Loading...
HomeMy WebLinkAboutW-382412N 1• i z w 75 CU Q J LLJ J J z 0 z LLJ I a J 4 —dHO dHO EX. 6" DI 136 LF (TO BE ABANDONED I + I 11 ILIF T — 1j 3 L4 dF a a "INVINi 0 1 dHO S. 7TH STREET SEE SHEET W-21 FOR DETAILS / GAS GAS GAS ZG'� E I P ASP GAS GAS �{D6AS ' AS I I GAS GASC 1 2 Is G r� GAS — 4+ I 8G8„ ��— a-°4 EX. 8" SD °a + U) V) + Q ' a \ \ / EX 12" DI a �O a � Q a / 1 z \ \ O O a Z z �16"CON W of ` � Q a a o En A S. 7TH STREET I3121 310 1... SECTION A -A: RENTON AVE. S. N0.7EM PROVIDE 0.5' CLEARANCE BETWEEN 8' HIGH PRESSURE GAS AND NEW 8' WATER. ©INSTALL 8" 11Y1 OR 22V VERTICAL BENDS W/ CONCRETE BLOCKING IF NEEDED. OTHERWISE, DEFLECT PIPE TO ESTABLISH GRADE ©INSTALL e' 11Y4 OR 22V VERTICAL BENDS W/ CONCRETE BLOCKING IF NEEDED. OTHERWISE, DEFLECT PIPE TO ESTABLISH GRADE DEFLECT PIPE TO ESTABLISH 30 COVER. 308 I ................................... ........1 LU LU i of p U) 2 U) Q ' _ m : W ......� ...... ............... 312 cn o � o o......3.............................................................. 310 ................... I ............. �DUSMCDON GRADE AT � .... I 308 113061 A ..................... ..........:............................. .......... 4 0 / PAVEMENTNEST EDGE 302 302 EX 6_ W (7D: BE ABANODNED) - - EX. 8" W (TO BE ABANDONED) JL EX. 8' W � 3 Q W� 2 300.......................................:..... .......................................................:......................... 300 a m W aQL W h}� 413J•W J. a 03 ^� �472 + Z oho 312 W ..... ' �........... ..... � AA 312 :.............:.............:.............:.............:..........Q .. Q W.o.�. ..�........................:........... �f �f +"i Ni uS �f0 uS ��� "i .N h h., W m.. ..�. y 'LiL6�� yPNrnrn� al..¢...e.z :o Q oo:ll II II EX2'GASOSOU7H v o rn rn rn rn N N ijXW .;tN EDGE OF PAEN .:N N N N p WN x-x- .- m=A ��axax�xa ���0) � ham ..........:......................................:.................. ............................. ... . h...308 308 _ 3 4 ............................... 2. s 3 04 EXISTING GRACE: AT ¢NEW 8' WATER 2 0.5' O -ss .. 304 yPNDpNED) 300 INSTALL: 6' Q-52 DI W/ MEGALUG i Pg 300 7HRUST:RES7RAINT. (1 EE 2 gp ",: 1 � � � • � NEVI � 55 296 CL-52 DI WA7E7i p 296 PRDPQSED .B' . ..... r ...:.:.: .... � � .... w . . . e Exam GAS O SYX/7H •' 0 o N o m 292.EDGE of PAVEMENT .......... : .. W 2 w w 292 EJL6' W (70 BE REMOVED) ' .... 288 _ 288 2+50 6 ONE- CA L L RE ER 800- 424- 55 ��TI rs below. PRIOR before you dig. NG UTILITIES ARE SHOWN FOR ENCE ONLY. CONTRACTOR FIELD LOCATE ALL EXISTING ES A MINIMUM OF 72 HOURS TO CONSTRUCTION. 3+00 10+00 10+50 AMERICAN SURVEYING & ENVIRONMENTAL, LLC (ASE) CONDUCTED AN AS —BUILT SURVEY TO LOCATE ALL WATER VALVES AND HYDRANTS. AS —BUILT DRAWING REDLINE MARKUPS WERE MAINTAINED BY LASER UNDERGROUND & EARTHWORKS, INC. BY THE ON —SITE CONSTRUCTION FOREMAN AND PROVIDED TO ASE TO PREPARE THE FINAL RECORD DRAWINGS. THE RECORD DRAWINGS REFLECT THE AS —CONSTRUCTED CONDITIONS BASED ON A COMBINATION OF FIELD SURVEY DATA AND THE AS —BUILT REDLINE MARKUP DRAWINGS PROVIDED BY LASER UNDERGROUND & EARTHWORKS, INC. AND SHOULD BE FIELD VERIFIED FOR ANY FUTURE USE. ALL WATER VALVES AND HYDRANTS WERE FIELD SURVEYED IN THEIR AS —BUILT LOCATIONS AND ACCURATELY REFLECTED HEREON. 3+50 4+00 N07E• ALL PIPE SHALL BE BAGGED AND SEALED FROM POINT OF DELIVERY THROUGH INSTALLA710N. SURVEYED: SCALE: DAIS: BRH VERTICAL: NAVD 83/1 RENTON HILL UTILITY REPLACEMENT PROJECT 08/15/18 HORIZONTAL: NAD 191988 1 DESIGNED: 1 "= 1 0' rL AW S. 7TH STREET Qa RENTON AVE. S. F1EL0e°°K° DRAWN: RENTON 8° WATER MAIN PLAN & PROFILE PAGE: AW ONE INCH DATUM DRAWING N0: CHECKED: AT FU Planning/Building/Public Works Dept. W-7A AG IF NOT ONE INCH NO. REVISION BY DATE APPR APPROVED::SCALE ACCORDINGLY SHEET.- OR 5A 89 G 1 IWI-10131812141