HomeMy WebLinkAboutExhibit_6_Drainage_Report2020 D. R. STRONG Consulting Engineers Inc. ROGOLO TOWNHOMES Technical Information Report Renton, Washington TECHNICAL INFORMATION REPORT For ROGOLO TOWNHOMES PRELIMINARY PLAT 82 Williams Ave S, Renton, Washington ____________________________________________________________________________ DRS Project No. 19067 Renton File No. PRE19-000224 Owner/Applicant Joe Bernasconi Windermere Real Estate PO Box 1343 Renton, WA 98056 Report Prepared by D. R. STRONG Consulting Engineers, Inc. 620 7th Avenue Kirkland, WA 98033 (425) 827-3063 Report Issue Date July 14, 2020 Exhibit 6 RECEIVED 07/29/2020 amorganroth PLANNING DIVISION DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. ROGOLO TOWNHOMES Technical Information Report Renton, Washington TECHNICAL INFORMATION REPORT ROGOLO TOWNHOMES PRELIMINARY PLAT TABLE OF CONTENTS SECTION I ...................................................................................................................... 1 Project Overview ......................................................................................................... 1 Predeveloped Site Conditions ..................................................................................... 1 Developed Site Conditions .......................................................................................... 1 SECTION II ................................................................................................................... 12 Conditions and Requirements Summary ................................................................... 12 Conditions of Approval............................................................................................... 14 SECTION III .................................................................................................................. 15 Off-Site Analysis ........................................................................................................ 15 Task 1: Define and Map Study Area ...................................................................... 16 Task 2: Resource Review ...................................................................................... 17 Task 3: Field Inspection ......................................................................................... 26 Task 4: Drainage System Description and Problem Descriptions .......................... 27 Task 5: Mitigation of Existing or Potential Problems .............................................. 28 SECTION IV .................................................................................................................. 34 Flow Control Analysis and Water Quality Design ...................................................... 34 Developed Site Hydrology ...................................................................................... 34 Performance Standards ............................................................................................. 36 Water Quality Treatment System ............................................................................... 37 SECTION V ................................................................................................................... 38 Conveyance System Analysis and Design ................................................................ 38 Rational Method ........................................................................................................ 39 SECTION VI .................................................................................................................. 41 Special Reports and Studies ..................................................................................... 41 SECTION VII ................................................................................................................. 42 Other Permits, Variances and Adjustments ............................................................... 42 SECTION VIII ................................................................................................................ 43 CSWPPP Analysis and Design (Part A) .................................................................... 43 SWPPP Plan Design (Part B) .................................................................................... 43 SECTION IX .................................................................................................................. 45 Bond Quantities, Facility Summaries, and Declaration of Covenant .......................... 45 SECTION X ................................................................................................................... 46 Operations and Maintenance Manual ........................................................................ 46 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. ROGOLO TOWNHOMES Technical Information Report Renton, Washington APPENDICES ............................................................................................................... 47 Appendix “A” Legal Description ................................................................................. 48 Appendix “B” Bond Quantity Worksheet .................................................................... 49 List of Figures Figure 1 TIR Worksheet .................................................................................................. 3 Figure 2 Vicinity Map ....................................................................................................... 8 Figure 3 Drainage Basins, Subbasins, and Site Characteristics ..................................... 9 Figure 4 Soils` ............................................................................................................... 10 Figure 5 City of Renton Topography Map .................................................................... 18 Figure 6 City of Renton Coal Mine Hazard Areas Map ................................................. 19 Figure 7 City of Renton Flood Hazards Map ................................................................. 20 Figure 8 City of Renton Streams and Wetlands Map .................................................... 21 Figure 9 City of Renton Landslide Hazards Map ........................................................... 22 Figure 10 City of Renton Seismic Hazard Areas Map ................................................... 23 Figure 11 FEMA Map .................................................................................................... 24 Figure 12 King County iMap Drainage Complaints Map................................................ 25 Figure 13 Offsite Analysis Downstream Map ................................................................ 29 Figure 14 Offsite Analysis Downstream Table .............................................................. 30 Figure 15 Developed Area Map .................................................................................... 35 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 1 ROGOLO TOWNHOMES Technical Information Report Renton, Washington SECTION I PROJECT OVERVIEW The Project is the proposed development of the existing parcel with six townhouses per the City of Renton (City) development process. The Project is located at 82 Williams Avenue South, Renton, Washington (Site) also known as Tax Parcel Number 000720- 0147. The Project will meet the drainage requirements of the 2016 King County Surface Water Design Manual (Manual), as adopted by the City. PREDEVELOPED SITE CONDITIONS The total existing Site area is approximately 6,001 s.f. (0.139 acres). The total Project area is 6,266 s.f. (0.144 acres) and includes the sidewalk area within Williams Avenue ROW to be reconstructed as a part of the new driveway cut. The Site is currently developed with one single family home, a concrete driveway and walkway, and a detachd garage. The Site is relatively flat with a shallow grade from west to east maintaining one Threshold Discharge Area (TDA). Runoff generated from the TDA gradually sheet flows from the southwest to the northeast toward the parking lot of the adjacent parcel.The conveyance system in this parking lot collects the runoff and is breifly conveyed in a northerly direction before entering the Cedar River. The conveyance system in Williams Avenue S also conveys runoff from the Site frontage to the north breifly before it enters the Cedar River via a different outfall. DEVELOPED SITE CONDITIONS The applicant is seeking approval to develop 0.139 acres with six townhouses (Project), All existing improvements located on the Site will be demolished or removed during Project construction. The Project is required to meet the City’s Peak Rate Flow Control Standard (Existing Conditions) and Basic Water Quality treatment. The proposed impervious surfaces consist of the roof area for the six townhomes and small portion of uncoveded concrete patio/driveway area. The total new and replaced impervious surfaces on site will be 5,052 s.f. 257 s.f. of sidewalk area will be replaced along the frontage as a part of the new driveway construction. The remai ning Project area will be pervious lawn. The Site is within a half mile of the 100-year flood plain for the Cedar River downstream of the Taylor Creek confluence, meaning the Project qualifies for the direct discharge exemption from providing a formal flow control facility. It is also exempt from providing a formal water quality treatment facility as only 1,948 s.f. of the proposed impervious surface is considered PGIS. This is below the 5,000 s.f. threshold for the surface area exemption from water quality mitigation, per the Manual. Per Section 1.2.9.2.1 Small Lot BMP Requirements of the Manual, projects are required to mitigate for impervious surfaces by use of Flow Control Best Management Practices (BMPs), to the maximum extent feasible. This requires all lots under 11,000 s.f. to apply flow control BMPs to mitigate impervious areas equal to 10% of the total lot area. 10% of the impervious area for this Site is 600 s.f., so flow control BMPS will be used to mitigate runoff from 600 s.f. of roof area if feasilble (See Section IV). DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 2 ROGOLO TOWNHOMES Technical Information Report Renton, Washington The soil investigation summarized by the project getotechnical engineer was conducted to a depth of 31.5 feet. The report indicates the presence of overbank and channel alluvium deposits. The geotechnical engineer recommends that the on-site soils should not be used for the purposes of infiltrating stormwatwer and that alternative means of stromwater management should be used for this Project. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 3 ROGOLO TOWNHOMES Technical Information Report Renton, Washington FIGURE 1 TIR WORKSHEET TECHNICAL INFORMATION REPORT (TIR) WORKSHEET Part 1 PROJECT OWNER AND PROJECT ENGINEER Part 2 PROJECT LOCATION AND DESCRIPTION Project Owner: Joseph Bernasconi Phone: (253) 740-2119 Address: 82 Williams Avenue South Renton, WA 98057 Project Engineer: Yoshio L. Piediscalzi, P.E. Company: D. R. STRONG Consulting Engineers Inc. Phone: (425) 827-3063 Project Name: Williams Avenue Townhouses City Permit#: PRE19-000224 Location: Township: 23 North Range: 5 West Section: 17 Site Address: 82 Williams Avenue S Renton, WA 98057 Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS Landuse Services Subdivision / Short Subdivision / UPD Building Services: M/F / Commercial / SFR Clearing and Grading Right-of-Way Other: DFW HPA Shoreline Mngmt COE 404 Structural DOE Dam Safety Rockery/Vault FEMA Floodplain ESA Section 7 COE Wetlands Other: Part 5 PLAN AND REPORT INFORMATION Technical Information Report Type of Drainage Review Full / Targeted / (circle): Large Site Date (include revision May 6, 2020 dates): Date of Final: Site Improvement Plan (Engr. Plans) Type (circle one): Full / Modified / : Small Site Date (include revision May 6, 2020 dates): Date of Final: Part 6 ADJUSTMENT APPROVALS Type (circle one): Standard / Complex / Preapplication / Experimental / Blanket Description: (include conditions in TIR Section 2) _____________________________________________________________________________________ _____________________________________________________________________________________ ____________________________________________________________________________________ Date of Approval: DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 4 ROGOLO TOWNHOMES Technical Information Report Renton, Washington Part 7 MONITORING REQUIREMENTS Monitoring Required: Yes / No Start Date: TBD Completion Date Describe: Monitor discharge location during construction. Part 8 SITE COMMUNITY AND DRAINAGE BASIN Community Plan: City of Renton Special District Overlays: Urban Design District A Drainage Basin: Cedar River / Lake Washington and Lower Cedar River Stormwater Requirements: Flow Control Duration Standard – Matching Forested Conditions and Basic WQ treatment Part 9 ONSITE AND ADJACENT SENSITIVE AREAS River/ Stream Lake Wetlands Closed Depression Floodplain Other Steep Slope Erosion Hazard Landslide Hazard Coal Mine Hazard Seismic Hazard Habitat Protection Part 10 SOILS Soil Type Ur Slopes 0-8% Erosion Potential Low to Moderate High Groundwater Table Sole Source Aquifer other Seeps/Springs Additional Sheets Attached DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 5 ROGOLO TOWNHOMES Technical Information Report Renton, Washington Part 11 DRAINAGE DESIGN LIMITATIONS REFERENCE Core Requirement #2 – Offsite Analysis SEPA Additional Sheet Attached LIMITATION / SITE CONSTRAINT Part 12 TIR SUMMARY SHEET Threshold Discharge Area: Site comprised of one TDA (name or description) Core Requirements (all 8 apply) Discharge of Natural Location Yes Number of Natural Discharge Locations: 1 Offsite Analysis Level: 1 / 2 / 3 dated: 02/06/20 Flow Control Level: 1 / 2 / 3 or Exemption Number Basic (incl. facility summary sheet Small Site BMPS: Conveyance System Spill containment located at: TBD Erosion and Sediment Control ESC Site Supervisor: T/B/D Contact Phone: T/B/D After Hours Phone: T/B/D Maintenance and Operation Responsibility: Private / Public If Private, Maintenance Log Required: Yes / No Financial Guarantees and Provided: Yes / No Liability Water Quality Type: Basic / Sens Lake / Enhanced Basic / Bog (include facility summary sheet) or exemption No. Landscape Management Plan: Yes / No Special Requirements (as applicable) Area Specific Drainage Type: CDA / SDO / MDP / BP / LMP / Shared / None Requirements Name: Floodplain/Floodway Delineation Type: Major / Minor / Exemption / None 100-year Base Flood Elevation (or range): Datum: Flood Protection Facilities Describe: N/A Source Control Describe Landuse: (comm. / industrial landuse) Describe any structural controls: Oil Control High-use Site: Yes / No Treatment BMP: Maintenance Agreement: Yes / No with whom? DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 6 ROGOLO TOWNHOMES Technical Information Report Renton, Washington Other Drainage Structures Describe: Runoff will be collected and conveyed to the existing conveyance system in Williams Avenue S. Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS MINIMUM ESC REQUIREMENTS DURING CONSTRUCTION Clearing Limits Cover Measures Perimeter Protection Traffic Area Stabilization Sediment Retention Surface Water Collection Dewatering Control Dust control Flow Control MINIMUM ESC REQUIREMENTS AFTER CONSTRUCTION Stabilize Exposed Surfaces Remove and Restore Temporary ESC Facilities Clean and Remove All Silt and Debris, Ensure Operations of Permanent Facilities Flag Limits of SAO and open space Preservation areas Other Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch Flow Control Type/Description Water Quality Type/Description Detention Infiltration Regional Facility Shared Facility Flow Control BMPs Other Biofiltration Wetpool Media Filtration Oil Control Spill Control Flow Control BMPs Other DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 7 ROGOLO TOWNHOMES Technical Information Report Renton, Washington Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS Drainage Easement Covenant Native Growth Protection Covenant Tract Other: Cast in Place Vault Retaining Wall Rockery > 4’ High Structural on Steep Slope Other: Part 17 SIGNATURE OF PROFESSIONAL ENGINEER I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were incorporated into this worksheet and the attached Technical Information Report. To the best of my knowledge the information provided here is accurate. 07-13-20 Signed/Date DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 8 ROGOLO TOWNHOMES Technical Information Report Renton, Washington FIGURE 2 VICINITY MAP Site DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 9 ROGOLO TOWNHOMES Technical Information Report Renton, Washington FIGURE 3 DRAINAGE BASINS, SUBBASINS, AND SITE CHARACTERISTICS DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 0GRAPHIC SCALE10'20'40'1 INCH = 20 FT.DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 10 ROGOLO TOWNHOMES Technical Information Report Renton, Washington FIGURE 4 SOILS DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 11 ROGOLO TOWNHOMES Technical Information Report Renton, Washington King County Area, Washington UR – Urban Land Map Unit Composition • Urban land: 100 percent • Estimates are based on observations, descriptions, and transects of the map unit. Description of Urban Land Interpretive groups • Land capability classification (irrigated): None specified • Land capability classification (nonirrigated): 8 • Hydric soil rating: No DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 12 ROGOLO TOWNHOMES Technical Information Report Renton, Washington SECTION II CONDITIONS AND REQUIREMENTS SUMMARY The Project must comply with the following Core and Special Requirements: • C.R. #1 – Discharge at the Natural Location: Existing drainage discharges the Site at one location, maintaining one TDA. The topography indicates that all stormwater runoff leaves the Site as sheet flow across the east property line. • C.R. #2 – Offsite Analysis: Analysis is included in Section III. The Analysis describes the Site’s runoff patterns in detail. • C.R. #3 – Flow Control Facilities: The Project is required to meet the City’s Peak Rate Flow Control Standard (Existing Conditions). The Site is required to “match the developed peak discharge rates to existing site conditions peak discharge rates for 2-, 10-, and 100-year return periods,” (City of Renton 2017 Surface Water Design Manual Amendment, Sec. 1.2.3.1). However, the Site is within a half mile of the 100 - year flood plain for the Cedar River downstream of the Taylor Creek confluence, meaning the Project qualifies for the direct discharge exemption from providing a formal flow control facility. • C.R. #4 – Conveyance System: New pipe systems are required to be designed with sufficient capacity to convey and contain (at minimum) the 25-year peak flow, assuming developed conditions for onsite tributary areas and existing conditions for any offsite tributary areas. Pipe system structures may overtop for runoff events that exceed the 25-year design capacity, provided the overflow from a 100-year runoff event does not create or aggravate a “severe flooding problem” or “severe erosion problem” as defined in C.R. #2. Any overflow occurring onsite for runoff events up to and including the 100-year event must discharge at the natural location for the project site. In residential subdivisions, such overflow must be contained within an onsite drainage easement, tract, covenant or public right-of-way. This analysis has been included in Section V of this report. • C.R. #5 – Construction Stormwater Pollution Prevention: The Project will provide the thirteen minimum ESC measures. A temporary erosion and sedimentation control plan will be prepared at the time construction plan preparation. • C.R. #6 – Maintenance and Operations: Maintenance of the proposed storm drainage facilities will be the responsibility of the City. An Operation and Maintenance Manual will be included in Section X. • C.R. #7 – Financial Guarantees and Liability: Prior to commencing construction, the Applicant must post a drainage facilities restoration and site stabilization financial guarantee. For any constructed or modified drainage facilities to be maintained and operated by the City, the Applicant must: 1) Post a drainage defect and maintenance financial guarantee for a period of two years, and 2) Maintain the drainage facilities during the two-year period following posting of the drainage defect and maintenance financial guarantee. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 13 ROGOLO TOWNHOMES Technical Information Report Renton, Washington • C.R. #8 – Water Quality Facilities: The Project is required to provide basic water quality treatment. However, the Project is only proposing 1,948 s.f. of PGIS for the concrete driveway. This is below the 5,000 s.f. threshold for formal water quality control in the Manual. This means that the Project is not required to provide a formal flow control facility. • C.R. #9 – On-Site BMPs: The Project is required to provide on-site BMPs to mitigate the impacts of storm and surface water runoff. Small lot BMPs were determined by the BMP requirements outlined in Section 1.2.9.2.1 of the CORSWDM. As required by the CORSWDM, small lot BMP requirements were analyzed in the order of preference listed in section 1.2.9.2.1. 1. Full Dispersion: There is an insufficient amount of native growth in order to utilize full dispersion. The lack of required undisturbed area and flowpath lengths means that full dispersion is infeasible for this Lot. 2. Full Infiltration: Per the geotechnical report, the existing soil on the Site is fine graded soils with high levels of silt to deaths of approximately eight feet. This means that infiltration applications are infeasible. The full geotechnical report is included with this application. 3. Limited Infiltration: Per the geotechnical report, the existing soil on the Site is fine graded soils with high levels of silt to deaths of approximately eight feet. This means that infiltration applications are infeasible. The full geotechnical report is included with this application. 4. Rain Gardens: Per the geotechnical report, the existing soil on the Site makes any form of infiltration infeasible. The full geotechnical report has been included in conjunction with the preliminary application. 5. Bioretention: Per the geotechnical report, the existing soil on the Site makes any form of infiltration infeasible. 6. Permeable Pavement: Per the geotechnical report, the existing soil on the Site makes any form of infiltration infeasible. 7. Basic Dispersion: Due to the amount of impervious surface proposed for this Project, there is no pervious area available for a flowpath that will meet the requirements of the manual for basic dispersion. Per the CORSWDM, a perforated stub out connection is required for a project that proposes the connection of roof downspouts to the local drainage system. A perforated pipe connection is provided for this Project and is shown on the plans. • S.R. #1 – Other Adopted Area-Specific Requirements: Not applicable for this Project. • S.R. #2 – Floodplain/Floodway Delineation: Not applicable for this Project. • S.R. #3 – Flood Protection Facilities: Not applicable for this Project. • S.R. #4 – Source Control: Not applicable for this Project. • S.R. #5 – Oil Control: Not applicable for this Project. S.R. #6 – Aquifer Protection Area: The Site is located within the Aquifer Protection Zone 1. No infiltration is proposed as a part of this Project, and therefore the Project does not need t meet the requirements in the Manual for zone 1. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 14 ROGOLO TOWNHOMES Technical Information Report Renton, Washington CONDITIONS OF APPROVAL Rogolo Townhomes PRE19-000224 TBD DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 15 ROGOLO TOWNHOMES Technical Information Report Renton, Washington SECTION III OFF-SITE ANALYSIS A Level One Downstream Analysis was prepared by D.R. Strong Consulting Engineers and is included in this Section. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 16 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington LEVEL ONE DOWNSTREAM ANALYSIS TASK 1: DEFINE AND M AP STUDY AREA This Offsite Analysis was prepared in accordance with Core Requirement #2, Section 1.2.2 of the 2017 King County Surface Water Design Manual and City Amendments as adopted by the City of Renton (Manual). The Site is located at 82 Williams Ave S, Renton, Washington. The Project is the development of one parcel with six townhouse units. See Figures 1, 2, 3, and 5 for maps of the study area. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 17 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington TASK 2: RESOURCE REVIEW • Adopted Basin Plans: King County Department of Permitting and Environmental Review (DPER) and Department of Natural Resources and Parks (DNRP) Lower Cedar River Basin Plan Summary • Finalized Drainage Studies: No available applicable drainage studies at this time. • Basin Reconnaissance Summary Reports: Cedar River Current and Future Conditions Rep ort (April 1993). • Comprehensive Plans: Renton’s Comprehensive Plan, adopted on June 22, 2015, effective July 1, 2015. • Floodplain/Floodway (FEMA) Map: No floodplains exist on site, See Figure 10. • Other Offsite Analysis Reports: N/A • Sensitive Areas Map Folios: See Figures 6-9. • DNRP Drainage Complaints and Studies: Per King County Water and Land Resources Division, there were no complaints within the downstream paths, within approximately one mile from the Site within the last 10 years. See Figure 11. • USDA King County Soils Survey: See Figure 4 • Wetlands Inventory: Vol. 2 East (1990) – No wetlands identified along the downstream paths in the KC Wetlands Inventory. The City of Renton Mapping Applications indicates there are also no wetlands along the downstream path. See Figure 8. • Migrating River Studies: The Site is not located near the channel migration zones of Cedar River, Tolt River, Raging River, Snoqualmie River, or Green River. • King County Designated Water Quality Problems: Per the Washington State Water Quality Assessment 303(d)/305(b) Integrated Report current as of 2012, the reach of the Cedar River will outlet to has three category 5 listings, one category 2 listing, and three category 5 listings. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 18 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FIGURE 5 CITY OF RENTON TOPOGRAPHY MAP Site DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 19 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FIGURE 6 CITY OF RENTON COAL MINE HAZARD AREAS MAP Site DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 20 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FIGURE 7 CITY OF RENTON FLOOD HAZARDS MAP Site DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 21 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FIGURE 8 CITY OF RENTON STREAMS AND WETLANDS MAP Site DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 22 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FIGURE 9 CITY OF RENTON LANDSLIDE HAZARDS MAP Site DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 23 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FIGURE 10 CITY OF RENTON SEISMIC HAZARD AREAS MAP Site DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 24 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FIGURE 11 FEMA MAP Site (Approximate) DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 25 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FIGURE 12 KING COUNTY IMAP DRAINAGE COMPLAINTS MAP Site DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 26 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington TASK 3: FIELD INSPECTION UPSTREAM TRIBUTARY AREA Upon evaluation of the upstream area through examining COR topographic map (see Figure 5) and by conducting field reconnaissance on February 5, 2020, the upstream tributary area for the Site is considered negligible. The area generally slopes from the southwest property corner to the northeast property corner. Runoff from the property to the south appears to head east away from the Site. Runoff from the right of way (Williams Ave S) to the west and the property to the north heads in a northerly direction away from the Site. GENERAL ONSITE AND OFFSITE DRAINAGE DESCRIPTIONS The Site consists of one Natural Discharge Area (NDA 1) with one Natural Discharge Location (NDL 1) and contained within one Threshold Discharge Area (TDA 1). Runoff from the Site leaves along the northeast property corner and sheet flows along the fence line of the adjacent property to the north before appearing to enter a drain. The runoff exits the drain on a property along S Riverside Dr. and travels northwest down a driveway until reaching a conveyance system on S Riverside Dr. where runoff is conveyed to Cedar River, continuing northwest and out letting into Lake Washington roughly 1 ½ miles from the Site. Runoff from the frontage was also considered and is contained within TDA 1. The runoff leaves along the western property line and sheet flows along the driveway to the curb line where it starts heading north. At the intersection of Williams Ave S and S Riverside Dr., the runoff enters a CB and pipe conveyance network that conveys the runoff northwest to Cedar River where it outlets and continues its path to Lake Washington. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 27 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington TASK 4: DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS DRAINAGE SYSTEM DESCRIPTION The downstream analysis is further illustrated and detailed in the Downstream Map Figure 12 and Downstream Table Figure 13. The drainage area is located within the Lower Cedar River. The drainage area was evaluated by reviewing available resources described in Task 2, and by conducting a field reconnaissance on February 2, 2020 under rainy conditions. EXISTING DOWNSTREAM PATH Runoff leaves the Site as sheet flow across the northeast property corner. Runoff continues north as sheet flow to an apparent drain located at the northeast corner of 74 Williams Ave S (100’). The drain was not observed, however it was assumed that runoff will be discharged northeast via wall drain based on area topography and the most probable runoff path. Runoff then exits into the parking lot of 77 Williams Ave S where it flows northeasterly as sheet flow and enters a Type-1 CB on the south side of S Riverside Dr. (164’). Runoff continues as pipe flow to a Type-1 CB on the north side of the same street before discharging to Cedar River where it flows northwest before entering Lake Washington roughly a mile from the outfall (1,331’). FRONTAGE DOWNSTREAM PATH Runoff leaves the Site as sheet flow across the western property line heading west down the driveway. The runoff reaches the driveway curb at which point it flows in a northerly direction until the runoff enters a Type-1 CB at the intersection of Williams Ave S and S Riverside Dr. (265’). The runoff is piped southwest to a Type-1 solid lid CB followed by conveyance to a Type-2 manhole northwest of the previous CB (333’). The runoff is then discharged into Cedar River and continues northwesterly to Lake Washington (1,330’). DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 28 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington TASK 5: MITIGATION OF EXISTING OR POTENTIAL PROBLEMS A review of the King County Water and Land Resource Division – Drainage Services Section Documented Drainage Complaints revealed no drainage complaints within one mile of the downstream flow paths within the past ten years. The Project is required to meet the City’s Peak Rate Flow Control Standard (Existing Conditions) and Basic Water Quality treatment, per the Manual. During construction, standard sediment and erosion control methods will be utilized. This will include the use of a stabilized construction entrance, perimeter silt fencing, and other necessary measures to minimize soil erosion during construction. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 29 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FIGURE 13 OFFSITE ANALYSIS DOWNSTREAM MAP Site A1 B1 C1 D1 E1 F1 G1 A2 H1 B2 C2 D2 E2 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 30 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FIGURE 14 OFFSITE ANALYSIS DOWNSTREAM TABLE EXISTING DOWNSTREAM PATH Symbol Drainage Component Type, Name, and Size Drainage Component Description Slope Distance From site Discharge Existing Problems Potential Problems Observations of field inspector resource reviewer, or resident See map Type: sheet flow, swale, Stream, channel, pipe, Pond; Size: diameter Surface area drainage basin, vegetation, cover, depth, type of sensitive area, volume % 1/4 mile = 1,320 feet Constrictions, under capacity, ponding, overtopping, flooding, habitat or organism destruction, scouring, bank sloughing, sedimentation, incision, other erosion Tributary area, likelihood of problem, overflow pathways, potential impacts. A1 Natural discharge area Runoff exits at the NDA across the northeast property corner –0’ None Observed None Anticipated No flow observed A1-B1 Northerly Sheet Flow Runoff sheet flows along fence line on 78 and 74 Williams Ave S None Observed None Anticipated No flow observed B1 Wall drain Northeast corner of 74 Williams Ave S –100’ None Observed None Anticipated No flow observed B1-C1 Northeasterly Pipe Flow Could not be observed at B1 or terminus at C1 as it is on private property None Observed None Observed Not observed due to private property C1 Pipe outlet Runoff exits to parking lot on 77 Williams Ave S ±105’ None Observed None Anticipated Not observed due to private property C1-D1 Northeasterly Sheet Flow Runoff sheet flows on 77 Williams Ave S None Observed None Anticipated No concentrated flow observed D1 Curb and Gutter Flow Runoff reaches curb on south side of S Riverside Dr. D1-E1 Easterly Sheet Flow Runoff sheet flows along south curb on S Riverside Dr. None Observed None Anticipated No flow observed E1 Type-1 CB South side of S Riverside Dr. ±164’ None Observed None Anticipated Medium flow observed E1-F1 Northeasterly Pipe Flow 12” PVC None Observed None Anticipated Medium flow observed F1 Type-1 CB North side of S Riverside Dr. ±182’ None Observed None Anticipated Medium flow observed F1-G1 Northeasterly Pipe Flow 12” concrete pipe None Observed None Anticipated Medium flow observed DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 31 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington FRONTAGE DOWNSTREAM PATH G1 Outfall to Cedar River COR Facility ID No. OUT-0342 ±209’ None Observed None Anticipated Medium flow observed G1-H1 Northwesterly Channel Flow Cedar River None Observed None Anticipated Heavy flow observed H1 Northwesterly Channel Flow This marks the end of field reconnaissance at over ¼ mile downstream from the Site ±1,331’ None Observed None Anticipated Heavy flow observed Symbol Drainage Component Type, Name, and Size Drainage Component Description Slope Distance From site Discharge Existing Problems Potential Problems Observations of field inspector resource reviewer, or resident See map Type: sheet flow, swale, Stream, channel, pipe, Pond; Size: diameter Surface area drainage basin, vegetation, cover, depth, type of sensitive area, volume % 1/4 mile = 1,320 feet Constrictions, under capacity, ponding, overtopping, flooding, habitat or organism destruction, scouring, bank sloughing, sedimentation, incision, other erosion Tributary area, likelihood of problem, overflow pathways, potential impacts. A2 Natural discharge area Runoff exits at the NDA across the western property line –0’ None Observed None Anticipated No flow observed A2-B2 Westerly Sheet Flow Runoff sheet flows down driveway along frontage None Observed None Anticipated No flow observed B2 Curb and Gutter Runoff enters curb and gutter on east side of Williams Avenue S None Observed None Anticipated No flow observed B2-C2 Northerly Curb and Gutter Flow Runoff sheet flows along flow line of city curb None Observed None Anticipated No concentrate flow observed C2 Type-1 CB Southeast of the intersection at Williams Ave S and S Riverside Dr. ±265’ None Observed None Observed Medium flow observed C2-D2 Northwesterly Pipe Flow 8” concrete pipe None Observed None Anticipated Medium flow observed D2 Type-2 Manhole Northeast of the intersection at Williams Ave S and S Riverside Dr. ±333’ None Observed None Anticipated Medium flow observed D2-E2 Northwesterly Pipe Flow 12” concrete pipe None Observed None Anticipated Medium flow observed E2 Outfall to Cedar River COR Facility ID No. OUT-0335 ±422’ None Observed None Anticipated Medium flow observed E2-H1 Northwesterly Channel Flow Cedar River None Observed None Anticipated Heavy flow observed DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 32 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington A1-B1 L1-M1 H1 Northwesterly Channel Flow This marks the end of field reconnaissance at over ¼ mile downstream from the Site ±1,330’ None Observed None Anticipated Heavy flow observed DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 33 ROGOLO TOWNHOMES Level One Downstream Analysis Renton, Washington B2-C2 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 34 ROGOLO TOWNHOMES Technical Information Report Renton, Washington SECTION IV FLOW CONTROL ANALYSIS AND WATER QUALITY DESIGN DEVELOPED SITE HYDROLOGY Per the geotechnical report, soils present on-site is holocene alluvium which is considered an outwash soil. The total proposed impervious surface area for the Project is 5,309 s.f. 4,861 s.f. of the proposed impervious area is roof area and the remaining 191 s.f. of on-site impervious area is uncovered concrete driveway area. The remainder of the Project impervious area consists of 257 s.f. of replaced sidewalk area within the Williams Avenue ROW. The uncovered and covered driveway area totals 1,948 s.f. which makes up all of the proposed PGIS for the Project. The remainder of the Site area will be lawn area. The developed area map below illustrates the area breakdown for the Site. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 35 ROGOLO TOWNHOMES Technical Information Report Renton, Washington FIGURE 15 DEVELOPED AREA MAP DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 36 ROGOLO TOWNHOMES Technical Information Report Renton, Washington PERFORMANCE STANDARDS The Project is required to meet the City’s Peak Rate Flow Control Standard (Existing Conditions). The Site is required to “match the developed peak discharge rates to existing site conditions peak discharge rates for 2-, 10-, and 100-year return periods,” (City of Renton 2017 Surface Water Design Manual Amendment, Sec. 1.2.3.1). However, the Site is within a half mile of the 100-year flood plain for the Cedar River downstream of the Taylor Creek confluence, meaning the Project qualifies for the direct discharge exemption from providing a formal flow control facility. Per Section 1.2.9.2.1 Small Lot BMP Requirements of the Manual, projects are required to mitigate for impervious surfaces by use of Flow Control Best Management Practices (BMPs), to the maximum extent feasible. This requires all lots under 11,000 s.f. to apply flow control BMPs to mitigate impervious areas equal to 10% of the total lot area. 10% of the impervious area for this Site is 600 s.f., so flow control BMPS will be used to mitigate runoff from 600 s.f. of roof area if feasilble. Small lot BMPs were determined by the BMP requirements outlined in Section 1.2.9.2.1 of the CORSWDM. As required by the CORSWDM, small lot BMP requirements were analyzed in the order of preference listed in section 1.2.9.2.1. 