Loading...
HomeMy WebLinkAboutRequest - Willowcrest Storm & sewer line conflict at Edmonds Ave CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Hi Nathan, From the email chain below I believe you have been briefed on the fiber duct bank conflict with the proposed sewer and storm lines into Edmonds Ave on the Willowcrest project. Coterra has worked to revise the design for both the 8” public sanitary sewer and 8” private storm drainage lines to avoid conflicting with the 30”x30” concrete-encased duct bank. Adjusting the inverts in the two downstream structures for both sanitary sewer (SSMH #1 and SSMH #2) and storm drain (CB #2 and CB #3) and running both lines at 2.0% between these structures, we are able to clear the sewer under the duct bank and the storm drain over the duct bank, both including the 14” DI casing pipes, per the original approved design. Attached for your review and approval are the updated Composite Utility Plan, Storm Drainage Plan, and a new sheet C4.4 – Utility Profiles at Duct Bank – showing the proposed design revisions. I have called out the clearances proposed between the utilities on the profiles, as well as the proposed cover. Please get in touch directly with any questions/comments on these revisions as the general contractor is eager to keep their utility connection work moving forward. Please also let our team know if any additional fees are required to for review and approval of this design change due to the unforeseen duct bank discovered in the field. Thank you Nate! Max Berde, P.E. max@coterraengineering.com<mailto:max@coterraengineering.com> coterra ENGINEERING PLLC 321 3rd Avenue South, Suite 406 Seattle, Washington 98104 206.596.7115 coterraengineering.com By using any embedded electronic file(s) contained herewith, the recipient assumes all risks associated with their use and, to the fullest extent permitted by law, to hold harmless and indemnify Coterra Engineering PLLC and Coterra Engineering PLLC’s professional associates and consultants from and against all claims, liabilities, losses, and expenses including attorney fees, arising out of or resulting therefrom. From: Kira Connery <kira@thirdplacedesigncoop.com> Sent: Friday, September 18, 2020 11:53 AM To: Evan Chan <EvanC@edgedevelopers.net>; Max Berde <Max@coterraengineering.com>; Peter Apostol <peter@coterraengineering.com> Cc: Suzanne Davis <suzanne@thirdplacedesigncoop.com>; Eric Pravitz <eric@homesteadclt.org>; Roger Farrens <rogerf@marpac.net>; Conner Chan <connerc@edgedevelopers.net> Subject: Re: FW: Willowcrest Storm & sewer line conflict at Edmonds Ave Hi Max and Peter, An issue has come up with the storm and sewer line installation in Edmonds Ave (please see email from Evan below). Are