,777 ‐ ‐ ‐ ‐ ‐ ‐ 2,506
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 298 182 1,777 ‐ ‐ ‐ ‐ ‐ ‐ 2,258 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 16 233 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 249
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 314 415 1,777 ‐ ‐ ‐ ‐ ‐ ‐ 2,506
Project Funding Status:
Secured 314 415 1,777 ‐ ‐ ‐ ‐ ‐ ‐ 2,506 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 314 415 1,777 ‐ ‐ ‐ ‐ ‐ ‐ 2,506
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This project will design flow reduction and stormwater quality treatment facilities for approximately 1,300 linear feet of roadway to include bio retention facilities, a storm conveyance system and permeable concrete
sidewalks on Jefferson Avenue NE (between NE 16th Street and NE 12th Street) and on NE 16th Street (between Jefferson Avenue NE and Harrington Ave NE) in the Sunset Area community along the existing roadway
where most feasible. The project is partially funded by an Ecology Stormwater Financial Assistance Program grant of $2,075,095 that was awarded in 2018. Project design and permitting is anticipated to be completed in 2020 with construction in 2021.
Rationale
This project was identified in the Sunset Area Surface Water Master Plan that was developed and approved as part of the Sunset Community Investment Strategy and Planned Action EIS. This project supports the city's
goals of economic development, public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Jefferson Ave NE Green Connections Project
Development
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 167
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:5
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ 480 480 480 ‐ 1,440
Project Management ‐ ‐ ‐ ‐ ‐ 20 20 20 ‐ 60
Major Maintenance 10,564 1,000 1,000 902 ‐ ‐ ‐ ‐ ‐ 13,466 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 10,564 1,000 1,000 902 ‐ 500 500 500 ‐ 14,966
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 10,564 1,000 1,000 902 ‐ 500 500 500 ‐ 14,966 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 10,564 1,000 1,000 902 ‐ 500 500 500 ‐ 14,966
Project Funding Status:
Secured 10,564 1,000 1,000 902 ‐ ‐ ‐ ‐ ‐ 13,466 Anticipated*‐ ‐ ‐ ‐ ‐ 500 500 500 ‐ 1,500
Total Project Funding 10,564 1,000 1,000 902 ‐ 500 500 500 ‐ 14,966
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
TOTAL
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Periodic maintenance dredging along the lower 1.23 mile of the Cedar River is necessary due to ongoing sediment transport and deposition. This project is a critical component of the Lower Cedar River Section 205 Flood
Hazard Reduction project which consisted of dredging and adding levees and floodwalls to the lower 1.23 miles of the river. This project was completed in 1998 in cooperation with the US Army Corps of Engineers (USACE).
Gravel removal from the lower 1.23 miles of the Cedar River maintains the 100‐year level of protection offered by the levees and floodwalls and is a requirement of the Project Cooperation Agreement with the USACE. The project is entirely funded by the King County Flood Control District. The project design, permitting and construction of the second dredging project was completed in 2016. The city is currently in the post‐construction
mitigation phase through 2026, during which the city is required to maintain mitigation plantings, monitor habitat parameters and fish counts in the Elliot and Royal Hills habitat channels, and submit yearly reports to the
permitting agencies. The planning and design effort for the next maintenance dredge is anticipated to begin in 2024.
Rationale
This will provide funding for completing permitting, design, construction and mitigation work associated with the project and performing long‐term monitoring, maintenance and reporting as required by the project
permits. This project supports the city's goals of economic development, public safety and quality of life.
Cedar River Gravel Removal (Maintenance Dredge) Project
Maintenance and Preservation
Previously Approved
Description and Scope
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 168
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:6
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 822 350 300 50 ‐ ‐ ‐ ‐ ‐ 1,522
Project Management ‐ 20 20 20 20 20 20 20 ‐ 140
Major Maintenance ‐ ‐ ‐ ‐ ‐ 50 50 50 ‐ 150 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ 2,500 1,000 510 ‐ ‐ ‐ 4,010
Total Expenditures 822 370 320 2,570 1,020 580 70 70 ‐ 5,822
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 343 370 320 2,570 1,020 580 70 70 ‐ 5,343 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 479 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 479
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 822 370 320 2,570 1,020 580 70 70 ‐ 5,822
Project Funding Status:
Secured 822 370 320 2,570 1,020 580 70 70 ‐ 5,822 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 822 370 320 2,570 1,020 580 70 70 ‐ 5,822
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
ESTIMATED
ESTIMATED
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Cedar River 205 Project Levee Recertification Project
Regulatory
Previously Approved
The U.S. Army Corps of Engineers originally certified the levees and floodwalls that were constructed as part of the Lower Cedar River Flood Hazard Reduction project in 1998. The U.S. Army Corps of Engineers has since
determined that their certification is no longer valid and that the city of Renton would need to re‐certify the levees and floodwalls, if they are to be accredited by FEMA as providing 100‐year flood protection for floodplain
mapping purposes. If the levees are not re‐certified and accredited by FEMA, the properties behind the levees would have to be remapped to show they are in a floodplain. Phase 1 of the project was completed in 2016. Phase 2 of the project to complete the re‐certification documentation was completed in 2018. Phase 3 of the project is currently in progress and it consists of the permitting, design and construction of the levee
improvements required for accreditation. Phase 3 is expected to be completed in 2023. Phase 4 will consist of any post‐construction mitigation measures and monitoring effort, if any is imposed onto the project.
Rationale
The city has to prepare the re‐certification information for approval by FEMA in order to have the levees and floodwall re‐certified and accredited by FEMA. This project is in coordination with the city's goals of economic
development, public safety and quality of life.
TOTAL
Description and Scope
Capital Investment Program ‐ Surface Water 5 - 169
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:7
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 137 175 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 312
Project Management ‐ 33 50 ‐ ‐ ‐ ‐ ‐ ‐ 83
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ 750 ‐ ‐ ‐ ‐ ‐ ‐ 750
Total Expenditures 137 208 800 ‐ ‐ ‐ ‐ ‐ ‐ 1,145
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 78 15 70 ‐ ‐ ‐ ‐ ‐ ‐ 163 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 59 193 730 ‐ ‐ ‐ ‐ ‐ ‐ 982
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 137 208 800 ‐ ‐ ‐ ‐ ‐ ‐ 1,145
Project Funding Status:
Secured 137 208 800 ‐ ‐ ‐ ‐ ‐ ‐ 1,145 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 137 208 800 ‐ ‐ ‐ ‐ ‐ ‐ 1,145
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The project will retrofit a city‐owned detention facility in the Heather Downs residential development to be a combined detention and wet pond stormwater facility. This stormwater facility will provide flow control and
additional basic water quality treatment to remove pollutants from streets and other pollution generating surfaces within a 30‐acre drainage basin. The existing detention pond is located at the intersection of Union
Avenue SE and SE 4th Street and is in the Maplewood Creek sub basin to the Cedar River. The design of this project was partially funded by an Ecology Stormwater Financial Assistance Program grant in the amount of $93,000 that was awarded in 2018. Construction will be partially funded by a King County Waterworks Grant that was awarded in 2017 in the amount of $70,000 and another Ecology Stormwater Financial Assistance
Program grant in the amount of $230,250. Project planning and design was completed in 2020 with construction planned for 2021.
Rationale
The improved facility will remove stormwater runoff pollutants to improve water quality in the Maplewood Creek Sub basin and the Cedar River. This project supports the city's goals of promoting public safety and quality
of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Heather Downs Detention Pond Retrofit
Maintenance and Preservation
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 170
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:8
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ 50 200 ‐ ‐ ‐ ‐ ‐ ‐ 250
Project Management ‐ 25 25 ‐ ‐ ‐ ‐ ‐ ‐ 50
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ 75 225 ‐ ‐ ‐ ‐ ‐ ‐ 300
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ 38 150 ‐ ‐ ‐ ‐ ‐ ‐ 188 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees ‐ 38 75 ‐ ‐ ‐ ‐ ‐ ‐ 113
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 75 225 ‐ ‐ ‐ ‐ ‐ ‐ 300
Project Funding Status:
Secured ‐ 75 225 ‐ ‐ ‐ ‐ ‐ ‐ 300 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ 75 225 ‐ ‐ ‐ ‐ ‐ ‐ 300
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Stormwater Facility Retrofit Study
Planning
Previously Approved
The purpose of the Stormwater Facility Retrofit Study is to identify, rank, and prioritize water quality treatment retrofits that can be feasibly made to the city’s publicly maintained flow control facilities, mainly detention
ponds, vaults and tanks. These facilities reduce peak stormwater flows from impervious surfaces, but do not provide any runoff treatment in areas that were developed prior to implementation of water quality standards.
This study will assess all forty nine (49) flow control facilities with no treatment component that discharge untreated runoff to the nearest waterbody. The identified projects will then be evaluated, ranked and prioritized as potential projects for future water quality treatment grants. Conceptual designs and cost estimates of the three highest‐priority potential future projects will be developed for incorporation into the Surface Water
Utility’s Capital Improvement Plan. This study will begin in 2020 and conclude in 2021.
Rationale
This study identifies opportunities to retrofit flow control facilities with water quality treatment and hence, it ultimately aims to protect and restore water quality in the waters of the state by reducing the discharge of
untreated stormwater from existing infrastructure and development. It supports the city's goal of increasing quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 171
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:9
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 2 20 215 203 ‐ ‐ ‐ ‐ ‐ 440
Project Management ‐ 10 10 10 ‐ ‐ ‐ ‐ ‐ 30
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 2 30 225 213 ‐ ‐ ‐ ‐ ‐ 470
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ 20 150 108 ‐ ‐ ‐ ‐ ‐ 278 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 2 10 75 105 ‐ ‐ ‐ ‐ ‐ 192
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 2 30 225 213 ‐ ‐ ‐ ‐ ‐ 470
Project Funding Status:
Secured 2 30 225 213 ‐ ‐ ‐ ‐ ‐ 470 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 2 30 225 213 ‐ ‐ ‐ ‐ ‐ 470
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Burnett Ave S and Williams Ave S Water Quality Retrofit Project
Development
Previoulsy Approved
This projects adds drainage improvements and water quality retrofits to the Burnett Avenue S and Williams Avenue S storm water system which discharges directly to the Cedar River, a waterbody listed on the
Department of Ecology's 303(d) under multiple categories of impairment. The need, to upsize the storm system, was identified through the Downtown Utilities Improvement Project. Water quality retrofits, paired with the
drainage improvements, will provide treatment to runoff from Williams Ave S and Burnett Ave S north of S 2nd St. The design of the water quality treatment retrofits in this project is funded by a Department of Ecology Storm Water Quality Grant. The design effort will start in 2020 and will be completed by January 2023. Subsequently, a construction grant application will be submitted to Ecology in fall 2023 and construction will take
place in 2025 if the grant application is successful.
Rationale
This project includes drainage improvements to reduce the risk of flooding and water quality retrofits to treat stormwater runoff along Williams Ave S and Wells Ave S. It supports the city's goal of protecting public safety
and increasing quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 172
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:10
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 207 213 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 420
Project Management ‐ 20 20 ‐ ‐ ‐ ‐ ‐ ‐ 40
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ 1,500 1,500 ‐ ‐ 3,000
Total Expenditures 207 233 20 ‐ ‐ 1,500 1,500 ‐ ‐ 3,460
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 141 217 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 359 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 66 15 20 ‐ ‐ 1,500 1,500 ‐ ‐ 3,101
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 207 233 20 ‐ ‐ 1,500 1,500 ‐ ‐ 3,460
Project Funding Status:
Secured 207 233 20 ‐ ‐ ‐ ‐ ‐ ‐ 460 Anticipated*‐ ‐ ‐ ‐ ‐ 1,500 1,500 ‐ ‐ 3,000
Total Project Funding 207 233 20 ‐ ‐ 1,500 1,500 ‐ ‐ 3,460
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The project includes the design and permitting of storm system improvements that include green stormwater infrastructure improvements of bio retention facilities and pervious sidewalks to provide water quality
treatment for the street stormwater runoff and flow reduction. The project is funded by a $250,000 Ecology Stormwater Financial Assistance Program grant that was awarded in 2018. The project design started in 2019
and will be completed in 2020. The city is applying for another Ecology grant to fund the construction of the proposed improvements in fall 2020. Construction will be planned once the city is notified of the outcome of the construction grant application, but it is estimated to take place in 2024.
Rationale
The project will address a street flooding problem and improve storm system conveyance capacity of existing drainage systems along 125th Avenue SE, 124th Avenue SE, 123rd Avenue SE, 122nd Avenue SE, and SE 172nd
Street. This project supports the city's goals of economic development, public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
SE 172nd St and 125th Ave N Storm System Improvement Project
Development
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 173
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:11
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ 300 200 100 ‐ ‐ ‐ ‐ 600
Project Management ‐ ‐ 50 50 50 20 10 ‐ ‐ 180
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ 500 500 ‐ 1,000
Total Expenditures ‐ ‐ 350 250 150 20 510 500 ‐ 1,780
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees ‐ ‐ 350 250 150 20 510 500 ‐ 1,780
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ 350 250 150 20 510 500 ‐ 1,780
Project Funding Status:
Secured ‐ ‐ 350 250 ‐ ‐ ‐ ‐ ‐ 600 Anticipated*‐ ‐ ‐ ‐ 150 20 510 500 ‐ 1,180
Total Project Funding ‐ ‐ 350 250 150 20 510 500 ‐ 1,780
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
SW 23rd Street Drainage and Fish Passage Improvements
Maintenance and Preservatiion
New Request
Panther Creek flows into the SW 23rd St channel prior to connecting into Springbrook Creek. The hydraulic capacity of this channel is reduced due to vegetation growth and due to culverts set below the grade of the
channel at East Valley Road and Lind Ave SW. The invert elevations of the culverts create a submerged condition which impairs both flow and fish passage. Channel improvements are needed along with culvert
replacements to ensure adequate hydraulic connectivity along Panther Creek from SR‐167 to Springbrook Creek. Furthermore, WSDOT approached the City in 2020 with a proposal to connect Rolling Hills Creek to the Panther Creek channel at SW 23rd St, to meet their fish passage injunction obligation by 2030. Connecting Rolling Hills Creek into the SW 23rd St channel would require further upsizing of the culverts and further channel
improvements. The Utility will collaborate with WSDOT on this project. Planning and hydraulic modeling would be completed by 2023, and design would be completed by 2025, with construction to follow in 2026. The
funding programmed for the project is only the Utility's estimated share of the overall project cost.
Rationale
This project presents an opportunity to partner with WSDOT and share the cost of hydraulic and fish passage improvements to Panther Creek, which would benefit both the City and the State of Washington. It supports
the city's goals of protecting public safety and increasing quality of life, and it promotes interagency cooperation.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 174
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:12
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ 20 10 10 10 10 10 10 ‐ 80
Major Maintenance 553 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 553 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ 75 85 85 85 90 90 90 ‐ 600
Total Expenditures 553 95 95 95 95 100 100 100 ‐ 1,233
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 21 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 21 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 532 95 95 95 95 100 100 100 ‐ 1,212
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 553 95 95 95 95 100 100 100 ‐ 1,233
Project Funding Status:
Secured 553 95 95 95 ‐ ‐ ‐ ‐ ‐ 838 Anticipated*‐ ‐ ‐ ‐ 95 100 100 100 ‐ 395
Total Project Funding 553 95 95 95 95 100 100 100 ‐ 1,233
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The Maplewood Creek Sedimentation Facility is located on the Maplewood Golf Course and traps sediment that is transported downstream by Maplewood Creek. The facility prevents the sediment from being deposited
on the golf course during large storms and reduces flooding of the golf course and SR‐169. The funding is programmed for project management, permitting, and construction to routinely remove the accumulated
sediment from the facility. The facility was constructed in 1996 in conjunction with a fish passage channel across the Maplewood Golf Course to the Cedar River. A fish ladder was constructed as part of the facility to allow upstream fish passage. The accumulated sediment in the facility needs to be removed on a yearly basis, depending upon flood events and the rate of sediment accumulation in the facility.
Rationale
The sediment will be removed from the facility in the summer of 2020 and annually thereafter, as needed. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Maplewood Creek Sedimentation Facility Maintenance
Maintenance and Preservation
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 175
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:13
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ 10 10 10 10 10 10 10 ‐ 70
Major Maintenance 377 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 377 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ 74 65 65 65 70 70 70 ‐ 479
Total Expenditures 377 84 75 75 75 80 80 80 ‐ 926
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 377 84 75 75 75 80 80 80 ‐ 926
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 377 84 75 75 75 80 80 80 ‐ 926
Project Funding Status:
Secured 377 84 75 75 ‐ ‐ ‐ ‐ ‐ 611 Anticipated*‐ ‐ ‐ ‐ 75 80 80 80 ‐ 315
Total Project Funding 377 84 75 75 75 80 80 80 ‐ 926
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The Madsen Creek Sedimentation Facility was originally constructed by King County to control sediment resulting from erosion of steep slopes in the Madsen Creek ravine due to increased upstream stormwater runoff
from new development projects. The facility is located on the New Life Church property that was annexed into the city as part of the New Life‐Aqua Barn annexation (A‐07‐001) in June of 2008. Approximately 800 cubic
yards of sediment has to be removed from the facility annually to control the sediment that is being deposited from the upstream area into the facility in order to maintain its proper operation. The accumulated sediment in the facility needs to be removed on a yearly basis, depending upon flood events and the rate of sediment accumulation in the facility.
Rationale
The maintenance of the facility is planned to be completed in the summer of 2020 and annually thereafter, as needed. This project supports the city's goals of promoting public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Madsen Creek Sedimentation Cleaning
Maintenance and Preservation
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 176
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:14
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 125 65 127 ‐ ‐ ‐ ‐ ‐ ‐ 318
Project Management ‐ 15 15 25 ‐ ‐ ‐ ‐ ‐ 55
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ 350 ‐ ‐ ‐ ‐ ‐ 350
Total Expenditures 125 80 142 375 ‐ ‐ ‐ ‐ ‐ 723
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 125 80 142 375 ‐ ‐ ‐ ‐ ‐ 723
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 125 80 142 375 ‐ ‐ ‐ ‐ ‐ 723
Project Funding Status:
Secured 125 80 142 375 ‐ ‐ ‐ ‐ ‐ 723 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 125 80 142 375 ‐ ‐ ‐ ‐ ‐ 723
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This project consists of increasing the level of flood protection of the Rainier and Oakesdale pump stations through the addition of on‐site permanent emergency generators. The Rainier Ave pump station is 50‐years old
and was inherited from WSDOT but it serves a critical role of protecting Rainier Ave S from flooding along the sag point underneath the BNSF railroad crossing. Permanent emergency generators would increase the level of
protection from flooding along Rainier Ave N and Oaksdale Avenue during thunderstorm events or disasters that result in loss of power supply. This project started with site assessments and evaluation of alternatives to site the generators and provide new control panels. Site constraints at both pump stations will likely require the city to obtain permanent easements from adjacent properties. This phase is expected to be completed in
2020. The design of the improvements is expected to be completed in 2021, and construction is anticipated in 2022.
Rationale
This program provides us with funding to upgrade critical pump stations and reduce the risk of flooding on major city arterials in a disaster event or thunderstorm. This project supports the city's goals of promoting public
safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Rainier Ave and Oakesdale Ave Pump Station Upgrades
Maintenance and Preservation
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 177
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:15
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ 70 20 25 ‐ ‐ ‐ ‐ ‐ 115 Major Maintenance 308 ‐ 20 25 ‐ ‐ ‐ ‐ ‐ 353 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 454 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 454
Total Expenditures 762 70 40 50 ‐ ‐ ‐ ‐ ‐ 922
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ResourcesResources:
Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 22 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 22 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 739 70 40 50 ‐ ‐ ‐ ‐ ‐ 900
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 762 70 40 50 ‐ ‐ ‐ ‐ ‐ 922
Project Funding Status:Secured 762 70 40 50 ‐ ‐ ‐ ‐ ‐ 922 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 762 70 40 50 ‐ ‐ ‐ ‐ ‐ 922
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The project consisted of developing a wetland mitigation bank, in partnership with WSDOT, on approximately 130 total acres in the valley adjacent to Springbrook Creek. The wetland mitigation bank is an alternative to
onsite mitigation imposed onto private and public projects (city of Renton or WSDOT) for wetland impacts that require mitigation. The newly created wetlands and the enhanced existing wetlands accomplished by the
project increased flood storage, improves water quality and enhance fish and wildlife habitat associated with Springbrook Creek. A total of 43.61 wetland mitigation bank credits have been released to date out of the total of 45 credits possible. The city’s share of wetland credits in is 20.55 credits. Projects that have wetland impacts can purchase credits rather than constructing onsite mitigation. This will help streamline the local, state and
federal permitting process associated with filling wetlands, reduces project costs and allows private developers to develop more area on their property, if it contains wetlands. This will result in higher assess property
values and create more jobs, which will benefit the city overall financially. The project construction was completed in 2009 with a following 10‐year monitoring period to verify whether performance standards have been met to allow for the release of wetland mitigation credits. Funds programmed in the budget will be used for long term maintenance to meet and maintain performance metrics.
Rationale
This provides funding for the city's share of plant establishment and monitoring costs necessary to meet performance standards to allow the release of mitigation credits. This project supports the city's goals of economic
development and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Springbrook Creek Wetland and Habitat Mitigation Bank
Development
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 178
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:16
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ 5 10 10 10 10 10 10 ‐ 65
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 485 ‐ 130 130 90 90 90 90 ‐ 1,105
Total Expenditures 485 5 140 140 100 100 100 100 ‐ 1,170
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 485 5 140 140 100 100 100 100 ‐ 1,170
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 485 5 140 140 100 100 100 100 ‐ 1,170
Project Funding Status:
Secured 485 5 140 140 ‐ ‐ ‐ ‐ ‐ 770 Anticipated*‐ ‐ ‐ ‐ 100 100 100 100 ‐ 400
Total Project Funding 485 5 140 140 100 100 100 100 ‐ 1,170
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This project consists of constructing fences around existing stormwater detention/retention and water quality treatment facilities that the Surface Water Utility owns and maintains. Stormwater facilities that were
constructed with side slopes that were not steep (3:1 or flatter side slopes), were not required to have fences by previous surface water design standards. The city's surface water design standards have been updated to
require all future constructed stormwater facilities to be fenced. Many of the stormwater facilities that are not fenced were constructed in unincorporated King County and were previously owned and maintained by the county. When the city annexed these areas, the Surface Water Utility assumed ownership and maintenance of the facilities. A total of 23 stormwater facilities have been fenced since the start of this project. There are
currently 22 stormwater facilities that still need fencing and the City expects to complete this effort within six years. This number may increase due to annexations and as the Utility takes over maintenance of stormwater
facilities from homeowners associations as part of the stormwater facility transfer program.
Rationale
This project will provide funding to install fences over time on stormwater facilities to protect residents and to limit liability associated with these facilities being unfenced. This project supports the city's goal of promoting
public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Stormwater Facility Fencing Project
Maintenance and Preservation
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 179
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:17
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ 20 50 50 50 50 50 50 ‐ 320
Major Maintenance 1,589 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,589 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 436 80 534 150 350 350 350 350 ‐ 2,600
Total Expenditures 2,024 100 584 200 400 400 400 400 ‐ 4,508
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 2,024 100 584 200 400 400 400 400 ‐ 4,508
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 2,024 100 584 200 400 400 400 400 ‐ 4,508
Project Funding Status:
Secured 2,024 100 584 200 ‐ ‐ ‐ ‐ ‐ 2,908 Anticipated*‐ ‐ ‐ ‐ 400 400 400 400 ‐ 1,600
Total Project Funding 2,024 100 584 200 400 400 400 400 ‐ 4,508
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This project consists of designing and constructing solutions to local flooding problems, minor storm system maintenance, and replacements that are relatively simple to construct by the city’s maintenance crews or
contractors. The Surface Water Utility identifies these projects on an annual basis through problem identification, citizen complaints, and input from the maintenance section. In 2021, this program will fund the
replacement of culverts along Talbot Road S.
Rationale
To provide funding for small drainage projects that will replace failing corrugated metal pipes and other storm systems, as needed. The projects selected will be in support of the city’s goal of promoting public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Small Drainage Projects Program
Maintenance and Preservation
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 180
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:18
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management 928 125 110 110 115 115 115 115 ‐ 1,734
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 928 125 110 110 115 115 115 115 ‐ 1,734
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 928 125 110 110 115 115 115 115 ‐ 1,734
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 928 125 110 110 115 115 115 115 ‐ 1,734
Project Funding Status:
Secured 928 125 110 110 ‐ ‐ ‐ ‐ ‐ 1,274 Anticipated*‐ ‐ ‐ ‐ 115 115 115 115 ‐ 460
Total Project Funding 928 125 110 110 115 115 115 115 ‐ 1,734
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This annual program is to update our storm system inventory maps and database with new storm system infrastructure that is constructed or added by private development projects, public projects, and annexations. The
information is integrated into the city’s Geographic Information System (GIS). The GIS data is used to track maintenance and inspection of public and private stormwater management systems and facilities for operation
and maintenance purposes. The data is also used to update long‐range asset management programs. The updating and adding newly constructed storm systems to the Surface Water Utility GIS is a requirement of the NPDES Phase II Municipal Stormwater permit.
Rationale
This annual program provides funding to maintain an accurate inventory of the city’s storm systems for use by the Surface Water Utility for maintenance, planning and engineering functions, other city departments, and
the public. This program meets regulatory requirements and supports the city’s goals of economic development and public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Surface Water Utility GIS
Regulatory
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 181
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:19
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ 10 5 5 5 5 5 5 ‐ 40
Major Maintenance 532 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 532 Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ 80 80 80 80 85 85 85 ‐ 575
Total Expenditures 532 90 85 85 85 90 90 90 ‐ 1,147
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 532 90 85 85 85 90 90 90 ‐ 1,147
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 532 90 85 85 85 90 90 90 ‐ 1,147
Project Funding Status:
Secured 532 90 85 85 ‐ ‐ ‐ ‐ ‐ 792 Anticipated*‐ ‐ ‐ ‐ 85 90 90 90 ‐ 355
Total Project Funding 532 90 85 85 85 90 90 90 ‐ 1,147
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The program consists of annually treating upland areas around the Panther Creek Wetlands to control mosquitoes from the wetlands in response to citizen complaints in the Talbot Hill area. This program also funds the
annual treatment of city‐owned stormwater water quality/flow control facilities in response to the West Nile Virus. It also provides additional funding in the event of a West Nile Virus outbreak occurs and more treatments
are advised by the Department of Health.
Rationale
This program provides funding for mosquito abatement in the Talbot Hill area and helps to protect the city against a West Nile Virus outbreak. This program meets regulatory requirements and supports the city's goal of
promoting public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Talbot Hill Area Mosquito Abatement Program
Regulatory
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 182
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:20
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 10 ‐ 200 50 ‐ ‐ ‐ ‐ ‐ 260
Project Management ‐ 10 10 10 ‐ ‐ ‐ ‐ ‐ 30
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ 310 ‐ ‐ ‐ ‐ ‐ 310
Total Expenditures 10 10 210 370 ‐ ‐ ‐ ‐ ‐ 600
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 10 10 210 370 ‐ ‐ ‐ ‐ ‐ 600
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 10 10 210 370 ‐ ‐ ‐ ‐ ‐ 600
Project Funding Status:
Secured 10 10 210 370 ‐ ‐ ‐ ‐ ‐ 600 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding 10 10 210 370 ‐ ‐ ‐ ‐ ‐ 600
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
CMP Storm System Replacement Program
Correcting Existing Deficiencies
Previously Approved
This program consists of assessing the condition of all corrugated metal pipes (CMP) whose diameter is 18 inches or larger, located in high risk areas (i.e. under major roads). Minor deficiencies are typically repaired
through coordination with the surface water maintenance section, while replacement projects resulting from significant structural issues (e.g. deterioration of the pipe wall, pipe collapse) require the replacement or
rehabilitation of the pipe and may require hiring a contractor. This program was driven by a failure of a CMP along Rainier Ave S in 2018, which caused a major cavity to form underneath the road, and required an emergency repair project. This program is intended to address deficiencies in CMPs, which are more susceptible to deterioration than plastic and concrete pipes, before a catastrophic failure becomes imminent. The
Surface Water Utility is currently identifying deficiencies across its CMPs. Expenditures beyond 2023 will be estimated once the required pipe rehabilitation and replacement projects are determined and prioritized.
Rationale
This program repairs and replaces corrugated metal pipes showing signs of deterioration in high risk areas to avoid catastrophic failures and emergency repairs. This project supports the city's goal of protecting public
safety.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 183
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:21
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ 400 ‐ ‐ ‐ ‐ ‐ 400
Project Management ‐ 2 ‐ 50 50 25 ‐ ‐ ‐ 127
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 7,471 ‐ ‐ ‐ 1,100 110 ‐ ‐ ‐ 8,681
Total Expenditures 7,471 2 ‐ 450 1,150 135 ‐ ‐ ‐ 9,208
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions 278 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 278 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 7,193 2 ‐ 450 1,150 135 ‐ ‐ ‐ 8,930
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 7,471 2 ‐ 450 1,150 135 ‐ ‐ ‐ 9,208
Project Funding Status:
Secured 7,471 2 ‐ 450 ‐ ‐ ‐ ‐ ‐ 7,923 Anticipated*‐ ‐ ‐ ‐ 1,150 135 ‐ ‐ ‐ 1,285
Total Project Funding 7,471 2 ‐ 450 1,150 135 ‐ ‐ ‐ 9,208
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
The planning, design and permitting of the first two phases of the project, which included installing approximately 3,600 linear feet of new 60‐inch storm system in SW 7th Street between Lind Avenue NE and Naches
Avenue SW has been completed. The third phase of the project includes the replacement of approximately 700 linear feet of 36 inch to 48‐inch storm system, between Hardie Avenue SW to SW 7th Street, with a new 60‐
inch storm system. Phase 3 project design will start in 2022 and will carry the 30% design completed in 2012 to final design. Construction is planned for 2024.
Rationale
This project supports the city's goals of economic development, public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Hardie Ave SW‐SW 7th St Storm System Improvements
Correcting Existing Deficiencies
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 184
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:22
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ 300 200 ‐ ‐ 500
Project Management ‐ ‐ ‐ ‐ ‐ 50 50 50 ‐ 150
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ 1,600 ‐ 1,600
Total Expenditures ‐ ‐ ‐ ‐ ‐ 350 250 1,650 ‐ 2,250
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees ‐ ‐ ‐ ‐ ‐ 350 250 1,650 ‐ 2,250
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 350 250 1,650 ‐ 2,250
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ 350 250 1,650 ‐ 2,250
Total Project Funding ‐ ‐ ‐ ‐ ‐ 350 250 1,650 ‐ 2,250
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Sections of Honey Creek between Union Avenue NE and Duvall Avenue NE contains an old, closed pipe system that has insufficient capacity and is located in parking lots, under buildings, and across public right‐of‐ways.
Land use changes in the upstream basin area have increased surface water runoff and could cause flooding due to the lack of capacity in the piped sections. Due to the age of the piped section, the structural condition of
the storm system is unknown. This project will consist of developing an accurate base map of the storm system location; inspecting its structural condition; developing a basin hydrologic and hydraulic model to perform capacity analysis of the existing system; and developing conceptual design solutions. The selected conceptual design solution will be used for the final design, permitting, and construction of the storm system
improvements. The improved conveyance system will have sufficient capacity to convey future land use condition runoff and meet city capacity design standards to help prevent flooding and the structural failure of the
storm system.
Rationale
The project will help protect businesses, residential areas and important transportation corridors (SR‐900) from flooding. This project is in coordination with the city's goals of economic development and promoting public
safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
NE Sunset Blvd & Union Ave NE Storm System Improvements
Correcting Existing Deficiencies
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 185
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:23
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ 250 450 ‐ ‐ 700
Project Management ‐ ‐ ‐ ‐ ‐ 50 50 50 ‐ 150
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,150 ‐ 3,150
Total Expenditures ‐ ‐ ‐ ‐ ‐ 300 500 3,200 ‐ 4,000
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees ‐ ‐ ‐ ‐ ‐ 300 500 3,200 ‐ 4,000
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 300 500 3,200 ‐ 4,000
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ 300 500 3,200 ‐ 4,000
Total Project Funding ‐ ‐ ‐ ‐ ‐ 300 500 3,200 ‐ 4,000
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
SW 43rd Street/Lind Ave SW Storm System Improvements
Correcting Existing Deficiencies
Previously Approved
The project includes constructing approximately 3,500 feet of a new 84‐inch diameter storm system along Lind Avenue SW, from SW 43rd Street to SW 39th Street, and then along SW 39th Street from Lind Avenue to a
new outfall into Springbrook Creek. The estimated total project cost is $4 million. Project design and permitting is programmed to start in 2024 with construction planned for 2026.
Rationale
This project is in coordination with the city's goals of economic development, public safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 186
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:24
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ 350 100 ‐ 450
Project Management ‐ ‐ ‐ ‐ ‐ ‐ 50 50 ‐ 100
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ ‐ 400 150 ‐ 550
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ 400 150 ‐ 550
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ ‐ 400 150 ‐ 550
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ ‐ 400 150 ‐ 550
Total Project Funding ‐ ‐ ‐ ‐ ‐ ‐ 400 150 ‐ 550
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
East Valley Road Storm System Improvements
Correcting Existing Deficiencies
Previously Approved
The project includes replacing the existing storm system along the East Valley Road between SW 29th Street and SW 23rd Street with a new 48‐inch storm system. The new storm system will discharge into the SW 23rd
Street channel, which flows to Springbrook Creek. The project schedule and improvements may change depending upon the schedule and scope of improvements planned by WSDOT and the city as part of the SW 23rd
Street Drainage and Fish Passage Improvements.
Rationale
This project is in coordination with the city's goals of economic development and promoting public safety.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 187
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:25
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design 298 100 ‐ ‐ ‐ ‐ 120 ‐ ‐ 518
Project Management ‐ 72 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 72
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures 298 172 ‐ ‐ ‐ ‐ 120 ‐ ‐ 590
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees 298 172 ‐ ‐ ‐ ‐ 120 ‐ ‐ 590
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 298 172 ‐ ‐ ‐ ‐ 120 ‐ ‐ 590
Project Funding Status:
Secured 298 172 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 470 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ 120 ‐ ‐ 120
Total Project Funding 298 172 ‐ ‐ ‐ ‐ 120 ‐ ‐ 590
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Surface Water Utility System Plan
Regulatory
Previously Approved
The Surface Water Utility System Master Plan is a comprehensive management plan of the city’s natural and constructed surface water systems. The plan identifies current and future resource requirements, policies,
regulatory requirements, and design criteria associated with the management of surface water runoff within the city. The plan defines maintenance and operational programs along with future capital investment
programs needed to solve flooding, water quality, and fish habitat problems in response to existing problems, future growth, and regulatory requirements related to the NPDES Phase II Permit and the Endangered Species Act. A draft Surface Water Utility System Master Plan is being prepared for review and approval by Renton City Council in 2020. Future funding is anticipated in 2025 to update this plan after the issuance of the 2024
National Pollutant Discharge Elimination System (NPDES) permit which is expected to create a new set of challenges for the Surface Water Utility.
Rationale
This plan update is a regulatory requirement as well as a guiding document for the Surface Water Utility . This plan supports the city's goals of economic development, public safety, and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 188
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:26
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ 300 ‐ ‐ ‐ 300
Project Management ‐ ‐ ‐ ‐ ‐ 50 ‐ ‐ ‐ 50
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ ‐ ‐ ‐ ‐ 350 ‐ ‐ ‐ 350
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees ‐ ‐ ‐ ‐ ‐ 350 ‐ ‐ ‐ 350
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ ‐ ‐ ‐ ‐ 350 ‐ ‐ ‐ 350
Project Funding Status:
Secured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Anticipated*‐ ‐ ‐ ‐ ‐ 350 ‐ ‐ ‐ 350
Total Project Funding ‐ ‐ ‐ ‐ ‐ 350 ‐ ‐ ‐ 350
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Ginger Creek/Cascade Park Basin Plan
Planning
Previously Approved
Ginger Creek is a tributary to the Cedar River, but sections of the stream have been placed in large pipes sections (72‐inch CMP) that are old and located in Tiffany Park, Cascade Park and residential neighborhoods. The
existing pipe system has surcharged during significant storm events causing flooding in Cascade Park. After the city annexed the Benson Hill area, the pipe systems and open channel were maintained to reduce sediment
buildup between SE 160th Street and the Cedar River Pipeline ROW, which has reduced the occurrence of flooding. However, the project is needed to evaluate conditions of the existing pipes sections due to their age and the capacity of the existing conveyance system. The basin plan will involve a complete hydrologic and hydraulic analysis of the basin for future land use runoff conditions and the evaluation of the conveyance system
conditions to identify long‐term capital investment needs to prevent future flooding and to protect public safety. In addition, the basin plan will evaluate opportunities for incorporating environmental and other multi‐
purpose benefits.
