HomeMy WebLinkAboutT-404368PCMS (128TH INTERSECTION)
— ONE WEEK AHEAD OF
LANE CLOSURE
[DATE]
PAVING
TO
PROJECT
[DATE]
2 SEC
2 SEC
Y
w
a
z
g
0
a
O
N
O
N
00
N
O
3
J
O
ry
z
O
U
ry
i
U
0
U
N
i
i
aD
v
a
v
c
0)
aD
0
rn
O
O
O
O
ol
�U
v
a�
t
0
a�
73
v
c
0
4-1
a�
M
z
O
z
w
ry
/
PCMS (128TH INTERSECTION)
— DURING LANE CLOSURE
ROAD
RIGHT
WORK
LANE
AHEAD
CLOSED
2 SEC
2 SEC
RENTON AVE S
I�
�30
60' 30' 0 60' 120'
SCALE: 1 "=60'
I r/'1r\IP1
0 N CLASS B SIGN LOCATION
W
WORK ZONE
coe--�� TEMPORARY TRAFFIC CONTROL
CHANNELIZING DEVICES
2 lxx:l BARRICADE
I
V o— TRAFFIC FLOW
FLAGGING STATION
a tto] 101111%At'7/ :111,111 0
1. FLAGGER STATIONS SHALL BE ILLUMINATED DURING HOURS
OF DARKNESS.
2. EXTEND DEVICES TAPER ACROSS SHOULDER.
3. SEE SPECIAL PROVISIONS SECTION 1-07.23 AND 1-10.
4. SIGNS SHALL BE 48"X48" BLACK LEGEND (NON—REFL.) ON
ORANGE BACKGROUND (REFL.) UNLESS OTHERWISE NOTED.
5. MOTORCYCLE USE EXTREME CAUTION SIGNS SHALL BE
INSTALLED WHEN THE FOLLOWING ROADWAY CONDITIONS
EXIST:
—GROOVED PAVEMENT
—ABRUPT LANE EDGE
—STEEL PLATES
—LOOSE GRAVEL OF EARTH
SPECIFIC SIGNS FOR EACH OF THE CONDITIONS NOTED
SHALL BE INSTALLED ALONG WITH MOTORCYCLES USE
EXTREME CAUTION SIGNS.
6. CHANNELIZING DEVICE SPACING FOR THE DOWNSTREAM
TAPER SHALL BE 20' O.C.
7. ALL SIGNS TO BE IN PLACE FOR 3 DAYS OR MORE SHALL
BE POST MOUNTED.
8. WORK REQUIRING LANE RESTRICTIONS SHALL BE PERMITTED
DURING THE FOLLOWING HOURS:
RENTON AVENUE SOUTH EASTBOUND AND WESTBOUND —
DOUBLE LANE CLOSURE
— DOUBLE LANE CLOSURE WITH ONE LANE OPEN TO
TRAFFIC IN EACH DIRECTION IN THE 4 LANE
CONFIGURATION
— MOBILE OPERATIONS
RENTON AVENUE SOUTH EASTBOUND AND WESTBOUND —
TRIPLE LANE CLOSURE
— TRIPLE LANE CLOSURE WITH ONE LANE OPEN TO
TRAFFIC IN EACH DIRECTION IN THE 5 LANE
CONFIGURATION
— MOBILE OPERATIONS
MON 9:OOAM TO 3:30PM SUN 7:30PM TO MON 5:30AM
TUES 9:OOAM TO 3:30PM MON 7:30PM TO TUES 5:30AM
WED 9:OOAM TO 3:30PM TUES 7:30PM TO WED 5:30AM
THURS 9:OOAM TO 3:30PM WED 7:30PM TO THURS 5:30AM
FRI 9:OOAM TO 3:30PM THURS 7:30PM TO FRI 5:30AM
9. ACCESS TO PRIVATE AND COMMERCIAL PROPERTIES MUST
BE MAINTAINED DURING CONSTRUCTION.
T 404368
0 1" 2"
TWO INCHES AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
U
0
00
M
W N0
w
0 z _04
(D 5 •
Z o�
LL] N
(D 0 0
Z z
z
J QO
�fri W z
z z
O �3
U
M J
N
N
>
m
Ix
J
~
C�
a
w
_
z
W
U
w
W
it
a.
Q
a
0
Z
0
Eo
7,
4-N
L
m
`-° "
>�
N
O
LLj
m
N
z
O
o
O
Lu
LI
a .=
o
O
m
W
Ld
N
0
m
m
Y U
U
V)
cr
O
z
(D
z_
V
w
o
LL
z
p�
z
Q
Z
=
=
c
Z J
O
Q
W
az
z
=
O m
W
=
w
�
O
za
LL
Z
O
v
�
=
C, o
z
iz
~
U
Z
W
�w
V
>
Q
H
O
Q
Y
Z
Y
Z
O
O
F_
z
W
DC
SHEET: 64/TC-1
OF: 70
JOB NO.: 17534
DWG: TRAFFIC —CONTROL