LETTER OF TRANSMITTAL
To: RJ Development Date: January 22, 2020
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duane accrete.build
No. of
uppies uate uescri Lion
1 1/3-1/17/20 Daily Field Report(s) # 102 & 108-112
Comments:
CC:
1:
John Wilson
ATTN:
johnw@rinocon.com
2:
Mark Richardson
ATTN:
markgaccrete.build
3:
Jeff Brain
ATTN:
ieff@.accrete.build
4:
Jennifer Vo ele
ATTN
jennifer@accrete.build
5:
Jonathan Chavez
ATTN:
jchavez@rentonwa.gov
rentonwa.gov
6:
Joe W
ATTN
joew accrete. build
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
1805 — 136" PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
" Earth Solutions NW«C
ESNW Rep.
Project No.
Page
AJ L
0895.06
1 of 1
15365 NE 901h Street, Suite 100
Redmond, WA 98052
Time On Site
Time Off Site
Date
Main (425) 449-4704 1 Fax (425) 449-4711
2:00 AM
2:45 PM
1/3/20
www esnw com Travel Time
DAILY FIELD REPORT 1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Contact
Mike
Contact
Project No
Weather
50' F, Cloudy
Report No.
102
Day of Week
Friday
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC * t%iv
Project Manager Reviewed
SSR
Permit No
At the client's request, ESNW rep was onsite to observe water main backfill and to observe the over steepened
excavation. While onsite, ESNW rep observed the following:
Water main Backfill
Rep observed that the contractor was installing water main on the north east corner of the site. ESNW rep observed
that the contractor had backfilled the shallow water main and compacted the backfill to a dense and solid state
using a medium track hoe pack. ESNW rep will return on Monday to take surface tests on the water main backfill.
Excavation Observations
While on -site, ESNW rep. observed the grading contractor continuing to work next to the over steepened
temporary excavation cuts. At the time of visit, ESNW rep. observed the temporary excavation to be stable in its
current condition and configuration, suitable for work to be conducted within the excavation. It is the responsibility
of the contractor to perform and implement all necessary safety measures in accordance with state and federal
regulations. ESNW rep recommends that the contractor cover the exposed soil slopes of the excavation with
plastic anchored using stakes and sandbags.
ESNW rep will return when requested.
Adrien Leland
ESNW Assistant Field Manager
Farlh
Solutions
NWux:
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Earth Solutions NWLLC
ESNW Rep.
AK
Project No.
0895.06
Page
_ 1/1
Date
Report No.
108
Day of Week
15365 NE 90'h Street, Suite 100
Redmond, WA 98052
Time On Site
Time Off Site
Main (425) 449-4704 1 Fax (425) 449-4711
Monday
www esnw. com
10:45 AM
11:15 AM
1 /13/20
DAILY FIELD REPORT
Travel Time
Weather
1.25 Hr. RT
30s°F, Overcast
Job Location
4500 Talbot Rd. S., Renton, WA
Mike
RJ Development, LLC
Field Supervisor Reviewed
LAC * 1/2,Z
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No Permit No.
Supplementary Report:
At the client's request, ESNW rep was onsite to observe or test pH of stormwater, cut slopes and earthwork
activities.
Test pH of Stormwater
While onsite, rep took pH tests to determine the acidity of stormwater. Rep took pH tests at the east end of the
quarry spall entrance and observed a pH level of 7 pH. At the west of the quarry spall entrance stormwater
(temporary) collection pit and observed a pH level of 9 pH. On the street, north and south of the west entrance,
rep took a pH tests and observed stormwater to be a 6.5/7 pH. In tested baker tank, rep observed a pH level of
8.5 pH. Rep observed that pH level was contained onsite and not leaving the site. The stormwater pH level in
street was in compliance of required pH level at 6.5/7 pH
Cut Slopes
Rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep observed
that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes are stable
in current configuration and stable to work within. The contractor is responsible for providing all safety measures
in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast corner of
the footing excavation to a 1:1 (H:V)
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
J
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Earth Solutions NWLLC ESNW Rep.
