HomeMy WebLinkAboutRS_Preliminary_TIR_10232020_v1
Western Washington Division Eastern Washington Division
165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd, Cle Elum, WA 98922
Phone: (425) 392-0250 Fax: (425) 391-3055 Phone: (509) 674-7433 Fax: (509) 674-7419
www.EncompassES.net
PRELIMINARY TECHNICAL INFORMATION REPORT
For
Mangat Short Plat
1415 N 24th St
Renton, WA 98056
October 23, 2020
10/23/2020
Prepared by:
Ian Dahl
Encompass Engineering Job No. 20547
Prepared For:
Sukhjinder Mangat
10623 SE 279th Street
Kent, WA 98030
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | i
Table of Contents
I. PROJECT OVERVIEW ................................................................................................................ 1
II. CONDITIONS AND REQUIREMENTS SUMMARY ...................................................................... 7
III. OFFSITE ANALYSIS .................................................................................................................. 12
IV. FLOW CONTROL, LOW IMPACT DEVELOPMENT AND WATER QUALITY FACILITY ANALYSIS
AND DESIGN ........................................................................................................................... 19
V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN ..................................................................... 23
VI. SPECIAL REPORTS AND STUDIES ............................................................................................ 23
VII. OTHER PERMITS ..................................................................................................................... 23
VIII. CSWPP ANALYSIS AND DESIGN .............................................................................................. 23
IX. BOND QUANTITIES, FACILITY SUMMARIES AND DECLARATION of COVENANT ................... 23
X. OPERATION AND MAINTENANCE MANUAL .......................................................................... 23
List of Figures
Figure 1 – TIR Worksheet
Figure 2 – Vicinity Map
Figure 3 – Soils Map and Legend
Figure 4 – Existing Conditions Map
Figure 5 – Developed Conditions Map
Figure 6 – Drainage Review Flow Chart
Figure 7 – Downstream Map
Appendix A
Limited Geotechnical Evaluation by Cobalt Geosciences dated August 20, 2020.
Appendix B
WWHM Output
CITY OF RENTON SURFACE WATER DESIGN MANUAL
2017 City of Renton Surface Water Design Manual 12/12/2016 8-A-1
REFERENCE 8-A
TECHNICAL INFORMATION REPORT (TIR)
WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner _____________________________
Phone ___________________________________
Address __________________________________
_________________________________________
Project Engineer ___________________________
Company _________________________________
Phone ___________________________________
Project Name __________________________
CED Permit # ________________________
Location Township ________________
Range __________________
Section _________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Land Use (e.g., Subdivision / Short Subd.)
Building (e.g., M/F / Commercial / SFR)
Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
Full
Targeted
Simplified
Large Project
Directed
__________________
__________________
__________________
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
Full
Modified
Simplified
__________________
__________________
__________________
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual 8-A-2
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: _______________________
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: SWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: _____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Landslide Hazard ______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2017 City of Renton Surface Water Design Manual 12/12/2016 Ref 8-A-3
Part 10 SOILS
Soil Type
______________________
______________________
______________________
______________________
Slopes
________________________
________________________
________________________
________________________
Erosion Potential
_________________________
_________________________
_________________________
_________________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:__________________
Flow Control (include facility
summary sheet)
Standard: _______________________________
or Exemption Number: ____________
On-site BMPs: _______________________________
Conveyance System Spill containment located at: _____________________________
Erosion and Sediment Control /
Construction Stormwater Pollution
Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual 8-A-4
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Maintenance and Operation Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Liability Provided: Yes / No
Water Quality (include facility
summary sheet)
Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
or Exemption No. _______________________
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: SDO / MDP / BP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): _______________
Datum:
Flood Protection Facilities Describe:
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control High-Use Site: Yes / No
Treatment BMP: _________________________________
Maintenance Agreement: Yes / No
with whom? _____________________________________
Other Drainage Structures
Describe:
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2017 City of Renton Surface Water Design Manual 12/12/2016 Ref 8-A-5
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Control Pollutants
Protect Existing and Proposed
BMPs/Facilities
Maintain Protective BMPs / Manage
Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent BMPs/Facilities, restore
operation of BMPs/Facilities as necessary
Flag limits of sensitive areas and open space
preservation areas
Other _______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional Facility
Shared Facility
On-site BMPs
Other
________________
________________
________________
________________
________________
________________
Vegetated Flowpath
Wetpool
Filtration
Oil Control
Spill Control
On-site BMPs
Other
________________
________________
________________
________________
________________
________________
________________
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ____________________________
Cast in Place Vault
Retaining Wall
Rockery > 4′ High
Structural on Steep Slope
Other _______________________________
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual 8-A-6
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
____________________________________________________________________________________
Signed/Date
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 1
I. PROJECT OVERVIEW
Project: Mangat Short Plat
Site Address: 1415 N. 24th Street, Renton, WA 98056 (See Vicinity Map)
Tax Parcel #: 334450-0234
Zoning District: R-6, Single Family Residential
Site Area: 21,412 SF (0.49 Acres)
Site Location: The site is in the City of Renton within the NW quarter of Section 5,
Township 23 North, Range 5 East, W.M, King County, Washington.
