HomeMy WebLinkAboutMFP20004948.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP20004948
IVR Number: 20004948
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:10/27/2020Application Date:1332730360Parcel Number: 19029 124TH AVE SE
Permit Type:12/10/2020Issue Date:Franchise
Permit Work Class:12/10/2021Expiration Date:Minor Utility
Job Number: 101133774Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO PARK IN ROW AT HH1 & TRANSFORMER
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contractor
Business License Number: 5109Construction Contractor: POTELI*227PL
SUMMIT FRENCHIES LLC 16000 CHRISTENSEN ROAD, #303
TUKWILA , WA 98188
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
MFP20004948
Scott Warlick CED 12/10/2020
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
124TH AVE SE1
2
4
T
H
A
V
E
S
E
SE 191ST ST123RD PL
SE
1010
12.5
12.
5
12.5
12.
5
#19029
#12354
#19025
HH1
M01
STOP
FLAGGER
STOP
FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7A10
0
'
RO
A
D
W
O
R
K
AH
E
A
D
W20-1BEPR
E
P
A
R
E
D
TO
ST
O
P W3-4100'100'BEPREPAREDTOSTOPW3-4100'ROADWORKAHEADW20-1100
'ROADWORKAHEADW20-1100'
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
TEMPORARY TRAFFIC CONTROL PLAN
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
VAULTVault
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
PSE PUGETSOUNDENERGY
JOB#101133774
19029 124th Ave SE, Renton, WA 98058
10/20/2020
safaa.alneema@pse.com
(425) 398-6077
SHEET 1 of 1
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
N
MFP20004948
18932
18941
18947
19011
19017
19025
19029
19019
12354
18938
19012
19006
19018
60
"
DW
60
"
DW
6
0
"
DW60" DW
C.O.
C.O.
C.O.
60
"
DW
60
"
DW
6
0
"
DW60" DW
41
M01
PAN
12
CUSTOMER PROVIDED
3/4 YD SAND
±50'
CUSTOMER PROVIDED
4'x4' WORK PIT
PSE INSTALLED 1/0 UG TPLX
CUSTOMER PROVIDED
3" GRAY SCH40 PVC CONDUIT
CUSTOMER PROVIDED
4'x4' WORK PIT
3/4 YD OF 5/8" MINUS CRUSH ROCK
18947
19011
19017
19025
19029
19019
12354
60"
D
W
60"
DW
60"
D
W
60"
DW
C.O.
C.O.
C.O.
60"
D
W
60"
DW
60"
D
W
60"
DW
M01
C.O.
20'
ROW
20'
ROW
124TH AVE E
20'
ROW
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
47.4318,-122.1768
Owner / Developer Contact Info
officeATTN:
SUMMIT HOMES
16000 CHRISTENSEN RD STE 303
SEATTLE, WA 98188
LANCE GARRITSON 360-339-0487
SITE SPECIFIC NOTES
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SCALE: NONE
CIRCUIT ONE-LINE DIAGRAM
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PAN-12
6/04/2020
56 79 74
NEW_A 3.1 NEW_C
56 82.1 74
HP Svc/MSA
Distribution
Job Order
Temporary
Removal
Permanent Power
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
N/AN/A
N/A
N/AN/A
N/AN/A
N/AN/A
104327226509625024
108124637N/A
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
CIRCUIT FEET ADDED:
SECONDARY UNDERGROUND
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
FOREMAN MUST FILL IN
YEAR MANUFACT:
CABLE #:
MANUFACTURER:
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:BRANDON SIMONS
253-263-0878
BRANDON.SIMONS@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'101133774 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Service Stubs
101133774
N/A
N/A
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
BRANDON SIMONS 253-263-0878 10/13/20
ASHAD PERNELL 253-289-8568 10/13/20
N/A N/A N/A
