Loading...
HomeMy WebLinkAboutMFP20005502.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP20005502 IVR Number: 20005502 Permit Information Permit Name: Astound Broadband/Wave Address/Location:11/05/2020Application Date:0850220000Parcel Number: 1000 OAKESDALE AVE SW Permit Type:11/30/2020Issue Date:Franchise Permit Work Class:11/30/2021Expiration Date:Minor Utility Job Number: 33642Franchise Type:Cable Description: Pull 24ct fiber through existing wave conduit for 160'. Dig and intercept existing wave conduit. Bore (1) 2" conduit W/ (1) 24ct fiber 12'. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling TYLER LIBADIA WAVE BROADBAND 3700 Monte Villa Pkwy Bothell, WA 98021 C: (425) 256-0547Applicant MATTHEW BADGLEY WAVE BROADBAND B: (425) 599-4128Applicant Michael Miller WAVE Broadband / Astound 401 Parkplace Center, Suite 500 Kirkland, WA 98033 B: (425) 223-0153Contact Domonique Price Wavedivision Holdings LLC 401 Parkplace Center, Suite 500 Kirkland, WA 98033 B: (425) 576-8200Contact NISQUALLY COMMUNCATION SERVICES GOVT CORP 12820 YELM Hwy SE OLYMPIA, WA 98513 B: (360) 338-0577Contractor Business License Number: 53579Construction Contractor: NISQUCS835RO CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Astound Broadband - billing 401 PARKPLACE CENTER, Suite 500 KIRKLAND, WA 98033 Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP20005502 Scott Warlick 11/30/2020 RESTORATION PER CITY OF RENTON STANDARDS DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering MFP20005502 Scott Warlick CED 11/30/2020 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CUSTOMER CONTACTS WAVE CONTACTS CUSTOMER CONTACT: ALTERNATE CONTACT: CONSTRUCTION MANAGER: PROJECT MANAGER: SCOPE OF WORK AERIAL CONSTRUCTION: BUILDING CONSTRUCTION: PERMITS: UNDERGROUND CONSTRUCTION: SITE CONSTRUCTION: EASEMENTS: OVERVIEW VICINITY GENERAL NOTES PAGE INDEX TITLET PAGE ID T PV TCP C DESCRIPTION PLAN VIEW TRAFFIC CONTROL PLANS CONSTRUCTION STANDARDS [33642] CITY OF RENTON - ROW PERMIT PLAN SET TITLE PAGE 1000 Oakesdale Ave. SW Renton, WA 98057 PLAN DATA * DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE PRECEDENCE. * THIS SET OF PLANS IS INTENDED TO BE USED FOR DIAGRAMMATIC PURPOSES ONLY. * PLAN DATA & ROW LOCATIONS ARE APPROXIMATE. STANDARDS * COORDINATE WITH SITE CONTACT MINIMUM 24 HOURS PRIOR TO STARTING ANY WORK ON PRIVATE PROPERTY. * ALL WORK AREAS TO COMPLY WITH OSHA/WISHA SAFETY STANDARDS. * ALL EFFORT TO PREVENT CONTAMINATION FROM CONSTRUCTION DEBRIS WILL BE TAKEN. SITE CONSTRUCTION * ALL CONSTRUCTION TO MEET NESC SAFETY STANDARDS. * WORK AREA WILL BE RESTORED TO “AS IS” OR “BETTER THAN” CURRENT CONDITIONS. * ALL EXTERIOR AND INTERIOR BUILDING PENETRATIONS TO BE WEATHER SEALED AND/OR FIRE CAULKED. * EXISTING UNDERGROUND UTILITIES ARE TO BE LOCATED. * FIELD VERIFICATION BY APPROVED METHODS REQUIRED BEFORE DIGGING OR TUNNELING COMMENCES. * NEW UNDERGROUND FACILITIES ON PRIVATE PROPERTY WILL BE A MINIMUM OF 30" IN DEPTH. * HARD SURFACE RESTORATION (ASPHALT OR CONCRETE) WILL BE RESTORED WITHIN 3 WEEKS OF JOB COMPLETION OR AS WEATHER PERMITS. * CONDUIT ENDS SHALL ONLY TERMINATE INSIDE WAVE OR CUSTOMER OWNED VAULTS. * ALL CONDUIT WILL BE SEALED WITH EXPANDABLE FOAM OR DUCT PLUGS, IN LAST VAULT BEFORE THE BUILDING * ALL CONDUIT WILL HAVE A DEDICATED LOCATE WIRE AND ADDITIONAL PULLING LINE FOR FUTURE. MATERIALS *MATERIALS SPECIFICATIONS SHEETS CAN BE PROVIDED UPON PROPERTY OWNER REQUEST. CITY OF RENTON - ROW AERIAL TOTAL LINEAR FOOTAGE = 0' U/G TOTAL LINEAR FOOTAGE =172 ' AERIAL + U/G TOTAL LINEAR FOOTAGE = 172' RISER TOTAL FOOTAGE = 0' PROJECT TOTAL ROW FOOTAGE = 172' JILLIAN HENDERSHOT jhendershot@wavebroadband.com TYLER LIBADIA 425-256-0547 tlibadia@wavebroadband.com AREA OF WORK PROJECT NAME: PROJECT NUMBER: LOCATION: AUTHOR: CHRISTOPHER.GIBSON@WAVEBROADBAND.COM 425-429-5052 Embry Riddle Aero University 33642 S24 T23N R4E 47.471326 -122.234997 PULL (1) 24ct FIBER THROUGH EXISTING WAVE CONDUIT - 160' DIG & INTERCEPT EXISTING WAVE CONDUIT BORE (1) 2" CONDUIT W/ (1) 24ct FIBER - 12' MFP20005502 LEGEND DETAIL ROW BOUNDRY OVER LASH AERIAL FACILITIES NEW AERIAL EXISTING UNDERGROUND CONDUIT NEW UNDERGROUND CONDUIT NEW FIBER OPTIC CABLE TRANSMISSION POLE DISTRIBUTION POLE WAVE POLE NEW DOWN GUY EXISTING DOWN GUY EXISTING VAULT NEW VAULT SPLICE ENCLOSURE FIBER TERMINATION PANEL / DEMARC PLAN VIEWP-1 1 900 1000 24ct 24ct 2" TIE-IN AT EXISTING WAVE VAULT1 PULL (1) 24ct FIBER THROUGH EXISTING WAVE