Rationale
This provides funding for a study to determine the primary cause of the problem, evaluate alternative solutions and develop a design of the preferred solution. This project supports the city's goal of promoting public
safety.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 189
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:27
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ 10 200 200 60 ‐ ‐ ‐ ‐ 470
Project Management ‐ 5 10 10 5 ‐ ‐ ‐ ‐ 30
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ 15 210 210 65 ‐ ‐ ‐ ‐ 500
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ 15 210 210 65 ‐ ‐ ‐ ‐ 500 Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 15 210 210 65 ‐ ‐ ‐ ‐ 500
Project Funding Status:
Secured ‐ 15 210 210 65 ‐ ‐ ‐ ‐ 500 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ 15 210 210 65 ‐ ‐ ‐ ‐ 500
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Cedar River Flood Risk Reduction Feasibility Study
Planning
Previously Funded
The Lower Cedar River Flood Risk Reduction Feasibility Study intends to assess the feasibility of improving the level of flood protection and evaluate future flood risk mitigation projects along the Cedar River from River
Mile 0 to River Mile 2.7. This feasibility study would identify potential measures or construction projects that would increase resiliency to floods greater than the 100‐year event and identify the most feasible level of flood
protection that could be achieved along this reach of the Cedar River, a critical area of development and economic activity within King County. The King County Flood Control Zone District (KCFCZD) placed the Feasibility Study on its 6‐year Capital Improvement Project funding plan in 2018 and a funding agreement was executed with the City in April 2020. This study is expected to begin in 2020 and be completed by 2023.
Rationale
This study evaluates the feasibility of increasing the level of flood protection along the Lower Cedar River, and reducing the risk of flooding to the surrounding area in Renton. It supports the city's goal of protecting public
safety.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 190
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:28
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ 85 85 85 ‐ ‐ ‐ ‐ ‐ 255
Project Management ‐ 11 11 11 ‐ ‐ ‐ ‐ ‐ 34
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Expenditures ‐ 96 96 96 ‐ ‐ ‐ ‐ ‐ 289
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Surfacewater Collection Fees ‐ 96 96 96 ‐ ‐ ‐ ‐ ‐ 289
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources ‐ 96 96 96 ‐ ‐ ‐ ‐ ‐ 289
Project Funding Status:
Secured ‐ 96 96 96 ‐ ‐ ‐ ‐ ‐ 289 Anticipated*‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Project Funding ‐ 96 96 96 ‐ ‐ ‐ ‐ ‐ 289
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
WSDOT Limited Access ROW Runoff Impact Mitigation Program
Regulatory
Previously Approved
The city currently charges surface water fees to WSDOT for the SR‐167 and I‐405 right of way within Renton city limits. RCW 90.03.525 allows local municipalities to charge stormwater fees for state limited access
highways and was modified when Senate bill 5505 was passed in 2019. The bill clarified the objectives of the Stormwater Management Funding and Implementation Program for highway related runoff problems and
required charges paid by the state to local jurisdictions to be used solely for stormwater control facilities that directly reduce state highway runoff impacts or implementation of best management practices that will reduce the need for such facilities. A plan and progress report are required to be submitted annually so that WSDOT pays their stormwater fee to the City. This program consists of studies and improvements to city facilities
downstream of limited access right‐of‐way implemented to remain in compliance with RCW 90.03.525.
Rationale
This program enables the city to keep collecting surface water fees from WSDOT for limited access right of way, and prioritizes improvements beneficial to both the City and WSDOT. It supports the city's goals of public
safety and quality of life.
TOTAL
ESTIMATED
ESTIMATED
Capital Investment Program ‐ Surface Water 5 - 191
2021/2022 Preliminary Budget City of Renton, Washington
Project Title:Priority Number:29
Project Category:
Status:
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
ExpendituresExpenditures:
Planning/Design ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Project Management ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Major Maintenance ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Land Acquisitions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Construction 177 50 50 50 50 50 50 50 ‐ 527
Total Expenditures 177 50 50 50 50 50 50 50 ‐ 527
Actual through
12/31/19 2020 2021 2022 2023 2024 2025 2026 Thereafter
Total Project
Resources
Resources:Mitigation Fees ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Bond Proceeds (RePmt Funding Src Only) ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Grants/Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Special Assessment District ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ System Development Charges 177 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 177
Surfacewater Collection Fees ‐ 50 50 50 50 50 50 50 ‐ 350
Interest ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
Total Resources 177 50 50 50 50 50 50 50 ‐ 527
Project Funding Status:
Secured 177 50 50 50 ‐ ‐ ‐ ‐ ‐ 327 Anticipated*‐ ‐ ‐ ‐ 50 50 50 50 ‐ 200
Total Project Funding 177 50 50 50 50 50 50 50 ‐ 527
*Expenditures utilizing anticipated funding are not included in the adopted budget.
Operating Fund Impacts ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
This fund is for unplanned or miscellaneous storm system improvements needed to keep the existing system functional or in response to an opportunity to fix identified system deficiencies in coordination with another
project. The funding is also available to respond to system failures (structure failure, pipeline failure, pump station failure) or other emergency response needs during storm events.
Rationale
These funds are used for unplanned projects in response to system failures that need immediate repair or other unplanned storm system improvements, as needed. The projects selected will be in support of the city's
goal of promoting public safety.
TOTAL
ESTIMATED
ESTIMATED
Description and Scope
SURFACE WATER UTILITY CAPITAL INVESTMENT PROGRAM
2021 through 2026 (in thousands of dollars)
Miscellaneous/Emergency Storm Projects
Maintenance and Preservation
Previously Approved
Capital Investment Program ‐ Surface Water 5 - 192
6 BUDGET BY FUND
Summary All Funds
6‐1
General Government
6‐11
Special Revenue
6‐12
Debt Service
6‐16
Capital Investment Program
6‐17
Enterprise
6‐26
Internal Service
6‐33
Investment Trust
6‐40
2021 Revenue, Expenditures, Fund Sources, All Funds
General Government General
000 001 003 004 005 098 108 Govt
General ComSvcs Street CDBG Museum Econ Dev Leased Prop Total 2021
Revenue
Property Tax 21,494,697 ‐ ‐ ‐ ‐ ‐ ‐ 21,494,697
Retail Sales and Use Taxes 28,448,434 ‐ ‐ ‐ ‐ ‐ ‐ 28,448,434
Business & Occupation Taxes 6,500,000 ‐ ‐ ‐ ‐ ‐ ‐ 6,500,000
Utility Taxes 8,647,555 4,999,175 1,453,909 ‐ ‐ ‐ ‐ 15,100,639
Other Taxes 3,410,992 ‐ ‐ ‐ ‐ ‐ ‐ 3,410,992
Sub‐Total Taxes 68,501,678 4,999,175 1,453,909 ‐ ‐ ‐ ‐ 74,954,762
Business License and Permits 918,780 ‐ ‐ ‐ ‐ ‐ ‐ 918,780 Other License and Permits 2,525,405 1,000 ‐ ‐ ‐ ‐ ‐ 2,526,405 Federal/State Grants ‐‐ 40,000 424,857 ‐ ‐ ‐ 464,857 Other Intergovernmental Revenues 1,799,770 ‐ 2,242,650 ‐ ‐ ‐ ‐ 4,042,420 Charges for Goods and Services 5,405,444 1,202,967 1,559,247 ‐ ‐ ‐ ‐ 8,167,658 Fines and Forfeits 3,829,782 ‐ ‐ ‐ ‐ ‐ ‐ 3,829,782 Interest and Other Earnings 320,000 ‐ 520,000 ‐ ‐ ‐ ‐ 840,000 Rents, Leases, and Concessions 30,808 163,680 ‐ ‐ ‐ ‐ 535,565 730,053 Other Miscellaneous Revenues 275,122 17,000 ‐ ‐ ‐ ‐ ‐ 292,122 Capital Contributions ‐‐ ‐ ‐ ‐ ‐ ‐ ‐Transfer In (Out)(14,765,333) 6,350,000 8,151,204 ‐ 264,129 ‐ ‐ ‐Total New Revenue 68,841,456 12,733,822 13,967,010 424,857 264,129 ‐ 535,565 96,766,839
Total Resources 68,841,456 12,733,822 13,967,010 424,857 264,129 ‐ 535,565 96,766,839
Expenditures ‐
Legislative 512,544 512,544
City Attorney 2,611,347 2,611,347
Executive: Mayor's Office 2,945,767 2,945,767
Emergency Management 781,615 ‐ 781,615
Court Services 3,102,930 3,102,930
Community & Economic Development ‐
Administrative 1,501,313 1,501,313
Economic Development 1,169,508 1,169,508
Planning 4,772,285 4,772,285 Development Services 2,885,532 361,724 3,247,256 Municipal Arts ‐Human Resources & Risk Mgmt: 1,656,832 1,656,832 Insurance ‐Administrative Services (Finance, Infor 3,928,944 3,928,944 City Clerk 1,433,840 1,433,840 Hearing Examiner 40,000 40,000 Police 42,530,483 42,530,483 Public Works ‐Administration 497,991 497,991 Transportation 6,638,464 6,638,464 Utility Systems & Technical Svc ‐‐Maintenance Services 6,580,354 6,580,354 Airport ‐
Community Services:‐
Community Services 15,788,205 849,876 16,638,081
Housing & Human Services 1,355,511 1,355,511
Comm Dev Block Grants 63,133 63,133
Museum 289,701 289,701
Golf Course ‐
Housing Opportunity ‐
Other City Services/Misc 5,804,993 5,804,993
Debt Service ‐
Transfers‐Out 4,638,275 ‐ ‐ 4,638,275
Total Expenditures 82,169,710 15,788,205 13,218,818 424,857 289,701 ‐ 849,876 112,741,168
Fund Balance, January 131,769,747 3,060,626 807,985 14,187 65,653 2,551,659 391,849 38,661,706 Total New Revenue 68,841,456 12,733,822 13,967,010 424,857 264,129 ‐ 535,565 96,766,839 Total Committed Expenditures (82,169,710) (15,788,205) (13,218,818) (424,857) (289,701) ‐ (849,876) (112,741,168) Fund Balance Plus Reserves 18,441,492 6,243 1,556,177 14,187 40,081 2,551,659 77,538 22,687,377 Operating Reserves 8,600,000 ‐ ‐ ‐ ‐ ‐ ‐ 8,600,000 Other Reserves/IBNR ‐‐ ‐ ‐ ‐ 2,500,000 ‐ 2,500,000
Fund Balance (Undesig/Designated) 9,841,492 6,243 1,556,177 14,187 40,081 51,659 77,538 11,587,377
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - Summary All Funds 6 - 1
Revenue
Property Tax
Retail Sales and Use Taxes
Business & Occupation Taxes
Utility Taxes
Other Taxes
Sub‐Total Taxes
Business License and PermitsOther License and PermitsFederal/State GrantsOther Intergovernmental RevenuesCharges for Goods and ServicesFines and ForfeitsInterest and Other EarningsRents, Leases, and ConcessionsOther Miscellaneous RevenuesCapital ContributionsTransfer In (Out)Total New Revenue
Total Resources
Expenditures
Legislative
City Attorney
Executive: Mayor's Office
Emergency Management
Court Services
Community & Economic Development
Administrative
Economic Development
PlanningDevelopment ServicesMunicipal ArtsHuman Resources & Risk Mgmt:InsuranceAdministrative Services (Finance, InforCity ClerkHearing ExaminerPolicePublic WorksAdministrationTransportationUtility Systems & Technical SvcMaintenance ServicesAirport
Community Services:
Community Services
Housing & Human Services
Comm Dev Block Grants
Museum
Golf Course
Housing Opportunity
Other City Services/Misc
Debt Service
Transfers‐Out
Total Expenditures
Fund Balance, January 1Total New RevenueTotal Committed ExpendituresFund Balance Plus ReservesOperating ReservesOther Reserves/IBNR
Fund Balance (Undesig/Designated)
2021 Revenue, Expenditures, Fund Sources, All Funds
Special Debt Service
110 125 127 135 Revenue 215 LT GO
Lodging Municipal Art Cable Com Wetlands Total 2021 Total 2021
‐ ‐ ‐ ‐ ‐ ‐
200,000 ‐ ‐ ‐ 200,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 57,674 ‐ 57,674 ‐
200,000 ‐ 57,674 ‐ 257,674 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 50,983 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 63,648 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 117,900 40,000 ‐ 157,900 7,030,387 200,000 117,900 97,674 ‐ 415,574 7,145,018
200,000 117,900 97,674 ‐ 415,574 7,145,018 ‐ ‐ ‐ ‐ 97,674 97,674 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 117,900 117,900 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 7,153,019 ‐ ‐ ‐ ‐ ‐ ‐ 117,900 97,674 ‐ 215,574 7,153,019
677,327 7,735 603,760 345,658 1,634,480 4,897,482 200,000 117,900 97,674 ‐ 415,574 7,145,018 ‐ (117,900) (97,674) ‐ (215,574) (7,153,019) 877,327 7,735 603,760 345,658 1,834,480 4,889,481 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,711,725
877,327 7,735 603,760 345,658 1,834,480 2,177,756
Special Revenue
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - Summary All Funds 6 - 2
Revenue
Property Tax
Retail Sales and Use Taxes
Business & Occupation Taxes
Utility Taxes
Other Taxes
Sub‐Total Taxes
Business License and PermitsOther License and PermitsFederal/State GrantsOther Intergovernmental RevenuesCharges for Goods and ServicesFines and ForfeitsInterest and Other EarningsRents, Leases, and ConcessionsOther Miscellaneous RevenuesCapital ContributionsTransfer In (Out)Total New Revenue
Total Resources
Expenditures
Legislative
City Attorney
Executive: Mayor's Office
Emergency Management
Court Services
Community & Economic Development
Administrative
Economic Development
PlanningDevelopment ServicesMunicipal ArtsHuman Resources & Risk Mgmt:InsuranceAdministrative Services (Finance, InforCity ClerkHearing ExaminerPolicePublic WorksAdministrationTransportationUtility Systems & Technical SvcMaintenance ServicesAirport
Community Services:
Community Services
Housing & Human Services
Comm Dev Block Grants
Museum
Golf Course
Housing Opportunity
Other City Services/Misc
Debt Service
Transfers‐Out
Total Expenditures
Fund Balance, January 1Total New RevenueTotal Committed ExpendituresFund Balance Plus ReservesOperating ReservesOther Reserves/IBNR
Fund Balance (Undesig/Designated)
2021 Revenue, Expenditures, Fund Sources, All Funds
Capital Project Capital
303 304 305 308 309 316 317 336 346 Project
C D Mitig Fire Mitig Trans Mitig REET 1 REET 2Mun Fac Trans CIP New Library New Family Total 2021
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,250,000 2,250,000 ‐ ‐ ‐ ‐ 4,500,000 ‐ ‐ ‐ 2,250,000 2,250,000 ‐ ‐ ‐ ‐ 4,500,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 300,000 ‐ ‐ ‐ 300,000 86,500 99,000 200,000 ‐ ‐ ‐ ‐ ‐ ‐ 385,500 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 86,185 ‐ ‐ ‐ 86,185 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,316,000 2,200,000 ‐ ‐ 4,516,000 86,500 99,000 200,000 2,250,000 2,250,000 2,702,185 2,200,000 ‐ ‐ 9,787,685
86,500 99,000 200,000 2,250,000 2,250,000 2,702,185 2,200,000 ‐ ‐ 9,787,685
‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ 675,250 675,250 ‐ ‐ ‐
2,954,433 2,954,433 ‐ ‐ ‐ ‐ ‐ 500,000 500,000 ‐ ‐
316,000 436,987 200,000 2,865,000 3,248,025 ‐ ‐ 7,066,012
316,000 436,987 200,000 2,865,000 3,248,025 2,954,433 675,250 ‐ 500,000 11,195,695
1,027,590 2,105,750 2,566,232 1,368,855 1,451,451 1,105,075 777,424 16,408 7,977,453 18,396,238 86,500 99,000 200,000 2,250,000 2,250,000 2,702,185 2,200,000 ‐ ‐ 9,787,685 (316,000) (436,987) (200,000) (2,865,000) (3,248,025) (2,954,433) (675,250) ‐ (500,000) (11,195,695) 798,090 1,767,763 2,566,232 753,855 453,426 852,827 2,302,174 16,408 7,477,453 16,988,228 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 16,408 7,477,453 7,493,861
798,090 1,767,763 2,566,232 753,855 453,426 852,827 2,302,174 ‐ ‐ 9,494,367
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - Summary All Funds 6 - 3
Revenue
Property Tax
Retail Sales and Use Taxes
Business & Occupation Taxes
Utility Taxes
Other Taxes
Sub‐Total Taxes
Business License and PermitsOther License and PermitsFederal/State GrantsOther Intergovernmental RevenuesCharges for Goods and ServicesFines and ForfeitsInterest and Other EarningsRents, Leases, and ConcessionsOther Miscellaneous RevenuesCapital ContributionsTransfer In (Out)Total New Revenue
Total Resources
Expenditures
Legislative
City Attorney
Executive: Mayor's Office
Emergency Management
Court Services
Community & Economic Development
Administrative
Economic Development
PlanningDevelopment ServicesMunicipal ArtsHuman Resources & Risk Mgmt:InsuranceAdministrative Services (Finance, InforCity ClerkHearing ExaminerPolicePublic WorksAdministrationTransportationUtility Systems & Technical SvcMaintenance ServicesAirport
Community Services:
Community Services
Housing & Human Services
Comm Dev Block Grants
Museum
Golf Course
Housing Opportunity
Other City Services/Misc
Debt Service
Transfers‐Out
Total Expenditures
Fund Balance, January 1Total New RevenueTotal Committed ExpendituresFund Balance Plus ReservesOperating ReservesOther Reserves/IBNR
Fund Balance (Undesig/Designated)
2021 Revenue, Expenditures, Fund Sources, All Funds
Enterprise Enterprise
4X2 403 4X4 4X5 4X6 4X7 416 Funds
Airport Sol Waste Golf Water Wastewater Surface Water Metro KC Total 2021
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 62,111 50,708 ‐ 112,819 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 145,557 22,636,386 2,304,205 17,314,812 11,280,375 12,070,004 17,607,838 83,359,177 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,857 5,000 770 219,000 158,000 108,000 ‐ 494,627 2,902,353 ‐ 527,600 136,591 ‐ ‐ ‐ 3,566,544 ‐ ‐ 600 2,000 86,000 1,000 ‐ 89,600 ‐ ‐ ‐ 300,000 200,000 200,000 ‐ 700,000 ‐ ‐ 68,100 ‐ ‐ ‐ ‐ 68,100 3,051,767 22,641,386 2,901,275 17,972,403 11,786,486 12,429,712 17,607,838 91,442,634
3,051,767 22,641,386 2,901,275 17,972,403 11,786,486 12,429,712 17,607,838 88,390,867 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 46,724 206,715 161,353 233,070 ‐ 647,862 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 22,216,615 6,040,240 6,882,259 5,252,810 ‐ 40,391,925 312,195 6,908,189 2,557,205 3,877,808 17,607,838 31,263,235 2,994,840 2,994,840 ‐ ‐ ‐ ‐ ‐
2,566,000 2,566,000 ‐ ‐ ‐ ‐ ‐ 1,779,574 710,151 1,130,850 ‐ 3,620,575 ‐ ‐ 68,100 ‐ ‐ ‐ ‐ 68,100
2,994,840 22,575,534 2,634,100 14,934,718 10,310,968 10,494,539 17,607,838 81,552,537
1,462,745 2,515,860 569,988 7,145,207 5,662,785 12,784,171 5,961,906 36,102,663 3,051,767 22,641,386 2,901,275 17,972,403 11,786,486 12,429,712 17,607,838 88,390,867 (2,994,840) (22,575,534) (2,634,100) (14,934,718) (10,310,968) (10,494,539) (17,607,838) (81,552,537) 1,519,672 2,581,712 837,163 10,182,892 7,138,303 14,719,344 5,961,906 42,940,993 216,784 400,000 641,500 1,403,417 1,349,853 964,517 380,000 5,356,071 1,115,207 ‐ ‐ 1,394,051 661,227 754,868 ‐ 3,925,353
187,681 2,181,712 195,664 7,385,424 5,127,223 12,999,960 5,581,906 33,659,569
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - Summary All Funds 6 - 4
Revenue
Property Tax
Retail Sales and Use Taxes
Business & Occupation Taxes
Utility Taxes
Other Taxes
Sub‐Total Taxes
Business License and PermitsOther License and PermitsFederal/State GrantsOther Intergovernmental RevenuesCharges for Goods and ServicesFines and ForfeitsInterest and Other EarningsRents, Leases, and ConcessionsOther Miscellaneous RevenuesCapital ContributionsTransfer In (Out)Total New Revenue
Total Resources
Expenditures
Legislative
City Attorney
Executive: Mayor's Office
Emergency Management
Court Services
Community & Economic Development
Administrative
Economic Development
PlanningDevelopment ServicesMunicipal ArtsHuman Resources & Risk Mgmt:InsuranceAdministrative Services (Finance, InforCity ClerkHearing ExaminerPolicePublic WorksAdministrationTransportationUtility Systems & Technical SvcMaintenance ServicesAirport
Community Services:
Community Services
Housing & Human Services
Comm Dev Block Grants
Museum
Golf Course
Housing Opportunity
Other City Services/Misc
Debt Service
Transfers‐Out
Total Expenditures
Fund Balance, January 1Total New RevenueTotal Committed ExpendituresFund Balance Plus ReservesOperating ReservesOther Reserves/IBNR
Fund Balance (Undesig/Designated)
2021 Revenue, Expenditures, Fund Sources, All Funds
Internal Service Internal Fiduciary All Funds
501 502 503 504 505 512 522 Services 611 Total
Equip R&R Insurance Inform Tech Facilities Communications Healthcare Ret Healthcare Total 2021 Fire Pension 2021
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 21,494,697 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 28,648,434 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 6,500,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 15,100,639 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 7,968,666 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 79,712,436 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 918,780 ‐ ‐ 150,000 ‐ ‐ ‐ ‐ 150,000 ‐ 2,789,224 ‐ ‐ ‐ ‐ ‐ ‐ 45,933 45,933 ‐ 561,773 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 160,000 4,502,420 6,542,775 3,511,775 6,435,901 5,992,730 1,154,732 ‐ ‐ 23,637,913 ‐ 115,613,896 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,829,782 12,000 22,000 7,000 4,000 1,000 20,000 20,000 86,000 225,000 1,731,812 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 4,296,597 ‐ ‐ ‐ ‐ ‐ 12,457,543 2,640,000 15,097,543 ‐ 15,479,265 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 700,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 11,772,387 6,554,775 3,533,775 6,592,901 5,996,730 1,155,732 12,477,543 2,705,933 39,017,389 385,000 241,908,372
6,554,775 3,533,775 6,592,901 5,996,730 1,155,732 12,477,543 2,705,933 39,017,389 385,000 241,908,372 ‐ ‐ 512,544 ‐ 2,611,347
1,152,826 1,152,826 4,196,267 ‐ 781,615 ‐ 3,102,930 ‐ ‐ ‐ 1,501,313 ‐ 1,169,508 ‐ 4,772,285 ‐ 3,247,256 ‐ 117,900 ‐ 1,656,832 3,276,889 12,580,831 1,362,685 17,220,405 17,220,405 6,427,451 6,427,451 210,475 11,214,733 ‐ 1,433,840 ‐ 40,000 ‐ 42,530,483 ‐ ‐ ‐ 497,991 ‐ 7,313,714 ‐ 40,391,925 4,957,803 4,957,803 42,801,392 ‐ 2,994,840 ‐ ‐
6,168,171 6,168,171 25,760,685 ‐ 1,355,511 ‐ 63,133 ‐ 289,701 ‐ 2,566,000 ‐ 500,000 ‐ 5,804,993 ‐ 10,773,594 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 11,772,387
4,957,803 3,276,889 6,427,451 6,168,171 1,152,826 12,580,831 1,362,685 35,926,656 210,475 248,995,124
5,636,326 14,637,136 2,364,514 454,366 717,150 5,301,437 14,795,948 43,906,877 7,833,427 151,432,873 6,554,775 3,533,775 6,592,901 5,996,730 1,155,732 12,477,543 2,705,933 39,017,389 385,000 241,908,372 (4,957,803) (3,276,889) (6,427,451) (6,168,171) (1,152,826) (12,580,831) (1,362,685) (35,926,656) (210,475) (248,995,124) 7,233,298 14,894,022 2,529,964 282,925 720,056 5,198,149 16,139,196 46,997,609 8,007,952 144,346,120 286,580 8,600,000 609,345 ‐ ‐ ‐ ‐ 9,495,925 ‐ 23,451,996 6,946,717 4,300,000 1,920,619 ‐ ‐ 3,774,249 246,791 17,188,377 ‐ 33,819,316 ‐ 1,994,022 ‐ 282,925 720,056 1,423,900 15,892,405 20,313,307 8,007,952 87,074,807
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - Summary All Funds 6 - 5
2022 Revenue, Expenditures, Fund Sources, All Funds
General Government General
000 001 003 004 005 098 108 Govt
General ComSvcs Street CDBG Museum Econ Dev Leased Fac. Total 2022
Revenue
Property Tax 21,709,653 ‐ ‐ ‐ ‐ ‐ ‐ 21,709,653
Retail Sales and Use Taxes 30,939,645 ‐ ‐ ‐ ‐ ‐ ‐ 30,939,645
Business & Occupation Taxes 9,500,000 ‐ ‐ ‐ ‐ ‐ ‐ 9,500,000
Utility Taxes 8,780,625 5,574,163 1,461,179 ‐ ‐ ‐ ‐ 15,815,967
Other Taxes 4,474,845 ‐ ‐ ‐ ‐ ‐ ‐ 4,474,845
Sub‐Total Taxes 75,404,768 5,574,163 1,461,179 ‐ ‐ ‐ ‐ 82,440,110
Business License and Permits 927,968 ‐ ‐ ‐ ‐ ‐ ‐ 927,968 Other License and Permits 2,946,147 1,000 ‐ ‐ ‐ ‐ ‐ 2,947,147 Federal/State Grants ‐ ‐ 40,000 424,857 ‐ ‐ ‐ 464,857 Other Intergovernmental Revenues 1,799,770 ‐ 2,242,650 ‐ ‐ ‐ ‐ 4,042,420 Charges for Goods and Services 6,245,351 1,211,290 1,591,588 ‐ ‐ ‐ ‐ 9,048,229 Fines and Forfeits 3,829,782 ‐ ‐ ‐ ‐ ‐ ‐ 3,829,782 Interest and Other Earnings 320,000 ‐ 520,000 ‐ ‐ ‐ ‐ 840,000 Rents, Leases, and Concessions 30,808 657,189 ‐ ‐ ‐ ‐ 790,321 1,478,318 Other Miscellaneous Revenues 275,122 17,000 ‐ ‐ ‐ ‐ ‐ 292,122 Capital Contributions ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Transfer In (17,125,333) 8,710,000 8,151,204 ‐ 264,129 ‐ ‐ ‐
Total Resources 74,654,383 16,170,642 14,006,621 424,857 264,129 ‐ 790,321 106,310,953
Expenditures ‐
Legislative 526,945 526,945
City Attorney 2,700,512 2,700,512
Executive: Mayor's Office 2,952,372 2,952,372
Emergency Management 805,202 ‐ 805,202
Court Services 3,215,462 3,215,462
Community & Economic Development ‐
Administrative 1,541,366 1,541,366
Economic Development 1,208,842 1,208,842
Planning 4,961,916 4,961,916
Development Services 2,994,321 361,724 3,356,045 Municipal Arts ‐ Human Resources & Risk Mgmt: 1,703,366 1,703,366 Insurance ‐ Administrative Services (Finance, Infor 4,066,581 4,066,581 City Clerk 1,477,120 1,477,120 Hearing Examiner 40,000 40,000 Other City Services/Misc 5,802,871 5,802,871 Debt Service ‐ Police 43,642,136 43,642,136 Public Works ‐ Administration 511,941 511,941 Transportation 6,775,702 6,775,702 Utility Systems & Technical Svc ‐ ‐ Maintenance Services 6,752,314 6,752,314
Airport ‐
Community Services:‐
Community Services 16,164,399 860,533 17,024,932
Housing & Human Services 1,383,868 1,383,868
Comm Dev Block Grants 63,133 63,133
Museum 297,273 297,273
Golf Course ‐
Transfers‐Out 2,881,000 ‐ ‐ ‐ 2,881,000
Total Expenditures 82,415,822 16,164,399 13,528,016 424,857 297,273 ‐ 860,533 113,690,900
Fund Balance, January 118,441,492 6,243 1,556,177 14,187 40,081 2,551,659 77,538 22,687,377 Total New Revenue 74,654,383 16,170,642 14,006,621 424,857 264,129 ‐ 790,321 106,310,953 Total Committed Expenditures (82,415,822) (16,164,399) (13,528,016) (424,857) (297,273) ‐ (860,533) (113,690,900) Fund Balance Plus Reserves 10,680,053 12,486 2,034,782 14,187 6,937 2,551,659 7,326 15,307,430 Operating Reserves 8,900,000 ‐ ‐ ‐ ‐ ‐ ‐ 8,900,000 Other Reserves/IBNR ‐ ‐ ‐ ‐ ‐ 2,500,000 ‐ 2,500,000
Fund Balance (Undesig/Designated) 1,780,053 12,486 2,034,782 14,187 6,937 51,659 7,326 3,907,430
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - Summary All Funds 6 - 6
Revenue
Property Tax
Retail Sales and Use Taxes
Business & Occupation Taxes
Utility Taxes
Other Taxes
Sub‐Total Taxes
Business License and PermitsOther License and PermitsFederal/State GrantsOther Intergovernmental RevenuesCharges for Goods and ServicesFines and ForfeitsInterest and Other EarningsRents, Leases, and ConcessionsOther Miscellaneous RevenuesCapital ContributionsTransfer In
Total Resources
Expenditures
Legislative
City Attorney
Executive: Mayor's Office
Emergency Management
Court Services
Community & Economic Development
Administrative
Economic Development
Planning
Development ServicesMunicipal ArtsHuman Resources & Risk Mgmt:InsuranceAdministrative Services (Finance, InforCity ClerkHearing ExaminerOther City Services/MiscDebt ServicePolicePublic WorksAdministrationTransportationUtility Systems & Technical SvcMaintenance Services
Airport
Community Services:
Community Services
Housing & Human Services
Comm Dev Block Grants
Museum
Golf Course
Transfers‐Out
Total Expenditures
Fund Balance, January 1Total New RevenueTotal Committed ExpendituresFund Balance Plus ReservesOperating ReservesOther Reserves/IBNR
Fund Balance (Undesig/Designated)
2022 Revenue, Expenditures, Fund Sources, All Funds
Special Debt Service
110 125 127 135 Revenue 215 LT GO
Lodging Municipal Art Cable Com Wetlands Total 2022 Total 2022
‐ ‐ ‐ ‐ ‐ ‐
200,000 ‐ ‐ ‐ 200,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 57,674 ‐ 57,674 ‐
200,000 ‐ 57,674 ‐ 257,674 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 44,610 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 117,900 40,000 ‐ 157,900 4,289,359
200,000 117,900 97,674 ‐ 415,574 4,333,969
‐ ‐ ‐ 97,674 97,674 ‐ ‐
‐ ‐ ‐ ‐ 117,900 117,900 ‐ ‐ ‐ ‐ ‐ ‐ ‐ 4,341,920 ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 117,900 97,674 ‐ 215,574 4,341,920
877,327 7,735 603,760 345,658 1,834,480 4,889,481 200,000 117,900 97,674 ‐ 415,574 4,333,969 ‐ (117,900) (97,674) ‐ (215,574) (4,341,920) 1,077,327 7,735 603,760 345,658 2,034,480 4,881,530 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,717,575
1,077,327 7,735 603,760 345,658 2,034,480 2,163,955
Special Revenue
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - Summary All Funds 6 - 7
Revenue
Property Tax
Retail Sales and Use Taxes
Business & Occupation Taxes
Utility Taxes
Other Taxes
Sub‐Total Taxes
Business License and PermitsOther License and PermitsFederal/State GrantsOther Intergovernmental RevenuesCharges for Goods and ServicesFines and ForfeitsInterest and Other EarningsRents, Leases, and ConcessionsOther Miscellaneous RevenuesCapital ContributionsTransfer In
Total Resources
Expenditures
Legislative
City Attorney
Executive: Mayor's Office
Emergency Management
Court Services
Community & Economic Development
Administrative
Economic Development
Planning
Development ServicesMunicipal ArtsHuman Resources & Risk Mgmt:InsuranceAdministrative Services (Finance, InforCity ClerkHearing ExaminerOther City Services/MiscDebt ServicePolicePublic WorksAdministrationTransportationUtility Systems & Technical SvcMaintenance Services
Airport
Community Services:
Community Services
Housing & Human Services
Comm Dev Block Grants
Museum
Golf Course
Transfers‐Out
Total Expenditures
Fund Balance, January 1Total New RevenueTotal Committed ExpendituresFund Balance Plus ReservesOperating ReservesOther Reserves/IBNR
Fund Balance (Undesig/Designated)
2022 Revenue, Expenditures, Fund Sources, All Funds
Capital Project Capital
303 304 305 308 309 316 317 336 346 Project
C D Mitig Fire Mitig Trans Mitig REET 1 REET 2Mun Fac Trans CIP New Library New Family Total 2022
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,300,000 2,300,000 ‐ ‐ ‐ ‐ 4,600,000 ‐ ‐ ‐ 2,300,000 2,300,000 ‐ ‐ ‐ ‐ 4,600,000 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 300,000 ‐ ‐ ‐ 300,000 86,500 99,000 200,000 ‐ ‐ ‐ ‐ ‐ ‐ 385,500 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 162,840 ‐ ‐ ‐ 162,840 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 2,000,000 2,200,000 ‐ ‐ 4,200,000
86,500 99,000 200,000 2,300,000 2,300,000 2,462,840 2,200,000 ‐ ‐ 9,648,340
‐ ‐ ‐ ‐ ‐
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐
‐ 583,000 583,000 ‐ ‐ ‐ ‐
2,455,962 2,455,962 ‐ ‐ ‐ ‐ ‐ 500,634 200,000 2,315,000 2,750,625 ‐ ‐ ‐ ‐ 5,766,259 ‐ 500,634 200,000 2,315,000 2,750,625 2,455,962 583,000 ‐ ‐ 8,805,221
798,090 1,767,763 2,566,232 753,855 453,426 852,827 2,302,174 16,408 7,477,453 16,988,228 86,500 99,000 200,000 2,300,000 2,300,000 2,462,840 2,200,000 ‐ ‐ 9,648,340 ‐ (500,634) (200,000) (2,315,000) (2,750,625) (2,455,962) (583,000) ‐ ‐ (8,805,221) 884,590 1,366,129 2,566,232 738,855 2,801 859,705 3,919,174 16,408 7,477,453 17,831,347 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 16,408 7,477,453 7,493,861
884,590 1,366,129 2,566,232 738,855 2,801 859,705 3,919,174 ‐ ‐ 10,337,486
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - Summary All Funds 6 - 8
Revenue
Property Tax
Retail Sales and Use Taxes
Business & Occupation Taxes
Utility Taxes
Other Taxes
Sub‐Total Taxes
Business License and PermitsOther License and PermitsFederal/State GrantsOther Intergovernmental RevenuesCharges for Goods and ServicesFines and ForfeitsInterest and Other EarningsRents, Leases, and ConcessionsOther Miscellaneous RevenuesCapital ContributionsTransfer In
Total Resources
Expenditures
Legislative
City Attorney
Executive: Mayor's Office
Emergency Management
Court Services
Community & Economic Development
Administrative
Economic Development
Planning
Development ServicesMunicipal ArtsHuman Resources & Risk Mgmt:InsuranceAdministrative Services (Finance, InforCity ClerkHearing ExaminerOther City Services/MiscDebt ServicePolicePublic WorksAdministrationTransportationUtility Systems & Technical SvcMaintenance Services
Airport
Community Services:
Community Services
Housing & Human Services
Comm Dev Block Grants
Museum
Golf Course
Transfers‐Out
Total Expenditures
Fund Balance, January 1Total New RevenueTotal Committed ExpendituresFund Balance Plus ReservesOperating ReservesOther Reserves/IBNR
Fund Balance (Undesig/Designated)
2022 Revenue, Expenditures, Fund Sources, All Funds
Enterprise
4X2 403 4X4 4X5 4X6 4X7 416 Funds
Airport Sol Waste Golf Water Wastewater Surface Water Metro KC Total 2022
‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 62,422 50,962 ‐ 113,384 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 145,557 23,103,703 2,383,485 18,449,435 11,671,891 12,475,527 17,695,877 85,925,475 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 3,857 5,000 770 219,000 158,000 108,000 ‐ 494,627 2,902,353 ‐ 527,600 136,591 ‐ ‐ ‐ 3,566,544 ‐ ‐ 600 2,000 86,000 1,000 ‐ 89,600 ‐ ‐ ‐ 300,000 200,000 200,000 ‐ 700,000 ‐ ‐ 72,200 ‐ ‐ ‐ ‐ 72,200
3,051,767 23,108,703 2,984,655 19,107,026 12,178,313 12,835,489 17,695,877 90,961,830 ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ 48,371 212,014 165,829 239,194 ‐ 665,407 ‐ ‐ ‐ ‐ ‐ ‐ 1,746,991 709,891 1,130,842 ‐ 3,587,724 ‐ ‐ ‐ ‐ ‐ 22,987,480 8,454,625 9,569,345 11,821,616 ‐ 52,833,067 316,172 7,028,647 17,695,877 31,575,189
2,927,234 2,927,234 ‐ ‐ ‐ ‐ ‐
2,638,766 2,638,766 ‐ ‐ 72,200 ‐ ‐ ‐ ‐ 72,200
2,927,234 23,352,023 2,710,966 17,442,277 13,096,699 17,074,512 17,695,877 94,299,587
1,519,672 2,581,712 837,163 10,182,892 7,138,303 14,719,344 5,961,906 42,940,992 3,051,767 23,108,703 2,984,655 19,107,026 12,178,313 12,835,489 17,695,877 90,961,830 (2,927,234) (23,352,023) (2,710,966) (17,442,277) (13,096,699) (17,074,512) (17,695,877) (94,299,587) 1,644,205 2,338,392 1,110,852 11,847,641 6,219,917 10,480,321 5,961,906 39,603,235 225,023 400,000 659,691 1,441,834 1,376,133 981,300 380,000 5,463,982 1,418,501 ‐ ‐ 1,394,051 661,227 754,868 ‐ 4,228,647
681 1,938,392 451,161 9,011,756 4,182,557 8,744,152 5,581,906 29,910,607
Enterprise
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - Summary All Funds 6 - 9
Revenue
Property Tax
Retail Sales and Use Taxes
Business & Occupation Taxes
Utility Taxes
Other Taxes
Sub‐Total Taxes
Business License and PermitsOther License and PermitsFederal/State GrantsOther Intergovernmental RevenuesCharges for Goods and ServicesFines and ForfeitsInterest and Other EarningsRents, Leases, and ConcessionsOther Miscellaneous RevenuesCapital ContributionsTransfer In
Total Resources
Expenditures
Legislative
City Attorney
Executive: Mayor's Office
Emergency Management
Court Services
Community & Economic Development
Administrative
Economic Development
Planning
Development ServicesMunicipal ArtsHuman Resources & Risk Mgmt:InsuranceAdministrative Services (Finance, InforCity ClerkHearing ExaminerOther City Services/MiscDebt ServicePolicePublic WorksAdministrationTransportationUtility Systems & Technical SvcMaintenance Services
Airport
Community Services:
Community Services
Housing & Human Services
Comm Dev Block Grants
Museum
Golf Course
Transfers‐Out
Total Expenditures
Fund Balance, January 1Total New RevenueTotal Committed ExpendituresFund Balance Plus ReservesOperating ReservesOther Reserves/IBNR
Fund Balance (Undesig/Designated)
2022 Revenue, Expenditures, Fund Sources, All Funds
Internal Service Internal Fiduciary All Funds
501 502 503 504 505 512 522 Services 611 Total
