HomeMy WebLinkAboutMFP20004827.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP20004827
IVR Number: 20004827
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:10/20/2020Application Date:6199600022Parcel Number: 12007 SE 184TH ST
Permit Type:11/16/2020Issue Date:Franchise
Permit Work Class:11/16/2021Expiration Date:Major Utility
Job Number: 347160Franchise Type:Cable
Description: Comcast to overlash (1) 48ct fiber on existing strand, place (1) 48ct Sheath 200' storage, place new node, overlash
(1) .875 Coax on existing strand. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Rhonda Resnik
Comcast
410 Valley Ave NW, Suite 12, Bldg C
Puyallup, WA 98371
B: (253) 864-4246Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Shannon Heaton
Cannon Construction
Contact
Michael Cannon
Cannon Construction Inc
406 Porter Way
Milton, WA 98354-9638
B: (253) 922-2787
C: (253) 588-4034
Contractor
Business License Number: 20838Electrical Contractor: CANNOCI873CL
Construction Contractor: CANNOCI055CS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP20004827
Scott Warlick 10/20/2020
This permit is for Major construction work in the ROW and will be billed at an additional
$60/HR for inspections. After hours and weekend work will be billed at $125/HR
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
Scott Warlick CED 10/20/2020
MFP20004827
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
11840 11854
18405
12017
12018
12007
11844
18411
18260
11841
18414120TH AVE SE120TH AVE SESE 184TH STEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOPROWROWROWROWROWROWROWROWROWROWROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWSE 184TH ST
SE 184TH ST
R2-1
WORK AREA
WT
W21-7
W21-7
W21-7
W21-7
W20-7a
W20-7a
W20-7a
W20-7a
FLAGGERFLAGGERFLAGGERFLAGGERW3-4
W3-4
W3-4
W3-4
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
TCP 1 7
10/12/2020 TH CK
COMCAST
N
CANNON COMPANIES
Cody Kainoa - (253)-753-7943 - ckainoa@cannonconstructioninc.com
COMCAST COMMUNICATION
Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com
MFP20004827
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP
ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
SE 184TH ST
WT
R2-1
WORK AREA
W21-7
W21-7W20-7a
W20-7a FLAGGERFLAGGERW3-4
W3-4
SE 184TH ST
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
TCP 2 7
10/12/2020 TH CK
COMCAST
N
MFP20004827
11804
11649
11638
11805
11810
11656
11637
18415
11648
0 118TH AVE SEEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP EOP EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWSE 184TH ST
SE 184TH ST
SE 184TH ST
DRIVEWAYR2-1
WORK AREA
WT
W21-7
W21-7
W21-7
W21-7
W20-7a
W20-7a
W20-7a
W20-7a
FLAGGERFLAGGERFLAGGERFLAGGERW3-4
W3-4
W3-4
W3-4
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
TCP 3 7
10/12/2020 TH CK
COMCAST
N
MFP20004827
18325
18329
18408
0
18504
18521
18515
18509
18503
18510
18516
18522
18525 116TH AVE SESE 184TH PL
115TH PL SEEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOP EOP EOP EOP EOP
EOP
EOP
EOP EOP
EOP EOP EOP
EOP
EOP EOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROW ROW ROW ROW ROWROWROWROWROWROW116TH AVE SESE 184TH ST
R2-1
WORK AREA
WT
W21-7
W21-7
W21-7
W21-7
W20-7a
W20-7a
W20-7a
W20-7A
FLAGGERFLAGGERFLAGGERFLAGGERW3-4
W3-4
W3-4
W3-4
R2-1
R2-1
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
TCP 4 7
10/12/2020 TH CK
COMCAST
N
MFP20004827
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROW116TH AVE SE116TH AVE SEWTR2-1
WORK AREA
W21-7
W21-7
W20-7a
W20-7a
FLAGGERFLAGGERW3-4
W3-4
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
TCP 5 7
10/12/2020 TH CK
COMCAST
N
MFP20004827
11436
18128
1145511431
11446
18204
11447
11428
11456
18134
11439
0
0
SE 182ND ST
FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FL FLFLFLFLFLFLFLFLFLFLFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWSE 182ND ST
116TH AVE SE116TH AVE SEWTR2-1
WORK AREA
R2-1
W21-7
W21-7
W21-7
W20-7a
W20-7a
W20-7a
FLAGGERFLAGGERFLAGGERW3-4
W3-4
W3-4
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
TCP 6 7
10/12/2020 TH CK
COMCAST
N
MFP20004827
11649
17867
18010
17861
11815
11806
11641
0
118TH AVE SE118TH AVE SESE 180TH ST EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWSE 180TH ST
R2-1
WT
W21-7
W21-7
W21-7
W21-7
W20-7a
W20-7a
W20-7a
W20-7a
FLAGGERFLAGGERFLAGGERFLAGGERW3-4
W3-4
W3-4
W3-4
WT
WORK AREA
WORK AREA
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
SITE SPECIFIC TRAFFIC CONTROL PLAN [AERIAL WORK] CONTROL TYPE: SINGLE CLOSURE 2-LANE ROAD
SITE NOTES:
1. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES
2. PLACE TEMP "NO PARKING" SIGNS AT LEAST
72 HOURS PRIOR TO WORK
3. SIDE WALKS TO REMAIN OPEN DURING
ROAD WORK, UNLESS NOTED OTHERWISE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
***TRAFFIC CONTROL ADDITIONAL NOTES ***
- At aerial work, will be a moving traffic control setup
-Will coordinate with business that will be affected by construction.
