HomeMy WebLinkAboutExhibit_9_Construction_Mitigation_DescriptionRogolo Townhomes Construction Mitigation Description The following narrative is provided to describe the proposed construction mitigation measures that the applicant “Applicant” and the to be named general contractor “Contractor” will implement throughout the duration of the site development and infrastructure period as well as during building construction. Proposed Construction Dates (Site Work): May 2020-October 2020 The Applicant anticipates on beginning clearing and site development work in the spring of 2021 depending on the timing of approvals. A roughly 180 day schedule is anticipated to finalize all grading, storm, sewer, water and asphalt repair. The goal will be to have the site completely stabilized by November 1st, 2021 before the winter. Proposed Construction Dates (Building Construction): The Applicant plans on beginning construction of the proposed building in spring of 2021 and anticipates an average construction timeline of seven months to complete. Hours & Days of Operation Normal site hours of operation will be in compliance with the allowable working hours in the City of Renton which are as follows: For new single-family residences and non-residential construction, the permitted work hours are 7:00am-8:00pm Monday through Friday, 9:00am-8:00pm Saturday, and no work shall be permitted on Sunday. Proposed Hauling/Transportation Routes The Project is located at 82 Williams Avenue S just south of the intersection of Williams Avenue S and S Tobin Street. The contractor anticipates one hauling route to and from Maple Valley Highway. It will start with heading south on Williams Avenue S before turning east on S 3rd Street which eventually becomes Houser Way S. Houser Way continues before reaching Maple Valley Highway. Measures to Minimize Impacts The Applicant and the Contractor will make every effort to minimize the impacts from this project on the surrounding neighbors, the environment and traffic circulation for the immediate area. The Contractor and the Applicant’s contact information will be clearly posted Exhibit 9 RECEIVED 07/29/2020 amorganroth PLANNING DIVISION DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E at the site to ensure communication and immediate responses to any questions or inquiries from the community. Dust/Mud/Erosion Impacts- The Contractor will implement and maintain the TESC measures approved for the project at all times. Measures such as water trucks, street sweepers and maintaining perimeter erosion fencing help to mitigate impacts. In addition, regular inspections by the City of Renton and the project’s certified erosion control and sediment lead (to be determined), as well as regular meetings between the Applicant and the Contractor to ensure compliance. Traffic/Transportation Impacts- The applicant and the Contractor will secure all necessary Right-of-Way use permits including providing traffic control measures to minimize the impact of the frontage improvements associated with the project. Haul routes and hours will be adhered to and the Applicant is attempting to minimize the amount of import/export needed on the project through careful design of the finishing grade within the site. Utilizing the on-site material and repurposing wood chips and top soil from the clearing activities minimize the need for ongoing truck and trailer loads. Noise- The Contractor will comply with the allowable working hours in the City of Renton (see above) to minimize the impact to neighbors during the site construction and building construction. DocuSign Envelope ID: 7AA8C5B2-956E-4E15-93A2-9CB8F148EB1E