Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTIR - Approved.pdfProject R18325 Ngochan Short Plat
10/16/2020
DEVELOPMENT ENGINEERING
jchavez 12/11 /2020
Ngochan Short Plat
10814 SE 173rd St
Renton, WA 98055
Parcel #: 1626800010
Contact/ Owner: Doan Nguyen
•FFaRR DESIepGn
Farr Design LLC
David Fam, PE
PO BOX 94652
SEATTLE, WA 98124
daviLd@fai-i-desiollc.com
206.353.7495
�J Digitally signed
UQ V I by David Farr,
PE
Farr, P E 020.1o.15
1151:38-07'00'
Project R18325 Ngochan Short Plat
10/16/2020
TABLE OF CONTENTS
1. PROJECT OVERVIEW
2. CONDITIONS AND REQUIREMENTS SUMMARY
3. OFFSITE ANALYSIS (LEVEL 1 DOWNSTREAM ANALYSIS)
Task 1: Study Area Definition and Maps
Task 2: Resource Review
Task 3: Field Inspection
Task 4: Downstream Drainage System Description and Existing and Potential Problems
4. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS AND
DESIGN
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
6. SPECIAL REPORTS AND STUDIES
7. OTHER PERMITS
8. CSWPPP ANALYSIS AND DESIGN
9. BOND QUANTITIES, FACILITY SUMMARIES AND DECLARATION OF
COVENANT
10. OPERATIONS AND MAINTENANCE MANUAL
3
LIST OF APPENDICES
Appendix A - Stormwater Site Plans
Appendix B - Operations & Maintenance Manual
Appendix C - CSWPPP
Appendix D -Soil logs/ Geotech Report
Appendix E - Bonding Quantities Worksheet
Appendix F - Declaration of Covenant
Appendix G - WWHM Report
LIST OF FIGURES
Figure 1 TIR Worksheet................................................................................2
Figure2 Site Location.................................................................................. 7
Figure 3 Drainage Basin/Downstream Path...................................................8
Figure4 Soils................................................................................................9
Figure 5 Aerial Photograph.......................................................................... 12
Figure 6 Existing Site Conditions........................................................... ... 15
Project R18325 Ngochan Short Plat
10/16/2020
1. PROJECT OVERVIEW
This Technical Information Report (TIR) is submitted in support of the permits for
the Ngochan Short Plat. Two new single family homes are proposed on each lot
along with a proposed driveways and a shared access driveway.
This analysis was completed using the format set forth in the 2017 Renton Surface
Water Design Manual (RSWDM. Figure 1 - TIR Worksheet is attached on the
following page.
Project Description:
Please refer to Figure 2 - Vicinity Map on the following pages to aid in the project
description.
The Ngochan Short Plat project proposes 2 single family homes and associated
infrastructure at Parcel # 162680-0010.
The proposed work includes construction and grading of the site for building pads,
and installation of utilities, all related to a new single family homes and a shared
driveway. The proposed storm drainage system consists of 2 infiltration trenches
for the future lot improvements and a single infiltration trench for the new shared
driveway, and associated stormwater conveyance.
The project is subject to Directed Drainage Review (2 proposed single family
residences, driveways, and shared driveway with 6,843 sf of impervious) which
require that all 9 Core Requirements to be addressed as well as all 6 Special
Requirements.
2
Figure 1 - TIR Worksheet
City of Renton
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
Part 1 PROJECT OWNER AND Part2 PROJECT LOCATION AND
PROJECT ENGINEER DESCRIPTION
Project Owner Doan Nguyen
Phone
Address 4046 S, 146th St
Tukwila, WA 98168
Project Engineer Han Phan, PE
Company PBC, LLC
Phone 206.229.6422
Part3 TYPE OF PERMIT APPLICATION
❑ Landuse (e-g-,Subdivision f Short Subd- i UPD)
❑ Building (e-g-,MIF I Commercial l S FR)
❑ Clearing and Grading
❑ Right -of -Way Use
❑ Other
Part5 PLAN AND REPORT INFORMATION
Technical Information Report
❑
Full
Type of Drainage Review
'❑
Targeted
(check one):
❑
Simplified
❑
Large Project
Date (include revision
❑
Directed
dates):
Date of Final:
Project Name NgoHan Short Plat
DPERPermit # TBD
Location Township 23
Range 05
Section 29
Site Address 10814 SE 173rd St
Park 4 OTHER REVIEWS AND PERMITS
❑
DFVV HPA
❑ Shoreline
❑
COE 4D4
Management
❑
DOE darn Safety
❑ Structural
❑
-
RockerylVaultf
FEMA Floodplain
❑ ESA section 7
❑
COE Wetlands
❑
Other
Site Improvement Plan (Engr. Plans)
Plan Type (check ❑ Full
oney ❑ Modified
❑ Simplified
Date (include revision
dates):
Date of Final:
Part6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard f Experimental i Blanket
Description: (in clLide conditions in TIR Section 2)
Approved Adjustment No. Date of Approval:
3
Park 7 MONITORING REQUIREMENTS
Monitoring Required: Yes No
Start Date:
Completion Date:
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Describe:
Re: KCSDM Adjustment No.
Community Plan : Boos Creek
Special District Overlays: None
Drainage Basin: Black River
Stormwater Requirements: Directed Stormwater Requirerents
Park 9 ONSITE AND ADJACENT SENSITIVE AREAS
❑ River/Stream
❑ Steep Slope
❑ Lake
❑ Erosion Hazard
❑ Wetlands
❑ Landslide Hazard
❑ Closed Depression
❑ CDal Mine Hazard
❑ Floodplain
❑ Seismic Hazard
❑ Other
❑ Habitat Protection
Ll
IIIIFTiN DINK43I11W
Soil Type
Arents, Wderwood Material
Slopes
0 tD 15%
❑ High Groundwater Table (with in 5 feet)
❑ Other
❑ Additional Sheets Attached
❑ Sale Source Aquifer
❑ SeepsfSprings
Erosion Potential
:l
Park 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE LIMITATION f BITE CONSTRAINT
21 Core 2 — Offsite Analysis
❑ BensitivelCrii ical Areas
❑ BEPA
] LID Infeasibility
Other Geotech
1 :1 Additional Sheets Attached
Park 12 TYR SUMMARY SHEET
(provide one TIR Summary Shut per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location
Number of Natural Discharge Locations:
Offsite Anal, sis
Level: 02 1 3 dated: 12}10rA18
Flaw Control (include facility
Level: 1 f 2 1 3 or Exemption Number
summary sheet)
Flow Controf BMPs Infiltration Trench
Conveyance System
Spill containment located at:
Erosion and Sediment Control l
C-SWPPICIESCUESC Site Supervisor:
Construction Btormwater
Contact Phone:
Pollution Prevention
After Hours Phone:
Maintenance and Operation
Responsibility (circle one): oEite I Public
If ::rivate, Maintenance Log Required: Yes o
Financial Guarantees and
Provided: Yes No
Liability
Water Quality (include facility
Type (circle one)_ Basic Bens_ Lake I Enhanced Basic f Bog
summary sheet)
or Exemption No.
Landscape Managrement Plan: Yes f No
Special Requirements (as applicable):
Area Specific Drainage
Type: CDA f BDO f MDP f BP f LMP f Shared Fac. cone
Requirements
Name:
FkxdplairJFloodway Delineation
Type (circle one): Major f Minor I Exemption f None
100-year Base Flood Elevation (or range):
Datum:
Flood Protection Facilities
Describe:
5
Part 12 TIR SUMMARY SHEET
(provide one TIR Summary Sheet per Threshold Discharge Area)
Source Control
Describe land use:
(commercial I industrial land use)
Describe any structural controls:
Oil Control
High -use Site: Yes No
Treatment BMP:
Maintenance Agreement: Yes f No
with whom?
Other Drainage Structures
Describe:
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
❑ Clearing Limits
Cover Measures
❑ Perimeter Protection
❑ Traffic Area Stabilization
❑ Sediment Retention
❑ Surface Water Collection
❑ Dewatehng Control
❑ Dust Control
❑ Flow Control
Protection of BY4 Control BMP Facilities
(existing and proposed)
Maintain BMPs,` Manage Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent Facilities, restore
operation of Flow Control BMP Facilities as
necessary
❑ Flag limits of SAO and open space preservation
areas
❑ Other
Part 14 STORMVVATER FACILITY DES CRIPT10NS (Note: Include Faci lity Summary and Sketch)
FlavControl
TypelDescription
Water Quality
TypefDescription
❑ Detention
Infiltration
❑ Regional Facility
❑ Shared Facility
❑ Flow Control BMPs
❑ Other
❑ Vegetated Flovrpath
❑ wetpooi
❑ Filtration
❑ Oil Control
❑ Spill Control
❑ Flgw Control BMPs
❑ Other
Infiltration Trench
0
Part 15 EASEMENTSITRACTS
Part 16 STRUCTURAL ANALYSIS
❑ Drainage Easement j Cast in Place Vault
❑ Covenant J Retaining Wall
❑ Native Growth Protection Covenant ❑ Rockery > 4' High
J Tract ❑ Structural on Steep Slope
U Other J Other
Part 17 SiCNATJRE'-]F PROFESSIONAL ENGINEER
I; or a civil engineer under my supervision, have visited the site- Actual site oanditions as observed were
incorporated into this worksheet and the attached Technical Information Report- To the best of my
knorwledge the information provided here is accurate-
12J1M 18
sue, te
7
Figure 2 - Site Location
SE 17$ND T
k ME
SE 173RD ST
w
d
SE 774N ST �
1
SE PETRQVITSI4Y RQ
n x
Er
Figure 3 - Drainage Basin/Downstream Path
A
Figure 4 - Soils
ram+ � ■ - _..•-.� #�--�.r-=�� .� .�„_ _ � - � :- iRvw..�-� .+a�.a��_ �i�a
f,ry < r�If
King County Area, Washington (WA633)
King County Area, Washington (WA533) 4
Map
Unit Map Unit Name
Acres percent
in of AOI
Symbol
AOI
AgB Alderwood gravelly
0.5 1.2%
sandy loam, 0 to 8
percent slopes
AgC Alderwood gravelly
26.1 59.80/0
sandy loam, 8 to
15 percent slopes
AmC Arents, Alderwood
17.0 39.0%
material, b to 15
percent slopes
Totals for Area of
43.6 100.00/c
Interest
The project site is located in Arents, Alderwood material (AmC) and is surrounded,
upstream and downstream by a similar soil, Alderwood gravelly sandy loam (AgB, AgC) of
varying slopes.
10
2. CONDITIONS AND REQUIREMENTS SUMMARY
CORE REQUIREMENT # 1: Discharge at the Natural Location
Onsite stormwater, in the existing condition, sheet flows into SE 173rd St and into the City
stormwater system. Stormwater, post site development, will continue to drain into the City
stormwater system via infiltration trenches and associated stormwater conveyance system.
CORE REQUIREMENT #2: Offsite Analysis
See the Level 1 Downstream Analysis included in Section 3 of this TIR.
CORE REQUIREMENT #3: Flow Control
Infiltration trenches are proposed for each single family residence and the shared driveway.
See Section 4.
CORE REQUIREMENT #4: Conveyance System
Conveyance capacity will be provided to handle peak flows from the 100-year storm event.
See Section 5.
CORE REQUIREMENT #5: Erosion and Sediment Control
A construction entrance, silt fencing or compost socks, temporary drainage swales, and
inlet protection along with appropriate cover measures will be provided for erosion and
sediment control for the site. See Section 8.
CORE REQUIREMENT #6: Maintenance and Operations
A Maintenance and Operations Manual is provided in Appendix B of this report.
CORE REQUIREMENT #7: Financial Guarantees and Liability
Bond and liability assurances will be provided by the Owner or the Contractor.
CORE REQUIREMENT #8: Water Quality
The site is located within a Basic Water Quality Area. The project proposes 3,604 sf
(individual driveways, shared driveway, and frontage) of Pollution Generating Impervious
Surface (PGIS), which does not trigger water quality requirements, See Section 4.
CORE REQUIREMENT #9: On -Site BMPs
The project falls under Small Lot BMP requirements. Due to site constraints, an infiltration
trench has been selected as a stormwater BMP (see Section 4)
SPECIAL REQUIREMENT # 1: Other Adopted Area -Specific Requirements
Not applicable.
SPECIAL REQUIREMENT #2: Flood Hazard Area Delineation
Not Applicable.
SPECIAL REQUIREMENT #3: Flood Protection Facilities
Not applicable.
SPECIAL REQUIREMENT #4: Source Controls
Not applicable.
SPECIAL REQUIREMENT #5: Oil Control
Not applicable.
SPECIAL REQUIREMENT #6: Aquifer Protection Area
The project is not located within an Aquifer Protection Area.
11
3. OFFSITE ANALYSIS (Level 1 Downstream Analysis)
Task 1: Study Area Definition and Maps
The study area covered was the project site and upstream and downstream
drainage areas near the development property.
Task 2: Resource Review
The project site is located within the Black River Drainage Basin. Additionally, the
site is not located in a critical drainage area. Research of available data shows no
seismic hazard, landslide hazards, erosion hazards, or wetlands located on site.
The soils on the site have been classified as Vashon Aged Glacial Till, see Geotech
report.
Task 3: Field Inspection
Please refer to Figure 5 - Aerial Photograph and Figure 6 - Existing Site Conditions
below to aid in the following description.
Figure 5 - Aerial Photograph
LPIP
Mob-
JF
+t / 1 -�--
�-
1 . y.• ' i a _ 13814 S66theast
• ;.- �•,r _173rd Street
4� R'
1 4
14
Catch Basin on NE corner of 108th Ave SE and SE 173rd St, collecting drainage
from ditch.
There are no signs of ponding, flooding, or erosion problems on site or downstream
of the site.
Tributary Upstream Drainage
The project site is downstream of a condominium complex which has a separate
conveyance system. As a result it is not considered to have an upstream basin.
Task 4: Downstream Drainage System Description and Existing and
Potential Problems
Based on research, and site visits there are no signs of drainage or erosion
problems. The site will be mitigated through infiltration trenches and will not
contribute significant additional drainage to the city stormwater system.
Drainage leaving the project site does so through sheet flow into a vegetated ditch
on the north side of SE 173rd St. It then enters a series of 12" to 18" pipes which
carries it south along 108th Ave SE. It then enters a vegetated swale and crosses
Benson Dr. through an 18" CMP. It then travels west through a series of 12" to 18"
pipes along SE 174th St. It reaches the 0.25 mile mark just shy of the SE 174th St
and 106th PI SE Intersection.
Conclusion:
The downstream system showed no signs of erosion. No adverse impact to the
downstream drainage system is expected from the proposed project.
15
4. FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS
AND DESIGN
Existing Site Hydrology (Part A)
The 10,800 sf project site is currently vacant. The site is covered with dense
underbrush, deciduous trees, and evergreen trees along its frontage and property
lines. The central portion of the property has been cleared. The site topography
ranges from 0 to 15% across the property towards the southern portion of the site.
There is currently no sidewalk on the frontage of the site. There is a vegetated ditch
on the project frontage which collects and conveys stormwater to the west.
The soil is classified as a Ardents, Alderwood Material by NRCS. The Geotech
reports a typical soil log as 6" of top soil, then 2.5' of tan sand with some gravel,
followed by 3' of compacted gray sand with some gravel. The soil log shows no
evidence of mottling or water seepage.
The site is bordered on the north, east, and west by single family homes as is
typical of an urban residential neighborhood.
16
Developed Site Hydrology (Part B)
Two new single family homes are proposed on each lot along with a proposed
driveways and a shared access driveway.
The project is subject to Directed Drainage Review (2 proposed single family
residences, driveways, and shared driveway for a total of 6,843 sf of on -site
impervious, along with 1,665 sf of frontage impervious, for a total of 8,508 sf of
impervious for the project) which require that all 9 Core Requirements to be
addressed as well as all 6 Special Requirements.
Developed Area Exhibit:
...........
ap �
E; S
Impervious Area Exhibit:
t
• 5
S
SS
SS
71
----------------
17
KEEP 5 FEET MIN. Dt%TANr.E
FROM kwk7mi h3r4 TRENCH
WALL TO ACAOFn
16 ROFrERlY &IM &
15 FROM 8LlILCI.r.CRAM�-AAAkCt
*4 wm�voff cn?i
xk
r r r
r
Pix fir swliq VAN
It=
3%=W�E—
t W!
— O'P- — 'A-- - Pr
e
Road _4
Mdeni ng: IMP-vAvrMmT
898 sf
IN
Total Developed Area
Description
SF
Ac
Total Property
10,800
0.25
Onsite Developed Area (cleared site, 839/6)
8,978
0.21
Pervious
2,135
0.05
Onsite Impervious
6,843
0.16
Proposed House 1 (Lot 1)
2,200
0.05
Proposed House 2 (Lot 2)
2,200
0.05
Proposed Driveways (Lot 1 & 2)
1,000
0.02
Proposed Shared Driveway
1,443
0.03
Frontage Developed Area
2,435
0.06
Frontage Impervious
1,665
0.04
Frontage Sidewalk
504
0.01
Frontage Driveway
263
0.01
Frontage Road Widening (PGIS)
898
0.02
Total Proposed Impervious
8,508
0.20
Total Developed Area (onsite & frontage area)
11,413
0.26
Performance Standards (Part C)
The project site/each lot is <22,000 sf and therefore is required to apply the
Renton Flow Control Standard OR Small Lot Flow Control BMPs. Due to the site's
constraints and low infiltration rate (1 in/hr. from Geotech), we have chosen to
abide by the Small Lot Flow Control BMPs requirements.
Due to the site's classified sandy loam soils, we have chosen limited infiltration trenches
as an On -site BMP per Core Requirement #9: On -Site BMPs for this project which will be
explained in Part D.
19
Flow Control System (Part D)
From the Small Lot BMP Requirement Feasibility Review:
1. Full Dispersion -Not Feasible. The site area is limited due to the
proximity to property lines and does not have sufficient flow path lengths.
2. Full Infiltration - Not Feasible - Based on the soil type (sandy loam), this
does not meet the requirements for Full Infiltration
3. Limited Infiltration - FEASIBLE Per the classified soil on site as sandy
loam and the recommendations of the Geotech, we have chosen infiltration
as a stormwater BMP.
Sizing of trenches
Per the recommendations of the Geotech and per the manual for sandy loam, For
each 1,000 square feet of tributary impervious surface, will be mitigated by a 361 x
2'W x 2'D infiltration trench. This equates to 1000 sf of impervious being mitigated
by 144 cf of gravel volume.