The site is located on the south side of N 24th St, west of the
intersection of Meadow Ave. N and N 24th St.
Figure 2: Vicinity Map
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 2
Pre-developed Site Conditions
The project site is located in the City of Renton on a 21,412 SF (0.49 Acres) lot that is zoned R-6
(single-family residential). The site is accessed from N 24th St, east of the intersection of N 24th St
and Meadow Ave N. The site is bordered to the east, west and south by single-family residences
and to the north by City of Renton ROW.
The site is currently developed with a single-family residence accessed from N 24th St via a
concrete driveway at the northeast corner of the site. South of the residence, a grassy hill slopes
off-site to the southwest at slopes of 4-8%. The property is located within the East Lake
Washington drainage basin, however it has two separate discharge areas. Runoff from the
northern portion of the existing site generally sheet flows towards N 24th St where it flows
downhill to west and enters the City of Renton storm system through a type 1 catch basin. Runoff
from the southern portion of the site sheet flows to the southwest towards an undeveloped
forested hillside, before entering the Bella Vista Apartment complex storm system, where it
converges with the stormwater from the northern discharge area at just under a ¼ mile from the
project site. Stormwater is ultimately discharged to Lake Washington, located approximately ½
mile west of the site. See full downstream analysis in Section III of this Technical Information
Report (TIR).
An Existing Conditions Map is included as Figure 4 at the end of this Section.
Critical Areas
A Wellhead Protection Area, Zone 1 Modified and an Aquifer Protection Area, Zone 2 are mapped
on the project site according to City of Renton Maps and the RSWDM Reference 15-B. No other
critical areas have been identified on the project site.
Soils
Per the US Department of Agriculture (USDA), Natural Resources Conservation Service (NR CS)
Web Soil Survey (WSS) information, the entire project site is underlain with Indianola loamy sand,
5 to 15 percent slopes (See Figure 3 on the following page). A Limited Geotechnical Evaluation
prepared by Cobalt Geosciences (Appendix A) confirms this soil classification across the site, with
the discovery of weathered and unweathered glacial till. An in-situ infiltration test was performed
and an infiltration rate of 0.22 inches per hour was found which is unsuitable for stormwater
infiltration.
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 3
Figure 3: Soil Map and Legend
Developed Site Conditions
The project proposes the development of two (2) single-family lots within the 21,412 SF (0.49
Acres) parcel, as well as an 11.5-foot right-of-way dedication with frontage improvements, and
road widening at the intersection of Meadow Ave N and N 24th St for an emergency vehicle
turnaround. Lot 1 is 10,277 SF (0.24 Acres) and is located along the eastern portion of the site
with driveway access off of N 24th St. Lot 2 is 9,536 SF (0.22 Acres) and is located on the western
portion of the site with driveway access off of N 24th St. Frontage improvements will include the
addition of a 5-foot sidewalk, 8-foot planter strip, as well as curb and gutter along the edge of
asphalt roadway. At the intersection of N 24th St and Meadow Ave N, the existing asphalt roadway
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 4
will be widened by approximately 7 feet to accommodate a hammerhead Emergency Vehicle
Turnaround.
The parcel is zoned R-6, which allows for a maximum building coverage of 40% and a maximum
impervious surface coverage of 55%. The maximum allowable building/impervious surface for
each lot is discussed below:
• Lot 1: The maximum allowable building coverage for Lot 1 is 10,277 SF*0.4 = 4,111 SF,
and the maximum impervious surface coverage is 10,277 SF*0.55 = 5,652 SF. The final
site layout of Lot 1 has not been determined at this stage; therefore, this report
assumes that the future impervious surfaces required to construct the residence on
Lot 1 will use the maximum coverages stated above.
• Lot 2: The maximum allowable building coverage for Lot 2 is 9,536 SF*0.4 = 3,814 SF,
and the maximum impervious surface coverage is 9,536 SF*0.55 = 5,245 SF. The final
site layout of Lot 2 has not been determined at this stage; therefore, this report
assumes that the future impervious surfaces required to construct the residence on
Lot 2 will use the maximum coverages stated above.