Equip R&R Insurance Inform Tech Facilities Communications Healthcare Ret Healthcare Total 2022 Fire Pension 2022
‐‐‐‐‐ ‐ ‐ ‐‐21,709,653 ‐‐‐‐‐ ‐ ‐ ‐‐31,139,645 ‐‐‐‐‐ ‐ ‐ ‐‐9,500,000 ‐‐‐‐‐ ‐ ‐ ‐‐15,815,967 ‐‐‐‐‐ ‐ ‐ ‐‐9,132,519 ‐‐‐‐‐ ‐ ‐ ‐‐87,297,784 ‐‐‐‐‐ ‐ ‐ ‐‐927,968 ‐‐150,000 ‐‐ ‐ ‐ 150,000 ‐3,210,531 ‐‐‐‐‐ ‐ 50,067 50,067 ‐559,534 ‐‐‐‐‐ ‐ ‐ ‐165,000 4,507,420 6,353,614 3,539,243 6,578,379 6,179,470 1,186,600 ‐ ‐ 23,837,306 ‐119,196,510 ‐‐‐‐‐ ‐ ‐ ‐‐3,829,782 12,000 22,000 7,000 4,000 1,000 20,000 20,000 86,000 125,000 1,708,467 ‐‐‐‐‐ ‐ ‐ ‐‐5,044,862 ‐‐‐‐‐ 13,546,817 2,640,000 16,186,817 ‐16,568,539 ‐‐‐‐‐ ‐ ‐ ‐‐700,000 ‐‐‐‐‐ ‐ ‐ ‐‐8,719,459
6,365,614 3,561,243 6,735,379 6,183,470 1,187,600 13,566,817 2,710,067 40,310,190 290,000 252,270,855 ‐‐526,945 ‐2,700,512
1,184,722 1,184,722 4,234,769 ‐805,202 ‐3,215,462 ‐‐1,541,366 ‐1,208,842 ‐4,961,916 ‐3,356,045 ‐117,900 ‐1,703,366 3,301,923 13,683,431 1,444,425 18,429,779 18,429,779 6,566,316 6,566,316 200,475 11,498,779 ‐1,477,120 ‐40,000 ‐5,802,871 ‐7,929,644 ‐43,642,136 ‐‐511,941 ‐7,358,702 ‐52,833,067 4,370,604 4,370,604 42,698,107 ‐2,927,234 ‐‐
6,357,208 6,357,208 25,838,102 ‐1,383,868 ‐63,133 ‐297,273 ‐2,638,766 ‐‐‐‐‐ ‐ ‐‐8,719,459
4,370,604 3,301,923 6,566,316 6,357,208 1,184,722 13,683,431 1,444,425 36,908,630 200,475 258,462,306
7,233,298 14,894,022 2,529,964 282,925 720,056 5,198,149 16,139,196 46,997,610 8,007,952 144,346,120 6,365,614 3,561,243 6,735,379 6,183,470 1,187,600 13,566,817 2,710,067 40,310,190 290,000 252,270,855 (4,370,604) (3,301,923) (6,566,316) (6,357,208) (1,184,722) (13,683,431) (1,444,425) (36,908,630) (200,475) (258,462,306) 9,228,308 15,153,342 2,699,027 109,187 722,934 5,081,535 17,404,838 50,399,170 8,097,477 138,154,670 291,619 8,900,000 624,132 ‐‐ ‐ ‐ 9,815,750 ‐24,179,732 8,936,689 4,400,000 2,074,895 ‐‐ 4,105,029 262,539 19,779,152 ‐36,719,235 ‐1,853,342 ‐109,187 722,934 976,506 17,142,299 20,804,268 8,097,477 77,255,702
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - Summary All Funds 6 - 10
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Property Taxes 17,838,993 17,392,662 20,978,323 17,429,367 21,280,959 21,494,697 21,709,653 23.3%1.0%
Retail Sales and Use Taxes 33,139,208 30,570,813 31,927,080 31,648,434 27,448,434 28,448,434 30,939,645 ‐10.1%8.8%
Business & Occupation Taxes 9,309,902 6,000,000 11,078,932 6,240,000 4,500,000 6,500,000 9,500,000 4.2% 46.2%
Utility Taxes 16,365,034 16,242,153 15,561,647 16,402,011 14,792,011 15,100,639 15,815,967 ‐7.9%4.7%
Other Taxes 4,754,853 3,955,500 11,517,060 3,963,500 2,895,992 3,410,992 4,474,845 ‐13.9%31.2%
Business Licenses and Permits 681,021 695,455 1,098,584 1,047,780 918,780 918,780 927,968 ‐12.3%1.0%
Other Licenses and Permits 3,309,265 3,790,405 3,131,333 3,790,405 2,526,405 2,526,405 2,947,147 ‐33.3%16.7%
Federal/State Grants 436,913 464,857 255,032 464,857 1,776,229 464,857 464,857 0.0% 0.0%
Other Intergovernmental Revenues 3,725,941 3,295,735 4,565,515 3,332,420 4,230,101 4,042,420 4,042,420 21.3%0.0%
Charges for Goods and Services 8,566,608 9,120,191 9,251,753 9,331,549 7,654,913 8,167,658 9,048,229 ‐12.5%10.8%
Fines and Forfeits 4,273,192 4,259,187 4,688,980 4,259,187 3,232,187 3,829,782 3,829,782 ‐10.1%0.0%
Interest and Other Earnings 1,143,478 830,000 1,360,892 825,000 825,000 840,000 840,000 1.8% 0.0%
Rents, Leases, and Concessions 1,721,024 1,415,245 1,715,372 1,415,745 722,295 730,053 1,478,318 ‐48.4%102.5%
Other Miscellaneous Revenues 822,569 380,326 697,539 384,940 412,870 292,122 292,122 ‐24.1%0.0%
Other Financing Sources (310,953) ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Transfer In 9,167 900,000 13,126,453 900,000 21,551,170 ‐ ‐ ‐100.0%N/A
TOTAL RESOURCES 105,786,218 99,312,529 130,954,493 101,435,195 114,767,345 96,766,839 106,310,953 ‐4.6%9.9%
EXPENDITURES:
Regular Salaries 35,316,087 39,024,191 37,628,266 41,162,149 41,399,188 42,934,794 44,285,474 4.3% 3.1%
Overtime 2,470,804 982,407 2,504,578 982,807 1,467,204 1,574,007 1,574,407 60.2%0.0%
Personnel Benefits 16,814,302 18,987,132 17,781,680 20,119,484 18,819,274 22,021,114 23,187,126 9.5% 5.3%
Part Time Salaries and Benefits 1,788,526 1,860,049 1,924,386 1,845,803 234,839 1,478,279 1,463,279 ‐19.9%‐1.0%
Supplies/Small Tools and Equipment 1,508,621 1,795,705 1,751,841 1,742,646 1,584,437 1,662,977 1,661,866 ‐4.6%‐0.1%
Professional Services 4,221,309 4,146,403 13,864,284 4,098,080 15,395,258 14,881,347 14,840,322 263.1%‐0.3%
Communication 16,640 30,081 23,105 29,525 23,665 18,075 18,025 ‐38.8%‐0.3%
Travel/Training 526,159 575,228 625,286 574,828 407,179 610,295 608,357 6.2%‐0.3%
Advertising 23,808 28,437 22,383 28,437 23,687 23,937 23,937 ‐15.8%0.0%
Operating Rentals 1,253,895 1,423,067 1,566,776 1,423,067 1,422,295 1,423,067 1,423,067 0.0% 0.0%
Utilities 2,309,501 2,335,269 2,267,524 2,335,269 2,325,269 2,335,269 2,335,269 0.0% 0.0%
Repairs & Maintenance 678,953 802,041 767,728 800,344 788,788 875,831 875,831 9.4% 0.0%
Miscellaneous 884,706 1,184,824 884,870 1,185,310 2,427,203 1,261,419 1,258,230 6.4%‐0.3%
Intergovernmental Services / Taxes 9,125,549 9,546,878 ‐ 9,965,507 ‐ ‐ ‐ ‐100.0%N/A
Capital 44,723 5,200 81,263 5,200 1,005,912 5,200 5,200 0.0% 0.0%
Debt Service 175,000 175,000 175,000 175,000 175,000 ‐ ‐ ‐100.0%N/A
Interfund Payments for Services 12,827,274 13,923,853 13,783,197 15,777,052 12,465,758 16,991,083 17,243,309 7.7% 1.5%
Resale Purchases 5,891 6,200 11,011 6,200 6,200 6,200 6,200 0.0% 0.0%
Transfer Out 2,750,714 4,393,000 31,812,708 2,318,000 24,191,465 4,638,275 2,881,000 100.1%‐37.9%
TOTAL EXPENDITURES 92,742,459 101,224,964 127,475,888 104,574,708 124,162,621 112,741,168 113,690,900 7.8% 0.8%
Fund Balance, January 1 31,534,619 30,807,162 44,578,377 28,895,226 48,056,982 38,661,706 22,687,377 33.8%‐41.3%
Total New Revenue 105,786,218 99,312,529 130,954,493 101,435,195 114,767,345 96,766,839 106,310,953 ‐4.6%9.9%
Total Committed Expenditures (92,742,459) (101,224,964) (127,475,888) (104,574,708) (124,162,621) (112,741,168) (113,690,900) 7.8% 0.8%
Fund Balance Plus Reserves 44,578,377 28,894,727 48,056,982 25,755,713 38,661,706 22,687,377 15,307,430 ‐11.9%‐32.5%
Reserve: Economic Dev Revolving ‐ ‐ ‐ ‐ 2,500,000 2,500,000 2,500,000 100.0%0.0%
Operating Reserves ‐ ‐ ‐ ‐ ‐ 8,600,000 8,900,000 100.0%3.5%
Undesignated Fund Balance, 12/31 44,578,377 28,894,727 48,056,982 25,755,713 36,161,706 11,587,377 3,907,430 ‐55.0%‐66.3%
Funds 000/001/003/004/005/098/108 General Government Funds
The General Government Funds consist of all those funds whose majorities of revenues are from taxes (property, sales, and utility), licenses and permits, charges for services,
fines and forfeits, intergovernmental, and other miscellaneous revenues. This includes the General Fund 000, Community Services Fund 001, Street Fund 003, Community
Development Block Grant Fund 004, Museum Fund 005, Economic Development Reserve Fund 098, Leased City Properties Fund 108.
2021/2022 Preliminary Budget City of Renton, Washington
Budget by Fund - General Government 6 - 11
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Retail Sales and Use Taxes 514,105 200,000 531,587 200,000 200,000 200,000 200,000 0.0% 0.0%
Interest and Other Earnings 7,493 ‐ 12,067 ‐ ‐ ‐ ‐ N/A N/A
Other Miscellaneous Revenues 26,000 ‐ 24,000 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 547,598 200,000 567,654 200,000 200,000 200,000 200,000 0.0% 0.0%
EXPENDITURES:
Professional Services 286,645 ‐ 346,152 ‐ 429,062 ‐ ‐ N/A N/A
TOTAL EXPENDITURES 286,645 ‐ 346,152 ‐ 466,562 ‐ ‐ N/A N/A
Fund Balance, January 1 461,434 351,805 722,387 551,805 943,889 677,327 877,327 22.7% 29.5%
Total New Revenue 547,598 200,000 567,654 200,000 200,000 200,000 200,000 0.0% 0.0%
Total Committed Expenditures (286,645) ‐ (346,152) ‐ (466,562) ‐ ‐ N/A N/A
Fund Balance Plus Reserves 722,387 551,805 943,889 751,805 677,327 877,327 1,077,327 16.7% 22.8%
Undesignated Fund Balance, 12/31 722,387 551,805 943,889 751,805 677,327 877,327 1,077,327 16.7%22.8%
Fund 110, Hotel/Motel Fund
During the 1997 Legislative session, SSB 5867 was passed. SSB 5867 allows Washington State cities to impose an increase in the hotel/motel tax of up to 1 percent for the
purpose of increasing tourism. On October 13, 1997, the Renton City Council passed Resolution No. 3288 establishing a Hotel/Motel Lodging Tax Advisory Committee. The
Committee investigated the feasibility of implementing the 1 percent tax and made a recommendation to the City Council to enact this tax. The Council adopted the tax
with Ordinance No. 4697 on December 15, 1997. In 1998, a marketing campaign was created using these collected funds. The Renton Community Marketing Campaign is
designed to help brand Renton and communicate the community's many positive attributes as a place to do business, work, visit, learn, shop, live, play, and stay. The
stakeholders, including the Renton Chamber of Commerce, Renton Visitor's Connection, City of Renton, Renton School District, Renton Technical College, and Valley
Medical Center, launched the campaign to improve the image of Renton in the community and the region; promote Renton as a desirable location to do business, work,
learn, live, shop, and visit; recruit quality companies to Renton to help diversify the employment base by supporting city economic development initiatives; showcase
Renton stakeholders and their achievements; and leverage and creatively market Renton's assets and amenities. Under the authority of the Hotel/Motel Lodging Tax
Advisory Committee and the Renton City Council, a new budget is established yearly and administered through the Executive Department (Prior to 2013 it was
administered by the Community and Economic Development Department).
2021/2022 Preliminary Budget City of Renton, Washington
6 - 12Budget by Fund - Special Revenue
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Interest and Other Earnings 1,337 ‐ 1,233 ‐ ‐ ‐ ‐ N/A N/A
Transfer In 15,000 15,000 102,000 15,000 180,660 117,900 117,900 686.0% 0.0%
TOTAL RESOURCES 16,337 15,000 103,233 15,000 180,660 117,900 117,900 686.0% 0.0%
EXPENDITURES:
Supplies/Small Tools and Equipment ‐ ‐ ‐ ‐ 200 200 200 100.0% 0.0%
Travel/Training ‐ ‐ ‐ ‐ 200 200 200 100.0% 0.0%
Miscellaneous ‐ ‐ ‐ ‐ 183,260 102,500 102,500 100.0%0.0%
Capital ‐ 15,000 123,814 15,000 88,130 15,000 15,000 0.0% 0.0%
TOTAL EXPENDITURES ‐ 15,000 123,814 15,000 271,790 117,900 117,900 686.0% 0.0%
Fund Balance, January 1 103,109 64,426 119,446 64,426 98,865 7,735 7,735 ‐88.0% 0.0%
Total New Revenue 16,337 15,000 103,233 15,000 180,660 117,900 117,900 686.0% 0.0%
Total Committed Expenditures ‐ (15,000) (123,814) (15,000) (271,790) (117,900) (117,900) 686.0% 0.0%
Fund Balance Plus Reserves 119,446 64,426 98,865 64,426 7,735 7,735 7,735 ‐88.0% 0.0%
Undesignated Fund Balance, 12/31 119,446 64,426 98,865 64,426 7,735 7,735 7,735 ‐88.0% 0.0%
Fund 125, Municipal Art Fund
The Municipal Art Fund was established to account for the activities of the Renton Municipal Arts Commission, as outlined in Renton Municipal Code (RMC) section 2‐8‐7.
Expenditures include grants paid to local artists, organizations, and community groups for arts and culture projects and events that serve the general public in Renton and
payments for Public Art capital projects located throughout the City.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 13Budget by Fund - Special Revenue
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Utility Taxes 40,000 40,000 40,000 40,000 ‐ ‐ ‐ ‐100.0% N/A
Other Taxes 61,828 57,674 85,177 57,674 57,674 57,674 57,674 0.0% 0.0%
Interest and Other Earnings 6,751 ‐ 8,288 ‐ ‐ ‐ ‐ N/A N/A
Transfer In ‐ ‐ ‐ ‐ 40,000 40,000 40,000 100.0% 0.0%
TOTAL RESOURCES 108,579 97,674 133,465 97,674 97,674 97,674 97,674 0.0% 0.0%
EXPENDITURES:
Supplies/Small Tools and Equipment ‐ 6,302 304 6,302 6,302 6,302 6,302 0.0%0.0%
Professional Services 16,102 42,702 49,246 42,702 42,702 42,702 42,702 0.0% 0.0%
Repairs & Maintenance ‐ 8,670 ‐ 8,670 8,670 8,670 8,670 0.0% 0.0%
Capital ‐ 40,000 ‐ 40,000 40,000 40,000 40,000 0.0% 0.0%
TOTAL EXPENDITURES 51,909 97,674 58,863 97,674 97,674 97,674 97,674 0.0% 0.0%
Fund Balance, January 1 472,489 472,489 529,159 472,489 603,760 603,760 603,760 27.8%0.0%
Total New Revenue 108,579 97,674 133,465 97,674 97,674 97,674 97,674 0.0% 0.0%
Total Committed Expenditures (51,909) (97,674) (58,863) (97,674) (97,674) (97,674) (97,674) 0.0% 0.0%
Fund Balance Plus Reserves 529,159 472,489 603,760 472,489 603,760 603,760 603,760 27.8% 0.0%
Undesignated Fund Balance, 12/31 529,159 472,489 603,760 472,489 603,760 603,760 603,760 27.8% 0.0%
Fund 127, Cable Communications Development Fund
The Cable Communications Development Fund, which is managed by the City Clerk's office, was established to provide promotion and development of cable
communications. The City uses a character generator to issue public information over a municipal access cable TV channel (Channel 21). The City Clerk's office is
responsible for gathering, formatting and programming the information submitted by City departments and external organizations for broadcast. On May 8, 1995, Council
authorized the broadcasting of weekly Council meetings on Channel 21. In December 1995, Council authorized the broadcasting of the Committee of the Whole meetings.
In 1998, the City began to produce quarterly videos on various highlights of the City. This included major private and public capital projects and highlights of major City
sponsored events.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 14Budget by Fund - Special Revenue
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Interest and Other Earnings 4,367 ‐ 4,763 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 4,367 ‐ 4,763 ‐ ‐ ‐ ‐ N/A N/A
EXPENDITURES:
TOTAL EXPENDITURES ‐ ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Fund Balance, January 1 336,528 336,528 340,895 336,528 345,658 345,658 345,658 2.7% 0.0%
Total New Revenue 4,367 ‐ 4,763 ‐ ‐ ‐ ‐ N/A N/A
Total Committed Expenditures ‐ ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Fund Balance Plus Reserves 340,895 336,528 345,658 336,528 345,658 345,658 345,658 2.7% 0.0%
Undesignated Fund Balance, 12/31 340,895 336,528 345,658 336,528 345,658 345,658 345,658 2.7% 0.0%
Fund 135, Springbrook Wetlands Bank
Per Ordinance 5269,in 2007, a new fund was created Fund 135, Springbrook Wetlands Bank Fund. The purpose of the fund is to provide accounting for the Springbrook
Creek Wetland and Habitat Mitigation Bank project. The Fund will receive revenue by selling Wetland credits to the third parties and to the City's internal departments. The
revenue received will pay for managing the wetlands.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 15Budget by Fund - Special Revenue
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Property Taxes 1,624,468 3,492,592 ‐ 3,851,592 ‐ ‐ ‐ ‐100.0%N/A
Other Taxes 3,395,124 2,627,000 ‐ 2,268,000 ‐ ‐ ‐ ‐100.0%N/A
Federal/State Grants 69,434 63,255 63,526 56,930 56,930 50,983 44,610 ‐10.4%‐12.5%
Charges for Goods and Services 357,660 372,059 372,058 386,827 386,827 63,648 ‐ ‐83.5%‐100.0%
Interest and Other Earnings 52,423 ‐ 62,171.26 ‐ ‐ ‐ ‐ N/AN/A
Transfer In 142,975 128,576 8,009,403 113,808 7,616,654 7,030,387 4,289,359 6077.4%‐39.0%
TOTAL RESOURCES 5,642,083 6,683,482 8,507,159 6,677,157 8,060,411 7,145,018 4,333,969 7.0%‐39.3%
EXPENDITURES:
Debt Service 5,696,184 6,793,668 6,814,874 6,798,436 7,162,386 7,153,019 4,341,920 5.2%‐39.3%
TOTAL EXPENDITURES 5,696,184 6,793,668 6,814,874 6,798,436 7,162,386 7,153,019 4,341,920 5.2%‐39.3%
Fund Balance, January 1 2,361,274 2,307,173 2,307,173 3,999,457 3,999,457 4,897,482 4,889,481 22.5%‐0.2%
Total New Revenue 5,642,083 6,683,482 8,507,159 6,677,157 8,060,411 7,145,018 4,333,969 7.0%‐39.3%
Total Committed Expenditures (5,696,184) (6,793,668) (6,814,874) (6,798,436) (7,162,386) (7,153,019) (4,341,920) 5.2%‐39.3%
Fund Balance Plus Reserves 2,307,173 2,196,987 3,999,457 3,878,178 4,897,482 4,889,481 4,881,530 26.1%‐0.2%
Bond Reserves ‐ ‐ ‐ ‐ 2,711,725 2,717,575 100.0%0.2%
Undesignated Fund Balance, December 31 2,307,173 2,144,063 3,999,457 2,022,784 4,897,482 2,177,756 2,163,955 7.7%‐0.6%
Fund 215, Limited Tax General Obligation Bonds
Council‐approved general obligation debt is also known as limited tax general obligation debt (LTGO) or councilmanic debt. Fund (215) maintains the revenue and
expenditures associated with various issues including but not limited to 2010 issue for the downtown parking garage; 2011 issue for two new libraries; 2013 issue for street
light improvements; 2015 refunding issue for the South Lake Washington infrastructure improvements; 2019 issue for improving parks and trails in the City; 2019 issue for
improving the South Lake Washington Revitalization Area. This fund also maintains the revenue and expenditures associated with the Fire District #40 loan related to the FD
#40 asset transfer as a result of the Benson Hill annexation; and the South Correctional Entity Regional Jail (SCORE) refunding Bonds (A & B) issued to refund the outstanding
balance of the 2009SCORE Bonds A & B used for the acquisition, construction and equipping for the operation of the South Correctional Entity Regional Jail (SCORE), a facility
located in Des Moines, Washington . The outstanding balance for general obligation bonds and other intergovernmental debt as of January 1, 2021 is $57,707,502.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 16Budget by Fund - Debt Service
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Charges for Goods and Services 640,651 86,500 469,290 86,500 86,500 86,500 86,500 0.0% 0.0%
Interest and Other Earnings 28,250 ‐ 39,453 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 668,901 86,500 508,743 86,500 86,500 86,500 86,500 0.0% 0.0%
EXPENDITURES:
Transfer Out ‐ 1,629,000 1,200,000 600,000 945,909 316,000 ‐ ‐47.3%‐100.0%
TOTAL EXPENDITURES ‐ 1,629,000 1,200,000 600,000 945,909 316,000 ‐ ‐47.3%‐100.0%
Fund Balance, January 1 1,909,355 2,226,393 2,578,256 683,893 1,886,999 1,027,590 798,090 50.3%‐22.3%
Total New Revenue 668,901 86,500 508,743 86,500 86,500 86,500 86,500 0.0% 0.0%
Total Committed Expenditures ‐ (1,629,000) (1,200,000) (600,000) (945,909) (316,000) ‐ ‐47.3%‐100.0%
Fund Balance Plus Reserves 2,578,256 683,893 1,886,999 170,393 1,027,590 798,090 884,590 368.4% 10.8%
Undesignated Fund Balance, 12/31 2,578,256 683,893 1,886,999 170,393 1,027,590 798,090 884,590 368.4%10.8%
Fund 303, Community Development Impact Mitigation Fund
Fund 303 was created in 1999 for the purpose of identifying Community Development (Park) Impact Mitigation revenue and expenditures. Mitigation feesarechargedto
new residential development. Revenue is collected at the time a permit is issued.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 17Budget by Fund - Capital Investment Program
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Charges for Goods and Services 644,521 99,000 769,766 99,000 99,000 99,000 99,000 0.0% 0.0%
Interest and Other Earnings 17,151 ‐ 23,698 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 661,672 99,000 793,464 99,000 99,000 99,000 99,000 0.0% 0.0%
EXPENDITURES:
Transfer Out 142,975 128,576 128,575 113,808 113,808 436,987 500,634 284.0% 14.6%
TOTAL EXPENDITURES 142,975 128,576 128,575 113,808 113,808 436,987 500,634 284.0% 14.6%
Fund Balance, January 1 936,972 892,997 1,455,669 863,421 2,120,558 2,105,750 1,767,763 143.9%‐16.1%
Total New Revenue 661,672 99,000 793,464 99,000 99,000 99,000 99,000 0.0% 0.0%
Total Committed Expenditures (142,975) (128,576) (128,575) (113,808) (113,808) (436,987) (500,634) 284.0% 14.6%
Fund Balance Plus Reserves 1,455,669 863,421 2,120,558 848,613 2,105,750 1,767,763 1,366,129 108.3%‐22.7%
Undesignated Fund Balance, 12/31 1,455,669 863,421 2,120,558 848,613 2,105,750 1,767,763 1,366,129 108.3%‐22.7%
Fund 304, Fire Impact Mitigation Fund
Fund 304 was created for the purpose of identifying Fire Impact Mitigation revenue and expenditures. Mitigation fees are charged to new development near existing fire
stations and developments located farther out. Revenue is collected at the time a permit is issued.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 18Budget by Fund - Capital Investment Program
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Charges for Goods and Services 2,991,336 1,020,000 1,875,489 1,435,875 1,435,875 200,000 200,000 ‐86.1% 0.0%
Interest and Other Earnings 35,227 ‐ 58,530 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 3,026,562 1,020,000 1,934,020 1,435,875 1,435,875 200,000 200,000 ‐86.1% 0.0%
EXPENDITURES:
Transfer Out 505,000 950,000 2,324,200 1,640,362 1,811,987 200,000 200,000 ‐87.8% 0.0%
TOTAL EXPENDITURES 505,000 950,000 2,324,200 1,640,362 1,811,987 200,000 200,000 ‐87.8%0.0%
Fund Balance, January 1 810,962 938,362 3,332,524 1,008,362 2,942,344 2,566,232 2,566,232 154.5% 0.0%
Total New Revenue 3,026,562 1,020,000 1,934,020 1,435,875 1,435,875 200,000 200,000 ‐86.1% 0.0%
Total Committed Expenditures (505,000) (950,000) (2,324,200) (1,640,362) (1,811,987) (200,000) (200,000) ‐87.8% 0.0%
Fund Balance Plus Reserves 3,332,524 1,008,362 2,942,344 803,875 2,566,232 2,566,232 2,566,232 219.2% 0.0%
Undesignated Fund Balance, 12/31 3,332,524 1,008,362 2,942,344 803,875 2,566,232 2,566,232 2,566,232 219.2%0.0%
Fund 305, Transportation Impact Mitigation Fund
Fund 305 was created for the purpose of identifying Transportation Impact Mitigation revenue and expenditures. Mitigation fees are charged to new development projects
within Renton city limits using a vehicle trip rate that has been established based on the number of vehicle trips generated by new development.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 19Budget by Fund - Capital Investment Program
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Other Taxes ‐ ‐ ‐ ‐ 2,000,000 2,250,000 2,300,000 100.0% 2.2%
Transfer In ‐ ‐ ‐ ‐ 1,143,855 ‐ ‐ N/A N/A
TOTAL RESOURCES ‐ ‐ ‐ ‐ 3,143,855 2,250,000 2,300,000 100.0% 2.2%
EXPENDITURES:
Transfer Out ‐ ‐ ‐ ‐ 1,775,000 2,865,000 2,315,000 100.0%‐19.2%
TOTAL EXPENDITURES ‐ ‐ ‐ ‐ 1,775,000 2,865,000 2,315,000 100.0%‐19.2%
Fund Balance, January 1 ‐ ‐ ‐ ‐ ‐ 1,368,855 753,855 100.0%‐44.9%
Total New Revenue ‐ ‐ ‐ ‐ 3,143,855 2,250,000 2,300,000 100.0% 2.2%
Total Committed Expenditures ‐ ‐ ‐ ‐ (1,775,000) (2,865,000) (2,315,000) 100.0%‐19.2%
Fund Balance Plus Reserves ‐ ‐ ‐ ‐ 1,368,855 753,855 738,855 100.0%‐2.0%
Undesignated Fund Balance, 12/31 ‐ ‐ ‐ ‐ 1,368,855 753,855 738,855 100.0%‐2.0%
Fund 308, REET 1 Fund
This fund accounts for the first quarter percent of real estate excise tax (REET) levied in accordance with RCW 82.46.010. The tax may be used for eligible capital projects, as
defined in RCW.82.46.010(6), that are included in the capital facilities element of the City’s comprehensive plan. REET 1 tax revenues are held in this fund and subsequently
transferred to the appropriate capital project fund when qualifying projects are budgeted.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 20Budget by Fund - Capital Investment Program
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Other Taxes ‐ ‐ ‐ ‐ 2,000,000 2,250,000 2,300,000 100.0% 2.2%
Transfer In ‐ ‐ ‐ ‐ 1,143,855 ‐ ‐ N/A N/A
TOTAL RESOURCES ‐ ‐ ‐ ‐ 3,143,855 2,250,000 2,300,000 100.0% 2.2%
EXPENDITURES:
Transfer Out ‐ ‐ ‐ ‐ 1,692,404 3,248,025 2,750,625 100.0%‐15.3%
TOTAL EXPENDITURES ‐ ‐ ‐ ‐ 1,692,404 3,248,025 2,750,625 100.0%‐15.3%
Fund Balance, January 1 ‐ ‐ ‐ ‐ ‐ 1,451,451 453,426 100.0%‐68.8%
Total New Revenue ‐ ‐ ‐ ‐ 3,143,855 2,250,000 2,300,000 100.0% 2.2%
Total Committed Expenditures ‐ ‐ ‐ ‐ (1,692,404) (3,248,025) (2,750,625) 100.0%‐15.3%
Fund Balance Plus Reserves ‐ ‐ ‐ ‐ 1,451,451 453,426 2,801 100.0%‐99.4%
Undesignated Fund Balance, 12/31 ‐ ‐ ‐ ‐ 1,451,451 453,426 2,801 100.0%‐99.4%
Fund 309, REET 2 Fund
This fund accounts for the second quarter percent of real estate excise tax (REET) levied in accordance with RCW 82.46.035. The tax may be used for eligible capital
projects, as defined in RCW.82.46.035(5), that are included in the capital facilities element of the City’s comprehensive plan. REET 2 tax revenues are held in this fund and
subsequently transferred to the appropriate capital project fund when qualifying projects are budgeted.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 21Budget by Fund - Capital Investment Program
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Other Taxes 4,420,000 1,373,000 ‐ 1,732,000 ‐ ‐ ‐ ‐100.0% N/A
Federal/State Grants 1,560,661 ‐ 487,585 ‐ 3,218,252 ‐ ‐ N/A N/A
Other Intergovernmental Revenues 624,337 ‐ 244,370 ‐ 542,500 300,000 300,000 100.0% 0.0%
Charges for Goods and Services 62,619 ‐ 10,643 ‐ ‐ ‐ ‐ N/A N/A
Interest and Other Earnings 284,317 ‐ 412,656 ‐ 175,910 86,185 162,840 100.0% 88.9%
Other Miscellaneous Revenues 173,116 ‐ 288,462 ‐ 11,000 ‐ ‐ N/A N/A
Other Financing Sources 849,460 ‐ 180,000 ‐ 160,000 ‐ ‐ N/A N/A
Transfer In 1,000,000 4,256,000 2,077,000 2,868,000 2,772,909 2,316,000 2,000,000 ‐19.2%‐13.6%
TOTAL RESOURCES 8,974,509 5,629,000 18,359,424 4,600,000 6,880,571 2,702,185 2,462,840 ‐41.3%‐8.9%
EXPENDITURES:
Supplies/Small Tools and Equipment 8,926 ‐ 126,551 ‐ 878,203 ‐ ‐ N/A N/A
Professional Services 365,496 455,000 236,546 425,000 114,774 ‐ 125,000 ‐100.0% 100.0%
Utilities 163 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Repairs & Maintenance 172,824 300,000 41,060 200,000 564,667 ‐ ‐ ‐100.0% N/A
Miscellaneous 4,226 ‐ ‐ ‐ 10,000 ‐ ‐ N/A N/A
Intergovernmental Services / Taxes 10 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Capital 7,246,884 5,746,750 9,718,976 3,818,004 27,533,280 2,560,185 1,926,927 ‐32.9%‐24.7%
Debt Service ‐ ‐ 152,670 ‐ ‐ ‐ ‐ N/A N/A
Interfund Payments for Services 172,438 389,607 438,323 406,676 746,459 394,248 404,035 ‐3.1% 2.5%
Transfer Out ‐ ‐ 1,924,970 ‐ 2,323,680 ‐ ‐ N/A N/A
TOTAL EXPENDITURES 7,970,967 6,891,357 12,639,095 4,849,680 32,171,063 2,954,433 2,455,962 ‐39.1%‐16.9%
Fund Balance, January 1 19,671,696 2,660,523 20,675,238 1,398,166 26,395,567 1,105,075 852,827 ‐21.0%‐22.8%
Total New Revenue 8,974,509 5,629,000 18,359,424 4,600,000 6,880,571 2,702,185 2,462,840 ‐41.3%‐8.9%
Total Committed Expenditures (7,970,967) (6,891,357) (12,639,095) (4,849,680) (32,171,063) (2,954,433) (2,455,962) ‐39.1%‐16.9%
Fund Balance Plus Reserves 20,675,238 1,398,166 26,395,567 1,148,486 1,105,075 852,827 859,705 ‐25.7% 0.8%
Undesignated Fund Balance, 12/31 20,675,238 1,398,166 26,395,567 1,148,486 1,105,075 852,827 859,705 ‐25.7% 0.8%
Fund 316, Municipal Facilities Capital Investment Fund
This fund is used to fund facility improvements and renovations, property acquisitions for parks and City space needs, parks development and equipment, and major
capital requirements as identified in the Capital Investment Program (CIP), Section 5.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 22Budget by Fund - Capital Investment Program
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Business & Occupation Taxes 1,379,314 2,000,000 ‐ 2,040,000 ‐ ‐ ‐ ‐100.0% N/A
Business Licenses and Permits 356,629 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Federal/State Grants 2,599,311 11,740,639 2,148,111 9,960,761 18,141,453 ‐ ‐ ‐100.0% N/A
Other Intergovernmental Revenues 147,351 2,800,000 144,127 ‐ 140,000 ‐ ‐ N/A N/A
Charges for Goods and Services ‐ ‐ ‐ ‐ 250,000 ‐ ‐ N/A N/A
Fines and Forfeits 38,056 ‐ 55,788 ‐ 7,200 ‐ ‐ N/A N/A
Interest and Other Earnings 71,387 ‐ 148,433 ‐ 70,000 ‐ ‐ N/A N/A
Other Miscellaneous Revenues 301,016 3,455,069 238,518 2,396,000 3,850,000 ‐ ‐ ‐100.0% N/A
Transfer In 1,425,000 1,700,000 8,479,757 2,400,362 4,669,687 2,200,000 2,200,000 ‐8.3% 0.0%
TOTAL RESOURCES 6,318,065 21,695,708 19,999,217 16,797,123 27,128,339 2,200,000 2,200,000 ‐86.9% 0.0%
EXPENDITURES:
Regular Salaries 634,086 ‐ 119,458 ‐ 56,000 ‐ ‐ N/A N/A
Supplies/Small Tools and Equipment 186,825 ‐ 44,903 ‐ ‐ ‐ ‐ N/A N/A
Professional Services 66,501 ‐ 31,063 ‐ ‐ ‐ ‐ N/A N/A
Operating Rentals 380 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Repairs & Maintenance ‐ ‐ 153,756 ‐ ‐ ‐ ‐ N/A N/A
Capital 5,731,498 21,190,208 6,036,639 17,564,673 45,242,768 675,250 583,000 ‐96.2%‐13.7%
Debt Service ‐ ‐ 91,358 ‐ ‐ ‐ ‐ N/A N/A
Transfer Out 15,000 15,000 66,500 15,000 ‐ ‐ ‐ ‐100.0% N/A
TOTAL EXPENDITURES 6,634,290 21,205,208 6,543,678 17,579,673 45,298,768 675,250 583,000 ‐96.2%‐13.7%
Fund Balance, January 1 5,808,539 1,141,331 5,492,313 1,631,831 18,947,853 777,424 2,302,174 ‐52.4% 196.1%
Total New Revenue 6,318,065 21,695,708 19,999,217 16,797,123 27,128,339 2,200,000 2,200,000 ‐86.9% 0.0%
Total Committed Expenditures (6,634,290) (21,205,208) (6,543,678) (17,579,673) (45,298,768) (675,250) (583,000) ‐96.2%‐13.7%
Fund Balance Plus Reserves 5,492,313 1,631,831 18,947,853 849,281 777,424 2,302,174 3,919,174 171.1% 70.2%
Undesignated Fund Balance, 12/31 5,492,313 1,631,831 18,947,853 849,281 777,424 2,302,174 3,919,174 171.1% 70.2%
Fund 317, Transportation Capital Improvement Fund
This fund supports City of Renton transportation projects and projects linked with various State and Federal Funding programs. Many of the projects are dependent on
acquisition of outside grants, formation of LID's and mitigation revenue. See the Capital Investment Program (CIP) Section 5, for further details regarding specific
projects/programs.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 23Budget by Fund - Capital Investment Program
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Interest and Other Earnings 5,510 ‐ 5,408 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 5,510 ‐ 5,408 ‐ ‐ ‐ ‐ N/A N/A
EXPENDITURES:
Intergovernmental Services / Taxes 12 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Transfer Out ‐ ‐ 445,591 ‐ ‐ ‐ ‐ N/A N/A
TOTAL EXPENDITURES 12 ‐ 445,591 ‐ ‐ ‐ ‐ N/A N/A
Fund Balance, January 1 451,093 451,093 456,591 451,093 16,408 16,408 16,408 ‐96.4% 0.0%
Total New Revenue 5,510 ‐ 5,408 ‐ ‐ ‐ ‐ N/A N/A
Total Committed Expenditures (12) ‐ (445,591) ‐ ‐ ‐ ‐ N/A N/A
Fund Balance Plus Reserves 456,591 451,093 16,408 451,093 16,408 16,408 16,408 ‐96.4% 0.0%
Capital Reserves 456,591 451,093 16,408 451,093 16,408 16,408 16,408 ‐96.4% 0.0%
Undesignated Fund Balance, 12/31 ‐ ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Fund 336, New Library Development Fund
This fund was created in 2011 to provide the accounting for revenues and expenditures used to construct two new libraries.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 24Budget by Fund - Capital Investment Program
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Other Intergovernmental Revenues ‐ ‐ ‐ ‐ 75,000 ‐ ‐ N/A N/A
Interest and Other Earnings 55,675 ‐ 60,791 ‐ ‐ ‐ ‐ N/A N/A
Other Miscellaneous Revenues 230,383 ‐ 37,495 ‐ ‐ ‐ ‐ N/A N/A
Transfer In ‐ ‐ 5,000,000 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 286,058 ‐ 5,098,286 ‐ 75,000 ‐ ‐ N/A N/A
EXPENDITURES:
Professional Services 89,759 ‐ 44,579 ‐ ‐ ‐ ‐ N/A N/A
Capital 160,385 ‐ 696,113 ‐ 648,948 500,000 ‐ 100.0%‐100.0%
TOTAL EXPENDITURES 250,143 ‐ 740,692 ‐ 648,948 500,000 ‐ 100.0%‐100.0%
Fund Balance, January 1 4,157,891 3,826,891 4,193,806 3,826,891 8,551,401 7,977,453 7,477,453 108.5%‐6.3%
Total New Revenue 286,058 ‐ 5,098,286 ‐ 75,000 ‐ ‐ N/A N/A
Total Committed Expenditures (250,143) ‐ (740,692) ‐ (648,948) (500,000) ‐ 100.0%‐100.0%
Fund Balance Plus Reserves 4,193,806 3,826,891 8,551,401 3,826,891 7,977,453 7,477,453 7,477,453 95.4% 0.0%
Capital Reserves 4,193,806 3,826,891 8,551,401 3,826,891 7,977,453 7,477,453 7,477,453 95.4% 0.0%
Undesignated Fund Balance, 12/31 ‐ ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Fund 346, New Family First Center Development Fund
This fund was created in 2017 to provide the accounting for revenues and expenditures used to construct a new community center.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 25Budget by Fund - Capital Investment Program
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Federal/State Grants 111,927 ‐ 198,148 ‐ ‐ ‐ ‐ N/A N/A
Charges for Goods and Services 291,873 145,557 291,026 145,557 145,557 145,557 145,557 0.0% 0.0%
Fines and Forfeits 316 ‐ 617 ‐ ‐ ‐ ‐ N/A N/A
Interest and Other Earnings 54,953 3,857 80,297 3,857 3,857 3,857 3,857 0.0% 0.0%
Rents, Leases, and Concessions 3,074,662 2,902,353 2,876,245 2,902,353 2,902,353 2,902,353 2,902,353 0.0% 0.0%
Other Miscellaneous Revenues 1,375 ‐ 11,995 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 3,535,107 3,051,767 3,505,829 3,051,767 3,051,767 3,051,767 3,051,767 0.0% 0.0%
EXPENDITURES:
Regular Salaries 642,631 734,900 690,770 783,773 794,707 803,443 847,467 2.5% 5.5%
Overtime 43,831 40,000 44,178 40,000 20,000 40,000 40,000 0.0% 0.0%
Personnel Benefits 249,059 266,987 273,138 285,292 285,292 428,436 458,572 50.2% 7.0%
Part Time Salaries and Benefits 99,575 50,000 76,041 50,000 9,687 26,458 26,458 ‐47.1% 0.0%
Supplies/Small Tools and Equipment 45,763 45,000 54,659 45,000 43,500 35,630 35,630 ‐20.8% 0.0%
Professional Services 284,043 100,000 285,173 100,000 246,214 175,000 175,000 75.0% 0.0%
Communication 929 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Travel/Training 22,830 30,000 19,553 30,000 10,000 28,000 28,000 ‐6.7% 0.0%
Advertising 1,392 ‐ 953 ‐ 500 2,000 2,000 100.0% 0.0%
Operating Rentals 17,503 19,020 22,078 19,020 23,020 22,500 22,500 18.3% 0.0%
Utilities 201,119 166,854 188,758 166,854 170,854 198,650 198,650 19.1% 0.0%
Repairs & Maintenance 31,601 35,000 27,630 35,000 36,000 555,500 455,500 1487.1%‐18.0%
Miscellaneous 9,861 7,500 11,642 7,500 4,500 8,500 8,500 13.3% 0.0%
Intergovernmental Services / Taxes 4,140 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Capital 62,857 925,000 213,110 525,000 5,893,386 277,000 227,000 ‐47.2%‐18.1%
Interfund Payments for Services 277,967 325,168 318,122 351,674 310,765 393,723 401,957 12.0% 2.1%
Transfer Out 13,820 ‐ 6,000 ‐ ‐ ‐ ‐ N/A N/A
TOTAL EXPENDITURES 2,008,919 2,745,429 2,231,804 2,439,113 7,848,424 2,994,840 2,927,234 22.8%‐2.3%
Fund Balance, January 1 3,459,189 887,289 4,985,377 1,193,627 6,259,402 1,462,745 1,519,672 22.5% 3.9%
Total New Revenue 3,535,107 3,051,767 3,505,829 3,051,767 3,051,767 3,051,767 3,051,767 0.0% 0.0%
Total Committed Expenditures (2,008,919) (2,745,429) (2,231,804) (2,439,113) (7,848,424) (2,994,840) (2,927,234) 22.8%‐2.3%
Fund Balance Plus Reserves 4,985,377 1,193,627 6,259,402 1,806,281 1,462,745 1,519,672 1,644,205 ‐15.9% 8.2%
Capital Reserves 1,242,102 1,011,584 372,867 1,614,870 1,089,945 1,115,207 1,418,501 ‐30.9% 27.2%
Operating Reserves 171,049 182,043 179,254 191,411 185,119 216,784 225,023 13.3% 3.8%
Undesignated Fund Balance, 12/31 3,572,226 ‐ 5,707,281 ‐ 187,681 187,681 681 100.0%‐99.6%
Funds 4X2 Airport Operations and Capital Improvement Funds
The Airport Fund supports administration, operation, and maintenance of the Renton Municipal Airport. The Airport is a section of the Public Works Transportation Systems.