15365 NE 90' Street, Suite 100 AK
Redmond, WA 98052 Time On Site
Main (425) 449-4704 i Fax (425) 449-4711
www esnw.com 11:00 AM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project No. Page
Report No
0895.06
1/1
109
Time Off Site
Date
Day of Week
Tuesday
11:30 AM
1 /14/20
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Are approved plans/permits on site? Project No.
Weather
30s°F, Snow
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC * t/m
Project Manager Reviewed
Ray
Permit No.
Supplementary Report:
At the client's request, ESNW rep was onsite to observe cut slopes and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
6 Earth SOIutIO11$ N■rLLC ESNW Rep Project No. Page Report No-
"
15365 NE 90" Street, Suite 100 AK 0895.06 1/2 110
E Redmond, WA 98052 Time On Site Time Off Site Date Day of Week
Main (425) 449-4704 1 Fax (425) 449-4711 Wed
www esnw com 2:00 AM; 3:30 PM; 1 /15/20
2:00 PM 3:30 PM
DAILY FIELD REPORT - .....- --
Travel Time Weather
1.25 Hr. RT (x2) 30s0F, Snow
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC Vk V,
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client's request, ESNW rep was onsite to observe or test water line backfill, pH of stormwater, cut slopes
and earthwork activities.
Water Line Backfill
While onsite, rep observed contractor use a medium sized excavator to excavate and install the water line. Rep
observed contractor install a 10" ductile iron pipe at the toe of the excavation (W4'xD4') embedded in a 12" lift pea
gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting
with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of
its maximum dry density (130.7 lbs./cu. ft.).
Test pH of Stormwater
Rep took pH tests to determine the acidity of stormwater. Rep took pH tests at the east end of the quarry spall
entrance and observed a pH level of 8 pH. At the west of the quarry spall entrance stormwater (temporary)
collection pit and observed a pH level of 6.5/7 pH. On the street, north and south of the west entrance, rep took a
pH tests and observed stormwater to be a 6.5/7 pH. In baker tank next to the main street rep observed a pH of
8.5/9. Rep observed that pH level was contained onsite and that stormwater pH level in street was in compliance
of required pH level at 6.5/7 pH.
Cut Slopes
Rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep observed
that the east slopes of the excavation were near a 0.75:1 (H:V) slope- Although over -steepened, slopes are stable
in current configuration and stable to work within. The contractor is responsible for providing all safety measures
in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast corner of
the footing excavation to a 1:1 (H:V).
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
s Earth Solutions NWLLC
15365 NE 901 Street, Suite 100
s Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
€ Contact
AK
0895.06
Time On Site
Time Off Site
ESNW Rep. Project No.
travel Tine Weather
1.25 Hr. RT (x2) 30s°F, Snow
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager Reviewed
Ray
Page 2/2 Report No.
110
Date Day of Week
Wed
1 /15/20
Are approved plans/permits on site? Project No. Permit No.
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
(Water Line)
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
(%)
(pcf)
Dry Density
108
See map forapproximate pP location
SG
1
130.7
10.2
124.4 W W
95
-......:..
109 See map for approximate location
SG
1
130.7
9.8
124.6
95
Supplementary Report:
108
.. -
109
. �...
o44
j.
Earth Solutions NWLLC
15365 NE 901h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
vvm.esnw.com
DAILY FIELD REPORT
ESNW Rep. Project No Page Report No.
AK 0895.06 1/2 111
Time On Site Time Off Site Date Day of Week
10:45 AM 12:15 PM 1/16/20 Thursday
Travel Time
1.25 Hr. RT
Weather
40s°F, Clear
Project Name
Weatherly Inn
Job Location
4500 Talbot Rd. S., Renton, WA
—
Client/Owner
RJ Development, LLC
-
Contractor #1
Rino Construction
— —
Contact
Mike
Field Supervisor
LAC
---...---..