Per the plans, each lot is mitigated by a 321 x 5'W x 2'D infiltration trench. The
shared driveway is mitigated by a 35'L x 3'W x 2'D infiltration trench.
Peak Flow Analysis
The NRCS classifies the soil of the site as Arents, Alderwood Material, which is in SCS
Hydrologic Soil Group "C".
The total developed area of 0.26 ac is modeled as forest in the predeveloped condition.
In the developed condition, all on -site impervious (0.16 ac) flows to the limited infiltration
trenches (modeled as 90% impervious, 10% grass), frontage impervious is modeled as
100% impervious, and the new pervious areas on site are modeled as grass. This
information is reflected in the following table:
Land Cover Type (ac)
Project Area
Forest
Pasture
Lawn
Impervious
Total
Impervious to Limited Infiltration (90% Impervious, 10% Grass)
0
0.02
0.14
0.16
Frontage Impervious
0.04
0.04
New Pervious Area
1 0.06
0.06
Total
01
01
0.081
0.18
0.26
20
W wi-im 2u 12, ana 15 minute times
if KingM12
King2O12
Map Controls ■
�A� AiION-1
IVI�liiil
Site Information
Site Name
Address
City
Gage Seatac
Precip Factor �.
❑ Use S-DOT data
21
E�I,• Basin 1 Predeveloped
Subbasin NamedBasin 1
Surface Interflow Groundwater
Flows To
Area in Basin F- Show Only Selected
Available Pervious
Acres
r A/B, Forest, Flak
A/B, Forest, Mod
A/B, Forest, Steep
A/B, Pasture, Flak
A/B, Pasture, Mod
A/B, Pasture, Steep
A/B, Lawn, Flak
A/B, Lawn, Mod
A/B, Lawn, Steep
C, Forest, Flak
C, Forest, Mod
C, Forest, Steep
C, Pasture, Flak
C, Pasture, Mod
C, Pasture, Steep
C, Lawn, Flak
C, Lawn, Mod
C, Lawn, Steep
SAT, Forest, Flak
SAT, Forest, Mod
SAT, Forest, Steep
Pervious Total
Impervious Total
Basin Total
Precipitation Gage
0.26 Acres
® Acres
0.26 Acres
DeseleckZero
11
Available Impervious
Fv-
ROADS/FLAT
F-
ROADSIMOD
ROADS/STEEP
ROOF TOPSIFLAT
DRIVEWAYS/FL4T
DRIVEWAYS/MOD
DRIVEWAYS/STEEP
SIDEWALKS/FLAT
F-
SIDEWALKSIMOD
SIDEWALKSISTEEP
PARKINGIFLAT
PARKING/MOD
PARKINGISTEEP
POND
Porous Pavement
Acres
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2 - <UNK> I seatac 15 minute Auto Assign Gages
Select By: I GO
22
E�!,• Basin 1 Mitigated
Subbasin Name: Basin 1 F- Designate as Bypass for POC:
Surface Interflow Groundwater
Flows To
Area in Basin F- Show Only Selected
Available Pervious
Acres
r A/B, Forest, Flak
A/B, Forest, Mod
A/B, Forest, Steep
A/B, Pasture, Flak
A/B, Pasture, Mod
A/B, Pasture, Steep
A/B, Lawn, Flak
A/B, Lawn, Mod
A/B, Lawn, Steep
C, Forest, Flak
C, Forest, Mod
C, Forest, Steep
C, Pasture, Flak
C, Pasture, Mod
C, Pasture, Steep
C, Lawn, Flak
0
C, Lawn, Mod
C, Lawn, Steep
SAT, Forest, Flak
SAT, Forest, Mod
SAT, Forest, Steep
Pervious Total
Impervious Total
Basin Total
Precipitation Gage
0.08 Acres
0.18 Acres
0.26 Acres
Deselect Zero
11
Available Impervious
Fv-
ROADSIFLAT
F-
ROADSIMOD
ROADSISTEEP
ROOF TOPSIFLAT
DRIVEWAYS/FL4T
DRIVEWAYS/
DRIVEWAYS/STEEP
SIDEWALKS/FLAT
F-
SIDEWALKSIMOD
F-
SIDEWALKSISTEEP
PARKINGIFLAT
PARKINGIMOD
PARKINGISTEEP
POND
Porous Pavement
Acres
.18
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2 - <UNK> I seatac 15 minute Auto Assign Gages
Select By: I GO
23
Flow Frequency
Flow{cfs} Predeveloped Mitigated
2 Year =
0.0076
0.0738
5 Year =
0.0120
0.0951
10 Year =
0.0145
0.1099
25 Year =
0.0171
0.1293
50 Year =
0.0187
0.1444
100 Year =
0.0201
0.1599
0.1599 - 0.0201 = 0.1398 cfs
(Full WWHM Report found in Appendix G)
Difference in peak flow is 0.1398 cfs which is below the 0.15 cfs threshold required for
flow control.
Since we have modeled the frontage impervious as part of this model, which is exempt
from flow control, we are exempt from Core Requirement #3.
Core Requirement #9: Onsite BMPs does not apply to frontage improvements. The word
"site" in "Onsite" is defined as the following: "a single parcel; or, two or more contiguous
parcels that are under common ownership or documented legal control; or a portion of a
single parcel under documented legal control separate from the remaining parcel, used as
a single parcel for a proposed project for purposes of applying for authority from the City
to carry out a proposed project. For projects located primarily within dedicated rights -of -
way, the length of the project site and the right-of-way boundaries define the site."
Water Quality System (Part E)
The project proposes 3,604 sf (lot driveways (1000 sf), shared driveway (1,443 sf), frontage
driveway (263 sf), and road widening (898 sf)) of Pollution Generating Impervious Surface
(PGIS), which is under the 5,000 sf threshold requirement for water quality. Therefore,
Water Quality is NOT required.
24
5. CONVEYANCE SYSTEM ANALYSIS AND DESIGN
Conveyance system will be designed in accordance with the 2017 RSWDM.
For a factor of safety, the basin is modeled as the fully developed area that was conducted
in the "Peak Flow Analysis" including roofs, lot driveways, shared driveway, pervious
area, and all frontage impervious which will be conveyed to the most constrained pipe on
the project, a 6" pipe at 2% slope.
Using Manning's equation to determine pipe capacity for a 6" diameter pipe
(minimum designed) at 2.0% minimum slope and a typical Manning's coefficient of
0.013 for PVC pipe:
Channel
Calcs
Depth Q
(fl) {cs�
050 07913
Section Type=
6tm Width (ft)
Side Slope,z1 =
Di ameter(ft) =
Inv Elew(ft)=
Slope (%)=
n-value =
Compute by=
Increments =
Area wi.. Wp
(sgfl) Vtri� M
9.196 4D4 1b-
Circular
0.50
10D.0D
2.0D
0.013
Q vs Depth
1
Y.
045
Pipe Capacity = 0.793 cfs > Ql oo = 0.1599 cfs 4 OK
TopWidth
M
000
25
6. SPECIAL REPORTS AND STUDIES
-Geotechnical Report by The Concept Group. (See Appendix D)
7. OTHER PERMITS
-None
8. CSWPPP ANALYSIS AND DESIGN
Less than an acre of disturbance is anticipated for this project. Proposed temporary
measures possible for this project will include the following BMP's:
• Construction Entrance
• Filter fences or Compost Socks.
• Straw mulch, hydroseed or other mulching and planting method to
stabilized unworked areas.
• Temporary drainage swales and rock check dams.
• Inlet protection of new and existing catch basins.
Please refer to the TESC Plan included in the Engineering Submittal for details,
along with a further CSWPPP explanation in Appendix C.
9. BOND QUANTITIES, FACILITY SUMMARIES AND
DECLARATION OF COVENANT
Bond and liability assurances will be provided by the Owner or the Contractor. A
Declaration of Covenant for the Flow Control BMPs will be recorded with Renton
prior to final approval. Copies of these are included in Appendix E and F,
respectively.
10.OPERATIONS AND MAINTENANCE MANUAL
An Operations and Maintenance Manual is included in Appendix B of this report.
26
Appendix A
Stormwater Site Plans
89E000Oz:O L80000-6L:vni 9LL000-6L:?!d
1Vld iNOHS NVHOOON
o
�
8
o
`
d
o=
z
O
u
'j
rc=
Q
O
w
Q
Z
Q
w
Hp
¢
O
))3
F�
�O
D
¢
�z.
oZz
Z
CO
U
U
co
3�
�o2
W
w
o
0
rcr
-oi
U
rcm
Z
qJ
o0
M
o
w�
0
C7
�rc
mwwz
arcz
Xa
1
mo
J
w
J
rc�
Q
F
fA
�rc
w
oF'o
y O
F O Oz�
U
¢ a
N ry
o
x wy Zm2
�w
LL
N
ww
Z
Q
w «
N oow
ona
x
zaaw $z�
W-
�z���
Q
IaL
o
? a
Qi
Ct .��^
a0�=e �w=
¢a
¢ W
�<w
zw
w
=�< Q �=��a
g a
o5
Z=
U
Z22wi �QOroO
Q
J ¢
Q J
mow
yCII�FF�
3w
QW
�`�
m ow�w oxrc$rc
Q
0 5J
�°Uli
a.,R,n
OOi
�rc
PIE
f [
�2 3 �
{
�f
�6
✓`�a
2
■
lilQ�AE
S
—
� �
a
�
z
�
� � i
Y�I
U7
b
a S
P e
iF
fg
jib i
pip g
aiE
oil 1. 1 oj�if
o
sItI
i Q
wti
€
lily
Ff9
3
`5C
lls
I �
Ij
Rq{
j]{
E
3 (}
� ¢
Q .
gS
15•� 10 ■eEi
l i
fil f
e ag
] tl
iif g a
e
@ 7
4$$
y€E
a 888
p$
E {ypppppp yp:y$(
gg3 �s
pppY $ i
ygS €a5 p{C Y
Y T
I Hill
ll gE
$�£ppl SSgygy
p
gg
Y pp �'
E 13�$i
a(�'� r S pL y
$ 33ii[ i $
pk1 8iii� lg
@ IH
�i4 R
Y�7Fi �
i I �if ��
INN
E66Fj� 1
IC■F:�
It J
J R
fR
U
5?
a�
FU�
ly a
�om
�y
Uw
J 2
o
O
w� o
0
ofN
�N
g �°wm
yN,n�a
w eto.
rn aa'�4°
a
H
Z
y FNr
o l M
w
z
r
m a
it z g�.�
m,
o`S
O co�u
L
oO N
o co
�1
ll a �3N
8 L L7-07-431 1Vlld 1210HS NVHOOON L 133HS "°°°' " °"' ° °' b °nO-Sd-SZ£8 "\s6ui.m4\Q"v0\O°id V °°"=°e") "•ns wsu as sieo - szsew\6°., \a °wd °°" Wass z, - ozoz W
co
0o
r
3�0
zo
W
3
a�
o
o
a
�
N
O
w
0
ko
�I
-
O
wVld a
U
3
„Ol,4D.10 N 30
-
5
\ Z
O
509
x
____- l
O
C\2 yom" o
0
,LO'OZI 3 „0 L,44.10 N
________ _ _ _______ __SM,9
-O
0
0
0
II I
—'06-OF
30
rnl
OJ rol
:ooas
I
o - z
w
F
z
z
r
a
3�u�i - zoo
r 3Q�e
c
sue. ooz`
686
o6x w To
o�z
co
Vr
o �
- o
=a�
w a s
m
O rc3 ~
2TTV-0-k—QRz
E9£0000z:0 L90000-66:Vni 9L6000-66:1:1d
1Vld BdOHS NVHOOON
41
el u
[My
�g2� frd�Yb�
g �
1i_DO
pilll5a il
e�� G�G�� 3 � ��� j
wit 0 1�f I � �
.11
!pill� ■�$ � F pig
$} fir}fi
1
p s pm p� z�z a eIII �
a
pp jF �
iill pp 88
pi a � $�a�p' �p iJa � pp pfif� a i� g a� �� ��_ �■� a � �yg[r
�g[
�7� jEg�
4a a
killSEE g
�gg ��"� �� � €f g■`
i r
rg Mh
111 sa �
p $j aYY as [{$ igyjg $glitq g Q PRO
R
H
i� r
d X ig R �Ye aS a# bg i i 3
gp$ 9 OgpPgp ig agjj g9�$j z $ i gele gg 2°al
!€ Hill i€ $ $Ej� w$ E Y
S
i
Z w 3
W o z w 0 w
O Q J o
rc cwi z o t z E o
(A o w¢ w rc w a- 3 o
w w o o z o rc
Z h w Z z o o LL a w w 11
w w, "per Z w o N Nw w o
U �3s zw o o ��
z w LL w m Q j ¢ w, j w i Z a
a F o w
o G m t s 4 p ¢ P p^ i i¢< G r m .w i w
Z tia No�wFw oywruw sjQ mot wrap w Rm
O w orc°= ° and
U Wzo oipmp ao�z �w< z. z.3i°ow w
ozimuwzua zdoot �~iuioa~rco?co'�o rc ood
W O z z cJi m r w o ? w 3 Q o§ 6 4 F i o< ' o w w w i Q of w
o z
2 Fz�w z�zwtiF�mmo zpz�ao omwzQ�Np w< a;w�d
W osLL¢oww o� iw " i< Jr`
WWU O p w F a aFW y¢ pm m J �zw OO O> rcz om 0m i rr> Orc om¢
j wh w
F w
wu rc o w w w
w.
w ronzr «,o�
_ ----o:
z �z o 1r
z
w���ww N
az. a-o
-- _-- -� "ao O�
J M
m
J� z w
1=e
I
I
I
I
I
I
I
I
£667-0b-(131
woQ ^ z
w, ,y� sw
z�w �d ��
-
bU) o
—
1 of
rU
5
W
(J)
~w� 0
a L o Z
0 C1 z
a
Q W o Z
Q
0 LU U_
z� U
U)
H
00
U)
o N
E I N
m
LLN
�z-�
<w --- - ��
7wa a
o v
,I w
d mo
a oFN
1Vld 1210HS NVHOO°JN £ 133HS n m :=wox m�o3 e.c 103-se-9zssL8Vc--O\OOVOV4md m --1) r=as wsu 3s nao - szcaw c ,om I -1d ozoz o0 om
G
12
89s0000z:0 L80000-61:vni 9M00-% 21d
1Vld 1NOHS NVHOOON
o w
u
Q $ N 3$
ww y a o y o n
yz wwN i z0. tt
o a�ay a =Qag o
Fn Qo - w aWN-
�o>2r m �"emp $
NwgaLE ¢Oof�Z w �WOwo"99j
'
¢mow �tw�- N a mtwr��
�zZm Z Z�awrcWW Z $ U�amrcW
® ® ® ® o
O ¢
ry U
K O ¢ K
¢ > o w oo W OW
2
3N 3N a o w ¢w oo r$
U p -,w w >F.
Sdm Sim zd n `xz Cy .m
a$ a$ o -o Iz �z$
�NF, xFz w J w
�uh mW w KQ
•N �LLw LL w Hw ayNv
om �mm�mm o oLLz40 as a w mm�$
��+o io a d� W J Wm Kua,o'mw
zw 3i r toz w� c°�-:im
�O�W mi Ow
o
ZawLYWW Zawrc WWW Z C-w Z W Ua U3 nwrc WW
0 0
O
O Z
U �
z >
OO �y
mp �
0rc oW¢ l OD
r Y U ¢
z NpC
K w Zry lw � a =jOr U z
C w LL w ww
uo ~ - zafl T o W !2 v
>K w � U �Q K C
co wN W Ww aw¢ O �w = Q W d u
W .1 ¢ wW0 �LLrc qa~ rc r Go
~O 3Q = torc wow w� u z d m ma a M
Z wrc og a�z °oF o' a`=' oo wo �z ow a t ~
O 23 FG hza a 57z oo z p4 �z o i aY o
=ww tz .a 3a sa 'N w w w
3
o $J� a�z �Qo ?� o y �u F, wfa J - o
0
F$ o� °mow ro� h� y w� w� o° wo -�°+
ZO row 3 orc ow oW ow ow u¢,W >`� rc
Z ,gym., Ua �y ZUa Ua Uw Ua Ua '�WW ZW Z $ Z
Ole (9 a Q a � 6 6 i a � 0 0 0
Loozr ,.0rss,rav
i I
I
' z N�
ww �a
w.¢ C�
- I I
I I zj
a
Yoh
�R
=
LZ ZLb
o
I
I
-
I
SL ZLb
a3
n0
ea
00
3
LLL
3
'OB
OL
1S
d
h
1
L9'l Lb
IOZLb
rcWwjl
S1VNO
'N
O
.l
6S
tlatl
ON
a0
3S
ad
Nn
i23,
a
Vw
o
30
a3
a3
tlM
II
J
U
LFILb
-
99 llb
�3
Z
n
o
w
zF
e3wz
�o
W.
Um
rcWWW',
az
w
�p
I
¢
TT
LZ'LLb
I
L9 LIb
o
ss
ao
I
N
o
w
SL
NO
tlatl
3S
W o
N
O
L
ISS
ON
a0
ad
Nn
m
,�
iz
w
3
MG
a3
tlM
CCU"
Ml
d
w
LO'Llb
0
+OL
1S
d
Q
LZ LIb
�
Illllm
iq
O
jF
zi
gg
I
Uw
rcWW
a
n
89
n0
11D3
I
w'9
OS'Olb
ld
0s o
b•l
w
y 9
w m
stab
oo+
Lro
s
I
-o
0 W
W
I
z
o�e
umb w
M
O Op
I o t�pm�
Jw WLLO FUa
LLrl z�a�� Za��
W F"w�tc=i�w w^o
p O,wi¢Y.
