HomeMy WebLinkAboutSR_ERC_Report_Rogolo_201123_v3_FINALDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
SR_ERC Report_Rogolo_201123_v1
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: November 23, 2020
Project File Number: PR20-000209
Project Name: Rogolo Townhomes
Land Use File Number: LUA20-000180, ECF, SA-A, SSDP, MOD
Project Manager: Alex Morganroth, Senior Planner
Owner/Applicant/Contact: Joe Bernasconi / PO Box 1343, Renton WA 98057 / JoeB@Windermere.com
Project Location: 82 Williams Ave S, Renton, WA 98055
Project Summary: The applicant is requesting Administrative Site Plan Review, Environmental
(SEPA) Review, a Shoreline Substantial Development Permit, and a Modification
in order to construct an 11,096 sq. ft., three-story residential structure with six
attached dwellings (flats) and structured parking. The subject site is located at
82 Williams Ave S (APN 0007200147) and is in the Center Downtown (CD) zone
and Urban Design District A overlay. The site is 6,000 sq. ft. (0.14 acres) in size.
An existing single-family home is proposed for removal. The ground floor of the
proposed structure would consist of vehicle parking, storage, and mechanical
equipment. The two floors above would include six (6) attached residential units
and would yield a net density of approximately 42 du/ac. Access to the site
would be via a single driveway off of Williams Ave S. Critical areas mapped on
the site include a High Seismic Area, Wellhead Protection Area Zone 1 and the
Cedar River Reach B Regulated Shoreline - High Intensity area. No trees are
proposed for removal as a result of the project. The applicant submitted a SEPA
Checklist, Drainage Report, Geotechnical Report, and Shoreline Impacts Memo
with the application.
Exist. Bldg. Area: 2,000 SF Proposed New Bldg. Area (footprint):
Proposed New Bldg. Area (gross):
2,814 SF
11,096 SF
Site Area: 6,000 SF Total Building Area GSF: 11,096
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a
Determination of Non-Significance - Mitigated (DNS-M).
Williams Ave S DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E
City of Renton Department of Community & Economic Development
Rogolo Townhomes
Staff Report to the Environmental Review Committee
LUA20-000180, ECF, SA-A, SSDP, MOD
Report of November 23, 2020 Page 2 of 7
SR_ERC Report_Rogolo_201123_v1
ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials:
Issue a DNS-M
B. Mitigation Measures
1. The applicant shall submit an updated geotechnical report by Associated Earth Sciences, Inc. that is
consistent with applicable codes in effect at the time of building permit application. The applicant shall
comply with the recommendations of the updated geotechnical report or future addenda.
2. If any Native American grave(s) or archaeological/cultural resources (Indian artifacts) are found all
construction activity shall stop in accordance with RCW 27.53.060 and 27.44.020, and the
owner/developer shall immediately notify the City of Renton planning department, concerned Tribes’
cultural committees, and the Washington State Department of Archeology and Historic Preservation.
C. Exhibits
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: SEPA Checklist
Exhibit 3: Site Plan
Exhibit 4: Architectural Elevations and Rendering
Exhibit 5: Landscape Plan
Exhibit 6: Technical Information Report (TIR), prepared by DR Strong, Inc., dated July 24, 2020
Exhibit 7: Conceptual Drainage/Utilities Plan, prepared by D.R. Strong Consulting Engineers, dated
July 13, 2020
Exhibit 8: Subsurface Exploration, Geologic Hazard, and Geotechnical Engineering Report,
prepared by Associated Earth Sciences, Incorporated, dated April 8, 2020
Exhibit 9: Construction Mitigation Description
Exhibit 10: Transportation Concurrency Memo
Exhibit 11: Shoreline Critical Area Review, prepared by Re-Align Environmental, dated July 7, 2020
Exhibit 12: Advisory Notes
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the
applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction
with the proposed development. Staff reviewers have identified that the proposal is likely to have the following
probable impacts:
1. Earth
Impacts: The subject property is topographically flat with a vertical change of less than 5 feet across the
site. COR maps has identified the site is within a High Seismic Hazard Area. Construction impacts to the
site include the demolition of the existing single-family home and detached garage, as well as soil
DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E
City of Renton Department of Community & Economic Development
Rogolo Townhomes
Staff Report to the Environmental Review Committee
LUA20-000180, ECF, SA-A, SSDP, MOD
Report of November 23, 2020 Page 3 of 7
SR_ERC Report_Rogolo_201123_v1
excavation and grading for the new building. The applicant anticipates approximately 6,266 square feet
of ground disturbance on the site and in the ROW (Exhibit 7). Approximately one (1) cubic yard of
excavation would be needed for the foundation trenches and approximately 88 cubic yards of fill would
be imported onto the site.