you able to make a site visit to troubleshoot? Thanks, Kira On Fri, Sep 18, 2020 at 11:31 AM Evan Chan <EvanC@edgedevelopers.net<mailto:EvanC@edgedevelopers.net>> wrote: Suzanne/Kira, Can you see if Coterra can come out to the site and come up with a solution for the Storm and Sewer lines that connect from our site to the new manholes we set in Edmonds Ave. There is an unmarked concrete encased Fiber Duct bank that is in the way. City of Renton wants Coterra to come up with a fix asap and to submit it to them for approval. The COR will work with us to get a quick approval if we can get it to them quickly. Please let us know what we can do to assist. Thanks, Evan Chan Edge Community Builders, LLC P: (206) 900-8635 evanc@edgedevelopers.net<mailto:evanc@edgedevelopers.net> ________________________________ NOTICE: This communication including any attachments may contain privileged or confidential information. If you are not the intended recipient, or believe that you received this communication in error, please advise the sender immediately and delete or destroy the communication you received without copying or disclosing the contents. From: Roger Farrens <rogerf@marpac.net<mailto:rogerf@marpac.net>> Sent: Friday, September 18, 2020 10:59 AM To: Evan Chan <EvanC@edgedevelopers.net<mailto:EvanC@edgedevelopers.net>> Subject: Storm & sewer line conflict