Minor Franchise Permit: MFP20004315
IVR Number: 20004315
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:09/22/2020Application Date:0007200172Parcel Number: 211 SHATTUCK AVE S
Permit Type:10/06/2020Issue Date:Franchise
Permit Work Class:10/06/2021Expiration Date:Minor Utility
Job Number: 423134Franchise Type:Cable
Description: Comcast potholing at 4 locations. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Shannon Heaton
Cannon Construction
Applicant
Rhonda Resnik
Comcast
410 Valley Ave NW, Suite 12, Bldg C
Puyallup, WA 98371
B: (253) 864-4246Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contractor
Business License Number: 20838Electrical Contractor: CANNOCI873CL
Construction Contractor: CANNOCI055CS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP20004315
Scott Warlick 9/22/2020
RESTORATION PER CITY OF RENTON STANDARDS
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
MFP20004315
Scott Warlick CED 9/22/2020
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
200
211
220
215211
203
315 321
222 EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPSHATTUCK AVE SROWROWROWROWROWROWROWROWROWROW
ROW
ROWROWROWROWROWROWROWROWROWROW
ROW
ROW
ROW ROW ROW ROW ROW ROW ROW
WTW21-5
W21-7
R2-1WORK AREA
WTW21-5
W21-7
42.8081
PARKINGNO
FROM
TO
NAME OF FIRM 000-0000PHONE (CONTACT #)TOW-AWAY AREA
42.8081
PARKINGNO
FROM
TO
NAME OF FIRM 000-0000PHONE (CONTACT #)TOW-AWAY AREA
10'
MIN
10'
MIN
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [UNDERGROUND WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000423134RN64 - SHATTUCK
S 3RD ST & SHATTUCK AVE S
RENTON, WA 98057
TCP 1 3
9/14/2020 TH TG
COMCAST
N
CONTACTS:
CANNON COMPANIES
Todd Gallant - (253)-468-5971 - tgallant@cannonconstructioninc.com
COMCAST COMMUNICATION
Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com
MFP20004315
315
138
205
200
212
300 322
220
207
201
319
125
316
115
00
301 305 309
325SHATTUCK AVE SS 3RD ST WHITWORTH AVE SEOPEOPEOPEOPEOPEOP
EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
S 3RD ST
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWPOLICE
OFFICER
WTR2-1
WORK AREA
W21-7
W20-7a
W3-4
FLAGGERFLAGGERR2-1
W21-7
W21-7
W20-7a
W20-7aW3-4
W3-4
W21-7 W20-7aW3-4
WHITWORTH AVE STHE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [UNDERGROUND WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000423134RN64 - SHATTUCK
S 3RD ST & SHATTUCK AVE S
RENTON, WA 98057
TCP 2 3
9/14/2020 TH TG
COMCAST
N
MFP20004315
Provide traffic cones
around work area.
Recommend lane shift
on S 3rd st to provide
more working room
and safe space.
315
138
205
200
212
300 322
220
207
201
319
125
316
0
301 305 309
325SHATTUCK AVE SS 3RD ST WHITWORTH AVE SEOPEOPEOPEOPEOPEOP
EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
S 3RD ST
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWWTWORK AREA
R2-1
R2-1
FLAGGERW21-7
W20-7a
W3-4
FLAGGERPOLICE
OFFICER
W21-7 W20-7aW3-4
W21-7 W20-7aW3-4
W21-7
W20-7a
W3-4 WHITWORTH AVE STHE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [UNDERGROUND WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000423134RN64 - SHATTUCK
S 3RD ST & SHATTUCK AVE S
RENTON, WA 98057
TCP 3 3
9/14/2020 TH TG
COMCAST
N
MFP20004315
Provide traffic cones
around work area.
Recommend lane shift
on S 3rd st to provide
more working room
and safe space.