Funding for capital improvements is primarily from federal/state grants and airport leasing agreements. For more detailed information, see the City of Renton CIP, Section 5.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 26Budget by Fund - Enterprise
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Other Intergovernmental Revenues 83,779 157,533 167,153 157,533 268,631 ‐ ‐ ‐100.0% N/A
Charges for Goods and Services 18,527,911 19,343,186 20,314,470 19,343,186 19,343,186 22,636,386 23,103,703 17.0% 2.1%
Interest and Other Earnings 34,079 5,000 35,550 5,000 5,000 5,000 5,000 0.0% 0.0%
Rents, Leases, and Concessions 7,675 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Other Miscellaneous Revenues 80 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 18,653,524 19,505,719 20,517,174 19,505,719 19,616,816 22,641,386 23,108,703 16.1% 2.1%
EXPENDITURES:
Regular Salaries 389,617 429,669 412,983 451,240 421,451 459,938 471,616 1.9% 2.5%
Overtime 1,748 1,372 1,474 1,372 1,372 1,372 1,372 0.0% 0.0%
Personnel Benefits 149,327 162,372 163,948 172,351 156,903 265,775 282,172 54.2% 6.2%
Part Time Salaries and Benefits ‐ ‐ 4,283 ‐ ‐ ‐ ‐ N/A N/A
Supplies/Small Tools and Equipment 17,862 11,900 11,212 11,900 10,171 11,900 11,900 0.0%0.0%
Professional Services 136,860 158,917 61,092 158,917 233,955 54,031 54,031 ‐66.0% 0.0%
Communication 79 1,122 ‐ 1,122 1,122 1,122 1,122 0.0% 0.0%
Travel/Training 4,172 7,008 3,584 7,008 3,926 7,008 7,008 0.0% 0.0%
Operating Rentals 1,896 ‐ 1,758 ‐ ‐ 2,500 2,500 100.0% 0.0%
Utilities 15,421,161 15,411,758 16,483,340 15,411,758 15,411,758 18,054,117 18,664,911 17.1% 3.4%
Repairs & Maintenance ‐ 612 ‐ 612 306 612 612 0.0% 0.0%
Miscellaneous 887 7,563 2,907,221 7,563 1,264,485 3,409,324 3,546,223 44979.0%4.0%
Intergovernmental Services / Taxes 2,785,288 2,682,798 ‐ 2,682,798 1,423,152 ‐ ‐ ‐100.0% N/A
Interfund Payments for Services 467,024 472,643 476,486 494,855 438,482 307,835 308,556 ‐37.8% 0.2%
Transfer Out 1,582 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
TOTAL EXPENDITURES 19,377,503 19,347,734 20,527,380 19,401,496 19,367,083 22,575,534 23,352,023 16.4% 3.4%
Fund Balance, January 1 3,000,312 3,137,522 2,276,333 3,295,506 2,266,127 2,515,860 2,581,712 ‐23.7%2.6%
Total New Revenue 18,653,524 19,505,719 20,517,174 19,505,719 19,616,816 22,641,386 23,108,703 16.1% 2.1%
Total Committed Expenditures (19,377,503) (19,347,734) (20,527,380) (19,401,496) (19,367,083) (22,575,534) (23,352,023) 16.4% 3.4%
Fund Balance Plus Reserves 2,276,333 3,295,506 2,266,127 3,399,729 2,515,860 2,581,712 2,338,392 ‐24.1%‐9.4%
Operating Reserves*400,000 400,000 400,000 400,000 400,000 400,000 400,000 0.0% 0.0%
Undesignated Fund Balance, 12/31 1,876,333 2,895,506 1,866,127 2,999,729 2,115,860 2,181,712 1,938,392 ‐27.3%‐11.2%
Fund 403, Solid Waste Utility Fund
The Solid Waste Utility Fund accounts for contracted garbage collection services to customers. There are three sections of the Public Works Department supported by this
fund: Solid Waste Utility Billing (403/004), Solid Waste Utility Systems (403/18), and Solid Waste Maintenance (403/19).
2021/2022 Preliminary Budget City of Renton, Washington
6 - 27Budget by Fund - Enterprise
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Federal/State Grants 5,259 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Charges for Goods and Services 1,879,699 1,951,600 1,954,194 2,003,600 2,294,800 2,304,205 2,383,485 15.0% 3.4%
Interest and Other Earnings 4,965 770 6,263 770 770 770 770 0.0% 0.0%
Rents, Leases, and Concessions 436,966 407,100 456,998 452,320 500,750 527,600 527,600 16.6% 0.0%
Other Miscellaneous Revenues 8,429 550 1,805 600 600 600 600 0.0% 0.0%
Transfer In 70,000 72,000 72,000 76,000 76,000 68,100 72,200 ‐10.4% 6.0%
TOTAL RESOURCES 2,405,318 2,432,020 2,491,260 2,533,290 2,872,920 2,901,275 2,984,655 14.5% 2.9%
EXPENDITURES:
Regular Salaries 758,166 786,088 795,381 812,300 853,470 943,357 972,233 16.1% 3.1%
Overtime 13,813 1,020 5,192 1,020 1,020 1,020 1,020 0.0% 0.0%
Personnel Benefits 361,101 377,559 355,964 398,421 426,234 497,247 526,745 24.8% 5.9%
Part Time Salaries and Benefits 314,533 312,500 344,450 312,500 231,468 231,468 231,468 ‐25.9% 0.0%
Supplies/Small Tools and Equipment 246,843 187,200 224,475 195,500 195,500 195,500 195,500 0.0% 0.0%
Professional Services 165 4,000 3,721 4,000 4,000 4,000 4,000 0.0% 0.0%
Communication ‐ ‐ 7 ‐ ‐ ‐ ‐ N/A N/A
Travel/Training 2,650 900 2,147 900 900 900 900 0.0% 0.0%
Advertising 4,289 6,000 3,150 6,000 6,000 6,000 6,000 0.0% 0.0%
Operating Rentals 7,039 11,000 19,544 11,000 11,000 11,000 11,000 0.0% 0.0%
Utilities 38,993 39,000 38,036 39,000 39,000 39,000 39,000 0.0% 0.0%
Repairs & Maintenance 102,372 55,300 157,041 127,300 127,300 98,400 79,500 ‐22.7%‐19.2%
Miscellaneous 4,217 4,850 15,807 4,850 16,850 16,850 16,850 247.4% 0.0%
Intergovernmental Services / Taxes 11,285 11,000 ‐ 12,000 ‐ ‐ ‐ ‐100.0% N/A
Capital 797 20,000 14,140 20,000 20,000 45,000 68,000 125.0% 51.1%
Interfund Payments for Services 242,660 258,000 251,689 278,377 341,940 350,258 360,550 25.8% 2.9%
Resale Purchases 120,851 115,000 122,133 126,000 126,000 126,000 126,000 0.0% 0.0%
Transfer Out 70,000 72,000 75,443 76,000 76,000 68,100 72,200 ‐10.4% 6.0%
TOTAL EXPENDITURES 2,299,773 2,261,417 2,428,321 2,425,168 2,476,682 2,634,100 2,710,966 8.6% 2.9%
Fund Balance, January 1 5,267 4,895 110,811 175,498 173,750 569,988 837,163 224.8% 46.9%
Total New Revenue 2,405,318 2,432,020 2,491,260 2,533,290 2,872,920 2,901,275 2,984,655 14.5% 2.9%
Total Committed Expenditures (2,299,773) (2,261,417) (2,428,321) (2,425,168) (2,476,682) (2,634,100) (2,710,966) 8.6% 2.9%
Fund Balance Plus Reserves 110,811 175,498 173,750 283,620 569,988 837,163 1,110,852 195.2% 32.7%
Operating Reserves 569,899 565,354 580,284 588,292 601,171 641,500 659,691 9.0% 2.8%
Undesignated Fund Balance, 12/31 (459,088) (389,856) (406,534) (304,671) (31,183) 195,664 451,161 ‐164.2% 130.6%
Funds 4X4 Golf Course Operations and Capital Improvement Funds
The golf course fund was created in 1985 to account for the revenues and expenditures of the Maplewood Golf Course. The golf course is an 18‐hole golf complex which includes a
driving range and clubhouse housing a pro shop, restaurant, and meeting rooms. The golf course is owned and operated by the City through the Parks division of the Community
Services department. See the Community Services operating budget section for more information. Funding for capital improvements are through green fees. For more detailed
information, see the City of Renton CIP, Section 5.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 28Budget by Fund - Enterprise
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Charges for Goods and Services 17,934,278 18,455,531 17,394,961 19,180,991 19,180,991 17,314,812 18,449,435 ‐9.7% 6.6%
Interest and Other Earnings 479,286 248,070 561,931 198,070 198,070 219,000 219,000 10.6% 0.0%
Rents, Leases, and Concessions 226,056 136,591 206,731 136,591 136,591 136,591 136,591 0.0% 0.0%
Other Miscellaneous Revenues 86,283 1,000 2,309 1,000 1,000 2,000 2,000 100.0% 0.0%
Capital Contributions 850,856 ‐ 415,875 ‐ ‐ 300,000 300,000 100.0% 0.0%
TOTAL RESOURCES 19,576,759 18,841,192 18,581,807 19,516,652 19,516,652 17,972,403 19,107,026 ‐7.9% 6.3%
EXPENDITURES:
Regular Salaries 2,875,650 3,065,955 2,938,993 3,188,172 3,134,185 3,130,044 3,210,118 ‐1.8% 2.6%
Overtime 57,048 74,584 58,716 74,584 74,584 74,584 74,584 0.0% 0.0%
Personnel Benefits 1,212,474 1,388,346 1,308,145 1,465,993 1,432,184 1,513,482 1,598,867 3.2% 5.6%
Part Time Salaries and Benefits 23,992 35,000 13,018 35,000 ‐ 35,000 35,000 0.0% 0.0%
Supplies/Small Tools and Equipment 844,055 885,590 959,046 885,590 833,418 885,590 885,590 0.0% 0.0%
Professional Services 442,212 229,505 437,628 229,505 313,020 255,020 255,020 11.1% 0.0%
Communication 31,829 31,871 27,419 31,871 31,871 31,871 31,871 0.0% 0.0%
Travel/Training 27,041 34,732 36,450 34,732 22,172 34,732 34,732 0.0% 0.0%
Advertising 666 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Operating Rentals 5,589 4,182 12,276 4,182 4,182 4,182 4,182 0.0% 0.0%
Utilities 810,752 723,817 700,698 723,817 708,817 723,817 723,817 0.0%0.0%
Repairs & Maintenance 29,303 62,856 58,599 62,856 61,428 62,856 62,856 0.0% 0.0%
Miscellaneous 58,562 82,500 1,944,860 82,500 2,051,809 2,114,075 2,248,169 2462.5% 6.3%
Intergovernmental Services / Taxes 1,959,281 1,971,896 ‐ 1,971,896 ‐ ‐ ‐ ‐100.0% N/A
Capital 3,490,574 9,159,963 6,461,095 7,909,963 37,304,963 1,489,963 3,709,963 ‐81.2% 149.0%
Debt Service 1,760,691 1,791,097 1,790,632 1,782,315 1,782,315 1,779,574 1,746,991 ‐0.2%‐1.8%
Interfund Payments for Services 1,890,613 2,319,897 2,219,647 2,502,680 2,185,563 2,799,928 2,820,517 11.9%0.7%
Transfer Out 12,656 ‐ 2,855 ‐ ‐ ‐ ‐ N/A N/A
TOTAL EXPENDITURES 15,532,990 21,861,791 18,970,076 20,985,656 49,940,511 14,934,718 17,442,277 ‐28.8% 16.8%
Fund Balance, January 1 33,913,567 8,507,916 37,957,336 5,487,317 37,569,067 7,145,207 10,182,892 30.2% 42.5%
Total New Revenue 19,576,759 18,841,192 18,581,807 19,516,652 19,516,652 17,972,403 19,107,026 ‐7.9% 6.3%
Total Committed Expenditures (15,532,990) (21,861,791) (18,970,076) (20,985,656) (49,940,511) (14,934,718) (17,442,277) ‐28.8% 16.8%
Fund Balance Plus Reserves 37,957,336 5,487,317 37,569,067 4,018,312 7,145,207 10,182,892 11,847,641 153.4% 16.3%
Bond Reserves 1,955,020 1,955,020 1,394,051 1,955,020 1,394,051 1,394,051 1,394,051 ‐28.7% 0.0%
Operating Reserves 966,635 1,076,256 1,264,220 1,122,173 1,305,984 1,403,417 1,441,834 25.1% 2.7%
Undesignated Fund Balance, 12/31 35,035,681 2,456,041 34,910,796 941,119 4,445,173 7,385,424 9,011,756 684.7% 22.0%
Fund 4X5, Water Utility Operation, Capital Improvement, and Waterworks Rate Stabilization Funds
This fund was created in 2006 for the purpose of identifying water utility revenue and expenses. Utility charges and fees provide revenue for the operation and
maintenance of the water utility and Public Works Trust Fund Loan payments. Utility collection fees, special assessment fees, connection charges, and City issued bonds
fund CIP projects. For more detailed information, see the City of Renton CIP, Section 5. Waterworks Rate Stabilization fund was created in 2003 to set aside net revenue
for future strategic opportunities in establishing the waterworks infrastructure.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 29Budget by Fund - Enterprise
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Other Licenses and Permits 83,660 61,802 112,779 61,802 61,802 62,111 62,422 0.5% 0.5%
Charges for Goods and Services 10,563,286 11,175,047 10,862,024 11,248,216 11,248,216 11,280,375 11,671,891 0.3% 3.5%
Fines and Forfeits 694 ‐ 616 ‐ ‐ ‐ ‐ N/A N/A
Interest and Other Earnings 249,103 161,266 282,176 136,266 136,266 158,000 158,000 15.9% 0.0%
Other Miscellaneous Revenues 272,016 34,500 160,517 34,500 34,500 86,000 86,000 149.3%0.0%
Capital Contributions 718,054 150,000 381,845 150,000 150,000 200,000 200,000 33.3% 0.0%
Transfer In 40,000 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 11,926,812 11,582,615 11,799,959 11,630,784 11,630,784 11,786,486 12,178,313 1.3% 3.3%
EXPENDITURES:
Regular Salaries 1,361,630 1,543,036 1,558,393 1,607,446 1,628,003 1,731,783 1,780,987 7.7% 2.8%
Overtime 25,270 33,998 32,527 33,998 33,998 33,998 33,998 0.0% 0.0%
Personnel Benefits 622,485 748,338 711,233 794,375 794,375 875,404 927,780 10.2%6.0%
Part Time Salaries and Benefits ‐ 10,000 9,551 10,000 ‐ 10,000 10,000 0.0% 0.0%
Supplies/Small Tools and Equipment 84,689 73,842 83,839 73,842 70,880 73,842 73,842 0.0% 0.0%
Professional Services 277,834 16,905 202,828 14,405 958,405 14,405 14,405 0.0% 0.0%
Communication 27,393 33,328 28,026 33,328 33,328 33,328 33,328 0.0% 0.0%
Travel/Training 15,912 24,192 20,312 24,192 15,287 24,192 24,192 0.0% 0.0%
Advertising 96 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Operating Rentals 11,236 ‐ 84,125 ‐ ‐ ‐ ‐ N/A N/A
Utilities 59,257 43,576 55,573 43,576 43,576 43,576 43,576 0.0% 0.0%
Repairs & Maintenance 3,209 31,106 13,281 31,106 21,106 31,106 31,106 0.0% 0.0%
Miscellaneous 9,782 13,590 1,910,094 13,590 1,872,579 1,997,703 2,034,997 14599.8% 1.9%
Intergovernmental Services / Taxes 1,881,726 1,865,100 ‐ 1,865,100 ‐ ‐ ‐ ‐100.0% N/A
Capital 3,956,631 7,010,200 3,528,918 5,010,200 18,163,200 2,764,200 5,353,200 ‐44.8% 93.7%
Debt Service 698,835 712,762 712,521 710,221 710,221 710,151 709,891 0.0%0.0%
Interfund Payments for Services 1,577,591 1,603,705 1,602,273 1,669,160 1,455,392 1,967,280 2,025,397 17.9% 3.0%
Transfer Out 41,582 95,000 95,768 ‐ ‐ ‐ ‐ N/A N/A
TOTAL EXPENDITURES 10,655,159 13,858,678 10,649,262 11,934,539 25,800,350 10,310,968 13,096,699 ‐13.6% 27.0%
Fund Balance, January 1 17,410,002 5,822,157 18,681,655 3,546,094 19,832,351 5,662,785 7,138,303 59.7% 26.1%
Total New Revenue 11,926,812 11,582,615 11,799,959 11,630,784 11,630,784 11,786,486 12,178,313 1.3%3.3%
Total Committed Expenditures (10,655,159) (13,858,678) (10,649,262) (11,934,539) (25,800,350) (10,310,968) (13,096,699) ‐13.6% 27.0%
Fund Balance Plus Reserves 18,681,655 3,546,094 19,832,351 3,242,339 5,662,785 7,138,303 6,219,917 120.2%‐12.9%
Bond Reserves 838,706 838,706 661,227 838,706 661,227 661,227 661,227 ‐21.2% 0.0%
Operating Reserves 460,350 1,009,976 1,241,575 1,033,323 1,237,553 1,349,853 1,376,133 30.6% 1.9%
Undesignated Fund Balance, 12/31 17,382,600 1,697,412 17,929,549 1,370,310 3,764,005 5,127,223 4,182,557 274.2%‐18.4%
Funds 4X6, Wastewater Utility Operations and Capital Improvement Funds
This fund was created in 2006 for the purpose of identifying the City's portion of wastewater utility revenue and expenses. Utility charges and fees provide revenue for the
operation and maintenance of the wastewater utility and Public Works Trust Fund Loan payments. Utility collection fees, special assessment fees, connection charges, and
City issued bonds fund CIP Projects. For more detailed information, see the City of Renton CIP, Section 5.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 30Budget by Fund - Enterprise
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Other Licenses and Permits 58,350 50,205 52,975 50,456 50,456 50,708 50,962 0.5% 0.5%
Federal/State Grants 603,747 ‐ 489,307 ‐ 2,491,259 ‐ ‐ N/A N/A
Other Intergovernmental Revenues 397,595 913,800 771,085 3,000,000 9,865,140 ‐ ‐ ‐100.0% N/A
Charges for Goods and Services 11,665,120 12,917,901 11,746,291 13,000,699 13,000,699 12,070,004 12,475,527 ‐7.2% 3.4%
Interest and Other Earnings 204,050 54,777 256,421 49,777 49,777 108,000 108,000 117.0%0.0%
Other Miscellaneous Revenues 345 500 326 500 500 1,000 1,000 100.0% 0.0%
Capital Contributions 292,196 ‐ 403,564 ‐ 84,886 200,000 200,000 100.0% 0.0%
Transfer In ‐ ‐ 6,378 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 13,221,403 13,937,183 13,726,348 16,101,432 25,542,717 12,429,712 12,835,489 ‐22.8% 3.3%
EXPENDITURES:
Regular Salaries 2,359,049 2,288,583 2,499,200 2,391,357 2,345,628 2,436,927 2,506,138 1.9% 2.8%
Overtime 37,824 36,813 30,558 36,813 34,584 36,813 36,813 0.0%0.0%
Personnel Benefits 1,002,419 1,086,628 1,054,183 1,153,001 1,107,790 1,244,591 1,320,119 7.9% 6.1%
Part Time Salaries and Benefits ‐ 12,550 9,551 12,550 ‐ 12,550 12,550 0.0% 0.0%
Supplies/Small Tools and Equipment 210,992 175,848 142,760 175,848 167,949 175,848 175,848 0.0% 0.0%
Professional Services 496,913 62,462 502,842 62,462 128,970 65,662 65,662 5.1% 0.0%
Communication 55,704 51,786 55,542 51,786 51,786 51,786 51,786 0.0% 0.0%
Travel/Training 15,286 23,323 20,688 23,323 14,424 23,323 23,323 0.0%0.0%
Advertising 233 ‐ 600 ‐ ‐ ‐ ‐ N/A N/A
Operating Rentals 5,311 28,311 12,245 28,311 25,311 28,311 28,311 0.0% 0.0%
Utilities 70,051 54,875 78,531 54,875 54,875 54,875 54,875 0.0% 0.0%
Repairs & Maintenance 10,762 200,364 52,124 36,564 2,935,370 36,564 36,564 0.0% 0.0%
Miscellaneous 145,113 133,513 1,011,373 133,513 1,082,241 1,198,633 1,233,327 797.8% 2.9%
Intergovernmental Services / Taxes 927,311 923,831 ‐ 923,831 ‐ ‐ ‐ ‐100.0%N/A
Capital 2,736,804 3,314,760 3,043,116 5,228,560 20,310,802 1,354,609 7,794,730 ‐74.1% 475.4%
Debt Service 1,094,411 1,122,971 1,122,776 1,129,795 1,129,795 1,130,850 1,130,842 0.1% 0.0%
Interfund Payments for Services 1,731,253 1,990,553 1,959,078 2,133,539 1,746,577 2,643,197 2,603,624 23.9%‐1.5%
Transfer Out 2,575 ‐ 7,721 ‐ ‐ ‐ ‐ N/A N/A
TOTAL EXPENDITURES 10,902,011 11,507,171 11,602,889 13,576,129 31,136,102 10,494,539 17,074,512 ‐22.7% 62.7%
Fund Balance, January 1 13,934,705 6,095,351 16,254,097 8,525,363 18,377,556 12,784,171 14,719,344 50.0%15.1%
Total New Revenue 13,221,403 13,937,183 13,726,348 16,101,432 25,542,717 12,429,712 12,835,489 ‐22.8% 3.3%
Total Committed Expenditures (10,902,011) (11,507,171) (11,602,889) (13,576,129) (31,136,102) (10,494,539) (17,074,512) ‐22.7% 62.7%
Fund Balance Plus Reserves 16,254,097 8,525,363 18,377,556 11,050,666 12,784,171 14,719,344 10,480,321 33.2%‐28.8%
Bond Reserves 497,632 497,632 754,868 497,632 754,868 754,868 754,868 51.7% 0.0%
Operating Reserves 661,078 721,244 800,179 758,700 818,628 964,517 981,300 27.1%1.7%
Undesignated Fund Balance, 12/31 15,095,387 7,306,487 16,822,509 9,794,334 11,210,674 12,999,960 8,744,152 32.7%‐32.7%
Funds 4X7, Surface Water Utility Operations and Capital Improvement Funds
This fund was created in 2006 for the purpose of identifying surface water utility revenue and expenses. Utility charges and fees provide revenue for the operation and
maintenance of the surface water utility and Public Works Trust Fund Loan payments. Utility collection fees, special assessment fees, connection charges, and City issued
bonds fund CIP Projects. For more detailed information, see the City of Renton CIP, Section 5.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 31Budget by Fund - Enterprise
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Charges for Goods and Services 16,815,804 16,922,613 17,258,422 17,007,226 17,007,226 17,607,838 17,695,877 3.5% 0.5%
Interest and Other Earnings 70,493 ‐ 86,060 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 16,886,297 16,922,613 17,344,482 17,007,226 17,007,226 17,607,838 17,695,877 3.5% 0.5%
EXPENDITURES:
Utilities 16,463,648 16,922,613 16,894,993 17,007,226 17,007,226 17,607,838 17,695,877 3.5% 0.5%
TOTAL EXPENDITURES 16,463,648 16,922,613 16,894,993 17,007,226 17,007,226 17,607,838 17,695,877 3.5% 0.5%
Fund Balance, January 1 5,089,769 5,089,769 5,512,418 5,089,769 5,961,906 5,961,906 5,961,906 17.1% 0.0%
Total New Revenue 16,886,297 16,922,613 17,344,482 17,007,226 17,007,226 17,607,838 17,695,877 3.5% 0.5%
Total Committed Expenditures (16,463,648) (16,922,613) (16,894,993) (17,007,226) (17,007,226) (17,607,838) (17,695,877) 3.5% 0.5%
Fund Balance Plus Reserves 5,512,418 5,089,769 5,961,906 5,089,769 5,961,906 5,961,906 5,961,906 17.1% 0.0%
Operating Reserves 380,000 380,000 380,000 380,000 380,000 380,000 380,000 0.0% 0.0%
Undesignated Fund Balance, 12/31 5,132,418 4,709,769 5,581,906 4,709,769 5,581,906 5,581,906 5,581,906 18.5% 0.0%
Fund 416, King County Metro Fund
This fund was created in 2006 for the purpose of identifying King County Metro's portion of the wastewater revenue and expenses. King County provides wholesale
wastewater treatment services to the City of Renton. King County charges the local agencies and the local agencies bill their customers to recover the County charge.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 32Budget by Fund - Enterprise
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Charges for Goods and Services 4,978,119 5,581,395 5,760,838 5,650,319 3,587,714 6,542,775 6,353,614 15.8%‐2.9%
Interest and Other Earnings 83,174 12,000 87,086 12,000 12,000 12,000 12,000 0.0% 0.0%
Other Miscellaneous Revenues 345 ‐ 4,553 ‐ ‐ ‐ ‐ N/A N/A
Sale of General Fixed Assets 74,250 ‐ 57,551 ‐ ‐ ‐ ‐ N/A N/A
Transfer In 1,307,000 1,811,000 2,102,000 ‐ ‐ ‐ ‐ N/A N/A
TOTAL RESOURCES 6,442,888 7,404,395 8,012,029 5,662,319 3,599,714 6,554,775 6,365,614 15.8%‐2.9%
EXPENDITURES:
Regular Salaries 723,306 750,951 740,037 778,573 697,305 770,580 787,829 ‐1.0% 2.2%
Overtime 20,823 957 27,935 957 957 957 957 0.0% 0.0%
Personnel Benefits 356,439 375,072 356,901 396,379 353,663 406,915 430,056 2.7% 5.7%
Part Time Salaries and Benefits ‐ 27,694 ‐ 37,258 37,258 27,694 37,258 ‐25.7% 34.5%
Supplies/Small Tools and Equipment 1,304,233 1,496,153 1,439,235 1,496,153 1,496,153 1,496,153 1,496,153 0.0%0.0%
Professional Services 33,084 ‐ 40,113 ‐ ‐ ‐ ‐ N/A N/A
Communication 72 328 171 328 328 328 328 0.0% 0.0%
Travel/Training 5,894 6,658 595 6,658 6,658 6,658 6,658 0.0% 0.0%
Operating Rentals 1,292 5,618 1,007 5,618 5,618 5,618 5,618 0.0% 0.0%
Utilities 832 2,185 1,423 2,185 2,185 2,185 2,185 0.0% 0.0%
Repairs & Maintenance 240,042 108,843 239,484 108,843 108,843 108,843 108,843 0.0%0.0%
Miscellaneous 21,758 9,534 19,755 9,534 9,534 9,534 9,534 0.0% 0.0%
Intergovernmental Services / Taxes 3,431 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Capital 4,102,372 4,211,000 4,757,098 1,839,000 2,064,000 2,092,000 1,454,417 13.8%‐30.5%
Interfund Payments for Services 15,721 29,483 29,484 36,694 32,697 30,338 30,768 ‐17.3% 1.4%
TOTAL EXPENDITURES 6,832,490 7,024,476 7,653,236 4,718,180 4,815,199 4,957,803 4,370,604 5.1%‐11.8%
Fund Balance, January 1 6,882,620 5,124,780 6,493,018 5,504,699 6,851,811 5,636,326 7,233,298 2.4% 28.3%
Total New Revenue 6,442,888 7,404,395 8,012,029 5,662,319 3,599,714 6,554,775 6,365,614 15.8%‐2.9%
Total Committed Expenditures (6,832,490) (7,024,476) (7,653,236) (4,718,180) (4,815,199) (4,957,803) (4,370,604) 5.1%‐11.8%
Fund Balance Plus Reserves 6,493,018 5,504,699 6,851,811 6,448,839 5,636,326 7,233,298 9,228,308 12.2% 27.6%
Replacement Reserves 6,220,006 5,223,351 6,562,197 6,160,921 5,361,206 6,946,717 8,936,689 12.8% 28.6%
Operating Reserves 273,012 281,348 289,614 287,918 275,120 286,580 291,619 ‐0.5%1.8%
Undesignated Fund Balance, 12/31 ‐ ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Fund 501, Equipment Repair and Replacement Fund
Equipment Repair and Replacement is an internal service fund used for maintaining and replacing vehicles and auxiliary equipment; except for golf course equipment that
is accounted for in Fund 404. The Equipment Repair and Replacement Fund is assigned to the Public Works Department, Maintenance Services Division. In 1997, resources
were allocated to the fund for maintenance of Fire apparatus, Parks vehicles, and replacement of Police patrol vehicles. Equipment purchases are funded with available
cash from maintenance and capital recovery payments charged to departments.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 33Budget by Fund - Internal Service
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Charges for Goods and Services 3,145,310 3,146,143 3,152,302 3,193,962 3,174,506 3,511,775 3,539,243 10.0% 0.8%
Interest and Other Earnings 231,394 22,000 268,637 22,000 22,000 22,000 22,000 0.0% 0.0%
Other Miscellaneous Revenues 282,391 ‐ 183,724 ‐ ‐ ‐ ‐ N/A N/A
Other Financing Sources 175,000 175,000 175,000 175,000 175,000 ‐ ‐ ‐100.0% N/A
TOTAL RESOURCES 3,834,094 3,343,143 3,779,663 3,390,962 3,371,506 3,533,775 3,561,243 4.2%0.8%
EXPENDITURES:
Regular Salaries 285,185 326,321 315,321 347,005 366,827 296,080 312,171 ‐14.7% 5.4%
Personnel Benefits 102,923 118,265 114,026 126,459 126,459 124,761 133,705 ‐1.3% 7.2%
City Personnel Benefits 778,857 990,946 375,174 990,946 990,946 990,946 990,946 0.0% 0.0%
Supplies/Small Tools and Equipment 323 6,956 ‐ 6,956 4,000 6,956 6,956 0.0% 0.0%
Professional Services 353,102 410,572 404,845 410,572 410,572 410,572 410,572 0.0% 0.0%
Travel/Training 2,373 22,040 1,346 22,040 5,540 22,040 22,040 0.0%0.0%
Insurance 1,509,595 1,424,392 1,083,382 1,424,392 1,424,392 1,424,392 1,424,392 0.0% 0.0%
Miscellaneous 2,802 1,142 2,318 1,142 1,142 1,142 1,142 0.0% 0.0%
Transfer Out 7,910 900,000 900,000 900,000 4,500,000 ‐ ‐ ‐100.0% N/A
TOTAL EXPENDITURES 3,043,070 4,200,634 3,206,308 4,229,512 7,829,878 3,276,889 3,301,923 ‐22.5% 0.8%
Fund Balance, January 1 17,731,130 17,723,528 18,522,154 16,866,038 19,095,508 14,637,136 14,894,022 ‐13.2% 1.8%
Total New Revenue 3,834,094 3,343,143 3,779,663 3,390,962 3,371,506 3,533,775 3,561,243 4.2%0.8%
Total Committed Expenditures (3,043,070) (4,200,634) (3,206,308) (4,229,512) (7,829,878) (3,276,889) (3,301,923) ‐22.5% 0.8%
Fund Balance Plus Reserves 18,522,154 16,866,038 19,095,508 16,027,488 14,637,136 14,894,022 15,153,342 ‐7.1% 1.7%
Anti Recessionary 5,000,000 5,000,000 5,000,000 5,000,000 5,000,000 4,300,000 4,400,000 ‐14.0% 2.3%
Annexation Sales Tax 5,400,000 4,500,000 4,500,000 3,600,000 ‐ ‐ ‐ ‐100.0% N/A
Operating Reserves 5,600,000 5,600,000 5,600,000 5,600,000 5,600,000 8,600,000 8,900,000 53.6%3.5%
Undesignated Fund Balance, 12/31 2,522,154 1,766,038 3,995,508 1,827,488 4,037,136 1,994,022 1,853,342 9.1%‐7.1%
Fund 502, Insurance Fund
Fund 502, is an internal service fund that provides accounting for self‐insurance services to all City departments for property losses, liability, worker's compensation, and
unemployment compensation. Expenses are paid by the Insurance Fund and rates are charged to departments based on use and/or coverage requirements.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 34Budget by Fund - Internal Service
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Other Licenses and Permits 266,824 150,000 315,987 150,000 150,000 150,000 150,000 0.0% 0.0%
Charges for Goods and Services 5,399,635 5,860,088 5,882,273 5,741,613 5,343,238 6,435,901 6,578,379 12.1% 2.2%
Interest and Other Earnings 46,828 7,000 56,029 7,000 7,000 7,000 7,000 0.0% 0.0%
Other Miscellaneous Revenues 50 ‐ 690 ‐ ‐ ‐ ‐ N/A N/A
Transfer In 309,321 ‐ 91,589 ‐ 9,630 ‐ ‐ N/A N/A
TOTAL RESOURCES 6,022,658 6,017,088 6,346,569 5,898,613 5,509,868 6,592,901 6,735,379 11.8% 2.2%
EXPENDITURES:
Regular Salaries 1,813,611 2,025,136 1,933,527 2,107,190 2,206,125 2,224,846 2,305,089 5.6% 3.6%
Overtime 34,019 30,000 35,746 30,000 15,000 30,000 30,000 0.0% 0.0%
Personnel Benefits 723,244 853,478 797,340 904,843 904,843 987,966 1,048,588 9.2% 6.1%
Part Time Salaries and Benefits 58,590 63,813 40,048 70,813 39,938 43,813 50,813 ‐38.1% 16.0%
Supplies/Small Tools and Equipment 485,409 623,455 520,074 588,255 983,155 540,755 540,755 ‐8.1%0.0%
Professional Services 1,804,336 1,633,836 1,614,289 1,604,696 1,975,349 1,781,294 1,781,294 11.0% 0.0%
Communication 324,489 356,492 368,748 326,970 327,450 376,564 376,564 15.2% 0.0%
Travel/Training 13,549 26,043 16,462 26,043 18,043 26,043 26,043 0.0% 0.0%
Repairs & Maintenance 8,723 10,000 249 10,000 10,000 10,000 10,000 0.0% 0.0%
Miscellaneous 86,966 90,047 103,512 85,209 85,209 72,170 72,170 ‐15.3% 0.0%
