Loading...
HomeMy WebLinkAboutEX03_P_Exterior_Elevations_200727LEVEL 01 0' -0" G F E D CHI A A-504 10 A-504 12 A-504 9 A-504 12 A-504 918' - 0"B 109125126A 138 AREA OF WORK 11 LEVEL 01 0' -0" 23456789 1 AREA OF WORK 143A149B 9 LEVEL 01 0' -0" 2 3 4 5 6 7 8 9 101 11 A-504 14 A-504 14 001 002 003 004 005 AREA OF WORK 18' - 0"153A 154 114G 100 1 2 3 4 5 6 78 6 10 TYP TYPTYP TYP TYP 5 SHEET NO: ITEM: REVISION / ISSUE: DATE:THIS DOCUMENT, AND THE INFORMATION CONTAINED HEREIN, ARE THE SOLE PROPERTY OF ATI ARCHITECTS AND ENGINEERS. ANY USE OR MODIFICATIONS OF THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT THE WRITTEN PERMISSION OF ATI ARCHITECTS + ENGINEERS, IS STRICTLY PROHIBITED.444 S. Flower St.#1200 Los Angeles, CA 90071 - T 714.338.1600 3009 Douglas Blvd #290 Roseville, CA 95661 - T 916.772.1800 4750 Willow Road #250 Pleasanton, CA 94588 - T 925.648.8800 CAUTION: IF THIS SHEET IS NOT 30"X42" IT IS A REDUCED PRINT CONSULTANT: PROFESSIONAL STAMP: KEY PLAN: PROJECT DIRECTORY:BIM 360://2019 Project Tiger/2019_Project Tiger_TI.rvt7/27/2020 8:58:19 PMEXTERIOR ELEVATION A-300 PROJECT TIGER 601 MONSTER ROAD SOUTHWEST PROJECT NO: T8301DATE: 3/2/2020 DRAWN BY: Author CHECKED BY: Checker 1/16" = 1'-0"1 EXTERIOR ELEVATION - SOUTH 1/16" = 1'-0"2 EXTERIOR ELEVATION - WEST 1/16" = 1'-0"3 EXTERIOR ELEVATION - EAST BUILDING PERM IT SUBM ITTAL 04/27/2020 5 ADDENDUM 4 07/27/2020 6 ADDENDUM 1 05/08/2020 1 ADD HEAT REFLECTIVE FILM AT INTERIOR OF WINDOWS ABOVE FINISH CEILING (TYP.) 2 PATCH AND PAINT WALL FINISHES AS REQ'D. AT REMOVED LIGHT FIXTURE 3 (N) CANOPY MOUNTED PER MANUFACTURER'S RECOMMENDATIONS - SEE SPECIFICATIONS 4 (N) INSULATED LOADING DOCK DOOR TO REPLACE (E) - (TYP OF 5) 5 (N) DOCK LIGHT COMMUNICATION SYSTEM (TYP.) 6 (N) DOOR BUMPER 7 (N) TRAILER RESTRAINT 8 (N) DOCK SEAL (TYP.) 9 EQUIPMENT CAGE, SEE MEP DRAWINGS 10 EMERGENCY POWER INPUT LOCATION, SEE MEP DRAWINGS KEY NOTES 5 (TYP.) 701 EXHIBIT 3 RECEIVED 09/16/2020 jding PLANNING DIVISION DocuSign Envelope ID: BAA7C1B8-8AE4-45F7-82F5-9C7837742288