-Will have Spotter on site to escort pedestrian through work zone.
- All work will stop while pedestrians are escorted through work zones.
-Will have no more than two work areas active at a time.
-Work Areas will have 2-3 Man Work Crews with line truck.
ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSOADOPTED SPECIALIZED GUIDELINES FOR TRAFFIC CONTROLWITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OFTHE ON-SITE TRAFFIC CONTROL PERSONNEL TO SEE IF ANDANY SPECIAL CONDITIONS EXIST
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
TCP 7 7
10/12/2020 TH CK
COMCAST
N
MFP20004827
1 - COVER SHEET
2 -LEGEND
3 -GENERAL NOTES
4-8 -DESIGN
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED CANNON COMPANIES
48 CT FIBER: FT + 20% STORAGE = FT
.875 COAX: 51 FT
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
SHEET INDEX:
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (0)=
TOTAL FOOTAGE =
0 FT.
FT.
0 FT.
0 FT.
0 FT.
FT.
PROJECT DESCRIPTION - ROW*
NEW BUILDING PATH WAY =
EXISTING BUILDING PATH WAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL FOOTAGE =
0 FT.
0 FT.
0 FT.
0 FT.
0 FT.
PROJECT DESCRIPTION -SITE*
TOTAL PROJECT FOOTAGE = FT.
- TIE IN TO EXISTING SPLICE CASE SP.WAKV.0566
- OVERLASH (1) 48CT FIBER ON EXISTING AERIAL STRAND
- PLACE (1) 48CT SHEATH 200' STORAGE
- PLACE NEW NODE HERE
- SPLICE IN TO EXISTING SPLICE CASE SP.WAKV.0817
- OVERLASH (1) .875 COAX ON EXISTING AERIAL STRAND
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST
CANNON COMPANIES
Cody Kainoa - (253)-753-7943 - ckainoa@cannonconstructioninc.com
COMCAST COMMUNICATION
Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com
SE 184th St & 116th Ave SE
Renton, WA 98058
WAKTVTH06000 2x2 off KV13A
JB#0000347160
1979
1979
1979
1928 2310
MFP20004827
EDGE OF PAVEMENT
FOGLINE
POWER
COMMUNICATION
SEWER
DRAIN
DRAINAGE DITCH
GAS
WATER
TRAFFIC SIGNAL
TELCOM
STEAM
UNKNOWN UTILITY
RIGHT OF WAY
TRAFFIC CONES
PROPOSED NEW CONDUIT
STRAW WATTLES
P
LT
CW
R
UTILITY POLE
VAULT - SMALL
PEDESTAL
STREET LIGHT
CROSSWALK LIGHT
UTILITY RISER
V VAULT - SMALL
444LA MANHOLE
VAULT - 25TA
CATCH BASIN
CATCH BASIN WITH SOCK
GLULAM UTILITY POLECENTER LINE
LANE LINE
FENCE
HIGH VISIBILITY FENCE
S SEWER MANHOLE
D DRAIN MANHOLE
W WATER MANHOLE
V UTILITY VALVE
SHRUBBERY
BORE PIT
VAULT - LARGE
VAULT - 25TA
C COMMUNICATION MANHOLE
FIRE HYDRANT
DISTANCE STATIONSTA 0+00
CONSTRUCTION NOTE CALLOUT#
X.X DISTANCE DIMENSION
ASPHALT SURFACE
CONCRETE SIDEWALK PANEL
CONCRETE ROADWAY PANEL
HF H-FRAME
VAULT - LARGE
C
CCAB CABINET
LEGEND
LANE DIRECTION INDICATOR
PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES
A
7
LANDSCAPE
CROSS SECTION SYMBOL
CROSS SECTION NAME
CROSS SECTION SHOWN ON PAGE
FL FL
EOP
P P
TS TS
C C
D D
DD DD DD DD DD DD
G G
W W
T T
ST ST
ROW
SS S SS
SS UK SS
CB
CB
P P
V V V
V VV
WORK BEING DONE1LOCATION
PHOTO NOTE CALLOUT
#PHOTO LOCATOR SYMBOL
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
LEGEND 2 8
10/12/2020 TH CK
COMCAST
MFP20004827
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
GENERAL NOTES 3 8