UWW w,- a
� o=¢oc�Qaz<yrc
co
r wz�¢]p���QJ
Ow¢wm JUrc rc
W w�00 Zm Waf Wo
c
ao �N
cd5�
m oo
a r
is
�• 3a
o=
m
YU
z
I �
a
` .�".i � A
of .. ..�
W
J
DW
aWoZWLL
OOQJQ(L
N3:IZ
Z�Z Qz
ir Z
U�Z(n�Q
\Z
Z J
�(L
Q
ir
a
00 3
�z�y
Ua n
.L
I
s
Z
'I XO
= 1
44 �
Iw�IJ
o N
� Ch
o
I m
ml N>w Z
z
i
� m �
r-�
-I ZI -> o z o
-:4
w w m
I� O W
i� b
z ^
•z3�a �¢C
U W
�� zap
a
"r, .ro
i
w
o
,. .
a
- m_
_
wl wZo ------"
m
e
W. O 2 -----
3
0 iNg
�re
w
f
lw
wzw
_
3.84.Zb.LON
_ LL'909
�7—
of N
�so�
3.96.ZbeLON
`I
£ l lb Ob 031 1V-ld 12iOH8 NVHOO°JN
b 133HS "" °' " °"'" °' s ° we-se-szca,a\ 0ava\a°d ,� --.—W —11n 1111 35 I-L - SZCBIN 6my g\q ° ld "
woo:, -
99s0000z:o L90000-6L:vm 9L[000-% QAd
1Vld ilJOHS NVHOOON
Lo a
0
O
I M�
z
r I W
"
I
I o ago
Z
I =m�
%s %L z z- z Q
I 3 ¢w0 Cf)
Z
0 -INn O Ord' O
Zc F-
$ 2_
OLL W
I~
I
rc
LL O
z
IL
Q .c
F n
IL �m
Q
- 1
u wo
z m
O 93:
J.
a
p
wo
o = I i N
.._.� 'NW,Z Icy 3
- 1
JI o J
m _ol
Q
W - b
j aZ
Q w H
¢O
'a w w °Q w
2 r .ZL ��ZL W a:i
no
Q W r _ u c
awa co m
;wo
0 o 3
o •Q
a z
to
3 ,wn
0
3 a
z
U U O
Z z& w o N
co
jU Ua Jcz
c
w oN N
w�
K WI 20 z wo
w. O m
UO Um a 0 N
NI o Z 3NN 1N3W3Stl3 w I rc
m3 1,1 N 0 --- m� Z
y o F ® ® ��oGB=p
u
w x
a� w a. wP�
w
a w m
96 -
OCP
3 0 w ? 'a J U $o� ®� e® Q
Q U W / w
L =
�O rc
bQ'—' LU z o ro ° �o
w p Y W
�N
zw - 5 I w ""o _a rc ¢ �ro �_
a� y o w Q �o ON I'll
-w-wT� u w a --- a 'co
` w
I m w 3NMiN3W3Stl3 p � L1
wm u I U wi w 1 �m
Ua r i t N
��`}j " � � l l •� � 3 N
I I a �
o�v
El Hb Ob-O31 1VId IHOHS NVHOOON 9133HS ""°°' ° °"'"°°' o"p"a-sd-szfala\ao°,.°=a\aava\co°d l °oHw6M 1==-05 p=fGl 35 91801 - SZfOIY\6m,Y OM\ ° va H wrooN - omz po =o
89c0000z:O L90000-6s:vm 9L[00o-% QAd
It/Id laOHS NVHOOON
F
/0
1
a
N
H
0
�1
a�
a�
l l •� � 3 N
a
a � o�
�-9U: %�
S l6t -Otr431 IV-1d IHOHS NVHOOJN 9133HS "" °' ° °" " `"pz3a-sd-szfala a°°,.° a\aava\co°d „ u°H °ry) laag5 pafGl 35 91801 — SZfOIY\6m,Y oM\ ° va H -aeon - omz 90 -
ses0000z:o L90000-6L:vm 4LLOoo-6l Id
It/Id 1a0HS NVHOOON
E i E
1 e
� P
}�E`� ... 1 � i `+�•� oil ;ii
IH
� LLLLLLJJJ
� �� � •
`
�
T T iiEi"
N
;
� i• � i� e � f ���
_
pill it 1
E
jr
�Yi➢3
�.
7
ago Q
dim W
oo¢ W
Nm3 �
O�w Q
Zoa z
co
V
Al
Eat
9m
2
z e��
l l •� � 3
a
S l 6t -Ob-431 IV-ld IHOHS NVHOOJN L 133HS "° °' 'aw "" `"°"a-sd-szfala ae°,.° a\aava\co°d l °o"ao6W laag5 -a -- — SZfOIY\6m,Y oM\. .... " - , - o so n
SS£OOOOz :O L80000-6F :vni 9LR000-6F :2ld 1VId 12lOHS NVHOOJN
5
s
��I
-f
�g�'�A's
i�
V� 4
p
i
f
6
� Y
a
i
1j
s
3R
—f
�.s Eft r. rl 19
E R RV-OV-031 i 1Vld 1210HS NVHOO`JN 9133HS ""°`°' BU10ry'"°`°' b•°'910-SE-SZiBitl\s6u.m4\Qdyp\(void VoyS —°bw i..ns wcu as —L - szca�a\e°.omv, ° ya "
0
Z
W
0
L LI
J
W
LLB
cn
cn
W
0
W
z
to
W
w
cr
H
z
Z
W
2
W
Q
J
w
w
0
z
d
gBs �s o� aza -=
m.3
�NU os. OG v 3 Bi m�' cE mw
W O O m$32. E.
E$-mmn
$a
Z O e5m _M
W m m$i mo tWS'mrmm a.
m d' W =_ E m F - w� •t m 5 `0 9 m 9 v $ V
3 H W Z aQ o m.mc wygE E
? pz Z
J O m = E m m g E wee -
W W� W Z '° m ',- c untyn &mm �= f U Ea-E E� CmZ.�a
¢ ¢C ¢ W ° a� $am 'm tam ma n� y c$ 00 m. W E/WI�''�
U �. � �. i� M1$� Q E W m m m $� _ m ry o `gy�pp - F c 2 V
LL LL3 ILL N cw-a `m a c5a °E> W W
z zp z z�9:t}m$ J
mom W
_wE °Q'ED
,,` o°ra am
=n agmm��-
va H'°w°
c$ cg d _ w E w UR n F y p n ! v a Q N
W
1Vld 18UHS NVHJUJN
C 5-
6 k
;gH
z
m
z
z
o
¢ a
3
~z a
o kow
`€
3 z
g
0
ww z
3
z� F
=~n W
U
O�of
a
z�: W
W
of
~
U
z
�
o
v
v
m
L
C
Z
OW
K
_
w
F
z
¢
0
000
c0 W
a0 �O
�O NO
to
to V z
.-I Z
E
�
O
H
3����
Y o
o
u
a v
c c
c
o o
u L
C _
0 o
L L
_ _
—__-
o o
L L
0
0 G
d~
v"i vi
i ~
1 d
d G
1 a
o
o
o o
o o
o o
.2
d
'^
.2 o
d C
m o
u
a>>>
o �
C
o
u
a a
N N
a
w �
N E
o o
o o
u u
o o
o o
u° u
o o
o o
u u
wEE�e
Y
Y N
> >
oo
>
o
Y x
VUUeVm
x Y
Y x
l�omm30003m
mmmmm
a
N my
in
ion
a°mo.+N
me
rn
.ro'azr adzro,rav
h' — — — — — — — — — — �r
I I
I Ir
----
.rdTK[ dd ,66o ION rT
L_ __—
-J
rr� —
L_ I
P
v
ti
I � S
L e�
---------------- -
I
£L fV OV 031 lVld IHOHS NVHOO'JN 6133HS
W
cr
n
U)
z
a
O
2
w
z
O
z
z
w
w
w
w
I
�¢
b
z
a
z
a
i
oz
z.
z
3
9
-
-
1Vld 18UHS NVHJOJN
ew g <
z
z
3 z
z
g�o J
az d
LL
o 0-
zx� Q
zU)
Q, ❑
(DM Q
z J
a
ro
va u��j8
w Z
rz a
�w
U �
�o
z
3 rco
a
z Li
-----------
I
k
z
o
r----
M
I
I
J
,
,
0
u
e
---------------
I
4
%r
L------------
p
I
I
z
Z
ILA �n
-'
— — — — — — —
—
r
Z
_-------------------
= _,nr___
I
i
see
£L LV-OV-031 I 1Vld 1FJOHS NVHOOEJN OL 133HS
89E000O2::O 80000-% wil I 9LLOOO-6VbIdj 1VId DJOHS NVHOO!DN
Ns
111
m ° =�a
Z J
y ® z m F
O o a LU
x z 3 p
U) go
p
O az Q
o �w
o yw w
Z zx
!111 lilt3 ar
F w cxo Z
0 a Z�' Z
U Z
w o Q
0� z a
0
r
w �
U
3
w �w
O o
n -go
N O. � ° N U O =Y
10
I.
�? a
o N -m Y t w cryrypap��on
� t 5 6 O G_ n .. O @ U U N N
d v coo " E y E o5 NE N c o m ma NoN @§§
n�ay>°wZT
yog -o �' y Em $ - c�°J 5 >v ° o noon
5 vw aw1°o 'o> s v a c >a ado
r w x °' _ ° ° 2- E
O >�a Nma m 3E f coo w° x mar
pyYo mmv`m OL my n!o 6 > o `v g Tnon
E o E a o 5 w> m
N 7 E d O N �• C'! °. N 6.2 .J w
m y m a m o
Bryn.. orao rnE
Z o c A. 'b � a .o
U N m
fO.l � N 6 m N' N N U _ N O oo N n U d "@O 3 o N y N O? C ry o
Oa a° ° O. N l6 y >. 3Im G O ° y
Q o L a= rn w e 01 >o °' y w m Z o" o ` m 'v n c m v'
°
rnHB n°w'y L
roo=c°.m o°_ym
Z EmE0
U ¢° 2UU O d>aa`E gz
o 0
xZ �
kw
wo w prc�
N J m rc 3 p r
y z
h w r w z z w - 0 w
¢ O Z H a o 11
0 of LL > a 3 3 w 0 ° z J x °
E� a ELL o° o - m o w� zw
LL LL h z a w rc y w a s h z 3
z °> > o y i Y� ° 0 , o s° ° az �w
z °
o z z �°-� o
Y x N= J z w ° w w a w z
3 >jr a w cYi rcy s > o o °z of wo
o Yog r z x'� ¢ m mQ x a i m LL a wo rc� �a
rc rc Y a y ° o r Sw N x a �aq o3
o O ¢ o x g ¢ za 1 LL J o 2 w a m a
Q z F
I °wrc ° ° 5 w0
a 3° z x a w o E m > W a w rc = m LL m J a
Qzo 3 ° >a o w
aim Z_ J
moo H F
III IIIIIII NJ w Q w
LL�ws J S U
II�IIII �d°v¢u a Z
�¢zw� m
III=1T i 30=0> r z
=III= z w0��� g
IIII III .Z, _ a
II IIIIG a ° _
rr3°3 fn _ 0 W
_ w
'NIW ZI N
£L LV OV 031 1Vld 1FJOHS NVHOOEJN 9133HS
e 11
W
Ste.
g9e� �89
27
Appendix B
Operations & Maintenance Manual
Your property contains a stormwater management flow control BMP (hest management practice)
called "iirrrifed wfiltrahon," which was installed to mitigate the stormwater quantity and quality
impacts of some or all of the inmpervious surfaces on your property_
Limited infiltration is a method of soaking runoff from impervious area (such as pairred areas and
roofs) into the ground. Infiltration deTaces, such as gravel filled trenches, drywells. and ground
surface depressions. facilitate this process by putting rtmotf in direct contact with the soil and holding
the mnoff long enough to soak most of it into the ground_ To be successful, the soil condition around
the infiltration device must be able to soak water into the grmmd for a reasonable number of years_
Infiltration Desires
The infiltration deuces used on your property include the following as indicated on the flow
control BMP site plan (CHECK THE BOXES) THAT APPLY):
❑ gravel filled trenches, ] drywells_
MAINTENANCE RESTRICTIONS
The sue_ placement, and composition of these devices as depicted by the flow control BMP site plan
and design details must be maintained and may not be changed without written approval either from
the King County Water and Land Resources Division or through a future development permit from
King Cotnmty.
INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES
To be successful. the soil condition around the infiltration device must be able to soak water into the
ground for a reasonable number of years.
• Infiltration devices antst be inspected auttally and after major storm events to identify and
repair any physical defects_
• Maintenance and operation of the system should focus on ensuring the system's viability by
preventing sediment -laden flows from entering the device. Excessive sedimentation will
result in a plugged or non-functioning facility.
• If the infiltration device has a catch bash. sediment accumulation must be removed on a
yearly basis or more frequently if necessary_
• Prolonged ponding arotmd or atop a device may indicate a plugged facility. If the device
becomes plugged it must be replaced_
• Keeping the areas that drain to infiltration devices well swept and clean will enhance the
longevity of these devices.
• For roofs, frequent cleaning of gutters will reduce sediment loads to these det ices_
RECORDING REQUIREMENT
These limited infiltration flow control BMP maintenance and operation instnxtions must be recorded
as an attachment to the required declaration of covenant and grant of easement per Requirement 3
of Section C_13_4 of the King Cotm ty Surface Water Design Manual_ The intent of these instructions
is to explain to fitture property owners, the purpose of the BMF and how it nntst be maintained and
operated. These instructions are intended to be a mimnnun; the King County Department of
Permitting and Environmental Services (DPER) may require additional instructions based on site -
specific conditions. See King County's Surface Water Design Manual %%rbsite for additional
information and updates.
29
Appendix C
CSPPP
30
CESCL REQUIREMENT
A Certified Erosion and Sediment Control Specialist shall be identified in the Construction SWPPP
and shall be onsite or oncall at all times. Certification may be obtained by an approved training
program that meets the erosion and sediment control training criteria established by Ecology. If a
preconstruction meeting is held, this person shall attend. See attached BMPC160 Certified Erosion
and Sediment Control Lead (CESCL)
CESCL
24hr Contact number:
Fax number:
Address:
ELEMENT 1 : MARK CLEARING LIMITS
• Prior to beginning land disturbing activities, including clearing and grading, all clearing limits,
sensitive areas and their buffers, and trees that are to be preserved within the construction area
should be clearly marked, both in the field and on the plans, to prevent damage and offsite impacts.
• Plastic, metal, or stake wire fence may be used to mark the clearing limits.
• The duff layer, native topsoil, and natural vegetation shall be retained in an undisturbed state to the
maximum extent practicable. If it is not practicable to retain the duff layer in place, it should be
stockpiled onsite, covered to prevent erosion, and replaced immediately upon completion of the
ground disturbing activities.
Element
#1
BMP
Description
X
C101
Preserving Natural Vegetation
X
C102
Buffer Zones
X
C103
High Visibility Plastic or Metal Fence
X
C104
Stake and Wire Fence
Construction and silt fencing will be used to delineate the limits of clearing for the project.
ELEMENT 2: ESTABLISH CONSTRUCTION ACCESS
• Construction vehicle access and exit shall be limited to one route if possible.
• Access points shall be stabilized with quarry spalls or crushed rock to minimize the tracking of
sediment onto public roads.
• Wheel wash or tire baths should be located onsite, if applicable.
• Public roads shall be cleaned thoroughly as needed to protect stormwater infrastructure and
downstream water resources. Sediment shall be removed from roads by shoveling or pickup
sweeping and shall be transported to a controlled sediment disposal area. Street washing will be
31
allowed only after sediment is removed in this manner.
• Street wash wastewater shall be controlled by pumping back onsite, or otherwise be prevented from
discharging untreated into systems tributary to state surface waters.
Element #2
BMP
Description
X
C105
Stabilized Construction Entrance
C106
Wheel Wash
C107
Construction Road/Parking Area Stabilization
The proposed construction accesses will be from SE 1731 St on the south property line.
ELEMENT 3: CONTROL FLOW RATES
• Properties and waterways downstream from development sites shall be protected from erosion due
to increases in the volume, velocity, and peak flow rate of stormwater runoff from the project site, as
required by local plan approval authority.
• Downstream analysis is necessary if changes in flows could impair or alter conveyance systems,
stream banks, bed sediment or aquatic habitat. See Chapter 3 for offsite analysis guidance.
• Where necessary to comply with Minimum Requirement #7, stormwater retention/detention facilities
shall be constructed as one of the first steps in grading. Detention facilities shall be
functional prior to construction of site improvements (e.g. impervious surfaces).
• The local permitting agency may require pond designs that provide additional or different
stormwater flow control if necessary to address local conditions or to protect properties and
• waterways downstream from erosion due to increases in the volume, velocity, and peak flow rate of
stormwater runoff from the project site.
• If permanent infiltration ponds are used for flow control during construction, these facilities shall be
protected from siltation during the construction phase and plans made for restoration after
construction.
Element
BMP
Description
#3
C240
Sediment Trap
C241
Temporary Sediment Pond
ELEMENT 4: INSTALL SEDIMENT CONTROLS
Prior to leaving a construction site, or prior to discharge to an infiltration facility, stormwater runoff
from disturbed areas shall pass through a sediment pond or other appropriate sediment removal
BMP. Runoff from fully stabilized areas may be discharged without a sediment removal BMP, but
must meet the flow control performance standard of Element #3, bullet #1. Full stabilization means
concrete or asphalt paving; quarry spalls used as ditch lining; or the use of rolled erosion products,
a bonded fiber matrix product, or vegetative cover in a manner that will
fully prevent soil erosion. The local permitting authority should inspect and approve areas stabilized
by means other than pavement or quarry spalls.
• Sediment ponds, vegetated buffer strips, sediment barriers or filters, dikes, and other BMP's
intended to trap sediment onsite shall be constructed as one of the first steps in grading. These
32
BMP's shall be functional before other land disturbing activities take place.
• Earthen structures such as dams, dikes, and diversions shall be seeded and mulched according to
the timing indicated in Element #5.
• BMPs intended to trap sediment on site must be located in a manner to avoid interference with the
movement of juvenile salmonids attempting to enter off -channel areas or drainages, often during
nonstorm events, in response to rain event changes in stream elevation or wetted area.
Element
#4
BMP
Description
C230
Straw Bale Barrier
C231
Brush Barrier
C232
Gravel Filter Berm
X
C233
Silt Fence
C234
Vegetated Strip
C235
Straw Wattles
C240
Sediment Trap
C241
Temporary Sediment Pond
C250
Construction Stormwater Chemical Treatment
C251
Construction Stormwater Filtration
The proposed sediment control measures are provided on TESC found in the engineering submittal.
At minimum, the project will be required to have downstream protection (compost socks, silt fencing,
or equivalent), inlet protection, and appropriate cover measures. The proposed plan is intended as
guidance and the Contractor shall be responsible for implementing and maintaining appropriate
sediment controls based on changing site conditions.
ELEMENT 5: STABILIZE SOILS
• All exposed and unworked soils shall be stabilized by application of effective BMPs that protect the
soil from the erosive forces of raindrop impact, flowing water, and wind.
• Soils shall be stabilized as outlined below, where downstream water resources or stormwater
infrastructure may be negatively affected by sediments (i.e., runoff discharges off the development
site).
• From October 1 through April 30, no soils shall remain exposed and unworked for more than 2
days. From May 1 to September 30, no soils shall remain exposed and unworked for more than 7
days. This condition applies to all onsite soils, whether at final grade or not. The local permitting
authority may adjust these time limits if it can be shown that a development site's erosion or runoff
potential justifies a different standard.
