HomeMy WebLinkAboutMFP20004940.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP20004940
IVR Number: 20004940
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:10/27/2020Application Date:2143701310Parcel Number: 438 SW 4TH PL
Permit Type:11/23/2020Issue Date:Franchise
Permit Work Class:11/23/2021Expiration Date:Minor Utility
Job Number: 101133056Franchise Type:Electric
Description: Puget Sound Energy Electric Locate fault via thumper method. Fault previously found 75' East of V02. Excavate 2'X4'
pit at fault location. Remove damaged cable and install splice to repair. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contractor
Business License Number: 5109Construction Contractor: POTELI*227PL
WILSON ROBERT W 438 SW 4TH PL
RENTON , WA 98057
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
Scott Warlick CED 11/23/2020
MFP20004940
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
SW
5
TH
P
L STEVENS AVE SWSW 5TH CT
603
V02
V01
181818 18
1818ROADWORKAHEADW20-1
100'
ROA
D
WORKAHEAD W20-1W1-4R1
0
0
'
1
0
0
'ROADWORKAHEADW20-1RIGHTSHOULDERCLOSEDW21-5aRW1-4L100'100'100'SW
4
T
H
P
L
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROM
TO
TOW AWAY
A
R
E
A
PHONE 888
-
9
9
9
9
INFRASOURCE
L
L
C
0
0
0
0
0
0
0
0
0
0
NO PARKING
NO-PARKmain
ta
in
(2) 11
'
lanes
CONE
TOPP
E
RCONETOPPERN PSE PUGETSOUNDENERGY
-OB101133056
438 SW 4TH PL RENTON, WA 98057
10/13/2020
jason.bisenius@pse.com
425-424-7316
SHEET 1 of 1
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
LEGEND
28" TRAFFIC CONE
SIGN LOCATION
TRAFFIC FLOW
UG/BOX/VAULTVault
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP20004940
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. TOBIN 253-548-4516 09/23/20
C. TOBIN 253-548-4516 09/23/20
N/A N/A N/A
N. RAFEEQ 253-395-6803 09/23/20
REQ-CITY OF RENTON
EAR-17 CREW2 611 SW 5TH CT RENT
BO CABLE REPAIR
438 SW 4TH PL RENTON, WA 98057
N/A N/A
N/A 101133056
AS NOTED 1 OF 2
KING N/A N/A QCSOKE
SW-18-23-05 N/A N/A
2305E071 2305E076 2305E071 EAR-17
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY 101133056FOREMAN (CHECK BOX WHEN COMPLETED)
#1 Print Name ___________________________________ Date ______________
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Material VERIFIED and CHANGES noted on Paperwork.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
#1 Foreman's Signature _______________________________________________
and that all quality requirements are met.
Field Changes RED-LINED on As-built.
Total PRIMARY Cable noted on As-built.
Correct QC Checklist(s) reviewed.
#1 #2
#2 Print Name ___________________________________ Date ______________
#2 Foreman's Signature _______________________________________________
SCOPE OF WORK
The general scope of this project is to make repair on b/o UG
AL1/0 primary cables within the project area by the most
economic means possible.
Project type : Planned
Project location :
Number of Cables : 0
Cable Footage Estimated : 0'
Cable Numbers Injected : 0
Cable Numbers Repaired : 31272, 31273
Cable Numbers Abandoned : 0
Cable Numbers Replaced : 0
There will be an advance notice provided by the contractor
24-hour advance notice of no parking in work areas. Access will
be maintained to all residences and their driveways. When work
is occurring directly in front of driveways, the contractor will work
with the residence to manage access.
Traffic Revisions
Flagging crews will maintain one lane; flaggers will assist
vehicles alternating through the roadway during work hours.
For more information on the project
24-hour project information (888) 471-7339, (360) 825-5236
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
POTELCO DESIGN AND
Signature _________________________________________
Print Name _________________________________________
This design complies with PSE
Any/all variations have been
Design/Engineering Standards.
QUALITY ASSURANCE
pre-approved/documented by the
appropriate PSE Representative.
Date _________________
JOB SITE
MAKE NO CHANGES TO THIS JOB WITHOUT PRIOR APPROVAL
Notify Customers and Service Area
48 HRS Prior To Planned Outages
ORDER#NOTIF#PROJECT PHASE
MAINTENENCE
O & M
SUPERIOR
FAILED SILICONE
REMOVAL
EXPENSE
11716678 101133056
N/A
108124111
VICINITY MAP
INDEX
PAGE 1 - GENERAL NOTES
PAGE 2 - SITE PLAN
For contacts below dial 1-888-CALL PSE (225-5773)
Contact Information
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
Overflow
Filter fabric walls for
Catch Basin Grate
dewatering sedimentCollected Sediment
Catch Basin Insert
MID 9995728
Filter fabric skirtSecured with grate.