1. Full Dispersion: There is an insufficient amount of native growth in order to utilize full dispersion. The lack of required undisturbed area and flowpath lengths means that full dispersion is infeasible for this Lot. 2. Full Infiltration: Per the geotechnical report, the existing soil on the Site is fine graded soils with high levels of silt to deaths of approximately eight feet. This means that infiltration applications are infeasible. The full geotechnical report is included with this application. 3. Limited Infiltration: Per the geotechnical report, the existing soil on the Site is fine graded soils with high levels of silt to deaths of approximately eight feet. This means that infiltration applications are infeasible. The full geotechnical report is included with this application. 4. Rain Gardens: Per the geotechnical report, the existing soil on the Site makes any form of infiltration infeasible. The full geotechnical report has been included in conjunction with the preliminary application. 5. Bioretention: Per the geotechnical report, the existing soil on the Site makes any form of infiltration infeasible. 6. Permeable Pavement: Per the geotechnical report, the existing soil on the Site makes any form of infiltration infeasible. 8. Basic Dispersion: Due to the amount of impervious surface proposed for this Project, there is no pervious area available for a flowpath that will meet the requirements of the manual for basic dispersion. Per the CORSWDM, a perforated stub out connection is required for a project that proposes the connection of roof downspouts to the local drainage system. A perforated pipe connection will be provided for this Project. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 37 ROGOLO TOWNHOMES Technical Information Report Renton, Washington WATER QUALITY TREATMENT SYSTEM The Project is required to adhere to the City of Renton’s basic water quality treatment criteria. However, the Project is only proposing 1,948 s.f. of PGIS for the concrete driveway. This is below the 5,000 s.f. threshold for formal water quality control in the Manual. This means that the Project is not required to provide a formal flow control facility. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 38 ROGOLO TOWNHOMES Technical Information Report Renton, Washington SECTION V CONVEYANCE SYSTEM ANALYSIS AND DESIGN Per Core Requirement #4 of the CORSWDM, the conveyance system must be analyzed and designed for the existing tributary and developed onsite runoff. Pipe systems shall be designed with sufficient capacity to convey and contain (at minimum) the 25-year peak flow with a minimum of 6 inches of freeboard between the design water surface and structure grate. Pipe system structures may overtop for runoff events that exceed the 25-year design capacity provided the overflow from a 100-year runoff event does not create or aggravate a “severe flooding problem” or “severe erosion problem” as defined in C.R. #2. The Rational Method is used to calculate the 100-year peak flow for the Site. A conveyance system consisting of pipes and catch basins has been designed for the Project. Onsite runoff from all target surfaces is collected by the on-site catch basin or roof drains and conveyed to the existing conveyance system in Williams Avenue S. Pipes are 6” diameter PVC material with a minimum slope of 2.00%. Per the rational method (below), the 25-year flow for the Site under proposed conditions is approximately 0.35 cfs. The program Flowmaster is used to estimate the capacity of the most limiting pipe in the conveyance system, which is a 6” PVC pipe at 2.00%. This pipe, and therefore the conveyance system, is capable of conveying 0.94 cfs. This conveyance system is adequately sized to handle the 100-year peak flow. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 39 ROGOLO TOWNHOMES Technical Information Report Renton, Washington RATIONAL METHOD Table 3.2.1.B Coefficients for the Rational Method "iR" Equation 100 year 50 year 25 year 10 year 5 year 2 year aR 2.61 2.75 2.66 2.44 2.33 1.58 bR 0.63 0.65 0.65 0.64 0.63 0.58 Table 3.2.1.A Runoff Coefficients Land Cover C Dense Forest 0.10 Light Forest 0.15 Pasture 0.20 Lawns 0.25 Playgrounds 0.30 Gravel Areas 0.80 Pavement & Roofs 0.90 Open Water 1.00 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 40 ROGOLO TOWNHOMES Technical Information Report Renton, Washington DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 41 ROGOLO TOWNHOMES Technical Information Report Renton, Washington SECTION VI SPECIAL REPORTS AND STUDIES The following report and studies have been provided with this submittal. Critical Area Memo: Re-Align Environmental – July 7, 2020 Geotechnical Engineering Study: Associated Earth Sciences, Inc. – April 8, 2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 42 ROGOLO TOWNHOMES Technical Information Report Renton, Washington SECTION VII OTHER PERMITS, VARIANCES AND ADJUSTMENTS None at this time. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 43 ROGOLO TOWNHOMES Technical Information Report Renton, Washington SECTION VIII CSWPPP ANALYSIS AND DESIGN (PART A) The Erosion and Sedimentation Control Design will meet the seven minimum King County requirements: 1. Areas to remain undisturbed shall be delineated with a high visibility plastic fence prior to any site clearing or grading. 2. Site disturbed areas shall be covered with mulch and seeded, as appropriate, for temporary or permanent measures. 3. Perimeter protection shall consist of a silt fence down slope of any disturbed areas or stockpiles. 4. The existing concrete driveway at the point of ingress/egress to the Site will be used as the stabilized construction entrance. 5. Perimeter silt fences downslope will provide sediment retention for the Site. 6. Surface water from disturbed areas will sheet flow to the silt fences. 7. Dust control shall be provided by spraying exposed soils with water until wet. This is required when exposed soils are dry to the point that wind transport is possible which would affect roadways, drainage ways, surface waters, or neighboring residences. SWPPP PLAN DESIGN (PART B) Construction activities that could contribute pollutants to surface and storm water include the following, with applicable BMP’s listed for each item: 1. Storage and use of chemicals: Utilize source control, and soil erosion and sedimentation control practices, such as using only recommended amounts of chemical materials applied in the proper manner; neutralizing concrete wash water, and disposing of excess concrete material only in areas prepared for concrete placement, or return to batch plant; disposing of wash-up waters from water-based paints in sanitary sewer; disposing of wastes from oil-based paints, solvents, thinners, and mineral spirits only through a licensed waste management firm, or treatment, storage, and disposal (TSD) facility. 2. Material delivery and storage: Locate temporary storage areas away from vehicular traffic, near the construction entrance, and away from storm drains. Material Safety Data Sheets (MSDS) should be supplied for all materials stored, and chemicals kept in their original labeled containers. Maintenance, fueling, and repair of heavy equipment and vehicles shall be conducted using spill prevention and control measures. Contaminated surfaces shall be cleaned immediately following any spill incident. Provide cover, containment, and protection from vandalism for all chemicals, liquid products, petroleum products, and other potentially hazardous materials. 3. Building demolition: Protect stormwater drainage system from sediment-laden runoff and loose particles. To the extent possible, use dikes, berms, or other DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 44 ROGOLO TOWNHOMES Technical Information Report Renton, Washington methods to protect overland discharge paths from runoff. Street gutter, sidewalks, driveways, and other paved surfaces in the immediate area of demolition must be swept daily to collect and properly dispose of loose debris and garbage. Spray the minimum amount of water to help control windblown fine particles such as concrete, dust, and paint chips. Avoid excessive spraying so that runoff from the site does not occur, yet dust control is achieved. Oils must never be used for dust control. 4. Sawcutting: Slurry and cuttings shall be vacuumed during the activity to prevent migration offsite and must not remain on permanent concrete or asphalt paving overnight. Collected slurry and cuttings shall be disposed of in a manner that does not violate ground water or surface water quality standards. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 45 ROGOLO TOWNHOMES Technical Information Report Renton, Washington SECTION IX BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION OF COVENANT 1. Bond Quantity Worksheet is included as Appendix B of this report. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 46 ROGOLO TOWNHOMES Technical Information Report Renton, Washington SECTION X OPERATIONS AND MAINTENANCE MANUAL The maintenance of the private catch basin on-site will be the responsibility of the owners. Maintenance guidelines set forth in the 2017 CORSWDM have been included in this Section. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-10 NO. 5 – CATCH BASINS AND MANHOLES MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Structure Sediment accumulation Sediment exceeds 60% of the depth from the bottom of the catch basin to the invert of the lowest pipe into or out of the catch basin or is within 6 inches of the invert of the lowest pipe into or out of the catch basin. Sump of catch basin contains no sediment. Trash and debris Trash or debris of more than ½ cubic foot which is located immediately in front of the catch basin opening or is blocking capacity of the catch basin by more than 10%. No Trash or debris blocking or potentially blocking entrance to catch basin. Trash or debris in the catch basin that exceeds 1/3 the depth from the bottom of basin to invert the lowest pipe into or out of the basin. No trash or debris in the catch basin. Dead animals or vegetation that could generate odors that could cause complaints or dangerous gases (e.g., methane). No dead animals or vegetation present within catch basin. Deposits of garbage exceeding 1 cubic foot in volume. No condition present which would attract or support the breeding of insects or rodents. Damage to frame and/or top slab Corner of frame extends more than ¾ inch past curb face into the street (If applicable). Frame is even with curb. Top slab has holes larger than 2 square inches or cracks wider than ¼ inch. Top slab is free of holes and cracks. Frame not sitting flush on top slab, i.e., separation of more than ¾ inch of the frame from the top slab. Frame is sitting flush on top slab. Cracks in walls or bottom Cracks wider than ½ inch and longer than 3 feet, any evidence of soil particles entering catch basin through cracks, or maintenance person judges that catch basin is unsound. Catch basin is sealed and is structurally sound. Cracks wider than ½ inch and longer than 1 foot at the joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. No cracks more than 1/4 inch wide at the joint of inlet/outlet pipe. Settlement/ misalignment Catch basin has settled more than 1 inch or has rotated more than 2 inches out of alignment. Basin replaced or repaired to design standards. Damaged pipe joints Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering the catch basin at the joint of the inlet/outlet pipes. No cracks more than ¼-inch wide at the joint of inlet/outlet pipes. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Inlet/Outlet Pipe Sediment accumulation Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment. Trash and debris Trash and debris accumulated in inlet/outlet pipes (includes floatables and non-floatables). No trash or debris in pipes. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2017 City of Renton Surface Water Design Manual 12/12/2016 A-11 NO. 5 – CATCH BASINS AND MANHOLES MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Inlet/Outlet Pipe (cont.) Damaged inlet/outlet pipe Cracks wider than ½-inch at the joint of the inlet/outlet pipes or any evidence of soil entering at the joints of the inlet/outlet pipes. No cracks more than ¼-inch wide at the joint of the inlet/outlet pipe. Metal Grates (Catch Basins) Unsafe grate opening Grate with opening wider than 7/8 inch. Grate opening meets design standards. Trash and debris Trash and debris that is blocking more than 20% of grate surface. Grate free of trash and debris. footnote to guidelines for disposal Damaged or missing grate Grate missing or broken member(s) of the grate. Any open structure requires urgent maintenance. Grate is in place and meets design standards. Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in place. Any open structure requires urgent maintenance. Cover/lid protects opening to structure. Locking mechanism not working Mechanism cannot be opened by one maintenance person with proper tools. Bolts cannot be seated. Self-locking cover/lid does not work. Mechanism opens with proper tools. Cover/lid difficult to remove One maintenance person cannot remove cover/lid after applying 80 lbs. of lift. Cover/lid can be removed and reinstalled by one maintenance person. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-12 NO. 6 – CONVEYANCE PIPES AND DITCHES MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Pipes Sediment & debris accumulation Accumulated sediment or debris that exceeds 20% of the diameter of the pipe. Water flows freely through pipes. Vegetation/root growth in pipe Vegetation/roots that reduce free movement of water through pipes. Water flows freely through pipes. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Damage to protective coating or corrosion Protective coating is damaged; rust or corrosion is weakening the structural integrity of any part of pipe. Pipe repaired or replaced. Damaged pipes Any dent that decreases the cross section area of pipe by more than 20% or is determined to have weakened structural integrity of the pipe. Pipe repaired or replaced. Ditches Trash and debris Trash and debris exceeds 1 cubic foot per 1,000 square feet of ditch and slopes. Trash and debris cleared from ditches. Sediment accumulation Accumulated sediment that exceeds 20% of the design depth. Ditch cleaned/flushed of all sediment and debris so that it matches design. Noxious weeds Any noxious or nuisance vegetation which may constitute a hazard to City personnel or the public. Noxious and nuisance vegetation removed according to applicable regulations. No danger of noxious vegetation where City personnel or the public might normally be. Contaminants and pollution Any evidence of contaminants or pollution such as oil, gasoline, concrete slurries or paint. Materials removed and disposed of according to applicable regulations. Source control BMPs implemented if appropriate. No contaminants present other than a surface oil film. Excessive vegetation growth Vegetation that reduces free movement of water through ditches. Water flows freely through ditches. Erosion damage to slopes Any erosion observed on a ditch slope. Slopes are not eroding. Rock lining out of place or missing (If applicable) One layer or less of rock exists above native soil area 5 square feet or more, any exposed native soil. Replace rocks to design standards. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 12/12/2016 2017 City of Renton Surface Water Design Manual A-40 NO. 28 – NATIVE VEGETATED SURFACE/NATIVE VEGETATED LANDSCAPE BMP MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITION WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Site Trash and debris Trash and debris accumulated on the native vegetated surface/native vegetated landscape site. Native vegetated surface site free of any trash or debris. Vegetation Insufficient vegetation Less than two species each of native trees, shrubs, and groundcover occur in the design area. A minimum of two species each of native trees, shrubs, and groundcover is established and healthy. Poor vegetation coverage Less than 90% if the required vegetated area has healthy growth. A minimum of 90% of the required vegetated area has healthy growth. Undesirable vegetation present Weeds, blackberry, and other undesirable plants are invading more than 10% of vegetated area. Less than 10% undesirable vegetation occurs in the required native vegetated surface area. Vegetated Area Soil compaction Soil in the native vegetation area compacted. Less than 8% of native vegetation area is compacted. Insufficient vegetation Less than 3.5 square feet of native vegetation area for every 1 square foot of impervious surface. A minimum of 3.5 square feet of native vegetation area for every 1 square foot of impervious surface. Excess slope Slope of native vegetation area greater than 15%. Slope of native growth area does not exceed 15%. NO. 29 – PERFORATED PIPE CONNECTIONS BMP MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Preventive Blocking, obstructions Debris or trash limiting flow into perforated pipe system or outfall of BMP is plugged or otherwise nonfunctioning. Outfall of BMP is receiving designed flows from perforated pipe connection. Inflow Inflow impeded Inflow into the perforated pipe is partially or fully blocked or altered to prevent flow from getting into the pipe. Inflow to the perforated pipe is unimpeded. Pipe Trench Area Surface compacted Ground surface over the perforated pipe trench is compacted or covered with impermeable material. Ground surface over the perforated pipe is not compacted and free of any impervious cover. Outflow Outflow impeded Outflow from the perforated pipe into the public drainage system is blocked. Outflow to the public drainage system is unimpeded. Outfall Area Erosion or landslides Existence of the perforated pipe is causing or exasperating erosion or landslides. Perforated pipe system is sealed off and an alternative BMP is implemented. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS 2017 City of Renton Surface Water Design Manual 12/12/2016 A-47 NO. 38 – SOIL AMENDMENT BMP MAINTENANCE COMPONENT DEFECT OR PROBLEM CONDITIONS WHEN MAINTENANCE IS NEEDED RESULTS EXPECTED WHEN MAINTENANCE IS PERFORMED Soil Media Unhealthy vegetation Vegetation not fully covering ground surface or vegetation health is poor. Yellowing: possible Nitrogen (N) deficiency. Poor growth: possible Phosphorous (P) deficiency. Poor flowering, spotting or curled leaves, or weak roots or stems: possible Potassium (K) deficiency. Plants are healthy and appropriate for site conditions Inadequate soil nutrients and structure In the fall, return leaf fall and shredded woody materials from the landscape to the site when possible Soil providing plant nutrients and structure Excessive vegetation growth Grass becomes excessively tall (greater than 10 inches); nuisance weeds and other vegetation start to take over. Healthy turf- “grasscycle” (mulch-mow or leave the clippings) to build turf health Weeds Preventive maintenance Avoid use of pesticides (bug and weed killers), like “weed & feed,” which damage the soil Fertilizer needed Where fertilization is needed (mainly turf and annual flower beds), a moderate fertilization program should be used which relies on compost, natural fertilizers or slow-release synthetic balanced fertilizers Integrated Pest Management (IPM) protocols for fertilization followed Bare spots Bare spots on soil No bare spots, area covered with vegetation or mulch mixed into the underlying soil. Compaction Poor infiltration due to soil compaction • To remediate compaction, aerate soil, till to at least 8-inch depth, or further amend soil with compost and re-till • If areas are turf, aerate compacted areas and top dress them with 1/4 to 1/2 inch of compost to renovate them • If drainage is still slow, consider investigating alternative causes (e.g., high wet season groundwater levels, low permeability soils) • Also consider site use and protection from compacting activities No soil compaction Poor infiltration Soils become waterlogged, do not appear to be infiltrating. Facility infiltrating properly Erosion/Scouring Erosion Areas of potential erosion are visible Causes of erosion (e.g., concentrate flow entering area, channelization of runoff) identified and damaged area stabilized (regrade, rock, vegetation, erosion control matting).For deep channels or cuts (over 3 inches in ponding depth), temporary erosion control measures in place until permanent repairs can be made Grass/Vegetation Unhealthy vegetation Less than 75% of planted vegetation is healthy with a generally good appearance. Healthy vegetation. Unhealthy plants removed/replaced. Appropriate vegetation planted in terms of exposure, soil and soil moisture. Noxious Weeds Noxious weeds Listed noxious vegetation is present (refer to current County noxious weed list). No noxious weeds present. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 47 ROGOLO TOWNHOMES Technical Information Report Renton, Washington APPENDICES DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 48 ROGOLO TOWNHOMES Technical Information Report Renton, Washington APPENDIX “A” LEGAL DESCRIPTION BEGINNING ON THE EASTERLY LINE OF WILLIAMS STREET AT A POINT 190.00 FEET NORTHERLY OF THE NORTHWEST CORNER OF BLOCK 23, TOWN OF RENTON, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 1 OF PLATS, PAGE 115, RECORDS OF KING COUNTY, WASHINGTON;THENCE NORTHERLY ALONG SAID EASTERLY LINE 50.00 FEET;THENCE EASTERLY AT RIGHT ANGLES 120.00 FEET;THENCE SOUTHERLY PARALLEL WITH SAID EASTERLY LINE 50.00 FEET;THENCE WESTERLY 120.00 FEET TO THE POINT OF BEGINNING. SITUATE IN THE COUNTY OF KING, STATE OF WASHINGTON. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E 2020 D. R. STRONG Consulting Engineers Inc. Page 49 ROGOLO TOWNHOMES Technical Information Report Renton, Washington APPENDIX “B” BOND QUANTITY WORKSHEET DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E Planning Division |1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200 Date Prepared: Name: PE Registration No: Firm Name: Firm Address: Phone No. Email Address: Project Name: Project Owner: CED Plan # (LUA):Phone: CED Permit # (U):Address: Site Address: Street Intersection:Addt'l Project Owner: Parcel #(s):Phone: Address: Clearing and grading greater than or equal to 5,000 board feet of timber? Yes/No:NO Water Service Provided by: If Yes, Provide Forest Practice Permit #:Sewer Service Provided by: SITE IMPROVEMENT BOND QUANTITY WORKSHEET PROJECT INFORMATION CITY OF RENTON CITY OF RENTON 1 Select the current project status/phase from the following options: For Approval - Preliminary Data Enclosed, pending approval from the City; For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City; Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal Engineer Stamp Required (all cost estimates must have original wet stamp and signature) Clearing and Grading Utility Providers N/A Project Location and Description Project Owner Information Rogolo Townhomes Renton, WA 98056 145750-0025 Joe Bernasconi PRE19-000224 (253) 740-2119 7/6/2020 Prepared by: FOR APPROVALProject Phase 1 yoshio.piediscalzi@drstrong.com Yoshio L. Piediscalzi 53232 DR Strong Consulting Engineers 620 7th Avenue, Kirkland, WA 98033 (425) 827-3063 82 Williams Avenue S. Renton, WA PO Box 1343 Just south of S. Tobin St. and Williams Ave. S. Abbreviated Legal Description: Page 2 of 14 Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Unit Reference #Price Unit Quantity Cost Backfill & compaction-embankment ESC-1 6.50$ CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 80.00$ Each Catch Basin Protection ESC-3 35.50$ Each 2 71.00 Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)95.00$ CY Ditching ESC-5 9.00$ CY Excavation-bulk ESC-6 2.00$ CY Fence, silt ESC-7 SWDM 5.4.3.1 1.50$ LF 224 336.00 Fence, Temporary (NGPE)ESC-8 1.50$ LF Geotextile Fabric ESC-9 2.50$ SY Hay Bale Silt Trap ESC-10 0.50$ Each Hydroseeding ESC-11 SWDM 5.4.2.4 0.80$ SY 68 54.40 Interceptor Swale / Dike ESC-12 1.00$ LF Jute Mesh ESC-13 SWDM 5.4.2.2 3.50$ SY Level Spreader ESC-14 1.75$ LF Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.50$ SY Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.00$ SY Piping, temporary, CPP, 6"ESC-17 12.00$ LF Piping, temporary, CPP, 8"ESC-18 14.00$ LF Piping, temporary, CPP, 12"ESC-19 18.00$ LF Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.00$ SY Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)45.00$ CY Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 1,800.00$ Each Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,200.00$ Each Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,200.00$ Each Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 19.00$ LF Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 70.00$ LF Seeding, by hand ESC-27 SWDM 5.4.2.4 1.00$ SY Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 8.00$ SY Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 10.00$ SY TESC Supervisor ESC-30 110.00$ HR 60 6,600.00 Water truck, dust control ESC-31 SWDM 5.4.7 140.00$ HR 12 1,680.00 Unit Reference #Price Unit Quantity Cost EROSION/SEDIMENT SUBTOTAL:8,741.40 SALES TAX @ 10%874.14 EROSION/SEDIMENT TOTAL:9,615.54 (A) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR EROSION & SEDIMENT CONTROL Description No. (A) WRITE-IN-ITEMS Page 3 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost GENERAL ITEMS Backfill & Compaction- embankment GI-1 6.00$ CY Backfill & Compaction- trench GI-2 9.00$ CY 20 180.00 Clear/Remove Brush, by hand (SY)GI-3 1.00$ SY Bollards - fixed GI-4 240.74$ Each Bollards - removable GI-5 452.34$ Each Clearing/Grubbing/Tree Removal GI-6 10,000.00$ Acre Excavation - bulk GI-7 2.00$ CY Excavation - Trench GI-8 5.00$ CY 20 100.00 Fencing, cedar, 6' high GI-9 20.00$ LF Fencing, chain link, 4'GI-10 38.31$ LF Fencing, chain link, vinyl coated, 6' high GI-11 20.00$ LF Fencing, chain link, gate, vinyl coated, 20' GI-12 1,400.00$ Each Fill & compact - common barrow GI-13 25.00$ CY 20 500.00 Fill & compact - gravel base GI-14 27.00$ CY Fill & compact - screened topsoil GI-15 39.00$ CY Gabion, 12" deep, stone filled mesh GI-16 65.00$ SY Gabion, 18" deep, stone filled mesh GI-17 90.00$ SY Gabion, 36" deep, stone filled mesh GI-18 150.00$ SY Grading, fine, by hand GI-19 2.50$ SY Grading, fine, with grader GI-20 2.00$ SY Monuments, 3' Long GI-21 250.00$ Each Sensitive Areas Sign GI-22 7.00$ Each Sodding, 1" deep, sloped ground GI-23 8.00$ SY Surveying, line & grade GI-24 850.00$ Day Surveying, lot location/lines GI-25 1,800.00$ Acre Topsoil Type A (imported)GI-26 28.50$ CY Traffic control crew ( 2 flaggers )GI-27 120.00$ HR 16 1,920.00 Trail, 4" chipped wood GI-28 8.00$ SY Trail, 4" crushed cinder GI-29 9.00$ SY Trail, 4" top course GI-30 12.00$ SY Conduit, 2"GI-31 5.00$ LF Wall, retaining, concrete GI-32 55.00$ SF Wall, rockery GI-33 15.00$ SF SUBTOTAL THIS PAGE:2,200.00 500.00 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) Page 4 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) ROAD IMPROVEMENT/PAVEMENT/SURFACING AC Grinding, 4' wide machine < 1000sy RI-1 30.00$ SY AC Grinding, 4' wide machine 1000-2000sy RI-2 16.00$ SY AC Grinding, 4' wide machine > 2000sy RI-3 10.00$ SY AC Removal/Disposal RI-4 35.00$ SY Barricade, Type III ( Permanent )RI-5 56.00$ LF Guard Rail RI-6 30.00$ LF Curb & Gutter, rolled RI-7 17.00$ LF Curb & Gutter, vertical RI-8 12.50$ LF Curb and Gutter, demolition and disposal RI-9 18.00$ LF Curb, extruded asphalt RI-10 5.50$ LF Curb, extruded concrete RI-11 7.00$ LF Sawcut, asphalt, 3" depth RI-12 1.85$ LF 52 96.20 Sawcut, concrete, per 1" depth RI-13 3.00$ LF Sealant, asphalt RI-14 2.00$ LF 52 104.00 Shoulder, gravel, 4" thick RI-15 15.00$ SY Sidewalk, 4" thick RI-16 38.00$ SY Sidewalk, 4" thick, demolition and disposal RI-17 32.00$ SY Sidewalk, 5" thick RI-18 41.00$ SY Sidewalk, 5" thick, demolition and disposal RI-19 40.00$ SY Sign, Handicap RI-20 85.00$ Each Striping, per stall RI-21 7.00$ Each Striping, thermoplastic, ( for crosswalk )RI-22 3.00$ SF Striping, 4" reflectorized line RI-23 0.50$ LF Additional 2.5" Crushed Surfacing RI-24 3.60$ SY HMA 1/2" Overlay 1.5" RI-25 14.00$ SY HMA 1/2" Overlay 2"RI-26 18.00$ SY HMA Road, 2", 4" rock, First 2500 SY RI-27 28.00$ SY HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 21.00$ SY HMA Road, 4", 6" rock, First 2500 SY RI-29 45.00$ SY HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 37.00$ SY HMA Road, 4", 4.5" ATB RI-31 38.00$ SY Gravel Road, 4" rock, First 2500 SY RI-32 15.00$ SY Gravel Road, 4" rock, Qty. over 2500 SY RI-33 10.00$ SY Thickened Edge RI-34 8.60$ LF SUBTOTAL THIS PAGE:200.20 (B)(C)(D)(E) Page 5 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL-1 21.00$ SY 2" AC, 1.5" top course & 2.5" base course PL-2 28.00$ SY 219 6,132.00 4" select borrow PL-3 5.00$ SY 1.5" top course rock & 2.5" base course PL-4 14.00$ SY SUBTOTAL PARKING LOT SURFACING:6,132.00 (B)(C)(D)(E) LANDSCAPING & VEGETATION No. Street Trees LA-1 200.00$ Median Landscaping LA-2 Right-of-Way Landscaping LA-3 Wetland Landscaping LA-4 SUBTOTAL LANDSCAPING & VEGETATION: (B)(C)(D)(E) TRAFFIC & LIGHTING No. Signs TR-1 200.00$ Street Light System ( # of Poles)TR-2 3,000.00$ Traffic Signal TR-3 Traffic Signal Modification TR-4 SUBTOTAL TRAFFIC & LIGHTING: (B)(C)(D)(E) WRITE-IN-ITEMS SUBTOTAL WRITE-IN ITEMS: STREET AND SITE IMPROVEMENTS SUBTOTAL:2,400.20 6,632.00 SALES TAX @ 10%240.02 663.20 STREET AND SITE IMPROVEMENTS TOTAL:2,640.22 7,295.20 (B)(C)(D)(E) Page 6 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/D D-1 26.00$ SY * (CBs include frame and lid) Beehive D-2 90.00$ Each Through-curb Inlet Framework D-3 400.00$ Each CB Type I D-4 1,500.00$ Each 1 1,500.00 1 1,500.00 CB Type IL D-5 1,750.00$ Each CB Type II, 48" diameter D-6 2,300.00$ Each for additional depth over 4' D-7 480.00$ FT CB Type II, 54" diameter D-8 2,500.00$ Each for additional depth over 4'D-9 495.00$ FT