10/12/2020 TH CK
COMCAST
MFP20004827
11840 11854
18405
12017
12018
12025
12007
11844
18411
18260
11841
12027
18414120TH AVE SE120TH AVE SESE 184TH STEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP
EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWSE 184TH ST
SE 184TH ST
SE 184TH ST
166'186'
SPLICE IN TO EXISTING
SPLICE CASE SP.WAKV.0817
PLACE NEW NODE HERE
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:1 PSE
316257-166733
NEUTRAL 28 3 N/A
SECONDARY DRIP 27 0 N/A
STREET LIGHT 24 0 N/A
COMCAST #1 21 8 N/A
COMM #1 20 8 N/A
D
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:2 PSE
A0510823
NEUTRAL 26 7 N/A
SECONDARY DRIP 25 6 N/A
COMCAST #1 18 3 N/A
COMM #1 17 4 N/A
D
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:3 PSE
313676-166478
NEUTRAL 27 4 N/A
SECONDARY DRIP 26 10 N/A
COMCAST #1 19 5 N/A
COMM #1 18 2 N/A
D
N
N
N
N
OVERLASH (1) 48CT FIBER ON
EXISTING AERIAL STRAND
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
DESIGN 4 8
10/12/2020 TH CK
COMCAST
N
MFP20004827
11804
11649
11638
11825
11805
11810
11656
11637
18415
11648
0 118TH AVE SEEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWSE 184TH ST
SE 184TH ST
SE 184TH ST
87'120'
106'
159'167'
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:4 PSE
316259-166636
NEUTRAL 28 1 N/A
SECONDARY DRIP 26 5 N/A
COMCAST #1 19 8 N/A
COMM #1 18 4 N/A
D
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:5 PSE
316259-166618
NEUTRAL 24 10 N/A
SECONDARY DRIP 24 0 N/A
STREET LIGHT 23 4 N/A
COMCAST #1 19 5 N/A
COMM #1 18 0 N/A
D
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:6 PSE
A0510819
NEUTRAL 24 4 N/A
SECONDARY DRIP 23 4 N/A
COMCAST #1 20 8 N/A
COMM #1 19 6 N/A
D
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:7 PSE
316259-166595
NEUTRAL 23 10 N/A
SECONDARY DRIP 21 0 N/A
COMCAST #1 20 6 N/A
COMM #1 18 10 N/A
D
N
N
N
NOWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:8 PSE
316260-166586
NEUTRAL 25 10 N/A
SECONDARY 25 0 N/A
STREET LIGHT 24 3 N/A
COMCAST #1 20 11 N/A
COMM #1 20 0 N/A
D
N
N
N
N
N
OVERLASH (1) 48CT FIBER ON
EXISTING AERIAL STRAND
POWER MAKE READY: RAISE SECONDARY DRIP TO 23'-10"
COMM MAKE READY: LOWER COMCAST #1 TO 20'-0"
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
DESIGN 5 8
10/12/2020 TH CK
COMCAST
N
MFP20004827
18325
11631
11625
11626
18416
11619
18329
18408
0
0
18504
18529
18521
18515
18509
18503
18510
18516
18522
18525 116TH AVE SESE 184TH PL
115TH PL SEEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP
EOP
EOP
EOP EOP EOP
EOP EOP EOP
EOP
EOP EOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROWROW ROW ROW ROW ROWROWROWROWROWROW116TH AVE SESE 184TH ST
SE 184TH ST62'126'176'174'
PLACE (1) 48CT SHEATH
200' STORAGE
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:9 PSE
A0510815
NEUTRAL 25 10 N/A
SECONDARY DRIP 25 1 N/A
COMCAST #1 18 5 N/A
COMM #1 17 2 N/A
D
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:10 PSE
316260-166558
NEUTRAL 26 0 N/A
SECONDARY DRIP 25 11 N/A
STREET LIGHT 24 10 N/A
COMM #1 22 7 N/A
COMM #2 22 0 N/A
COMCAST #1 21 9 N/A