Reviewed
W VI
Contractor #2
Contact
Project Manager
Ray
Reviewed
Are approved plans/permits on site? Project No Permit No. J
Supplementary Report:
At the client's request, ESNW rep was onsite to observe or test water line backfill, cut slopes and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a medium sized excavator to excavate and install the water line. Rep
observed contractor install a 10" ductile iron pipe at the toe of the excavation (W4'xD4') embedded in a 12" lift pea
gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting
with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of
its maximum dry density (130.7 lbs./cu. ft.).
Cut Slopes
Rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep observed
that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes are stable
in current configuration and stable to work within. The contractor is responsible for providing all safety measures
in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast corner of
the footing excavation to a 1:1 (H:V).
ESNW rep will return to observe earthwork activities when requested by client
__� /,L—
Andrew Kimn, Senior Technician, 206-430-9183
0Earth Solutions NWLLC
ESNW Rep.
AK
15365 NE 901h Street, Suite 100
i Redmond, WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw com
10:45 AM
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Project No Page Report No
0895.06 2�2 111
Time Off Site Date Day of Week
12:15 PM 1/16/20 Thursday
Job Location
4500 Talbot Rd. S., Renton, WA
Mike
Contact
Weather
40s°F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No Permit No.
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
(Water Line)
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
(%)
(pcf)
Dry Density
110
See map for approximate location
SG
1
130.7
9.7
124.9
96
111
See map for approximate location
SG
1
130.7
10.0
125.2
96
Supplementary Report:
110
111
�
~
Earth Solutions NWLLC
ESNW Rep,
Project No. Page Report No.
AK
0895.06 1/2 112
15365 NE 901h Street, Suite 100 1-
— -
i
Redmond, WA 98052
Time On Site
Time Off Site Date Day of Week
Main (425) 449-4704 1 Fax (425) 449-4711
10:15 AM;
12:30 PM; Friday
www.esnw.com
1.3o PM
1 /17/20
3:45 PM
DAILY FIELD REPORT
Travel Time
I Weather
1.25 Hr. RT (x2) 40s°F, Overcast
Project Name
Job Location
Client/Owner
Weatherly Inn
4500 Talbot Rd.
S., Renton, WA RJ Development, LLC
Contractor #1
Contact
Field Supervisor Reviewed
Rino Construction
Mike
LAC �t2
Contractor #2
Contact
Project Manager
Reviewed
Ray
Are approved plans/permits on site? Project No Permit No.
Supplementary Report:
At the client's request, ESNW rep was onsite to observe or test water line backfill, footing excavations, cut slopes
and earthwork activities.
Water Line Backfill
While onsite, rep observed contractor use a medium sized excavator to excavate and install the water line. Rep
observed contractor install a 10" ductile iron pipe at the toe of the excavation (W4'xD4') embedded in a 12" lift pea
gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting
with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of
its maximum dry density (130.7 lbs./cu. ft.).
Footing Excavations
Rep observed contractor use a large excavator to excavate the footings for the north footings of the building. Rep
used a'/" steel t-probe and observed that the subgrade was very dense, firm, unyielding, and suitable for support
of the proposed building footings.
Cut Slopes
Rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep observed
that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes are stable
in current configuration and stable to work within. The contractor is responsible for providing all safety measures
in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast corner of
the footing excavation to a 1:1 (H:V).
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWIU-C ESNW Rep. Project No.
AK 0895.06
15365 NE 901h Street, Suite 100 Redmond. WA 98052 Time On Site Time Off Site
Main (425) 449-4704 1 Fax (425) 449-4711 10:15 AM; 12:30 PM;
www.esnw.com 1:30 PM 3:45 PM
DAILY FIELD REPORT ;
Travel Time
1 1.25 Hr. RT (x2)
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
Contractor #1 Contact
Rino Construction Mike
Contractor #2 Contact
Page 2/2 Report No.
112
Date Day of Week
1 /17/20 Friday
Weather
40s°F, Overcast
RJ Development, LLC
Field Suoervisor FiReviewed
LAC
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No Permit No.