Loading...
HomeMy WebLinkAboutC_Extension Request Response_Haevin Ridge_201120_v1 November 23, 2020 Lou Larsen Pacific Engineering Design 15445 53rd Ave S, Unit 100 Seattle, WA 98188 Subject: Request for Standard Extension PR18-000119 Haevin Ridge, LUA18-000205, SHPL-A, MOD Dear Mr. Larsen: This office has reviewed your request (November 1, 2020) to extend an approved short plat (File No. LUA18-000205) for a period of one (1) year. The preliminary short plat was set to expire on June 8, 2020. On April 20, 2020 the Renton City Council adopted an emergency ordinance (Ordinance no. 5968) that temporarily extended the validity of certain permits by a period of six (6) month due to on -going construction challenges created by the COVID-19 outbreak. Therefore the emergency ordinance extended the expiration date of the plat until December 8, 2020. Since the first extension was granted in response to the current public health emergency, the project remains eligible for the standard single- extension of up to one (1) year as authorized in RMC 4-7-070M. In your request, you identify continuing challenges created by the COVID-19 outbreak as the reason for the request, which staff concurs with. In addition, you identify a delay in obtaining the National Pollutant Discharge Elimination System (NPDES) Permit from WA State Dep artment of Ecology due to staffing shortages at the agency. Pursuant to RMC 4-7-070M, the municipal code allows the original approving body to issue a single extension of up to one (1) year to an applicant who files a written request with the Administrator at least thirty (30) days before the expiration of preliminary short plat approval, provided the Administrator finds that the applicant has obtained issuance of a construction permit and h as made sustained progress towards final construction, engineering, and surveying necessary to record a final plat. Your request meets requirements of Renton Municipal Code and qualifies for a one -time extension of one year, as an extension request was sub mitted more than 30 days prior to the expiration of the preliminary short plat approval, the Construction Permit was issued on November 12, 2020, and the applicant has made sustained progress towards final construction necessary for the recording of the fi nal short plat. Therefore, your one (1) year short plat extension request is approved. The one (1) year extension shall be measured using the expiration date of the preliminary short plat approval after Lou Larsen Page 2 of 2 November 23, 2020 issuance of the temporary six (6) month extension (December 8, 2020) in order to ensure consistency with the extensions granted to other projects under the emergency ordinance . Please note that all construction must be completed or deferred and the final plat recorded in accordance with City Code prior to the last day of the new extension period (December 8, 2021). In addition, please note that no additional extensions will be granted. Please contact Alex Morganroth, Senior Planner, at (425) 430-7219 or amorganroth@rentonwa.gov should you have any further questions or comments regarding this extension. Sincerely, Vanessa Dolbee Planning Director cc: Chip Vincent, CED Administrator Brianne Bannwarth, Development Engineering Manager Clark Close, Interim Current Planning Manager Alex Morganroth, Senior Planner Jonathan Chavez, Civil Engineer III Lakh Sandu (via email) City of Renton File LUA18-000205 Parties of Record