HomeMy WebLinkAboutMFP20004521.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP20004521
IVR Number: 20004521
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:10/05/2020Application Date:3276900260Parcel Number: 17800 113TH PL SE
Permit Type:10/07/2020Issue Date:Franchise
Permit Work Class:10/07/2021Expiration Date:Major Utility
Job Number: 109132227Franchise Type:Natural Gas
Description: PSE gas RUSH REQUEST CREW TO REPLACE EXISTING 2" STW IP MAIN IN 113TH PL SE WITH 2" PE IP MAIN.
BEGINNING AT APPROX 72' SCL SE PETROVITSKY RD, REPLACE SOUTHERLY TO APPROXIMATELY 356' NCL SE
179TH ST APPROX 793'. RESTORATION PER CITY OF RENTON STANDARDS.
Replace existing 1" STW IP main (68E 191) in the cul de sac off the west side of 113th Pl SE at approximately 500'
SCL SE Petrovitsky Rd. Beginning at from 10' WCL of 113 Pl SE replace westerly to the EOM at approximately 128'
WCL. Approx. 121'
Replace existing 1" STW IP main (68E 191) in the cul de sac off the east side of 113th Pl SE at approximately 375'
NCL SE 179th St. Beginning at from 10' WCL of 113 Pl SE replace easterly to the EOM at approximately 102' ECL.
Approx. 116'
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
INFRASOURCE SVCS B: (206) 949-5846Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
NGUYEN QUANG 17800 113TH PLACE NE
RENTON , WA 98055
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
MFP20004521
Scott Warlick CED 10/5/2020
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
SE PETROVITSKY RDSE PETROVITSKY RD113TH PL SEBUSSTOPBUSSTOP13131212121212
1212121212ARRW-BRD
ARRW-BRD
RIGHT
KEEP
R4-7BRIGHTKEEPR4-7BSTOPFLAGGER
STOP
FLAGGER
W20-7ABEPREPARED
TOSTOP W3-4350'350'ROAD
WORK
AHEAD W20-1350'350'350'RIGHT LANECLOSEDAHEAD W20-5RW4-2LW20-7ABEPREPAREDTOSTOPW3-4350'350'350'350'RIGHT LANECLOSEDAHEADW20-5RW4-2LW20-7AROADWORKAHEADW20-1
W20-4ONE LANEROADAHEAD100'100'100'STOP
FLAGGER
PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKRESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSUREEMERGENCY VEHICLES WILL BEALLOWED TO PASS WORK ZONE.MOVE BUS STOP 250' WEST. NOTIFYKING COUNTY METRO CONTACTEDAT 206-477-1150 FIVE DAYS INADVANCE OF SCHEDULED DATE.X'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN1050 FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANPSEPUGETSOUNDENERGYJOB#10913222717800 113th Pl SE, Renton, WA 980559/25/2020safaa.alneema@pse.com(425) 398-6077SHEET 1 of 628" TRAFFIC CONEWORK PITTRAFFIC FLOWSIGN LOCATIONSTOPFLAGGERLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 70' SCL of SE Petrovitsky Rd &14-7' WCL of 113th Pl SE, and 81' SCL of SE PetrovitskyRd & 7' WCL of 113th Pl SE.NMFP20004521
SE PETROVITSKY RD
SE PETROVITSKY RD
113TH PL SEBUS
STOP
BUS
STOP
1313
1313 12121212121212121212STOP
FLAGGER
STOP
FLAGGER W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'350'
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4
350'350'350'W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LAN
E
ROAD
AHEAD
100'100'100'
RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSURE
EMERGENCY VEHICLES WILL BE
ALLOWED TO PASS WORK ZONE.
PLACE SIGNS
BOTH SIDES OF
WORK AREA
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC
000
0000000NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
WORK PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
N PSE PUGETSOUNDENERGY
JOB#109132227
17800 113th Pl SE, Renton, WA 98055
9/25/2020
safaa.alneema@pse.com
(425) 398-6077
SHEET 2 of 6
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area will be 162-235' SCL of SE Petrovitsky
Rd & 7' WCL of 113th Pl SE.
MFP20004521
SE PETROVITSKY RD
SE PETROVITSKY RD
113TH PL SE113TH PL SEBUS
STOP
BUS
STOP
1313
1313
13
13 12121212121212121212STOP
FLAGGER
STOP
FLAGGERW20-7A100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'ROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4
350'350'W20-7AROAD
WORKAHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSURE
EMERGENCY VEHICLES WILL BE
ALLOWED TO PASS WORK ZONE.
PLACE SIGNS
BOTH SIDES OF
WORK AREA
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE L
LC
000
0
0000
00 NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
K
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
WORK PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
N PSE PUGETSOUNDENERGY
JOB#109132227
17800 113th Pl SE, Renton, WA 98055
9/25/2020
safaa.alneema@pse.com
(425) 398-6077
SHEET 3 of 6
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area will be 282-348-352-353' SCL of SE
Petrovitsky Rd & 7' WCL of 113th Pl SE.
