Loading...
HomeMy WebLinkAboutR-406201N N 1 N N (O (fl O O V 1 O N I LL 0 Z W SS I- Q _J 0- [Y 0 W rWn V 0 0/ L Z W Q 2 0 W W A PORTION OF SE 1/4, SE 1/4, SECTION 32, TOWNSHIP 23 N, RANGE 05 E, W.M., KING COUNTY, WA HAEVIN RIDGE SHORT PLAT DocuSfgn Envelope ID. 3B1B34D3-7EOA-476C-ADB3-4329FFEOC108 SURFACE WATER STANDARD PLAN NOTES: THE FOLLOWIIG IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER HEREBY REFERRED TO AS APPLICANT. MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER. THE APPLICANT SMALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF AUDIT TONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE SURFACE WA TEN S i ANOARD PLAN NO IES. 1 BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS. A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CRY OF RENTON, HEREBY REFERRED TO AS THE CITY. THE APPLICANT, AND THE APPLICANTS CONTRACTOR- 2. THE APPLICANT SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY CITY. STATE AND FEDERAL PERMITS PRIOR TO CONSTRUCTION, 3. ALL S1OHM DRAINAGE IMPROVEMENT 5 SHALL BE DESIGNED AND CONSIRUC I ED IN ACCORDANCE WI I H IHE LAI EST LOT I IUN OF I HE CI I Y OF HEN IUN SURFACE WATER DESIGN MANUAL (RENTON SWOM). RENTON MUNICIPAL CODE (RAC). AND THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE AAERICAN PUBLIC WORKS ASSOCIATION (APWA). IT SMALL BE THE SOLE RESPONSIBILITY OF THE APPLICANT TO CORRECT ANY ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THE PLANS- ALL CORRECTIONS SMALL BE AT NO ADDITIONAL COST TO THE CITY, 4. APPROVAL OF THE ROAD, GRADING, PARKING, BUILDING, AND DRAINAGE PLAN DOES NOT CONSTITUTE AS APPROVAL OF NY OTHER CONSTRUCTION (E.G WATER, SEWER. GAS. ELECTRICAL. ETC.) PLANS FOR STRUCTURES SUCH AS BRIDGES, VAULTS, AND RETAINING WALLS REQUIRE A SEPARATE REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION THE SURFACE WATER DRAINAGE SYSTEM SHALL OF CONSTRUCTED ACCORDING TO THE APPROVFn PI ANS ANY DFVIATON FROM THE APPROVED PLANS WILL REQUIRE COORDINATION FOLLOWED BY WRITTEN APPROVAL FROM THE CITY- 5 A COPY OF THE APPROVED PLANS SHALL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS 6 THE LOCATIONS OF ALL EXISTING UTILITIES SHOWN HEREON HAVE BEEN ESTABLISHED BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHALL THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE, IT IS THE SOLE RESPONSIBILITY OF THE APPLICANT AND THE APPLICANTS CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN, AND TO FURTHER DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN HEREON THAT MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN. THE APPLICANT SHALL RECORD ON THE AS -BUILT DRAWINGS ALL UNDOCUMENTED UTILITIES DISCOVERED AND ANY CHANGES TO THE APPROVED PLANS THE APPLICANT SHALL IMMEDIATELY NOTIFY THE ENGINEER Or RECORD IL A CONFLICT EXISTS. 