EROSION CONTROL
NOT TO SCALE
CHRISTOPHER_TOBIN
253-548-4516
6905_S_228TH_ST_KENT_WA_98032
PSE GENERAL SPECIFICATIONS
General
- All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards
are available upon request.
- Work sites shall be kept clear of debris and all construction materials, equipment and
packing shall be removed daily.
- Return all Street lights, area lights and floodlights.
- All fault indicators will be maintained in their current location on the 1/0 cables upon
completion of the job. If it is noted to remove any of the indicators they shall be returned to
local PSE first response department for re-issue.
Preconstruction
- Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by
permitting agency, in advance of starting work in Right-of-way involving a Permit.
- All system switching shall be approved by System Operations (425-882-4652) a minimum
of 48 hours in advance.
- Notify customers of all outages 48 hours in advance.
Work Drawings & Documents
- Field design changes shall be approved by PSE Project Manager or Engineer.
- Mark all field changes, equipment ID numbers and Underground cable information in red on
Foreman's copy of work sketch.
- Return one Foreman's copy of work sketch to Project Manager at completion of job.
- When permits are required, a copy shall be available on work site at all times.
Safety
- Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements.
- Refer to PSE standards 6275.9050 for personal protective grounding requirements.
- Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements.
- Proper line clearances shall be taken at the beginning, and released at the end, of each
work day, or as otherwise instructed by the System Operator.
Traffic /Pedestrian control notes
- Utilize flagging and other vehicle traffic control as necessary and in conformance with local
traffic regulations.
-The uniform code of traffic control shall be adhered to at all times..
-Provide signs, barricades, and traffic control in conformance with local permit regulations.
-Provide route for pedestrians when working on or near sidewalks.
-Maintain traffic flow as required by permitting agency.
UNDERGROUND CONSTRUCTION
Existing Utilities:
Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point
of crossing. Protect underground utilities during excavation. Use hand excavation methods if
necessary to avoid damage to existing utilities. Fabricate and install adequate temporary
structures to support and protect underground utilities while exposed during construction.
Excavation
- Trenching outside of the Right-of-way shall be of sufficient depth to provide a minimum of
36" of cover for primary conductors and 24" of cover for secondary conductors.
- Road crossings and all trenches within the Right-of-way shall be of sufficient depth to
provide a minimum of 36" of cover for all conductors or as required by the permitting Agency.
- No rocks larger than 6" shall be included in backfill.
- Back fill in road crossings and within the Right-of-way shall be compacted to 95% density or
as required by the permitting Agency.
- Restore all excavated areas to original condition.
CREW TO PROVIDE ALL PROPERTY OWNER'S THAT ARE
IMPACTED BY PROJECT PRIOR NOTICE AND MAKE AN EFFORT
TO WORK WITH PROPERTY OWNER'S TO MAINTAIN THEIR
ACCESS TO THEIR PROPERTY, AS WELL AS, REDUCE THE
IMPACT OF OUR WORK ON THEIR USE OF THEIR PROPERTY.
WIRE CREW FOREMAN NOTE:
ALL FAULT INDICATORS WILL BE MAINTAINED IN THEIR
CURRENT LOCATION ON 1/0 CABLES AFTER NEW CABLE IS
INSTALLED UNLESS OTHERWISE SPECIFIED.
PLEASE RED-MARK ALL FAULT INDICATORS ON "CABLE
DIAGRAM" FOR MAPPING.
CIVIL CREW FOREMAN NOTE:
MAINTAIN ON SITE, IN GOOD CONDITION, A COMPLETE FILE OF
ALL WORK DRAWINGS. THESE DRAWINGS SHALL BE AVAILABLE
AT ALL TIMES TO A PUGET SOUND ENERGY REPRESENTATIVE.
CORRECTIONS AND CHANGES MADE DURING THE JOB SHALL BE
RECORDED CONTINUOUSLY ON THESE DRAWINGS. FURNISH
PUGET SOUND ENERGY A COMPLETE SET OF AS-BUILT PRINTS
(FOREMAN'S COPIES) AT THE END OF THE JOB.