• Applicable practices include, but are not limited to, compost addition, temporary and permanent
seeding, sodding, mulching, plastic covering, soil application of polyacrylamide (PAM), early
application of gravel base on areas to be paved, and dust control.
• Soil stabilization measures selected should be appropriate for the time of year, site conditions,
estimated duration of use, and potential water quality impacts that stabilization agents may have on
downstream waters or ground water.
33
• Soil stockpiles must be stabilized from erosion, protected with sediment -trapping measures, and
located away from storm drains, waterways, or drainage channels.
• Work on linear construction sites and activities, including right-of-way and easement clearing,
roadway development, pipelines, and trenching for utilities, shall not exceed the capability of the
individual contractor for his portion of the project to install the bedding materials, roadbeds,
structures, pipelines, and/or utilities, and to re -stabilize the disturbed soils, in compliance with the
applicable 2-day or 7-day criterion listed above.
Element
#5
BMP
Description
X
C120
Temporary and Permanent Seeding
X
C121
Mulching
C122
Nets and Blankets
X
C123
Plastic Covering
X
C124
Sodding
X
C125
To soilin
C126
Polyacrylamide for Soil Erosion Protection
C130
Surface Roughening
C131
Gradient Terraces
C140
Dust Control
C180
Small Project Construction Stormwater Pollution Prevention
Temporary and permanent cover measures shall be provided based upon plans and
Contractor's discretion per site conditions during construction.
ELEMENT 6: PROTECT SLOPES
• Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion.
• Consider soil type and its potential for erosion.
• Reduce slope runoff velocities by reducing the continuous length of slope with terracing and
diversions, reduce slope steepness, and roughen slope surface.
• Offsite stormwater (run-on) shall be diverted away from slopes and disturbed areas with interceptor
dikes and swales. Offsite stormwater should be managed separately from stormwater generated on
the site.
• To prevent erosion, at the top of slopes collect drainage in pipe slope drains or protected channels.
Temporary pipe slope drains shall handle the peak flow from a 10-year, 24-hour event; permanent
slope drains shall be sized for a 25-year, 24-hour event. Check dams shall be used within channels
that are cut down a slope.
• Provide drainage to remove ground water intersecting the slope surface of exposed soil areas.
• Stabilize soils on slopes, as specified in Element #5.
Element
#6
BMP
Description
X
C120
Temporary and Permanent Seeding
X
C130
Surface Roughening
X
C131
Gradient Terraces
C200
Interceptor Dike and Swale
34
C201
Grass -Lined Channels
C204
Pipe Slope Drains
C205
Subsurface Drains
C206
Level Spreader
C207
Check Dams
C208
Triangular Silt Dike
The Contractor shall be responsible for protecting and stabilizing site slopes as required.
ELEMENT 7: PROTECT DRAIN INLETS
• As needed to protect stormwater infrastructure and downstream water resources, all storm drain
inlets made operable during construction shall be protected so that stormwater runoff shall not enter
the conveyance system without first being filtered or treated to remove sediment.
• All approach roads shall be kept clean, and all sediment and street wash water shall not be allowed
to enter storm drains without prior and adequate treatment, unless treatment is provided before the
storm drain discharges to waters of the State.
Element
BMP
Description
#7
X
C220
Storm Drain Inlet Protection
Both existing and proposed drain inlets shall be protected as required.
ELEMENT 8: STABILIZE CHANNELS AND OUTLETS
• All temporary onsite conveyance channels shall be designed, constructed and stabilized to prevent
erosion from the peak 10-minute flow velocity from a Type 1A 10-year 24-hour frequency storm for
the developed condition. Alternatively, the 10-year, 1-hour flow rate indicated by an approved
continuous runoff model, increased by a factor of 1.6, may be used.
• Stabilization, including armoring material, adequate to prevent erosion of outlets, adjacent stream
banks, slopes and downstream reaches shall be provided at the outlets of all conveyance systems.
Element
BMP
Description
#8
C202
Channel Lining
X
C209
Outlet Protection
Permanent conveyance channels shall be, at a minimum, lined with grass. Outlets to open
drainage areas shall be lined with rip -rap.
ELEMENT 9: CONTROL POLLUTANTS
• All pollutants, including waste materials and demolition debris that occur onsite shall be handled
and disposed of in a manner that does not cause contamination of stormwater.
• Cover, containment, and protection from vandalism shall be provided for all chemicals, liquid
products, petroleum products, and non -inert wastes present on the site (see Chapter 173-304 WAC
for the definition of inert waste). Onsite fueling tanks shall include secondary containment.
• Maintenance and repair of heavy equipment and vehicles involving oil changes, hydraulic system
drain down, solvent and de -greasing cleaning operations, fuel tank drain down and removal, and
35
other activities which may result in discharge or spillage of pollutants to the ground or into
stormwater runoff must be conducted using spill prevention measures, such as drip pans.
Contaminated surfaces shall be cleaned immediately following any discharge or spill incident.
Report all spills to 911. Emergency repairs may be performed onsite using temporary plastic placed
beneath and, if raining, over the vehicle.
• Wheel wash, or tire bath wastewater, shall be discharged to a separate onsite treatment system or
to the sanitary sewer if allowed by the local wastewater authority.
• Application of agricultural chemicals, including fertilizers and pesticides, shall be conducted in a
manner and at application rates that will not result in loss of chemical to stormwater runoff.
Manufacturers' label recommendations shall be followed for application rates and procedures.
• Management of pH -modifying sources shall prevent contamination of runoff and stormwater
collected on the site. These sources include, but are not limited to, bulk cement, cement kiln dust,
fly ash, new concrete washing and curing waters, waste streams generated from concrete grinding
and sawing, exposed aggregate processes, and concrete pumping and mixer washout waters.
• Construction sites with significant concrete work shall adjust the pH of stormwater if necessary to
prevent violations of water quality standards.
36
Element
BMP
Description
#9
X
C151
Concrete Handling
X
C152
Sawcutting and Surfacing Pollution Prevention
The Contractor shall be responsible for controlling pollutants from construction activities off the
project site.
ELEMENT 1 0: CONTROL DE -WATERING
• All foundation, vault, and trench de -watering water, which has similar characteristics to stormwater
runoff at the site, shall be discharged into a controlled conveyance system, prior to discharge to a
sediment trap or sediment pond. Channels must be stabilized, as specified in Element #8.
• Clean, non -turbid de -watering water, such as well -point ground water, can be discharged to
systems tributary to state surface waters, as specified in Element #8, provided the de -watering flow
does not cause erosion or flooding of the receiving waters. These clean waters should not be
routed through sediment ponds with stormwater.
• Highly turbid or otherwise contaminated dewatering water, such as from construction equipment
operation, clamshell digging, concrete tremie pour, or work inside a cofferdam, shall be handled
separately from stormwater at the site.
• Other disposal options, depending on site constraints, may include: 1) infiltration, 2) transport offsite
in vehicle, such as a vacuum flush truck, for legal disposal in a manner that does not pollute state
waters, 3) onsite treatment using chemical treatment or other suitable treatment technologies, or 4)
sanitary sewer discharge with local sewer district approval.
The Contractor shall be responsible for discharging de -watering water in an appropriate manner.
ELEMENT 1 1 : MAINTAIN BMP's
• All temporary and permanent erosion and sediment control BMP's shall be maintained and repaired
as needed to assure continued performance of their intended function. All maintenance and repair
shall be conducted in accordance with BMP's.
• Sediment control BMP's shall be inspected weekly or after a runoff -producing storm event during
the dry season and daily during the wet season.
• All temporary erosion and sediment control BMP's shall be removed within 30 days after final site
stabilization is achieved or after the temporary BMP's are no longer needed. Trapped sediment
shall be removed or stabilized on site. Disturbed soil areas resulting from removal of BMP's or
vegetation shall be permanently stabilized.
The Contractor shall be responsible for maintaining BMP's to assure performance of their
intended function.
ELEMENT 1 2: MANAGE THE PROJECT
• Phasing of Construction - Development projects shall be phased where feasible in order to prevent
soil erosion and, to the maximum extent practicable, the transport of sediment from the project site
during construction. Revegetation of exposed areas and maintenance of that vegetation shall be an
integral part of the clearing activities for any phase.
37
Clearing and grading activities for developments shall be permitted only if conducted pursuant to an
approved site development plan (e.g., subdivision approval) that establishes permitted areas of clearing,
grading, cutting, and filling. When establishing these permitted clearing and grading areas, consideration
should be given to minimizing removal of existing trees and minimizing disturbance/compaction of native
soils except as needed for building purposes. These permitted clearing and grading areas and any other
areas required to preserve critical or sensitive areas, buffers, native growth protection easements, or tree
retention areas as may be required by local jurisdictions, shall be delineated on the site plans and the
development site.
All plats shall include lot -specific grading plans, including information specified by the local permitting
authority such as finished grades, finished floor elevations, buildable areas, and identified drainage outlets.
This information would normally be submitted with the construction drawings, but may be required prior to
preliminary plat approval.
• Seasonal Work Limitations
From October 1 through April 30, clearing, grading, and other soil disturbing activities shall only be permitted
if shown to the satisfaction of the local permitting authority that silt -laden runoff will be prevented from leaving
the construction site through a combination of the following:
1. Site conditions including existing vegetative coverage, slope, soil type and proximity to receiving
waters; and
2. Limitations on activities and the extent of disturbed areas; and
3. Proposed erosion and sediment control measures.
Based on the information provided, and/or local weather conditions, the local permitting authority may
expand or restrict the seasonal limitation on site disturbance. If, during the course of any construction activity
or soil disturbance during the seasonal limitation period, silt -laden runoff leaving the construction site causes
a violation of the surface water quality standard or if clearing and grading limits or erosion and sediment
control measures shown in the approved plan are not maintained, the local permitting authority may take
enforcement action, including but not limited to a notice of violation, administrative order, fine/penalty, stop -
work order, or correction notice.
The following activities are exempt from the seasonal clearing and grading limitations:
1. Routine maintenance and necessary repair of erosion and sediment control BMP's;
2. Routine maintenance of public facilities or existing utility structures that do not (a) expose the
soil or (b) result in the removal of the soil's vegetative cover; and Self-contained project sites,
where there is complete infiltration of the water quality design event runoff within the site.
3. Local governments may restrict clearing and grading activities where site conditions may
present a significant risk of impact to property or critical areas. Contact the local permitting
authority for information on specific site restrictions. In Olympia, except where approved
chemical treatment, full dispersion or infiltration is practiced, clearing, grading, and other soil
disturbing activities are prohibited in all watersheds November through February, and in Green
Cove, Percival, Woodard, and Ellis Creek watersheds between October through April.
• Coordination with Utilities and Other Contractors
The primary project proponent shall evaluate, with input from utilities and other contractors, the stormwater
management requirements for the entire project, including the utilities, when preparing the Construction
SWPPP.
• Inspection and Monitoring
All BMP's shall be inspected, maintained, and repaired as needed to assure continued performance of their
intended function. Site inspections shall be conducted by a person who is knowledgeable in the principles
and practices of erosion and sediment control. The person shall have the skills to (1) assess site conditions
and construction activities that could impact stormwater runoff quality, and (2) assess erosion and sediment
control measure effectiveness.
A Certified Erosion and Sediment Control Specialist shall be identified in the construction SWPPP and shall
be onsite or on -call at all times. Certification may be obtained an approved training program that meets the
erosion and sediment control training criteria established by Ecology. If a pre -construction meeting is held,
this person shall attend.
Sampling and analysis of the stormwater discharges from a construction site may be necessary on a case -
by -case basis to ensure compliance with standards. Monitoring and reporting requirements may be
established by the local permitting authority when necessary.
The following discharge standard applies:
Runoff leaving the construction site shall be free of settle able solids, as measured with an Imhoff Cone and
in accordance with Standard Methods for the Examination of Water and Wastewater, most recent edition,
American Water Works Association. "Free of settle able solids" shall be defined as measuring less than 2.5
mL/L/hr, for storms up to the water quality design event.1
The following surface water standard applies:
1. For storms up to the water quality design event, turbidity downstream of a construction site may
not increase more than 5 NTU, if upstream turbidity is 50 NTU or less, and may not increase
more than 10 percent, if upstream turbidity is over 50 NTU. To the extent practicable, samples
should be taken far enough downstream so that the construction site discharge has been well -
mixed with the surface water.
2. Whenever inspection and/or monitoring reveals that the BMP's identified in the Construction
SWPPP are inadequate, due to the actual discharge of or potential to discharge a significant
amount of any pollutant, appropriate BMP's or design changes shall be implemented as soon as
possible.
Maintaining an Updated Construction SWPPP - The SWPPP shall be retained onsite or within
reasonable access to the site.
The SWPPP shall be updated within 7 days to reflect any significant changes in the design, construction,
operation, or maintenance at the construction site that have, or could have, a significant effect on the
discharge of pollutants to waters of the state.
The SWPPP shall be updated within 7 days if during inspections or investigations by site staff or local or
state officials, it is determined that the SWPPP is ineffective in controlling pollutants such that applicable
discharge or surface water standards violations are apparent.
The objective is to control erosion and prevent sediment and other pollutants from leaving the site during
the construction phase of a project.
The Contractor shall be responsible for managing the construction phase of the project within
reasonable applications of the guidelines of this section and the SWPPP.
39
SECTION 3 - CONSTRUCTION SWPPP CHECKLIST
Construction Stormwater Pollution Prevention Plan Checklist
Project Name:
City Reference No_
Re--iew Date:
ou-site Inspection Revie�,N-- Date:
Constnuction SW- PPP Reviewer:
Section I — Construction SWPPP Narrative
1. Construction Stormwater Pollution Prevention Elements
_ a. Describe hove each of the Construction Stormu-ater Pollution Prevention Elements has
been addressed though the Construction SINTPP.
b. Identify the type and location of BPs used to satisfy the required element.
c. Written justification identifying the reason an element is not applicable to the proposal.
12 Required Elements - Construction Stormwater Pollution Prevention Plan
1 _ Mark Clearing Limits_
_ 2. Establish Construction Access.
_ 3 _ Control Flow Rates_
_ 4. Install Sediment Controls_
_ S . Stabilize Sails.
6. Protect Slopes.
_ 7. Protect Drain Inlets.
8. Stabilize Channels and Outlets.
_ 9. Control Pollutants.
14_ Control De -Watering.
_ 11. Maintain BMPs
12_ Manage the Project.
2. Project Description
_ a. Total project area.
b. Total proposed iuipervions area_
c. Total proposed area to be disturbed„ including off site borrow and fill areas.
d. Total volumes of proposed cut and fill_
3. Existing Site Conditions
a. Description of the existing topography.
b. Description of the existing ;vegetation.
c. Description of the existing drainage.
February 2005 Volume N — Construction Stormwater Poftutron Preventton 3-21
.E
Construction Stormwater Pollution Prevention Plan Checklist
Project Name.
City Reference No_
4. Adjacent Areas
I_ Description of adjacent areas which may be affected by site disturbance
a_ Streams
b. Lakes
c_ Wetlands
d. Residential Areas
e_ Roads
f Other
II. Description of the &-kynstream drainage path leading from the site to the receiving body
ofwater. (Minimum distance of 400 y-ards_)
5. Critical Areas
_ a. Description of critical areas that are on or adjacent to the site.
b. Description of special requirements for working in or near critical areas.
6. soils
Description of on -site sails_
a_ Soil name(s)
b_ Soil mapping unit
_ c_ Erodibilih,
_ d_ Settleability
e_ Penneability
f. Depth
g_ Texture
h_ Soil Stricture
i. Erasion Problem Areas
Description of potential erosion problems on site.
S. Construction Phasiug
_ a. Construction sequence
b_ Constniction plea;ing (if proposed)
3-22 Volume N — Construction Stormwater PdUron Preventrorr February 2005
41
Construction Stormwater Pollution Prevention Plan Checklist
Project Name.
City Reference No_
9. Construction Schedule
I. Provide a proposed construction schedule_
II_ Wet Season Construction Activities
_ a_ Proposed wet season construction activities.
b. Proposed vet season construction restraints for environmentally sensitive..critical
areas.
10. Finaacial-"Ownership Responsibilities
a. Identify the property owner responsible for the initiation of bands andior other financial
securities_
b. Describe bonds and?or other evidence of financial responsibility- for liability associated
with erasion and sedimentation impacts.
11. Engineeizng Calculations
1. Provide Design Calculations_
a_ Sediment Ponds."Traps
_ b. Diversions
_ c_ Waterways
d. Runaff'Stormwater Detention Calculations
February 2005 Volume N — Construction Stonnwa ter Pollution Prevention 3-23
42
Construction Stormwater Pollution Prevention Plan Checklist
Project Name:
City Reference No_
1_ General
a_ Vicinity Map
b_ City of
Section II - Erosion and Sediment Control Plans
Clearing and Grading Approval Block
Erasion and Sediment C:ontrolNotes
2. Site Plan
_ a. Legal description of subject property.
b. North Arro-,r
c. Indicate boundaries of existing vegetation, e.g_ tree lines, pasttue areas, etc.
d. Identify and label areas of potential erosion problems_
e. Identify any on -site or adjacent siuface vv'aters, critical areas and associated buffers.
f_ Identify FEMA base flood boundaries and Shoreline Management boundaries (if
applicable)
g. Shove existing and proposed contours.
h. Indicate drainage basins and direction of floor for individual drainage areas_
i_ Label final grade contours and identify developed condition drainage basins_
j_ Delineate areas that are to be cleared and graded.
k. Show all cut and fill slopes indicating top and bottom of slope catch lines.
3. Conveyance Systems
a_ Designate locations for swales, interceptor trenches, or ditches-
b. Shaw all temporan• and permanent drainage pipes, ditches, or cut-off trenches required
for erosion and sediment control_
c_ Provide minimum slope and cover for all temporary pipes or call out pipe inverts_
d_ Shove grades,_ dimensions, and direction of flow in all ditches, su, ales, culverts and pipes_
e_ Provide details for bypassing off -site runoff around disturbed areas_
f. Indicate locations and outlets of any dewatering systems_
4. Location of Detention BMPs
a. Identify location of detention BMPs_
3-24 Volume N — Conshwct+on Stormwa ter Poltution Pmvenfiorr February 2005
43
Construction Storrnwater Pollution Prevention Plan Checklist
ProjectName:
City Reference No_
a. Erosion and Sediment Control Facilities
a_ Show the locations of sediment traps), pond(s), pipes and strictures.
b. Dimension pond berm widths and inside and outside pond slopes_
c. Indicate the trap pond storage required and the depth. length, and Width dimensions.
d. Provide typical section views through pond and outlet stnicture.
e. Provide typical details of gray.el cone and standpipe; and. -'or other filtering devices_
f_ Detail stabilization techniques for outlet."inlet_
g. Detail controL'restrictor dele-ice location and details_
_ h. Specify mulch andior recommended cover of berms and slopes.
