Loading...
HomeMy WebLinkAboutM_NDPES WAR309525 20201007 Coverage Letter_201112_v1 October 7, 2020 Lakh Sandhu Permittee 9329 S 200th ST Kent, WA 98031 RE: Coverage under the Construction Stormwater General Permit Permit number: WAR309525 Site Name: Haevin Ridge Short Plat Location: 18809 116th Ave SE Renton County: King Disturbed Acres: 1.23 Dear Lakh Sandhu: The Washington State Department of Ecology (Ecology) received your Notice of Intent for coverage under Ecology’s Construction Stormwater General Permit (CSWGP). This is your permit coverage letter. Your permit coverage is effective October 7, 2020. Please retain this permit coverage letter as the official record of permit coverage for your site. Ecology has approved use of electronic formats as long as they are easily produced on your construction site. A mobile friendly copy of the CSWGP permit, permit forms, and information related to your permit can be viewed and downloaded at www.ecology.wa.gov/eCoverage-packet. Please contact your Permit Administrator, listed below, if you would like to receive a hard copy of the CSWGP. Please take time to read the entire permit and contact Ecology if you have any questions. Electronic Discharge Monitoring Reports (WQWebDMR) This permit requires that Permittees submit monthly discharge monitoring reports (DMRs) for the full duration of permit coverage (from issuance date to termination). DMRs must be submitted electronically using Ecology’s secure online system, WQWebDMR. To sign up for WQWebDMR go to www.ecology.wa.gov/webportalhelp. If you have questions, contact the portal staff at (360) 407-7097 (Olympia area), or (800) 633-6193/option 3, or email WQWebPortal@ecy.wa.gov. Lakh Sandhu October 7, 2020 Page 2 Appeal Process You have a right to appeal coverage under the general permit to the Pollution Control Hearing Board (PCHB). Appeals must be filed within 30 days of the date of receipt of this letter. Any appeal is limited to the general permit’s applicability or non-applicability to a specific discharger. The appeal process is governed by chapter 43.21B RCW and chapter 371-08 WAC. “Date of receipt” is defined in RCW 43.21B.001(2). For more information regarding your right to appeal, go to https://fortress.wa.gov/ecy/publications/SummaryPages/1710007.html to view Ecology’s Focus Sheet: Appeal of General Permit Coverage. Ecology Field Inspector Assistance If you have questions regarding stormwater management at your construction site, please contact Maria Zeman of Ecology's Northwest Regional Office in Bellevue at Maria.Zeman@ecy.wa.gov, or at 425-649-7100. Questions or Additional Information Ecology is committed to providing assistance. Please review our web page at www.ecology.wa.gov/constructionstormwaterpermit. If you have questions about the Construction Stormwater General Permit, please contact your Permit Administrator, Kendra Henderson at Kendra.Henderson@ecy.wa.gov, or (360) 407-6556 Sincerely, Jeff Killelea, Acting Section Manager Program Development Services Section Water Quality Program