7. VERTICAL DATUM SHALL BE NAVE) 68 AND HORIZONTAL DATUM SMALL BE NAD 53 (WA STATE PLANE, NORTH). UNLESS OTHERWISE APPROVED BY THE CITY. REFERENCE BENCHMARK. DATUMI. AND ELEVATIONS SHALL BE NOTED ON THE PUNS. S. ALL UTILITY TRENCH BACKFILL AND ROADWAY SUBORADE SHALL BE COMPACTED TO 9Uk MAXIMUM DRY DENSITY PER SECTION 2-03.3(14)D - COMPACTION AND MOTS 1 LIRE CONI ROL TESTS OF I HE WSW I S I ANUARD SPECIF ICA I IONS- IN PERMEABLE PAVEMEN I AND OTHER INFIL IRA [ION AREAS, ALL T HENK:M BACKI-ILL SMALL BE FIRM AND UNYIELDING BUT IN NO CASE SMALL BE C(AWAC I ED 10 MORE I HAN 92% OF MAXIMUM DRY OENSI I Y. 9. OPEN CUTTING OF EXISTING ROADWAYS FOR STORM DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY TRENCH RESTORATION STANDARDS. 10. ALL PIPE AND STRUCTURES SHALL BE STAKED FOR SURVEY LINE AND GRADE PRIOR TO THE START OF CONSTRUCTION WHERE SHOWN ON THE PLANS OR WHERE DIRECTED BY THE CITY. THE EXISTING MANHOLES, CATCH BASINS, OR INLETS SHALL BE ADJUSTED TO THE GRADE AS STAKED 11 ALL FLOW CONTROL FACILITIES SHALL BE INSTALLED AND IN OPERATION PRIOR TO. OR IN CONJUNCTION WITH, ANY CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE CITY 12 ALL PIPE AND APPURTENANCES SHALL BE LAX) ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL. AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED SEDDINC MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL SE SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. ALL PIPE BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE CITY STANDARD PLAN 220,00 223,10, AND 220.20, 13, STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT 1, 2, OR 51NSIDE AND OUTSIDE. 14. ALL DRAINAGE STRUCTURES SUCH AS CATCH BASINS AND MANHOLES SMALL BE FITTED WITH DUCTILE IRON, DOLT -LOCKING LIDS PER THE CITY STANDARD PLAN 204. 10.204.20. 204,30.204,40, AND 204.50. STRUCTURES SHALL HAVE: • RECTANGULAR OR ROUND. SOLID LIDS WHEN NOT COLLECTING RUNOFF, AND OUTSIDE OF THE ROADWAY • ROUND. SOLID LIDS WHEN NOT COLLECTING RUNOFF. AND LOCATED WITHIN THE ROADWAY. BUT OUTSIDE OF THE CUR&GUTTER LINE. • ROUND, SOLID LIDS DISPLAYING THE CITY LOGO WHEN WITHIN THE PUBLIC RIGHT-OF-WAY OR IN AN EASEMENT TO THE CRY PRIVATE STRUCTURE LIDS OUTSIDE PUBLIC RIGHT-OF-WAY AND EASEMENTS TO THE C,TY SHALL NOT DISPLAY THE CRY LOGO. 15. BUILDINGS AND OTHER STRUCTURES SMALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES OF THE RENTON SWOM 16. LIDS OF MANHOLE&CATCH BASINS WITHIN PUBLIC RIGHT-OF-WAY SHALL NOT BE ADJUSTED TO FINAL GRADE UNTIL AFTER PAVING. ALL MANFIOLEICATCH BASIN RIMS SHALL BE ADJUSTED TO BE FLUSH WITH FINAL FINISHED GRADES, UNLESS OTHERWISE SHOWN. 17. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY RGHT-OF-WAY SHIALL BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF THE DITCH. LNUM OIHENWISE NOI tU, URAW NG IS NO IU XALE (N IS) STD. PLAN - 267.00 • PUBLIC WORKS SURFACE WATER STANDARD PLAN tarWtin W": DEPARTMENT NOTES (1 OF 2) Pastucha8/13/2020 1wF.Li119BA/4U DATE AS -BUILT NOTES: 1. AS -BUILT INFORMATION ON THESE DRAWINGS IS BASED ON INFORMATION PROVIDED TO APCE BY SADLER & BARNARD & SURVEYORS AND ANYTHING NOT SHOWN ON THESE PLANS AS HAVING BEEN CONSTRUCTED DIFFERENTLY FROM WHAT WAS SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS IS UNDERSTOOD BY APCE TO HAVE BEEN BUILT PER THE APPROVED DESIGN PLANS. 