_ i_ Provide rock specifications and detail for rock check dam(s)_ if applicable_
j_ Spe€ify spacing for rock check dams as required.
_ k. Provide front and side sections oftypi€al rock check dams_
L Indicate the locations and provide details and specifications for silt fabric.
m_ Locate the construction entrance and provide a detail_
6. Detailed Drawings
a. Any structural practices used that are not referenced in the Ecology Manual should be
explained and illustrated with detailed drawings_
7. Other Pollutant BIIPs
a_ Indicate on the site plan the location ofBMPS to be used for the control of pollutants
other than sediment, e.g_ concrete wash water.
S. Monitoring Locations
a_ Indicate on the site plan the water quality sampling locations to be used for monitoring
water quality on the construction site, if applicable.
February 2005 1loluffie 11— Construction Stormwater Pollution Prevenfion 3-25
Appendix D
Geotech/NRCS
DocuSign Envelope ID: 922A5043-8263-48E6-9A5B-F7087123331 B
Date:
To:
From:
MEMORANDUM
4/Ul JVV Aamlral nay, Jte 3b3 • Jeattle, vm y)bl lb be 1 LUb.44b.Iale www.uonceptbusinessuroup.com
March 13, 2020
City of Renton
Anna Nguyen, P.E.
ad
Subject: Infiltration Assessment "4"''". A-trj ``"'
Project Address: 10814 SE 173rd Street DOWMAM134M.-
Geologic Setting
The Geologic Map of King County, by Derek B. Booth, Kathy A. Troost & Aaron P. Wisher
published in March 2007, was referenced for the geologic and soil conditions of the project site.
According to this publication, the surficial soil unit at the project site and its immediate vicinity is
mapped as Ti I I (Qvt).
-
projecIti
location
-9
ii
f
Figure 1 - Geologic Map of Des Moines (Not -to -Scale)
Soils on this property were investigated under my supervision on March 8, 2020. Three (3) test pits
were excavated in the vicinity of the proposed stormwater BMP locations. In accordance with
Section C.2.2 of the 2016 King County Surface Water Design Manual, soil logs are required to be
excavated to a minimum depth of 5 feet. Refer to Figure 2 for the test pit locations and Figure 3 for
the soil log.
A NEW DIMENSION OF DESIGN PERCEPTION
DocuSign Envelope ID: 922A5043-8263-48E6-9A5B-F7087123331 B
10814 Southeast 173rd Street Page 2 of 3
Figure 2 - Soils Test Pit Location (Not -to -Scale)
Groundwater
The soil sample was collected during the wet -season. No groundwater seepage was observed. It
should be noted that groundwater levels vary seasonally with rainfall and other factors.
Hydraulic Restrictive Layer
The test pits were excavated to a total depth of 6.0 ft. There was no restrictive layer or hardpan clay
at this depth.
EPA Falling Head Infiltration Test
Infiltration tests were conducted at the site following the EPA Falling Head test methodology. Data
from all three (3) test pits were analyzed. The most limiting measured percolation rate was 1.0
inches/hour.
Subsurface Soil Data
A representative soil sample was collected near the grade of the proposed BMP bottom layer which
was analyzed by Northwest Agricultural Consultants, Inc. on March 11, 2020. The soils
encountered at 3 to 4 feet below grade in the proposed infiltration area are consistent with sandy
loam classification based on the sieve analysis, as summarized in the attached lab results. Figure 3
contains a representative soil log.
THE CONCEPT GROUP
DocuSign Envelope ID: 922A5043-8263-48E6-9A5B-F7087123331 B
10814 Southeast 173rd Street Page 3 of 3
Depth (FT)
Sample
USC5
Graphic
description
0.0
1
=_____=
topsoil
0.5
1.0
1.5
tan sand with some gravel, no mottling or
2
5P
2.0
water seepage
2.5
3.0
3.5
f'sss'sss
4.0
f}
's
compacted gray sand with some gravel, no
4.5
3
5M
f
mottling or water seepage
5.0
fsss'sss
5.5
6.0fffffff
Figure 3 — Representative Soils Log (Not -to -Scale)
Limitations
The conclusions and recommendations contained in this report are based on site conditions as they
existed at the time of our exploration and assume that the soil and groundwater conditions
encountered in the test pits are representative of subsurface conditions on the site. If the subsurface
conditions encountered during construction are significantly different from those observed in our
explorations, we should be advised at once so that we can review these conditions and reconsider
our recommendations where necessary.
Unanticipated soil conditions are commonly encountered on construction sites and cannot be fully
anticipated by merely taking soil samples in test pits. Subsurface conditions can also vary between
exploration locations. Such unexpected conditions frequently require making additional
expenditures to attain a properly constructed project.
This report has been prepared for the exclusive use of the property owner and its representatives
for specific application to this project and site. Our recommendations and conclusions are based
on observed site materials and engineering analyses. Our conclusions and recommendations are
professional opinions derived in accordance with current standards of practice within the scope of
our services and within budget and time constraints.
No warranty is expressed or implied. The scope of our services does not include services related to
construction safety precautions, and our recommendations are not intended to direct the
contractor's methods, techniques, sequences, or procedures, except as specifically described in our
report for consideration in stormwater design.
THE CONCEPT GROUP
DocuSign Envelope ID: 922A5043-8263-48E6-9A5B-F7087123331 B
Northwest Agricultural The Concept Group
Consultants 4701 SW Admiral Way STE 353
460 Seattle, WA 98116
2545 W Falls Avenue PAP -Accredited
Kennewick, WA 99336
509.783.7450 Report: 51021-1-2
Date: March 11, 2020
www.nwag.com
Project No:
lab@nwag.com Ji Project Name: 10814 SE 173rd St.
Sample ID
Moisture
Organic Matter
Cation Exchange Capacity
PIT B
15.83% by weight
2.42%
7.7 meq/100g
Gravimetric
ASTM D2974
EPA 9081
Sample ID
Sand
Silt
Clay
Texture Class
PIT B
61.0%
34.0%
5.0%
Sandy Loam
Sieve No.
Diameter (mm)
Passing (%)
4
4.75
91.6
40
0.425
67.2
60
0.250
54.5
DocuSign Envelope ID: 922A5043-8263-48E6-9A5B-F7087123331 B
Northwest Agricultural The Concept Group
Consultants 4701 SW Admiral Way STE 353
460 Seattle, WA 98116
2545 W Falls Avenue PAP -Accredited
Kennewick, WA 99336
509.783.7450 Report: 51021-2-2
Date: March 11, 2020
www.nwag.com
Project No:
lab@nwag.com Ji Project Name: 10814 SE 173rd St.
Sample ID
Moisture
Organic Matter
Cation Exchange Capacity
PIT A
13.05% by weight
1.14%
5.7 meq/100g
Gravimetric
ASTM D2974
EPA 9081
Sample ID
Sand
Silt
Clay
Texture Class
PIT A
66.0%
30.0%
4.0%
Sandy Loam
Sieve No.
Diameter (mm)
Passing (%)
4
4.75
96.9
40
0.425
72.9
60
0.250
59.0
DocuSign Envelope ID: 922A5043-8263-48E6-9A5B-F7087123331B
Project Address: 10814 SE 173rd Street (PIT A)
Date: March 8, 2020
Infiltration Rate Calculation (per 2016 KCSWM 5.2.1)
Assumptions:
Step # 1: Measured percolation Rate
time interval= A100
minutes
water level drop = inches
percolation rate: minutes/inch
percolation rate:inch/hour
Step # 2: Calculate design infiltration rate (Idesign)
I design = Imeasured x Ftesting x Fgeometry x Fplugging
Where:
Imeasured = infiltration rate measured in the field
Ftesting = 0.30 for EPA Falling Head Method, 0.50 for Small -Scale Pilot Test
Fgeometry = (4D)/W +0.05
Where:
D = depth from the bottom of the proposed facility to the maximum wet -season water table
or nearest impervious layer, which ever is less
W = width of facility
Fplugging = 0.7 for loams and sandy Ioams
= 0.8 for fine sands and loamy sands
= 0.9 for medium sands
= 1.0 for coarse sands or cobbles, or any soil type in an infiltration facility
preceded by a water quality facility
Imeasured - 1.00 inch/hour
Ftesting = 0.30 per EPA Falling Head Method
Fgeometry = 1.55 assumed D = 0.75 ft, W = 2.0 ft
Fplugging = 0.70 sandy Ioams
Idesign - 0.3 inch/hour
DocuSign Envelope ID: 922A5043-8263-48E6-9A5B-F7087123331B
Project Address: 10814 SE 173rd Street (PIT 8)
Date: March 8, 2020
Infiltration Rate Calculation (per 2016 KCSWM 5.2.1)
Assumptions:
Step # 1: Measured percolation Rate
time interval= minutes
water level drop =Edinch/hour
inches
percolation rate: minutes/inch
percolation rate:
Step # 2: Calculate design infiltration rate (Idesign)
Idesign = Imeasured x Ftesting x Fgeometry x Fplugging
Where:
Imeasured = infiltration rate measured in the field
Ftesting = 0.30 for EPA Falling Head Method, 0.50 for Small -Scale Pilot Test
Fgeometry = (4D)/W +0.05
Where:
D = depth from the bottom of the proposed facility to the maximum wet -season water table
or nearest impervious layer, which ever is less
W = width of facility
Fplugging = 0.7 for loams and sandy Ioams
= 0.8 for fine sands and loamy sands
= 0.9 for medium sands
= 1.0 for coarse sands or cobbles, or any soil type in an infiltration facility
preceded by a water quality facility
Imeasured - 1.50 inch/hour
Ftesting = 0.30 per EPA Falling Head Method
Fgeometry = 1.55 assumed D = 0.75 ft, W = 2.0 ft
Fplugging = 0.70 sandy Ioams
Idesign — 0.5 inch/hour
DocuSign Envelope ID: 922A5043-8263-48E6-9A5B-F7087123331B
Project Address: 10814 SE 173rd Street (PIT C)
Date: March 8, 2020
Infiltration Rate Calculation (per 2016 KCSWM 5.2.1)
Assumptions:
Step # 1: Measured percolation Rate
time interval= A100
minutes
water level drop = inches
percolation rate: minutes/inch
percolation rate:inch/hour
Step # 2: Calculate design infiltration rate (Idesign)
I design = Imeasured x Ftesting x Fgeometry x Fplugging
Where:
Imeasured = infiltration rate measured in the field
Ftesting = 0.30 for EPA Falling Head Method, 0.50 for Small -Scale Pilot Test
Fgeometry = (4D)/W +0.05
Where:
D = depth from the bottom of the proposed facility to the maximum wet -season water table
or nearest impervious layer, which ever is less
W = width of facility
Fplugging = 0.7 for loams and sandy Ioams
= 0.8 for fine sands and loamy sands
= 0.9 for medium sands
= 1.0 for coarse sands or cobbles, or any soil type in an infiltration facility
preceded by a water quality facility
Imeasured - 1.00 inch/hour
Ftesting = 0.30 per EPA Falling Head Method
Fgeometry = 1.55 assumed D = 0.75 ft, W = 2.0 ft
Fplugging = 0.70 sandy Ioams
Idesign - 0.3 inch/hour
45
we
. t,
(2)
King County Area, Washington (WAG33)
King County Area, Washington (WA633)
Map Acres percent
Unit Map Unit Name in of AaI
Symbol ADI
AmC Arents, AlderV15
1.1 100.0°Io
material, 6 tercent slo
Totals for Area of 1.1 100.00l0
Interest
47
t Unit E —Xi
Printable Version)
Report — Map Unit Description
Ding County Area, Washington
AmC—Arents, Alderwood material, 5 to 15 percent slopes
Map Unit Setting
National map unit symbol: I h m s q
Elevation: 50 to 660 feet
Mean annual precipitation: 35 to 60 inches
Mean annual air temperature: 50 degrees F
Frost -free period: 150 to 200 days
Farmland classification: Not prime farmland
Map Unit Composition
Arents, alderwuod material, and similar soils: 100 percent
Estimates are based on observations, descriptions, and transects of the
mapunit.
Description of Arents, Alderwood Material
Setti ng
Landform: Till plains
Parent material: Basal till
Typical profile
N1 - 4 to 26 inches: gravelly sandy loam
Fit - 26 to 60 inches: very gravelly sandy loam
Properties and qualities
SIO.De: 6 to 1 s perCerlt
Depth to rest;-crjve feature: 20 to 40 inches to densic material
Natural drainage class: Moderately well drained
Capacity of the most limiting layer to transmit water (Ksat): Very low
to moderately low (0.00 to 0.06 in/hr)
Depth to water table: About 16 to 36 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Very low (about 2.3 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4s
Hydrologic Soil Group: B/D
Hydric soil rating: No
Appendix E
Bond Quantities Worksheet
C3
Q)
1
Q
m
W
W
U)
(A
a
oD
4-
O
L~
r
G
LL
(
C
Q
Z
O
Iz
Z
Z
W
I'll
W
O
G
w
>
�
a
�
�°
Lr)O
O�/
Y�
a
o
Ln
`W
r
a
a
z
O
U
F-
V)
z
O
u
cr
O
LL
O
a
ci
Of of
v
w w
i
O
rz
w w
a
cn Ln
z
06 06
a)
ui ui
a a
Y Y
a
C
O
w W
w w
to
u U
3
N
Ln Vt
a
w
0o
O O
v Ln
E
,at
>_
O
++
00
C
M
i
GJ
T
V)
Ol
C
4+
LAa,
O
C
3
z
Q
v
4a
00
j
00
G!
O
O
N
a+
a)
�
V
M
Ln
i
by
Lr)
�
b
•r
a..,
• GJ
m
m
Ln
Z
Ql
U
N
t
3
O
N
LL
i
O
z
t0
l0
1Y
m
o
to
Lna
rj
v v
v
0 0
o
O
a a
U
N
C
u
U U
G1
L
`a
O
O
L
L
v v
++
to
a
Ln
V) :n
U
p
O
-O
-O
O
-6
Q
Q
Q
a
a
a
V)
n•
°q
C
'O
L
O C
N Y
E
ip O
}I
00
0 6
00
Z O
O
i 1
++
00
E
0)
0)
LL
w
ti
y
O
" a
f6
u
a
O
ro
a
a
o
bA
N
U
u o
O
V)
O
y
0
}
v
O N
O
v i
O
(O
L
to N
L
O Q
'p
C:
J
O
C
a
�+
cn
o
l7
++ Z
G!
2
fG
j
O
m
wCL
O
^�
a
�
0
'n
Ln
o
a
C
+�
00
v
w
c
±1
d
�
l7
u
rro
O
vi
Q
00
s o a
•r
O
a
Ln
p
W
J
=
O
,• 3
v
L
GJ
�
00
l7
rn
lD
(7
U
U
O
O
c�-I
00
C
00
l0
N
,., Y
3 f6 c
U
rG
L d
O
z
Ql
O
O
�
o 0
v
2
a
Lr)
C
i•1
L
d
F v
L i
tw a
bq N
C G1
Q
'++
00
i 6L
..
/n
Qj
bA z G1
+�
v�
G,
v
•i
},
C
O
'a
z
+
C
�
v
L
..
v C
O
C
m OL
rG
z
Q
�
ik
•> Q
c a
v
Z
<
Q
G1
_
�..�
U
rG
a
N
a
<
Q
�•••
v
U L
L Z yj
E
E
E
�
O
_
p
0
0
G1
v
i
L u
N}
W
_
.z
E
i1
Z
a
i
LL
a
w
a
U
U
in
to
a
Q 0
U
5:
v
Y
0
L E
C -0
O O
u
7
aT• � O
U -6 OJ
Y > O
O U
E Q u
0 .v
� o
v d
o O n
Q Q
v o
O m �
L
c t � � O
'3
o D°
c d w
O Q
� N.
+� N O 4c
O w
C
m c
CCL Cl
0
7 C u
v" E " c
W LL
u N
O O 7
O o O Q 0
3
N O lJ
3 tu
U Q V y
U
FA 0
J
O
Z
O
V
H
Z
w
W
tA
06
Z
0
M
O
W
O
LL
cc
0
0
0
0
0
0
of
o
0
0
0
0
N
Ln
N
0
Ln
tr
a�-I
Il
00
Ln
9
ri
O
u
v
a
kD
o
0
o
c,
In
00
N
O
lO
C
f6
i
N
cr
'E }
U
U}}}
LL
LL}
U}
LL}
LL}}
LL
LL
LL}}
U
U
U
LL
LL}}}
d'
d'
E
= U
W
W
U
U
U
J
J
V)
Lm
V)
J
{n
J
(n
V)
J
J
J
V)
U
W
W
W
J
J
(n
V1
V1
==
O
O
O
O
O
O
O
O
O
O
O
O
O
In
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
In
O
In
o
0
o
In
In
In
In
oo
O
In
I,
u�
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
to
O
Vl
In
U)
N
-1
-1
N
O
O
-1
M
c-I
N
N
N
00
Vl
O
O
O
ai
O
-1
00
O
O
O
00
M
U)
O
O
O
-1
I,
C-I
C-I
�
00
N
N
c-I
M
N
M
`
H
d'
N
M`
H
H
N
H
H
d'
u1
u1
1p
M
N
N
N
N
N
`~
�F
�F
Ul
ul
ul
N
N
N
N
iL
IJ
Ui
c
c�
c�
c�
c
c�
c�
U)
c
c)
c
cn
c
cn
c
cn
c
cn
c
cn
c
c)
c
c,
c
c�
i
a1
4�
C
C
C
C
♦•
C
°
Ol
°
o
o
°
o
°°
°0000°°000
.
