Loading...
HomeMy WebLinkAbout0895.06 DFR 1.pdfTo: Ea rth ls�ion Ea Earth Solutions NW, LLC LETTER OF TRANSMITTAL RJ Development Date: July 23, 2019 401 Central Street SE ESNW No.: ES- 895.06 Olympia, WA 98501 Project: Weatherly Inn Attn: Mr. Duane Meyer Email: duane accrete.build No. of Copies Date Description 1 7/23/19 Daily Field Re ort s # 1 Comments: CC: 1: 2: 3: 4: 5: John Wilson Transmitted By: Earth Solutions NW, LLC PM: Kyle Campbell, P.E. ATTN: ATTN: ATTN: ATTN: ATTN: -johnw@rinocon.com 1805 — 136t' Pl NE, Suite 201 Bellevue, WA 98005 (425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710 Earth SolutionS NW_« Field Rep. CGH/SR 1805 136" Place NE, FAX: MTime On Site Suite 201 (425) 449-4711 Bellevue, WA 98005 TOLL FREE: (425)449-4704 (866)366-8710 DAILY FIELD REPORT Project No. 0895.06 Time Off Site 10:00 a.m. 11:00 a.m Travel Time Project Name Job Location Weatherly Inn _4500 Talbot Rd. S., Renton, WA General Contractor General Contractor's Superintendent Grading Contractor Grading Foreman Rino Construction John Wilson Are approved Plans/Permits onsite YES NO Project No. Page of Report No 1 of 1 1 Date Day of Week 07/23/2019 Tuesday Weather Cloudv Client / Owner _ RJ_Development, LLC Received Onsite By 1 Checked By f a 3lZ,j Permit No. ESNW representatives were on site to observe the excavation of confirmatory test pits within the proposed vault location and along various sections of the proposed cut rockery. ESNW project manager and staff (Scott Riegel and Chase Halsen) were on site to observed the excavation of test pits within the proposed vault location and along various sections of the proposed rockery. The intent of the test pits was to observe soil and groundwater conditions likely to be exposed during mass excavations for construction of the vault and rockeries. A summary of our geotechnical recommendations, as based on the observed conditions, will be provided by email. J &,6Au Chase Halsen Senior Staff Geologist [COPY TO: CONTINUED ON NEXT PAGE