a city sidewalk Evan, See email below from Joel. Brad Stocco with COR was also on site. There is “federal” fiber duct bank encased in concrete (30”x30”) where the top of this concrete encasement is 46” down from top of sidewalk there. They want the civil engineer of record to find solution and submit to Nate with the COR. IF Coterra can get out here this afternoon then revised design can be reviewed and approved by COR on Monday so as to not delay the work any further. Roger Farrens Marpac Construction LLC | Superintendent | 1225 South Weller Street | suite 500 | Seattle, WA 98144 | Office 206.329.4992 | Direct | Mobile 206-794-3797 | rogerf@marpac.net<mailto:rogerf@marpac.net> [cid:image001.jpg@01D69C9A.2B110280] Disclaimer “Due to recent increase in email phishing attacks. All emails originating from Marpac will have this message.” Marpac Construction Administrator. 2020 © From: Joel Mccann <JMccann@Rentonwa.gov<mailto:JMccann@Rentonwa.gov>> Sent: Friday, September 18, 2020 10:45 AM To: Nathan Janders <NJanders@Rentonwa.gov<mailto:NJanders@Rentonwa.gov>> Cc: Roger Farrens <rogerf@marpac.net<mailto:rogerf@marpac.net>> Subject: Willowcrest Townhomes Morning Nate, Contractor has installed CB#2 down in Edmonds and we have run into a problem with the fiber duct bank being directly in the way of storm line heading up the hill to the East, they could