HomeMy WebLinkAboutT-404340U)
w
a
z
g
a
00
O
O
N
O
N
co
N
0
c
01
O
0
0
0)
c
�U
0
I
I
I
I
I
I
r
RENTON AVE S
W I
a ----
W
W
co
O
C j 00
ch 5
a 33+00
W
z
J
L) 5
GENERAL
1. ALL SIGN TYPES, COLORS, AND DIMENSIONS ARE STANDARD PER THE
MUTCD, UNLESS OTHERWISE INDICATED.
2. SIGNS SHALL BE CONSTRUCTED ENTIRELY OF TYPE III OR TYPE IV
REFLECTIVE SHEETING PER WSDOT STANDARD SPECIFICATIONS SECTION
9-28.12.
3. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC UNLESS INDICATED
OTHERWISE.
4. CONTRACTOR SHALL FURNISH AND INSTALL TEMPORARY PAVEMENT
MARKINGS IMMEDIATELY FOLLOWING PAVING.
CHANNELIZATION NOTES:
1.
CONTRACTOR SHALL FURNISH AND INSTALL 4" PAINTED EDGE LINE W/
J
RPMs PER COR DETAIL HR-03, COR STANDARD PLAN PAGE H008,
m
SHEET 41 /CH-9.
+�
W 2.
CONTRACTOR SHALL FURNISH AND INSTALL DOUBLE YELLOW CENTER
W
LINE PER COR STANDARD PLAN PAGE H001, SHEET 39/CH-7.
3.
CONTRACTOR SHALL FURNISH AND INSTALL TWO-WAY LEFT TURN LANE
+I
w
0
'
CDPER
COR STANDARD PLAN PAGE H001, SHEET 39/CH-7.
c�
31
32
+ p4.
CONTRACTOR SHALL FURNISH AND INSTALL APPROACH LINE PER COR
+00
M
STANDARD PLAN PAGE H001, SHEET 39/CH-7.
w
o
Q 5.
CONTRACTOR SHALL FURNISH AND INSTALL LANE LINE PER COR
N
H--
STANDARD PLAN PLAN PAGE H002, SHEET 39/CH-7.
-
W 6.
CONTRACTOR SHALL FURNISH AND INSTALL 24" PLASTIC STOP LINE PER
0
0
z
COR DETAIL HR-03, COR STANDARD PLAN PAGE H008, SHEET
=
41 /CH-9.
V 7.
CONTRACTOR SHALL FURNISH AND INSTALL 24" PLASTIC CROSSWALK
LINES PER COR STANDARD PLAN H-05, COR STANDARD PLAN PAGE
H009.1, SHEET 42/CH-10.
8.
CONTRACTOR SHALL FURNISH AND INSTALL WHITE PLASTIC TRAFFIC
-----------------
ARROW PER COR STANDARD PLAN PAGE H009, SHEET 41 /CH-9.
9.
CONTRACTOR SHALL FURNISH AND INSTALL PLASTIC YIELD LINE SYMBOL
PER WSDOT STANDARD PLAN M-24.60-04, SEE SHEET 40/CH-8.
10.
CONTRACTOR SHALL PAINT ISLAND CURB WHITE WHERE LOCATED ALONG
THE RIGHT-HAND EDGE OF THE TRAVEL LANES, AND SHALL PAINT
ISLAND CURBS YELLOW WHERE LOCATED ALONG THE LEFT-HAND EDGE
BURROUS
OF THE TRAVEL LANES.
-480-0850
11.
CONTRACTOR SHALL FURNISH AND INSTALL DOUBLE ROW OF 4"
YELLOW TYPE II RPM'S AT 1 FOOT ON CENTER.
12.
CONTRACTOR SHALL FURNISH AND INSTALL THREE INDIVIDUAL ROWS OF
4" YELLOW TYPE 1 RPM'S AT 1 FOOT ON CENTER.
13.
CONTRACTOR SHALL FURNISH AND INSTALL YELLOW FLEXIBLE MARKER.
C>
SIGNING NOTES:
1.
CONTRACTOR SHALL PROTECT EXISTING SIGN DURING CONSTRUCTION.
2.
VACANT.
I 3.
CONTRACTOR SHALL RELOCATE EXISTING SIGN. FURNISH AND INSTALL
I
NEW POST AND HARDWARE. WASTE HAUL EXISTING POST AND
FOUNDATION.
SCHWAB 4.
VACANT.
#214480-0905
5.
CONTRACTOR SHALL FURNISH AND INSTALL NEW SIGN(S) AND POST PER
• I
COR STANDARD PLANS 129 AND 134, SHEET 38/CH-6.
I 6.
CONTRACTOR SHALL COORDINATE WITH METRO TRANSIT FOR TEMPORARY
SIGN RELOCATION DURING CONSTRUCTION AND FOR PERMANENT SIGN
LOCATION.
R9-3A
18"x18" - 7.
CONTRACTOR SHALL FURNISH AND INSTALL NEW SIGN(S) ON
- - - -
TEMPORARY POST.
5
34+00
0
N
0
N
0
N,
41
0
N
---
---
---
I -
I
SCHWAB
#214480-0905 •
I
I
R9-3A
18"x18"
I
I
5
n
r
z
m
N
t37
35 0
0
m
m
m
N
m
0
t37
T 404340
20' 10' 0 20' 40' 0 1" 2"
SCALE: 1 "=20' TWO INCHES AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
�U)
w
°w
c�
o
m
o
F-
N
W
0
Q
Z
Y
p
W
W
a
0
r�j
U
Q
a
Q
uj
Es
0
0
w
�L
0,
>°
N
o
N
m
N
J
z
o
O
W
mz
C.
m
w
N
0
a
m
m
U
N
Ix
Z°
CD
Z_
V
z
a
o
OTC
Z
�
Z
=
z
Z
=
z
W
=
O
F_
O
Q
N
ILL
O
W
W
Zz
z
z
=
_
0
W
z
z
Y
O
H
Z
W
OC
SHEET: 36/CH-4
OF: 70
JOB NO.: 17534
DWG: CHAN