Intergovernmental Services / Taxes 2,062 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Capital 469,498 340,000 359,367 340,000 1,068,500 334,000 325,000 ‐1.8%‐2.7%
Interfund Payments for Services 812 1,552 1,552 1,804 1,804 ‐ ‐ ‐100.0% N/A
TOTAL EXPENDITURES 5,825,309 6,053,852 5,790,915 6,095,823 7,635,416 6,427,451 6,566,316 5.4% 2.2%
Fund Balance, January 1 3,737,060 2,023,748 3,934,408 1,986,984 4,490,062 2,364,514 2,529,964 19.0% 7.0%
Total New Revenue 6,022,658 6,017,088 6,346,569 5,898,613 5,509,868 6,592,901 6,735,379 11.8%2.2%
Total Committed Expenditures (5,825,309) (6,053,852) (5,790,915) (6,095,823) (7,635,416) (6,427,451) (6,566,316) 5.4% 2.2%
Fund Balance Plus Reserves 3,934,408 1,986,984 4,490,062 1,789,774 2,364,514 2,529,964 2,699,027 41.4% 6.7%
Replacement Reserves 3,398,827 1,415,599 3,946,907 1,214,192 1,707,823 1,920,619 2,074,895 58.2% 8.0%
Operating Reserves 535,581 571,385 543,155 575,582 656,692 609,345 624,132 5.9% 2.4%
Undesignated Fund Balance, 12/31 ‐ ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Fund 503, Information Technology Fund
Fund 503 is an internal service fund which was created in 2006 for the purpose of identifying communication and data support to meet departmental function and record
keeping, and supply technical support services to all data/voice system users in the City. Expenses are paid by the Information Technology Fund and rates are charged to
departments based on use and/or coverage requirements.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 35Budget by Fund - Internal Service
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Charges for Goods and Services 5,085,446 5,257,799 5,285,521 5,318,506 4,306,771 5,992,730 6,179,470 12.7% 3.1%
Interest and Other Earnings 19,840 4,000 16,506 4,000 4,000 4,000 4,000 0.0% 0.0%
Other Miscellaneous Revenues 21 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Transfer In 25,542 ‐ 45,143 ‐ 2,880 ‐ ‐ N/A N/A
TOTAL RESOURCES 5,130,850 5,261,799 5,347,172 5,322,506 4,313,651 5,996,730 6,183,470 12.7% 3.1%
EXPENDITURES:
Regular Salaries 1,478,524 1,973,806 1,705,643 2,103,642 2,041,061 2,426,797 2,523,196 15.4%4.0%
Overtime 41,653 10,000 74,744 10,000 10,000 10,000 10,000 0.0% 0.0%
Personnel Benefits 708,982 1,095,177 864,936 1,169,199 1,116,248 1,425,199 1,516,540 21.9% 6.4%
Part Time Salaries and Benefits 293,526 93,481 235,639 96,121 ‐ ‐ ‐ ‐100.0% N/A
Supplies/Small Tools and Equipment 489,576 403,368 535,808 328,468 339,168 307,068 307,068 ‐6.5% 0.0%
Professional Services 47,016 347,153 41,486 347,153 191,174 411,174 411,174 18.4%0.0%
Travel/Training 1,649 1,000 4,208 1,000 1,000 1,000 1,000 0.0% 0.0%
Operating Rentals 67,605 8,730 85,732 8,730 8,730 8,730 8,730 0.0% 0.0%
Utilities 1,069,513 1,191,007 1,016,796 1,191,007 1,191,007 1,191,007 1,191,007 0.0% 0.0%
Repairs & Maintenance 845,254 252,286 851,438 246,486 112,499 256,486 256,486 4.1% 0.0%
Miscellaneous 11,312 1,224 4,587 1,224 1,224 1,224 1,224 0.0% 0.0%
Intergovernmental Services / Taxes 2,950 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Capital 49,063 ‐ 10,901 ‐ ‐ ‐ ‐ N/A N/A
Interfund Payments for Services 71,113 65,254 66,617 76,045 67,450 129,486 130,783 70.3% 1.0%
Transfer Out 107,000 ‐ 5,221 ‐ ‐ ‐ ‐ N/A N/A
TOTAL EXPENDITURES 5,284,738 5,442,486 5,503,755 5,579,075 5,079,561 6,168,171 6,357,208 10.6% 3.1%
Fund Balance, January 1 1,530,747 1,170,436 1,376,859 989,749 1,220,276 454,366 282,925 ‐54.1%‐37.7%
Total New Revenue 5,130,850 5,261,799 5,347,172 5,322,506 4,313,651 5,996,730 6,183,470 12.7%3.1%
Total Committed Expenditures (5,284,738) (5,442,486) (5,503,755) (5,579,075) (5,079,561) (6,168,171) (6,357,208) 10.6% 3.1%
Fund Balance Plus Reserves 1,376,859 989,749 1,220,276 733,180 454,366 282,925 109,187 ‐61.4%‐61.4%
Undesignated Fund Balance, 12/31 1,376,859 989,749 1,220,276 733,180 454,366 282,925 109,187 ‐61.4%‐61.4%
Fund 504, Facilities Fund
Fund 504 is an internal service fund which was created in 2009 for the purpose of identifying the City's facilities costs. The intention is to track the costs during 2009 for
information purposes only, and to allocate these costs in 2010 and beyond. Expenditures are paid by the Facilities Fund and rates will be charged to departments based on
use and/or requirements.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 36Budget by Fund - Internal Service
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Federal/State Grants ‐ ‐ ‐ ‐ 86,050 ‐ ‐ N/A N/A
Charges for Goods and Services 1,107,635 1,104,816 1,104,816 1,133,441 1,069,076 1,154,732 1,186,600 1.9% 2.8%
Interest and Other Earnings 8,357 1,000 10,154 1,000 1,000 1,000 1,000 0.0% 0.0%
Other Miscellaneous Revenues ‐ ‐ 425 ‐ 21,000 ‐ ‐ N/A N/A
TOTAL RESOURCES 1,115,992 1,105,816 1,115,394 1,134,441 1,177,126 1,155,732 1,187,600 1.9% 2.8%
EXPENDITURES:
Regular Salaries 506,319 529,369 484,943 545,972 599,935 546,601 563,754 0.1% 3.1%
Overtime 430 ‐ 3,079 ‐ ‐ ‐ ‐ N/A N/A
Personnel Benefits 199,223 212,387 198,143 223,348 251,632 248,281 262,990 11.2% 5.9%
Part Time Salaries and Benefits 12,764 16,000 34,558 16,000 ‐ 16,000 16,000 0.0% 0.0%
Supplies/Small Tools and Equipment 31,487 55,432 36,651 55,432 71,350 55,432 55,432 0.0% 0.0%
Professional Services 64,255 65,000 29,636 65,000 102,917 65,000 65,000 0.0%0.0%
Communication 153,732 157,939 128,952 157,939 142,145 157,939 157,939 0.0% 0.0%
Travel/Training 2,712 1,864 4,800 1,864 19,606 1,864 1,864 0.0% 0.0%
Advertising ‐ ‐ ‐ ‐ 35,402 ‐ ‐ N/A N/A
Repairs & Maintenance 104 5,000 643 5,000 4,500 5,000 5,000 0.0% 0.0%
Miscellaneous 60,946 54,709 73,056 54,709 32,109 54,709 54,709 0.0% 0.0%
Intergovernmental Services / Taxes 30 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Interfund Payments for Services 6,543 2,967 2,965 3,941 3,941 2,000 2,034 ‐49.3%1.7%
TOTAL EXPENDITURES 1,038,544 1,100,667 997,426 1,129,205 1,263,537 1,152,826 1,184,722 2.1% 2.8%
Fund Balance, January 1 608,145 604,116 685,593 609,265 803,561 717,150 720,056 17.7% 0.4%
Total New Revenue 1,115,992 1,105,816 1,115,394 1,134,441 1,177,126 1,155,732 1,187,600 1.9% 2.8%
Total Committed Expenditures (1,038,544) (1,100,667) (997,426) (1,129,205) (1,263,537) (1,152,826) (1,184,722) 2.1% 2.8%
Fund Balance Plus Reserves 685,593 609,265 803,561 614,501 717,150 720,056 722,934 17.2%0.4%
Undesignated Fund Balance, 12/31 685,593 609,265 803,561 614,501 717,150 720,056 722,934 17.2% 0.4%
Fund 505, Communications Fund
Fund 505 is an internal service fund which was created in 2009 for the purpose of maintaining community and intergovernmental relations and communications with the
public. Communications is a major activity of the City's administration responsible for external communications, employee communications, media relations, and
coordination of all departments in producing the City's website.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 37Budget by Fund - Internal Service
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Interest and Other Earnings 60,037 34,102 67,539 34,102 42,102 20,000 20,000 ‐41.4% 0.0%
Other Miscellaneous Revenues 10,369,521 10,985,660 11,208,271 12,607,592 12,607,592 12,457,543 13,546,817 ‐1.2% 8.7%
TOTAL RESOURCES 10,429,558 11,019,762 11,275,810 12,641,694 12,649,694 12,477,543 13,566,817 ‐1.3% 8.7%
EXPENDITURES:
Regular Salaries 173,682 177,493 186,299 184,587 191,627 228,250 233,466 23.7% 2.3%
Personnel Benefits 70,138 63,733 65,276 67,272 67,272 87,018 91,441 29.4%5.1%
City Personnel Benefits 10,047,022 10,907,820 9,652,761 11,752,536 11,752,536 11,699,850 12,752,837 ‐0.4% 9.0%
Supplies/Small Tools and Equipment 13,663 7,500 13,196 7,500 7,500 7,500 7,500 0.0% 0.0%
Professional Services 385,131 430,879 405,527 441,783 414,907 472,037 508,456 6.8% 7.7%
Travel/Training 8 ‐ ‐ ‐ ‐ ‐ ‐ N/A N/A
Miscellaneous ‐ 2,000 2,550 2,000 5,633 6,000 6,000 200.0% 0.0%
Intergovernmental Services / Taxes 3,298 3,530 ‐ 3,633 ‐ ‐ ‐ ‐100.0% N/A
Interfund Payments for Services 94,593 58,064 58,064 60,430 60,430 80,176 83,731 32.7% 4.4%
TOTAL EXPENDITURES 10,787,535 11,651,019 10,383,673 12,519,741 12,499,905 12,580,831 13,683,431 0.5% 8.8%
Fund Balance, January 1 4,617,488 4,231,112 4,259,511 3,599,855 5,151,648 5,301,437 5,198,149 47.3%‐1.9%
Total New Revenue 10,429,558 11,019,762 11,275,810 12,641,694 12,649,694 12,477,543 13,566,817 ‐1.3% 8.7%
Total Committed Expenditures (10,787,535) (11,651,019) (10,383,673) (12,519,741) (12,499,905) (12,580,831) (13,683,431) 0.5% 8.8%
Fund Balance Plus Reserves 4,259,511 3,599,855 5,151,648 3,721,808 5,301,437 5,198,149 5,081,535 39.7%‐2.2%
Healthcare IBNR*3,236,260 3,495,306 3,115,102 3,755,922 3,749,972 3,774,249 4,105,029 0.5% 8.8%
Undesignated Fund Balance, 12/31 1,023,251 104,549 2,036,546 (34,114) 1,551,465 1,423,900 976,506 ‐4273.9%‐31.4%
*IBNR is calculated at 30%
Fund 512, Healthcare Insurance Fund
Fund 512 was created in 2004 for the purpose of identifying healthcare insurance revenue and expenditures. In the second half of 2004, Fund 512 was further defined to
report only active employees and Fund 522 was created to report all LEOFF1 Retirees healthcare related items. This is an internal service fund that provides accounting for
self‐insurance services to all City departments for health care programs. Expenses are paid by the Healthcare Insurance Fund and rates are charged to departments based
on use and/or coverage requirements.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 38Budget by Fund - Internal Service
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Federal/State Grants 45,754 45,014 35,898 45,014 45,014 45,933 50,067 2.0% 9.0%
Interest and Other Earnings 166,532 39,320 209,441 39,320 39,320 20,000 20,000 ‐49.1% 0.0%
Other Miscellaneous Revenues 2,624,684 1,156,939 2,624,684 1,160,128 160,128 2,640,000 2,640,000 127.6% 0.0%
TOTAL RESOURCES 2,836,970 1,241,273 2,870,023 1,244,462 244,462 2,705,933 2,710,067 117.4% 0.2%
EXPENDITURES:
Regular Salaries 18,570 19,243 19,838 20,261 20,568 72,882 74,592 259.7%2.3%
Personnel Benefits 6,717 7,173 7,138 7,636 7,636 26,536 27,829 247.5% 4.9%
City Personnel Benefits 778,510 913,223 859,042 965,225 1,181,225 1,233,956 1,312,693 27.8% 6.4%
Professional Services 43,698 38,341 60,711 38,607 38,607 29,104 29,104 ‐24.6% 0.0%
Miscellaneous ‐ ‐ 194 ‐ 207 207 207 100.0% 0.0%
Intergovernmental Services / Taxes 191 201 ‐ 207 ‐ ‐ ‐ ‐100.0% N/A
TOTAL EXPENDITURES 847,686 978,181 946,922 1,031,936 1,248,243 1,362,685 1,444,425 32.1%6.0%
Fund Balance, January 1 11,887,344 12,050,466 13,876,628 12,313,558 15,799,729 14,795,948 16,139,196 20.2% 9.1%
Total New Revenue 2,836,970 1,241,273 2,870,023 1,244,462 244,462 2,705,933 2,710,067 117.4% 0.2%
Total Committed Expenditures (847,686) (978,181) (946,922) (1,031,936) (1,248,243) (1,362,685) (1,444,425) 32.1% 6.0%
Fund Balance Plus Reserves 13,876,628 12,313,558 15,799,729 12,526,084 14,795,948 16,139,196 17,404,838 28.8% 7.8%
Healthcare IBNR*155,702 182,645 171,808 193,045 236,245 246,791 262,539 27.8% 6.4%
Undesignated Fund Balance, 12/31 13,720,926 12,130,914 15,627,921 12,333,039 14,559,703 15,892,405 17,142,299 28.9% 7.9%
*IBNR is calculated at 20%
Fund 522, LEOFF1 Retirees Healthcare Insurance Fund
Fund 522 was created in 2004 for the purpose of identifying LEOFF1 Retirees Healthcare Insurance revenue and expenditures. This is an internal service fund that provides
accounting for self‐insurance services to all City departments for health care programs. Expenses are paid by the Healthcare Insurance Fund and rates are charged to
departments based on use and/or coverage requirements.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 39Budget by Fund - Internal Service
2018 2019 2019 2020 2020 2021 2022 Change Change
Item Actual Orig Bdgt Actual Orig Bdgt YE Estimate Proposed Proposed 2020‐2021 2021‐2022
REVENUE:
Other Intergovernmental Revenues 154,275 143,000 155,413 143,000 143,000 160,000 165,000 11.9% 3.1%
Interest and Other Earnings 1,352,435 325,000 470,009 325,000 325,000 225,000 125,000 ‐30.8%‐44.4%
TOTAL RESOURCES 1,506,710 468,000 625,422 468,000 468,000 385,000 290,000 ‐17.7%‐24.7%
EXPENDITURES:
Personnel Benefits 192,624 200,000 194,353 200,000 200,000 200,000 200,000 0.0% 0.0%
Supplies/Small Tools and Equipment ‐ 475 ‐ 475 475 475 475 0.0% 0.0%
Professional Services ‐ 10,000 12,150 ‐ ‐ 10,000 ‐ 100.0%‐100.0%
TOTAL EXPENDITURES 192,624 210,475 206,503 200,475 200,475 210,475 200,475 5.0%‐4.8%
Fund Balance, January 1 5,832,897 6,100,422 7,146,983 6,357,947 7,565,902 7,833,427 8,007,952 23.2% 2.2%
Total New Revenue 1,506,710 468,000 625,422 468,000 468,000 385,000 290,000 ‐17.7%‐24.7%
Total Committed Expenditures (192,624) (210,475) (206,503) (200,475) (200,475) (210,475) (200,475) 5.0%‐4.8%
Fund Balance Plus Reserves 7,146,983 6,357,947 7,565,902 6,625,472 7,833,427 8,007,952 8,097,477 20.9% 1.1%
Undesignated Fund Balance, 12/31 7,146,983 6,357,947 7,565,902 6,625,472 7,833,427 8,007,952 8,097,477 20.9% 1.1%
Fund 611, Firemen's Pension Fund
The Firemen's Pension Fund is a closed system with membership limited to firefighters employed prior to March 1, 1970; when the Law Enforcement Officers and Fire
Fighters' (LEOFF) Retirement System was established. This fund provides full benefits for firefighters, and beneficiaries, retiring prior to March 1, 1970, and excess benefits
over LEOFF pensions for those firefighters retiring thereafter who are members of the plan. Payments for medical bills related to retirement disability for retirees prior to
enactment of LEOFF.
2021/2022 Preliminary Budget City of Renton, Washington
6 - 40Budget by Fund - Investment Trust
7 APPENDIX
General Information
7‐1
Largest Taxpayers/Principal Employers
7‐2
Full‐Time Employee Staffing
7‐3
Comparison of Taxes and Rates
7‐4
2020/2021 Index of Positions and Pay Ranges (2020 represented pending development)
7‐5
2021/2022 Rates and Fees Schedule
7‐17
2021/2022 Utility Rates Brochure Not shown for Proposed Budget
7‐XX
Budget Glossary
7‐34
Adopted Legislations (Budget, Taxes, Fees, and etc) Not shown for Proposed Budget
7‐XX
General Information ‐‐ City of Renton, Washington
DATE OF INCORPORATION ............................... September 6, 1901
FORM OF GOVERNMENT ....................................... Mayor ‐ Council
TYPE OF GOVERNMENT ..............................Non‐Charter, Code City
LOCATION ................................................. 11 Miles South of Seattle
LAND AREA ........................................................ 24.13 Square Miles
RANK IN SIZE WITHIN STATE WASHINGTON ................................ 8
RANK IN SIZE WITHIN KING COUNTY ............................................ 4
POPULATION (Official 4/1/20)............................................ 105,500
ELECTIONS:
Number of Precincts ................................................................ 96
Number of Active Registered Voters (2018) ..................... 53,915
CITY EMPLOYEES (2022 Proposed):
Funded Full‐Time Equivalents (FTE) ...................................... 614.03
(Excluding Intermittent Employees)
2019 KING CO CERTIFICATION OF ASSESSED VALUATION
For the 2020 Tax Roll Year ................................. $19,919,244,210
PROPERTY TAX LEVY (2020):
General Levy (Includes Fire Pension) ........................ $22,012,189
TOTAL 2020 PROPERTY TAX LEVY ................................ $22,012,189
PROPERTY TAX RATES (2020): (Per $1,000 of Assessed Value)
City of Renton ‐ General Levy ....................................... $1.10460
City of Renton ‐ Special Levy ............................................ 0.0000
TOTAL City of Renton Property Tax Rate ................... $1.10460
King County .................................................................... 1.23953
Port of Seattle ................................................................ 0.11944
Hospital District #1 ......................................................... 0.40069
King County Library System ............................................ 0.36040
Renton School District #403 ........................................... 3.48868
State of Washington School Fund .................................. 3.02799
Emergency Medical Service ............................................ 0.26500
Ferry District ................................................................... 0.00000
King County Flood District .............................................. 0.09199
Regional Transit Authority (Sound Transit)..................... 0.19937
Renton Regional Fire Authority ...................................... 0.82041
TOTAL PROPERTY TAX RATES ....................................... $11.11810
Kent School District #415 (2019) ................................................... 3.83834
Issaquah School District #411 (2019) ............................................. 3.50666
UTILITY TAX RATES (2020):
Electricity, Gas (Utility and Use), and Sewer ............................ 6%
Water, Storm Drain, and Solid Waste ................................... 6.8%
TV Cable, Telephone, and Cellular Phone ................................ 6%
SALES TAX RATE (2020):
State ..................................................................................... 6.5%
King County Metro ............................................................... 0.6%
King County Transportation.................................................. 0.1%
King County Mental Health .................................................. 0.1%
Transit and Traffic Congestion (effective 4/1/01) ................. 0.2%
RTA (effective 4/1/17) .......................................................... 1.4%
City of Renton Local Option ................................................. .1.0%
King County Local Option ‐ Criminal Justice.......................... 0.1%
TOTAL SALES TAX RATE ......................................................10.0%
OTHER TAXES (2020):
Hotel/Motel Tax ................................................................... 1.0%
Admission Tax (Theater and Other Events) .......................... 5.0%
LICENSES & PERMITS (2019)
Business Licenses (includes all businesses) ......................... 7,204
Employees working within Renton ................................... 68,203
Animal Licenses (Dog and Cat) ............................................ 2,510
UTILITY RATES (2020):
(Reduced rates are available for low income senior citizens
and disabled persons.)
WATER (Basic Service Charge, ¾’ Meter) .............. $17.95/month
CITY WASTEWATER (Single Family Residence) ..... $30.51/month
METRO WASTEWATER (Single Family Res.) .......... $45.33/month
SURFACE WATER (Single Family Residence.) ........ $15.15/month
GARBAGE RATES: (Residential, curbside)
1 cart (35 gal)/every other week ......................... $23.07/month Extra garbage (up to 15 gal) per unit..................... $4.29/pickup
POLICE PROTECTION:
Number of Commissioned Police Personnel .......................... 129
Number of Non‐Commissioned Police Personnel ................. 34.4
Total Number of Police Personnel (2021 Budget) ............... 163.4
Number of Calls for Service (2019) ................................... 80,094
PARKS & RECREATION (2019):
Total Parks and Open Space Acreage ............................... 1,244.5
Number of Developed Parks and Playgrounds ......................... 32
Major Facilities:
Liberty Park Cedar River Trail Cedar River Park
Carco Theatre Cedar River Off‐Leash Dog Park
Renton Senior Activity Center Renton Community Center
Gene Coulon Memorial Beach Park (Lake Washington)
Maplewood Golf Course
STREETS (2020):
Street Center Line Miles ........................................................ 311
Lane Miles .............................................................................. 682
Alleys ......................................................................................... 8
Confirmed Sign Locations .................................................. 15,500
Number of Street Lights (City and PSE owned) ................... 7,737
Number of signalized intersections ...................................... 138
UTILITIES (2019):
WATER UTILITY:
Total Water Customers ..................................................... 18,315
Gallons of Water Produced .................................. 2,517,101,251
Number of Fire Hydrants .................................................... 3,818
Miles of Water Main .............................................................. 315
WASTEWATER UTILITY:
Total Sanitary Wastewater Customers ............................. 18,788
Miles of Gravity Sewer and Force Main .......................... 235.78
SURFACE WATER UTILITY:
Number of Accounts ........................................................ 24,341
Miles of Storm Water ....................................................... 282.77
SOLID WASTE UTILITY (Contracted Services)
Total Accounts .................................................................. 25,892
AIRPORT (2017):
Area in acres .......................................................................... 167
Feet of Asphalt/Concrete Runway ...................................... 5,382
Total Operations ............................................................ 128,030
2021/2022 Preliminary Budget City of Renton, Washington
7 - 1Appendix - General Information
Principal Property Tax Payers – 2019
Taxpayer
Real & Personal Property
AV
Percentage
of AV
1 Boeing 917,917,996 4.79%
2 Southport LLC 214,173,000 1.12%
3CPT The Landing LLC 161,996,500 0.85%
4Puget Sound Energy‐Elec/Gas 147,662,162 0.77%
5 Paccar 131,875,157 0.69%
6Hotel at Southport LLC 100,076,800 0.52%
7Port Quendall Company 98,720,700 0.52%
8TLUS Rise Renton LP 95,710,400 0.50%
9 Oaksdale Business Park LLC 81,251,900 0.42%
10 BMF IV WA Grammercy LLC 78,321,000 0.41%
Total Assessed Valuation‐ Largest Taxpayers 2,027,705,615 10.59%
Total Assessed Valuation‐ All Others 17,124,318,700 89.41%
Total Assessed Valuation 19,152,024,315 100.00%
Principal Employers ‐ 2019
Principal Employers
Full‐Time Equivalent
Employees
% of Total
Employment
1BOEING COMPANY 14,753 21.63%
2 VALLEY MEDICAL CENTER 3,663 5.37%
3RENTON SCHOOL DISTRICT 2,677 3.93%
4 PACCAR INC 1,797 2.63%
5PROVIDENCE WA REGIONAL SERVICES 1,614 2.37%
7CITY OF RENTON 1,006 1.48%
6KAISER PERMANENTE (FORMERLY GROUP HEALTH)*1,013 1.49%
8FRED MEYER STORES 944 1.38%
9 IKEA 884 1.30%
10 KING COUNTY*714 1.05%
Total number of Employees ‐ Principal Employers 29,065 42.62%
Total number of Employees ‐ All Other Employers 39,138 57.38%
Total Employees working within Renton 68,203 100.00%
Source:Employee and Employer Data, Business License Data, City of Renton
Total Employees Working in Renton, PSRC
* Employee data gathered using the perentage increase in total employees from 2018 to 2019 and applying a multiplier to 2018 numbers.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 2Appendix - Largest Taxpayers/Principal Employers
Full‐Time Employee Staffing
City of Renton Full‐Time Employee (FTE) Staffing levels per 1,000 Renton Citizens
Regular Employees per Total Population
Year FTE's 1,000 Population of Renton
2011 693.8 7.49 92,590
2012 695.2 7.40 93,910
2013 672.3 7.04 95,540
2014 678.8 6.99 97,130
2015 687.9 6.99 98,470
2016 700.9 6.92 101,300
20171 567.4 5.52 102,700
2018 571.4 5.49 104,100
2019 597.5 5.71 104,700
2020 616.5 5.84 105,500
2021²614.0 5.73 107,083
2022²614.0 5.65 108,689
Source
Population: State of Washington Office of Financial Management
All other information: City of Renton Administrative Services Department
12017 FTE's are lower due to the formation of the Renton Regional Fire Authority (RRFA)
22021 and 2022 Population estimates are based on a 1.5% growth rate
The graph below represents the number of regular full time employees (FTE) working for the City of Renton,
as well as the number of employees per every 1,000 Renton citizens. The number of FTEs has decreased 11.5
percent between 2011 and 2021 and 11.7 percent between 2012 and 2022, while the population grew 15
percent during the same time periods. The number of FTEs per 1,000 Renton citizens are beginning to
stabilize. The high was in 2011 at 7.49 FTE per 1000 citizens.
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
80,000
85,000
90,000
95,000
100,000
105,000
110,000
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 Employees per 1,000 PopulationPopulationTotal Population of Renton Employees per 1,000 Population
2021/2022 Preliminary Budget City of Renton, Washington
7 - 3Appendix - Full-Time Employee Staffing
Monthly
Renton's
Rank Renton Auburn Bellevue Kent Redmond Seattle Tukwila
Population1 4 105,500 81,940 148,100 130,500 69,900 761,100 21,360
Typical Taxes & Fees
City Property Tax2 7 40.96 53.82 70.18 43.76 77.97 127.70 85.67
Library and Fire District Taxes/fees2,3 2 61.28 64.22 28.11 59.50 25.68 ‐ 11.29
Utility Taxes4 6 31.97 32.20 32.25 38.89 25.65 57.47 37.05
Utility Rates (2020)
Water (750 CF)5 6 39.60 43.13 53.31 43.89 35.58 61.15 44.13
Wastewater6 3 30.51 25.45 69.51 25.44 14.15 71.30 30.00
Surface Water7 6 15.15 18.58 15.58 13.03 16.56 46.56 15.83
Solid Waste / Garbage8 4 23.07 24.92 23.92 19.73 17.46 49.70 21.56
8Waste Management provides services to Redmond, Auburn, Seattle, and Tukwila. Republic Services provides services to Renton, Auburn, Bellevue,
and Kent. CleanScapes provides services to Seattle. For comparison purposes, rates include a 32 or 35‐gallon garbage can, recycling, and yard waste
collection.
5Rates were based on bimonthly consumption of 1,500 cubic feet of water, using 3/4" pipe size. Seattle and Tukwila have different water rates in the
summer (June ‐ September); the average monthly rates for summer and non‐summer months were weighted. Bellevue includes capital recovery
charge.
6Rates for Bellevue and Seattle were based on a volume of 750 cubic feet per month. All other districts are on a fixed monthly charge. Rates do not
include the King County Wastewater Treatment charge ($45.33). Bellevue includes capital recovery charge.
7Rates are based on residential lot sizes between 2,000‐7,000 sq. ft. Bellevue includes capital recovery charge.
Taxes, Fees, and Utilities Service Fees on a Typical Home ‐ 2020
1Populations estimates are based on 2020 and were provided by the Washington State Office of Financial Management. Auburn includes King and
Pierce Counties.
2Based on 2020 levy rates and 2020 average home values provided by King County Department of Assessments. City portion only.
3Renton includes tax & fee for fire service provided by Renton Regional Fire Authority (RFA). Auburn includes tax & fee for fire service provided by
Valley RFA. Kent includes tax & fee for fire service provided by Puget Sound RFA. Seattle is the only city that provides local library service.
4Based on monthly comparison of 2020 utility rates. Includes Electric, Gas, Telephone/Cell Phone, Cable, Water, Wastewater, Surface Water, and
Solid Waste Utilities.