COMM #3 18 8 N/A
D
N
N
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:11 PSE
316274-166558
NEUTRAL 26 4 N/A
SECONDARY DRIP 26 4 N/A
COMM #1 22 9 N/A
COMM #2 21 11 N/A
COMCAST #1 21 8 N/A
COMM #3 19 9 N/A
D
N
N
N
N
N
N OVERLASH (1) 48CT FIBER ON
EXISTING AERIAL STRAND
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
DESIGN 6 8
10/12/2020 TH CK
COMCAST
N
MFP20004827
11436
18128
18115
18125
11446 11456
18134
SE 182ND ST
FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPFL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL
FL FLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFL FL FL FL FL FL FL FL FL FL FL FL FL FL
FLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWSE 182ND ST 116TH AVE SE116TH AVE SE222'51'126'TIE IN TO EXISTING SPLICE
CASE SP.WAKV.0566
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:17 PSE
316327-166559
NEUTRAL 33 0 N/A
SECONDARY DRIP 32 0 N/A
STREET LIGHT 28 0 N/A
COMM #1 26 6 N/A
COMM #2 25 8 N/A
COMCAST #1 23 7 N/A
COMM #3 22 9 N/A
D
N
N
N
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:18 PSE
316350-166560
NEUTRAL 30 5 N/A
SECONDARY 29 2 N/A
COMM #1 26 5 N/A
COMM #2 25 9 N/A
COMCAST #1 24 9 N/A
COMM #3 24 5 N/A
D
N
N
Y
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:19 PSE
316362-166560
NEUTRAL 25 7 N/A
SECONDARY 25 3 N/A
COMM #1 22 3 N/A
COMM #2 21 4 N/A
COMCAST #1 19 9 N/A
COMM #3 18 5 N/A
D
N
N
Y
N
N
N
OVERLASH (1) 48CT FIBER ON
EXISTING AERIAL STRAND
COMM MAKE READY: LOWER COMM #1 TO 25'-9"
COMM MAKE READY: LOWER COMM #2 TO 24'-9"
COMM MAKE READY: LOWER COMCAST #1 TO 24'-5"
COMM MAKE READY: LOWER COMM #3 TO 23'-9"
COMM MAKE READY: LOWER COMM #1 TO 21'-11"
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
DESIGN 7 8
10/12/2020 TH CK
COMCAST
N
MFP20004827
11649
17867
11831
18010
11633
11828
18017
11823
17861
11820
18021
11815
18019
11806
11641
0
118TH AVE SE118TH AVE SESE 180TH ST EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROW ROW ROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWSE 180TH ST
SE 180TH ST
51'
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:20 PSE
316391-166620
NEUTRAL 30 3 N/A
SECONDARY DRIP 29 7 N/A
COMCAST #1 24 10 N/A
COMM #1 22 9 N/A
D
N
N
N
N
OWNER:
POLE#:
- ATTACHMENTS - HEIGHT
CLASS/HT:
POLE TYPE:
- MAKE READY - VIOLATION
MID SPAN:21 PSE
316391-166626
NEUTRAL 32 4 N/A
SECONDARY DRIP 30 4 N/A
STREET LIGHT 24 11 N/A
COMCAST #1 21 3 N/A
COMM #1 21 1 N/A
D
N
N
N
N
N
OVERLASH (1) .875 COAX ON
EXISTING AERIAL STRAND
OF
DATE REVISION BY QC
CANNON COMPANIES
0000347160WAKTVTH06000
116TH AVE SE & SW 184TH ST
REANTON, WA 98058
DESIGN 8 8
10/12/2020 TH CK
COMCAST
N
MFP20004827
Comcast Cable Communications Management
410 Valley Ave NW
Suite 12 Bldg C
Puyallup, WA 98371
10/20/2020
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for 0000347160
To whom it may concern:
Cannon Construction has been contracted to design and engineer this project on behalf of
Comcast Cable Communications Management. Comcast is applying for a variance request in
order to upgrade their existing facilities.
