Loading...
HomeMy WebLinkAboutERC_DNS_Determination_Issuance_20001026 Enclosure cc: Boyd Powers, Department of Natural Resources King County Wastewater Treatment Div. Matthew Feldmeyer, Renton Schools Larry Fisher, WDFW Misty Blair, Department of Ecology Jalaine Madura, Seattle Public Utilities Minnie Dhaliwal, City of Tukwila Stephanie Jolivette, Office of Archaeology & Historic Preservation Duwamish Tribal Office Duffy McColloch WSDOT, NW Region US Army Corp. of Engineers Andy Swayne, Puget Sound Energy Erin George, City of Kent Wendy Weiker, Puget Sound Energy Glen St. Amant , Fisheries, Muckleshoot Indian Tribe John Greene, King County Transit Laura Murphy, Muckleshoot Cultural Resources Jim Ishimaru, King County Transportation Steve Osguthorpe, City of Newcastle Puget Sound Clean Air October 26, 2020 Washington State Department of Ecology Environmental Review Section PO Box 47703 Olympia, WA 98504-7703 Subject: ENVIRONMENTAL (SEPA) THRESHOLD DETERMINATION Transmitted herewith is a copy of the Environmental Determination for the following project : SEPA DETERMINATION: Determination of Non-Significance (DNS) DETERMINATION DATE: October 26, 2020 PROJECT NAME: PR18-000155 Project Tiger Food Processing Facility PROJECT NUMBER: LUA20-000213, ECF, MOD Appeals of environmental determination are addressed in RMC 4-9-070R. Please refer to the enclosed Notice of Environmental Determination for complete details. If you have questions, please call me at (425) 430-6598. For the Environmental Review Committee, Jill Ding Senior Planner DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT SIGNATURES: Martin Pastucha, Administrator Public Works Administrator Date Anjela Barton, Fire Marshal Renton Regional Fire Authority Date Kelly Beymer, Administrator Community Services Department Date Chip Vincent, Administrator Date Community and Economic Development Chair ENVIRONMENTAL (SEPA) DETERMINATION OF NON-SIGNIFICANCE (DNS) PROJECT NUMBER: LUA20-000213, ECF, MOD APPLICANT: Justin Kirk, Prologis / 12720 Tukwila Gateway Dr., Suite 110, Tukwila, WA 98168 PROJECT NAME: Project Tiger Food Processing Facility PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Site Plan Modification for tenant improvements proposed to the 161,320 square foot building constructed under LUA18-000237 (601 Monster Road SW). The project site is zoned Medium Industrial (IM). The proposed tenant improvements would total 71,764 square feet for a food processing facility within the e xisting warehouse/industrial building (shell). Proposed business operations focus primarily on preparation of fresh fruits and vegetables with minor cooking operations as needed to create pre-packaged meals and sandwiches for retail sale off-site. Exterior work is limited to installation of ground and roof-mounted mechanical, electrical and refrigeration equipment as needed for the proposed operations. A trash compactor is proposed within a refuse/recyclable services area located along the eastern building facade. The proposal includes the striping of an additional 18 parking spaces on the southeast corner of the site. No changes in access are proposed. PROJECT LOCATION: 601 Monster Rd SW (APN 2423049008) LEAD AGENCY: City of Renton Environmental Review Committee Department of Community & Economic Development The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This Determination of Non-Significance is issued under WAC 197-11-340. When the DNS becomes appealable, the appeal period will be 14 days. DATE OF DECISION: October 26, 2020 DocuSign Envelope ID: BAA7C1B8-8AE4-45F7-82F5-9C7837742288 10/26/2020 | 2:39 PM PDT 10/26/2020 | 1:47 PM PDT 10/26/2020 | 1:59 PM PDT DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov PLEASE FOLLOW THE DOCUMENT CENTER LINK TO SEE ASSOCIATED PROJECT DOCUMENTS. IF YOU NEED ADDITIONAL ASSISTANCE YOU MAY CONTACT THE CITY OF RENTON, DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT AT (425) 430-7200, EXT. 2. PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION. OF ENVIRONMENTAL DETERMINATION ISSUANCE OF A DETERMINATION OF NON-SIGNIFICANCE (DN S) POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION DNS: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT. DATE OF NOTICE OF ENVIRONMENTAL DETERMINATION: October 26, 2020 PROJECT NAME/NUMBER: PR18-000155 Project Tiger Food Processing Facility / LUA20-000213, ECF, MOD PROJECT LOCATION: 601 Monster Rd SW (APN 2423049008) APPLICANT/PROJECT CONTACT PERSON: Justin Kirk, Prologis / 12720 Tukwila Gateway Dr., Suite 110, Tukwila, WA 98168 / jkirk@prologis.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/SfLEilz The applicant is requesting Environmental (SEPA) Review and a Site Plan Modification for tenant improvements proposed to the 161,320 square foot building constructed under LUA18-000237 (601 Monster Road SW). The project site is zoned Medium Industrial (IM). The proposed tenant improvements would total 71,764 square feet for a food processing facility within the existing warehouse/industrial building (shell). Proposed business operations focus primarily on preparation of fresh fruits and vegetables with minor cooking operations as needed to create pre- packaged meals and sandwiches for retail sale off-site. Exterior work is limited to installation of ground and roof- mounted mechanical, electrical and refrigeration equipment as needed for the proposed operations. A trash compactor is proposed within a refuse/recyclable services area located along the eastern building facade. The proposal includes the striping of an additional 18 parking spaces on the southeast corner of the site. No changes in access are proposed. When the DNS becomes appealable, the appeal period will be 14 days. NOTICE