Loading...
HomeMy WebLinkAbout0895.06 DFR 256.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. AES 0895.06 1 of 1 256 Time On Site Time Off Site Date Day of Week 8:00, 2:55 8:20, 3:15 12/16/20 Wednesday Travel Time Weather 1 hr. 47°F, Rain Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC General Contractor Contact Field Supervisor Reviewed Accrete Construction, LLC Joe LAC Contractor #2 Contact Project Manager Reviewed Are approved plans/permits on site? Project No. Permit No. As requested by the client, ESNW representative was onsite for testing of turbidity and pH of baker tank for discharge into stormwater system. While onsite, ESNW rep. observed the following: Baker Tank 1. Morning Sample a. Turbidity: 28.28 NTU b. pH: 10.4 2. Afternoon Sample a. Turbidity: 17.26 NTU b. pH: 9.4 The baker tank did not meet the requirements of a pH between 6.5 and 8.5 for discharge into the storm system. ESNW rep. will return as requested. Alexandra Shaner Field Technician (206) 355-877