CONDUIT - 160'2 DIG & INTERCEPT EXISTING WAVE CONDUIT3 BORE (1) 2" CONDUIT W/ (1) 24ct FIBER - 12' 4 INTERCEPT CUSTOMER OWNED CONDUIT ON PRIVATE PROPERTY5 2 4 3 5 6 PULL (1) 24ct FIBER THROUGH CUSTOMER OWNED CONDUIT ON PRIVATE PROPERTY6 PROJECT NAME: PROJECT NUMBER: LOCATION: AUTHOR: CHRISTOPHER.GIBSON@WAVEBROADBAND.COM 425-429-5052 Embry Riddle Aero University 33642 S24 T23N R4E 47.471326 -122.234997 MFP20005502RESTORATION PER CITY OF RENTON STANDARDS MFP20005502 Provide a spotter to assist Pedestrians around work area General Notes * A copy of the permit shall be on site at all times. * Where permits from state, county, city, railroad or government agencies are required all work performed will comply with these agencies standard specifications. * Work areas to comply with OSHA/WISHA safety standards and traffic control plans approved in the permit. * Wave reserves the right to inspect at any time the work being performed by the contractor. If the Wave representative determines that the work is not being performed to minimum quality standards, then the contractor shall provide rework at his own cost. * Any change in project scope, including but not limited to, conduit length, conduit path, aerial path etc., must be approved by Wave representative. General Underground Construction Notes * Contractor is responsible for locating all utilities 48 hours prior to construction activity. See local directory for contact telephone number of local call before you dig agency. * Any and all underground utilities encountered are the responsibility of the contractor to locate, protect, and repair, if damaged. * Bore depths shall be a minimum of 36" deep. If 36" depth is not attainable, you must get the written approval of the Wave Construction Lead/Manager and document, in detail, the path and depth variance. * Conduit sweeps at the sides of structures (buildings or poles) shall be Sched 40 PVC 3ft radius with bell ends down. * Sweeps at poles shall be a minimum of 5" from the pole and/or line up with an empty spot on any existing riser brackets. * If no existing riser brackets are present, the conduit shall sweep up on the side of the pole with the 'butt gain' cut out. * Sweeps at the side of a building shall be approximately 2" from the wall to accommodate uni-strut to secure the conduit to the wall vault or Wave riser (which ever is placed). * All vaults shall be set on a 4" layer of drainable gravel material and conduit shall extend above the gravel surface. * Conduit shall extend no more than 2" above gravel base inside of vaults or no more than 2" inside vault sidewall penetrations. * Concrete vault wall penetrations shall be grouted, inside and out. * Hard surface restoration (asphalt or concrete) must be restored within 3 weeks of job completion, or as weather permits. * All buried infrastructure must be accompanied with warning tape and/or tracer wire – as called out. * Locate wire to be exposed at the base of any riser. * All conduit to be plugged with expandable foam or duct seal after fiber is placed. * Bore depth profile shall include: - Detailed description of 0.00 start station. including GPS coordinates (can be obtained from Google Earth in Degrees/Decimal format) - Bore direction in Degree's-magnetic (can be obtained from Google Earth measuring tool) - Bore vertical profile data at 20ft intervals with occasional detailed description of interval station, listed as x+xx ft. and xx in deep - Lateral alignment in relation to the road curb or centerline listed as 0.00ft E-W-N or S of Curb, Fog line or Centerline. General Aerial Construction Notes * All work to be NESC compliant. * All fiber cables to be double-lashed to strand. * Install anchors before strand is tensioned and fiber installed. * All risers shall be installed on the 'cut out' side of the pole where the 'Butt Gain' notch is. * Conduit on risers shall always have the bell end down. Fiber Placement Notes * If Wave is co-occupying developer installed conduit with other telecommunications facilities, we shall pull in a multi cell duct divider system, such as MaxCell and pull the Wave fiber in one of the cells. * Fiber optic identification tags shall be placed at every work pole, manhole, fiber, storage loops, splice cases and where indicated by project manager. tags need to be placed so as to be read from the ground. * All fiber in vaults and exposed in buildings shall have Wave 'ID Carrots' at input and output and at approx. 