Stormwater runoff from the proposed development of Lots 1 and 2 will be managed as follows:
• Lot 1: Stormwater BMP’s satisfying Core Requirement #9 will be used to the maximum
extent feasible to mitigate new runoff created by the proposed single family residence
and other impervious surfaces on-site. A 50-foot basic dispersion trench with notched
board and 25-foot native vegetated flowpath is proposed on Lot 1 south of the
residence to mitigate stormwater from rooftop areas. This report assumes that 3,500
SF of rooftop area will be conveyed to this dispersion trench, the maximum allowed
for its size.
• Lot 2: Stormwater BMP’s satisfying Core Requirement #9 will be used to the maximum
extent feasible to mitigate new runoff created by the proposed single family residence
and other impervious surfaces on-site. A 50-foot basic dispersion trench with notched
board and 25-foot native vegetated flowpath is proposed on Lot 1 south of the
residence to mitigate stormwater from rooftop areas. This report assumes that 3,500
SF of rooftop area will be conveyed to this dispersion trench, the maximum allowed
for its size.
Please refer to Core Requirement # 9 in Section II and Section IV of this TIR for additional
discussion on stormwater BMPs. A Developed Conditions Map is provided as Figure 5 at this end
of this Section.
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 7
II. CONDITIONS AND REQUIREMENTS SUMMARY
The 2017 City of Renton Surface Water Design Manual (RSWDM) was utilized to determine and
address all core and special requirements. Based on the criteria specified in Figure 1.1.2.A of the
RSWDM, the project falls under Full Drainage Review. Per Section 1.1.2.4 of the RSWDM, the
project must meet all nine (9) core and all six (6) special requirements. See Figure 6 below for
more information on how the type of drainage review was d etermined.
Figure 6: Drainage Review Flow Chart
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 8
Core Requirements
Core Requirement #1: Discharge at the Natural Location
The proposed development runoff will follow existing drainage patterns that flow to the
north into N 24th St and the City of Renton storm system as well as southwest towards an
undeveloped, forested hillside. Refer to the Level 1 Downstream Analysis in Section III of
this TIR for a complete description of the existing drainage path s.
Core Requirement #2: Downstream Analysis
A Level 1 Downstream analysis has been completed for the site and no existing or
potential problems have been identified. This analysis is included in Section III of this TIR.
Core Requirement #3: Flow Control Facilities
Based on the City of Renton’s flow control application map, the project site is located
within the Peak Rate Flow Control Standard (Existing Site Conditions). Flow control
facilities are required to match the developed peak discharge rates to existing site
conditions peak discharge rates for 2-, 10- and 100-year return periods.
The proposed stormwater BMPs result in a 0.0109 CFS decrease in the 100-year flow using
15-minutes time steps. This is below the allowable threshold of a 0.15 CFS maximum
increase per Section 1.2.3.1.A of the RSWDM; therefore, the project meets flow control
exemption 2. No formal flow control facilities are proposed at this time; however, flow
control BMPs will be implemented as described in Core Requirement #9. Please refer to
Section IV of this TIR for additional discussion.
Core Requirement #4: Conveyance System
Conveyance in compliance with the requirements detailed in Section 1.2.4.1 of the City
of Renton 2017 SWDM will be provided with final engineering.
Core Requirement #5: Construction Stormwater Pollution Prevention
The limits of construction for the project are less than 1 acre. A temporary erosion and
sediment control (TESC) plan providing details on best management practices (BMPs) to
be implemented during construction is included in the engineering plan set. A
Construction Stormwater Pollution Prevention Plan (CSWPPP) will be provided with final
engineering. Please refer to Section VIII of this TIR for additional discussion.
Core Requirement #6: Maintenance and Operations
An Operation and Maintenance Manual will be provided with final engineering.
Core Requirement #7: Financial Guarantees and Liability
The owner will arrange for any financial guarantees and liabilities required by the permit.
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 9
Core Requirement #8: Water Quality Facilities
In accordance with Section 1.2.8.1.A of the RSWDM, Basic Water Quality Treatment is not
required for this project as new plus replaced pollution generating impervious surfaces
(PGIS) do not exceed 5,000 SF, meeting exemption 1. 1,949 SF of asphalt road repair and
widening is proposed on N 24th St, 494 SF of concrete driveway is proposed within the
ROW dedication area, and 750 SF of asphalt driveway is estimated within Lots 1 & 2 (at a
15-foot width). These quantities total to 3,193 SF of PGIS that will be created or replaced
as a result of this project.
Core Requirement #9: Flow Control BMPs
This project is classified as a small subdivision; therefore, it is subject to the Small
Subdivision Project BMP Requirements detailed in Section 1.2.9.3.1 in the RSWDM.
