Loading...
HomeMy WebLinkAboutM_specialized billing_201118_v11 Nathan Janders From:Jim Dalpay <jrdalpay@rocketmail.com> Sent:Tuesday, November 17, 2020 1:59 PM To:Nathan Janders; Don Dawes Cc:Licensing Subject:Re: Contractor COI Nathan, Don, I spoke to the contractor and they will have this straightened out with updates shortly. Nathan, I will be responsible for special billing matters of which can be emailed or sent to my P.O box 2436 Renton, 98056. Don, we'll get the signed plans from you during the pre-con Thank you! Jim On Tuesday, November 17, 2020, 12:05:17 PM PST, Don Dawes <ddawes@barghausen.com> wrote: Thanks Nathan! We did receive the link and have downloaded the plans. We have also printed a set of plans for the inspector. I will bring those to the pre-con meeting. Jim, I assume that you will coordinate with May Valley to get their city business license renewed? Regarding the specialized billing contact, Nathan will need to know the person or entity that is responsible for paying any fees that may come up during construction. I would assume that this would be you or your LLC. Nathan said that you could just email the contact info to him. Please reach out to Nathan directly if you have any questions on this. I have also printed a set of the approved construction plans for you and May Valley. If you need them now, you can pick up a copy at our Kent office, or I can have them delivered to you. If not, I will just plan to bring them to the pre-con meeting. Just let me know which you prefer. CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 2 Thanks, Don Dawes, P.E.| Senior Project Engineer Office: 425-251-6222 | Direct: 425-656-7495 | Mobile: 206-396-8616 Barghausen Consulting Engineers, Inc. 300 Deschutes Way SW, Suite 215, Tumwater, WA 98501 www.barghausen.com From: Nathan Janders <NJanders@Rentonwa.gov> Sent: Tuesday, November 17, 2020 9:21 AM To: Jim Dalpay <jrdalpay@rocketmail.com>; Don Dawes <ddawes@barghausen.com> Cc: Licensing <Licensing@Rentonwa.gov> Subject: RE: Contractor COI Jim, Don, You should have just received an automated email that contains a download link. In this link is the stamped set of plans for the project. Please print (1) full size set and bring them to the pre-con meeting for our inspector (Date TBD). The link is only open for a week, please download the files for your record and if you have any trouble let me know. I did hear back from licensing regarding May Valley Excavation. The following is what they told me: They have not renewed the license for 2020. They have also not reapplied at our portal FileLocal. They do not hold a current business license with us. If they say the mailed in the payment, I have not been in the office this week, so have not processed mail until tomorrow or Thursday I recommend having May Valley contact our licensing team directly at licensing@rentonwa.gov to rectify the issues. As a reminder the following items are still needed and I re-added one due to the licensing issue: