HomeMy WebLinkAbout0895.06 DFR 143-147.pdfEarth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: RJ Development
401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Meyer
Email: duane@accrete.build
No. of
C 001es D t ae D . f escno· 10n
Date: March 12, 2020
ESNW No.: ES-895.06
Project: Weatherly Inn
1 3/2-3/6/20 Daily Field Report(s) # 143-147
Comments:
CC:
1: John Wilson
2: Mark Richardson
3: Jeff Brain
4: Jennifer Vogele
5: Jonathan Chavez
6: JoeW
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
ATTN:
ATTN:
ATTN:
ATTN:
ATTN:
ATTN:
joh nw@rinocon.com
mark@accrete.build
ieff@accrete. build
jennifer@accrete. build
jchavez@rentonwa.gov
joew@accrete. build
15365 NE 90th Street, Suite 100 Red mond, WA 98052
(425)449-4704 FAX (425) 449-4711
Earth Solutions NWu_c
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Job Location
ESNWRep.
AK, TSH
Time On Site
11:45 AM
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
2:00 PM
Page
1/1
Date
3/2/20
Weather
40s°F, Rain
ClienUOwner Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
Contact
Mike
Contact
Project No.
Field Supervisor
LAC
Project Manager 5�{2.
Permit No.
Report No.
143
Day of Week
Monday
the client's request, ESNW rep was onsite to observe or test cut slopes, wall backfill with cement, test pH of
stormwater and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1: 1 (H:V).
Wall Backfill with Cement
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place
12"-18" lifts for a hoe pack and 6"-8" lifts for a jumping jack during compaction. Rep will return to observe and test
the compaction of the wall backfill as needed.
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater. In the filled baker tanks rep observed 9.46 NTU and a pH
of 6.5. Rep observed that pH level was contained onsite at 6.5 pH.
ESNW rep will return to observe earthwork activities when requested by client �f-
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLc
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Job Location
ESNW Rep.
AK,
Time On Site
1:15 PM
Travel Time
1.25 Hr. RT
Project No. Page Report No.
0895.06 1/1 144
Time Off Site Date Day of Week
1:30 PM 3/3/20 Tuesday
Weather
40s°F, Overcast
Client/Owner Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
Contact
Mike
Contact
Project No.
Field Supervisor
LAC
Reviewi.t-., /
oi.
Project Manager s��
Permit No.
the client's request, ESNW rep was onsite to observe or test cut slopes, footing excavations and earthwork
activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1 :1 (H:V).
Footings Excavations
Rep observed contractor use a medium sized excavator to excavate and the building footings. Rep recommended
and observed that contractor was over-excavating footings ~4" from designed footing grade. Rep observed
contractor backfill the over-excavation with a 3"-4" lift of 1 ¼" minus crushed rock for the footing subgrade to
increase stability during wall construction. Rep used a ½" steel t-probe and observed the footing subgrade to be
very dense, firm, unyielding, and suitable for support of the proposed footings.
ESNW rep will return to observe earthwork activities when requested by client �f-
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLc
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Job Location
ESNWRep. AK
Time On Site
12:00 PM
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
1:30 PM
Page
1/2
Date
3/4/20
Weather
40s°F, Clear
ClienUOwner Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
Contact
Mike
Contact
Project No.
Project Manager
'5�'iL
Permit No.
Report No.
145
Day of Week
Wed
the client's request, ESNW rep was onsite to observe or test cut slopes, wall backfill with cement, water line backfill
and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1 :1 (H:V).
Wall Backfill with Cement
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place
12"-18" lifts for a hoe pack and 6"-8" lifts for a jumping jack during compaction. Rep took compaction tests on
backfill and observed material to be adequate of at least 95% of its maximum dry density that was adjusted based
on calculations with the cement treatment (130.7 lbs./cu. ft.).
Water Line Backfill
Rep observed the prior to arrival that contractor had used a medium sized excavator to excavate a water line
trench (W8'xD12'). Contractor expressed plans to continue working on water line backfill tomorrow, March 5,
2020. Rep will return to observe or test backfill as needed.
ESNW rep will return to observe earthwork activities when requested by client +wf-
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWttc
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Job Location
ESNWRep. AK
Time On Site
12:00 PM
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
1:30 PM
Page 2/2
Date
3/4/20
Weather
40s°F, Clear
ClienUOwner
Report No.
145
Day of Week
Wed
Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rina Construction
Contractor #2
Are approved plans/permits on site?
Test Test Location
Number (Wall Backfill)
Contact Mike
Contact
Project No.
Elevation
127 See map for approximate location -10'
128 See map for approximate location -8'
Supplementary Report:
i � l
..
;I ' ,.-\ ,· I, .. I ..,,�
Reference
Compaction
Curve
1
1
·1
Field Supervisor Reviewed
LAC
Project Manager r SS(L
Permit No.
Maximum Fill Test % of
Dry Density Moisture Dry Density Maximum
(pcf) (%) (pcf) Dry Density
130.7 16.9 124.6 95
130.7 18.4 124.1 95
-7
..
[ 127,128 I .,_ . __ j
Project Name
Weatherly Inn
Earth Solutions I\IWLLc
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
Job Location
ESNWRep.AK
Time On Site
12:00 Pm
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
1:15 PM
Page
1/1
Date
3/5/20
Weather
40s°F, Clear
ClienUOwner4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Report No.
146
Day of Week
Thursday
Contractor #1
Rina Construction ContactMike Field SupervisorLAC Reviewe�-,, /
41\
Contractor #2 Contact Project Manager-�cl--
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
the client's request, ESNW rep was onsite to observe or test cut slopes, wall backfill with cement, water line backfill
and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1: 1 (H:V).
Wall Backfill with Cement
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place
12"-18" lifts for a hoe pack and 6"-8" lifts for a jumping jack during compaction. Rep will return to observe or test
backfill as needed.
Water Line Backfill
Rep observed the prior to arrival that contractor had used a medium sized excavator to excavate a water line
trench (W8'xD12'). Contractor expressed plans to continue working on water line backfill tomorrow, March 6,
2020. Rep will return to observe or test backfill as needed.
ESNW rep will return to observe earthwork activities when requested by client +wf-
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWuc
15365 NE 901h Street, Suite 100
Redmond, WA 98052
Main (425) 449-47041 Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
ESNWRep. AK
Time On Site
2:15Pm
Project No.
0895.06
Time Off Site
3:30 PM
Page Report No.
1/1 147
Date Day of Week
3/6/20 Friday
Weather Travel Time
1.25 Hr. RT 40s°F, Overcast
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No.
Client/Owner
RJ Development, LLC
Field Supervisor
LAC
Project Manager
$5fL
Permit No.
the client's request, ESNW rep was onsite to observe or test cut slopes, wall backfill with cement, water line backfill
and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1 :1 (H:V).
Wall Backfill with Cement
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place
12"-18" lifts for a hoe pack and 6"-8" lifts for a jumping jack during compaction. Rep will return to observe or test
backfill as needed.
Water Line Backfill
Rep observed the prior to arrival that contractor had used a medium sized excavator to excavate a water line
trench (W8'xO12'). Contractor expressed plans to continue working on water line backfill Monday, March 9, 2020.
Rep will return to observe or test backfill as needed.
ESNW rep will return to observe earthwork activities when requested by client +wf--
Andrew Kimn, Senior Technician, 206-430-9183