$40.96 $53.82 $70.18 $43.76 $77.97
$127.70
$85.67$31.97 $32.20 $32.25
$38.89
$25.65
$57.47
$37.05
$108.33 $112.08
$162.31
$102.09 $83.75
$228.71
$111.52
$61.28 $64.22
$28.11
$59.50 $25.68
$11.29$242.54
$262.32 $292.85
$244.23
$213.04
$413.88
$245.53
Renton Auburn Bellevue Kent Redmond Seattle Tukwila
2020 Monthly Taxes and Fees
City Property Tax Utility Taxes City Utilities Library and Fire District Taxes/Fees
2021/2022 Preliminary Budget City of Renton, Washington
7 - 4Appendix - Comparison of Taxes and Rates
3.50%
Grade Code Position Title Monthly Annual Monthly Annual
e10 1030 Mayor (1)15,059 180,708 15,059 180,708
e09 1005 City Council President (2)(7)2,050 24,600
e09 1000 City Council Members (2)1,750 21,000
e08 10,397 124,764 10,925 131,100 11,476 137,712 12,057 144,684 12,665 151,980
e11 1020 Municipal Court Judge (6)14,396 172,754 14,396 172,754
Salary effective July 2019 ‐ June 2020
Salary is 95% of District Court Judge Salary
m53 1035 Chief Administrative Officer (3)13,641 163,692 14,336 172,032 15,059 180,708 15,819 189,828 16,612 199,344
m52 13,307 159,684 13,980 167,760 14,694 176,328 15,438 185,256 16,209 194,508
m51 12,983 155,796 13,641 163,692 14,336 172,032 15,059 180,708 15,819 189,828
m50 12,665 151,980 13,307 159,684 13,980 167,760 14,694 176,328 15,438 185,256
m49 1400 City Attorney (3)12,360 148,320 12,983 155,796 13,641 163,692 14,336 172,032 15,059 180,708
m49 1102 Community Services Administrator (3)12,360 148,320 12,983 155,796 13,641 163,692 14,336 172,032 15,059 180,708
m49 1105 Community & Economic Development Administrat 12,360 148,320 12,983 155,796 13,641 163,692 14,336 172,032 15,059 180,708
m49 1101 Administrative Services Administrator (3) 12,360 148,320 12,983 155,796 13,641 163,692 14,336 172,032 15,059 180,708
m49 1104 Human Resources & Risk Mgmt Administrator (3) 12,360 148,320 12,983 155,796 13,641 163,692 14,336 172,032 15,059 180,708
m49 1103 Public Works Administrator (3)12,360 148,320 12,983 155,796 13,641 163,692 14,336 172,032 15,059 180,708
m49 1201 Police Chief (3)12,360 148,320 12,983 155,796 13,641 163,692 14,336 172,032 15,059 180,708
m48 12,057 144,684 12,665 151,980 13,307 159,684 13,980 167,760 14,694 176,328
m47 11,764 141,168 12,360 148,320 12,983 155,796 13,641 163,692 14,336 172,032
m46 1535 Police Deputy Chief (4)11,476 137,712 12,057 144,684 12,665 151,980 13,307 159,684 13,980 167,760
m45 1200 Deputy Public Affairs Administrator (3)11,197 134,364 11,764 141,168 12,360 148,320 12,983 155,796 13,641 163,692
m45 1573 Deputy PW Administrator ‐ Transportation (3) 11,197 134,364 11,764 141,168 12,360 148,320 12,983 155,796 13,641 163,692
m45 2302 Deputy Community Services Administrator(3) 11,197 134,364 11,764 141,168 12,360 148,320 12,983 155,796 13,641 163,692
m44 10,925 131,100 11,476 137,712 12,057 144,684 12,665 151,980 13,307 159,684
m43 10,656 127,872 11,197 134,364 11,764 141,168 12,360 148,320 12,983 155,796
m42 1401 Sr Assistant City Attorney 10,397 124,764 10,925 131,100 11,476 137,712 12,057 144,684 12,665 151,980
m41 10,145 121,740 10,656 127,872 11,197 134,364 11,764 141,168 12,360 148,320
m40 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712 12,057 144,684
m39 9,657 115,884 10,145 121,740 10,656 127,872 11,197 134,364 11,764 141,168
m38 2011 City Clerk/Public Records Officer 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1403 Chief Prosecuting Attorney 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1500 Court Services Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1575 Development Services Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1501 Economic Development Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 2044 Emergency Management Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1207 Facilities Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1210 Fiscal Services Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
2021 CITY OF RENTON SALARY TABLE
NON‐REPRESENTED Effective January 1, 2021
STEP A STEP B STEP C STEP D STEP E
ELECTED OFFICIALS
MANAGEMENT & SUPERVISORY (NON‐UNION)
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 5
3.50%
Grade Code Position Title Monthly Annual Monthly Annual
2021 CITY OF RENTON SALARY TABLE
NON‐REPRESENTED Effective January 1, 2021
STEP A STEP B STEP C STEP D STEP E
m38 1212 Information Technology Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1571 Maintenance Services Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 8084 Parks and Trails Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1208 Parks Planning and Natural Resources Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1502 Planning Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 2031 Police Commander (5)9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1214 Recreation & Neighborhoods Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1570 Utility Systems Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m38 1572 Transportation Systems Director 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100 11,476 137,712
m37 9,194 110,328 9,657 115,884 10,145 121,740 10,656 127,872 11,197 134,364
m36 2463 HR Labor Relations & Compensation Manager 8,968 107,616 9,422 113,064 9,899 118,788 10,397 124,764 10,925 131,100
m35 1402 Assistant City Attorney 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740 10,656 127,872
m34 2460 Organizational Development Manager 8,530 102,360 8,968 107,616 9,422 113,064 9,899 118,788 10,397 124,764
m33 2072 Airport Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 5015 Budget & Accounting Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 2074 Building Official 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 1578 Community Development & Housing Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 2021 Current Planning Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 2073 Development Engineering Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 2411 Financial Services Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 2020 Long Range Planning Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 2174 Property & Technical Services Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 2176 Transportation Design Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 2075 Transportation Operations Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 2177 Transportation Planning Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 2172 Utility Engineering Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m33 3072 Water Maintenance Manager 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884 10,145 121,740
m32 4480 Capital Projects Manager 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064 9,899 118,788
m32 1577 Economic Development Manager 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064 9,899 118,788
m32 4470 Parks Planning Manager 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064 9,899 118,788
m32 3083 Urban Forestry and Natural Resources Manager 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064 9,899 118,788
m31 7,925 95,100 8,325 99,900 8,747 104,964 9,194 110,328 9,657 115,884
m30 2418 Application Support Manager 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064
m30 2273 Assistant Development Engineering Manager 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064
m30 3073 Fleet Manager 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064
m30 2407 GIS Manager 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064
m30 2462 Human Resources Benefits Manager 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064
m30 2033 Police Manager 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064
m30 2409 Risk Manager 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064
m30 3071 Street Maintenance Manager 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064
m30 3176 Transportation Maintenance Manager 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064
m30 3070 Waste Water/Special Operations Manager 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616 9,422 113,064
m29 3084 Golf Course Manager 7,538 90,456 7,925 95,100 8,325 99,900 8,747 104,964 9,194 110,328
m29 1522 Human Services Manager 7,538 90,456 7,925 95,100 8,325 99,900 8,747 104,964 9,194 110,328
m29 1404 Prosecuting Attorney 7,538 90,456 7,925 95,100 8,325 99,900 8,747 104,964 9,194 110,328
m29 2087 Recreation & Neighborhoods Manager 7,538 90,456 7,925 95,100 8,325 99,900 8,747 104,964 9,194 110,328
m28 3086 Facilities Manager 7,361 88,332 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616
m28 6031 Financial Operations Manager 7,361 88,332 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616
m28 8010 Parks Maintenance Manager 7,361 88,332 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616
m28 5254 Permit Services Manager 7,361 88,332 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616
m28 1116 Tax & Licensing Manager 7,361 88,332 7,732 92,784 8,122 97,464 8,530 102,360 8,968 107,616
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 6
3.50%
Grade Code Position Title Monthly Annual Monthly Annual
2021 CITY OF RENTON SALARY TABLE
NON‐REPRESENTED Effective January 1, 2021
STEP A STEP B STEP C STEP D STEP E
m27 2204 Census Program Manager 7,180 86,160 7,538 90,456 7,925 95,100 8,325 99,900 8,747 104,964
m27 2578 Housing Programs Manager 7,180 86,160 7,538 90,456 7,925 95,100 8,325 99,900 8,747 104,964
m26 2202 Communications Manager 7,005 84,060 7,361 88,332 7,732 92,784 8,122 97,464 8,530 102,360
m25 2086 Head Golf Professional 6,834 82,008 7,180 86,160 7,538 90,456 7,925 95,100 8,325 99,900
m25 2562 Senior Benefits Analyst 6,834 82,008 7,180 86,160 7,538 90,456 7,925 95,100 8,325 99,900
m25 2563 Senior Employee Relations Analyst 6,834 82,008 7,180 86,160 7,538 90,456 7,925 95,100 8,325 99,900
m25 2410 Senior Finance Analyst 6,834 82,008 7,180 86,160 7,538 90,456 7,925 95,100 8,325 99,900
m25 2561 Senior Risk Analyst 6,834 82,008 7,180 86,160 7,538 90,456 7,925 95,100 8,325 99,900
m25 2479 Solid Waste Coordinator 6,834 82,008 7,180 86,160 7,538 90,456 7,925 95,100 8,325 99,900
m24 5112 Deputy City Clerk/Enterprise Content Manager 6,671 80,052 7,005 84,060 7,361 88,332 7,732 92,784 8,122 97,464
m23 3562 Benefits Analyst 6,501 78,012 6,834 82,008 7,180 86,160 7,538 90,456 7,925 95,100
m23 3563 Employee Relations Analyst 6,501 78,012 6,834 82,008 7,180 86,160 7,538 90,456 7,925 95,100
m23 2080 Recreation Supervisor 6,501 78,012 6,834 82,008 7,180 86,160 7,538 90,456 7,925 95,100
m23 2461 Risk Analyst 6,501 78,012 6,834 82,008 7,180 86,160 7,538 90,456 7,925 95,100
m22 2404 Community Events Coordinator 6,348 76,176 6,671 80,052 7,005 84,060 7,361 88,332 7,732 92,784
m22 1510 Court Services Supervisor 6,348 76,176 6,671 80,052 7,005 84,060 7,361 88,332 7,732 92,784
m22 8007 Golf Course Supervisor 6,348 76,176 6,671 80,052 7,005 84,060 7,361 88,332 7,732 92,784
m22 2091 Museum Manager 6,348 76,176 6,671 80,052 7,005 84,060 7,361 88,332 7,732 92,784
m21 2218 Tax & Licensing Auditor, Senior 6,191 74,292 6,501 78,012 6,834 82,008 7,180 86,160 7,538 90,456
m20 6,040 72,480 6,348 76,176 6,671 80,052 7,005 84,060 7,361 88,332
m19 6150 City Council Liaison 5,895 70,740 6,191 74,292 6,501 78,012 6,834 82,008 7,180 86,160
m19 6103 Executive Assistant 5,895 70,740 6,191 74,292 6,501 78,012 6,834 82,008 7,180 86,160
m18 5,747 68,964 6,040 72,480 6,348 76,176 6,671 80,052 7,005 84,060
m17 5,610 67,320 5,895 70,740 6,191 74,292 6,501 78,012 6,834 82,008
n16 multiple Administrative Assistants (All Depts)5,451 65,412 5,726 68,712 6,007 72,084 6,316 75,792 6,631 79,572
n16 5118 Finance Analyst III 5,451 65,412 5,726 68,712 6,007 72,084 6,316 75,792 6,631 79,572
n16 5416 Payroll Technician III 5,451 65,412 5,726 68,712 6,007 72,084 6,316 75,792 6,631 79,572
n16 2217 Tax & Licensing Auditor II 5,451 65,412 5,726 68,712 6,007 72,084 6,316 75,792 6,631 79,572
n15 5,309 63,708 5,584 67,008 5,864 70,368 6,162 73,944 6,477 77,724
n14 5,185 62,220 5,451 65,412 5,726 68,712 6,007 72,084 6,316 75,792
n13 5115 Finance Analyst II 5,057 60,684 5,309 63,708 5,584 67,008 5,864 70,368 6,162 73,944
n13 2662 Human Resources Specialist 5,057 60,684 5,309 63,708 5,584 67,008 5,864 70,368 6,162 73,944
n13 5316 Payroll Technician II 5,057 60,684 5,309 63,708 5,584 67,008 5,864 70,368 6,162 73,944
n13 2216 Tax & Licensing Auditor I 5,057 60,684 5,309 63,708 5,584 67,008 5,864 70,368 6,162 73,944
n12 4,938 59,256 5,185 62,220 5,451 65,412 5,726 68,712 6,007 72,084
n11 2488 Assistant Golf Professional 4,813 57,756 5,057 60,684 5,309 63,708 5,584 67,008 5,864 70,368
n11 5139 Human Resources Assistant 4,813 57,756 5,057 60,684 5,309 63,708 5,584 67,008 5,864 70,368
n10 5114 Finance Analyst I 4,698 56,376 4,938 59,256 5,185 62,220 5,451 65,412 5,726 68,712
n10 5216 Payroll Technician I 4,698 56,376 4,938 59,256 5,185 62,220 5,451 65,412 5,726 68,712
n09 6151 Administrative Secretary I EX 4,586 55,032 4,813 57,756 5,057 60,684 5,309 63,708 5,584 67,008
NON‐UNION (CLERICAL, OTHER)
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 7
3.50%
Grade Code Position Title Monthly Annual Monthly Annual
2021 CITY OF RENTON SALARY TABLE
NON‐REPRESENTED Effective January 1, 2021
STEP A STEP B STEP C STEP D STEP E
n08 4,471 53,652 4,698 56,376 4,938 59,256 5,185 62,220 5,451 65,412
n07 6144 Secretary II EX 4,363 52,356 4,586 55,032 4,813 57,756 5,057 60,684 5,309 63,708
n06 4,255 51,060 4,471 53,652 4,698 56,376 4,938 59,256 5,185 62,220
n05 4,152 49,824 4,363 52,356 4,586 55,032 4,813 57,756 5,057 60,684
n04 4,053 48,636 4,255 51,060 4,471 53,652 4,698 56,376 4,938 59,256
n03 3,958 47,496 4,152 49,824 4,363 52,356 4,586 55,032 4,813 57,756
n02 3,861 46,332 4,053 48,636 4,255 51,060 4,471 53,652 4,698 56,376
n01 5138 Office Specialist 3,772 45,264 3,958 47,496 4,152 49,824 4,363 52,356 4,586 55,032
$6,247
Completion of 5 Yrs
Completion of 10 Yrs
Completion of 15 Yrs
Completion of 20 Yrs
Completion of 25 Yrs
Completion of 30 Yrs
(1) In addition to salary receives annual car allowance of $4800 or use of a city vehicle.
(2)
(3) Not eligible for Longevity/Education or Uniform Allowance
(4) Not eligible for Longevity/Education or Uniform Allowance
Eligible for 3% cash premium or 3% into deferred compensation per employee's discretion for passing physical fitness.
(5)Receive Education/Longevity & Uniform Allowance based on Union Contract plus eligible for 3% deferred compensation for passing physical fitness.
(6) 4 year term
(7) Council president to be paid $200/month above council members salary.
Council members salary set per Salary Commission effective 1/1/16. Council receives 2% of salary for deferred comp. If members are not
participating in PERS, they receive an extra 1.4 % of salary for deferred compensation.
The City contributes 4% of employee's base wage per year to a deferred compensation account
for Management and Non‐Represented employees; except for CAO receives 7% per year.
5% Step a14E $312 per month
6% Step a14E $375 per month
7% Step a14E $437 per month
Step a14, E =
3% Step a14E $187 per month
4% Step a14E $250 per month
2% Step a14E $125 per month
NON‐REPRESENTED LONGEVITY PAY
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 8
COLA 3.5%
Contract ends 12/31/2020
Grade Code Position Title Monthly Annual Monthly Annual
a40 9,746 116,952 10,233 122,796 10,752 129,024 11,298 135,576 11,868 142,416
a39 9,525 114,300 9,998 119,976 10,489 125,868 11,022 132,264 11,580 138,960
‐
a38 9,282 111,384 9,746 116,952 10,233 122,796 10,752 129,024 11,298 135,576
a37 9,069 108,828 9,525 114,300 9,998 119,976 10,489 125,868 11,022 132,264
a36 8,839 106,068 9,282 111,384 9,746 116,952 10,233 122,796 10,752 129,024
a35 8,627 103,524 9,069 108,828 9,525 114,300 9,998 119,976 10,489 125,868
a34 8,417 101,004 8,839 106,068 9,282 111,384 9,746 116,952 10,233 122,796
a33 8,214 98,568 8,627 103,524 9,069 108,828 9,525 114,300 9,998 119,976
a32 2413 Network Systems Manager 8,015 96,180 8,417 101,004 8,839 106,068 9,282 111,384 9,746 116,952
a32 2428 Principal Civil Engineer 8,015 96,180 8,417 101,004 8,839 106,068 9,282 111,384 9,746 116,952
a32 2425 Utility/GIS Engineer 8,015 96,180 8,417 101,004 8,839 106,068 9,282 111,384 9,746 116,952
a31 2078 Assistant Airport Manager 7,813 93,756 8,214 98,568 8,627 103,524 9,069 108,828 9,525 114,300
a30 2512 Client Technology Sys & Support Supervi 7,626 91,512 8,015 96,180 8,417 101,004 8,839 106,068 9,282 111,384
a29 2475 Civil Engineer III 7,441 89,292 7,813 93,756 8,214 98,568 8,627 103,524 9,069 108,828
a29 2570 Program Development Coordinator II 7,441 89,292 7,813 93,756 8,214 98,568 8,627 103,524 9,069 108,828
a29 2451 Senior Systems Analyst 7,441 89,292 7,813 93,756 8,214 98,568 8,627 103,524 9,069 108,828
a28 2422 Senior Planner 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004 8,839 106,068
a28 2480 Capital Project Coordinator 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004 8,839 106,068
a28 2416 Senior Network Systems Specialist 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004 8,839 106,068
a27 2452 Senior Business Systems Analyst 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568 8,627 103,524
a26 2474 Civil Engineer II 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004
a26 2417 Systems Analyst 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004
a26 3473 Water Utilities Maintenance Supervisor 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180 8,417 101,004
a25 2481 Facilities Coordinator 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568
a25 3484 Lead Electrical/Ctrl Systems Technician 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568
a25 2470 Program Development Coordinator I 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568
a25 2170 Property Services Agent 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568
a25 8179 Signal/Electronic Systems Supervisor 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756 8,214 98,568
a24 2420 Database Technician 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180
a24 3450 Lead Building Inspector 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180
a24 3469 Lead Construction Inspector 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180
a24 2403 Senior Economic Development Specialist 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180
a24 2419 Network Systems Specialist 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180
a24 2476 Transportation Planner 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512 8,015 96,180
a23 8475 Airport Ops & Maintenance Supervisor 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756
a23 2429 Building Plan Reviewer 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756
a23 2421 Business Systems Analyst 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756
a23 2472 Engineering Specialist III 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756
2020 CITY OF RENTON SALARY TABLE
AFSCME, Local 2170
STEP A STEP B STEP C STEP D STEP E
Effective July 1, 2020
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 9
COLA 3.5%
Contract ends 12/31/2020
Grade Code Position Title Monthly Annual Monthly Annual
2020 CITY OF RENTON SALARY TABLE
AFSCME, Local 2170
STEP A STEP B STEP C STEP D STEP E
Effective July 1, 2020
a23 2505 GIS Analyst II 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756
a23 8175 Pavement Management Technician 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756
a23 2450 Plan Reviewer 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756
a23 2484 Property Services Specialist 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756
a23 8001 Street Maintenance Services Supervisor 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756
a23 8002 Waste Water Maint. Services Supervisor 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292 7,813 93,756
a23 8000 Water Maintenance Services Supervisor
a22 2473 Civil Engineer I 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512
a22 2430 Lead Code Compliance Inspector 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512
a22 5197 Neighborhood Program Coordinator 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084 7,626 91,512
a21 2424 Associate Planner 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 3452 Building Inspector/Combination 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 3451 Building Inspector/Electrical 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 2200 Communications Specialist II 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 3472 Construction Inspector 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 8008 Custodial Maintenance Supervisor 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 5130 Emergency Management Coordinator 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 3089 Facilities Supervisor 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 5111 GIS Analyst I 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 8006 Parks Maintenance Supervisor 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 3483 Signal/Electronics Systems Technician III 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 8004 Traffic Signage & Marking Supervisor 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a21 8011 Water Meter Technician Services Superv 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972 7,441 89,292
a20 5013 Assistant Public Records Officer 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084
a20 2079 Business Coordinator ‐ Airport 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084
a20 2402 Economic Development Specialist 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084
a20 2487 Housing Repair Coordinator 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084
a20 2489 Human Services Coordinator 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884 7,257 87,084
a19 6128 Accounting Supervisor 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972
a19 2427 Code Compliance Inspector 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972
a19 7182 Electrical Technician 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972
a19 3453 Energy Plans Reviewer 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972
a19 2471 Engineering Specialist II 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972
a19 3485 HVAC Systems Technician 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972
a19 7172 Lead Vehicle & Equipment Mechanic 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972
a19 8178 Water Utility Instr./SCADA Technician 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868 7,081 84,972
a18 3456 Development Services Representative 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884
a18 5195 Farmers Market Coordinator 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884
a18 2015 Probation Officer 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884
a18 2083 Recreation Program Coordinator 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900 6,907 82,884
a17 2423 Assistant Planner 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868
a17 8374 Maintenance Buyer 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868
a17 5001 Paralegal 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868
a17 5012 Public Records Specialist 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868
a17 5213 Senior Service Desk Technician 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868
a17 3482 Signal/Electronics Systems Technician II 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868
a17 3470 Water Quality/Treatment Plant Operato 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868
a17 2203 Digital Media Specialist 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004 6,739 80,868
a16 8284 Lead Golf Course Maintenance Worker 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 10
COLA 3.5%
Contract ends 12/31/2020
Grade Code Position Title Monthly Annual Monthly Annual
2020 CITY OF RENTON SALARY TABLE
AFSCME, Local 2170
STEP A STEP B STEP C STEP D STEP E
Effective July 1, 2020
a16 8074 Lead Maintenance Services Worker 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900
a16 8080 Lead Parks Maintenance Worker 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900
a16 5194 Program Assistant 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144 6,575 78,900
a15 6167 Court Operations Specialist 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004
a15 7181 Facilities Technician II 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004
a15 7184 Grounds Equipment Mechanic 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004
a15 8174 Lift Station Technician 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004
a15 5122 Planning Technician 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004
a15 5180 Senior Program Specialist 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004
a15 7170 Vehicle & Equipment Mechanic 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004
a15 3474 Water Utility Maintenance Technician 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260 6,417 77,004
a14 5161 Asset Management Systems Technician 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144
a14 5160 Recreation Systems Technician 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472 6,262 75,144
a13 8474 Airport Operations Specialist 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260
a13 3471 Engineering Specialist I 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260
a13 7180 Facilities Technician I 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260
a13 3487 Housing Maintenance Technician 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260
a13 6263 Permit Services Specialist 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260
a13 7110 Print & Mail Supervisor 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260
a13 5179 Program Specialist 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260
a13 5214 Service Desk Technician 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260
a13 3481 Signal/Electronics Systems Technician I 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708 6,105 73,260
a12 2201 Communications Specialist I 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472
a12 8283 Golf Course Maintenance Worker III 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472
a12 6166 Judicial Specialist II 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472
a12 8173 Maintenance Services Worker III 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472
a12 8083 Parks Maintenance Worker III 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472
a12 8573 Traffic Maintenance Worker II 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076 5,956 71,472
a11 8473 Airport Maintenance Worker 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708
a11 5014 City Clerk Specialist 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708
a11 7173 Fleet Management Technician 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708
a11 8183 Lead Maintenance Custodian 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708
a11 6265 Payroll Analyst 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708
a11 5007 Public Records Specialist 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708
a11 2486 Recreation Specialist 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372 5,809 69,708
a10 6164 Judicial Specialist/Trainer 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076
a10 6165 Legal Assistant 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076
a10 6263 Permit Technician 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076
a10 6163 Probation Clerk 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824 5,673 68,076
a09 6131 Accounting Assistant IV 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372
a09 6151 Administrative Secretary I 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372
a09 8286 Golf Course Operations Assistant 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372
a09 8070 Mechanic's Assistant 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372
a09 2085 Recreation Assistant 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156 5,531 66,372
a08 8282 Golf Course Maintenance Worker II 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824
a08 7126 Housing Repair Technician 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824
a08 6162 Judicial Specialist I 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824
a08 6109 Lead Office Assistant 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 11
COLA 3.5%
Contract ends 12/31/2020
Grade Code Position Title Monthly Annual Monthly Annual
2020 CITY OF RENTON SALARY TABLE
AFSCME, Local 2170
STEP A STEP B STEP C STEP D STEP E
Effective July 1, 2020
a08 8172 Maintenance Services Worker II 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824
a08 8082 Parks Maintenance Worker II 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824
a08 8375 Purchasing Assistant 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824
a08 8572 Traffic Maintenance Worker I 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668 5,402 64,824
a07 6132 Accounting Assistant III 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156
a07 8184 Maintenance Custodian 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156
a07 7112 Print & Mail Operator 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156
a07 6142 Secretary II 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156
a07 8110 Water Meter Technician 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132 5,263 63,156
a06 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704 5,139 61,668
a05 6134 Accounting Assistant II 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132
a05 6130 Office Assistant III 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132
a05 6141 Secretary I 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252 5,011 60,132
a04 6160 Court Security Officer 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704
a04 8281 Golf Course Maintenance Worker I 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704
a04 8181 Lead Custodian 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704
a04 8171 Maintenance Services Worker I 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704
a04 8081 Parks Maintenance Worker I 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704
a04 6282 Pro Shop Assistant 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704
a04 8576 Solid Waste Maintenance Worker 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860 4,892 58,704
a03 6136 Accounting Assistant I 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252
a03 6120 Office Assistant II 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252
a03 7111 Print & Mail Assistant 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492 4,771 57,252
a02 3,831 45,972 4,018 48,216 4,223 50,676 4,431 53,172 4,655 55,860
a01 8182 Custodian 3,731 44,772 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492
a01 6111 Office Assistant I 3,731 44,772 3,920 47,040 4,117 49,404 4,324 51,888 4,541 54,492
$6,262
Completion of 5 Yrs
Completion of 10 Yrs
Completion of 15 Yrs
Completion of 20 Yrs
Completion of 25 Yrs
Completion of 30 Yrs
per month
LONGEVITY PAY
Step a14, E =
2% Step a14E $125 per month
3% Step a14E $188
The City contributes 4% of employee's base wage per year to a deferred compensation account. (Article 14)
6% Step a14E $376 per month
7% Step a14E $438 per month
4% Step a14E $250 per month
5% Step a14E $313 per month
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 12
COLA 3.50%
Contract ends 12/31/2020
Grade Code Monthly Annual Monthly Annual
Police Chief See Management & Supervisory Matrix, Grade m49
Police Deputy Chief See Management & Supervisory Matrix, Grade m46
Police Commander See Management & Supervisory Matrix, Grade m38
pc61 3035 Sergeant*9,384 112,609 9,853 118,240
(15% over Police Officer)*Step increase at 24 months
pc60 4131 Patrol Officer II 6,097 73,165 6,614 79,363 7,134 85,613 7,646 91,747 8,161 97,932
pc59 4130 Patrol Officer I 5,738 68,861 6,225 74,699 6,715 80,575 7,196 86,347 7,681 92,172
2
Percent
Interpreters ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐3%
Detectives ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4%
Traffic Assignment‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4%
Motorcycle Assignment‐‐‐‐‐‐‐‐‐‐‐‐‐ 2%
Canine Officer ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐3%
Corporal Assignment ‐‐‐‐‐‐‐‐‐‐‐‐7.5%
Field Training Officer ‐‐‐‐‐‐‐‐‐‐‐‐4%
Training Officer‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4%
SWAT Assignment ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4%
SRO Assignment‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐4%
Civil Disturbance Unit ‐‐‐‐‐‐‐‐‐‐‐Paid at rate of double time with 3 hrs
minimum when called to emergency.
Crisis Communication Unit‐‐‐‐‐‐Paid at rate of double time with 3 hrs
minimum when called to emergency.
Percentage (of base wage)
Percentage (of base wage)
‐
‐
‐
‐
‐
2020 CITY OF RENTON SALARY TABLE
POLICE DEPARTMENT ‐ Commissioned Officers Effective January 1, 2020
STEP ASTEP BSTEP CSTEP DSTEP E
Position Title
HAZARD DUTY AND PREMIUM PAY (Article 6.7 and 6.8)
MONTHLY LONGEVITY PAY (Appendix B)
Years of Service
Completion of 5 Yrs 2%
Completion of 10 Yrs 4%
Completion of 15 Yrs 6%
Completion of 20 Yrs 10%
Completion of 25 Yrs 12%
Completion of 30 Yrs 14%
MONTHLY EDUCATIONAL INCENTIVE PAY (Appendix B)
Patrol Officer II: Effective 1‐1‐18 Patrol Officer II and Sergeant had 6.25% added to their base pay to reflect the additional 109
hours worked in a calendar year. This is reflected in the ranges above.
Effective January 1, 2008, Sergeants assigned to Investigation and Traffic Unit will not receive the 3% premium if they have
been in the position of Sergeant for 24 months.
NOTE: Please refer to the current labor agreement for specific information.
AA Degree (90 credits) 4%
BA Degree/Masters Degree 6%
The City contributes 2.0% of employee's wage base toward deferred compensation. (Appendix A.2.3)
The City will contribute 3.0% of employee's wage base toward deferred compensation for passing physical fitness. (Article 6.8.4,
and Appendix A.2.4)
Beginning 1‐1‐2020 the City will contribute 1% of employee's wage base to a VEBA plan. (Article 14.11)
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 13
COLA 3.25%
Contract ends 12/31/2020
Grade Code Position Title Monthly Annual Monthly Annual
pn58 6178 Police Service Specialist Supv 6,454 77,442 6,776 81,314
Step A(15% above Specialist, Step E)* step increase at 24 months
Step E (5% above Supervisor, Step A)
pn57 6182 Police Service Specialist Lead 6,032 72,390 6,032 72,390
(7.5% above Specialist, Step E)
pn54 4138 Police Community Prgm Coord 4,993 59,916 5,396 64,752 5,928 71,136 6,390 76,680 6,710 80,520
pn54 4120 Crime Analyst 4,993 59,916 5,396 64,752 5,928 71,136 6,390 76,680 6,710 80,520
pn56 4133 Electronic Home Detention Coord 4,926 59,112 5,316 63,792 5,854 70,248 6,436 77,232 6,756 81,072
pn53 3432 Evidence Technician 4,700 56,400 5,073 60,876 5,583 66,996 6,142 73,704 6,458 77,496
pn61 4121 Domestic Violence Victim Advocate 4,661 55,932 5,063 60,756 5,627 67,524 6,186 74,232 6,513 78,156
pn60 4,445 53,340 4,828 57,936 5,364 64,368 5,898 70,776 6,205 74,460
pn52 4135 Animal Control Officer 4,433 53,196 4,793 57,516 5,270 63,240 5,795 69,540 6,086 73,032
pn62 6181 Police Service Specialist 4,088 49,056 4,416 52,992 4,860 58,320 5,346 64,152 5,612 67,344
pn51 6183 Police Secretary 3,829 45,948 4,133 49,596 4,550 54,600 5,008 60,096 5,254 63,048
pn51 4137 Parking Enforcement Officer 3,829 45,948 4,133 49,596 4,550 54,600 5,008 60,096 5,254 63,048
Interpreter Premium………………………………..………………….……………. 3% of base pay (Article 6.5.2)
2.5% of base pay (Article 6.5.3)
4% of base pay (Article 6.5.1)
Double time with 3 hrs min (Article 6.4)
‐ Beginning 1/1/2020 the City will contribute 1% of the employee's base wage to a VEBA plan. (Article 14.10)
2020 CITY OF RENTON SALARY TABLE
Effective January 1, 2020
STEP ASTEP BSTEP CSTEP DSTEP E
POLICE DEPARTMENT ‐ Non‐Commissioned Officers
Completion of 5 Yrs 2%
NON‐ COMMISSIONED PREMIUM PAY (Articles 6.4 and 6.5)
Public Records Act Premium……………………………………………………………
Field Training Officer, FTO (Police Service Specialist)…………........…
Crisis Communication Unit………………………………………..…...………
POLICE NON‐COMMISSIONED‐ MONTHLY LONGEVITY INCENTIVE PAY SCHEDULE (Article 12, Appendix B.1)
Years of Service Percentage (of base wage)
Completion of 10 Yrs 4%
Completion of 15 Yrs 6%
Completion of 20 Yrs 10%
‐ The City will contribute an additional 3.0% of employee's wage base toward deferred comp for passing physical fitness prior to
beginning of each calendar year. (Article 6.8.3)
Completion of 25 Yrs 12%
Completion of 30 Yrs 14%
MONTHLY EDUCATIONAL INCENTIVE PAY SCHEDULE (Appendix B.2)
Percentage (of base wage)
AA Degree (90 credits) 4%
BA/BS Degree or Masters Degree 6%
‐ The City contributes 4.5% of the employee's base wage to a deferred comp account. (Appendix A.3)
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 14
Grade STEP A STEP B STEP C STEP D STEP E
h06 13.50
h07 13.75 14.00 14.25 14.50 14.75
h08 15.00 15.25 15.50 15.75 16.00
h09 16.25 16.50 16.75 17.00 17.25
h10 17.50 17.75 18.00 18.25 18.50
h11 18.75 19.00 19.25 19.50 19.75
h12 20.00 20.50 21.00 21.50 22.00
h13 22.50 23.00 23.50 24.00 24.50
h14 25.00 25.50 26.00 26.50 27.00
h15 27.50 28.00 28.50 29.00 29.50
h16 30.00 30.50 31.00 31.50 32.00
h17 32.50 33.00 33.50 34.00 34.50
h18 35.00 35.50 36.00 36.50 37.00
h19 37.50 38.00 38.50 39.00 39.50
h20 40.00 40.50 41.00 41.50 42.00
h21 42.25 42.50 42.75 43.00 43.25
h22 43.50 43.75 44.00 44.25 44.50
h23 45.00 45.50 46.00 46.50 47.00
h24 47.50 48.00 48.50 49.00 49.50
h25 50.00 51.00 52.00 53.00 54.00
h26 55.00 60.00 65.00 70.00 75.00
h27 80.00 85.00 90.00 95.00 100.00
h28 105.00 110.00 115.00 120.00 125.00
2021 CITY OF RENTON SALARY TABLE
SUPPLEMENTAL EMPLOYEE WAGE TABLE
2021/2022 Preliminary Budget City of Renton, Washington
Appendix - 2020/2021 Index of Positions and Pay Ranges 7 - 15
This page is intentionally left blank
2021/2022 Preliminary Budget City of Renton, Washington
7 - 16Appendix - 2021/2022 Index of Positions and Pay Ranges
Rev. November 2020
2021/2022 Preliminary Budget City of Renton, Washington
7 - 17Appendix - 2021/2022 Rates and Fees Schedule
Table of Contents Page
SECTION I. MISCELLANEOUS FEES 7 ‐ 19
SECTION II. MAPLEWOOD GOLF COURSE 7 ‐ 20
SECTION III. City CENTER PARKING FEES 7 ‐ 21
SECTION IV. AQUATIC FEES 7 ‐ 21
SECTION V. CARCO THEATER (REPEALED)7 ‐ 21
SECTION VI. PARKS AND FACILITIES USE AND RENTAL 7 ‐ 21
SECTION VII. COMMUNITY CENTER PASS CARD & FEES 7 ‐ 23
SECTION VIII. AIRPORT CHARGES 7 ‐ 23
SECTION IX. ANIMAL LICENSES FEES* ‐ RMC 5‐4‐27 ‐ 23
SECTION X. BUSINESS LICENSES 7 ‐ 23
SECTION XI. ADULT ENTERTAINMENT LICENSES 7 ‐ 23
SECTION XII. DEVELOPMENT FEES 7 ‐ 23
Building Fees:7 ‐ 23
Land Use Review Fees:7 ‐ 25
Public Works Fees:7 ‐ 27
Technology Surcharge Fee 7 ‐ 31
Impact Fees:7 ‐ 31
SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA)7 ‐ 32
2021/2022 Preliminary Budget City of Renton, Washington
7 - 18Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
APPENDIX SECTION
SECTION I. MISCELLANEOUS FEES 2021 2022
1. Maps:
a. Zoning maps ‐ standard 11 x 17 $4 $4
b. Zoning maps ‐ large 24 x 36 $12 $12
c. Comprehensive Plan map ‐ standard 11 x 17 $4 $4
d. Comprehensive Plan map ‐ large 24 x 36 $12 $12
e. Precinct maps $5 $5
2. Plat:
a. First page $2 $2
b. Each additional page $1 $1
3. Photocopies:
a. Each 8.5" x 11" or 8.5" x 14"$0.15 $0.15
b. Each 11" x 17"$0.20 $0.20
c. Each 8.5" x 11" or 8.5" x 14" color $0.25 $0.25
4. Budget:
a. City's Budget $10 $10
b. N/C N/C
5. Audio or Video Recording Copies:
a.Audio recording, each copy $2 $2
b.Video recording, each copy $2 $2
6.Regulations and Plans:
a.Comprehensive Plan and Map $30 $30
b.Title IV, Development Regulations:
(i) Text and Zoning Map $110 $110
(ii) Text only $100 $100
c.Individual Chapters of Development Regulations $10 $10
d. Renton Municipal Code (two volumes)$400 $400
e.Code Supplements, per year:
(i) Titles I ‐ III and VI ‐ X $70 $70
(ii) Title IV $70 $70
7. Miscellaneous Services:
a.Certification and Notary Fees ‐ Clerk's Certification $10 $10
b.Notary Public Attestation or Acknowledgement or as $10 $10
otherwise provided for in RCW 42.28.090, per signature
c.Hold Harmless Agreements and other similar documents $20 $20
not otherwise provided for
d.Lamination of licenses, pictures $6 $6
e.Community Development Block Grants (CDBG) Loan Program:
(i) Application Fee $200 $200
(ii) Loan Origination Fee $150 or 0.25% of
loan amount,
whichever is greater
$150 or 0.25% of loan
amount, whichever is
greater
(iii)Closing Costs (including any legal fees)50% of total actual
costs
50% of total actual
costs
8. Miscellaneous Charges for Police Services:
a.Police Reports per page $0.15 $0.15
b.Record Checks (Written Response) $5 $5
c.Photographs ‐ Digital on CD $2 $2
d.Photographs ‐ black & white or color ‐ Cost of developing film Cost Cost
e.Fingerprint Cards $5 $5
(i) Each additional card $1 $1
9. Charges for Fire Documents:
a.Fire reports per page $0.15 $0.15
b.Fire investigative report on CD $2 $2
c.First copy ‐ black & white or color ‐ Cost of developing film Cost Cost
d.Additional copy ‐ black & white or color ‐ Cost of developing film Cost Cost
10. Computer Listings:
a.City of Renton new business list $10 $10
b.List of all business licenses $20 $20
c.Copies requested to be faxed, local number $3 $3
d.Copies requested to be faxed, long distance number
(i) One (1) ‐ five (5) pages $10 $10
(ii) Six (6) or more pages (ten (10) page limit)$20 $20
11. Utility Fee:
a.Special Request Water Meter Reading $30 $30
b.Utility New Account Setup $25 $25
c.Utility Billing Account Transfer (tenant billing form)$5 $5
d.Water utility outstanding balance search requested by $25 $25
fax, messenger, or letter
12. Schedule of Fines for False Alarms ‐ Security/Burglar: (effective February 1, 2019)
a.One‐time Registration Fee $25 $25
City's Budget to other municipality or quasi‐municipal corporation or other nonprofit charitable or education organization
2021/2022 Preliminary Budget City of Renton, Washington
7 - 19Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION I. MISCELLANEOUS FEES (CONTINUED)2021 2022
b.Annual Registration Renewal N/C N/C
c.First False Alarm in a registration year*N/C N/C
d.Second False Alarm in a registration year*$100 $100
e.Third or more False Alarm in a registration year*$250 $250
f.Late Payment Fee $25 $25
g.Unregistered Alarm System Fee $50 $50
*A registration year shall mean January 1 thru December 31 each year.