60ft intervals. * Cable lubrication shall be used to reduce pulling tension. Lubricants must not contain any petroleum products. * A 100 foot fiber coil must remain in all vaults unless otherwise noted. * All risers will be capped at all times. *All slack shall be marked with colored tape at the “ID carrots” to indicate direction to the next structure (vault or pole, Not snowshoe) 1.) The Center of the slack shall have the colored tape next to each other to indicate the center of the stored slack. 2.) RED tape for the next structure South (2) bands RED and West (1) RED - from current location. 3.) BLUE tape for the next structure – North (2) bands BLUE and East (1) band BLUE - from the current location. * When preparing slack for a new splice closure, mark the center with colored tape to show direction. * If there is traffic control required at the splice location, prep the splice tails for splicing. * If excess cable is pulled off the reel, NEVER cut the excess off. * Always distribute the excess along the project path as follows; Under 60ft –store at the nearest slack storage. Over 60ft –call the PM to determine how to distribute. CONSTRUCTION STANDARDSC-1 MFP20005502 General Requirements and Information * Work is expected to begin no less than 7 days upon issuance of work order and approved permits to Contractor unless otherwise agreed upon in writing by Wave project manager. * Contractor shall ensure they have and maintain valid Business Licenses as needed to perform the work. * Contractor shall provide within 3 days of issuance a written schedule for anticipated completion time frames. * Contractor shall place multiple crews on the project as needed to ensure completion of the project within the agreed upon project schedule. * Contractor shall ensure any and all subs they may elect to use, meet all Wave requirements as listed in this RFP or as agreed upon between WDH and Contractor. * Contractor also agrees to be solely responsible for any and all activities performed by the sub and accepts all liabilities implicit and/or implied for those activities performed by the sub. Materials * Fiber shall be provided by Wave * All other material shall be furnished by contractor, unless otherwise agreed upon with project manager. Closeout Package * Complete and submit Wave documentation forms. * Submit as-built prints within 1-week of job completion, prior to submitting an invoice. * As-Built documentation needs to include fiber sequential at all locations (i.e. vaults in/out, riser, pole, loops in/out, tails, etc.). * Invoice needs to include fiber reel number and pre-construction sequential (Inside/Outside) and Post-Construction sequential (Inside/Outside). * Send all Invoices to cpminvoices.wa@wavenotify.com, with the job name & number in the subject line * New Underground As-built documentation will consist of an aerial overview detailing new facilities pathway, including structures (i.e.. vaults, risers, etc.) and where applicable, accompanied by a bore profile. * Photos are required for all new vault and riser installations. * Bore depth profile: 1.) Shall include: - Detailed description of 0.00 start station. including GPS coordinates (can be obtained from Google Earth in Degrees/Decimal format) 2.) Bore direction in Degree's-magnetic (can be obtained from Google Earth measuring tool) 3.) Bore vertical profile data at 20ft intervals with occasional detailed description of interval station, listed as x+xx ft. and xx in deep 4.) Lateral alignment in relation to the road curb or centerline listed as 0.00ft E-W-N or S of Curb, Fog line or Centerline. * Wave reserves the right to request additional close out information on a per project basis. These specific requests will be agreed upon prior to work commencement. All footages shall be listed on the invoice as such: Reel # C024-0615 Inside footage: 0' Outside footage:12,342' End Footage: 19,998' Numbers above are examples All invoices will be rejected if the footages are not listed as such and match the inventory of the reel on file. Footages for invoicing purposes. *Inside footage – This is the inner footage typically exiting center of reel – remains the same until all fiber is removed. * Outside footage - This is the outside footage at the reel, as it comes off the reel after the job is complete. * End footage - This is the end of the fiber at the far end of the job, after the job is complete. CONSTRUCTION STANDARDSC-2 MFP20005502