POTHOLE LOCATION
POTHOLE LOCATION 1 - COVER SHEET
2 -LEGEND
3 -GENERAL NOTES
4 -DESIGN
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES
CONTACTS:
PROJECT MAP:
N
SCOPE OF WORK:
SHEET INDEX:
- POT-HOLING AT 4 LOCATIONS
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST
CANNON COMPANIES
Todd Gallant - (253)-468-5971 - tgallant@cannonconstructioninc.com
COMCAST COMMUNICATION
Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com
S 3rd St & Shattuck Ave S
Renton, WA 98057
RN64 SHATTUCK - FORCED RELOCATES
JB#0000423134
MFP20004315
EDGE OF PAVEMENT
FOGLINE
POWER
COMMUNICATION
SEWER
DRAIN
DRAINAGE DITCH
GAS
WATER
TRAFFIC SIGNAL
TELCOM
STEAM
UNKNOWN UTILITY
RIGHT OF WAY
TRAFFIC CONES
PROPOSED NEW CONDUIT
STRAW WATTLES
P
LT
CW
R
UTILITY POLE
VAULT - SMALL
PEDESTAL
STREET LIGHT
CROSSWALK LIGHT
UTILITY RISER
V VAULT - SMALL
444LA MANHOLE
VAULT - 25TA
CATCH BASIN
CATCH BASIN WITH SOCK
GLULAM UTILITY POLECENTER LINE
LANE LINE
FENCE
HIGH VISIBILITY FENCE
S SEWER MANHOLE
D DRAIN MANHOLE
W WATER MANHOLE
V UTILITY VALVE
SHRUBBERY
BORE PIT
VAULT - LARGE
VAULT - 25TA
C COMMUNICATION MANHOLE
FIRE HYDRANT
DISTANCE STATIONSTA 0+00
CONSTRUCTION NOTE CALLOUT#
X.X DISTANCE DIMENSION
ASPHALT SURFACE
CONCRETE SIDEWALK PANEL
CONCRETE ROADWAY PANEL
HF H-FRAME
VAULT - LARGE
C
CCAB CABINET
LEGEND
LANE DIRECTION INDICATOR
PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES
A
7
LANDSCAPE
CROSS SECTION SYMBOL
CROSS SECTION NAME
CROSS SECTION SHOWN ON PAGE
FL FL
EOP
P P
TS TS
C C
D D
DD DD DD DD DD DD
G G
W W
T T
ST ST
ROW
SS S SS
SS UK SS
CB
CB
P P
V V V
V VV
WORK BEING DONE1LOCATION
PHOTO NOTE CALLOUT
#PHOTO LOCATOR SYMBOL
OF
DATE REVISION BY QC
CANNON COMPANIES
0000423134RN64 - SHATTUCK
S 3RD ST & SHATTUCK AVE S
RENTON, WA 98057
LEGEND 2 4
9/14/2020 TH TG
COMCAST
MFP20004315
OF
DATE REVISION BY QC
CANNON COMPANIES
0000423134RN64 - SHATTUCK
S 3RD ST & SHATTUCK AVE S
RENTON, WA 98057
GENERAL NOTES 3 4
9/14/2020 TH TG
COMCAST
MFP20004315
315
205
200
212
401
300
211
322
220
207
201
215
319
125
316
115
211
203
301 305 309
325
222
SHATTUCK AVE SS 3RD ST WHITWORTH AVE SEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP SHATTUCK AVE SS 3RD ST
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROWROWROWPOTHOLE LOCATION #1
POTHOLE LOCATION #2
POTHOLE LOCATION #3 POTHOLE LOCATION #4
RESTORE CONCRETE SIDEWALK
PANELS IN WHICH POT HOLES 1 & 2
ARE BEING DONE IN PER CITY OF
RENTON'S STANDARDS
RESTORE ASPHALT ROADWAY
WHERE POT HOLES 3 & 4 ARE
BEING DONE IN PER CITY OF
RENTON'S STANDARDS
OF
DATE REVISION BY QC
CANNON COMPANIES
0000423134RN64 - SHATTUCK
S 3RD ST & SHATTUCK AVE S
RENTON, WA 98057
DESIGN 4 4
9/14/2020 TH TG
COMCAST
N
MFP20004315