MFP20004521
17800 113th Pl SE
Renton
WA 98055
USA
SE PETROVITSKY RD
113TH PL SE113TH PL SE1313
1313
1313
1313
STOP
FLAGGER
STOP
FLAGGER
STOP
FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LAN
E
ROAD
AHEAD100'100'100'RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSURE
EMERGENCY VEHICLES WILL BE
ALLOWED TO PASS WORK ZONE.
PLACE SIGNS
BOTH SIDES OF
WORK AREA
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE
LLC
00
0
000
0000 NO PARKINGNO-PAR
K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
WORK PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
N PSE PUGETSOUNDENERGY
JOB#109132227
17800 113th Pl SE, Renton, WA 98055
9/25/2020
safaa.alneema@pse.com
(425) 398-6077
SHEET 4 of 6
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area will be 452-521' SCL of SE Petrovitsky
Rd & 7' WCL of 113th Pl SE, and 15' SCL of 113th Pl SE
& 130' WCL of 113th Pl SE.
MFP20004521
17800 113th Pl SE
Renton
WA 98055
USA
SE PETROVITSKY RD
113TH PL SE113TH PL SE113TH PL SE SE 179TH ST
131313131313
1313
1313
1313
STOP
FLAGGER
STOP
FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD
WORK
AHEAD W20-1BE
PREPARED
TO
STOP W3-4100'100'100'RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSURE
EMERGENCY VEHICLES WILL BE
ALLOWED TO PASS WORK ZONE.
PLACE SIGNS
BOTH SIDES OF
WORK AREA
FROMTOTOW AWAY AREAPHONE 888-9999
INFRASOURCE
LLC
000
000
0000 NO PARKINGNO-PA
R
K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA
R
K
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
WORK PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
N PSE PUGETSOUNDENERGY
JOB#109132227
17800 113th Pl SE, Renton, WA 98055
9/25/2020
safaa.alneema@pse.com
(425) 398-6077
SHEET 5 of 6
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area will be 641-688-802' SCL of SE
Petrovitsky Rd & 7' WCL of 113th Pl SE.
MFP20004521
17800 113th Pl SE
Renton
WA 98055
USA113TH PL SE113TH PL SE113TH PL SE SE 179TH ST1313 13131313
1313
1313
1313
SE 179TH ST
RESIDENT(S) WILL BE INFORMED OF
TEMPORARY DRIVEWAY CLOSURE
EMERGENCY VEHICLES WILL BE
ALLOWED TO PASS WORK ZONE.
PLACE SIGNS
BOTH SIDES OF
WORK AREA
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE
LLC
00
0
000
0000 NO PARKINGNO-PAR
K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
STOP
FLAGGER
STOP
FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD
100'100'100'ROADWORKAHEADW20-1
100'
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
WORK PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
N PSE PUGETSOUNDENERGY
JOB#109132227
17800 113th Pl SE, Renton, WA 98055
9/25/2020
safaa.alneema@pse.com
(425) 398-6077
SHEET 6 of 6
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
8. Work area will be 379-356' NCL of SE 179th St & 7'
WCL of 113th Pl SE, and 15' SCL of 113th Pl SE & 100'
ECL of 113th Pl SE.
MFP20004521
N
Vicinity Map
Owner / Developer Contact Info
officeATTN:
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
109133242
108624354
108624353
GAS
PROJECT PHASE Notification #Order #
Main Retire
SVC Retire
SAP Superior
Service/Meter
Service/Meter
HP Svc/MSA
Dis. Reg. / FT
Ind. MSA
Ind. Service
Service/Meter
Service/Meter
AREA PLAN
SCALE: N.T.S.
LEGEND
###
T&T
###
T&T
KEY TO SERVICE ACTION
FIELD NOTES:
2. NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING CONSTRUCTION,
1. ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK.
INCLUDING AT OR BEYOND THE CONNECTION POINTS.
