Minor Franchise Permit: MFP20005179
IVR Number: 20005179
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:11/09/2020Application Date:6198400125Parcel Number: 19016 116TH AVE SE
Permit Type:12/10/2020Issue Date:Franchise
Permit Work Class:12/10/2021Expiration Date:Minor Utility
Job Number: 105094139Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO SET TRUCK AT V02 (316042 166583) AND OPEN TRENCH 40'
CROSSING SE 191ST ST. RESTORATION PER CITY OF RENTON STANDARDS. APPROVED WITH COMMETNS OR
REDLINES
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contractor
Business License Number: 5109Construction Contractor: POTELI*227PL
19016 116TH LLC 19016 116TH AVE SE
RENTON , WA 98058
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
Scott Warlick CED 12/10/2020
MFP20005179
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
13131515SE 191ST STV02116TH AVE SE
RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURES/WCLOSEDR9-9S/W
CLOSEDR9-9DETOURM4-9bDETOURM
4
-
9
b
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
STOP
FLAGGERSTOP
FLAGGER
W20-7AROADWORKAHEADW20-1
W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPSEPUGETSOUNDENERGYJOB10509413919016 116th Ave SE, Renton, WA 9805910/28/20KALI-JAMAL.COLLINS@PSE.COM425-424-6425SHEET 1 of 2MFP20005179
13131515SE 191ST ST116TH AVE SE
RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
STOP
FLAGGERSTOP
FLAGGER
W20-7AROADWORKAHEADW20-1
W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040TRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANPSEPUGETSOUNDENERGYJOB10509413919016 116th Ave SE, Renton, WA 9805910/28/20KALI-JAMAL.COLLINS@PSE.COM425-424-6425SHEET 2 of 2MFP20005179
N
Vicinity Map
47.4316, -122.1863
Owner / Developer Contact Info
officeATTN:
ANAIYAH HOMES LLC
39829 212TH AVE SE
ENUMCLAW, WA 98022
SCOTT L JEPSON 253.592.4299
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
508847364 105094139
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
509074578 107059526
N/A 106365570
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Perm. Service
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
105094139107059526DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. BLACKIE 235.395.6850 .
A. VASQUEZ .03.17.20
A. VASQUEZ .03.17.20
A. VASQUEZ .03.17.20
REDT # ( RW-TBD )CITY OF RENTON
WANG SHORT PLAT
1Ø PRIMARY U/G LINE EXTENSION - 7 S/F LOTS
19016 116TH AVE SE, RENTON, WA 98058
PUGET SOUND ENERGY
N/A IP 132-60
107059526 105094139
N/A 1 OF 2
KING 32 CIKNC QCSOKE
33SW-T23N-R05E 212.080 215.084
2305E131 2305E136 2305E131 PAN-15
CABLE
CBL TBD
CBL TEL TBD
TELEPHONE
COMM TBD
COMM TEL TBD
RIGHT OF WAY
ROW TBD
ROW TEL TBD
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:RANDY BLACKIE
235.395.6850
randy.blackie@pse.com
x
x
x
...
...
...
x
Scott@AnaiyahHomes.com
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
3'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
3'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
JOINT TRENCH DETAIL
NOT TO SCALE JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
12" Min
12" Sand
Cover when
gas line is in
trench
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
Gas
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power 48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
@ H1A
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"
16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
SITE
VAULT DETAIL @ V01
NOT TO SCALE
EXCAVATION: _____ CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
TOP VIEW
7'
7'
6 1/3
MFP20005179
116TH AVE SESE 189TH PLACE
(PUBLIC)
SE 191ST ST
(PUBLIC)117TH PLACE SE(PUBLIC)(PUBLIC)116TH AVENUE SE(PUBLIC)ROAD A
ROAD A
TRACT B
LOT 1
LOT 2 LOT 3 LOT 4 LOT 5 LOT 6
LOT 7
EX: 1-2"
EX: 1-2"397 AACABCN
115KV115KV397 AACABCN
C#4ACSR
CUST. OWNED, INSTALLED, &
MAINTAINED CONDUIT/WIRE
FROM HH1 TO METER LOCATION
COR ST. LIGHT11719
116TH AVENUE SEF.H.UTILITY
CONFLICT
N.O.117TH PL SE(PUBLIC)11725 11731
19015
19009
1911319101
19107
~19016~
11645
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
R. BLACKIE 235.395.6850 .
A. VASQUEZ .03.17.20
A. VASQUEZ .03.17.20
A. VASQUEZ .03.17.20
REDT # ( RW-TBD )CITY OF RENTON
WANG SHORT PLAT
1Ø PRIMARY U/G LINE EXTENSION - 7 S/F LOTS
19016 116TH AVE SE, RENTON, WA 98058
PUGET SOUND ENERGY
N/A IP 132-60
107059526 105094139
1" = 50'2 OF 2
KING 32 CIKNC QCSOKE
33SW-T23N-R05E 212.080 215.084
2305E131 2305E136 2305E131 PAN-15
CABLE
CBL TBD
CBL TEL TBD
TELEPHONE
COMM TBD
COMM TEL TBD
RIGHT OF WAY
ROW TBD
ROW TEL TBD
.
.
.
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PAN-15
05.23.19
209 208 165
N/A N/A 5
209 208 170
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: TBD
27 3,212
130 AMPS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
→CLICK HERE FOR PSE HANDBOOKS←
SEE 1218 (SF),1220 (MF), 6080,
FOR TRENCH SEE 3061, 2809
CONTACT PSE PROJECT MANAGER IMMEDIATELY
REGARDING CONVERSION OF OVERHEAD SYSTEM
TO UNDERGROUND ON 116TH AVE SE. CONVERSION
WORK TO BE COMPLETED UNDER SEPARATE WORK
ORDER , COST AGREEMENTS, AND TARIFFS.
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #ST. LIGHT
N/A
N/A
100A
N/A
1KW
N/A
1.8 @ H1A
2.6 @ H1A
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
-1 H1A 1 #2 CITY OF RENTON ST. LIGHT
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS
This is a private storm system.
City separations do not apply
to private systems. Please
adjust your conduits north to
provide room for the fire
hydrant
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
MFP20005179