Subsurface reconnaissance and assessment was conducted by the applicant’s geotechnical engineer and
summarized in the geotechnical report prepared by Associated Earth Sciences, Incorporated, dated April
8, 2020 (Exhibit 8) and submitted with the project application. One subsurface boring was conducted on
the site using a track-mounted drill rig. The maximum depth of exploration was approximately 31.5 feet,
with samples obtained at 2.5 to 5 foot-depth intervals. Findings from the one boring (Boring EB-1)
identify overbank alluvium comprised of loose to very loose silt and fine sand. Underlying the overbank
alluvium, channel alluvial soils were found from eight (8’) feet below grade until the maximum depth of
the exploration reached at 31.5 feet. The channel alluvial soils generally consisted of medium dense to
dense gravelly sand. Groundwater was encountered at 19 feet below grade and according to the
consultant, is expected to fluctuate seasonally due to the proximity to the Cedar River and frequency of
winter rainfall in the region.
According to the City of Renton (COR) Critical Areas Maps, the project site is located in a seismic hazard
area. The submitted geotechnical report concluded that the project site is subject to three (3) potential
hazards as a result of a seismic event: 1) surficial ground rupture, 2) liquefaction, and 3) ground motion.
Due to the long recurrence interval between seismic events and distance of the site from the nearest
fault system, the risk of surficial ground rupture is low according to the report. A liquefaction hazard
analysis completed for the site by the consultant using LiquefyPro computer software concluded that
the potential for liquefaction on the site is moderate and can be mitigated for with a specific foundation
design. According to the consultant, ground motion during a seismic event should be expected and can
be mitigated for by ensuring the 2015 IBC guidelines for seismic design are met.
The applicant’s geotechnical engineer includes a number of recommendations related to site
preparation, subgrade protection, site drainage and surface water control, and foundations. The
installation of rock-filled trenches under the foundation is recommended in order to mitigate for the
likely post-construction consolidation and settlement on the site. The trenches would extend to a depth
of between 8 and 9 feet and have minimum width of four feet. The consultant specifically recommends
that a geotechnical engineer or engineering geologist be present at the site on a full-time basis during
the trench excavation and backfill in order to ensure proper rock placement and trench depth. Once the
trenches are constructed and back-filled, a conventional spread footing foundation would be able to
adequately support the proposed new building. Due the groundwater fluctuation, the report
recommends that all perimeter foundation walls be provided with a drain at the footing elevation. The
recommendations in the report are based on seismic design standards in the 2015 International Building
Code (IBC) edition. The City of Renton plans to adopt the updated 2018 IBC in early 2021. Therefore in
order to ensure the correct seismic design requirements are reflected in the project recommendations,
staff recommends as a mitigation measure that the applicant be required to submit an updated
geotechnical report by Associated Earth Sciences, Inc. that is consistent with applicable codes in effect at
the time of building permit application. In addion, due to the presence of a geotechnical hazard on the
site, staff recommends as a mitigation measure that the applicant be required to comply with the
recommendations of the updated report or future addenda.
The applicant has indicated the project would result in approximately 257 sq. ft. of replaced impervious
area and 5,052 sq. ft. of new impervious surface area.
Mitigation Measures: The applicant shall submit an updated geotechnical report by Associated Earth
Sciences, Inc. that is consistent with applicable codes in effect at the time of building permit application.
The applicant shall comply with the recommendations of the updated geotechnical report or future
addenda.
DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E
City of Renton Department of Community & Economic Development
Rogolo Townhomes
Staff Report to the Environmental Review Committee
LUA20-000180, ECF, SA-A, SSDP, MOD
Report of November 23, 2020 Page 4 of 7
SR_ERC Report_Rogolo_201123_v1
Nexus: State Environmental Policy Act (SEPA) Environmental Review, City of Renton Comprehensive
Plan Policy L-37, RMC 4-3-050 Critical Areas Regulations, and RMC 4-4-060 Grading, Excavation and
Mining Regulations.
2. Air
Impacts: It is anticipated that some temporary air quality impacts could be associated with site work and
building construction required to complete the proposed project at this site. Project development
impacts during construction activities may include dust as a result of concrete cutting and utility work,
as well as exhaust from construction vehicles, equipment and/or machinery. These emissions would be
temporary and are anticipated to rapidly dissipate. Dust control would be mitigated through the use of
temporary erosion control measures, watering or other best management practices as identified in the
construction mitigation memo provided by the applicant (Exhibit 9).
No further site specific mitigation for the identified impacts from typical vehicle and construction
exhaust is recommended.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
3. Water
a. Wetland, Streams, Lakes
Impacts: A portion of the eastern half of the site is located in the Cedar River Reach B Shoreline High
Intensity Designation. As such, the applicant submitted a Shoreline Critical Area Review, prepared by
Re-Align Environmental and dated July 7, 2020 (Exhibit 11). Per the report, approximately 930 sq. ft.
of the property (or 16%) is located in the shoreline overlay. The proposed building would be sited at
a distance of approximately 170 feet from the Cedar River at its nearest point. Existing development
including a paved road (S Riverside Dr), multiple commercial buildings with associated surface
parking, and a single-family home is located between the project site and the river. Due to factors
including the developed nature of the surrounding area, a drainage conveyance design in which
runoff from all impervious surfaces are captured and conveyed to City infrastructure, and the fact
that only a small portion of the site that is located within the actual shoreline buffer area, the report
concludes that the project would result in no net loss of ecological function for the Cedar River.
Therefore, no further mitigation is recommended for impacts to the Cedar River.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
b. Ground Water
Impacts: The COR mapping system has identified the far eastern portion of the property is located in
a Wellhead Protection Zone 1 due to its proximity to the City’s source of drinking water. The site’s
proposed residential use is not indicative of a type of use that would potentially harm the City’s
groundwater. Further, site excavations are relatively shallow and likely would not encounter
groundwater as it was found to be 19 feet below grade. However, any offsite fill materials shall be
from a verifiable source in order to ensure it is clear of contaminants. The City’s grading and
excavation regulations require imported fill in excess of 50 cubic yards within a Zone protection
have a source statement certified by a qualified professional or confirm the fill was obtained from a
WDOT approved source.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E
City of Renton Department of Community & Economic Development
Rogolo Townhomes
Staff Report to the Environmental Review Committee
LUA20-000180, ECF, SA-A, SSDP, MOD
Report of November 23, 2020 Page 5 of 7
SR_ERC Report_Rogolo_201123_v1
c. Storm Water
Impacts: The applicant submitted a Technical Information Report (TIR) prepared by D.R. Strong
Consulting Engineers, Inc., dated July 24, 2020, (Exhibit 6) with the land use application. The report
analyzes existing conditions and proposed surface water collection and distribution. All nine core
requirements and the six special requirements have been discussed in the drainage report.
The project site is located within the Lower Cedar River drainage basin. According to the consultant,
the natural discharge location for the project is at the northeastern corner of the site due to the
downward slope that travels from the western to the eastern portion of the site. Currently, runoff
leaves the site via a sheet flow process to a drain located at the northeast corner of the property at
74 Williams Ave S. The flowpath from the project site discharge point is less than a half mile to the
Cedar River, therefore the final TIR is required to provide a review of any downstream water quality
problems and propose mitigation if problems are encountered in the analysis. The project is
required to provide basic water quality treatment, regardless of whether any problems are found.