Although implementation of individual lot BMPs is not required until building permit
application, BMPs have been considered for the future improvements on Lots 1 and 2
based on Section 1.2.9.2 and of the RSWDM. See Section IV of this TIR for further
discussion and flow control analysis.
Impervious Surface BMPs
Full Dispersion: Infeasible for Lots 1 and 2.
• Lots 1 and 2: The space required for a 100-foot native vegetated flowpath segment is
not available on these sites.
Full Infiltration: Infeasible for Lots 1 and 2.
• Lots 1 and 2: The Limited Geotechnical Evaluation prepared by Cobalt Geosciences
dated August 20, 2020 (Appendix A) states that infiltration is infeasible at the site due
to underlain glacial till and confirmed by an in-situ infiltration test.
Limited Infiltration: Infeasible for Lots 1 & 2.
• Lots 1 and 2: BMP’s relying on infiltration are not feasible as described above.
Rain Gardens/Bioretention: Infeasible for Lots 1 and 2.
• Lots 1 and 2: BMP’s relying on infiltration are not feasible as described above.
Permeable Pavement: Infeasible for Lots 1 and 2.
• Lots 1 and 2: BMP’s relying on infiltration are not feasible as described above.
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 10
Basic Dispersion: Feasible for Lots 1 and 2
• Lot 1: A 50-foot Basic Dispersion trench with notched board and 25 -foot native
vegetated flowpath is proposed for Lot 1. The maximum area of 3,500 SF will be
conveyed to this trench from the rooftop of the residence.
• Lot 2: A 50-foot Basic Dispersion trench with notched board and 25 -foot native
vegetated flowpath is proposed for Lot 1. The maximum area of 3,500 SF will be
conveyed to this trench from the rooftop of the residence.
Reduced Impervious Surface Credit: Infeasible for Lots 1 and 2
• Lots 1 and 2: The maximum impervious surfaces assumed for Lots 1 and 2 of 5,652 SF
and 5,245 SF respectively, exceed the threshold of 4,000 SF, which is required for
eligibility for a reduced impervious surface credit.
Native Growth Retention Credit: Infeasible for Lots 1 and 2
• Lots 1 and 2: The necessary area to allow for 3.5 SF of native vegetated surface for
every SF of impervious surface is not available on either lot.
Tree Retention Credit: Feasible for Lots 1 and 2
• Lots 1 and 2: At least 30% of significant trees will be retained per Department of
Community and Economic Development notes in the Pre-Application Meeting.
Soil Amendment: Feasible for Lots 1 and 2
• Lots 1 and 2: All disturbed, pervious areas of the project will meet soil amendment
requirements as detailed in Section C.2.13 of the RSWDM.
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 11
Special Requirements
Special Requirement #1: Other Adopted Area-Specific Requirements
Critical Drainage Area – N/A
Master Drainage Plan – N/A
Basin Plan – N/A
Lake management Plan – N/A
Shared Facility Drainage Plan – N/A
Special Requirement #2: Flood Hazard Area Delineation
The limits of this project do not lie within a delineated FEMA 100-year floodplain.
Special Requirement #3: Flood Protection Facilities
This project does not rely on or propose to modify/construct a new flood protection
facility.
Special Requirement #4: Source controls
The project is a single-family residential development; therefore, this requirement is not
applicable.
Special Requirement #5: Oil Control
This project is not considered high-use in need of oil control.
Special Requirement #6: Aquifer Protection Area
The site is located within Zone 2 of the City’s Aquifer Protection Area, and complies with
the requirements listed in section 1.3.6 of the RSWDM. No flow control facilities or open
conveyance systems are proposed on the site.
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 12
III. DOWNSTREAM ANALYSIS
A Level 1 Downstream analysis has been conducted per the requirements in Section 1.2.2.1 of
the RSWDM. Please see Tasks 1 through 4 below for a summary of the results.
Task 1: Define and Map the Study Area
The area of analysis extends from the site discharge points along N 24th St and the southern limit
of the site to approximately a quarter-mile downstream where the two discharge areas converge.
A Downstream Map is provided in Figure 7 below.
Figure 7: Downstream Map
Task 2: Review All Available Information on the Study Area
Per King county resources, there have been no significant drainage complaints within a quarter -
mile downstream of the site.
Task 3: Field Inspect the Study Area
A field inspection was performed by Encompass Engineering & Surveying on October 6, 2020.
Please refer to Task 4 for a detailed description of the downstream drainage system and analysis.