2. OTHER THAN AS SHOWN AS -BUILT CHANGES TO SURFACE ELEVATIONS ARE NOT REFLECTED IN THIS PLAN. Know what's below. Call before you dig. CIVIL PLAN SET PERMIT: 19001 90 1 8:4, DocuSfgn Envelope ID, 3B1B34D3-7EOA476C-AD63-4329FFEOC108 SURFACE WATER STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE DRAINAGE PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER HEREBY REFERRED TO AS APPLICANT. MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER. THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOT ES. IF ADDITIONAL NOTES ARE NEEUEU FOR SPECIFIC ASPECTS. THEY SMALL BE ADDED AFTER THE SURFACE WA I HI S I ANDARD PLAN NOI ES. 1& ROCK FOR EROSIDN PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED. SHALL BE OF SOUND QUARRY ROCK PLACED TO A MINIMUM DEPTH OF ONE (1) FOOT AND SHALL MEET THE FOLLOWING SPECIFICATIONS: • A - S INCH ROCK 140 - 70% PASSING: • 2-4INCH ROCK /3U-40%PASSING: AND • LESS TRAIN 21NCH ROCK 10- 20% PASSING- 19. FOOTING DRAINAGE SYSTEMS AND ROOF DOWNSPOUT SYSTEMS SHALL NOT BE INTERCONNECTED AND SHAD. SEPARATELY CONVEY COLLECTED FLOWS TO THE CONVEYANCE SYSTEM OR FLOW CONTROL FACILITY ON THE SITE, UNLESS APPROVED BY THE CITY. FOOTING DRAINS SHALL NOT BE CONNECTED TO ON -SITE BMPS. 20. THE END OF EACH STORM DRAIN STUD SHALL BE CAPPED. A CLEANOUT TOPPED WITH A BOLT -LOCKING LID MARKED 'STORM' OR MRAIN- SHALL BE LOCATED AT THE PROPERTY UNE OR AT THE POINT OF CONNECTION OF A PRIVATE STORM DRAINAGE CONVEYANCE SYSTEM PER THE CITY STANDARD PLAN 227.00. 21 ALL STORM SYSTEM EXTENSIONS SHALL BE STAKED FOR LINE AND GRADE BY A SURVEYOR LICENSED IN WASHINGTON STATE. AND CUT SHEETS SHALL BE PROVIDED TO THE CITY PRIOR TO CONSTRUCTION. 22- ALL NEWLY -INSTALLED AND NEWLY -REHABILITATED (PUBLIC AND PRIVATE) STORM CONVEYANCE SYSTEMS SHALL BE INSPECTED BY MEANS OF REMOTE CCTV ACCORDING TO I HE CI Y S IANDARD PLAN 2W.00. CC I V NSPEC [IONS AND REPOR IS SMALL BE SUBMI i 1 ED TO THE CI TY PRIOR 10 RECEIVING APPROVAL TO INS IALL PROJEC 1 CURETS, GU 11 ERS ANOiOR PAVEMEN 1, 23. ALL STURM SYSTEMS AND CONNECTIONS TO EXISTING MAINS SHALL BE TESTED IN ACCORDANCE WITH SECTION 744.3(1) OF THE WSDOT STANDARD SPECIFICATIONS AND IN THE PRESENCE OF A REPRESENTATIVE OF THE CITY, STORM DRAIN STUBS SMALL BE TEST ED FOR ACCEPTANCE AT THE SAME TIME THE MAIN STORM IS TESTED. 24 FOR ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED. ETC.) OF THE DEVELOPMENT SITE, TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL EITHER STOCKPILE AND REDISTRIBUTE THE EXISTING DUFF LAYER AND NATIVE TOPSOIL OR AMEND THE SOIL WITH COMPOST IN ACCORDANCE WITH STANDARD PLAN 264 (X) 25 ISSUANCIF OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY DOES NOT RELIEVE THE APPI MALT OF THE CONTINUING L EGAL OBLIGATION AND K)R 1 "11 TTv CONNECTED WITH STORMWATFR DISPOSAL THE CITY DOES NOT ACCEPT ANY OR[ IGATION FOR THE PROPFR FUNCTIONING AND MAINTFNANCF OF THE STORM SYSTEM PROVIDED DURING CONSTRUCTION 26 ADEQUATE SAFEGUARDS, SAFETY DEVICES, PROTECTIVE EQUIPMENT. FLAGGERS, AND ANY OTHER ACTIONS NEEDED TO PROTECT THE LIFE HEALTH, AND SAFETY Of THE PUBLIC AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORT( SHALL BE PROVIDED. