HomeMy WebLinkAboutERC_DNS_Determination_Issuance_20001026
Enclosure
cc:
Boyd Powers, Department of Natural Resources King County Wastewater Treatment Div. Matthew Feldmeyer, Renton Schools
Larry Fisher, WDFW Misty Blair, Department of Ecology Jalaine Madura, Seattle Public Utilities
Minnie Dhaliwal, City of Tukwila Stephanie Jolivette, Office of Archaeology
& Historic Preservation
Duwamish Tribal Office
Duffy McColloch WSDOT, NW Region US Army Corp. of Engineers
Andy Swayne, Puget Sound Energy Erin George, City of Kent Wendy Weiker, Puget Sound Energy
Glen St. Amant , Fisheries, Muckleshoot Indian Tribe John Greene, King County Transit
Laura Murphy, Muckleshoot Cultural Resources Jim Ishimaru, King County Transportation
Steve Osguthorpe, City of Newcastle Puget Sound Clean Air
October 26, 2020
Washington State
Department of Ecology
Environmental Review Section
PO Box 47703
Olympia, WA 98504-7703
Subject: ENVIRONMENTAL (SEPA) THRESHOLD DETERMINATION
Transmitted herewith is a copy of the Environmental Determination for the following project :
SEPA DETERMINATION: Determination of Non-Significance (DNS)
DETERMINATION DATE: October 26, 2020
PROJECT NAME: PR18-000155 Project Tiger Food Processing Facility
PROJECT NUMBER: LUA20-000213, ECF, MOD
Appeals of environmental determination are addressed in RMC 4-9-070R. Please refer to the
enclosed Notice of Environmental Determination for complete details. If you have questions, please
call me at (425) 430-6598.
For the Environmental Review Committee,
Jill Ding
Senior Planner
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
SIGNATURES:
Martin Pastucha, Administrator
Public Works Administrator
Date Anjela Barton, Fire Marshal
Renton Regional Fire Authority
Date
Kelly Beymer, Administrator
Community Services Department
Date Chip Vincent, Administrator Date
Community and Economic Development
Chair
ENVIRONMENTAL (SEPA) DETERMINATION OF
NON-SIGNIFICANCE (DNS)
PROJECT NUMBER: LUA20-000213, ECF, MOD
APPLICANT: Justin Kirk, Prologis / 12720 Tukwila Gateway Dr., Suite 110, Tukwila, WA 98168
PROJECT NAME: Project Tiger Food Processing Facility
PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Site Plan
Modification for tenant improvements proposed to the 161,320 square foot building constructed under LUA18-000237
(601 Monster Road SW). The project site is zoned Medium Industrial (IM). The proposed tenant improvements would total
71,764 square feet for a food processing facility within the e xisting warehouse/industrial building (shell). Proposed
business operations focus primarily on preparation of fresh fruits and vegetables with minor cooking operations as needed
to create pre-packaged meals and sandwiches for retail sale off-site. Exterior work is limited to installation of ground and
roof-mounted mechanical, electrical and refrigeration equipment as needed for the proposed operations. A trash
compactor is proposed within a refuse/recyclable services area located along the eastern building facade. The proposal
includes the striping of an additional 18 parking spaces on the southeast corner of the site. No changes in access are
proposed.
PROJECT LOCATION: 601 Monster Rd SW (APN 2423049008)
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse
impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This
Determination of Non-Significance is issued under WAC 197-11-340. When the DNS becomes appealable, the appeal
period will be 14 days.
DATE OF DECISION: October 26, 2020
DocuSign Envelope ID: BAA7C1B8-8AE4-45F7-82F5-9C7837742288
10/26/2020 | 2:39 PM PDT
10/26/2020 | 1:47 PM PDT
10/26/2020 | 1:59 PM PDT
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
PLEASE FOLLOW THE DOCUMENT CENTER LINK TO SEE ASSOCIATED PROJECT DOCUMENTS.
IF YOU NEED ADDITIONAL ASSISTANCE YOU MAY CONTACT THE CITY OF RENTON,
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT AT (425) 430-7200, EXT. 2.
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION.
OF ENVIRONMENTAL DETERMINATION
ISSUANCE OF A DETERMINATION OF
NON-SIGNIFICANCE (DN S)
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
DNS: THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED THAT THE PROPOSED
ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT.
DATE OF NOTICE OF ENVIRONMENTAL
DETERMINATION:
October 26, 2020
PROJECT NAME/NUMBER: PR18-000155 Project Tiger Food Processing
Facility / LUA20-000213, ECF, MOD
PROJECT LOCATION: 601 Monster Rd SW (APN 2423049008)
APPLICANT/PROJECT CONTACT PERSON: Justin Kirk, Prologis / 12720 Tukwila Gateway Dr., Suite 110, Tukwila, WA
98168 / jkirk@prologis.com
LOCATION WHERE APPLICATION MAY BE
REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/SfLEilz
The applicant is requesting Environmental (SEPA) Review and a Site Plan Modification for tenant improvements
proposed to the 161,320 square foot building constructed under LUA18-000237 (601 Monster Road SW). The project
site is zoned Medium Industrial (IM). The proposed tenant improvements would total 71,764 square feet for a food
processing facility within the existing warehouse/industrial building (shell). Proposed business operations focus
primarily on preparation of fresh fruits and vegetables with minor cooking operations as needed to create pre-
packaged meals and sandwiches for retail sale off-site. Exterior work is limited to installation of ground and roof-
mounted mechanical, electrical and refrigeration equipment as needed for the proposed operations. A trash
compactor is proposed within a refuse/recyclable services area located along the eastern building facade. The proposal
includes the striping of an additional 18 parking spaces on the southeast corner of the site. No changes in access are
proposed.
When the DNS becomes appealable, the appeal period will be 14 days.