The project may qualify for the direct discharge exemption and should demonstrate compliance
with the exemption criteria in the Final TIR submitted at the time of Civil Construction Permit
application. According to the preliminary TIR, the proposal is also exempt from providing water
quality based on a surface area exemption outlined in the Renton Surface Water Design Manual
(RSWDM). Staff concurs with the applicant’s water quality exemption claim based on the amount of
new pollution generating impervious surface (PGIS) proposed. If the plans submitted with Civil
Construction Permit exceed 5,000 SF of PGIS then either a leachable metals covenant or water
quality treatment would need to be provided.
Under the proposed stormwater conditions, the majority of the new runoff would occur from the
non-pollution generating roof area of the proposed building. Flows would be collected via roof
drains and a single yard drain, and conveyed via one discharge pipe to the public storm main in
Williams Ave S.
A Stormwater Pollution Prevention Plan (SWPPP) is required for this site and was provided with the
preliminary TIR. All impacts to stormwater are anticipated to be addressed through the
requirements of the RSWDW and no additional mitigation measures are recommended.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
4. Vegetation
Impacts: Except for the existing single-family home and associated detached garage, the subject
property is almost entirely covered in unmaintained grasses. There are no trees located on the site and a
single tree within the existing planter strip along the Williams Ave S frontage. The applicant submitted a
conceptual landscape plan prepared by Monsef Design Studio (Exhibit 5). The existing street tree was
not shown on the landscape plan but will be required to be retained. Four (4) white pine trees are
provided between the building and the sidewalk and are interspersed with small to medium flowering
trees and shrubs. As shown on the applicant’s landscape plan, a landscape buffer strip ranging in width
between three (3) and five (5) feet is proposed around the entire perimeter of the site and would be
planted with a mix of ferns, daffodils, iris, and medium to low lying shrubs such as azaleas or
rhododendrons. Additional at-grade and above grade onsite planting is proposed along the front (west)
façade.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
5. Aesthetics
DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E
City of Renton Department of Community & Economic Development
Rogolo Townhomes
Staff Report to the Environmental Review Committee
LUA20-000180, ECF, SA-A, SSDP, MOD
Report of November 23, 2020 Page 6 of 7
SR_ERC Report_Rogolo_201123_v1
Impacts: The proposed building would be three (3) stories tall and approximately 38 feet tall at the
highest point (Exhibit 4). While larger than the surrounding single-family homes, the size of the building
is typical for the CD zone and is similar in scale to future development expected on the block. Similarly
sized buildings are already present to the west and south of the site. Exterior features proposed as part
of the building design include a ground floor brick façade along the frontage, significant clear glazing
along all façades, decorative exterior lighting fixtures, and integrated above-grade planters. Upper floors
incorporate Hardie siding in both lap and panel configurations with varying colors. The building’s
articulation treatments include proportionate modulations on the second and third stories, ground to
roof color and materials transitions, alternating trim bands, and a combination of pitched and slope roof
forms. Upper story inset balconies further enhance the building’s articulation. The applicant would be
required to meet Urban Design Regulations for overlay District ‘A’ as a component of the land use
application.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
6. Environmental Health
Noise
Impacts: Noise impacts would primarily result from the construction of the proposed road
improvements and new structures. The construction noise would be regulated through the City’s
adopted noise level regulations per Chapter 8-7, RMC. The City’s noise regulations limit haul hours
between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development
Services Division. Permitted work hours in or near residential areas are restricted to the hours between
seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m. for multi-family construction activities from
Monday through Friday. Work on Saturdays is restricted to the hours between nine o’clock (9:00) a.m.
and eight o’clock (8:00) p.m. No work is permitted on Sundays (Exhibit 20).
Temporary noise impacts are anticipated that would be commonly associated with multi-family
development.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
7. Historic and Cultural Preservation
Impacts: In the SEPA checklist, the applicant indicated that they completed a search of the Washington
State Information System of Architectural and Archaeological Records Data. The Checklist concludes that
the system did not identify any properties within the project area as being on the historic property
inventory or register.
