HomeMy WebLinkAbout0895.06 DFR 1.pdfTo:
Ea rth
ls�ion
Ea
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
RJ Development Date: July 23, 2019
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duane accrete.build
No. of
Copies Date Description
1 7/23/19 Daily Field Re ort s # 1
Comments:
CC:
1:
2:
3:
4:
5:
John Wilson
Transmitted By: Earth Solutions NW, LLC
PM: Kyle Campbell, P.E.
ATTN:
ATTN:
ATTN:
ATTN:
ATTN:
-johnw@rinocon.com
1805 — 136t' Pl NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth SolutionS NW_« Field Rep.
CGH/SR
1805 136" Place NE, FAX: MTime On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425)449-4704 (866)366-8710
DAILY FIELD REPORT
Project No.
0895.06
Time Off Site
10:00 a.m. 11:00 a.m
Travel Time
Project Name Job Location
Weatherly Inn _4500 Talbot Rd. S., Renton, WA
General Contractor General Contractor's Superintendent
Grading Contractor Grading Foreman
Rino Construction John Wilson
Are approved Plans/Permits onsite YES NO Project No.
Page of Report No
1 of 1 1
Date Day of Week
07/23/2019 Tuesday
Weather
Cloudv
Client / Owner
_ RJ_Development, LLC
Received Onsite By
1 Checked By f a 3lZ,j
Permit No.
ESNW representatives were on site to observe the excavation of confirmatory test pits within the proposed vault
location and along various sections of the proposed cut rockery.
ESNW project manager and staff (Scott Riegel and Chase Halsen) were on site to observed the excavation of test
pits within the proposed vault location and along various sections of the proposed rockery. The intent of the test pits
was to observe soil and groundwater conditions likely to be exposed during mass excavations for construction of the
vault and rockeries. A summary of our geotechnical recommendations, as based on the observed conditions, will be
provided by email.
J
&,6Au
Chase Halsen
Senior Staff Geologist
[COPY TO:
CONTINUED ON NEXT PAGE