.
r
O
e-I
N
M
Ln
W
Il
00
Q1
O
e-I
N
M-T
m
w
N
00
m
O
e-I
O ci
N
M
�
Lfl
lD
I�
00
01
a -I
a -I
a -I
a -I
a -I
a -I
a -I
a -I
a -I
a -I
N
N
N
N
N
N
N
N
N
N
M
M
z u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
u
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
0
u
v
E
bD
c
X
S
X
Lr,
c
v
s
6
s
n
-1
ti
X
c E
v
x
o
c
O
6
N
-
Y
O
aJ
aJ
E
_6
m
O
Y
-
-
N
U
U
U
E
aJ
o
00
NUO
O
M
W
00
r1
Y
-6
OA
-6
O
O
O
Y
O
d
d
LL
a
E
E
O
vOi
v
Q
>
ai
O
'++
.�
u
`�
Z
aJ
U
U
0-
r0
IZ
u.l
W
v
L
a
'i
O
v1
O
U
N
C
G
c�
NN
WbD
Q
a
o
co
C
s
u
I
7
ou
LL
E
_
uO
O
.�
Y
1
U
N
N
Q
++
Lu
V1
O
t
v
>,
>,
>
N
N
1Z
}.+
-0
;H
ci
aJ
L
-O
-O
bA�,
�n
H
.X
N
Q
N
O_
s
aO-'
*O-'
*O-'
O
O
(L
0A
0A
0A
++
�_
CF-Y
U
L
L>
aJ
aJ
CO
O
U
V1
L
U
L
U
0A
C
0A
C
0A
C
.V
�'
U
Y
Y--
U
a-+
,�
_3
C
-6
C
-O
aJ
Y
U
V/
i'
u
m
U
U
o
y
a1
'�
a'aIZ
UO
(>
f0
CO
L
U
(6
Uu
u
O
X
W
a1
LL
aJ
U-
(D
@
_
_
ate+
s
-
N
3
c�
c
:5
LL
LL
LL
a1
aJ
aJ
aJ
O
O
W11
aA
C C
0
N
m
0
E
U
CC N w
V
a c
G
Li
� o
0
0
0
0
0
0
o
Ln
Ln
N
Y
Y
a -I
"0
rn
G
Qj
N
O
N
N
U
E
U
� N o
O
Q
E
—
�
N
ca
O
7
Cf
U +�
v
O
U
a
v u
� o
a
Ll
L E
ca
0
0
0
0
Ln
Ln
>-
N
o
b �j
U
� O m
x Y
W t
Y
(Tf
>-
>-}
U
U
}
}
LA-
LL
LA-
U
>-
>-
>-
>-
>-
>-
>-
>-U
U
>-}
}
}
>-
LL
LL
LL
W
U
U
V)
W
W
u
U
U
J
J
J
m
LU
U
u
U
V)
V)
Ln
V)
V)
LL
LL
V)
p
U
C1
S
V)
V)
V)
J
In
V I
Q
CL
V)
00
o
a
a
o
0
0
o
ci
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
=
u
0
0
0
r-
M
O
0
0
0
M
0
0
0
0
0
0
0
o
Ln
o
0
0
0
0
0
M
0
0
0
0
0
0
0
LD
M
cq
O
N
O
N
M
O
W
O
O
M
Il
M
M
O
O
N
N
O
Il
W
O
O
W
O
W
M
N
M
M
M
J
d
N
M
N
OD
N
N
M
LO
M
M
Ln
Ln
0
N
r4
-1
Ln
c-i
Q
N
Ln
O
N
O
0
V}
V?
V}
V}
V}
V}
V}
V?
V}
V?
V}
'JI
V}
V?
V}
V?
V}
V}
tf?
V}
tf}
VT
V}
V*
V}
V?
V}
VT
t/?
VT
V}
V?
V}
p
Ln
O
M
Ln
LDN
WQ1OMVLnL.O
I,
00
m
o
-1
N
rn
Oci
N
M
Ln
LD
T
I�
W
l71
ci
ci'nLn
Irq
C7
C7
7
C7
3
3
3
C7
3
3
3
3
3
C7
C7
3
C7
3
3
3
3
3
C7
3
3
3
3
3
3
0
L
N
0A
G
v
t
s
t
Y
ro
VI
VI
VI
`1
}
'6
o
p
—_
(U01
E
E
LU
E
-6
C
t
>
O
U
O
3
i
w
Q
�
G
N
LY6
O
f0
N
p
+-'
v
N
.2
0
W
N
Al
txo
W
L
w
w
w
G
Ns
N
O_
\O
G
-OO
+OU'
_
>
E
E
N
>
NO
v
O
O
6GLoiA
O
2
.o
OO
`wN
o
-o
U
U
7
l]A
U
Y
Y
Y
O
U
L
L
O
0A
l]A
m
a
E
N
3
c
'U
O
m
>
C
Y
_L
l0
C
C
C
U
0A
an
tU
N
tU
>—
J
Ln
i
O_
E
Cl-
E>
v
°1a
3
c
Q
o
Q
t
$
O
U
O
U
O
E
X
:�
N
i
\
G
G
'6
Al
U
r6
i
U
'co
i
U
'ia
i
U
Lo
O_
to
Q
Lo
O_
-_
N
-_
00
-_
LD
N
G
`�
N
i
`�
'^
Y
-
-
—
O
N
Q
Y
11
L
O_
_
G
N
06
06
'^
'
v7
0A
O
Z
O
Y
bZ
a
0A
a
�
O
�
O
�
O
c-I
G
c-I
O
M
G
L]A
l]A
N
E
>
l]A
l]D
.G
�
G
�
—
O
U
_
_
_
+-'
.0
v
0
O
>
j
j
c
c
c
c
U
U
U
O
O
O
O
3
;Y
C
>,
AJ
>,
•�
u
a
-6
Y
Y
fA
(O
f0
U
U
U
U
06
co
02{
-0
-O
G
N
-6
LO
m
m
m
O
U
O
M
O
m
O
U
X
W
X
W
LL
LL
LL
LL
LA_
LZ
LL
C7
C7
C7
C7
C7
cO
c
N
Ln
O
V)
7
VI
7
V)
0
H
i
H
i
H
i
H
i
H
O
U
@
G
u
m
ao
C ^
C p
N
ro
0
E
U
CC W w
V
T c
G
o
0
0
0
0
00
co
N
Y
Y
V
V
a1 E
U
.cu N o
O
Ll
Q
E
0
O
—
(6
Cf
U +�
N
O
U
D
v u
o
a
E
a
0
0
0
0
0
0
0
N
N
ei
N
P
Ln
N
N
ei
O
C.
.
p
u
a-4
M
M
C1
'Y
x Y
t
Wto
Ll
ci
O
lD
LD
r,
n
�•''
C
N
Ql
M
ci
M
ci
Il
n
(6
U-
LL
LL
LL
LL
LL
LL
LL
LL
LL
}
}
}
}
}
U
U
LL
U-
}
}
}
}
}
}
>-
>-
>-
>-
LL
C
W
Ln
Ln
Ln
Ln
—iJ
—i
—i
—i
—i
—i
—i
—i
—i
Ln
Ln
Ln
Ln
Ln
m
W
m
W
In
—i
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
Ln
J
d
N
0
0
0
0
0
0
0
0
0
0
O
Ln
O
O
C
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O
O
0
=
u
0O0O0O0Ln0Ln0OD0QQO000000Ln1-0
0000000001-0
O
lD
O
m
tD
O
I,
N
00
Ln
Il
c-i
M
N
M
W
N
c-i
O
M
Il
M
O
M�T
W
W
c-i
M
Il
W
M
O
W
J
M
r-i
N
M
m
M
N
c-I
-4
N
M
MIZT
�T
00
c-i
c-I
N
N
M
M
r-i
-4
a
'E
O
m
C7
Ln
O
N
M
Ln
I�
00
Ql
O
-i
N
M
V
Ln
lD
I�
00
Ql
O
-i
N
M
O
ci
N
M
Ln
lD
I�
00
Ql
ci
ci
ci
ci
ci
ci
ci
I'D
ci
ci
ci
N
N
N
N
"IN
N
N
N
N
M
M
M
M
M
0=
K
K
K
K
K
OC
K
0=
K
K
K
K
OC
K
0=
K
OC
K
K
K
0=
K
0=
K
0=
K
0=
LL
N
~
T
Z
W^
o
°
°
}
N
0
O
O_
O_
Y_
O
p
W
O
N
O
O
_0
_0N
3
M
O
N
LnO
N
O
CD0A
O
O
O
}
N
Y
c
ns
a
o
O
O+-'
a
v
c,
n
m
t
U
Ln
>
Ln
>
OY
a)
C
C
C
0OZ
'
Ln
>
O
W
i
L
L
m
`—'
N
+�-'
-
U
O
O
`-'
-O
Ln
i.i
5
2E
5
i
vVi
C
cuO
E
(U0
E
cuO
E
O
'
�••�
fl_
v
�
Y
Y
Y
Y
m
H
LL
c
W
d
.�
a)
u
'�
E
aJ
m
Q
v
u
Q
Y
-
ar
ai
Y
.^_'
t
'^
c-i
-
cV
u
0
U
0
u
0
u
O-
a
U
u
i
.3
_06
.3
Q=
v1
O
_�
M
Y
Y
Y
Y
U
_
_
_
Ln
O
O
p
L
O
>
a
U_
aj
U
u
U
u
—
—
Q
O
N
U
2
2_
v
lD
lD
�vav�Q
Yvv��'
°>
�
�n0
LrL
>>-
d
ao
ca
ao
\
a
T
H
al
Y
a1
y
L
Q
U
G
L
Q
a
Ln
Ln
n7
`—'
ar
v
_�
N
O
O
N
N
7
-O
w
C
C
C
>
_
7
O
l7
vi
t6
0
U
-O
O_
L
Y
n7
_
-6
-6
O
O
v
-6
-O
-6
E
@
l7
V
-6
D
Y
aJ
Y
a1
++
a+
++
N
-6
Y
ns
Y
c6
Y
ns
Y
co
C
bA
oA
bA
GO
N
\
N
\
c6
O
to
O
c6
O
t6
O
c6
O
OC
K
G
a�
.�
.�
.7
(D
cacr
��
oo
oo
co
3
u
�
u
C
v
v
v
v
2
�.CLCL�
C
C
C
.Y
�
aaaaaaa
.--�
K
OC
K
OC
K
�
>>
-
aJ
I
p
U
U
U
U
c0
O
7
7
7
7
7
ra
f6
a1
t-O_
-O_
M
@
c�
L
a
a
a
a
m
u
v
u
v
u
Ln
Ln
Y
Ln
Y
Ln
Y
Ln
a
x
x
x
x
x
x
x�
U
W
W
Z
O W
>- W
F-
H 0
Q a
c
LLI
Z
0
`W Z
i
Z�
W
LLI
W
0 `^
5a 0
LL
W
L
r
7A
E
d
a
0
w
U
ao
C
C p
N
m �
o
E
U
CC v w
a �-
G
� o
N
�
O
1Qj
Y
N
O
U
� � o
a O
Q
E
-
i+
(6
U +N
N
O
U
D E
a
v u
O
a
' E
c
>
+
to
u
N Q O]
xv
W
(6
Cf
}
}
}
}
D
O
O
O
O
ai
o
0
0
0
-4
oo
ui
a
N
N
r-i
J
J
J
J
Z
Z
a
a
d
a
v
i
3
0
u
O
i
4
3
O
c
rr^^
V
Q
N
U
a
°ZvLncc
Q
c i
N
-
a
ai
LL
u
tV
06
N
O
O
o°
U
o
o
v
a
i
Z
O
u5
-
N
c
U
a
O
U
v
Q
Q
Q
N
d
N
N
N
W
0 0 0
o ni rri
N
v n
_
S
_
S
_
S
_
^ 06 0
U
V
U
U
L
0
0
0
0
0 %q
C
C
C
C
C vi vi c-4
N
O
N
N N M
m
N
N m
m
N -4 M m
N
c-I
ci
Z
w
J
O
Z
t
(B
n J p J
c F Q
G
F
LU -
@
LaL
(Dw
Z m {H
Q
(D
w of w
vO
F
O
O
O
w
>
06
0
O
~
O
O
V
>� J W
J
0
N
Z
LL
<
> W Q >
2 Ln z
Y+�
`�
d
~
+�
¢
~ > a
u
a
a
O
W
Z
N VZJJJJQ
D
W Q
O
UO
Z
�
m
a
a
O
W
v=i
m
Z
Q W
D
H
H
h
LLI
Z
W
Ln
_O
W
p
Oq
d
C
W
i
C
a
Z
Q
O
0�
on
u
H
�t
a
u
{A
a
_0Z
ta6
�i
N
U
J
VU/
J
N
O
W
FL
N
>
C
C
z_
Vf
H
e
LL
LL
N
u
n
u
W
H
xo
0
ra
.�
m
m
oc
��
r
W
W W
N
Y J
GC
O v
�LL
� oc
H W
H H
Q
Q
p OL
Z
O
m p
F— Z
Z Q
W rW^
V
W Q
> Z
I.f
a p
W 0
H
N
40
G �
m 'Q
0
U
NQn
OP
r s
M [
it
3
d
�
m
3
Cf
0
0
0
0
0
0
O
M
M
�
Y
Y
co
ei
a1
O
N E
H
O
U
Y
@
V C]
ME: o
n
Li
C
'
N
O
O
7
O
0
4 N
O
O E
U
a
v >
3 0
w G
D
o
a
0
0
0
0
?
'^
'^
o
v
v
cm
c
U
ti O m
XV
w L
bD
�
M
O
O
}
L
V
L
V
L
V
L
V
L
u
L
V�
L
V
L
V
L
V
L
V
L
V
L
V
L
V
L
V
-r-
V
L
V
-
—
-
—
-
—
-
—
-
—
-
'E
Ur
Z)
N
m
w
m
w
m
w
m
w
m
w
w
m
w
w
m
w
w
m
w
w
m
w
w
m
w
m
w
m
w
m
w
m
w
m
w
m
w
J
J
J
J
J
J
J
J
J
J
J
Qa
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
=
y
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
�o
0000000Ln00000Ln00000000MLnMLni
�ocooa
(n
N
al
O
O
Ln
O
w
O
al
O
O
O
Ln
O
N
m
r1
w
Ln
m
I�
O
11
c-I
r1
fV
M
V
Ln
I�
M
cl
N
Q
CL
V
lfl
I�
M
V
Lr
V
CO
lD
O
00
O
al
M
V
V
Ln
c-I
r1
fV
r-I
c-I
N
N
lD
V
O
C
1.,,.r.4
CD
O
c-I
N
M
�
V1
lD
I�
W
Ol
O
c-I
N
M
�
V1
lD
I�
W
Ol
O
c-I
N
M
o
a -I
N
M
V1
lD
I�
W
Ol
a -I
c-I
c-I
c-I
c-I
c-I
c-I
c-I
c-I
c-I
N
N
N
N
N
N
N
N
N
N
M
M
M
M
c
�
o
_
o
a
a
a
a
a
o
3
>
>
>
>
>
N�
v
E
>
o�
>
o�
>
o�
>
o�
>
o
O
w
J..i
J..i
J..i
J..i
Y
11
C
C
C�C
C
N
C�C
C
N
C�C
C
N
C�C
C
N
C�C
C
N
__
_
V
lD
00
_
__
00
fV
Lf)
00
V
O
lD
�
N
.--I
C
-
C
-
C
-
C
-
C
N
Lf)
CO
rl
U
U
U
V
lD
c-I
r1
c-I
N
M
(M
"6
00
V
O
L
O
O
lD
O
Z-
N
I�
O
Z,
Zo
al
O
r,
rl
ci
N
>>>
U
U
U
U
U
U
U
U
U
[L
CL
3
3
3
Y
sL
a
s>>>>>>>>>
o
u
;'
-
J-----
'a
-a
u
u
u
u„
„
d
a
a
d
a
d
a
d
a
U
v
cc
r--
'
v
L
'D
a
v
a
o
v
0
a
a
0
a
0
a
m
s
m
m
s
3
3
)
m
>
L
3
D_
}
[1
>,
CL
?
CL
?
Q
?
Q
?
Q
?
L
L
L
L
o
C
0
C
0
C
N
CJ
v
v
v
v
v
v
v
v
v
V—
w
L
co
CO
co
co
co
co
co
cL
m
m
4!
N
41
O
3
O
3
3
3
3
3
3
3
3
Q
t
CO
N
U
U
U
U
U
U
U
H
H
H
H
U
U
U
U
U
U
U
U
U
U
U
U
U
U
i
a
r
W
W W
N
Y J
GC
O v
�LL
� oc
H W
H H
Q
Q
p OL
Z
O
0`0 p
r Z
Z Q
W (WLI
V
W Q
> Z
a p
W 0
H LL
N
40
G �
EOP
0
U
OP
r s
M [
it
7
3
Y
N
H
0
U
Y
ME: 0
n
E
Cf
0
4 N
O
3E
u
a
v >
O
W E
cr
cm
0
U
c
ti O m
W L
bD
K
,
Cf
-
J
W-
J
J
W
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W-
J
J
W
J
Li'C:
Z)
Q
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
=
y
0
0
0
0
0
0
0
00
0
0
0
0
0
0
0
0
0
0
00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
�
V
Ln
c-I
ID
w
O
O
O
O
fV
00
w
00
w
Ln
O
m
1n
V
lD
V
m
rl
to
00
O
O
fV
V
lD
00
O
N
V
tD
CO
J
mvinl1,mm11,
nvvl�vl1,N1nl"Otir1Nm
ztmr"mIDl1,00moNmvin'D
Q
D_
1i
rl
fV
(M
rl
c-1
rl
fV
c-1
rl
cl
rl
cl
rl
c-1
F
0
m
D
���vl�
D
m
Ln
lD
1.,
co
m
O
M
�t
V1
lD
Il
co
m
O
-1
N
M
V1
lD
Il
00
m
O
-1
N
M
�
V1
lD
I,
co
O
M
M
M
M
M
M
IT
V
IT
V
LnLn
u'1
V1
u'1
V1
u'1
V1
u'1
V1
lD
lD
lD
lD
lD
lD
lD
lD
lD
Z
0
O.
0i
N
In
00
V
O
lD
lD
C0
-1
ci
rl
r
c
m
O
++
-
N
In
00
V
O
lD
N
w
i
GO
rl
ci
rl
N
M
m
V
V
(,
L!1
W
O
lD
00
O
N
Y
+�+
Y
+�+
Y
+�+
Y
+�+
Y
fl-
Q
Q
O_
O_
O_
O_
O_
-
N
L )
00
O
lD
00
c-I
-4
N
M
M
lD
1-
4!
N
N
N
N
U)
4!
N
4!