ASHAD PERNELL 253-289-8568 10/13/20
N/A YES
CANYON TERRACE
HH REPLACEMENT W/ NEW UG SERVICE
19029 124TH AVE SE RENTON, 98058
N/A N/A
N/A 101133774
AS NOTED 1 OF 2
RENTON N/A N/A CSPSKEPM
SW 33-23N-05E N/A N/A
2305E131 2305E136 2305E131 PAN-12
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
510093443
N/A
AT V01: 316065-1667768 (EXISTING)
-EXISTING Ø1 50kVA 120/240v PM XFMR TO REMAIN
- DE-ENERGIZE WIRE CONNECTED TO EXISTING HH1
AT HH1: (REPLACE)
-EXISTING HH TO BE REMOVED
-INSTALL (1) CONC 233 STD PLT DOOR HANDHOLE PER STD 6050.2020 (HH18500SP)
-INSTALL (3) 8 POS #10 - 350KCMIL CONNECTION BARS (MID:7651102)
DEVELOPER & CUSTOMER NOTES:
THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL, COMPACTION &
RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500
-REQUIRED TO PROVIDE & INSTALL 1-3" DISCONTINUOUS SCHEDULE 40 PVC CONDUIT FROM HH2 TO M01 ±40'
-REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLY PULL ROPE IN ALL CONDUITS FROM HH2 TO M01
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT HH2
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES
-EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-CUSTOMER IS REQUIRED TO SUPPLY AND INSTALL PHENOLIC LABLE ON METER BASE PRIOR TO SERVICE
CONNECTION
-L&I INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION
-RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING
Jobsite
SPAN SPECIFIC NOTES
HH1 TO M01:
-INSTALL 1-RUN 1/0 UG TPX, ± 50’ ___' ACTUAL
Removal
UNDERGROUND CIRCUIT MAP
SCALE: 1" = 200'
JOB SITE
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
0
200 AMPS
GAS
9.8 KW
115A
3.1%
3.1%
00 1"2"
00 50'100'
N
20' R/W
CL
S
NOT TO SCALE
CROSS SECTION - 124TH AVE SE
LOOKING EAST
PARTIAL PLAN DETAIL
SCALE: 1" = 20'
RESTORATION PER CITY OF RENTON STANDARDS
MFP20004948
Owner / Developer Contact Info
officeATTN:
SUMMIT HOMES
16000 CHRISTENSEN RD STE 303
SEATTLE, WA 98188
LANCE GARRITSON 360-339-0487
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
BRANDON SIMONS 253-263-0878 10/13/20
ASHAD PERNELL 253-289-8568 10/13/20
N/A N/A N/A
ASHAD PERNELL 253-289-8568 N/A
N/A RENTON
CANYON TERRACE
HH REPLACEMENT W/ NEW UG SERVICE
19029 124TH AVE SE RENTON, 98058
N/A N/A
N/A 101133774
AS NOTED 2 OF 2
KING N/A N/A CSPSKEPM
SW 33-23N-05E N/A N/A
2305E131 2305E136 2305E131 PAN-12
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
CUSTOMER-SUPPLIED SERVICE TRENCH
Electric Service Cable
Direct Buried
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
Final Backfill for
Direct-Buried
See requirements
above
3" Sand Bedding
12" Typical
(6" Min)
3" Sand
Shading
36" MINIMUM COVER
IN RIGHT OF WAY
TRENCH DETAIL
Electric Service Cable Direct Buried (NTS)
To Excavated Dirt Pile
Final Backfill for Direct Bury - The backfill layer above the sand shading shall be soil that is
free from rocks larger than 8" in diameter, construction debris, glass, sharp rocks, and frozen
clods with standard shading depth per trench figures shown below.
Customer's
service
conductors
Captive L-Bolt
27-1/4"
2"
18"
Captive L-Bolt
Lock Cover, 10 lbs
40-1/2"
Conductors enter from
beneath and shall be
folded back with handhole
SIDE VIEW
Lock Cover
30"
Approx
Approx
17"
Set handhole flush
to final grade
SINGLE PHASE SECONDARY HANDHOLE
Not to scale 6050.2000
MFP20004948