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 13
Task 4: Describe the Drainage System
Runoff from the site is split into two Natural Discharge Areas (A & B), however these flowpaths
converge within a ¼ mile downstream of the site, creating one Threshold Discharge Area for the
site. Runoff from Discharge Area A sheet flows into N 24 th St and flows to the west along the
south side of the crowned roadway along the edge of pavement (A1). A raised asphalt bump
directs the flow northwest towards a type 1 catch basin (A2) which conveys the stormwater north
through an 8” CMP pipe on Garden Ct N. After approximately 100 LF, the stormwater enters
another type 1 catch basin (A3) and flows west onto private property o n parcel 0523059065.
According to City of Renton Maps, the stormwater enters a type 2 CB (A4) on parcel 0523059065
and moves west through two type 1 CB’s and two type 2 CB’s via a 12” PVC stormwater main,
before entering a type 2 CB (A5) in the Bella Vista Apartment Complex. From here, stormwater
runs in a counterclockwise loop through a series of type 1 CB’s (A6) around the complex with
stormwater main starting at 12” PVC and sizing up to 15” and then 18” PVC before entering a
type 2 CB (A7) at the entrance of the apartment complex where it joins the stormwater from
Discharge Area B (described below). This is where the analysis was completed, just over ¼ mile
downstream of the site, but less than ¼ mile from Discharge Area B, the shorter of the two
flowpaths. Please refer to Figure 7 above, for the approximate location of identified drainage
features.
Runoff from Discharge Area B sheet flows off-site to the southwest onto grass and forested areas
(B1) on adjacent parcels 3344500235 & 3344500250. The slope increases to approximately 30%
as runoff continues to sheet flow down the undeveloped, forested hillside until it reaches a
depression (B2) behind three townhouse buildings in the Bella Vista Apartment complex. This
low point runs to the south behind these units in an overgrown vegetated depression until it
reaches a grass lawn area (B3) and sheet flows to the west onto a paved parking lot. A type 1 CB
(B4) picks up this storm water and coveys it to the north via a 12” storm pipe into a Type 2 CB
(B5) where it joins the stormwater from Discharge Area B at just under ¼ mile from the project
site. Stormwater from both discharge areas continue through the City of Kent stormwater system
and discharge into Lake Washington (A8/B6) at Coulon Beach Park at app roximately a ½ mile
from the project site.
If conveyance system nuisance, severe erosion, severe flooding, or wetland hydrology problems
are identified downstream of the site under Core Requirement #2, additional impact analysis
and/or mitigation may be required. As discussed in Task 2, there have been no recent significant
drainage complaints within a quarter-mile downstream of the site. As no existing drainage or
conveyance issues have been recently identified, further impact analysis and mitigation of t he
downstream stormwater system is not required. Please refer to the conveyance analysis in
Section V of this TIR for additional discussion and evaluation of the on -site conveyance system
capacity. Photographs from the site visit are included below.
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 14
Element A1- Sheet flow on N 24th St at site frontage downhill to the West
Element A2- Type 1 CB with raised asphalt bump to direct stormwater
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 15
Element A3- Type 1 CB conveying stormwater onto private property to the West
Element A5- Type 2 CB in Bella Vista Apartment Complex
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 16
Element A6- Series of type 1 CB’s in counterclockwise loop around Bella Vista Complex
Element A7/B5- Type 2 CB (w/rectangular lid) where Discharge Area A & B converge
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 17
Element B1- Sheet flow off-site to southwest onto undeveloped grass & forest
Element B2- Low point at bottom of hillside behind Bella Vista townhomes
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 18
Element B3- Sheet flow down grass lawn towards asphalt parking area and Bella Vista storm
system
Element A8/B6- Final Discharge into Lake Washington
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 19
IV. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND DESIGN
Part A: Existing Site Hydrology
The 21,412 SF (0.49 AC) site is currently developed with a single-family residence accessed from
N 24th St via a concrete driveway at the northeast corner of the site. South of the residence, a
grassy hill slopes off-site to the southwest at slopes of 4-8%. The property is located within the
East Lake Washington drainage basin, however it has two separate discharge areas. Runoff from
the northern portion of the existing site generally sheet flows towards N 24th St where it flows
downhill to west and enters the City of Renton storm system through a type 1 catch basin . Runoff
from the southern portion of the site sheet flows to the southwest towards an undeveloped
forested hillside, before entering the Bella Vista Apartment complex storm system, where it
converges with the stormwater from the northern discharge area at just under a ¼ mile from the
project site. Stormwater is ultimately discharged to Lake Washington, located approximately ½
mile west of the site. See full downstream analysis in Section III of this Technical Information
Report (TIR).
The Limited Geotechnical Evaluation prepared by Cobalt Geosciences (Appendix A) confirms the
NRCS Indianola loamy sand soil classification on the site, and has determined infiltration to be
infeasible.
WWHM 2012 was used to model the existing condition within the 22,870 SF (0.53 AC) limits of
disturbance using existing surfaces found on site including rooftop, driveway, lawn and walkways.
