Loading...
HomeMy WebLinkAboutNOA_Project Acceptance_201208DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE (DNS) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: December 9, 2020 PROJECT NAME/NUMBER: PR20-000322 Chevron Fuel System Replacement / LUA20-000286, ECF PROJECT LOCATION: 1419 NE 30th St (APN 3342103271) APPLICANT/PROJECT CONTACT PERSON: Sean Anderson, Barghausen Consulting Engineers, Inc. / 18215 72nd Ave S, Kent, WA 98032/ sanderson@barghausen.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/KhEGHDF PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review for the removal and replacement of Underground Storage Tanks (UST) at the Chevron Gas Station. The project site totals 1.73-acre (75,172 square feet) and is located within the Commercial Neighborhood (CN) zone and Urban Design District D. The existing development includes a 1,800-square-foot convenience store, a 2,000-square-foot fuel dispenser canopy, four (4) fuel dispensers, and three (3) 15,000-gallon gasoline Underground Storage Tanks (USTs). The project will include the removal of the three (3) USTs and installation of one (1) 20,000-gallon Regular Gasoline UST, one (1) 15,000-gallon Supreme Gasoline UST, and one (1) 12,000-gallon Diesel UST, along with four (4) new dispensers and associated product and vapor piping. The purpose of the project is to modernize the existing fuel system, including replacing USTs that are beyond their warranty period and to ensure the compliance with the latest environmental standards for retail gas stations. No changes in access to the project site are proposed. The project site is mapped with a Wellhead Protection Area, Zone 2. DATE OF APPLICATION: November 30, 2020 NOTICE OF COMPLETE APPLICATION: December 9, 2020 OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. When the DNS becomes appealable, the appeal period will be 14 days. PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Buildng Permit REQUESTED STUDIES: Drainage Report CONSISTENCY OVERVIEW: Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Commercial Neighborhood (CN) on the City’s Zoning Map. Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist NOTICE If you would like to be made a party of record to receive further information on this proposed project, complete this form and return to: City of Renton, CED – Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR20-000322 Chevron Fuel System Replacement/ LUA20-000286, ECF NAME: MAILING ADDRESS: City/State/Zip: EMAIL: ______ TELEPHONE NO.:  I prefer to receive project information and documents in hard copy via US mail Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-2-120 and other applicable codes and regulations as appropriate. Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting. Comments on the above application must be submitted in writing to Jill Ding, Senior Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on December 23, 2020. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request. CONTACT PERSON: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: jding@rentonwa.gov N 30th St Park Ave N N 29th St