13. NSF Check Fees $25 $25
14. Veteran Park Tile: Three lines $75 $75
15. Electronic Records:
a.Photocopies or printed copies of electronic records, per page $0.15 $0.15
b.Scanning paper records, per page $0.10 $0.10
c.Electronic files or attachments uploaded for electronic delivery (email, cloud‐based data storage service, or $0.05 $0.05
other means of electronic delivery), for each four (4) files
d.Transmission of records in an electronic format or for the use of agency equipment to send the records $0.10 $0.10
electronically, per gigabyte (GB)
16. Document Recording Fees:
a.Actual Costs Actual Costs
b.Miscellaneous charges associated with document recording, such as courier fees Actual Costs Actual Costs
17. School Impact Fee Administration 5% x School Impact
Fee
5% x School Impact
Fee
SECTION II. MAPLEWOOD GOLF COURSE 2021 2022
1.
a.Weekday:
(i) 18 Hole $37 $39
(ii) 9 Hole $27 $29
(iii) 18 Hole, Senior $28 $30
(iv) 9 Hole, Senior $20 $22
(v) 18 Hole, Junior $19 $21
(vi) 9 Hole, Junior $15 $17
b.Weekend:
(i) 18 Hole $44 $46
(ii) 9 Hole $27 $29
2. Club Rental*:
a.Regular $18 $25
b.Premium $0 $50
3. Golf Cart Fees*:
a.18 Hole $30 $34
b.18 Hole Single Rider $22 $26
c.9 Hole $18 $22
d.9 Hole Single Rider $12 $16
e.Trail Fee $10 $15
4. Driving Range Fees*:
a.Large Bucket $9 $11
b.Small Bucket $6 $6
c.Warm‐up Bucket $4 $4
5. Lesson Fees:
a.1/2 Hour Private $45 $45b.1 Hour Private $65 $65c.1/2 Hour Series Private $160 $160d.1 Hour Series Private $240 $240
*The charges identified in RCW 42.56.120(3)(b) (and referenced above) may be combined to the extent that more than one
type of charge applies to copies produced in response to a particular request. The actual cost of any digital storage media or
device provided by the agency. Alternatively, the City may charge a flat fee of up to $2 for the entire request as long as the
cost of uploading and transmitting the electronic records is reasonably estimated to equal or exceed that amount. Only one
$2 flat fee per request is authorized for electronic records produced in installments. When records are provided
electronically on a CD, DVD, thumb drive, flash drive, or other electronic device, the requestor will be charged for the cost of
the electronic storage device. The City may charge an actual‐cost service charge for requests that require use of IT expertise
to prepare data comilations or provide customized electronic access services when not used by the City for other purposes.
A cost estimate and explanation will be provided to the requestor before incurring the costs.
Option to waive charges. The City may waive charges associated with fulfilling a request. The decision will be based on
various factors, including the volume and format of the responsive documents. The decision to assess fees for fulfilling a
public records request shall be made on a consistent and equitable basis, dependent primarily upon the amount of staff
time required for copying, scanning, shipping, uploading, and/or transmitting the records associated with fulfilling a
request.
Certified copies. If the requestor is seeking a certified copy of a City record, an additional charge of $1.00 per each
complete document may be applied to cover the additional expense and time required for certification.
Note: Should Section I fees due total less than $4.00 and no other fee is due to the City at the same time, the department
administrator may authorize to waive the entire amount due at their discretion.
For purposes of this section, "weekend" shall mean Friday, Saturday, and Sunday. "Weekday" shall mean the remaining
four days of the week. "Junior" shall mean ages 17 and under, "Senior" shall mean ages 62 and over.
The applicant shall pay all document recording fees charged by King county and all administrative fees charged by the title
company for processing. Payment in full shall by submitted to the City before documents are sent for recording.
Green Fees*:
Off‐season and promotional rates determined by management; posted on website.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 20Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION II. MAPLEWOOD GOLF COURSE (CONTINUED)2021 2022
e.Group Series $100 $100f.1/2 Hour Private, Junior $25 $25g.Playing Lesson(3‐hole minimum/9‐hole maximum) per hole $15 $15
* Rates include Washington State Sales Tax (WSST)
SECTION III. City CENTER PARKING FEES 2021 2022
1. City Center Parking Garage Fees:
Parking rates for retail parking will be as follows:
a.Zero (0) ‐ two (2) hours N/C N/C
b.Two (2) ‐ four (4) hours $2 $2
c.Four (4) ‐ six (6) hours $4 $4
d.Six (6) ‐ (10) hours $6 $6
e. 10 hours or more $10 $10
f.Monthly pass‐holders, tax included $35 $35
SECTION IV. AQUATIC FEES 2021 2022
1. Admission for the Aquatic Center shall be as follows:
a.Regular Session:
(i) Infants ‐ under 1 year N/C N/C
(ii) Youth ‐ 1 to 4 years $4.50 $6.00
(iii) Ages 5 and up $8.50 $11.00
(iv) Lap swim ‐ water walking only $3 $4
b.Season Pass:
(i) Resident infants ‐ under 1 year N/C N/C
(ii) Non‐resident infants ‐ under 1 year N/C N/C
(iii) Resident ages 1 and up $60 $60
(iv) Non‐resident ages 1 and up $120 $120
c.Miscellaneous Rates:
(i) Resident regular session per person rate (group rates)*$10 $12
(ii) Non‐resident regular session per person rate $16 $16
(iii) Locker Rental $0.25 $0.25
d.Canopy Rental Fees*: (includes canopy and admission for one leisure swim session):
(i) Henry Moses Party Tent #1
(10' x 20' for up to twenty‐five (25) guests on wave pool):
(1)Resident Rate, per session $310 $450
(2) Non‐resident Rate, per session $475 $550
(ii) Henry Moses Party Tent #2
(10' x 20' for up to twenty‐five (25) guests):
(1) Resident Rate $200 $400
(2) Non‐Resident Rate $300 $500
(iii) Henry Moses Party Tent #3
(10' x 10' for up to ten (10) guests):
(1)Resident Rate, per session $200
(2) Non‐resident Rate, per session $240
e.Resident Rate all inclusive*$1,800 $1,800
f.Non‐resident Rate all inclusive*$2,300 $2,300
*Sales tax not included in the rental fee
g.Swim Lesson Program: Fees and associated descriptions are published in the "What's Happening" Renton Activities Guide
h.End‐of‐year School Party Rentals:
(i) Renton School District
(1) 001 ‐ 299 students $1,900 $1,900
(2) 300 ‐ 399 students $2,250 $2,250
(3) 400 ‐ 499 students $2,400 $2,400
(4) 500 ‐ 599 students $2,550 $2,550
(ii) Other Schools and Districts
(1) 001 ‐ 299 students $2,450 $2,450
(2) 300 ‐ 399 students $2,850 $2,850
(3) 400 ‐ 499 students $3,150 $3,150
(4) 500 ‐ 599 students $3,360 $3,360
2. Boat Launch Rates:
a.Daily resident ‐ 7 days a week $10 $10
b.Daily Non‐resident ‐ 7 days a week $20 $20
c.Overnight resident ‐ 7 days a week $20 $20
d.Overnight Non‐resident ‐ 7 days a week $40 $40
e.Annual parking permit ‐ resident $60 $60
f.Annual parking permit ‐ non‐resident $120 $120
g.Additional sticker (launching permit)$5 $5
h.$50 $50
SECTION V. CARCO THEATER (REPEALED)2021 2022
SECTION VI. PARKS AND FACILITIES USE AND RENTAL 2021 2022
1. Outlying Picnic Shelters (Cedar River Trail, Liberty Park, Phillip Arnold Park, Teasdale Park and Heritage Park) Maximum of 50 people
Fishing Tournaments at Coulon Beach (additional rental fee if using the Pavilion area for weigh in and or electricity at the
current rental rate) per event
*Group Rates: Group rates offer guaranteed admission for the group. In order to qualify for a group rate, the group must
consist of ten (10) or more persons, and the session must be scheduled in advance. Please note that the number of groups
may be limited each day. Staff has the authority to offer discounted daily rates for partial sessions or Renton‐only events.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 21Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION VI. PARKS AND FACILITIES USE AND RENTAL (CONTINUED)2021 2022
a.Resident 10am‐7pm $90 $140
b.Non‐resident 10am‐7pm $180 $280
2. Gene Coulon Beach Park Shelters (South #1, South #2 and Creekside) Maximum of 75 people:
a.Resident 10am‐7pm $100 $140
b.Non‐resident 10am‐7pm $180 $280
e.South Shelters 1 & 2 Resident rate $300 $300
f.South Shelters 1 & 2 Non‐resident rate $600 $600
3. Gene Coulon Beach Park Shelters (North Shelter):
a.Resident 10am‐7pm $120 $160
b.Non‐resident 10am‐7pm $240 $320
4. Tennis, Basketball and Sand Volleyball court rate per hour (Tournament Play Only):
a.Tennis court $10 $10
b.Park basketball court $10 $10
c.Sand volleyball court $10 $10
5. Catering and Event Rate (All city parks apply):
a.Resident half day $200 $200
b.Resident full day $350 $350
c.Non‐resident half day $400 $400
d.Non‐resident full day $700 $700
6.
a.Each $50 $50
7.
a.Resident rate per hour $10 $10
b.Non‐resident rate per hour $25 $25
c.Special Event Permit Fee $85 $85
8. Piazza Park Open Space Event Rental
a.Full day rental 10am ‐ 7pm $500 $500
9. Photo Shoots per hour:
a.Commercial Film and Photo Shoots per hour $300 $300
10. Electrical Spider Box rental:
a. Electrical spider box rental per box, per event, with special event approval $100 $100
11. Athletic Field Rental, Lights and Prep Fees:
a.Sports field rental per hour ‐ resident $25 $25
b.Sports field rental per hour ‐ non‐resident $30 $30
c.Renton Area Youth Sports Agencies, per hour $6 $6
d.Field prep for softball/baseball ‐ resident per occurrence $30 $30
e.Field prep for soccer ‐ resident per occurrence $45 $45
f.Custom Field prep ‐ resident per occurrence $100 $100
g.Field prep for softball/baseball ‐ non‐resident per occurrence $35 $35
h.Field prep for soccer ‐ non‐resident per occurrence $50 $50
i.Custom Field prep ‐ non‐resident per occurrence $100 $100
j.Field lights all sports ‐ resident per hour $25 $25
k.Field lights all sports ‐ non‐resident per hour $30 $30
12. Banquet & Classroom Rental ‐ Community Center & Senior Activity Center:
a.Friday evening 5 hour minimum ‐ resident $650 $650
b.Weekend Rates 10 hour minimum ‐ resident $1,300 $1,300
c.Extra hours ‐ per hour ‐ resident $130 $130
d.Friday 5 hour minimum ‐ non‐resident $750 $750
e.Weekend Rates 10 hour minimum ‐ non‐resident $1,500 $1,500
f.Extra hours ‐ per hour ‐ non‐resident $150 $150
g.Kitchen charge ‐ per hour $100 $100
h.Banquet Room ‐ Mon ‐ Fri ‐ daytime ‐ resident/hr 3 hour min $85 $85
i.Banquet Room ‐ Mon ‐ Fri ‐ daytime ‐ non‐resident/hr 3 hour min $90 $90
j.Damage deposit $550 $550
k.Contract violation fee ‐ per hour $200 $200
l.Cancellation Fee ‐ Less than 90 days $550 $550
13. Classroom and Gymnasium Rental ‐ Renton Community Center:
a.Resident single gym athletic ‐ per hour $45 $45
b.Non‐resident single gym athletic ‐ per hour $50 $50
c.Resident double gym athletic ‐ per hour $90 $90
d.Non‐resident double gym athletic ‐ per hour $100 $100
e.Resident single gym non‐athletic $550 $550
f.Non‐resident single gym non‐athletic $675 $675
g.Resident double gym non‐athletic $1,100 $1,100
h.Non‐resident double gym non‐athletic $1,350 $1,350
i.Carpet fee single gym ‐ resident & non‐resident $325 $325
j.Carpet fee double gym ‐ resident & non‐resident $650 $650
k.Classroom resident $35 $35
l.Classroom Non‐resident $40 $40
Inflatable and big toy rate:
Note: Along with rental fee for the use of City facility for each inflatable or big toy, Applicant or Renter shall provide proof of
insurance naming the City of Renton as additional insured.
Open Space Area in the Parks (Cascade, Teasdale, Phillip Arnold, Cedar River, Earlington, Gene Coulon, Glencoe, Kennydale
Lions, Sunset, and Riverview Parks):
2021/2022 Preliminary Budget City of Renton, Washington
7 - 22Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION VI. PARKS AND FACILITIES USE AND RENTAL (CONTINUED)2021 2022
14. Birthday Party Packages:
a.Party package ‐ resident $65 $65
b.Party package ‐ non‐resident $75 $75
15. Facility Rental ‐ Neighborhood Center:
a.Meeting room ‐ resident $35 $35
b.Gymnasium ‐ resident $35 $35
c.Meeting room ‐ non‐resident $40 $40
d.Gymnasium ‐ non‐resident $40 $40
16. Farmer's Market
a.10x10 Lot $40 $40
b.Half Lot $20 $20
c.Application fee $30 $30
d.Electrical fee $5 $5
17. Reader Board
a.One day/day of event $110
b.Two weeks prior to event $275
SECTION VII. COMMUNITY CENTER PASS CARD & FEES 2021 2022
Fees and associated descriptions are published in the "What's Happening" Renton Activities Guide
SECTION VIII. AIRPORT CHARGES 2021 2022
1.Airport Fuel Flow Charge: per gallon $0.08 $0.08
2.JetA Fuel Flow Charge: per gallon $0.10 $0.10
3.Transient airplane parking daily $8 $8
4.Hangar wait list, one time fee $100 $100
5.Tie‐down wait list, one time fee $25 $25
6.Lost gate card fee per occurrence $50 $50
7.T‐Hangar, Non‐Refundable Move‐in Fee $250 $250
8.Penalty for violation of Minimum Standards/Airport Rules & Regulations (each occurrence)$500 $500
9.Penalty for Movement Area Incursions (each occurrence), assessed to sponsor/tenant $500 $500
SECTION IX. ANIMAL LICENSES FEES* ‐ RMC 5‐4‐2 2021 2022
1.Altered Animal Annual License $30 $30
2.Unaltered Animal Annual License $50 $50
3.Economically Qualified Resident Special Lifetime License $0 $0
4.Duplicate Tag $10 $10
5.Late Charge $30 $30
SECTION X. BUSINESS LICENSES 2021 2022
1. General Business License:
a.Registration Fee $150 $150
b.Appeal of Business License Decision $250 $250
2. Penalties:
a.The penalty to reinstate an expired business license $50 $50
b.The penalty for failure to obtain a business license $250 $250
c.
SECTION XI. ADULT ENTERTAINMENT LICENSES 2021 2022
1. Every person applying for a adult entertainment license shall pay the applicable nonrefundable application fee:
a.Adult Entertainment Business License $750 $750
b.Entertainer $75 $75
c.Manager $75 $75
d.License Replacement $10 $10
2. Penalties:
a.Civil Penalty, per violation $1,000 $1,000
SECTION XII. DEVELOPMENT FEES 2021 2022
1. Building Fees:
a.Building Permit Fees:1
(i) Base Fee/Valuation $1.00 to $500.00 $34 $34
(ii) Valuation $501.00 to $2,000.00 $34 + $3.83 x each
$100 value
$34 + $3.83 x each
$100 value
(iii) Valuation $2001.00 to 25,000.00 $88.75 + $17.59 x
each $1,000 value
$88.75 + $17.59 x
each $1,000 value
(iv) Valuation $25,001.00 to $50,000.00 $493.26 + $12.60 x
each $1,000 value
$493.26 + $12.60 x
each $1,000 value
(v)Valuation $50,001.00 to $100,000.00 $808.26 + $8.77 x
each $1,000 value
$808.26 + $8.77 x
each $1,000 value
(vi) Valuation $100,001.00 to $500,000.00 $1,225.76 + $7.04 x
each $1,000 value
$1,225.76 + $7.04 x
each $1,000 value
(vii) Valuation $500,001.00 to $1,000,000.00 $4,039.76 + $5.93 x
each $1,000 value
$4,039.76 + $5.93 x
each $1,000 value
5%‐15%5%‐15%
Failure to pay the license fee within one day after the day on which it is due and payable pursuant to subsection C7 of
Chapter 5 of the RMC shall render the business enterprise subject to a penalty of (5%) of the amount of the license fee for
the first month of the delinquency and an additional penalty of (5%) for each succeeding month of delinquency, but not
exceeding a total penalty of (15%) of the amount of such license fee.
*Please note, impounded animals are subject to license fees, microchipping costs, and other out‐of‐pocket costs as specified in
RMC 6‐6‐2.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 23Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022
1. Building Fees: (continued)
(viii) Valuation $1,000,001.00 and up $7,006.01 + $4.57 x
each $1,000 value
$7,006.01 + $4.57 x
each $1,000 value
b.Combination Building Permit Fees*1
(i) Plumbing up to 3,000 sq ft $256 $256
(ii) Plumbing over 3,000 sq ft $282 $282
(iii) Mechanical up to 3,000 sq ft $205 $205
(iv) Mechanical over 3,000 sq ft $231 $231
(v) Electrical up to 3,000 sq ft $231 $231
(vi) Electrical over 3,000 sq ft $282 $282
* Combination Building Permit fees are required for each new single family residential structure
c.Building Plan Check Fee1
(i) Initial Building Plan Check Fee*65% of permit fee 65% of permit fee
(ii) Additional Building Plan Check Fee 50% of initial plan
Check Fee
50% of initial plan
Check Fee
d.Demolition Permit Fee:
(i) Residential $125 $125
(ii) Commercial $272 $272
e.State Building Code Fee:
(i) Non‐residential projects:$25 $25
(ii) Residential projects:$6.50 $6.50
(1) Each additional unit after first unit:$2 $2
f.Electrical Permit Fees:
(i) Residential Fees ‐ Single ‐Family and Duplex
(1)New Service ‐ Single Family and Duplex1
(a) Up to 200 AMP $217 $217
(b) Over 200 AMP $231 $231
(2) Service Changes/New Circuits ‐ Single Family and Duplex:
(a) Change up to 200 AMP $169 $169
(b) Change over 200 AMP $179 $179
(c) Any new circuits added to above price is per each up to a maximum of $80.00 $21 $21
(d) Minimum fee for remodel/addition of new circuits without a service charge $169 $169
(e) Cooling system circuit for new or replaced appliance $75 $75
(ii) Multi‐Family, Commercial and Industrial Fees:
(1) Value of work:
$1.00 to $500.00 $66 $66
$500.01 to $1,000.00 $49 + 3.5% of
value
$49 + 3.5% of
value
$1,000.01 to 5,000.00 $86.10 + 3.05% of
value
$86.10 + 3.05% of
value
$5,000.01 to $50,000.00 $245.70 + 1.8% of
value
$245.70 + 1.8% of
value
$50,000.01 to $250,000.00 $1,183.35 + 1.05%
of value
$1,183.35 + 1.05% of
value
$250,000.01 to $1,000,000.00 $3,939.60 + 0.85%
of value
$3,939.60 + 0.85% of
value
$1,000,000.01 and up $12,759.60 + 0.47%
of value
$12,759.60 + 0.47% of
value
(iii)Temporary Electrical Services $169 $169
(iv)Miscellaneous Electrical Fees
(1) Job Trailers $169 $169
(2) Signs per each $169 $169
(3) Mobile Homes $169 $169
(4)50% of commercial
fees Minimum $169
50% of commercial
fees Minimum $169
g.House Moving* ‐ minimum per hour Inspection Fee:$154 $154
h.Inspection Fee For Condominium Conversions $154 on 1st unit /
$21 each add'l unit
$154 on 1st unit /
$21 each add'l unit
i.Manufactured/Mobile Home Installation Fees*:
(i)Within a manufactured home park $154 $154
* Building Plan Check Fee is in addition to the building permit fees and combination building permit fees. The plan check
fee is equal to 65% of the building permit fee or the combination building permit fee. Includes three (3) review cycles.
*This covers only the Building Section inspection of the structure prior to move. There is a separate additional fee
charged by the Public Works Department to cover the actual house move permit. A building permit is also required in
order to site the structure on the new site.
Exemption: Residential telephone communication systems, thermostats, security systems, and cable television installations
are exempt from fees
Low Voltage Work (e.g., alarm systems; thermostats; computer, data, or phone lines; fiber optics, cable
television, etc.)
2021/2022 Preliminary Budget City of Renton, Washington
7 - 24Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022
1. Building Fees: (continued)
(ii) Outside of a manufactured home park Building Permit Fees Building Permit Fees
j.Mechanical Permit Fees:1
(i) Residential ‐ Mechanical Permit base fee plus itemized fees below:$53 $53
(1)$21 $21
(2) Boiler or Compressor $21 $21
(3)$21 $21
(4) Ventilation/exhaust fan $21 $21
(5) Fuel Gas Piping (each gas piping system up to 6 outlets)$21 $21
(ii) Commercial or Multi‐Family ‐ Mechanical Permit base fee plus itemized fees below:$77 $77
(1)$36 $36
(2) Boiler or Compressor $77 $77
(3) Refrigeration System $77 $77
(4)$77 $77
(5) Incinerator: Installation or relocation of each $103 $103
(6)$36 $36
(7) Fuel Gas Piping (each gas piping system up to 6 outlets)$36 $36
k.Plumbing Permit Fees:1
(i) Residential ‐ Plumbing Permit base fee plus itemized fees below:$53 $53
(1)$10 $10
(2) Water Service: For meter to house $10 $10
(3) Per fixture for repair or alteration of drainage or vent piping $10 $10
(4) Per drain for rainwater systems $10 $10
(5) Per lawn sprinkler system, includes backflow prevention $10 $10
(6) Per vacuum breaker or backflow protection device on tanks, vats, etc.$10 $10
(7)Per interceptor for industrial waste pretreatment $10 $10
(8) Fuel Gas Piping: (each gas piping system up to 6 outlets)$21 $21
(ii) Commercial or Multi‐Family: Plumbing Permit base fee plus itemized fees below:$77 $77
(1) Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap $15 $15
(2) Water Service: For meter to building $15 $15
(3)Per fixture for repair or alteration of drainage or vent piping $15 $15
(4) Per drain for rainwater systems $15 $15
(5) Per lawn sprinkler system, includes backflow prevention $15 $15
(6) Per vacuum breaker or backflow protection device on tanks, vats, etc.$15 $15
(7) Per interceptor for industrial waste pretreatment $15 $15
(8) Fuel Gas Piping: (each gas piping system up to 6 outlets)$26 $26
(9)Medical Gas Piping: (each gas piping system up to 6 outlets)$77 $77
l.Sign Permit Fees:
(i) Permanent Signs:
(1) Roof, projecting, awning, canopy, marquee, and wall signs $256 $256
(2) Freestanding ground and pole signs $256 $256
(ii) Temporary and Portable Signs:
(1) Real Estate Directional Signs, pursuant to RMC 4‐4‐100J2, permit valid for a 12‐months period $77 $77
(2)Grand Opening Event Signs, pursuant to RMC 4‐4‐100J6d(i) $77 $77
(3) Event Signs, pursuant to RMC 4‐4‐100J6d(ii) and (iii) per sign, per promotion $51 $51
(4)$128 $128
(5) Commercial Property Real Estate Banner each sign permit is valid for 12 months.$77 $77
(6) Decorative Flags fee is per entrance and valid until flag(s) are removed $77 $77
(iii)Request for Administrative Modifications of City Center Sign Regulations per RMC 4‐4‐100H9:$256 $256
m.Miscellaneous Fees:
(i) Inspection Fees:
(1) Minimum Housing Inspection $128 $128
(2) WABO ‐ Adult Family Home; Misc building inspection $128 $128
(3) Reinspection Fee; Misc building inspection $128 $128
(ii) Plan Review Fees:
(1) Electrical, Plumbing, or Mechanical Permits (percentage of permit fee)40%40%
(2) Additional Plan Review Fees: Over three review cycles (percentage of plan review fee)50%50%
(3)Miscellaneous Plan Review: hourly fee.$128/hr $128/hr
(iii)2 X Permit Fee 2 X Permit Fee
2. Land Use Review Fees:
a.General Land Use Review:
1Per Resolution 4359, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision of ten or more
lots and vested as of the adoption date of Res. 4359, through December 31, 2020. Accessory Dwelling Units (ADU) fees may be reduced; please see Resolution 4359 or
subsequent legislation.
A‐Frame Signs, pursuant to RMC 4‐4‐100J5 Charge is for the first sign, all subsequent signs are $50.00
Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap
Commercial Hood: Installation of each served by a mechanical exhaust, including the ducts for such hood
Work commencing before permit Issuance: Where work for which the permit is required is started prior to
obtaining the permit, a special investigation fee in an amount equal to twice the permit fee shall be charged. The
special investigation fee shall be paid in addition to the required permit fees.
Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air
conditioner, chiller or Air Handling Unit (VAV) including ducts and vents)
Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for
which no other fee is listed in this code
* Includes plan review and inspection fees for the foundation (electrical, plumbing, mechanical, sewer and water
connection fees are in addition to the below amounts).
Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for
which no other fee is listed in this code
Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air
conditioner, chiller or Air Handling Unit (VAV) including ducts and vents)
2021/2022 Preliminary Budget City of Renton, Washington
7 - 25Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022
(i) Additional Animals Permit $50 $50
(ii) Address Change $105 $105
(iii) Annexation:
2. Land Use Review Fees: (Continued)
(1) Less than 10 acres $5,250 $5,250
(2) 10 acres or more $5,250 $5,250
(iv) Appeal (or reconsideration) of:
(1) Hearing Examiner's Decision $500 $500
(2) Administrative Decision $500 $500
(3) Environmental Decision $500 $500
(v) Binding Site Plan (total fee for both preliminary and final phases)$5,140 $5,280
(vi) Code Text Amendment N/C N/C
(vii) Comprehensive Plan Map or Text Amendment (each)$5,250 $5,250
(viii) Conditional Use Permit:
(1) HEX $3,300 $3,300
(2) Administrative
3 $1,600 $1,600
(ix) Critical Areas Exemption N/C N/C
(x) Critical Areas Permit $1,250 $1,250
(xi)100% of 100% of
contract cost contract cost
(xii) Development Agreement $10,000 $10,000
(xiii)100% of cost 100% of cost
(xiv) Environmental Checklist Review $1,600 $1,600
(xv) Environmental (SEPA) Addendum $1,600 $1,600
(xvi) Fence Permit (special)$160 $160
(xvii) Grading and Filling Permit (Hearing Examiner)$5,410 $5,410
(xviii) Landscape Review Fee $160 $160
(xix) Legal Lot Segregation N/C N/C
(xx) Lot Consolidation $510 $510
(xxi) Lot Line Adjustment $1,090 $1,090
(xxii) Manufactured/Mobile Home Park:
(1) Tentative $1,090 $1,090
(2) Preliminary $3,250 $3,250
(3)Final $1,600 $1,600
(xxiii)Open Space Classification Request $155 $155
(xxiv) Plats:
(1)Preliminary Short Plat (total fee for both preliminary and final phases)$5,410 $5,410
(2) Final Short Plat $2,705 $2,705
(3) Preliminary Plat $10,830 $10,830
(4) Final Plat $5,410 $5,410
(xxv) Planned Urban Development:
(1) Preliminary Plan $5,410 $5,410
(2) Final Plan $2,700 $2,700
(xxvi)Reasonable Use Exception:
(a) In conjunction with land use permit $510 $510
(b) Stand alone $1,540 $1,540
(xxvii)Public Arts Exemption N/C N/C
(xxviii)Rezone $5,250 $5,250
(xxix)Routine Vegetation Management Permit without Critical Areas $105 $105
(xxx)Shoreline‐Related Permits:
(1) Shoreline Permit Exemption N/C N/C
(2) Substantial Development Permit $2,700 $2,700
(3) Conditional Use Permit $3,250 $3,250
(4)Variance $3,250 $3,250
(xxxi)Site Development Plan (Site Plan or Master Plan
which includes design review fee for projects subject to RMC 4‐3‐100):
(1) Hearing Examiner Review $3,800 $3,800
(2) Administrative Review $2,700 $2,700
(3) Modification (minor, administrative)
50 % of project
application fee
50 % of project
application fee
(4)Application Application
Fees Fees
(xxxii)Small Cell Permit, per site4 $510 $510
(xxxiii)Special Permit (Hearing Examiner) $2,700 $2,700
(xxxiv)Street Naming (Honorary)
(1) Application $250 $250
(2) Installation $250 $250
(xxxv)Temporary Use Permits:
(1) Tier 1 $105 $105
(2) Tier 2 $205 $205
(xxxvi)Variance (per each variance requested) Administrative or Hearing Examiner $1,330 $1,330
(xxxvii)Waiver or Modification of Code Requirements cost is per request $260 $260
(xxxviii)Zoning Compliance Letter $480 $480
b.Miscellaneous Fees:
Modification (major) required new application and repayment of fee required
Critical Areas Review Fee: for those projects that propose impacts to critical areas and will be billed at the cost of
contract biologist’s review.1
Environmental Impact Statement Cost include the coordination, review and appeal. Draft and Final2
2021/2022 Preliminary Budget City of Renton, Washington
7 - 26Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022
(i) Permit review staff overtime (applies only if permit review is requested by the applicant to be performed $175/hr 175/hr
on Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays outside of the
hours of city staff regular work schedule)
c.
2. Land Use Review Fees: (Continued)
3. Public Works Fees:
a.Franchise Application Fee*$5,000 $5,000
b.Franchise Permit Fees: 1,2
(i) (1) Small work, including trenching less than 60 linear feet or installation of 6 or less utility poles $600 $600
$600 $600
(ii) Master Lease Agreement including Site License Addendum, Small Cell Only
(1) Master Lease Agreement Administrative Costs, $100 per staff hour Actual cost Actual cost
(2) Pole Reservation, per pole $120 $120
(3) Administrative Fee, $100 per staff hour and/or cost of materials $760 deposit + $760 deposit +
time and materials time and materials
Actual cost Actual cost
(5) All other fees, $100 per staff hour and/or cost of materials Actual cost Actual cost
1Bond required pursuant to RMC 9‐10‐5
c.Latecomers' Agreement Application Fees:
(i) Processing fee* (Nonrefundable)
(1) If amount covered by latecomers’ is $50,000 or less $1,000 $1,000
(2) If amount covered by latecomers' is between $50,000 and $200,000 $2,000 $2,000
(3) If amount covered by latecomers' is greater than $200,000 $4,000 $4,000
(ii) Latecomers' Agreement – Administration and collection fee
(1) if amount covered by latecomers' is $50,000 or less 15% of total 15% of total
(2) If amount covered by latecomers' is between $50,000 and $200,000 10% of total 10% of total
(3) If amount covered by latecomers' is greater than $200,000 5% of total 5% of total
(iii) Segregation processing fee, if applicable $750 $750
d.System Development Charge Tables:
(i) Water and Wastewater System Development Charges:
(1) 5/8 x 3/4 inch and 1 inch:
(a) Water service fee3 $4,450 $4,500
(b) Fire service fee 1,2 $594 $601
(c) Wastewater fee3 $3,450 $3,500
(2) 1‐1/2 inch:
(a) Water service fee3 $22,250 $22,500
(b) Fire service fee 1,2 $2,971 $3,005
(c) Wastewater fee3 $17,250 $17,500
(3) 2 inch:
(a) Water service fee3 $35,600 $36,000
(b) Fire service fee 1,2 $4,754 $4,807
*The fixed application fee established herein is intended to cover the City’s internal administrative costs in processing
and administering the franchise. In addition to the fixed application fee, the City may require applicants to either directly
pay or reimburse the City for external costs reasonably incurred to process the application and/or administer the
franchise agreement. The City may require applicants to deposit funds in advance to cover legal and/or other
professional services fees as they are incurred.
2The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and
expenses directly to the applicant.
*The administration and collection fee is deducted from each individual latecomer fee payment and the balance
forwarded to the holder of the latecomer’s agreement pursuant to RMC 9‐5, Tender of Fee.
2When the City is the lead agency for a proposal requiring an Environmental Impact Statement (EIS) and the Environmental Review Committee (ERC) determines that the EIS
shall be prepared, the City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City in preparing the EIS. The ERC shall advise the
applicant(s) of the projected costs for the EIS prior to actual preparation; the applicant shall post bond or otherwise ensure payment of such costs. The ERC may determine
that the City will contract directly with a consultant for preparation of an EIS, or a portion of the EIS, and may bill such costs and expenses directly to the applicant. Such
consultants shall be selected by mutual agreement of the City and applicant after a call for proposals. If a proposal is modified so that an EIS is no longer required, the ERC
shall refund any fees collected under this subsection which remain after incurred costs are paid. The City may collect a reasonable fee from an applicant to cover the cost of
meeting the public notice requirements of this Title relating to the applicant’s proposal. The City shall not collect a fee for performing its duties as a consulted agency. The
City may charge any person for copies of any document prepared under this Title, and for mailing the document, in a manner provided by chapter 42.17 RCW.
3Per Resolution 4359, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision of ten or more
lots and vested as of the adoption date of Res. 4359, through December 31, 2020. Accessory Dwelling Units (ADU) fees may be reduced; please see Resolution 4359 or
subsequent legislation.
4Prior to issuance of a small cell permit, the applicant shall pay the actual administrative expenses incurred by the City that are directly related to the City's review of the
application, including plan inspection, and approval, as authorized by RCW 35.21.860(1)(b), as may be amended.
(4) Public Reimbursement (any costs incurred by the City on behalf of the permit applicant for installation or
operation of site equipment including electrical costs)
1Per RMC 4‐3‐050F7, the City may charge and collect fees from any applicant to cover costs incurred by the City in review of plans, studies, monitoring reports and other
documents related to evaluation of impacts to or hazards from critical areas and subsequent code‐required monitoring.
Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the
development regulations of King County, the King County Land Use Review Fee Schedule shall apply, and is hereby adopted
by reference. A copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk’s office for public
review.