Part B: Developed Site Hydrology
The project proposes the development of two (2) single-family lots within the 21,412 SF (0.49
Acres) parcel, as well as an 11.5-foot right-of-way dedication with frontage improvements, and
road widening at the intersection of Meadow Ave N and N 24th St for an emergency vehicle
turnaround. Lot 1 is 10,277 SF (0.24 Acres) and is located along the eastern portion of the site
with driveway access off of N 24th St. Lot 2 is 9,536 SF (0.22 Acres) and is located on the western
portion of the site with driveway access off of N 24th St. Frontage improvements will include the
addition of a 5-foot sidewalk, 8-foot planter strip, as well as curb and gutter along the edge of
asphalt roadway. At the intersection of N 24th St and Meadow Ave N, the existing asphalt roadway
will be widened by approximately 7 feet to accommodate a hammerhead Emergency Vehicle
Turnaround.
Stormwater runoff from the proposed development of Lots 1 and 2 will be managed as follows:
• Lot 1: Stormwater BMP’s satisfying Core Requirement #9 will be used to the maximum
extent feasible to mitigate new runoff created by the proposed single family residence
and other impervious surfaces on-site. A 50-foot basic dispersion trench with notched
board and 25-foot native vegetated flowpath is proposed on Lot 1 south of the
residence to mitigate stormwater from rooftop areas. This report assumes that 3,500
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 20
SF of rooftop area will be conveyed to this dispersion trench, the maximum allowe d
for its size.
• Lot 2: Stormwater BMP’s satisfying Core Requirement #9 will be used to the maximum
extent feasible to mitigate new runoff created by the proposed single family residence
and other impervious surfaces on-site. A 50-foot basic dispersion trench with notched
board and 25-foot native vegetated flowpath is proposed on Lot 1 south of the
residence to mitigate stormwater from rooftop areas. This report assumes that 3,500
SF of rooftop area will be conveyed to this dispersion trench, the maximum a llowed
for its size.
WWHM 2012 was used to model the proposed condition as follows:
• Lot 1: The modeled limits of disturbance for Lot 1 is 10,277 SF. The maximum
impervious surface per R-6 zoning of 5,652 SF was assumed with 3,500 SF of this area
being conveyed to the Basic Dispersion trench. Per Table 1.2.9.A in the RSWDM, 90%
of the area going to basic dispersion can be modeled as impervious, and 10% as lawn.
The remaining 4,625 SF of pervious surface on Lot 1 will meet soil amendment
requirement as detailed in Section C.2.13 of the RSWDM; therefore, it has been
modeled as 100% pasture with moderate slopes in type C soils.
• Lot 2: The modeled limits of disturbance for Lot 2 is 9,526 SF. The maximum
impervious surface per R-6 zoning of 5,245 SF was assumed with 3,500 SF of this area
being conveyed to the Basic Dispersion trench. Per Table 1.2.9.A in the RSWDM, 90%
of the area going to basic dispersion can be modeled as impervious, and 10% as lawn.
The remaining 4,291 SF of pervious surface on Lot 1 will meet soil amendment
requirement as detailed in Section C.2.13 of the RSWDM; therefore, it has been
modeled as 100% pasture with moderate slopes in type C soils.
• ROW Dedication & Road Widening: The modeled limits of disturbance for the ROW
dedication area and road widening is 3,829 SF. This will include 603 SF of sidewalk,
495 SF of driveway as well as 1,954 SF of asphalt road repair and widening. The
remaining 777 SF of pervious surface will meet soil amendment requirement as
detailed in Section C.2.13 of the RSWDM; therefore, it has been modeled as 100%
pasture with moderate slopes in type C soils.