Comcast proposes to TIE IN TO EXISTING SPLICE CASE SP.WAKV.0566
- OVERLASH (1) 48CT FIBER ON EXISTING AERIAL STRAND
- PLACE (1) 48CT SHEATH 200' STORAGE
- PLACE NEW NODE HERE
- SPLICE IN TO EXISTING SPLICE CASE SP.WAKV.0817
- OVERLASH (1) .875 COAX ON EXISTING AERIAL STRAND
Comcast is requesting that the City of Renton approve this variance request based on the fact
that the requirements for undergrounding this proposed over-lash on existing plant will cause
undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction
roughly 15-25 times the amount of an aerial over-lash on the existing Comcast strand.
2. Risk of potential damage to underground facilities will be increased.
3. Over-lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Over-lashing the cable will be accomplished in a few days, and the
residents will not notice any impact. Comcast will clean up the over-lashed spans as
necessary and identify and remove any existing dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased
construction costs if forced to install the proposed extension underground.
MFP20004827
5. The granting of the variance will not be materially detrimental to the public welfare.
Comcast does agree to participate in future underground improvements for its
proportionate share of the undergrounding costs, waiving the obligation into the future
when all other utilities are undergrounded to prevent an undue hardship against
Comcast currently.
Upon the granting of the variance, Comcast will coordinate construction and traffic control as
per your requirements. Comcast and their contractors want to cooperate at the highest level
and agree to adhere to all provisions and requirements set forth by the City of Renton to insure
safe installation and maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact Rhonda Resnik.
Thank you for your consideration in this matter.
Rhonda Resnik
Permit Coordinator
Comcast Cable Communications Management
o 253-864-4246 | e Rhonda_Resnik@comcast.com
November 16, 2020
Rhonda Resnik
Comcast Cable Communications Management
410 Valley Ave NW
Puyallup, WA 98371
Via Email: Rhonda_Resnik@comcast.com
SUBJECT: Request for Undergrounding Exemption (JB#347160, MFP20004827, 12007 SE 184th St)
Dear Ms. Resnik:
The City of Renton has reviewed your request to grant Comcast an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
Comcast proposes to have Cannon Construction, Inc. overlash approximately 1,928 lineal feet of new 48ct
fiber and 51 lineal feet of new .875 coax to existing Puget Sound Energy (PSE) poles. Work proposed to
take place in 2 separate areas:
1. Begin overlashing new 48ct fiber at the pole to the northwest of 12007 SE 184th Street property ,
continue west along the south side of SE 184th St for 1,341 lineal feet, then north for 587 lineal
feet along the east side of 116th Avenue SE, and ends at the pole to the west of property 18006
116th Ave SE.
2. Begin overlashing new .875 coax at the pole to the northeast of property 11649 SE 180th St and
ends 51 lineal feet at the pole to the northwest of property 18010 118th Ave SE.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. Ordinance 5720
grants Comcast, the right to install fiber optic cable and related appurtenances under, along, over, below,
through and across the streets, avenues and alleys of City of Renton within the right-of-way of Renton.
Section 3.4 of the franchise ordinance states that if all of the distribution lines all the wireline service
providers, such as telecommunications service providers, as defined in RCW 35.99.010, a utility service
provider or a Cable Operator (collectively “Service Providers”) in any portion of the Franchise Area are
underground, Grantee shall place its Cable System’s distribution cables underground within that area;
provided that such underground locations are actually capable of accommodating Grantee’s cable and
other equipment without technical degradation of the Cable Systems’ signal quality.
The proposal would utilize existing poles with other attached franchisee communication facilities and
overlash to the existing Comcast aerial path. As minimum vertical height clearance of 15’-6” would need
to be provided for, any existing obsolete cable will need to be removed; staff recommends these as
conditions of approval. Therefore, the City is granting an exemption with conditions, per the Comcast
franchise agreement which allows new overhead facilities to be placed overhead provided there are other
similar providers overhead as well.
Comcast Job JB#347160
Page 2 of 2
November 16, 2020
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with the Comcast Franchise Agreement.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Comcast’s cost, when any one of the following events occurs: (1) any
other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed
by a franchisee within the Project Reach, in which case Comcast shall participate in the joint
use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is
made available within the Project Reach that will accommodate the aerial lines. The new
aerial lines must be undergrounded within one year, or approved otherwise by the City of
Renton Community and Economic Development Administrator or designee, from the first
event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, November 30, 2020.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Vanessa Dolbee, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Permit Technician
Franchise Permits
Shannon Heaton, Comcast sheaton@cannonconstructioninc.com
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP20004827
Engineering
1 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
3 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
Comcast’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case
Comcast shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
4 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
Page 1 of 1