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVED BY THE CITY, ALL SECTIONS OF THE WSDOT STANDARD SPECIFICATIONS I.10 TEMPORARY TRAFFIC CONTROL SHALL APPLY 27 PROJECTS LOCATED WITHIN THE CITY S AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL REQUIREMENT 06 OF THE RENTON SWDM AND AQUII-ER PROTECTION REGULATIONS (RMC 4-1-MO). 20 PLACEMENT OF SURFACE APPURTENANCES (CATCH SASIL'MANHOLE LIDS, CLEANUU TS. INLETS. ETC ) IN THE STREET TRAVEL LANE WHEEL PATH. INTERSECTIONS OF STREET TRAVEL LANES, BIKE OWES, SIDEWALKS. AND CROSSWALKS SHALL BE AVOIDED WHENEVER POSSIBLE. ANY SURFACE APPURTENANCE PLACED IN A SIDEWALK OR CROSSWALK SHALL BE FITTED WITH A NON -SLIP OR NON-SKID LID PER ADA REQUIREMIE WS. 29 CLEARLY LABEL PUBLIC AND PRIVATE SYSTEMS ON 1 HE PLANS. PRIVATE SYSTEMS SMALL BE MAINTAINED BY I HE APPUCANI. 3D MINIMUM COVER OVER STORM DRAINAGE PIPE SHALL CONFORM TO TABLE 4 2.1.A2 OF THE RENTON SWOM. CONSTRUCTED PERMEABLE PAVEMENT SHALL BE PERMEABLE ENOUGH TO ABSORB WATER AT A MINIMUM RATE OF 20 INCHES PER HOUR IMMEDIATELY AFTER THE PAVEMENT SURFACE HAS BEEN WETTED CONTINUOUSLY FOR AT LEAST 10 MINUTES. COMPLIANCE WITH THIS MINIMUM RATE SHALL BE CHECKED PRIOR TO CONSTRUCTION APPROVAL OF THE PAVEMENT. COMPLIANCE MAY BE CHECKED USING A SIMPLE BUCKET TEST IN WHICH 5 GALLONS OF WATER IS POURED ONTO THE PAVEMENT SURFACE ALL AT ONCE. IF ONLY A MINOR AMOUNT OF WATER PONDS CM RUNS OFF THE SURFACE, THEN THE PAVEMIENT IS CONSIDERED TO MEET THE MINIMUM RATE OF ABSORPTION AT LEAST ONE TEST $HAL L BE CONDUCTED PER 1,MX) SQUARE FEET OF PERMEABLE PAVEMENT IF THIS TEST IS NOT CONCLUSIVE, THFN ANOTHER TEST PER ASTM C1701 SHALL BE CONCUCTFD. FOR LARGE AREAS (F.G , PARKING AREAS) TESTING OBSERVATION MAY OF ACC.OMPL ISHED WHILF WALKING BEHIND A SLONLY MOVING WATER TRUCK DISCHARGING WATER AT A RATE SIMILAR TO THE BUCKET TEST PERMEABLE PAVERS SHALL BE TESTED USING ASTM C 1781 LMk57 UIHkNWtSt NUfEU. DRAW NOIS NU 10 STALE (HIS) A.':: j•; PUBLIC WORKS DEPARTMENT SURFACE WATER STANDARD PLAN E-vip­v NOTES (2 OF 2) STD. PLAN - 267.10 8:48 Aartin Pastuchi/13/2020 iBAfG9R14w9D DATE APCONSULTING ENGINEERSPLLC CIVIL ENGINEERING APCE@APConsutbngEngineers.com (253) 737-4173 PO BOX 162, AUBURN, WA 98071 �V R� ISTER�� �S ONAL E AS -BUILT REVISION DocuSfgn Envelope ID 6EECF5B6-602A-4E4A-B436-A317AA638878 EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: I HEFOLLOWING IS A USTING OF GENERAL NOTES THAI SHALL IE INCORPORAIEU IN THE EROSION AND SEOWENT CONFROL (ESC) PLAN SE 1. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT- THE APPLICAN I OR OWNER- HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER- THE APPLICANT SMALL NOT RENUMBER NOR EDIT THE REMAINING NOTES IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES. 1 BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS. A PRE -CONSTRUCTION MEETING SIVLLL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT Of ECOLOGY(ECOLOGY) CONSTRUCTION SIURMWAIER GENERAL PERMIT. IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4 THE BOUNDARIES OF THE CLEARING LIMITS- SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIFLD IN ACCORDANC.F W NTH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANTIESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT, ADDITIONAL MEASURES. SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE. PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT TINE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER. AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE 6. WASHOUT FROM CONCRETE TRUCKS SMALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCHS I WASMOUI AREAS 7 ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND:OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND;GR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC SNIPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION MAINTENANCE. REPLACEMENT. ENHANCEMENT. AND REMOVAL OF ESC BMPS SMALL BE THE RESPONSIBILITY OF THE APPLICANT. N ANY HAZARDOUS MATERIALS OR L IOUID PRODUCTS THAT RAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY 9. THE ESC SNIPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE. THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE DURING THE COURSE OF CONSTRUCTION. IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT 10 ADDRESS ANY NEW CONLI TK)NS 1 MAI MAY BE CKEAIEU BY 1 HE ACI M I IES ANU 10 PROVIDE AUDI I ZONAL ESC BMPS. OVER AND ABOVE MINIMUM REOUIREMENI S. AS MAY BE NEEDED- IU PROIECI ADJACENT PROPERTIES AND WATER DUALITY OF IHE RECEIVING DRAINAGE SYSIENI. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRK:TORS. CHANNELS, OR STORMWATER FACILITIES. IT. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS INCLUDING ROADWAY EMBANKMENTS THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER IST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY IST THROUGH SEPTEAI[iER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS IE.G.. SEEDING. MULCHING. PLASTIC COVERING. ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13 WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER IST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY 14. ANY AREA NEEUING AUDI I TONAL ESC MEASURES. NO I REQUIRING IMMEDIATE ATIENTION. SHALL BE ADDRESSED "I MIN SEVEN (1) DAYS. 15, THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT INSPECTION AND MAINTENANCE SHALL OCCUR PADRE FREQUENTLY AS REQUIRED BY THE CRY 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY. CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 20 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BL CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. IS, ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHIAI.I PROVIDE ADEQUATE STORAGE CAPACITY IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS. BIORETENTION, PERMEABLE PAVEMENT. ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER IST). ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY 5"il9CI I ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON, AN EXHIBI T OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW 21 PRIOR TO FINAL CONSTRUCTION ACCEPTANCE THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE ALL ESC BMPS SHALL BE REMOVED. AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES. AND OWSITE BMPSS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SMALL BE SODOM OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22, ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS ALL ROCKERIES IN CITY ROAD RIGHTSOFWAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE UNLESS OTHERWISE NOTTD, DRAWING IS NOT -O SCALE (NTS) .. PUBLIC WORKS DEPARTMENT EROSION AND SEDIMENT CONTROL STANDARD PLAN NOTES STD. PLAN - 268.00 :45 Aj ° ° GAZ 9/28/2018 I DAT PROJECT INFORMATION PARCEL NUMBER: 322305-9075 ADDRESS: 18809 116TH AVENUE SE GROSS AREA: 57,847 SF (1.33 AC) R O.W. (DEDICATION):9,412 SF (0.22 AC) DISTURBED AREA 53,719 SF (1.23 AC) PROPOSED LOTS: 6 ZONING. R-8 DENSITY PROPOSED: 5.40 DU/ACRE DENSITY PERMITTED: 8.00 DU/ACRE FRONT YARD SETBACK: 20' REAR YARD SETBACK: 20' SIDE YARD SETBACK: 5' SIDE YARD SETBACK: 15' (ALONG STREETS) PRELIMINARY APPROVAL DATE: JUNE 7, 2018 APPROVAL EXPIRATION DATE. JUNE 7, 2029 NPDES PERMIT# (IN PROCESS, APP ID #22214) POWER COMPANY: PUGET SOUND ENERGY (888)225-5773 GAS COMPANY PUGET SOUND ENERGY (888)225-5773 WATER & SEWER: SOOS CREEK SEWER & WATER PH: (253) 630-9900 CABLE. COMCAST (800) 266-2278 TELEPHONE: CENTURY LINK (877)548-6869 CPH 1 11/22/231 1 .17-FD SHEET INDEX i A.UVi=h A-ILL1 2 BOUNDARY AND TOPOGRAPHIC SURVEY 3 HORIZONTAL CONTROL PLAN 4 SITE PLAN 5 TESC PLAN 6 TESC DETAILS 7 GRADING PLAN 8 DRAINAGE PLAN 9 ACCESS ROAD PLAN & PROFILE 10 VAULT ACCESS PLAN & PROFILE 11 VAULT OUTFALL PLAN & PROFILE 12 116TH AVE SE PLAN AND PROFILE 13 COMPOSITE UTILITY PLAN 14 WETVAULT DETAIL 15 ROAD DETAILS 16 ROAD DETAILS 17 DRAINAGE DETAILS 18 DRAINAGE DETAILS 19 ILLUMINATION PLAN 20 ILLUMINATION DETAILS 21 ILLUMINATION DETAILS 22 LANDSCAPE PLAN 23 LANDSCAPE DETAILS SEE GRAPHIC DRAWN CNNE INCH -CKE. A FULL SCALE IF 140T ONE INCH ;DATE ROVIE VERTICAL NAVL e" B HORIZONTAL NAD 1983/1991 DATUM 5l�- 1t;9th J Ln "4 SE 190th APPROVAL VICINITY MAP NTS .__4 minueu THE HAEVIN RIDGE SHORT PLAT, FILE NO, LUA18-000205, IS SUBJECT TO THE FOLLOWING CONDITIONS: 1 THE APPLICATION SHALL RECORD A NOTE ON THE FACE OF THE PLAT THAT EXECUTES A SHARED MAINTENANCE AGREEMENT FOR EQUAL OWNERSHIP AND MAINTENANCE RESPONSIBILITIES FOR IMPROVEMENTS IN THE TO -BE -CREATED JOINT USE ACCESS TRACT, STORMWATER TRACT, TELECOM 1 TRACT AND TELECOM 2 TRACT A DRAFT VERSION OF A SHARED MAINTENANCE AGREEMENT SHALL BE SUBMITTED FOR REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER PRIOR TO SHORT PLAT RECORDING. 2. THE APPLICANT SHALL SUBMIT A REVISED LANDSCAPE PLAN SHOWING ADDITIONAL LANDSCAPING ON LOT 4 AT THE TIME OF CONSTRUCTION PERMIT APPLICATION SUBMITTAL. THE UPDATED LANDSCAPE PLAN WOULD BE SUBJECT TO REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER. 3. THE APPLICANT SHALL SUBMIT A REVISED LANDSCAPE PLAN DEMONSTRATING COMPLIANCE WITH THE STREET TREE REQUIREMENTS IN RMC 4-4-070. 