Please refer to Core Requirement #9 in Section II of the TIR for additional discussion. A Developed
Conditions Map is provided as Figure 5. A summary of the existing and developed analyses is
provided in the table below:
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 21
WWHM Model (Mitigated)
Area Description Size Developed Condition
ROW Dedication Sidewalk 603 SF (0.01 AC) Modeled as Sidewalk, Mod
ROW Dedication Driveway 495 SF (0.01 AC) Modeled as Driveway, Flat
ROW Dedication Roadway 1,959 SF (0.05 AC) Modeled as Roads, Mod
ROW Dedication Lawn 777 SF (0.02 AC) Modeled as Pasture, C, Mod
Lot 1 Rooftop 4,927 SF (0.11 AC) Modeled as Rooftops, Flat
Lot 1 Driveway 375 SF (0.01 AC) Modeled as Driveways, Flat
Lot 1 Lawn 4,975 SF (0.11 AC) Modeled as Pasture, C, Mod
Lot 2 Rooftop 4,520 SF (0.10 AC) Modeled as Rooftops, Flat
Lot 2 Driveway 375 SF (0.01 AC) Modeled as Driveways, Flat
Lot 2 Lawn 4,641 SF (0.11 AC) Modeled as Pasture, C, Mod
TOTAL LIMITS OF DISTURBANCE 23,642 SF (0.54 AC) See Above
WWHM Model (Pre-Developed)
Area Description Size Existing Condition
Rooftop 2,899 SF (0.07 AC) Modeled as Rooftops,
Flat
Driveway 1,009 SF (0.02 AC) Modeled as Driveways,
Mod
Walkways/Decks 808 SF (0.02 AC) Modeled as Sidewalks,
Mod
Roadway 580 SF (0.01 AC) Modeled as Roads, Mod
Lawn 18,346 SF (0.42 AC) Modeled as Lawn, C,
Mod
TOTAL LIMITS OF DISTURBANCE 23,642 SF (0.54 AC) See Above
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 22
Part C: Performance Standards
Based on the City of Renton’s flow control map, the project site is located within the Peak Rate
Flow Control Standard (Existing Site Conditions). Flow control facilities are required to match
the developed peak discharge rates to existing site conditions peak discharge rates for 2-, 10-
and 100-year return periods. However, the site meets flow control exemption 2 per Section
1.2.3.1.A of the RSWDM, and flow control facilities are not required.
In addition, the site is smaller than 22,000 SF. Therefore, the site is subject to Small Lot BMP
Requirements detailed in Section 1.2.9.2.2 of the RSWDM.
The site falls within a Basic Water Quality treatment area in accordance with Section 1.2.8.1.A of
the RSWDM, however new plus replaced impervious pollution generating areas within the
project site is under 5,000 SF and therefore water quality treatment is not required .
Part D: Flow Control System
As shown in the table on the following page, the proposed stormwater BMPs result in a 0.0109
CFS decrease in the 100-year flow using 15-minutes time steps. This is below the allowable
threshold of a 0.15 CFS maximum increase per Section 1.2.3.1.B of the RSWDM; therefore, the
project meets flow control exemption 2. No formal flow control facilities are proposed at this
time; however, flow control BMPs will be implemented as described in Core Requirement #9 in
Section II of this TIR. Please refer to Appendix B for a copy of the full WWHM data output.
Part E: Water Quality System
In accordance with Section 1.2.8.1.A of the RSWDM, Basic Water Quality Treatment is not
required for this project as new plus replaced pollution generating impervious surfaces (PGIS)
do not exceed 5,000 SF, meeting exemption 1. 1,949 SF of asphalt road repair and widening is
proposed on N 24th St, 494 SF of concrete driveway is proposed within the ROW dedication
area, and 750 SF of asphalt driveway is estimated within Lots 1 & 2 (at a 15-foot width). These
quantities total to 3,193 SF of PGIS that will be created or replaced as a result of this project.
Mangat Short Plat Preliminary Technical Information Report
10/23/2020 P a g e | 23
V. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
A conveyance system analysis will be provided with final engineering
VI. SPECIAL REPORTS AND STUDIES
• Limited Geotechnical Evaluation by Cobalt Geosciences dated August 20, 2020
VII. OTHER PERMITS
• Civil Construction Permit
• Final Short Plat
• Building Permits
• Right-of-Way Use Permit
VIII. CSWPP ANALYSIS AND DESIGN
A CSWPPP will be provided with final engineering.
IX. BOND QUANTITIES, FACILITY SUMMARIES AND DECLARATION of
COVENANT
Bond Quantities, Facility Summary and Declaration of Covenant to be provided with Final
Engineering.
X. OPERATION AND MAINTENANCE MANUAL
An Operation and Maintenance Manual to be provided with Final Engineering.