possibly go over the top of duct bank but maintaining clearance from bank and with pipe casing there will be min coverage over top of pipe. Contractor just potholed their sewer coming SSMH#1 to the East and line is running directly into the bottom of duct bank also. I let contractor know that they will need to get ahold of their engineer so he can come take a look and have something sent over to you Nate. [Renton SEAL_Color] Joel McCann Construction Inspector | CED JMcCann@Rentonwa.gov|<mailto:JMcCann@Rentonwa.gov%7C> Cell: (425) 757-9595 P Please consider the environment before printing this email Inspection Hours 7:00 a.m. to 3:30 p.m. [811 CBYD Logo] -- Kira Connery | Assoc. AIA | LEED Green Associate Associate third place design co-operative 304 Alaskan Way S., Suite 301 | Seattle, WA 98104 [o] 206-331-3795x07 | [c] 206-660-6447 | [w] thirdplacedesigncoop.com<http://thirdplacedesigncoop.com/> 㐓㣿룈�ꑄ䥏傻ꮘٙ约鿻悿蓛剟쌁灿阷实≔Ę̗⣩⥬붓孪꧂庆ثᔓꭒᯠࡥ搻꨿㫻쮈ᯥୟᮀ븨뢸앭ꇱ흣有뎇駵ꁪ녫亀닐颳㇠ۓ겝䯍ያ�彰䔛磖櫈칧풴뫃⣫䭶ꁃ焖彛畊瘭坔ꫠѤ桴ꡗ꺞瘰Ꝋ䘧⹆阫ꔾ�瀪஠欎퉝馟㊨�촍۬쓍⬺Ԓ툺虼ﭗ騕�᮵竳࿭ꆯ뙢辭﯆㜘籐쇱浡圃傋䝄귫⮏듳࿘䲇๿⒙嶬ขꃁ竒ờ쟅娟譁煘괜⯷귕࿘䲇륒结ૡ䴣醅圣졺뒝宻ᥝﺾ㨥죭뤔덥²綎⓴뻣厍ᨗ續污圌捈ジ䰶ய菧ㆱ挈욏硭ꀜ놓쏮 퀚咴闌媱᧬꘻侘⡝㖌긎Ꜣⷌ錧圱탼ꐡ粫㯌沠塝᝔取혗谫ึ谎⺼枬튟滮餕鷯崱䉸ᴳ̴轻쳆᫄�ꦡ췵⺼⺲낺甼ỡ涕桧虽⠛藔ꇶ橍톐ퟖ볊᭱�餏᳾椲餏憵墜ꇍᭂ欂飉鿸࿅桝娟譅靫뙺ꙃ蛟♃蚪ꞙ馆ૣ҂�恳痤䧡㺮칂퍔᭷툀䦓蘪﵃烍忖쫣磋푗崱᥸ꋝ얤哴筿卞㼙鼚૵ﳊ幬έ롺ꂍ�춸ꍫ峷ᑍ櫹孌湅뤄䓕녖엲ᆏὤ뱂쒊꾸옦㕥삡쥕⹷䚾솿䓨揟꡴޿꒹�㈪㑅穞䱥鷽팋ᛩ趦࣬ゼᩅ텦ꆥ௮竓읙髷謁깻胗劀융ᐍﱟ鹠 桾ⴓ䒶杲랭影过㫋඾搿毆ࣈ箙톅嬔ᛗ霝榅銭縨ᤌ탻뒺뙸ꞻ�䔽搿펔榸桼窘ㆅ䥌ᢟ൹쩳滝띷⫊΅6ӹ뙅㟧抿ν⽐諼ꯅ韤랈룑﵉訁縫쯰‾藺鑻䖬鷢꿂뱑箊ርꙤ옵⊬䨷竜ꪥ쟢ㄨ쾶敹룻絓ꡜ쯞⫴ᝎ㌉䪜�瑠㨱쪔팹ஒ�熤掆乌턁㡧蚖蛽ⓑ᭫娙᢬೏⷇�⛬㦇펫㌏덌䢭沆纑ꩦ㮀�율挙摸㕶銾摷㖤皮艤婫㽭欫ⅻ냉氉鐁馞㨓ዾ罃�꓎ꙗ櫸虇ክฆᝃﵥ큂꙱ఈ猣❂螨ꙧ䳭敺㖤皮언賒똔떊朌�ష쌻⌮≟雄삧爙繂蜉ែᤞ껕䱂濞᱌⥵␷ 