HomeMy WebLinkAbout0895.06 DFR 123-127.pdfTo:
+ fArth
Sv1tition
mWit.
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
RJ Development Date: February 10, 2020
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 _ Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duaneaaccrete.build
No. of
Copies Date Descriptlon
1 2/3-2/7/20 Daily Field Report(s) # 123-127
-r- i
Comments:
CC:
1:
John Wilson
ATTN:-johnw@rinocon.com
2:
Mark Richardson
ATTN:
mark@accrete.build
3
Jeff Brain
ATTN:
i accrete.build
4:
Jennifer Vogele
ATTN:
Jennifer accrete. build
5:
Jonathan Chavez
ATTN:
iChavez _rentonwa. g ov
6:
Joe W
ATTN:
ioew accrete. build
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
15365 NE 90th Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
Earth Solutions NW«C
o
15365 NE 9011 Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
ESNW Rep.
AK
Project No.
0895.06
Page
1/1
Report No.
123
Time On Site
Time Off Site
Date Day of Week
9:45 AM;
10:45 AM;
Monday
2/3/20
12:15 PM
1:15 PM
Travel Time
Weather
1.25 Hr. RT
40sOF, Overcast
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Are approved plans/permits on site? Project No
Supplementary Report:
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed. LAC Z/q
illy'
Project Manager Reviewed
Ray
Permit No.
At the client's request, ESNW rep was onsite to observe or test cut slopes, sewer discharge, storm line backfill
and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Sewer Discharge
Rep used IMHOFF cone to test baker tank sewer water discharge. Rep used IMHOFF cone and found sediment
(<3 ml) after testing water for one hour. Rep took PH test and found water suitable for discharge at a pH level of
6.5.
Storm Line Backfill
Rep observed contractor use a medium sized excavator to excavate oversaturated material north of the main
entrance to the site. Rep will return tomorrow, February 4, 2020, to observe and test the compaction of the new
backfill when needed.
ESNW rep will return to observe earthwork activities when requested by client
4J3 �_
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLc
15365 NE 90" Street, Suite 100
t Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
ESNW Rep.
AK
Project No.
0895.06
Page
1/1
Report No.
124
Time On Site
Time Off Site
Date
Day of Week
Tuesday
12:15 PM
1:15 PM
2/4/20
Travel Time
Weather
1.25 Hr. RT
30s°F, Snow
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Client/Owner
RJ Development, LLC
Field Supervisor
LAC
Project Manager
Ray
Are approved plans/permits on site? Project No. Permit No
Supplementary Report:
Reviewed S J
9
Reviewed
At the client's request, ESNW rep was onsite to observe or test cut slopes, sewer discharge, test pH of stormwater,
storm line backfill and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Sewer Discharge
Rep used IMHOFF cone to test baker tank sewer water discharge. Rep used IMHOFF cone and found sediment
(<3 ml) after testing water for one hour Rep took PH test and found water suitable for discharge at a pH level of
6.5.
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater. In the south end baker tanks rep observed 11.56 NTUs and
a pH of 6.5, rep observed that contractor added dry ice to lower the pH level. Rep observed that pH level was
contained onsite.
Storm Line Backfill
Rep observed contractor use a medium sized excavator to excavate oversaturated material north of the main
entrance to the site Rep will return tomorrow, February 5, 2020, to observe and test the compaction of the new
backfill as needed.
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWt_t_C
ESNW Rep
AK
15365 NE 90" Street, Suite 100
Redmond, WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw corn
9:00 AM
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
rrotect Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Project No. Page Report No.
0895.06 1/1 125
Time Off Site Date Day R Week
Wed
10:15 AM 2/5/20
Job Location
4500 Talbot Rd. S., Renton, WA
- ......... ....__ ...... ... _.........
Contact
J
Mike
Contact
Weather
40s°F, Rain
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC VI
Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No Permit No
Supplementary Report:
At the client's request, ESNW rep was onsite to observe or test cut slopes, sewer discharge and earthwork
activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Sewer Discharge
Rep used IMHOFF cone to test baker tank sewer water discharge. Rep used IMHOFF cone and found sediment
(<3 ml) after testing water for one hour. Rep took PH test and found water suitable for discharge at a pH level of
6.5.
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Earth Solutions NWLLC
15365 NE 90" Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw corn
DAILY FIELD REPORT
ESNW Rep. Project No. Page
AK 0895.1
Time On Site Time Off Site Date
10:45 AM 1 11:45 AM1 2/6/20
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
1/1
Report No.
126
--
Day of Week
Thursday
Weather
40sOF, Rain
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed��/1
LAC
Project Manager Reviewed
Ray j
Are approved plans/permits on site? Project No Permit No.
Supplementary Report:
At the client's request, ESNW rep was onsite to observe or test cut slopes, test pH of stormwater and earthwork
activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1:1 (H:V).
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater. In the filled baker tanks rep observed 14.4 NTUs and 15.2
NTUs, rep observed that contractor added dry ice to lower the pH level. Rep observed that pH level was contained
onsite.
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183
M Earth Solutions NWLLC
ESNW Rep.
AK
15365 NE 901h Street, Suite 100
t 1 Redmond. WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
12:15 PM
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
I Contractor #2
Are approved plans/permits on site?
Project No.
Page
Report No.
0895.06
1/1
127
Time Off Site
Date
Day of Week
Friday
1:00 PM
2/7/20
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No
Weather
40s°F, Rain
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC * I -A
Project Manager I
Reviewed
Ray
Permit No.
Supplementary Report:
At the client's request, ESNW rep was onsite to observe or test cut slopes, test pH of stormwater and earthwork
activities.
J Cut Slopes
I` While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1 A (H:V).
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater In the filled baker tanks rep observed. 17.46, 24.21, and
4 4 NTUs, rep observed that contractor added dry ice to lower the pH level. Rep observed that pH level was
contained onsite.
ESN,Wrerep
`�will
creturn to observe earthwork activities when requested by client
f / —
Andrew Kimn, Senior Technician, 206-430-9183