If a franchise agreement does not specify the fee amount, the generic fee, as identified in the following table, shall be
(2) All other work, permit fee plus $60 per hour of inspection applied during regular inspection hours, overtime
inspection rates apply thereafter
2021/2022 Preliminary Budget City of Renton, Washington
7 - 27Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022
3. Public Works Fees: (continued)
(c) Wastewater fee3 $27,600 $28,000
(4) 3 inch:
(a) Water service fee3 $71,200 $72,000
(b) Fire service fee 1,2 $9,508 $9,615
(c) Wastewater fee3 $55,200 $56,000
(5) 4 inch:
(a) Water service fee3 $111,250 $112,500
(b) Fire service fee 1,2 $14,856 $15,023
(c) Wastewater fee3 $86,250 $87,500
(6) 6 inch:
(a) Water service fee3 $222,500 $225,000
(b) Fire service fee 1,2 $29,712 $30,046
(c) Wastewater fee3 $172,500 $175,000
(7) 8 inch:
(a) Water service fee3 $356,000 $360,000
(b) Fire service fee 1,2 $47,539 $48,073
(c) Wastewater fee3 $276,000 $280,000
(ii) Storm Water System Development Charges:
(1) New single family residence (including mobile/manufactured homes)3 $2,000 $2,100
(2)
(3)$0.800 $0.084
per sq foot per sq foot
e.Administrative Fees for SDC Segregation Request* $750 +
administrative costs
$750 + administrative
costs
f.
(i) Water Construction Permit Fees:1
(1) Water meter tests for 3/4” to 2" meter $50 $50
(a) Water meter tests on meters 2" or larger $60 deposit + time
and materials
$60 deposit + time
and materials
(b) Open and close fire hydrants for fire flow tests conducted by others. Time and materials Time and materials
(c) Water service disconnection (cut at main)$275 $275
(d) Meter resets $95 $95
(e) Repair of damage to service $250 $250
(f) Water main connections $560 $560
(g)Water main cut and cap $1,025 $1,025
(h) Water quality/inspection/purity tests $80 $80
(i) Specialty water tests (lead, copper, etc)Cost of test + $70
processing fee
Cost of test + $70
processing fee
(j) Water turn ons/offs after hours $185 $185
(k) Installation of isolation valve. $2,000 deposit +
time and materials
$2,000 deposit + time
and materials
(l)$250 + $0.15 $250 + $0.15
per lineal per lineal
foot foot
(m)Miscellaneous water installation fees. Time and materials Time and materials
(n) Service size reductions $50 $50
(o) Installation fees for ring and cover castings $200 $200
(2) Water meter installation fees – City installed:
(a) 3/4” meter installed by City within City limits. Installation of stub service and meter setter only.$2,875 $2,875
(i)3/4" meter drop in only $400 $400
(b) 3/4” meter installed by City outside City limits. Installation of stub service and meter setter only.$2,935 $2,935
(i) 3/4" meter drop in only $400 $400
(c) 1” meter installed by the City. Installation of stub service and meter setter only.$2,875 $2,875
(i) 1" meter drop in only $460 $460
(d) 1‐1/2" meter installed by the City. Installation of stub service and meter setter only.$4,605 $4,605
(i)1‐1/2” meter drop in only $750 $750
(e) 2” meter installed by the City. Installation of stub service and meter setter only.$4,735 $4,735
(i) 2" meter drop in only $950 $950
$0.840 per sq foot$0.800 per sq foot
the first two hundred fifty (250) lineal feet
Public Works Construction Permit Fees:
New water line chlorination fee. Fee plus $0.15 per lineal foot for any footage after
Addition to existing single family residence greater than 500 square feet (including mobile/manufactured
homes) Fee not to exceed $2,000 (2021) or $2,100 (2022)
All other uses charge per square foot of new impervious surface, but not less than $2,000 (2021) or $2,100
(2022)
1 Based upon the size of the fire service (NOT detector bypass meter)
*The applicant shall pay the City’s administrative costs for the preparation, processing and recording of the partial
payment of the fee(s). If the same segregation is used for more than one utility’s special assessment district, and/or
latecomer’s charge, then only one administrative fee is collected.
2 Unless a separate fire service is provided, the system development charge(s) shall be based upon the size of the meter installed and a separate fire service fee will not
be charged.
3Per Resolution 4359, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision of ten or
more lots and vested as of the adoption date of Res. 4359, through December 31, 2020. Accessory Dwelling Units (ADU) fees may be reduced; please see Resolution
4359 or subsequent legislation.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 28Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022
3. Public Works Fees: (continued)
(3)$220 $220
(4) Hydrant Meter fees:
(a) Hydrant meter permit fee $50 $50
(b) Deposits:
(i) 3/4” meter and backflow prevention assembly.$500 $500
(ii) 3” meter and backflow prevention assembly.$2,000 $2,000
(iii) Deposit processing charge, nonrefundable.$25 $25
(c) Meter rental (begins on day of pickup):
(i) 3/4” meter and backflow prevention assembly. Per month.$50 $50
(ii) 3” meter and backflow prevention assembly. Per month.$250 $250
(ii) Wastewater and Surface Water Construction Permit Fees:1
(1) Residential:
(a) Wastewater permit fee $350 $375
(b) Surface water permit fee $350 $375
(2) Commercial:
(a) Wastewater permit fee $350 $375
(b) Surface water permit fee $350 $375
(3) Industrial:
(a) Wastewater permit fee $350 $375
(b) Surface water permit fee $350 $375
f.
(ii) Wastewater and Surface Water Construction Permit Fees:1 (continued)
(4) Repair of any of the above
(a) Wastewater permit fee $350 $375
(b) Surface water permit fee $350 $375
(5) Cut and cap/Demolition permit:
(a) Wastewater permit fee $350 $375
(b) Surface water permit fee $350 $375
(6)$350 $375
(7)$350 $375
plus King County plus King County
sewer rate sewer rate
on discharged on discharged
amount amount
(iii) Right‐of‐way Permit Fees:
(1) Single family residence $325 $325
(2) All other uses, excluding those listed $625 $625
(3) Wastewater or storm water service $350 $375
(4)King County ROW Permits/Inspections:
(a) Service Installation Only $1,025 $1,025
(b) Utility Extension per 100' of Length (Min 200' Length)$1,025 $1,025
(iv)$525 $525
(v)
(1) Standard locate $500 $500
(2) Large project locate $1,000 $1,000
g.
(i)
(1) $150,000.00 or less 6% of cost 6% of cost
(2) Over $150,000.00 but less than $300,000.00. $9,000 + 5% over
$150,000
$9,000 + 5% over
$150,000
(3) $300,000.00 and over. $16,500 + 4% over
$300,000
$16,500 + 4% over
$300,000
(ii)Standard or minor drainage adjustment review $550 $550
Ground water discharge (temporary connection to wastewater system for discharge of contaminated ground
water over 50,000 gallons) Rate plus billed for current Renton and King County sewer rate on discharged
amount (meter provided by property owner)
Water meter processing fees – Applicant installed: For meters larger than 2”, the applicant must provide
materials and installs.
Utility Locate Refresh Fee (Fee is due each time excavator calls in for locate refresh during 45‐day locate ticket)
Street light system fee, per new connection to power system
1Per Resolution 4359, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision of ten or
more lots and vested as of the adoption date of Res. 4359, through December 31, 2020. Accessory Dwelling Units (ADU) fees may be reduced; please see Resolution
4359 or subsequent legislation.
Exception: No permit fee shall be charged for individual homeowners for work in street rights‐of‐way for street tree or parking strip irrigation systems. No permit fee
shall be charged for moving pods or moving trucks in the right‐of‐way provided that they are in the right‐of‐way for no more than three (3) days.
Public works plan review and inspection fees1,3: All developers, municipal or quasi‐municipal entities, or utility corporations
or companies, except those specifically exempted, shall pay fees under this Section. Exempted entities include City‐
franchised cable TV, cable modem, natural gas, telecommunications, and electrical power. The fee will be based upon
percentages of the estimated cost of improvements using the following formula.
2Construction cost shall be based on the City's bond quantity worksheet and shall include all project related improvements outside of the building envelopes, including,
but not limited to, all costs required to construct the following: paved parking lots, private sidewalks or walkways; private and public storm water management
facilities; temporary erosion and sedimentation control facilities; water quality facilities; public and private streets; public and private sanitary sewers; public water
main improvements; required off‐site street, bike and pedestrian improvements; street lighting improvements; required landscaping and street tree improvements; and
1Includes three (3) review cycles. Additional reviews will be charged $1,500 each.
Work in right‐of‐way – construction permit: Utility and street/sidewalk improvements: A bond is required, as
stipulated in RMC 9‐10‐5, Street Excavation Bond.
Public Works Construction Permit Fees: (continued)
Reinspection for Wastewater or Surface Water Permits
Street and utility plan review and inspection fees; estimated construction cost2: The applicant must submit
separate, itemized cost estimates for each item of improvement subject to the approval by the Public Works Plan
Review Section.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 29Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022
3. Public Works Fees: (continued)
h.Grade and Fill License Fees: Fees shall be based on Tier.
Grade and Fill Quantity
New or Replaced
Hard Surface
Tier
< 50 cy < 2,000 sf 0
50 cy ‐ 499 cy 2,000 sf ‐ 4,999 sf 1
500 cy ‐ 4,999 cy 5,000 sf ‐ < 1 ac 2
5,000 cy ‐ 49,999 cy 1 ac ‐ < 2.5 ac 3
50,000 cy ‐ 99,999 cy 2.5 ac ‐ < 5 ac 4
100,000 cy and larger 5 ac and larger 5
(i) Review/Intake Fee:
(1) Tier 0 N/A N/A
(2) Tier 1 $466 $466
(3) Tier 2 $621 $621
(4) Tier 3 $932 $932
(5) Tier 4 $1,242 $1,242
(6) Tier 5 $1,553 $1,553
(ii) Inspection/Issuance Fee:
(1) Tier 0 N/A N/A
(2) Tier 1 $444 $444
(3) Tier 2 $887 $887
(4) Tier 3 $1,183 $1,183
(5) Tier 4 $2,366 $2,366
(6) Tier 5 $3,550 $3,550
h. Grade and Fill License Fees: Fees shall be based on Tier. (continued)
(iii) Solid Waste Fills:1.5 x plan 1.5 x plan
check fee check fee
(iv) Annual Licenses of Solid Waste Fills: 1.5 x plan 1.5 x plan
check fee check fee
i.
(i) Filing fee $250 $250
(ii) Processing fee $250 $250
j.
(i) Single family and two family uses annually, fee plus leasehold excise tax1 if applicable $10.00 + LET1 $10.00 + LET1
(ii)0.5% x Value2 LET1 0.5% x Value2 LET1
(iii)
(iv) Insurance Required:
(v) Exception for Public Agencies:
2Right‐of‐way value shall be based on the assessed value of the land adjoining the property as established by the King County Assessor
k.
(i) Filing fee $500 $500
(ii)
Appraised Value of Vacated right‐of‐way:
(1) Less than $25,000 $750 $750
(2) $25,000 to $75,000 $1,250 $1,250
(3) Over $75,000 $2,000 $2,000
l.
(i)
Processing and completion fee, payable upon Council approval of the vacation and upon administrative
determination of appraised value of vacated right‐of‐way.
3If deemed necessary by the City in its sole discretion, the City will contract with one or more consultants to provide plan reviews and/or inspections with the related
costs and expenses payable by the applicant.
30% of system
development charge
30% of system
development charge
0.5% x Value2 LET1 0.5% x Value2 LET1
site grading and mobilization costs.
7,000 sf ‐ < 3/4 acre
3/4 ac ‐ < 1 ac
1 ac ‐ < 2.5 ac
Cleared or
Disturbed Area
< 7,000 sf
Revocable Right‐of‐way Permit Fees:
2.5 ac ‐ < 5 ac
5 ac and larger
The fee for annual licenses for solid waste fills shall be one and one‐half (1‐1/2) times the plan checking fees listed
above. The fee for a grading license authorizing additional work to that under a valid license shall be the difference
between the fee paid for the original license and the fee shown for the entire project. Any unused fee may be
carried forward to the next year. If any work is done before the license is issued, the grading license fee shall be
doubled.
The plan check fee for solid waste fills shall be one and one‐half (1‐1/2) times the plan checking fees listed above.
The fee for a grading license authorizing additional work to that under a valid license shall be the difference
between the fee paid for the original license and the fee shown for the entire project.
Release of easement fees: The imposition, collection, payment and other specifics concerning this charge are detailed in
chapter 9‐1 RMC, Easements.
All uses without public benefit fee is a per month charge based on property value2 of land to be utilized, plus
leasehold excise tax1, if applicable.
Uses with public benefit fee is a per year of assessed value of land adjoining the property, plus leasehold excise
tax1, if applicable. In no case less than $10.00.
Temporary connections to a City utility system may be granted for a one‐time, temporary, short‐term use of a portion of the
property for a period not to exceed three (3) consecutive years:
Storm Water Fee; Fee equal to thirty percent (30%) of the current system development charge applicable to that
portion of the property.*
1There is hereby levied and shall be collected a leasehold excise tax on that act or privilege of occupying or using public owned real or personal property through a
leasehold interest at the rate established by the State of Washington
a no‐fee permit may be issued only when the applicant is a public agency and when the proposed use of the right‐
of‐way provides a direct service to the public (e.g., Metro applications for right‐of‐way for bus shelters).
Public Liability and property damage insurance is also required pursuant to RMC 9‐2‐5B, Minimum Permit
Requirements for Excess Right‐of‐Way Use.
Street and Alley vacation Fees: The imposition, collection, payment and other specifics concerning this charge are detailed in
chapter 9‐14 RMC, Vacations.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 30Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022
3. Public Works Fees: (continued)
(ii)
(iii)
m.Water or Sewer ‐ Redevelopment:
(i) Fee(s) based upon meter(s) proposed for final project minus fee(s) based upon meter existing on site.
n.Miscellaneous Fees:
(i) Re‐inspection Fee $128 $128
(ii) Plan Revision following Permit Issuance:
(1)$250 $250
(2)$1,500 $1,500
(iii) Street Frontage Improvements Fee‐In‐Lieu:
(1) Street with existing storm drainage main line $110/LF $113/LF
(2) Street with existing conveyance ditch $125/LF $128/LF
(iv)$125/hr $125/hr
(v)$175/hr $175/hr
(vi)Actual cost Actual cost
4. Technology Surcharge Fee
5.0%5.0%
5. Impact Fees:
a. School Impact Fees:
(i) Issaquah School District
(1) Single Family Fee $18,213 $18,213
(2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU)$12,043 $12,043
(ii)Kent School District
(1) Single Family Fee $5,692.85 $5,692.85
(2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU)$2,404.63 $2,404.63
(iii) Renton School District
(1) Single Family Fee $7,681 $7,681
(2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU)$4,989 $4,989
b. Transportation Impact Fees:1
(i) Light Industrial, per sq foot $6.96 $6.96
(ii)Apartment, per dwelling & Accessory Dwelling Unit (ADU)$4,918.53 $4,918.53
(iii) Church, per sq foot $3.92 $3.92
(iv)Coffee/Donut Shop, no drive up, per sq foot $161.90 $161.90
(v)Coffee/Donut Shop, with drive up, per sq foot $170.06 $170.06
(vi) Condominium & Duplexes per dwelling $4,133.66 $4,133.66
(vii)Convenience market ‐ 24 hour, per sq foot $162.43 $162.43
(viii)Daycare, per sq foot $71.58 $71.58
(ix)Drinking Place, per sq foot $45.06 $45.06
(x)Drive‐in bank, per sq foot $102.35 $102.35
(xi)Fast food, no drive‐up, per sq foot $103.88 $103.88
(xii) Fast food, with drive‐up, per sq foot $132.33 $132.33
(xiii)Gas station with convenience store, per pump $47,824.85 $47,824.85
(xiv)Gas station, per pump $63,940.88 $63,940.88
(xvi) General office, per sq foot $10.68 $10.68
(xvii)Health/fitness club, per sq foot $26.38 $26.38
(xviii)Hospital, per sq foot $5.71 $5.71
(xix)Hotel, per room $3,139.49 $3,139.49
(xx) Manufacturing, per sq foot $5.24 $5.24
(xxvi)Marina, per boat berth $1,674.40 $1,674.40
(xxi) Medical office, per sq foot $24.12 $24.12
(xxii) Mini‐warehouse, per sq foot $1.89 $1.89
30% of system
development charge
30% of system
development charge
30% of system
development charge
30% of system
development charge
Credit for existing water or sewer service: Any parcel that currently has water and or sewer service is eligible for a prorated
system development charge.
Minor (Results in a change 10% or less than the cost of construction based on the City's bond quantity
worksheet. Excludes minor adjustments that are approved by the City to be shown on record drawings.)
Major (Results in a change of greater than 10% of the cost of construction based on the City's bond quantity
worksheet.)
Water Fee; Annual fee equal to thirty percent (30%) of the current system development charge applicable to the
size of the temporary water meter(s).*
An additional technology surcharge shall be required for all fees included in the following Subsections of Section XII,
Development Fees, of the City of Renton Fee Schedule Brochure: Subsection 1, Building Fees; Subsection 2, Land Use Review
Fees, except for appeals, critical areas review fee, and direct EIS costs; Subsections b, e, f, g and h of subsection 3, Public Works
Fees; and Section XIII, Fire Department Fire Marshall Fees
Wastewater Fee; Annual fee equal to thirty percent (30%) of the current system development charge applicable to
the size of the temporary domestic water meter(s).*
*Fee shall be paid annually (non‐prorated), and shall be nonrefundable, nontransferable (from one portion of the property to another) and shall not constitute a credit
to the system development charge due at the time of permanent use of the utility system. The application for temporary connection shall consist of a detailed plan and
a boundary line of the proposed development service area for use in the fee determination.
After hours inspection (applies to inspections performed on Saturdays, Sundays, observed City of Renton holidays,
and non‐holiday Monday‐Fridays outside the hours of 7:00am to 3:30pm)
Public Works Reimbursement (any work performed by City forces or under City contract on behalf of a permit
applicant to repair damage to the City infrastructure caused by the permit applicant or contractor under its
control, or any and all roadway or right‐of‐way cleanup efforts performed by City forces or under City contract that
resulted from the work performed by the permit applicant or contractors under its control.
Permit review staff overtime (applies only if permit review is requested by the applicant to be performed on
Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays outside of the hours of
city staff regular work schedule)
2021/2022 Preliminary Budget City of Renton, Washington
7 - 31Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022
5. Impact Fees: (continued)
(xxiii)Mobile home, per dwelling $4,709.24 $4,709.24
(xxiv) Motel, per room $2,877.86 $2,877.86
(xxv)Movie theater, per seat $470.93 $470.93
(xxvii)Nursing home, per bed $1,308.12 $1,308.12
(xxviii) Restaurant: sit‐down, per sq foot $44.64 $44.64
(xxix)Senior housing ‐ attached, per dwelling $2,145.32 $2,145.32
(xxx) Shopping center, per sq foot $19.46 $19.46
(xxxi)Single family house, per dwelling $7,953.37 $7,953.37
(xxxii) Supermarket, per sq foot $48.20 $48.20
(xxxiii) Net New PM Peak Hour Vehicle Trip (Proposed ‐ Existing), per PM Peak Hour Vehicle Trip $5,507.07 $5,507.07
c.Park Impact Fees:1
(i) Single family $4,012.78 $4,012.78
(ii) Multi‐family: 2 units, Duplexes, & Accessory Swelling Unit (ADU)$3,257.43 $3,257.43
(iii) Multi‐family: 3 or 4 units $3,100.07 $3,100.07
(iv) Multi‐family: 5 or more units $2,722.40 $2,722.40
(v) Mobile home $2,848.28 $2,848.28
d.Fire Impact Fees:
(i) Residential ‐ single family (detached dwellings & duplexes), per dwelling unit $829.77 $829.77
(ii) Residential ‐ multi family & Accessory Dwelling Unit (ADU), per dwelling unit $964.53 $964.53
(iii) Hotel/motel/resort, per sq foot $1.29 $1.29
(iv)Medical care facility, per sq foot $3.92 $3.92
(v) Office, per sq foot $0.26 $0.26
(vi) Medical/dental office, per sq foot $1.99 $1.99
(vii) Retail, per sq foot $1.25 $1.25
(viii) Leisure facilities, per sq foot $2.36 $2.36
(ix) Restaurant/lounge, per sq foot $5.92 $5.92
(x) Industrial/manufacturing, per sq foot $0.15 $0.15
(xi) Church, per sq foot $0.56 $0.56
(xii) Education, per sq foot $0.72 $0.72
(xiii) Special public facilities, per sq foot $4.48 $4.48
*(i)‐(ii) is per unit
*(iii)‐(xiii) is per square foot
SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA)2021 2022
a.Fire plan review and inspection fees:
(i) $0 to $249.99 $35 $35
(ii) $250.00 to $999.99 $35 + 2%
of the cost
$35 + 2%
of the cost
(iii) $1,000.00 to $4,999.99 $60 + 2%
of the cost
$60 + 2%
of the cost
(iv) $5,000.00 to $49,999.99 $175 + 1.5%
of the cost
$175 + 1.5%
of the cost
(v)$50,000.00 to $99,999.99 $400 + 1.2%
of the cost
$400 + 1.2%
of the cost
(vi) $100,000.00 and above $900 + .75%
of the cost
$900 + .75%
of the cost
(vii)$125 $125
(viii)
(ix)
(x) Preventable Fire alarm fee:
(1) First, second, and third preventable alarms N/C N/C
(2) Fourth and fifth preventable alarms in a calendar year, fee is per each alarm.$75 $75
(3)$150 $150
(xi)Late Payment Penalty $35 $35
b.Fire Permit type:
(i)$100 $100
(ii) Permits for Mobile food facilities that have passed a fire and life safety inspection in another jurisdiction that $50 $50
has reciprocity with Renton RFA
(iii) Hazardous materials and HPM facilities yearly $175 $175
(iv) Construction permit:
(v) Replacement for lost permit, per each $35 $35
(vi)$175
$150
$250
20% of plan review
fee ‐ Min. $52
$175
$150
$250
20% of plan review
fee ‐ Min. $52
1Per Resolution 4359, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision of ten or
more lots and vested as of the adoption date of Res. 4359, through December 31, 2020. Accessory Dwelling Units (ADU) fees may be reduced; please see Resolution
4359 or subsequent legislation.
Third Re‐Inspection/Pre‐Citation Follow‐Up Inspection when re‐inspections are required beyond the first and
second re‐inspections
Sixth preventable alarm and successive preventable alarms in a calendar year, fee is per each alarm.
Operational fire code permit (issued in accordance with Section 105.6 of the IFC) fee is yearly (includes items such
as fire special events, covered stages, mobile food facilities, hot works, etc.)
Construction Re‐inspection. Fee is per hour with a 2 hour minimum. The minimum may be assessed if the
requested inspection does not meet the approval of the inspector.
Violation/Second Re‐Inspection after 30‐day period (whenever 30 days or more have passed since Fire Department
notification of a violation, which required a first re‐inspection, and such violation has not been remedied or
granted an extension)
Hazardous production materials permit (for businesses storing, handling, or using hazardous production materials as
regulated in the fire code) permit is yearly
2021/2022 Preliminary Budget City of Renton, Washington
7 - 32Appendix - 2021/2022 Rates and Fees Schedule
City of Renton Fee Schedule
2021‐2022
SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA) (CONTINUED)2021 2022
(vii) Underground tank removal permit (commercial)See Fire plan review
and construction
permit fees
See Fire plan review
and construction
permit fees
(viii) Underground tank removal or abandonment‐in‐ place permit (residential)$84 $84
(ix)$125 $125
(x) NSF check fees $25 $25
(xi)
3%3%
Other requested inspection when not required by the fire code. Fee is per hour with a minimum 1 hr when
approved by the Fire Marshal, such as home daycares
RFA technology surcharge fee applied to Fire Department Fire Marshal Fees, subsection a. (i, ii, iii, iv, v, vi) and
subsection b. (iii)
2021/2022 Preliminary Budget City of Renton, Washington
7 - 33Appendix - 2021/2022 Rates and Fees Schedule
Budget Glossary
Accounting System: The total set of records and procedures, which are used to record, classify, and
report information on the financial status and operations of an entity.
Accrual Basis: A basis of accounting in which transactions are recognized at the time they are incurred,
as opposed to when cash is received or spent. Also, see Modified Accrual Basis of Accounting.
Activity: A combination of people, technology, supplies, methods, and environment that produce a
given product or service.
Ad Val Orem Taxes: A tax levied on the assessed value of real property.
AFSCME (American Federation of State, County and Municipal Employees Union #2170): Labor union
representing all regular non‐exempt personnel, grades 1 through 40.
Agency Fund: A fund used to account for assets held by a government as an agent for individuals,
private organizations, other governments, and/or other funds.
Appropriation: Legislation by the City Council that approves budgets for individual funds.
Appropriation ordinances authorize spending in the personnel services, non‐personnel services,
employee benefits, equipment accounts, debt service, and capital categories. Departments cannot
spend more money than is approved in these categories. Appropriations can only be adjusted by
passage of a subsequent ordinance of the City Council upon recommendation by the Mayor.
Arbitrage: The excess of the yield on investments acquired with gross proceeds of a bond issue over
the bond yield of the issue. This excess must be rebated to the United States Treasury, and is called
arbitrage rebate.
Assessed Valuation: The estimated value placed upon real and personal property by the King County
Assessor as the basis for levying property taxes.
Balanced Budget: Funding recommendations for the operating and capital budgets do not exceed the
estimated resources.
BARS: The State of Washington prescribed Budgeting, Accounting, Reporting System Manual required
for all governmental entities in the State of Washington.
Base Budget: Ongoing expense for personnel, contractual services, and the replacement of supplies
and equipment required to maintain service levels previously authorized by the City Council.
Biennial Budget: A budget applicable to a two‐year fiscal period.
Bond (Debt Instrument): A written promise to pay (debt) a specified sum of money (called principal or
face value) at a specified future date (called the maturity date) along with periodic interest paid at a
specified percentage of the principal (interest rate). Bonds are typically used for long‐term debt to pay
for specific capital expenditures.
Budget: Budget adopted by Renton’s City Council that goes into effect on January 1st, including
amendments through December 31st, of the current year.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 34Appendix - Budget Glossary
Budget (Operating): A plan of financial operation embodying an estimate of proposed expenditures for
a given period (typically a fiscal year) and the proposed means of financing them (revenue estimates).
The term is also used to denote the officially approved expenditure ceilings under which the City and
its departments operate.
Budget Adjustment: A procedure to revise a budget appropriation either by City Council approval
through the adoption of a supplemental appropriation ordinance for any interdepartmental or
interfund adjustments, or authorization by the Mayor to adjust appropriations within a departmental
budget.
Budgets and Budgetary Accounting: The City of Renton budgets its funds in accordance with the
Revised Code of Washington (RCW) 35A.33. In compliance with the Code, appropriated budgets are
adopted for the General, Special Revenue, Debt Service, and Capital Projects Funds. Any unexpended
appropriations lapse at the end of the fiscal year. The City of Renton budgets on an accrual basis.
Budget Calendar: The schedule of key dates or milestones that the City follows in the preparation and
adoption of the budget.
Budgetary Control: The control or management of a government in accordance with the approved
budget for the purpose of keeping expenditures within the limitations of available appropriations and
resources.
CDBG: Community Development Block Grant is funding for the purpose of carrying out eligible
community development and housing activities.
CIP: See Capital Investment Program.
Capital Assets: Assets of significant value, which have a useful life of several years.
Capital Investment Program: A separately published plan for capital expenditures to be incurred each
year over a period of six future years, which sets forth each capital project identifying the expected
beginning and ending date for each project, the amount to be expended in each year, and the method
of financing those expenditures.
Capital Outlay: Expenditures, which result in the acquisition of, or additions to, capital assets.
Examples include land, buildings, machinery and equipment, and construction projects.
Cash Basis: A basis of accounting in which transactions are recognized only when cash is received or
disbursed.
Committed Expenditures: Appropriated expenditures (see definition of appropriation.)
Comprehensive Plan: A general plan that outlines growth and land use for residential, commercial,
industrial, and open space areas.
Contingency: A budgetary reserve set‐aside for emergencies or unforeseen expenditures.
Councilmanic Bonds: Councilmanic bonds refer to bonds issued with the approval of the Council, as
opposed to voted bonds, which must be approved by vote of the public. Councilmanic bonds must not
exceed .75 percent of the assessed valuation and voted bonds 1.75 percent.
Debt Service: Payment of interest and repayment of principal to holders of the City's debt instruments.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 35Appendix - Budget Glossary
Debt Service Fund: A fund established to account for the accumulation of resources for, and the
payment of, general long‐term debt principal and interest.
Deficit: (1) The excess of an entity's liabilities over its assets (see Fund Balance). (2) Expenses exceeding
revenue during a single accounting period.
Department: Basic organizational unit of City government responsible for carrying out a specific
function.
Depreciation: (1) Expiration in the service life of capital assets attributable to wear and tear,
deterioration, action of the physical elements, or inadequacy of obsolescence. (2) That portion of the
cost of a capital asset that is charged as an expense during a particular period.
Division: A group of homogeneous cost centers within a department.
Enterprise Fund: Separate financial accounting used for government operations that are financed and
operated in a manner similar to business enterprises, and for which preparation of an income
statement is desirable.
EOC: The Emergency Operations Center is located at Fire Station 12 and is used by the Emergency
Management Team as the command center in the event of an emergency in the greater Renton area.
Equipment Rental Fund: An internal service fund used to account for the cost of maintaining and
replacing all City vehicles and auxiliary equipment except for golf course equipment.
Expenditures: Where accounts are kept on the accrual or modified accrual basis of accounting, the cost
of goods received or services rendered whether cash payments have been made or not. Where
accounts are kept on a cash basis, expenditures are recognized only when the cash payments for the
above purposes are made.
FEMA: The Federal Emergency Management Act is a Federal initiative designed to provide financial
assistance in the event of an emergency.
FICA: Federal Insurance Contribution Act is an employment tax levied against both an employee and
employer for Social Security and Medicare taxes.
Full‐Time Equivalent Position (FTE): FTE is a measure of a position by its budgeted hours. For example,
1 FTE equals 2,080 hours and .75 FTE equals 1,566 hours.
Fund: An independent fiscal and accounting entity with a self‐balancing set of accounts recording cash
and/or other resources together with all related liabilities, obligations, reserves, and equities which are
segregated for the purpose of carrying on specific activities or attaining certain objectives.
Fund Balance: Difference between fund assets and fund liabilities (the equity) in governmental funds.
Fund balances will be classified as nonspendable, restricted, committed, assigned, or unassigned.
Nonspendable funds: items that cannot be spent due to form; inventories, prepaid amounts,
long‐term loan receivables, or amounts that must be maintained intact legally.
Restricted funds: amounts constrained for specific purposes imposed by external parties.
Committed funds: amounts constrained by the City Council, either though formal budget
adoption, contract approvals, or for other purposes formally approved by the Council.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 36Appendix - Budget Glossary
Assigned funds: all amounts remaining in governmental funds, other than the general fund, not
classified as nonspendable, restricted or committed. Amounts reported as committed also
include year‐end encumbrances that have received approval from the City Council and re‐
appropriated in the following year’s carry forward budget. Also, the City’s financial policies
require a maximum amount of 12% and minimum of 8% fund balance to remain in the general
fund for cash flow purposes.
Unassigned funds: any remaining fund balance in the general fund not classified as
nonspendable, restricted, committed or assigned.
GAAP: Generally Accepted Accounting Principles are standards used for accounting and reporting used
for both private industry and governments.
GASB: Government Accounting Standards Board established in 1985 to regulate the rules and
standards for all governmental units.
General Fund: The fund supported by taxes, fees, and other revenue that may be used for any lawful
purpose.
General Obligation Bonds: Bonds for which the full faith and credit of the insuring government are
pledged for payment.
IAFF (International Association of Firefighters Union #864): Labor union representing firefighter
officers, lieutenants, captains, and fire battalion chiefs.
Indebtedness: The state of owing financial resources to other financial institutions and investors.
Interfund Payments: Expenditures made to other funds for services rendered. This category includes
interfund repairs and maintenance.
Intergovernmental Services: Intergovernmental purchases of those specialized services typically
performed by local governments.
Intermittent Employee: An intermittent employee is one who is hired to work for an indefinite or
intermittent period, as needed. An intermittent employee may work a fluctuating schedule or on an
on‐call basis, limited to a maximum of four months of full‐time and/or may not work more than 69
hours per month, not to exceed 1,500 hours in a calendar year.
Internal Service Fund: Funds used to account for the financing of goods or services provided by one
department or agency to other departments or agencies of the City, or to other governments, on a
cost‐reimbursement basis.
LEOFF: Law Enforcement Officers and Firefighters Retirement System provided in the State of
Washington.
LID: Local Improvement District or Special Assessments made against certain properties to defray part
or all of the cost of a specific improvement or service deemed to primarily benefit those properties.
Limited Term Employee: An individual hired to work a full or part‐time schedule for a pre‐determined
period not to exceed three years or unless extended by the City Council. A limited term position is an
authorized and budgeted exempt or non‐exempt position with full or prorated City benefits and
compensated according to the City of Renton Index of Positions and Pay Ranges.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 37Appendix - Budget Glossary
Long Term Debt: Debt with a maturity of more than one year after the date of issuance.
LTGO: Limited Tax General Obligation bonds are non‐voter approved bonds for which the full faith and
credit of the insuring government are pledged for payment.
Mission: A succinct description of the scope and purpose of an organization.
Mitigation Fees: Fees paid by developers toward the cost of future improvements to City
infrastructure, which improvements are required due to the additional demands generated by new
development.
Modified Accrual Basis of Accounting: The accrual basis of accounting adapted to the governmental
fund‐type measurement focus. Under this form of accounting, revenue and other financial resource
increments (e.g., bond proceeds) are recognized when they become both measurable and available to
finance expenditures of the current period. Expenditures are recognized when the fund liability is
incurred except for certain inventory materials and supplies and prepaid insurance. All governmental
funds, expendable trust funds, and agency funds are accounted for using the modified accrual basis of
accounting.
Object: As used in expenditure classification, this term applies to the type of item purchased or the
service obtained (as distinguished from the results obtained from expenditures). Examples are
personnel services, contractual services, and materials and supplies.
Objective: Desired accomplishment that can be measured and achieved within a given time frame.
Operating Funds: Recurring revenue sources used to finance ongoing operating expenditures and pay‐
as‐you‐go capital projects.
Operating Transfer: Routine and/or recurring transfers of assets between funds.
Other Services and Charges: A basic classification for services other than personnel services that are
needed by the City. This item includes professional services, communication, travel, advertising, rentals
and leases, insurance, public utility services, repairs and maintenance, and miscellaneous.
PERS: Public Employees Retirement System provided for, other than Police and Fire, by the State of
Washington.
Performance Measures: Indicators of program performance that are collected to show the impact of
resources spent on city services directly tied to program results.
Personnel Benefits: Those benefits paid by the City as part of the conditions of employment. Examples
include insurance and retirement benefits.
Police Guild Union: Represents commissioned police officers and sergeants, and non‐commissioned
personnel.
Preliminary Budget: The official written statement prepared by the budget office and supporting staff,
which presents the proposed budget to the City Council.
Program: A group of related services or activities that are provided or administered by a department
or division and accounted for in its budget.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 38Appendix - Budget Glossary
Public Works Trust Fund Loans (PWTF) : A State revolving loan fund that provides low‐interest loans to
help local governments maintain or improve essential public works systems.
Reserve: See fund balance.
Resources: Total dollars available for appropriations including estimated revenue, fund transfers, and
beginning fund balances.
Retained Earnings: An equity account reflecting the accumulated earnings of the City.
Revenue: Income received by the City in support of a program of services to the community. It includes
such items as property taxes, fees, user charges, grants, fines and forfeits, interest income and
miscellaneous revenue.
Revenue Bonds: Bond issued pledging future revenue (usually water, sewer, or drainage charges) to
cover debt payments in addition to operating costs.
Revenue Estimate: A formal estimate of how much revenue will be earned from a specific revenue
source for some future period, typically, a future fiscal year.
Revenue for Reserve: Revenue placed in a fund balance reserve account.
Salaries and Wages: Amounts paid for personal services rendered by employees in accordance with
rates, hours, terms and conditions authorized by law or stated in employment contracts. This category
also includes overtime and temporary help.
Special Revenue Fund: A fund used to account for the proceeds of specific revenue sources that are
legally restricted to expenditure or specified purposes.
Supplemental Appropriation: An appropriation approved by the Council after the initial budget
appropriation.
Supplies: A basic classification of expenditures for articles and commodities purchased for
consumption or resale. Examples include office and operating supplies, fuel, power, water, gas,
inventory or resale items, and small tools and equipment.
Temporary Employee: A temporary employee is one who was hired to work in a position designated
and specifically budgeted as “temporary” for that purpose. Temporary employees are entitled to
accrue “general leave” after serving in the position for two consecutive years.
TIP: Transportation Investment Program is a comprehensive program used to identify specific
transportation projects for improvement to enhance local, regional, State, and Federal transportation
systems.
Trust Fund: Funds used to account for assets held by a government in a trustee capacity for individuals,
private organizations, other governments, and/or other funds.
Use of Prior Year Revenue: Fund balance from prior year revenue to be used to offset current year
expenditures.
UTGO: Unlimited Tax General Obligation bonds are voter approved and retired by a tax levy commonly
referred to as an excess levy.
YE Estimate: Year‐end estimate.
2021/2022 Preliminary Budget City of Renton, Washington
7 - 39Appendix - Budget Glossary
City of Renton
1055 South Grady Way
Renton, WA 98057
rentonwa.gov