FIELD DESIGNER:
CELL:
EMAIL:
CONSTRUCTION QUESTIONS:
PROJECT CONTACT INFORMATION:
CONST MANAGER:
CELL:
EMAIL:
PROJ MANAGER:
CELL:
EMAIL:
FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNER
SHALL BE CONTACTED:
BILLING QUESTIONS:
425-424-6542
JACOB DETERS
jacob.deters@pse.com
206-255-4824
STEVE MELLINGER
steve.mellinger@pse.com
425-424-6542
JACOB DETERS
jacob.deters@pse.com
SAP BATCH YEAR & FOOTAGE
ACTUAL
LENGTH OF
RETIREMENT
MATERIAL
RETIRED
ORIGINAL
JOB
ORIGINAL
YEAR
PROPOSED
LENGTH OF
RETIREMENT
SIZE OF
RETIRED
MAIN
Cell Phone:
"Locates Required"
"Flagging Required"
Yes No
Yes No
E-Mail:
Manager:
Project Manager Contact Information:
JACOB DETERS
425-424-6542
jacob.deters@pse.com 109132227HOLE HOG/BORE TABLE
CALLOUT LOCATION DEPTH LENGTH
BP1 START
BP2 END
BP3 START
BP4 END
BP5 START
BP6 END
BP7 START
BP8 END
BP9 START
BP10 END
BP11 START
BP12 END
BP13 START
BP14 END
BP15 START
BP16 END
BP17 START
BP18 END
BP19 START
BP20 END
BP21 START
BP22 END
BP23 START
BP24 END
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
GAS MAIN INSTALLATION/RETIREMENT
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
Type/Work ManufacturerPipe Size Type Est Length Act Lgth
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 02/18
TEST RESULTS
/ /
/ /
/ /
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
GASSED UP PIPELINE
PIPE
SEGMENT
FOREMAN'S DATENAME
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: __________________________ Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
4680 06/11 DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
Drawing Number
SAP Sup Order Nbr
PC APPROVAL
J.DETERS 425-424-6542 .
.
R.BECK 425-424-6483 .
M.LOCK 425-424-6413 .
J.DETERS 425-424-6542 .
JOHNSON 206-571-8519 9/30/20
...
N/A RENTON
STEEL WRAP MAIN REPLACEMENT`
17800 113TH PL SE
RENTON, WA 98055
PUGET SOUND ENERGY
109132227
109132227
1" = 30'-0"1/3
KING 132A SYSSKGPM
NE 32-23-05 212.080 214.083
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
10913222711699688113TH PL SESTANDARD IP & LP GAS
REPLACEMENT CONSTRUCTION NOTES
1.NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED
OUTAGE.
2.INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS
OPERATING STANDARD 2525.2300.
3.MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED
BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.
4.INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND
PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.
5.INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES PER
PSE GAS OPERATING STANDARD 2550.1600.
6.REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.
7.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400
AND PSE GAS FIELD PROCEDURE 4700.1500.
8.PROJECT MANAGER TO MAKE AN ACTIVE SERVICE RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.
9.INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARD 2525.2100.
10.PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING
STANDARDS 2525.2100 AND 2525.3600.
11.REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.
12.INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER
PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.
13.REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.
14.REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.
15.ACTIVE SERVICES TO BE REPLACED DENOTED BY:
16.MAINS AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH 2525.1200.
17. PIPE SQUEEZING SHALL BE DONE IN ACCORDANCE WITH GOS 2525.1200 AND GAS FIELD PROCEDURES 4700.1300 AND
4700.1310.
###
STANDARD GAS CONSTRUCTION NOTES:
1.FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO
CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811
2.NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).
3.ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.
4.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY
EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
5.NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS
PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER
FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE
OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS
OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.
6.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE
APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
7.COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST
LEAD) INSTALLATION.
8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS
OPERATING STANDARD 2525.2500.
9.INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY
THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY
ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.
10.TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS
SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
11.SYSTEM MAOP DENOTED BY: SYSTEM MAOP = 60 PSIG
12.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.
13.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.
14.PURGE POINTS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3400.
15.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.
16.IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.
____JOHNSON__________________________, PHONE___206-571-8519___________.
17.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES FOOTAGE
BETWEEN FITTINGS.
18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL
INFORMATION ON D-4 CARD)SHEET 2SHEET 3113TH PL SESE 179TH ST
(ARTERIAL)
SE PETROVITSKY RD
(SE 176TH ST)
INSTALL 2"MPE 1074'
RETIRE 2"STW 821'
RETIRE 2"PE 6'
RETIRE 1-1/4"PE-A 8'
RETIRE 1"STW 194'
60 60 PSIG
10/01/2020ML
RB 10/01/2020
JD 10/05/2020
JD 10/05/2020
MFP20004521
RESTORATION PER CITY OF RENTON STANDARDS
This permit is for Major construction work in the ROW and will be billed at an additional
$60/HR for inspections. After hours and weekend work will be billed at $125/HR
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///
////////////
///////////////////////////////////6" STW IP 35'S
852365 1985
6" STW IP 35'S
852365 1985
2" STW IP 10'W68E191 19683/4" STW IP 717'W19855/8" PE IP 81'S
1984
1/2" STW IP 235'S19695/8" MPE IP 162'S
1999
35'S
1/2" STW IP 235'S19695/8" MPE IP 282'S
1997
3/4" STW IP 348'S19681/2" STW IP 348'S19681 1/8" MPE IP 75'W20131 1/8" MPE IP 352'S20135/8" MPE IP
4
5
2
'
S
IP GAS FLOW
IP GAS FLOW
IP GAS FLOWT&T17709T&T177031770817702T&T176221762117613T&T176141132517611T&T17716(___')11'W2" PE IP 14'W852365 1985IP GAS FLOW1/2" STW IP 353
'
S
1968
1 1/8" MPE IP 352'S
2013
1/2" STW IP 235'S
1969 ///////73'S
(___')2" STWIP 10'W2" PEIP 14'WTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PLOT PLAN
SCALE: 1" = 30'-0"
Cell Phone:
"Locates Required"
"Flagging Required"
Yes No
Yes No
E-Mail:
Manager:
Project Manager Contact Information:
JACOB DETERS
425-424-6542
jacob.deters@pse.com
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: __________________________ Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
4680 06/11 DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
Drawing Number
SAP Sup Order Nbr
PC APPROVAL
J.DETERS 425-424-6542 .