The portion of the Cedar River near the project site was channelized in 1912 in order to redirect the
river to flow into Lake Washington instead of the Black River. Based on the probability of the subject site
being near the banks of an old river channel, there is a higher likelihood of cultural resources discovery,
through ground disturbing activity. As such, staff recommends as a mitigation measure that if any Native
American grave(s) or archaeological/cultural resources (Indian artifacts) are found all construction
activity shall stop in accordance with RCW 27.53.060 and 27.44.020, and the owner/developer shall
immediately notify the City of Renton planning department, concerned Tribes’ cultural committees, and
the Washington State Department of Archeology and Historic Preservation (DAHP). The SEPA checklist
indicates that if any archaeological resources are encountered a professional Archaeologist would be
called to assess the significance of the find.
Mitigation Measures: If any Native American grave(s) or archaeological/cultural resources (Indian
artifacts) are found all construction activity shall stop in accordance with RCW 27.53.060 and 27.44.020,
DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E
City of Renton Department of Community & Economic Development
Rogolo Townhomes
Staff Report to the Environmental Review Committee
LUA20-000180, ECF, SA-A, SSDP, MOD
Report of November 23, 2020 Page 7 of 7
SR_ERC Report_Rogolo_201123_v1
and the owner/developer shall immediately notify the City of Renton planning department, concerned
Tribes’ cultural committees, and the Washington State Department of Archeology and Historic
Preservation.
Nexus: SEPA Environmental Review, RCW 27.53 Archaeological Sites and Resources, and RCW 27.44
Indian Graves and Records.
8. Transportation
Impacts: According to the submitted Environmental SEPA Checklist, the applicant indicates that the
proposed project would generate less than twenty (20) new PM peak hour trips and therefore a traffic
analysis was not provided with the application (Exhibit 2). Staff has reviewed the applicant’s justification
and concurs with the finding that the new use would not generate more than 20 new PM peak hours
trips. Therefore, at this time, staff does not recommend any site-specific mitigation measures related to
traffic impacts, as any impacts would mitigated through the payment of code-required traffic impact
fees at the time building permit issuance.
The applicant has proposed six (6) new structured parking spaces which would accommodate the
parking needs for future residents of the building.
The proposal has passed the City’s Traffic Concurrency Test per RMC 4-6-070.D (Exhibit 10), which is
based upon a test of the citywide Transportation Plan, consideration of growth levels included in the
LOS-tested Transportation Plan, and future payment of appropriate Transportation Impact Fees.
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
9. Fire & Police
Impacts: Police and Fire Prevention staff indicated that sufficient resources exist to furnish services to
the proposed development; provided the applicant constructs Code required improvements and pays
associated impact fees (Exhibit 12).
Mitigation Measures: No further mitigation recommended.
Nexus: N/A
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments
have been incorporated into the text of this report and/or “Advisory Notes to Applicant.”
Copies of all Review Comments are contained in the Official File and may be attached to this report.
DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
Rogolo Townhomes
Land Use File Number:
LUA20-000180, ECF, SA-A, SSDP, MOD
Date of Meeting
November 23, 2020
Staff Contact
Alex Morganroth
Senior Planner
Project Contact/Applicant
Joe Bernasconi / PO Box
1343, Renton WA 98057 /
JoeB@Windermere.com
Project Location
82 Williams Ave S, Renton, WA
98055
The following exhibits are included with the ERC Report:
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: SEPA Checklist
Exhibit 3: Site Plan
Exhibit 4: Project Rendering
Exhibit 5: Landscape Plan
Exhibit 6: Drainage Report, prepared by DR Strong, dated July 24, 2020
Exhibit 7: Conceptual Drainage/Utilities Plan, prepared by D.R. Strong Consulting Engineers, dated
July 13, 2020
Exhibit 8: Geotechnical Report, prepared by Associated Earth Sciences, Inc, dated April 8, 2020
Exhibit 9: Construction Mitigation Description
Exhibit 10: Transportation Concurrency Memo
Exhibit 11: Shoreline Critical Area Review, prepared by Re-Align Environmental, dated July 7, 2020
Exhibit 12: Advisory Notes