'D
0,
�--�
a -I
�--�
N
M
M
*
Lfl
W
u i
L d
u i
L d
u i
L d
u i
L d
u i
L
c
c
c
c
c
c
c
c
c
W
W
W
W
W
W
W
W
a
D_
a
D_
a
D_
a
D_
a
D_
Q
U
U
U
U
U
U
U
U
o
U
0
U
0
U
0
U
0
U
0
U
0
U
o
U
Oaa_aa_aa_aa_vVUUUUUUUU
U
U
U
U
U
U
U
U
U
J
J
J
J
J
J
J
J
J
J
Z}
Y
Y
Y-
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Q
N
41
v
v
41
N
4J
v
v
v
v
v
v
v
v
v
v
v
v
v
v
v
41
N
41
v
v
v
v
v
v
v
41
v
ID
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
G
3
U
7
U
3
U
7
U
7
U
3
U
7
U
3
U
7
U
3
U
m U
3
U
7
U
3
U
7
U
3
U
3
U
3
U
7
U
3
U
7
U
3
U
7
U
3
U
7
U
3
U
7
U
3
U
3
U
3
U
3
U
3
U
3
U
3
U
3
U
i
m
O
b�D
a
r
W
W W
N
Y J
GC
O v
�LL
� oc
H W
p ~
Q
Q
p O
Z H
O
0`0 p
r Z
Z Q
W (WLI
V
W Q
> Z
a p
W 0
H
N
bA
G �
EOP
o
CJ
O
OP
Ll
r s
ro [
�
3
d
�
m
Cf
0
0
N
N
ei
a -I
y
In
In
r
O
Q C
U
y E _
ME:
n
Li
E
c
00
0
4 N
O
�E
u
a
v >
O
CL
Li
t
Cf
a
o
00
00
w
T
m
rn
o
0
0
00
u
ei
c
ti O m
XV
W L
w
Li
�
M
4,�
O
O
�
Cf
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
J
w
Z)
Q
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
=
a)Soo
O
CDO
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
F
V
O
N
N
N
V
l0
00
ci
l0
ci
l0
ci
l0
c 1
V
m
Ln
O
to
ci
m
V
lD
N
m
m
rl
V
lD
m
N
In
CO
O
M
l0
m
c-I
J
wmvvll0mNr�moovmmwwm00
tilmNmmvioCO0NIn1,mNv�Door1
a
CL
rl
c-1
ci
rl
N
N
m
m
V
V
In
c-1
rl
c-1
rl
c-1
N
m
V
In
rl
c-1
rl
c-1
rl
N
N
N
N
m
F
O
m
m
O
D
O
lD
1-
n
r
cm
n
'tV1
r
n
lD
r
I"
n
00
r
m
n
0
W
W
N
oO
M
W
oO
V1
W
lD
oO
I�
W
oO
W
m
0
.--�
N
M
V1
lD
I�
.
m
0
0
0
0
0
0
0
z
0
'Q
s
N
7
vui
v
-
lD
-
CO
N
-1
in
ci
00
rl
V
r
O
m
to
m
00
V
V
L(1
O
1
N
1,
�.%
Cl
N
lD
00
N
.4
u'1
c-1
00
4
N
O
M
to
M
00
V
V
Ln
O
3
N
I,
C
C
C
C
C
C
C
C
C
C
C
C
W
to
W
Il
W
W
a-
W
a-
W
0-
W
a-
W
a-
W
a-
W
a-
W
a-
W
a-
W
a
W
a-
W
a
CL
0
CL
0
CL
0
CL
0
CL
0
CL
0
CL
0
CL
0
0-
0
CL
0
CL
0
CL
0
_
tD
-
00
N
-
L-,
.--1-
00
t
O
to
00
t
Ln
O
to
N
1-
(7
a-
0-o
0
0
0
0
0
0
0
0
0
0
o
a
a
a
a
a
a
a
a
a
a
a
a==========--
Z
a
a
a
a
a
a
O
O
O
O
O
O
O
O
O
O
O
O
a
a
a
a
a
a
Q
v
v
v
v
v
v
v
v
v
v
v
>
>
a
a
a
a
a
a
a
a
a
a
a
a
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
2
a
a
a
a
a
a
a
GJCCCCCCCCCCCCC
'Q
a
a
'Q
a
a
a
a
'Q
a
a
'Q
a
a
'a
a
a
v
U
V
U
V
U
V
U
V
U
v
v
i
a
W
W
N
Y
GC
O
H
H
Z
Q
D�/
V
a
z
W
H
Z
W5
L
W
O
cc
5a
L
W
H
N
40
G �
m '�
o
E °
v
OP
rr
r s
Ll
m [ 3 �
C
m
0
Cf
Y
C
N
H
°
U
Y
m
ar o
a` °
n
E
—
Y
m
Cf
0
4 N
O
u
�E
a
v > u
� o
CL
LL E
m
Cf
m
°
U
c
- O m
W L
bD
K
C
m
Cf
}
LL
LL}
U}
U
V
U}
U}
•c
V1
(J
J
J
N
m
W
Vl
m
W
m
W
m
W
U
m
W
2
VI
W
0
0
0
0
0
0
0
0
0
0
0
0
0
W
l7
v
Lno00000000000
a
0i00�0roo�0000rgoLnrq
z
ru
r4
oo
,-1
Ln Ln
rq
Q
C
N
�l
c-1
c l
c l
�
D
}
Q
o�lrgmvLn�o
u
timv
nTo
,Oorn
ti1�tititititi
W
z
V)
0
(A
0
V)
0
V1
0
Ln
0
V1
V)
0
V1
V)
0
V1
0
V)
0
V)
V)
0
V1
0
V)
rLLn
J
Q
O
F-
m
D
V,
v
c
n
v
�
ai
a�
o
0
O
Ln
E
M
n
?
@
-
-
v
Y
p.
o
°'
�
N
Ln
i
00
E
°
3
$
u
ate+
N
c-i
L
T
.�
0
.
0
.�
0
_m
-O
Oq
v
-O
v
s
V
Q
v
N
m
3
rY�O
rY`6
rY�O
io
tLo
M
c
v1
nno_n
Ln
U!
N
U
-
O
E
V
v
a
3
n
n--
O
c>
N
c
Nco
"
O
N
°
Q�
ri
l0
ai
vaib'oo
��
v
0
Q
•},
>
O
o
O
n
m
oA
O
L
W
.°
r�
m
(Li
m
N
u
s
U+
v
+m+
i
i
g
m
E
E
N
m
LL
(D
d
K
K
K
ac
H
a
a
u
li
L
C
111111111111111111
fWII l fWII l fWII l u l u l u l u l u l u l u l u l u l u l u l u l u l
s
�m
c
D
a
- C
o
N
m -
E u
p
V
a �
{- T
m t
it
a
�
a
�
y E
O
V
v o
O
Q
a
u
73
O
u
a
v >
o
LL G
a
0
0
0
0
O
Ln
Ln
O
Ln
Ln
>
N
to
C
U
i
O m
Wv
bA
�
C
N
�
l0
a
L
D
W
C
z
O
U
O
u
LL
d
K
Q
n
I
0
m
O
N
N
M
L
a
m
w
H
z
O
w
c
�
o
D
+
J
�z
N
J
ga
Lu
LL
}
za
Cf
W
�a
N
HLRIII ML-." nLL--R""
a
W
H
N
C
D
M
O
v
a
W
W
N
Y
CC
H
z
Q
\/
0
z
/0
LW
r
z
5W
L
W
0
a
W
H
N
Ids
W
a
N�
Y�
0
LL
�o
C �
O
� _u
D
E
U
CC Ww
T �V
4� G
Li
@ O
y
@
N
i+
G
ai a)
y�
N
D
U
@ a, o
a o
nLi
E
c
@
U Y
— �
a!
++
N
O
v
a E
� j U
� o
+� a
LL
T
�
by
v
N O m
X -
W L
h0Li
'�
L
L
L
L
L
L
L
L
L
L
L
L
L
L
J
E
Q
U
@
W
J
—j
_j
J
_j
J
_j
J
_j LL
J
U
@
W
U
@
W
U
@
W
U
@
W
U
@
W
U
@
W
U
@
W
U
@
W
U
@
W
U
@
W
U
@
W
U
@
W
U
@
W
Q
O
H
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
m
D
a)
V
0
O
0
O
0
LD
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
00
0
0
O
0
O
0
O
0
O
0
O
0
O
0
O
N
K
a
O
Ln
Ln
lD
I,
w
O
O
O
O
O
O
O
O
O
O
O
O
O
0
Ln
I�
W
O
N
O
00
O
Ln
O
O
O
O
F
N
W
Ol
O
O
Q
irli
ci
N
O
c-I
N
rn
Ln
Lo
Il
oo
Ol
o
r
c 1
m
Ln
lD
I�1
oo
T
rI
1 I
r
r
r
r
r
r
r
r
vv
Y
++
t
c
++
C
C
a+
C
+E
@
@
v
v
v
a)
v
o
O�
+�+
��+
L
U
L
U
L
U
.—
ob
@
T
LD
oo
t—I
a1
al
C
C
C
c
o
E
N
N
N
N
N
E
E
7
lO
.0
fl-
v
Y
Ln
J
Ln
J
Ln
J
Ln
J
Ln
J
N
w
w+'
a)v
a1
�'
a1
-a@
E
Q
@
Q
>.
>
>.
Y
@
U
U
U
U
U
r+
—w
y
N
Q
N
v
c
c
c
c
c
E
E
E@@
^
c
c
ar
a>
>
E
E
E
E
E
�N-i¢Q¢>
X
++
a+
++
a+
++
L
U
L
U
L
U
U
G
U
G
T
T
O
v
O
ba
C
0
2i
�i
2i
iD
ao
ti
a
m
E
E
c
c
O
c
O
c
O
c
O
c
O>>>>>
ar
v
ar
v
ai
c
Y
c
N
N
-a
-o
-O
u
p
m
Q
Q
c
c
c
a1
al
aJ
al
a1
>
>
>
>
_
@
(Up
@
fl_
aZ
fl_
N
c
+
U
Y
U
+
U
Y
U
+
U
y
°J
Y
°'
Y
E
>
>
E
E
E
v
MIME
v
U
0.0
0
Q
Q
l7
C7
l7
l7
Om
W
2
Q
Q
U
a
W
W
Y
CC
0
H
Q
[D
rI
a
Mz
z
5W
L
W
Y�
a
W
H
ZA—
GC
W
W
tA
a
Z
a
tA
GC
0
LL
� C
si g
.'
� O
U
N �
— T
M
7
d
,3j
0
0
c�
E
> v o
a
n
E
—
Y
d
U +N
-
O
E
to
O
U
LL
U >
O
Y Q
LL
d
T
Y
0
>�
U
0 m
Y
w
Y
d
Y
�
L
U
W
L
U
W
L
U
W
L
U
W
LL
J
LL
J
LL
J
LL
J
LL
J
LL
J
L
U
W
L
U
W
L
U
W
L
U
W
L
U
W
LL
J
In
J
VJ
J
VJ
J
J
Q
O
v
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
El::)00000u;L;oLn000000000 N
dO
O
O
O
O
O
O
O
w
m
O
ci
N
ci
ci
ci
M
ci
0
(5
0
Ln
0
Ln
0
Ln
0
O
w
ci
O
Ln
O
O
W
C
rl
06161
vl
lD
tD
I�
00
N
N
N
N
O
ci
N
M
7
111
T
I�
OP
T
ci
ri
z
zLnV)LnV)(nLn(nLnLnLnLnLnLnLnLnLnV)LnLnLna
a�
v
as
v
C
c
.L
°Y
a
L
a`�
E
O
C
o
0
0
0
2
0
co
M
W
M
Oq
t
U
t
U
2
co
E
N
E
E
4
a)U
N
N
O
L
to
roYYYY
Q
Y41
N
OO
�
CC
CC
CC
CC
CC
U
U
C
U
ro
o
N>.`000»
oN
oc
UQC
O
O
OdQ��_N
L
L
L
L
L
C
N
fl_
Q
C
C
C
C
C�
U
U
U
d
d
d
d
00
7
0
N
lO
fl_
a.
W
N
4J
N
4J
N
41
N�
Ln
l0
I-
m
O
O-
v
C
0—
w
3
w
3
0_
a
Q
a
O_
a
Q
d
ai
ai
ai
ai
ai
O
rn
Q
0
O_
a
0
(3)
(I)
N
N
OOOOO
U�
v
Y
C
vOi
N
N
U1
O
L
L
L
L
-0-2
3
3
3
3
oa
o0
oa
o0
oa
0�
3
U(D(7
l7
cncn
cn
cn
cn
cn�����aO
_Q
�cnJ
e J
0 F
0
a W
w
w Ln
N �
Q
z
LA
2
W
H
Ln
N
O
W
ci
00
0)
I�
n
V
M
o0
l0
M
Q1
V
7
� h «Q =
z u
O o
m
W Ql
V �
z =
Q a
z al
°
W
I- x
10
Y
z m
v
zo
QaC
W
M
L =
wo
0
a
M
x
L
o
i--I
cc
,�
O
00
e^-I
o
N
Z0
a
m
o
vi
o
vri s
=
o
000
V
W --
o
0
e�i
00
o
w
O
Z
M
14
00
M
V
00 0
v
n
n
ZT
M
N o
M
M
o0
M
G�
N
a
cn
zr
Q
N
V
L
Q
0
y
6
LL
G
y
a
a
Q
y
m°
F
LL
V
V
in
a
a
z
O c
G
Q v3i
Q N
z N
m
z a
O a0+
7 O
z
O
O
O
o
O
X
V
N
00
00
00
m
a
d
u
U
a
N
o
o
ai
O
a
O
ns
Ln
v
M
J
2
C
P
E
h
a
z_
L
N
>
n
_
a
�
lYo
N
�%
of
iz
m
ti
o
n
U
v
O
°c_
a
o
a
0
3
00
co
l0
S
a
a
Ln
oN
ca
0.
v
y
o
O
E
w
-+,
0
Q
C
:Z
Oi
,
C
C
N
m
LL
cc
O
O
c
E
E
E
a
c
3
m
00
O
a
3
p
C
x
W
O
�n
C
a
z
\
c
o
n
E
m
c
0
o
N
0)
R
obD
0
0
0
0
E
-6
o
L
v
°
c
°
3
•m
Z
v
¢
Zo
Q
Y`o
v
v
3
c v c
`5 ac .z
v
o
c
a;
Qj
E
y
ai
c—
z
E
o
"c � "o
cc
V
a
��.
a5
W
L
E
+-'X
3
O
O
N O N
+�-'
O
0
Z
LL
11
11
LL
W
{n
W
LL
N
m
0: m D;
N
V
Gc�
G
m
U
Appendix F
Declaration of Covenant
EXHIBIT A - FLOW CONTROL BMP SITE PLAN
12" DI SD I I
10+00 I I
—
LJ
SE 173RD STREET
117 - APPROVED BY:
S. r r Y r l �,' TITTLE: NGOCHAN SHORT PLAT
11+00
HORIZONTAL GRAPHIC SCALE
10 5 0 5 10
1 inch = 20 ft.
SCALE: 1 "_20-
DATE: 4-15-2020
EXHIBIT B - MAINTENANCE INSTRUCTIONS FOR LIMITED INFILTRATION
YOUR PROPERTY CONTAINS AN ON -SITE BMP (BEST MANAGEMENT PRACTICE) CALLED "LIMITED INFILTRATION," WHICH WAS INSTALLED TO
MITIGATE THE STORMWATER QUANTITY AND QUALITY IMPACTS OF SOME OR ALL OF THE IMPERVIOUS SURFACES ON YOUR PROPERTY.
LIMITED INFILTRATION IS A METHOD OF SOAKING RUNOFF FROM IMPERVIOUS AREAS\ (SUCH AS PAVED AREAS AND ROOFS) INTO THE GROUND.
IF PROPERLY INSTALLED AND MAINTAINED PER APPENDIX A OF THE CITY OF RENTON'S SURFACE WATER DESIGN MANUAL, LIMITED
INFILTRATION CAN MANAGE RUNOFF SO THAT A MAJORITY OF PRECIPITATION EVENTS ARE ABSORBED. INFILTRATION DEVICES, SUCH AS
GRAVEL FILLED TRENCHES, DRYWELLS, AND GROUND SURFACE DEPRESSIONS, FACILITATE THIS PROCESS BY PUTTING RUNOFF IN DIRECT
CONTACT WITH THE SOIL AND HOLDING THE RUNOFF LONG ENOUGH TO SOAK MOST OF IT INTO THE GROUND. TO BE SUCCESSFUL, THE OIL
CONDITION AROUND THE INFILTRATION DEVICE MUST BE RELIABLY ABLE TO SOAK WATER INTO THE GROUND FOR A REASONABLE NUMBERS OF
YEARS.
INFILTRATION DEVICES
THE DISPERSION DEVICES USED ON YOUR PROPERTY INCLUDE THE FOLLOWING AS INDICATED ON THE SITE PLAN:
® ❑ ❑
GRAVEL FILLED TRENCHES, DRYWELLS, GROUND SURFACE DEPRESSIONS.
MAINTENANCE RESTRICTIONS
THE SIZE, PLACEMENT, AND COMPOSITION OF THESE DEVICES ARE DEPICTED BY THE SITE PLAN AND DESIGN DETAILS MUST BE MAINTAINED
AND MAY NOT BE CHANGED WITHOUT WRITTEN APPROVAL FROM THE CITY OF RENTON OR A THROUGH A FUTURE DEVELOPMENT PERMIT FROM
THE CITY OF RENTON.
INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES
• INFILTRATION DEVICES MUST BE INSPECTED ANNUALLY AND AFTER MAJOR STORM EVENTS TO IDENTIFY AND REPAIR AND PHYSICAL
DEFECTS.
• MAINTENANCE AND OPERATION OF THE SYSTEM SHOULD FOCUS ON ENSURING THE SYSTEM'S VIABILITY BY PREVENTING
SEDIMENT -LADEN FLOWS FROM ENTERING THE DEVICE. EXCESSIVE SEDIMENTATION WILL RESULT IN A PLUGGED OR NON-FUNCTIONING
FACILITY.
• IF THE INFILTRATION DEVICE HAS A CATCH BASIN, SEDIMENT ACCUMULATION MUST BE REMOVED ON A YEARLY BASIS OR MORE
FREQUENTLY IF NECESSARY.
KEEPING THE AREAS THAT DRAIN TO INFILTRATION DEVICES WELL SWEPT AND CLEAN WILL ENHANCE THE LONGEVITY OF THESE AREAS
FOR ROOFS, FREQUENT CLEANING OF GUTTERS WILL REDUCE SEDIMENT LOADS ON THESE DEVICES.