둳豗䜁ᝆ⊫唺㤤梿▾숗噪⺶汒尡﹭懈ྐ큶펕᥌গ䭐ϱҗ㨑섳ᖸ⍳↢펪檾侊䆸炘끟痢挱歇숬⋑ᐒ㪘蹓菔師�护ꙫ볣⥱ꚱ栽灔잎ᠽ鶰笎഑䃳垭赃뀈鞵ਮ饁㝎䭑푼⸣꛲왘⍊轺蚃씁栧ⁱ첡豴ḓטּ䝢휡册竔캐ྍ菔癜낤쑁඄謯஖녅骵旡㹑㣣铓穰袑ײ䖱삱⭛詳⛑챌丸ᮍ䛲뛷螨も蠉䶣塄䲛⼺엶撋땹뺚총롴俰ㅯ컑꧱㸗㸕ʅ瑷榒굃앝ᶤ뉢蠾�꿗ኈ毈흤屺ࡨᆠ꼒祏회฽䓄钰ㅼ鰎녽那왫樨䠽웧ᘇԓꇍ맦여들駝撘錑ﮢ颰额蠄�ဠ㙭⁐ 铞Ȼ鈻ᙔ隄떛風딴ᐫ䬕簮ሏ딝薬ꈝ댸姄泱댟魁㣩彯퇃億윻麧ੰ拄삢饬菜횡빫䦋쐾뫄鰛ሽ華ᅘⷰ꺓桒ጶ皳㢬颰꣠跑ᶋ岅䘳㩁㸷ཐ갆鯧쵃拾錐᝼⪓뉢棰띴ⷜퟲ渢观鈣Ⲙ혽匋躞�廞Ԓ䶉쓊邥Ⅳ䭫ց혴䶭胖걪ᙦ刑䮧䜶ఱ॰씫馣ꢎ룀Ꝣ瀽䳧郼qᵋ갘ظ褙䭣찻髺껠ቒ⤏偁䒚蕓�蜖ꙺᝋ⭘犢얒ꅕ㳙䓄쥓ꧼ뀨풔ϕޫ늇瘯爄ᣍ굁琇맮䋀낢깺찹輼ℏ瞩�錫致ꅐ攤敮꜂鄈ᰆ辉嫊蘜๩큗Ö掘꫶尬蛫㱉Ꞔ뮜ᯄ嫆ܣ該ഀ暖졆ꏔ典뜬ꎊ�䝌�횗璃㰇≎ꉒ盀 畸싄ꏳ횡緋剥闎壉鰋纣礞Ặ젫㋂킥Ṭ迶蠙蚉࿃偙리朓㆚됞謃ʉ匿僦峳쐾뻤䤲敻뒲荨锟ڷ맃⏬З嶼饽⚼쁴ᭇ鄞췛顄⾦ℾ耘橌ѫꑢ☧밸謻줗髢왐ꎷ躙�㩁뛳礃慠孈袚��㝚엜峤邙੃﫸൭嫵ꏲ⡵腷ꃟ䳙径㪠縜苈鍢诬蔝㍜兆쇩㜺뀾⢘麰๯켵⽥㊾等艥룏許✢ꈓð잻鑀⡇㣶脧ᅗ縦壪齟炌喼㴺앎赫佄ⶎⰢ죑蚳杯䓱깜엀䳖辇嫏䶤菗๴숐⛖Ⰺ턌ℳ퍎᪁鹖ㅗ嘹瀦飹험墱밨癯잭ᆖ▘༌曍勢뉻刳縜苈쾢十쎂៙਻暹ꊌ޻�샸ꉢ 竀㦾㳔ྗ㤱♗頹츣퇌焜虦揷㜥㎈⵳쪈䒖謴쌬ꕲ붸⋔꙼戻胱毼蛒⎏鵗ֆ㒺枳ຝ⬃⺴딺횵跫慻侈ឃ歒㠑阫볺屯㒃ˤ憗⠂賲ᇟ恘퇠ᐭ뱧쁰恪见ᔣ뎆ꯀꞐ芑혘夔ၚ뤆凒ꎨ瑂섶鉾騸৏寓乽疐✾伋㕄衇ꎖ闱ﭙ鸘ᵟन捘䄼ꇐ炚卢䓘࣡욓ⷀ᫖ℼ⡥侮깺ꦴ聏ꃶꌓ훣ᵇ皝身肷쨧֐팴൅�ࡉ喫신䩶鿌譬㱢戟嬬衹歍�⛜爏䰀䅅ᔮ夾즌㯗�줰ᥣ队♆퓧�㫂萓惔䘟袇䔖끪鶸ᅤ蟂ퟮ⍛鄔연�朆懌豋證櫠鸁劁碹窍쬧嘱灭巍탂验쯁됎 虭噯뢩迁靮挝윮⛥엇燋쩹靂惷֐㌙⠼쮐븆䄼碇礬㕄褭岛৬ᢳǶ媃蓶㤔ஞ恙짫狏ތ娘❭隻⋴ༀ牍릎䜉錩ؐ쒌䧕ꞛ惰诛鎚蟣脽壥찬윬�㥕꾖盹븘ᡶᑾ鏻ᶃᾆ辭骫ᱻஆ쎴㦩ఽ뾱㸜骼㜋籐DZᄎ僠귵쉻꩸ᮧ试窧剹ꪽ磶쾟⨭컞軧ߢ濕珧㫣Ἠ珧叅㲽⺩犃玸㽦ᐍﱟ猪哭棴Ꮭ簦⩶ꦺ韮忘笔詶ᑽ꠿㭾㻅὚仩瓵窣哲住讪春玸庨ꁯ픇蝯䟡匾�᥌䳽鼙攳㏚췥ੵ忷ᐌ䭵診꩏鮗퓫뫑亹吝崿ҧ㻚픝系嵐抾�ᜋ磗訆縯ﵐ臦둵㵺 㵺ﻺ澚믎誋ꏝ䇸鯵竑绵ﻵ⽽쵟팋鸵롆例뮪ฏ�멺퍴쏫顫퓱憭嗆샃憢ﱺ썄糴フ臎峨嵬谴Ὸ역穖똮ᩞ㟆㓮ކៅ俇谴忐൷峳Јੳ哞橿輦ブꫳ灡憢吞ί嗲핲嘰ꧬ鱞円ᆗ窥楹�편Ḙ弔㼜パ唞憯左쳃蚛庙쳃蚧澙㌍᪯螦蚫剹ঢ়嗘㣃삿භ�霠蚗跱贻䇡엱Ᏹ昚㗞볌顩埩犹箜꣥杗瓚␋⾽䂳ﮩ콲ﱑ몠翳﯌蹢ᵯ꩗뛟앳珊뜻ᴏ뮧蹖�࿅ꨛゃ閷絺ﻺ⭇꾩ꓩ㢱堁䯅畁性䪵띔�꡵봷뱞⽞뵏�耺ꝵ蝛濤ᠣ븨 䇸竵핃纵옐ﵓ䰱嬻㇩覒洼䰚久灃롷寓㍤�픺믠ᬗ鎞殝輿퍰걑よ┈뎂稔ㅏ◒諂붻둤欪ヅᝋ텏⒏௒拞㬣渋ꝯ醖轵謎곟ꢈ및垕赥삿殢殯뿵쮎꧹㐉芍ᐒꄶ䋅ク눽̅咗ṣ흐쐥㫝笤體뇶﫡蕄ꩄ嘢爘쉌ꏓ貏⿸㧥虝餌壼缳ﭩ䶕豶�ȱ辈팈랓⌋䣏⻨婔啉髜氺⡌綦ᤜ恠袾鏍첮헂쳗땺頴॰�榐ũ敖⾺䢻ꞏ䨾奈鰻퀪밴妆㪗�㶮╻㙻蔺祁䭵퐣∹茷斗鬪났⅂∳䊐蠸แ஋屭暰鯹z瀻结ഇ⟀蚈읟㹒ꑒ랶͊䥯䇖樴‐ᳮ邗翄올�旫윩徭뜶䤧籭緇뜡 