Loading...
HomeMy WebLinkAboutExhibit_10_ElevationsBoeing Apron E Sound Wall Rendering 01.28.2020 Rev. 1 - 01.28.20 Exhibit 10 DocuSign Envelope ID: 63538EA2-9DDC-4F7A-9A88-640B330A9A04 LEVEL 1 0' - 0" G F E C ABD T.O. PARAPET 82' - 6" 1 9 2 1 9 5 555 W-1W-1 W-1 W-1 W-1 W-1 L-4L-4L-4L-4 1 5 L-8 LEVEL 1 0' - 0" ROOF 80' - 0" GFECABD LOWER ROOF 50' - 0" 6 2 10 4 1 2 2 65 2 2 2 6 2 55 5 5 T/O STAIR PENTHOUSE 90' - 9 59/64" SF-8SF-10 SF-11 SF-12 SF-9 SF-8 SF-7 SF-6 SF-5 SF-5 SF-4 W-1 W-1W-1W-1W-1W-1W-1W-1W-1W-1W-1W-1W-1 W-1 2 2 5 5 5 3 8 6' - 0"25' - 2"3' - 6 3/4"17' - 5 1/4"9' - 11 3/4"42' - 2"6' - 0"46' - 2"38' - 2"5 5 5 5 5 5 L-2L-2 L-3 L-3 L-6 L-2 L-12 L-1 L-11 L-3 L-5 L-5 L-5 L-5 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT.DATE DRAWN DATE CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE TITLE CURRENT REVISION SYMBOL DATE SHEET JOB NO. DWG NO. COMP NO. DESIGN BY:DATE:12/18/2019 11:29:23 AMORIG APRON E -PAINT HANGAR C199389 RAI EC 12.20.19 Author 12.20.19 Checker 12.20.19 Designer 12.20.19 BUILDING ELEVATIONS APRON E - PAINT HANGAR RENTON, WA BUILDING 5-70 A-D/1-6 C199389 ORIG 12.20.19 A60 A37 5-70-A60 Author:ARCHITECTURAL MASTER RAI 12.20.19 60% DESIGN SUBMITTAL NOT FOR CONSTRUCTION 0 8'16' 32' 48' 1/16" = 1'-0" LEGEND GENERAL NOTES CONSTRUCTION NOTES CONCRETE PANEL WALL, 6"X7'-2" HIGH.1 SCALE: 1/16" = 1'-0"A60 1NORTH ELEVATION SCALE: 1/16" = 1'-0"A60 2SOUTH ELEVATION PREFINISHED INSULATED METAL PANEL SYSTEM. CENTRIA 'FORMAWALL', 3"THICK. TRANSLUCENT PANEL SYSTEM. KAWALL 2 3/4" THICK, CRYSTAL, CRYSTAL. HM DOOR AND FRAME PER SCHEDULE ON SHEET A350. LOUVER PER MECHANICAL. PREFINISH METAL SIDING ON STRUCTURAL FRAMING. 42" HIGH PIPE RAILING AT BREAK AREA BALCONY. 1 1/2" O.D. PIPE@ 5 1/2" O.C. HORIZ. ALUMINUM STOREFRONT ENTRY. SEE DOOR SCHEDULE ON SHEET A350. SHEET METAL CLAD HANGAR DOORS. SEE STRUCTURAL. SECTORIAL OVERHEAD DOOR PER SCHEDULE ON SHEET A350. 2 3 4 5 6 7 8 9 10 REV. 1 - 01.28.20 DocuSign Envelope ID: 63538EA2-9DDC-4F7A-9A88-640B330A9A04 LEVEL 1 0' - 0" ROOF 80' - 0" 8765234 9 LOWER ROOF 50' - 0" 1 2 3 2 1 4 6 2 6 7 T/O STAIR PENTHOUSE 90' - 9 59/64" SF-13 W-1W-1W-1W-1W-1W-1W-1W-1W-1 5 5 5 5 L-10L-10 L-10L-10 LEVEL 1 0' - 0" ROOF 80' - 0" 8 7 6 5 2349 LOWER ROOF 50' - 0" 1 2 3 2 2 6 6 7 8 1 4 T/O STAIR PENTHOUSE 90' - 9 59/64" SF-3 SF-2 SF-1 SF-2 W-1 W-1 W-1 W-1 W-1 W-1 W-1 W-1W-1 5 5 L-8 L-8 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT.DATE DRAWN DATE CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE TITLE CURRENT REVISION SYMBOL DATE SHEET JOB NO. DWG NO. COMP NO. DESIGN BY:DATE:12/18/2019 11:29:32 AMORIG APRON E -PAINT HANGAR C199389 RAI EC 12.20.19 Author 12.20.19 Checker 12.20.19 Designer 12.20.19 BUILDING ELEVATIONS APRON E - PAINT HANGAR RENTON, WA BUILDING 5-70 C199389 ORIG 12.20.19 A61 A38 5-70-A61 Author:ARCHITECTURAL MASTER RAI 12.20.19 60% DESIGN SUBMITTAL NOT FOR CONSTRUCTION SCALE: 1/16" = 1'-0"A61 1WEST ELEVATION SCALE: 1/16" = 1'-0"A61 2EAST ELEVATION CONCRETE PANEL WALL, 6"X7'-2" HIGH.1 PREFINISHED INSULATED METAL PANEL SYSTEM. CENTRIA 'FORMAWALL', 3"THICK. TRANSLUCENT PANEL SYSTEM.KAWALL 2 3/4" THICK, CRYSTAL, CRYSTAL. HM DOOR AND FRAME PER SCHEDULE ON SHEET A350. LOUVER PER MECHANICAL. PRE-FINISHED METAL SIDING ON STRUCTURAL FRAMING. 42" HIGH PIPE RAILING AT BREAK AREA BALCONY. 1 1/2" O.D. PIPE@ 5 1/2" O.C. HORIZ. ALUMINUM STOREFRONT ENTRY. SEE DOOR SCHEDULE ON SHEET A350. SHEET METAL CLAD HANGAR DOORS. SEE STRUCTURAL. SECTORIAL OVERHEAD DOOR PER SCHEDULE ON SHEET A350. 2 3 4 5 6 7 8 9 10 CONSTRUCTION NOTES REV. 1 - 01.28.20 RECEIVED 02/06/2020 amorganroth PLANNING DIVISION DocuSign Envelope ID: 63538EA2-9DDC-4F7A-9A88-640B330A9A04