PUBLIC WORKS FLOW CONTROL BMP DETAILS
DEPARTMENT DATE: 4-15-2020
50
Appendix G
WWHM Report
WWHM2012
PROJECT REPORT
General Model Information
Project Name:
Ngochan SP Peak Flows 2020.04.28
Site Name:
Site Address:
City:
Report Date:
10/16/2020
Gage:
Seatac
Data Start:
1948/10/01
Data End:
2009/09/30
Timestep:
15 Minute
Precip Scale:
1.000
Version Date:
2019/09/03
Version:
4.2.16
POC Thresholds
Low Flow Threshold for POC1: 50 Percent of the 2 Year
High Flow Threshold for POC1: 50 Year
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:26:25 AM Page 2
Landuse Basin
Data
Predeveloped Land Use
Basin 1
Bypass:
No
Groundwater:
No
Pervious Land Use
acre
C, Forest, Flat
0.26
Pervious Total
0.26
Impervious Land Use
acre
Impervious Total
0
Basin Total
0.26
Element Flows To:
Surface Interflow Groundwater
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:26:25 AM Page 3
Mitigated Land Use
Basin 1
Bypass: No
Groundwater: No
Pervious Land Use acre
C, Lawn, Flat 0.08
Pervious Total 0.08
Impervious Land Use acre
ROADS FLAT 0.18
Impervious Total 0.18
Basin Total 0.26
Element Flows To:
Surface Interflow Groundwater
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:26:25 AM Page 4
Routing Elements
Predeveloped Routing
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:26:25 AM Page 5
Mitigated Routing
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:26:26 AM Page 6
Analysis Results
POC 1
w 0.0,
U
0.01
0
0.0
Percent Time E�cceedir+g 0 Y.S 1 i
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area: 0.26
Total Impervious Area: 0
Mitigated Landuse Totals for POC #1
Total Pervious Area: 0.08
Total Impervious Area: 0.18
Flow Frequency Method: Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period
Flow(cfs)
2 year
0.007644
5 year
0.012006
10 year
0.014477
25 year
0.017096
50 year
0.018716
100 year
0.020094
Flow Frequency Return Periods for Mitigated
Return Period
Flow(cfs)
2 year
0.073753
5 year
0.095149
10 year
0.109924
25 year
0.129336
50 year
0.144362
100 year
0.159888
Annual Peaks
Annual Peaks for Predeveloped and Mitigated
Year
Predeveloped
Mitigated
1949
0.008
0.100
1950
0.009
0.098
1951
0.017
0.063
1952
0.005
0.050
1953
0.004
0.054
1954
0.007
0.060
1955
0.011
0.067
1956
0.008
0.066
1957
0.007
0.078
1958
0.008
0.060
POC #1
POC #1
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:26:26 AM Page 7
1959
0.007
0.058
1960
0.011
0.065
1961
0.006
0.066
1962
0.004
0.054
1963
0.005
0.064
1964
0.007
0.060
1965
0.005
0.081
1966
0.005
0.051
1967
0.010
0.090
1968
0.006
0.102
1969
0.006
0.074
1970
0.005
0.069
1971
0.006
0.082
1972
0.013
0.092
1973
0.006
0.048
1974
0.006
0.077
1975
0.008
0.080
1976
0.006
0.059
1977
0.001
0.059
1978
0.005
0.073
1979
0.003
0.099
1980
0.012
0.104
1981
0.005
0.076
1982
0.009
0.111
1983
0.008
0.085
1984
0.005
0.056
1985
0.003
0.077
1986
0.013
0.064
1987
0.012
0.098
1988
0.005
0.058
1989
0.003
0.073
1990
0.025
0.152
1991
0.015
0.116
1992
0.006
0.055
1993
0.006
0.046
1994
0.002
0.048
1995
0.008
0.067
1996
0.018
0.077
1997
0.015
0.073
1998
0.003
0.069
1999
0.014
0.152
2000
0.006
0.074
2001
0.001
0.076
2002
0.006
0.099
2003
0.008
0.077
2004
0.011
0.141
2005
0.008
0.065
2006
0.009
0.058
2007
0.018
0.136
2008
0.023
0.114
2009
0.012
0.089
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank
Predeveloped
Mitigated
1
0.0245
0.1524
2
0.0235
0.1522
3
0.0182
0.1412
Ngochan SP Peak Flows 2020.04.28
10/16/2020 11:27:08 AM Page 8
4
0.0179
0.1360
5
0.0168
0.1165
6
0.0150
0.1144
7
0.0148
0.1111
8
0.0140
0.1037
9
0.0132
0.1023
10
0.0125
0.1005
11
0.0119
0.0992
12
0.0117
0.0990
13
0.0115
0.0983
14
0.0114
0.0979
15
0.0107
0.0915
16
0.0105
0.0897
17
0.0104
0.0889
18
0.0094
0.0852
19
0.0091
0.0823
20
0.0091
0.0815
21
0.0085
0.0802
22
0.0084
0.0783
23
0.0084
0.0773
24
0.0083
0.0769
25
0.0082
0.0767
26
0.0077
0.0765
27
0.0076
0.0763
28
0.0075
0.0761
29
0.0072
0.0740
30
0.0067
0.0737
31
0.0066
0.0735
32
0.0065
0.0730
33
0.0065
0.0726
34
0.0065
0.0692
35
0.0064
0.0689
36
0.0063
0.0672
37
0.0062
0.0669
38
0.0061
0.0662
39
0.0059
0.0659
40
0.0059
0.0648
41
0.0057
0.0648
42
0.0057
0.0642
43
0.0056
0.0638
44
0.0055
0.0625
45
0.0053
0.0601
46
0.0053
0.0598
47
0.0052
0.0597
48
0.0052
0.0593
49
0.0051
0.0585
50
0.0050
0.0584
51
0.0047
0.0582
52
0.0046
0.0581
53
0.0043
0.0557
54
0.0040
0.0552
55
0.0034
0.0543
56
0.0032
0.0543
57
0.0030
0.0515
58
0.0030
0.0503
59
0.0020
0.0485
60
0.0011
0.0477
61
0.0007
0.0463
Ngochan SP
Peak Flows 2020.04.28
10/16/2020 11:27:08 AM Page 9
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:08 AM Page 10
Duration Flows
Flow(cfs)
Predev
Mit
Percentage
Pass/Fail
0.0038
17547
115371
657
Fail
0.0040
16164
112013
692
Fail
0.0041
14970
108719
726
Fai 1
0.0043
13851
105618
762
Fai 1
0.0044
12816
102645
800
Fai 1
0.0046
11809
99843
845
Fail
0.0047
10900
97041
890
Fail
0.0049
10119
94410
932
Fail
0.0050
9383
91929
979
Fail
0.0052
8729
89512
1025
Fail
0.0053
8145
87095
1069
Fail
0.0055
7593
84742
1116
Fail
0.0056
7060
82454
1167
Fail
0.0058
6590
80336
1219
Fail
0.0059
6145
78326
1274
Fai 1
0.0061
5777
76315
1321
Fail
0.0062
5431
74412
1370
Fail
0.0064
5097
72572
1423
Fai 1
0.0065
4808
70776
1472
Fai 1
0.0067
4524
69000
1525
Fai 1
0.0068
4254
67311
1582
Fai 1
0.0070
4017
65685
1635
Fai 1
0.0071
3784
64081
1693
Fai 1
0.0073
3546
62541
1763
Fai 1
0.0074
3337
61044
1829
Fai 1
0.0076
3138
59653
1900
Fai 1
0.0077
2952
58220
1972
Fai 1
0.0079
2785
56787
2039
Fai 1
0.0080
2599
55418
2132
Fail
0.0082
2447
54092
2210
Fail
0.0083
2304
52873
2294
Fai 1
0.0085
2160
51654
2391
Fai 1
0.0086
2024
50456
2492
Fail
0.0088
1898
49323
2598
Fail
0.0089
1790
48146
2689
Fai 1
0.0091
1687
46991
2785
Fai 1
0.0092
1583
45900
2899
Fai 1
0.0094
1483
44874
3025
Fail
0.0095
1380
43890
3180
Fail
0.0097
1292
42927
3322
Fail
0.0098
1219
41922
3439
Fail
0.0100
1154
40981
3551
Fail
0.0101
1098
40040
3646
Fail
0.0103
1048
39099
3730
Fail
0.0104
997
38200
3831
Fail
0.0106
930
37366
4017
Fail
0.0107
884
36511
4130
Fai 1
0.0109
838
35719
4262
Fail
0.0110
789
34864
4418
Fail
0.0112
743
34158
4597
Fai 1
0.0113
713
33431
4688
Fai 1
0.0115
670
32703
4881
Fai 1
0.0116
633
31998
5054
Fai 1
0.0118
596
31313
5253
Fai I
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:08 AM Page 11
0.0119
567
30629
5401
Fail
0.0121
540
29944
5545
Fail
0.0122
497
29324
5900
Fai 1
0.0124
474
28725
6060
Fai 1
0.0125
437
28083
6426
Fai 1
0.0127
401
27527
6864
Fail
0.0128
370
26971
7289
Fail
0.0130
348
26394
7584
Fail
0.0131
324
25816
7967
Fai 1
0.0133
296
25217
8519
Fai 1
0.0135
272
24704
9082
Fai 1
0.0136
256
24148
9432
Fail
0.0138
235
23635
10057
Fai 1
0.0139
217
23143
10664
Fai 1
0.0141
195
22651
11615
Fai 1
0.0142
180
22180
12322
Fai 1
0.0144
158
21710
13740
Fai 1
0.0145
145
21263
14664
Fail
0.0147
129
20852
16164
Fail
0.0148
119
20407
17148
Fai 1
0.0150
109
20009
18356
Fai 1
0.0151
97
19616
20222
Fai 1
0.0153
91
19229
21130
Fai 1
0.0154
82
18846
22982
Fai 1
0.0156
76
18439
24261
Fai 1
0.0157
69
18082
26205
Fai 1
0.0159
61
17736
29075
Fai 1
0.0160
55
17404
31643
Fail
0.0162
48
17079
35581
Fail
0.0163
41
16728
40800
Fail
0.0165
38
16397
43150
Fai 1
0.0166
33
16031
48578
Fai 1
0.0168
27
15708
58177
Fail
0.0169
22
15368
69854
Fail
0.0171
21
15071
71766
Fai 1
0.0172
20
14788
73940
Fai 1
0.0174
19
14510
76368
Fai 1
0.0175
17
14256
83858
Fail
0.0177
14
13984
99885
Fail
0.0178
12
13725
114375
Fai 1
0.0180
9
13483
149811
Fai 1
0.0181
4
13253
331325
Fai 1
0.0183
3
13004
433466
Fai 1
0.0184
3
12741
424700
Fai 1
0.0186
3
12521
417366
Fai 1
0.0187
3
12299
409966
Fai I
The development has an increase in flow durations
from 1 /2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:08 AM Page 12
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:
0 acre-feet
On-line facility target flow:
0 cfs.
Adjusted for 15 min:
0 cfs.
Off-line facility target flow:
0 cfs.
Adjusted for 15 min:
0 cfs.
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:08 AM Page 13
LID Report
LID Technique
Used for
Total Volume
Volume
Infiltration
Cumulative
Percent
Waterfluality
Percent
Comment
Treatment?
Needs
Through
Volume
Volume
Volume
WaterQuality
Treatment
Facility
(ac-ft)
Infiltration
Infiltrated
Treated
(ac-ft)
(ac-ft)
Credit
Total Volume Infiltrated
0.00
0.00
0.00
0.00
OM
0%
No Treat.
Credit
Duration
Compliance with LID
Analysis
Standard 0% of2-yrto 50% of
Result =
2 yr
Failed
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:08 AM Page 14
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:40 AM Page 15
Appendix
Predeveloped Schematic
a Basin 1
,. 0.25ac
LA
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:40 AM Page 16
Mitigated Schematic
Basin 1
„ 0.25ac
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM Page 17
Predeveloped UC/ File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <----------- File Name ------------------------------ >***
<-ID->
***
WDM
26
Ngochan SP
Peak Flows 2020.04.28.wdm
MESSU
25
PreNgochan
SP
Peak
Flows
2020.04.28.MES
27
PreNgochan
SP
Peak
Flows
2020.04.28.L61
28
PreNgochan
SP
Peak
Flows
2020.04.28.1,62
30
POCNgochan
SP
Peak
Flows
2020.04.281.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 10
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<---------- Title ----------- >***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Basin 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><------- Name----
10 C, Forest, Flat
END GEN-INFO
*** Section PWATER***
->NBLKS Unit -systems Printer ***
User t-series Engl Metr ***
in out ***
1 1 1 1 27 0
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
10 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
10 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT -INFO
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM Page 18
PWAT-PARM1
<PLS > PWATER variable monthly parameter
value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW
VIRC VLE INFC HWT ***
10 0 0 0 0 0 0 0
0 0 0
0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2
***
# - # ***FOREST LZSN INFILT
LSUR SLSUR
KVARY AGWRC
10 0 4.5 0.08
400 0.05
0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3
***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR
BASETP AGWETP
10 0 0 2
2 0
0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4
***
# - # CEPSC UZSN NSUR INTFW
IRC
LZETP ***
10 0.2 0.5 0.35
6 0.5
0.7
END PWAT-PARM4
PWAT-STATEI
<PLS > *** Initial conditions at start of
simulation
ran from 1990 to end of 1992 (pat
1-11-95) RUN 21
***
# - # *** CEPS SURS UZS
IFWS LZS
AGWS GWVS
10 0 0 0
0 2.5
1 0
END PWAT-STATEI
END PERLND
IMPLND
GEN-INFO
<PLS ><------- Name ------- > Unit -systems
Printer ***
# - # User t-series
Engl Metr ***
in out
***
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
END ACTIVITY
PRINT -INFO
<ILS > ******** Print -flags ******** PIVL
PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
END PRINT -INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter
value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2
***
# - # *** LSUR SLSUR NSUR RETSC
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3
***
# - # ***PETMAX PETMIN
END IWAT-PARM3
IWAT-STATEI
<PLS > *** Initial conditions at start of
simulation
# - # *** RETS SURS
END IWAT-STATEI
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM
Page 19
END IMPLND
SCHEMATIC
<-Source->
<Name> #
Basin 1***
PERLND 10
PERLND 10
******Routing******
END SCHEMATIC
<--Area--> <-Target-> MBLK
<-factor-> <Name> # Tbl#
0.26 COPY 501 12
0.26 COPY 501 13
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------ >< --- > User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT -INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------ ><-------- ><-------- ><-------- ><-------- ><-------- ><-------- > ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------ ><-------- > <--- ><--- ><--- ><--- >< --- > *** <--- ><--- ><--- ><--- >< --- >
END HYDR-INIT
END RCHRES
SPEC -ACTIONS
END SPEC -ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM Page 20
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL
END EXT TARGETS
MASS -LINK
<Volume> <-Grp>
<-Member-><--Mult-->
<Target>
<-Grp> <-Member->***
<Name>
<Name> # #<-factor->
<Name>
<Name> # #***
MASS -LINK
12
PERLND PWATER
SURO 0.083333
COPY
INPUT MEAN
END MASS -LINK
12
MASS -LINK
13
PERLND PWATER
IFWO 0.083333
COPY
INPUT MEAN
END MASS -LINK
13
END MASS -LINK
END RUN
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM Page 21
Mitigated UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 2009 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <----------- File Name ------------------------------ >***
<-ID->
***
WDM
26
Ngochan SP
Peak Flows 2020.04.28.wdm
MESSU
25
MitNgochan
SP
Peak
Flows
2020.04.28.MES
27
MitNgochan
SP
Peak
Flows
2020.04.28.L61
28
MitNgochan
SP
Peak
Flows
2020.04.28.1,62
30
POCNgochan
SP
Peak
Flows
2020.04.281.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 16
IMPLND 1
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<---------- Title ----------- >***TRAN PIVL DIG1 FIL1
1 Basin 1 MAX
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
PYR DIG2 FIL2 YRND
1 2 30 9
<PLS ><------- Name ------- >NBLKS Unit -systems Printer ***
# - # User t-series Engl Metr ***
in out ***
16 C, Lawn, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
16 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
16 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT -INFO
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM Page 22
PWAT-PARM1
<PLS > PWATER variable monthly parameter
value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW
VIRC VLE INFC HWT ***
16 0 0 0 0 0 0 0
0 0 0
0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2
***
# - # ***FOREST LZSN INFILT
LSUR SLSUR
KVARY AGWRC
16 0 4.5 0.03
400 0.05
0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3
***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR
BASETP AGWETP
16 0 0 2
2 0
0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4
***
# - # CEPSC UZSN NSUR INTFW
IRC
LZETP ***
16 0.1 0.25 0.25
6 0.5
0.25
END PWAT-PARM4
PWAT-STATEI
<PLS > *** Initial conditions at start of
simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21
***
# - # *** CEPS SURS UZS
IFWS LZS
AGWS GWVS
16 0 0 0
0 2.5
1 0
END PWAT-STATEI
END PERLND
IMPLND
GEN-INFO
<PLS ><------- Name ------- > Unit -systems
Printer ***
# - # User t-series
Engl Metr ***
in out
***
1 ROADS/FLAT 1 1 1
27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
1 0 0 1 0 0 0
END ACTIVITY
PRINT -INFO
<ILS > ******** Print -flags ******** PIVL
PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
1 0 0 4 0 0 0 1
9
END PRINT -INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter
value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
1 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2
***
# - # *** LSUR SLSUR NSUR RETSC
1 400 0.01 0.1
0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3
***
# - # ***PETMAX PETMIN
1 0 0
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM
Page 23
END IWAT-PARM3
IWAT-STATEI
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
1 0 0
END IWAT-STATEI
END IMPLND
SCHEMATIC
<-Source->
<Name> #
Basin 1***
PERLND 16
PERLND 16
IMPLND 1
******Routing******
END SCHEMATIC
<--Area--> <-Target-> MBLK
<-factor-> <Name> # Tbl#
0.08 COPY 501 12
0.08 COPY 501 13
0.18 COPY 501 15
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------ >< --- > User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT -INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------ ><-------- ><-------- ><-------- ><-------- ><-------- ><-------- > ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------ ><-------- > <--- ><--- ><--- ><--- >< --- > *** <--- ><--- ><--- ><--- >< --- >
END HYDR-INIT
END RCHRES
SPEC -ACTIONS
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM Page 24
END SPEC -ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL
END EXT TARGETS
MASS -LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target>
<Name> <Name> # #<-factor-> <Name>
MASS -LINK 12
PERLND PWATER SURO 0.083333 COPY
END MASS -LINK 12
MASS -LINK 13
PERLND PWATER IFWO 0.083333 COPY
END MASS -LINK 13
MASS -LINK 15
IMPLND IWATER SURO 0.083333 COPY
END MASS -LINK 15
END MASS -LINK
END RUN
<-Grp> <-Member->***
<Name> # #***
INPUT MEAN
INPUT MEAN
INPUT MEAN
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM Page 25
Predeveloped HSPF Message File
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM Page 26
Mitigated HSPF Message File
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM Page 27
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as -is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2020; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
Ngochan SP Peak Flows 2020.04.28 10/16/2020 11:27:41 AM Page 28