Loading...
HomeMy WebLinkAboutT-404310Y V) 3 W a z POST- SEE STD. SPEC. 8-01.3(9)A GEOTEXTILE BACKFILLED & COMPACTED NATIVE SOIL LEI = -rr.-rrr• BURY GEOTEXTILE IN TRENCH II :0 FASTEN GEOTEXTILE TO POST EVERY 6" (IN.) O.C. 0 a SELF-LOCKING TIE -NYLON 6/6 (MIN. GRADE), 120# MIN. TENSILE STRENGTH, UV STABILIZED 'Ti NOTE DURING EXCAVATION, MINIMIZE DISTURBING THE GROUND AROUND TRENCH AS MUCH AS IS FEASIBLE, AND SMOOTH SURFACE FOLLOWING EXCAVATION TO AVOID CONCENT- RATING FLOWS. COMPACTION MUST BE ADEQUATE TO PREVENT UNDERCUTTING FLOWS. 4 H TYPICAL INSTALLATION DETAIL (STEEL POSTS SHOWN) / Qk SEE NOTE 1 Q� NOTES 1. Install the ends of the high visibility silt fence to point slightly upslope to prevent sediment from flowing around the ends of the fence. 2. Perform maintenance in accordance with Standard Specifications 8-01.3(9)A and 8-01.3(15). 3. Splices shall never be placed in low spots or sump locations. If splices are located in low or sump areas, the fence may need to be reinstalled unless the Project Engineer approves the installation. 4. Install silt fencing parallel to mapped contour lines. / SEE NOTE 1 Q GEOTEXTILE FOR HIGH VISIBILITY SILT FENCE COLOR - ORANGE - SEE STANDARD SPECIFICATION SECTION 9-33.2 (1), TABLE 6 POST - WOOD OR STEEL (TYPICAL) TYPICAL HIGH VISIBILITY SILT FENCE WITHOUT BACKUP SUPPORT ISOMETRIC (STEEL POSTS SHOWN) FASTEN GEOTEXTILE TO POST EVERY 6" (IN.) O.C. EROSION/SEDIMENTATION CONTROL NOTES 1. CONTRACTOR SHALL SUBMIT TEMPORARY WATER POLLUTION/EROSION CONTROL PLAN PER THE CONTRACT SPECIFICATIONS. 2. ALL LIMITS OF CLEARING AND AREAS OF VEGETATION PRESERVATION SHALL BE OBSERVED DURING CONSTRUCTION. 3. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE IN OPERATION PRIOR TO LAND CLEARING AND/OR OTHER CONSTRUCTION TO ENSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER THE NATURAL DRAINAGE SYSTEM. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND /OR CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON —SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 4. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND AS UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE CONTRACTOR SHOULD ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE CONTRACTOR TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY HIS ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE THE MINIMUM REQUIREMENTS, AS MAY BE NEEDED TO PROTECT ADJACENT PROPERTIES AND THE WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 5. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND DISPOSING OF THE SEDIMENT. ALL CATCH BASINS, CONVEYANCE LINES AND DITCHES SHALL BE CLEANED PRIOR TO PAVING. 6. THE CONTRACTOR SHALL REMOVE MATERIAL DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO THE CITY RIGHT—OF—WAY OR INTO THE EXISTING STORM DRAINAGE SYSTEM. DEBRIS SHALL NOT BE WASHED INTO THE STORM DRAINAGE SYSTEM. 7. TEMPORARY EROSION CONTROL FACILITIES SHALL BE INSPECTED WEEKLY AND MAINTAINED WITHIN 24 HOURS FOLLOWING A STORM EVENT. SEDIMENT SHALL BE REMOVED TO INSURE THE FACILITIES WILL FUNCTION PROPERLY. THE FACILITIES SHALL BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR ON —SITE EROSION HAS PASSED. 8. ALL STORM DRAIN INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT STORMWATER RUNOFF SHALL NOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. 9. NO DISTURBED SOIL SHALL REMAIN UNSTABILIZED FOR MORE THAN TWO DAYS. FABRIC (GEOTEXTILE) (TYPICAL) HIGH VISIBILITY SILT FENCE r a STANDARD PLAN 1-30.17-00 SHEET 1 OF 1 SHEET SPLICED FENCE SECTIONS SHALL BE CLOSE ENOUGH TOGETHER TO PREVENT SILT LADEN WATER FROM ESCAPING THROUGH THE APPROVED FOR PUBLICATION FENCE AT THE OVERLAP. JOINING SECTIONS SHALL NOT BE PLACED IN LOW SPOTS OR IN SUMP LOCATIONS. Pasco Bakotich III 3122113 STATE DESIGN ENGINEER DATE SPLICE DETAIL A=k Washington State Department of Transportation (WOOD POSTS SHOWN) v7A �� SEDIME DRAINAGE GRATE - REC- SECTION VIEW ISOMETRIC VIEW C" \AAV NOTES 1. Size the Below Inlet Grate Device (BIGD) for the storm water structure it will service. 2. The BIGD shall have a built-in high -flow relief system (overflow bypass). 3. The retrieval system must allow removal of the BIGD without spilling the collected material. 4. Perform maintenance in accordance with Standard Specification 8-01.3(15). PUBLIC WORKS CATCH BASIN FILTER DEPARTMENT PASS 3RATE DEVICE =M (TYP.) STD. PLAN - 216.30 FA_a 1!: Tiiiiiiiiiiiiiii 0 310 0 1" 2" TWO INCHES AT FULL SCALE. IF NOT, SCALE ACCORDINGLY • U V U) w w O Z Z W v' Z I � J U) Z O L� M Ir O 0 F_ N C9 0 is LLI Q Z U 0 0 0 U Q LJ 0 D_ D_ Q w a 0 Z 0 0 0 £o �r�3� 6 > 0 N m D_ N Z O LL O U LU n/ LL w 'a �v 0 S =' -O O v N m W rQ_ w N0. dj f] m In a Y U U ?N W O Z 0 Z_ U Z Q O li Z 3 LU 0 Z W = J W LLL O H Z 0 0 ? Z W a F_ o w F_ V 0 0 > Q Z Y Z 0 Z W SHEET: 9/TE-6 OF: 70 JOB NO.: 17534 DWG: TESC_DET