鼔鍬ᓃₛ吨㣱ၟꉇ腌↚蠕섯ᩡ祉呂ྌ묘Ṿ魥⬙⤽䈍უᎢଚ긝㍐⡹煅⪃뉗钸籘鎽ᆉཱྀ嚋ᰳ䒢㨨ຂ졞�朷㖲綶젚٤喲࢕扺侚ૌ蕎솶⨌蠭㵓ªᣨ멤悆캍虤瀣䫃搓ꁀ쳔곾漃툃潍﮶릁霯䳝혁豀猢쑐ʀ構ᢥ⧠綉Ⓗ଺ᜦ㰫립蒄얆䩚ꖩლ聸䐖্鹸朤ᬥ嵼ᬊᄔ⍉⣍魤뢒��䯗࠘팜뿄葨࠙㗾ሰ⍠샋鰋⠄⎶㱅֙淟꟱搩煲ꄷ瓒莋椃ሟ驙趐稢ꡄ䫦�ၒ餘䃔᠏㦚緃칇싼᷐鐆᫧箛띘⯕퉙ꈇ動֠ꮘ샸鍼㨍鎶†随좔زଏ䲥蒞鍄嬉뺄 䲊呍㩙ὰ쾲똘䟲ᡀ㩚Ѫꑨ댇绠ꢁ骜Ⱁਦ㯵䌼付⮍맧뜰覌㫇鎖뎭惴枀㢾픊隵∊烻꨽⧤넊壊ႍ祒䚏궐궬ⴧ埗冓䄜씆踗퉺ᘰ奚鳼뒖뱍숬⭤繫ﵦ枀뇑‮ဵ접讥ɯ髼邧襭�텧Ŭ馇돌鸋൮☢�♏앛᛫쵂ࢬ鑊穠〮퍈⃒쑅鸈設Ь㹰騅烒뮄֝䃱؋錝䆭ク䃙仚펫醂旙㡁⫰惁ⶲ銑䟣孈�餜㯁❹೉␞參㥳捦礂諬臙߂䄣䨪宆챼路鄆㿳⽙柄뽦楼ﶽ賐摸ፋ镻ᩁ�鳰㒵Ꮵ몾葴䘺㎛악鏐 ̄픸뛁ꫢ㢌⍆隲豳鲤䘸�盭溌诫㫱㢮묉ꌝ슝沏棇Ⰷ 큖痛ꇙ㷦襘눀㹐帼䓗蹥껑␾㭩孆毫梥톎烹庌鮭瑣蹱旑்ᣪ㡭拻ⅇ賗呑핤㜺ှ఩菘虯쇚⍥ᖅซ䱛嶤◀㞛姧ㅝ뚆瑣ݐ㗛畤蜚郻豳ᰦ⚻맂ᵙᮣ�豶▱쉎᦮ᛲ蹵껑仳픏읯ݨ簬띒닫쵃戟戞๒椱ᣦ憇톎疮⢬掶㩴ꌜᳱ㪲杆ᣧ᳟ඣ彧⣬髤許Ữ玴ϣ즋윰읨䌷ឲ熓錕䔘ꩌ䘹❇턦ꌜ㪓囘鮜읮烨䘸鏣䘺崘饉掋坴德㱟㪫묉䁦蜺顟䘹总铡嶺ᶗ�錐衸㝉棇齗耞읢�⡺ᣦ༝갚앣얁骤둣㶋겅ꌙ颡瑣蹰໑菘虯쇚❥娦ჼⲓ剢㇌㬺ऱᣦ푝盅왭㇌᰺톎ꓸ톎㧑坆윔 껨뽾ᢾ嬞◢髬缡봘蕠緙⺻찻림䯘�䦢虊䘺﫻躣껑ꗵ햤㨱踞僑ᴘ掝饴᳝ඣ彥৬쵤䄘ཷᵍ莣豳끶尞찳Ḏⅻ矉�錫蹬滑嫎㭻豵孠㙇㡸䍆꯯瑣蹲壑ꡐ瑣띗彟ꖌ㢦묉ꌝ擸톎堎ጜ희蝥㵠饜獌皌揵융흨顺ᣦฝ棇剼᳠놣僖棇뎇눔豦횢㪃䝆ᣧ胭ꡦ尝拶彲쒙㊽ꬼ�᳊뮣�륂掫㩴ꌜḫ�톎㧙捆ꅁ톎�絾⋱盙瘒郍ꢷ豳鵶鏣䘹总깱嶱ᶗ�缞즈㊱육煫皌豶굶蕇ꃟ䀑윐앨蟡夬㇔諬蔽᦬ꢣꃵ촖ⳤບ菘虯쇚⽥䦕⯚찓곦춞㨱莨蕭�豶 蟎瑣崘掜╴䨧햱甍毅뷿蒝㍝鬝윺猧皌‘⺻퐻誼뇉섲띯둣饟獌皌厭粰豶桖ጶ㦋ཆᣧ떍㪆㭆嶜Ʇ㖐ᑣẵ㇔㬺棇㟁닠錓깴⁌㠟ꂈ祖ࣺ�䳦෢쭻ꆚ镟玦⤓떰䱝膁ᶌ靀싸ᆓ脣䱦줱뷐砷剐檫✂ଓᔰ䪸퐣⸘灶뛙뉫둳㠦Զ顼앤議渋貕킰釴氭襫㢸짘ݾ쭗㦐Ꮨⷖ〟ꅋ她사ሟ샍䛁憖퉕氈뒻뜀㊄捲ೃ�棥㢑�ఫ謢█๢゗ꏺ隹袰⎬ꎌ�싞댳腁앜袮킨噁摮෣孡ʆ뢽㑊㛞ᡚퟃ邆䣬㩴ᩖ꛹햮牍੔䊰⣑鍚裯ຉᨻമ嚊᷅쫯晋㛷⵰茬榍ڭ猽ꬥⓙ 廳읳碿깈ᇆ씟⩏蹍쐊ꉔ₋ୂ셺ඛ衊渽螜桧ⵡ昦䇬橂浵掿ᑿ慎几挶轁㥢䟸焳ト೒쫿氹躀繁饅뼪㭊茟╭䴚ㄺꘫ쥘뷋菖꣧ᷚ峖稲䱦ﳱ笙⋴띪旸㸉쀒ꇄ웟魆敛�㊦홗က犥ೢ摅芎઻浳⋯鳉瓳熁뀫섌尮湸䧀鎫蒹ꊬ똇Ⳮᶣ幖冖㋜ᒚ鷈⹤鞰⽾ᢈΌṁ遣鮱熄ᓩࢊ斶뜎➀ᶙᖠ摵虲㡣姀駴ꪙ⑶䁗꥕裹틃脇웽浊�愊頶㌱蛩쇺龃䚎﯃ⲥ틵梦㶯枆찎葨 훤걈㐦㪊‱笺吠䚌ⵣ홉ﱑᆠ裔⯺㸶仈贺꼠灪➽禊퐠퍊渞赉꫁蜖鎰趮肐幢 웻宣罏瀐酺᥋㩄䮱趫S왘斴旕꣸�寬⨞슮隕存覮ꉁ৪紝欳ἳ쇔�╳呿皾집郄ᕦ�퍋쮂밬壭ዻ鶫錐油Ⲯຎ䅞롧Ꞃᓉ獰苊윞迸韢璶簶�坳舝佃㧒⛐䐍櫤蝱ڇힿ⫬㞼程샢擺蒸⵪�暸빚畑쫥�Ⳃ➋ប硸盫錒塒腳⎬槙씟畅쑅蒕榞쟎歒贛㇦㕭꡺䬔ᮬ籑␭Ἢ惞伖谊㎰䊻બᡕﶁ鬅榸�㌆䷂譛봬ﳏ縨།୲ਐ㸗툼釡﹍養㸺麺퀝ါ湸씘㵙灆崬�鋗র墭泿ᠱ醰쁱꾶웄妾퉎఑銥՟⁸棆笐୩怺梤糍ஊ趉靹ꏮ퇐᥁ଽ⎱ᭆᴫ휕圆늍칕뗢远鷁륀蒜Եෞ絥豝䷘导풗 櫓晈䋎싧襕ⷜ瀣颿珥쏑쑓᠂ꖅⶇ훐섮㽂덀酬ﳝ렚야翽翾뺿訞਍湥獤牴慥൭湥潤橢ㄍ‴‰扯൪㰼䰯湥瑧⁨〷㤶启灹⽥佘橢捥⽴畓瑢灹⽥浉条⽥楗瑤⁨㔲⼲效杩瑨㈠㈵䌯汯牯灓捡⽥敄楶散䝒⽂楂獴敐䍲浯潰敮瑮㠠䘯汩整孲䘯慬整敄潣敤䐯呃敄潣敤⽝敄潣敤慐浲孳畮汬渠汵嵬㸾瑳敲浡਍鱸禝吇孓씉ꈠ؈螥₦휨䢀‡ꪗ偀튚蠻䝈⅁⊠騒†袝䡴苨ᒀ틩ൻ酈篐䈄幈﷮ヘ랽飏鱣혱朞秬姶쵳㙵艥Ᏺꢸꆣƭ䂀