FOREMAN NOTE:
CALL (800) 424-5555 UTILITY NOTIFICATION CENTER 24/7
BEFORE BEGINNING ANY EXCAVATION PREVENTS DAMAGE
TO UNDERGROUND FACILITIES, SERVICE INTERRUPTIONS &
BODILY INJURY.
438 SW 4TH PL RENTON, WA 98057
Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade 24" Min
(ROW) 36" MIN Cover
(PVT PROP)
36" MIN
48"
Max
Backfill
(No rocks over 8" diameter)
3" Bedding Clean Native Soil, Sand or 5/8" Minus
12" Typical
TRENCH DETAIL
NOT TO SCALE
12" Min Shading Clean Native Soil, Sand or 5/8" Minus
- A 3" layer of sand, 5/8" minus or clean shading is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches
- A 12" layer of sand, 5/8" minus or clean shading is required when excavated native material contains rocks up to 8" in diameter.
FOREMAN TO CONTACT REGIONAL CONSTRUCTION MANAGER FOR COVER DEVIATIONS FROM THIS DETAIL
PHOTOS AND DETAILED NOTES SHALL BE PROVIDED BY FOREMAN
12"
MIN
48" MAX
36" MIN
EXISTING
PAVEMENT / SIDEWALK
VERTICAL SAW
CUT LINE
CRUSHED SURFACING
MATERIAL COMPACT
TO 95% MAX DENSITY.
EXCAVATION AND HARD RESTORATION DETAIL
NOT TO SCALE
12" MIN
3" Sand Bedding or 5/8" Minus
12" Min Sand Shading or 5/8" Minus
12" MIN
ASPHALT PATCH, 2" MIN
MATCH EXISTING
Conduit
(ROW) 36" MIN
(PVT PROP) 36" MIN
MFP20004940
S/WS/W
S/WS/W
S/W
S/WS/WS/WS/W
S
/W
SW 5TH C
T STEVENS AVE SWSW
5
TH
P
L
SW
5
T
H
P
L
603611
600
521
513
D/W
31274 - CØ
EXISTING
TO REMAIN
AØ31272
BØ31273
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
C. TOBIN 253-548-4516 09/23/20
C. TOBIN 253-548-4516 09/23/20
N/A N/A N/A
N. RAFEEQ 253-395-6803 09/23/20
REQ-CITY OF RENTON
EAR-17 CREW2 611 SW 5TH CT RENT
BO CABLE REPAIR
438 SW 4TH PL RENTON, WA 98057
N/A N/A
N/A 101133056
AS NOTED 2 OF 2
KING N/A N/A QCSOKE
SW-18-23-05 N/A N/A
2305E071 2305E076 2305E071 EAR-17
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
Potelco, Inc.DESIGNED BY 101133056SITE PLAN
SCALE: 1:50
EXISTING UNDERGROUND MAP: # .
SCALE: 1:100
2305E071
VAULT & EQUIPMENT TABLE
SITE GRID
NUMBER VAULT SIZE & COVER TYPE & SIZE
EQUIPMENT IN VAULT
PRIMARY
BUSHINGS TRANSFORMER
ID NUMBERS
(COMPANY ID)
REMARKS
LB DC
V01 317683
165631
EXISTING COMBO
VAULT
J-BOX BELOW GRADE
W/ 3-4 POS. J-BUS
25kVA PM XFMR
120/240v EXISTING
--
V02 317675
165613
EXISTING
VAULT
225kVA PM XFMR
120/240v
EXISTING
--
TOTALS :--
PRIMARY CABLE & CONDUIT TABLE
LOCATION PRIMARY CABLE REMARKS
FROM TO CABLE
SIZE
DESIGN
LENGTH
(ft)
ACTUAL
LENGTH
(ft)
CABLE NUMBERS PLEASE RECORD FOREMAN - COMPLETE
A B C MANUFACTURER COMPOUND YEAR
V01 V02 1/0 AL JKT 1 31272 31273 -
TOTAL 2"
SITE SPECIFIC NOTES
-LOCATE FAULT VIA THUMPER METHOD
-FAULT PREVIOUSLY FOUND 75' EAST OF V02.
-EXCAVATE 2' X 4' PIT AT FAULT LOCATION
-REMOVE DAMAGED SECTION OF CABLE L________'
-INSTALL L________' 1/0 AL STR BARE CN PRI SPLICE (SPL10JX) TO MAKE REPAIR
ON B/O UG AL 1/0 PRIMARY CN CABLE #AØ31272, BØ31273
-RESTORE GROUND BACK TO GRADE