4. THE APPLICANT SHALL SUBMIT A REVISED TREE RETENTION PLAN SHOWING AT LEAST NINE (9) RETAINED SIGNIFICANT TREES AT THE TIME OF CONSTRUCTION PERMIT APPLICATION SUBMITTAL FOR REVIEW AND APPROVAL BY THE CURRENT PLANNING ANALYSIS EXPLAINING WHY RETENTION OF ADDITIONAL SIGNIFICANT TREES IS NOT FEASIBLE, SUBJECT TO CONCURRENCE BY THE CURRENT PLANNING PROJECT MANAGER. 5. IF ADDITIONAL TREES CAN BE RETAINED, THE APPLICANT SHALL SUBMIT AN ANALYSIS SHOWING COMPLIANCE WITH THE TREE DENSITY REQUIREMENTS AT THE TIME OF CONSTRUCTION PERMIT APPLICATION SUBMITTAL. 6 THE APPLICANT SHALL SUBMIT ADDITIONAL DETAILS ON THE FENCING PROPOSED AROUND THE VARIOUS TRACTS AT THE TIME OF CONSTRUCTION PERMIT APPLICATION SUBMITTAL FOR REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER. 7 THE FUTURE HOME ON LOT 5 SHALL UTILIZE CORNER LOT SETBACKS FOR THE R-8 ZONE (SIDE YARD SETBACKS ON THE NORTH AND WEST SIDES OF THE PROPERTY, FRONT YARD AND SECONDARY FRONT YARD SETBACKS ON THE SOUTH AND EAST SIDES OF THE PROPERTY) AND DESIGN THE HOME IN WAY THAT BOTH THE SOUTHERN AND EASTERN FACING ENGAGE THE PUBLIC ROW THROUGH USE OF FEATURES SUCH AS ADDITIONAL GLAZING, MODULATION, DORMERS. AND A WRAPPED PORCH. 8. THE APPLICANT SHALL CREATE A NEW JOINT USE DRIVEWAY TRACT TO BE LOCATED BETWEEN THE STORMWATER TRACT AND THE PROPOSED PUBLIC HALF -STREET IN ORDER TO ALLOW FOR ACCESS TO LOT 3, LOT 4, AND THE STORMWATER TRACT. A RESTRICTION SHALL BE RECORDED ON THE FACE OF THE PLAT ONLY ALLOWING ACCESS TO THE TWO LOTS AND STORMWATER TRACT. A PUBLIC ACCESS/UTILITY EASEMENT SHALL BE PLACED OVER THE PROPOSED JOINT USE DRIVEWAY TRACT AND STORMWATER TRACT AND A NOTE SHALL BE ADDED ON THE FACE OF THE PLAT THAT EXECUTES A SHARED MAINTENANCE AGREEMENT FOR EQUAL OWNERSHIP AND MAINTENANCE RESPONSIBILITIES FOR IMPROVEMENTS IN THE NEW JOINT USE DRIVEWAY TRACT A DRAFT VERSION OF THE PROPOSED JOINT USE DRIVEWAY TRACT DIMENSION, PUBLIC ACCESS/UTILITY EASEMENT, AND SHARED MAINTENANCE AGREEMENT SHALL BE SUBMITTED AT THE TIME OF CONSTRUCTION PERMIT APPLICATION SUBMITTAL FOR REVIEW AND APPROVAL BY THE CURRENT PLANNING PROJECT MANAGER. 9. THE APPLICANT SHALL INSTALL ONE "NO PARKING- ON EACH SIDE OF THE PAVEMENT WITHIN THE JOINT USE DRIVEWAY TRACT AND INSTALL BOLLARDS AT THE END OF THE TRACT IN ORDER PREVENT VEHICLES FROM DRIVING OR PARKING IN THE STORM TRACT AREA PRIOR TO FINAL PLAT RECORDING. 10 IN THE CASE THAT THE APPLICANT PROPOSES TO UTILIZE AN OPEN POND INSTEAD OF A VAULT AT THE TIME CONSTRUCTION PERMIT SUBMITTAL, THE CHANGE IN STORMWATER FACILITY TYPE SHALL BE CONSIDERED A MAJOR AMENDMENT TO THE SHORT PLAT AND THE APPLICANT WOULD BE REQUIRED TO SUBMIT A NEW SHORT PLAT APPLICATION. CITY OF RENTON elanning/Bullding/Public Works Dep R-406201 IN COMPLIANCE WITH CITY OF RENTON STANDARDS CIVIL PLAN SET HAEVIN RIDGE SHORT PLA-I RENTON, WA ACCESS ROAD PLAN 05/27/2020 ELDBOOK 'AGE DRAWING NO 080-18 SHEET OF 23 CD CD CD 0) I- LAI D7 O N C) C) CD J Q