CB Type II, 60" diameter D-10 2,800.00$ Each for additional depth over 4'D-11 600.00$ FT CB Type II, 72" diameter D-12 6,000.00$ Each for additional depth over 4'D-13 850.00$ FT CB Type II, 96" diameter D-14 14,000.00$ Each for additional depth over 4'D-15 925.00$ FT Trash Rack, 12"D-16 350.00$ Each Trash Rack, 15"D-17 410.00$ Each Trash Rack, 18"D-18 480.00$ Each Trash Rack, 21"D-19 550.00$ Each Cleanout, PVC, 4"D-20 150.00$ Each Cleanout, PVC, 6"D-21 170.00$ Each Cleanout, PVC, 8"D-22 200.00$ Each Culvert, PVC, 4" D-23 10.00$ LF 5 50.00 Culvert, PVC, 6" D-24 13.00$ LF 19 247.00 Culvert, PVC, 8" D-25 15.00$ LF Culvert, PVC, 12" D-26 23.00$ LF Culvert, PVC, 15" D-27 35.00$ LF Culvert, PVC, 18" D-28 41.00$ LF Culvert, PVC, 24"D-29 56.00$ LF Culvert, PVC, 30" D-30 78.00$ LF Culvert, PVC, 36" D-31 130.00$ LF Culvert, CMP, 8"D-32 19.00$ LF Culvert, CMP, 12"D-33 29.00$ LF SUBTOTAL THIS PAGE:1,747.00 1,550.00 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) Page 7 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) DRAINAGE (Continued) Culvert, CMP, 15"D-34 35.00$ LF Culvert, CMP, 18"D-35 41.00$ LF Culvert, CMP, 24"D-36 56.00$ LF Culvert, CMP, 30"D-37 78.00$ LF Culvert, CMP, 36"D-38 130.00$ LF Culvert, CMP, 48"D-39 190.00$ LF Culvert, CMP, 60"D-40 270.00$ LF Culvert, CMP, 72"D-41 350.00$ LF Culvert, Concrete, 8"D-42 42.00$ LF Culvert, Concrete, 12"D-43 48.00$ LF Culvert, Concrete, 15"D-44 78.00$ LF Culvert, Concrete, 18"D-45 48.00$ LF Culvert, Concrete, 24"D-46 78.00$ LF Culvert, Concrete, 30"D-47 125.00$ LF Culvert, Concrete, 36"D-48 150.00$ LF Culvert, Concrete, 42"D-49 175.00$ LF Culvert, Concrete, 48"D-50 205.00$ LF Culvert, CPE Triple Wall, 6" D-51 14.00$ LF Culvert, CPE Triple Wall, 8" D-52 16.00$ LF Culvert, CPE Triple Wall, 12" D-53 24.00$ LF Culvert, CPE Triple Wall, 15" D-54 35.00$ LF Culvert, CPE Triple Wall, 18" D-55 41.00$ LF Culvert, CPE Triple Wall, 24" D-56 56.00$ LF Culvert, CPE Triple Wall, 30" D-57 78.00$ LF Culvert, CPE Triple Wall, 36" D-58 130.00$ LF Culvert, LCPE, 6"D-59 60.00$ LF Culvert, LCPE, 8"D-60 72.00$ LF Culvert, LCPE, 12"D-61 84.00$ LF Culvert, LCPE, 15"D-62 96.00$ LF Culvert, LCPE, 18"D-63 108.00$ LF Culvert, LCPE, 24"D-64 120.00$ LF Culvert, LCPE, 30"D-65 132.00$ LF Culvert, LCPE, 36"D-66 144.00$ LF Culvert, LCPE, 48"D-67 156.00$ LF Culvert, LCPE, 54"D-68 168.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) Page 8 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) DRAINAGE (Continued) Culvert, LCPE, 60"D-69 180.00$ LF Culvert, LCPE, 72"D-70 192.00$ LF Culvert, HDPE, 6"D-71 42.00$ LF Culvert, HDPE, 8"D-72 42.00$ LF Culvert, HDPE, 12"D-73 74.00$ LF Culvert, HDPE, 15"D-74 106.00$ LF Culvert, HDPE, 18"D-75 138.00$ LF Culvert, HDPE, 24"D-76 221.00$ LF Culvert, HDPE, 30"D-77 276.00$ LF Culvert, HDPE, 36"D-78 331.00$ LF Culvert, HDPE, 48"D-79 386.00$ LF Culvert, HDPE, 54"D-80 441.00$ LF Culvert, HDPE, 60"D-81 496.00$ LF Culvert, HDPE, 72"D-82 551.00$ LF Pipe, Polypropylene, 6"D-83 84.00$ LF Pipe, Polypropylene, 8"D-84 89.00$ LF Pipe, Polypropylene, 12"D-85 95.00$ LF Pipe, Polypropylene, 15"D-86 100.00$ LF Pipe, Polypropylene, 18"D-87 106.00$ LF Pipe, Polypropylene, 24"D-88 111.00$ LF Pipe, Polypropylene, 30"D-89 119.00$ LF Pipe, Polypropylene, 36"D-90 154.00$ LF Pipe, Polypropylene, 48"D-91 226.00$ LF Pipe, Polypropylene, 54"D-92 332.00$ LF Pipe, Polypropylene, 60"D-93 439.00$ LF Pipe, Polypropylene, 72"D-94 545.00$ LF Culvert, DI, 6"D-95 61.00$ LF Culvert, DI, 8"D-96 84.00$ LF Culvert, DI, 12"D-97 106.00$ LF Culvert, DI, 15"D-98 129.00$ LF Culvert, DI, 18"D-99 152.00$ LF Culvert, DI, 24"D-100 175.00$ LF Culvert, DI, 30"D-101 198.00$ LF Culvert, DI, 36"D-102 220.00$ LF Culvert, DI, 48"D-103 243.00$ LF Culvert, DI, 54"D-104 266.00$ LF Culvert, DI, 60"D-105 289.00$ LF Culvert, DI, 72"D-106 311.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) Page 9 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) Specialty Drainage Items Ditching SD-1 9.50$ CY Flow Dispersal Trench (1,436 base+)SD-3 28.00$ LF French Drain (3' depth)SD-4 26.00$ LF Geotextile, laid in trench, polypropylene SD-5 3.00$ SY Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,000.00$ Each Pond Overflow Spillway SD-7 16.00$ SY Restrictor/Oil Separator, 12"SD-8 1,150.00$ Each Restrictor/Oil Separator, 15"SD-9 1,350.00$ Each Restrictor/Oil Separator, 18"SD-10 1,700.00$ Each Riprap, placed SD-11 42.00$ CY Tank End Reducer (36" diameter)SD-12 1,200.00$ Each Infiltration pond testing SD-13 125.00$ HR Permeable Pavement SD-14 Permeable Concrete Sidewalk SD-15 Culvert, Box __ ft x __ ft SD-16 SUBTOTAL SPECIALTY DRAINAGE ITEMS: (B)(C)(D)(E) STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch) Detention Pond SF-1 Each Detention Tank SF-2 Each Detention Vault SF-3 Each Infiltration Pond SF-4 Each Infiltration Tank SF-5 Each Infiltration Vault SF-6 Each Infiltration Trenches SF-7 Each Basic Biofiltration Swale SF-8 Each Wet Biofiltration Swale SF-9 Each Wetpond SF-10 Each Wetvault SF-11 Each Sand Filter SF-12 Each Sand Filter Vault SF-13 Each Linear Sand Filter SF-14 Each Proprietary Facility SF-15 Each Bioretention Facility SF-16 Each SUBTOTAL STORMWATER FACILITIES: (B)(C)(D)(E) Page 10 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs) WI-1 WI-2 WI-3 WI-4 WI-5 WI-6 WI-7 WI-8 WI-9 WI-10 WI-11 WI-12 WI-13 WI-14 WI-15 SUBTOTAL WRITE-IN ITEMS: DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:1,747.00 1,550.00 SALES TAX @ 10%174.70 155.00 DRAINAGE AND STORMWATER FACILITIES TOTAL:1,921.70 1,705.00 (B)(C)(D)(E) Page 11 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Connection to Existing Watermain W-1 2,000.00$ Each 1 2,000.00 Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 50.00$ LF Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 56.00$ LF Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 60.00$ LF Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 70.00$ LF Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 80.00$ LF Gate Valve, 4 inch Diameter W-7 500.00$ Each Gate Valve, 6 inch Diameter W-8 700.00$ Each Gate Valve, 8 Inch Diameter W-9 800.00$ Each Gate Valve, 10 Inch Diameter W-10 1,000.00$ Each Gate Valve, 12 Inch Diameter W-11 1,200.00$ Each Fire Hydrant Assembly W-12 4,000.00$ Each Permanent Blow-Off Assembly W-13 1,800.00$ Each Air-Vac Assembly, 2-Inch Diameter W-14 2,000.00$ Each Air-Vac Assembly, 1-Inch Diameter W-15 1,500.00$ Each Compound Meter Assembly 3-inch Diameter W-16 8,000.00$ Each Compound Meter Assembly 4-inch Diameter W-17 9,000.00$ Each Compound Meter Assembly 6-inch Diameter W-18 10,000.00$ Each Pressure Reducing Valve Station 8-inch to 10-inch W-19 20,000.00$ Each WATER SUBTOTAL:2,000.00 SALES TAX @ 10%200.00 WATER TOTAL:2,200.00 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR WATER Quantity Remaining (Bond Reduction) (B)(C) Page 12 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.d WATER Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E CED Permit #: Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Clean Outs SS-1 1,000.00$ Each Grease Interceptor, 500 gallon SS-2 8,000.00$ Each Grease Interceptor, 1000 gallon SS-3 10,000.00$ Each Grease Interceptor, 1500 gallon SS-4 15,000.00$ Each Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 80.00$ LF Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 95.00$ LF 10 950.00 Sewer Pipe, PVC, 8 inch Diameter SS-7 105.00$ LF Sewer Pipe, PVC, 12 Inch Diameter SS-8 120.00$ LF Sewer Pipe, DI, 8 inch Diameter SS-9 115.00$ LF Sewer Pipe, DI, 12 Inch Diameter SS-10 130.00$ LF Manhole, 48 Inch Diameter SS-11 6,000.00$ Each Manhole, 54 Inch Diameter SS-13 6,500.00$ Each Manhole, 60 Inch Diameter SS-15 7,500.00$ Each Manhole, 72 Inch Diameter SS-17 8,500.00$ Each Manhole, 96 Inch Diameter SS-19 14,000.00$ Each Pipe, C-900, 12 Inch Diameter SS-21 180.00$ LF Outside Drop SS-24 1,500.00$ LS Inside Drop SS-25 1,000.00$ LS Sewer Pipe, PVC, _10 Inch Diameter SS-26 115.00$ LF Lift Station (Entire System)SS-27 LS SANITARY SEWER SUBTOTAL:950.00 SALES TAX @ 10%95.00 SANITARY SEWER TOTAL:1,045.00 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR SANITARY SEWER Quantity Remaining (Bond Reduction) (B)(C) Page 13 of 14 Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E Planning Division |1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200 Date: Name:Project Name: PE Registration No:CED Plan # (LUA): Firm Name:CED Permit # (U): Firm Address:Site Address: Phone No.Parcel #(s): Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a) Existing Right-of-Way Improvements Subtotal (b)(b)4,840.22$ Future Public Improvements Subtotal (c)-$ Stormwater & Drainage Facilities (Public & Private) Subtotal (d)(d)3,626.70$ (e) (f) Site Restoration Civil Construction Permit Maintenance Bond 1,693.38$ Bond Reduction 2 Construction Permit Bond Amount 3 Minimum Bond Amount is $10,000.00 1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering. 2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will cover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering. * Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton. ** Note: All prices include labor, equipment, materials, overhead and profit. (425) 827-3063 yoshio.piediscalzi@drstrong.com Rogolo Townhomes PRE19-000224 82 Williams Avenue S. Renton, WA 145750-0025 FOR APPROVAL 620 7th Avenue, Kirkland, WA 98033 20,502.57$ P (a) x 100% SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS 7/6/2020 Yoshio L. Piediscalzi 53232 DR Strong Consulting Engineers R ((b x 150%) + (d x 100%)) S (e) x 150% + (f) x 100% Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2 Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2 T (P +R - S) Prepared by:Project Information CONSTRUCTION BOND AMOUNT */** (prior to permit issuance) EST1 ((b) + (c) + (d)) x 20% -$ MAINTENANCE BOND */** (after final acceptance of construction) 9,615.54$ 4,840.22$ 10,887.03$ 9,615.54$ -$ 3,626.70$ -$ Page 14 of 14 Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 7/14/2020 DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E