Mangat Short Plat Preliminary Technical Information Report
Appendix A
Limited Geotechnical Evaluation by Cobalt Geosciences dated August 20, 2020
Mangat Short Plat Preliminary Technical Information Report
Appendix B
WWHM Output
WWHM2012
PROJECT REPORT
20547 Magnat 10/15/2020 10:40:37 AM Page 2
General Model Information
Project Name:20547 Magnat
Site Name:
Site Address:
City:
Report Date:10/15/2020
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2019/09/13
Version:4.2.17
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
20547 Magnat 10/15/2020 10:40:37 AM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Mod 0.42
Pervious Total 0.42
Impervious Land Use acre
ROADS MOD 0.01
ROOF TOPS FLAT 0.07
DRIVEWAYS FLAT 0.02
SIDEWALKS MOD 0.02
Impervious Total 0.12
Basin Total 0.54
Element Flows To:
Surface Interflow Groundwater
20547 Magnat 10/15/2020 10:40:37 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Pasture, Mod 0.24
Pervious Total 0.24
Impervious Land Use acre
ROADS MOD 0.05
ROOF TOPS FLAT 0.21
DRIVEWAYS FLAT 0.03
SIDEWALKS MOD 0.01
Impervious Total 0.3
Basin Total 0.54
Element Flows To:
Surface Interflow Groundwater
20547 Magnat 10/15/2020 10:40:37 AM Page 5
Routing Elements
Predeveloped Routing
20547 Magnat 10/15/2020 10:40:37 AM Page 6
Mitigated Routing
20547 Magnat 10/15/2020 10:40:37 AM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.42
Total Impervious Area:0.12
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.24
Total Impervious Area:0.3
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.083567
5 year 0.123869
10 year 0.154157
25 year 0.196622
50 year 0.231377
100 year 0.268872
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.123102
5 year 0.157048
10 year 0.18029
25 year 0.21062
50 year 0.233957
100 year 0.257959
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.139 0.167
1950 0.138 0.163
1951 0.081 0.105
1952 0.047 0.082
1953 0.043 0.092
1954 0.067 0.101
1955 0.070 0.112
1956 0.071 0.108
1957 0.096 0.128
1958 0.058 0.101
20547 Magnat 10/15/2020 10:41:12 AM Page 8
1959 0.048 0.102
1960 0.086 0.113
1961 0.073 0.107
1962 0.047 0.090
1963 0.077 0.107
1964 0.066 0.100
1965 0.102 0.129
1966 0.052 0.086
1967 0.135 0.144
1968 0.116 0.168
1969 0.092 0.116
1970 0.077 0.116
1971 0.094 0.137
1972 0.128 0.143
1973 0.043 0.083
1974 0.097 0.126
1975 0.101 0.136
1976 0.073 0.102
1977 0.066 0.100
1978 0.081 0.128
1979 0.079 0.170
1980 0.166 0.180
1981 0.078 0.126
1982 0.150 0.178
1983 0.085 0.140
1984 0.057 0.090
1985 0.078 0.120
1986 0.079 0.109
1987 0.081 0.162
1988 0.040 0.099
1989 0.054 0.133
1990 0.256 0.253
1991 0.181 0.187
1992 0.062 0.091
1993 0.041 0.082
1994 0.035 0.085
1995 0.067 0.111
1996 0.125 0.136
1997 0.093 0.122
1998 0.076 0.115
1999 0.202 0.236
2000 0.085 0.121
2001 0.063 0.130
2002 0.129 0.154
2003 0.113 0.138
2004 0.181 0.230
2005 0.077 0.107
2006 0.076 0.097
2007 0.236 0.223
2008 0.174 0.182
2009 0.104 0.154
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.2562 0.2531
2 0.2362 0.2359
3 0.2022 0.2297
20547 Magnat 10/15/2020 10:41:12 AM Page 9
4 0.1810 0.2234
5 0.1810 0.1875
6 0.1736 0.1816
7 0.1656 0.1802
8 0.1500 0.1782
9 0.1390 0.1697
10 0.1379 0.1685
11 0.1345 0.1668
12 0.1286 0.1633
13 0.1276 0.1620
14 0.1255 0.1543
15 0.1165 0.1536
16 0.1131 0.1444
17 0.1035 0.1432
18 0.1017 0.1402
19 0.1009 0.1383
20 0.0974 0.1366
21 0.0963 0.1364
22 0.0940 0.1362
23 0.0932 0.1328
24 0.0915 0.1302
25 0.0861 0.1293
26 0.0852 0.1282
27 0.0849 0.1279
28 0.0813 0.1262
29 0.0812 0.1259
30 0.0806 0.1218
31 0.0791 0.1211
32 0.0787 0.1204
33 0.0784 0.1160
34 0.0782 0.1160
35 0.0773 0.1145
36 0.0769 0.1131
37 0.0767 0.1122
38 0.0761 0.1115
39 0.0755 0.1094
40 0.0729 0.1082
41 0.0726 0.1072
42 0.0714 0.1069
43 0.0700 0.1066
44 0.0673 0.1050
45 0.0667 0.1020
46 0.0662 0.1016
47 0.0661 0.1011
48 0.0633 0.1010
49 0.0624 0.1000
50 0.0580 0.0996
51 0.0573 0.0986
52 0.0544 0.0965
53 0.0525 0.0920
54 0.0485 0.0908
55 0.0470 0.0904
56 0.0466 0.0903
57 0.0432 0.0863
58 0.0429 0.0848
59 0.0411 0.0829
60 0.0397 0.0824
61 0.0346 0.0821