.
R.BECK 425-424-6483 .
M.LOCK 425-424-6413 .
J.DETERS 425-424-6542 .
JOHNSON 206-571-8519 9/30/20
...
N/A RENTON
STEEL WRAP MAIN REPLACEMENT`
17800 113TH PL SE
RENTON, WA 98055
PUGET SOUND ENERGY
109132227
109132227
1" = 30'-0"2/3
KING 132A SYSSKGPM
NE 32-23-05 212.080 214.083
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
(SE 176TH ST)
MATCHLINE A-A
SHEET 3
Scale: N.T.S.
TIE-IN DETAIL1
1
-
(ARTERIAL)113TH PL SESE PETROVITSKY RD
10/01/2020ML
RB 10/01/2020
MFP20004521
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
/////////////////////////////////////////////////
0" STW IP
1
0
5
'
W
NR
5/8" MPE IP
4
5
2
'
S
2007
1/2"
S
T
W
I
P
6
8
8
'
S
196
9128'W1" STW IP 10'S
68E191 1968
5/8" MPE IP 379'N
2010
1/2" STW IP 802'
S
1969
1/
2
"
S
TW
I
P
6
5
'
E
1
9
6
9
1/2"
S
T
W
I
P
6
5
'
E
196
9
1/
2
"
S
TW
I
P
7
7
'
E
1
9
6
9
1/2" STW IP 78'E19705/8" PE IP 314'N
1988 10'W@BASE@BA
S
E
3
5
'
S73'E3/4" ST
W
I
P
1
0
5
'
W
1969
1/2" STW IP 10
5
'
W
1968
5/
8
"
M
P
E
I
P
1
0
4
'
W
20
0
9
P
IP GAS FLOW
IP GAS FLOWIP GAS FLOW
178091780117808178001775017746T&T177511774717741177251772117717T&T177131774017734T&T17726T&T17716IP GAS FLOW(___')(___')
(___')
1" STW IP 1
0
'
S
68E191 196
8
5/8
"
P
E
I
P
6
4
1
'
S
19
7
5
0"
U
n
k
n
o
w
n
I
P
N
R
2" STW IP 10'W68E191 19681 1/4" PE-A IP 10'W862005 19861/2" STW I
P
8
0
2
'
S
NR
5/8"
M
P
E
I
P
5
2
1
'
S
2007
1/2"
S
T
W
I
P
6
4
1
'
S
196
9
1/2" STW IP 688'S19691/2"
S
T
W
I
P
6
4
1
'
S
NR
1/2" STW IP 78'E20201/2" STW IP 77'E2020//////////////2" STWIP 10'W356'N
(___')(___')(___')
356'N
358'N
1 1/4" PE-AIP 10'WTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PLOT PLAN
SCALE: 1" = 30'-0"
Cell Phone:
"Locates Required"
"Flagging Required"
Yes No
Yes No
E-Mail:
Manager:
Project Manager Contact Information:
JACOB DETERS
425-424-6542
jacob.deters@pse.com
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: __________________________ Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
4680 06/11 DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
Drawing Number
SAP Sup Order Nbr
PC APPROVAL
J.DETERS 425-424-6542 .
.
R.BECK 425-424-6483 .
M.LOCK 425-424-6413 .
J.DETERS 425-424-6542 .
JOHNSON 206-571-8519 9/30/20
...
N/A RENTON
STEEL WRAP MAIN REPLACEMENT`
17800 113TH PL SE
RENTON, WA 98055
PUGET SOUND ENERGY
109132227
109132227
1" = 30'-0"3/3
KING 132A SYSSKGPM
NE 32-23-05 212.080 214.083
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/ASE 179TH ST113TH PL SEScale: N.T.S.
TIE-IN DETAIL2
2
-
MATCHLINE A-A
SHEET 2
10/01/2020ML
RB 10/01/2020
MFP20004521