HomeMy WebLinkAbout0895.06 DFR 148-152.pdfEarth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: RJ Development 401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Meyer
Email: duane@accrete. build
No. of
C opres D t ae D . r escnp·,on
Date: March 19, 2020
ESNWNo.: ES-895.06
Project: Weatherly Inn
1 3/9-3/13/20 Daily Field Report(s) # 148-152
Comments:
CC:
1: John Wilson
2: Mark Richardson
3: Jeff Brain
4: Jennifer Vogele
5: Jonathan Chavez
6: JoeW
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
ATTN:
ATTN:
ATTN:
ATTN:
ATTN:
ATTN:
johnw@rinocon.com
mark@accrete. build
jeff@accrete. build
jennifer@accrete.build
jchavez@rentonwa.gov
joew@accrete. build
15365 NE 90th Street, Suite 100 Redmond, WA 98052
(425)449-4704 FAX (425) 449-4711
Earth Solutions NWLLc
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Job Location
ESNWRep.AK
Time On Site
1:45PM
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
2:45 PM
Page
1/1
Date
3/9/20
Weather
40s°F, Clear
Client/Owner
Report No.
148
Day of Week
Monday
Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
Contact
Mike
Contact
Project No.
Field SupervisorLAC
Project Manager
Ray
Permit No.
Review�')/,,
Reviewed
the client's request, ESNW rep was onsite to observe or test cut slopes, test pH of stormwater, water line backfill
and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1: 1 (H:V).
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater. In the filled baker tanks rep observed 10.2 NTU in a baker
tank. Rep observed that contractor added dry ice to lower the pH level. Rep observed that pH level was contained
onsite at 6.5 pH.
Water Line Backfill
Rep observed the prior to arrival that contractor had used a medium sized excavator to excavate a water line
trench (W8'xD12'). Contractor expressed plans to continue working on water line backfill Tuesday, March 10,
2020. Rep will return to observe or test backfill as needed.
ESNW rep will return to observe earthwork activities when requested by client �f-
Andrew Kimn, Senior Technician, 206-430-9183
Project Name
Weatherly Inn
Contractor #1 Rino Construction
Earth Solutions I\IWuc
15365 NE 90 th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 J Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Job Location
ESNWRep. AK
Time On Site
12:30 PM
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
2:00 PM
Page 1/2
Date
3/10/20
Weather
40s°F, Clear
ClienUOwner
4500 Talbot Rd. S., Renton, WA RJ Developme11.Yi.LC
Contact
Mike
Field Supervisor
LAC
Report No.
149
Day of Week
Tuesday
Contractor #2 Contact Project Manager
Ray
Reviewed
Are approved plans/permits on site? Project No. Permit No.
Test Test Location Reference Maximum Fill Test % of
Number (Water Backfill) Elevation Compaction Dry Density Moisture Dry Density Maximum
Curve (pcf) (%) (pcf) Dry Density
129 See map for approximate location -4'1 130.7 22.4 124.6 95
130 See map for approximate location -2'1 130.7 21.6 125.3 96
131 See map for approximate location SG 1 130.7 20.7 124.4 95
Supplementary Report:
the client's request, ESNW rep was onsite to observe or test cut slopes, water line backfill, footing backfill and
earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1: 1 (H:V).
Water Line Backfill
Rep observed the prior to arrival that contractor had used a medium sized excavator to excavate a water line
trench (W8'xD12'). Rep observed contractor use a medium sized excavator to mix and cement treat native brown
silty sand with gravel material. Rep observed contractor treat native material with a 3% cement mix. Rep observed
contractor place 12"-18" lifts and compaction with a hoe pack. Rep took compaction tests on backfill and observed
material to be adequate of at least 95% of its maximum dry density that was adjusted based on calculations with
the cement treatment (130.7 lbs./cu. ft.).
Footing Backfill
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place 8"-
8" lifts and compaction with a jumping jack. Rep took compaction tests on backfill and observed material to be
adequate of at least 95% of its maximum dry density that was adjusted based on calculations with the cement
treatment (130.7 lbs./cu. ft.).
ESNW rep will return to observe earthwork activities when requested by client �f--
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLc
15365 NE 90th Street, Suite 1 oo
Redmond, WA 98052
Main (425) 449-4704 / Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Job Location
ESNWRep. AK
Time On Site
12:30 PM
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
2:00 PM
Page 2/2
Date
3/10/20
Weather
40s°F, Clear
Client/Owner
Report No.
149
Day of Week
Tuesday
Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rine Construction
Contractor #2
Are approved plans/permits on site?
Contact
Mike
Contact
Project No.
Reference Test Test Location
Number (Footing Backfill) Elevation Compaction
132 See map for approximate location
133 See map for approximate location
134 See map for approximate location
•
• I
--... �-.... ___ .. __ .... 132 133 J
SG
SG
SG
Curve
1
. .. ., ...... ., •
Maximum
Field Supervisor LAC
Project Manager Ray
Permit No.
Fill
Dry Density Moisture
(pcf) (%)
130.7 18.3
130.7 16.8
130.7 18.0
129,130,131
Reviewed
Reviewed
Test % of
Dry Density Maximum
(pcf) Dry Density
124.8 96
125.2 96
124.7 95
Earth Solutions NWLLc
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Job Location
ESNWRep. AK
Time On Site
12:30 PM
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
1:45 PM
Page
1/1
Date
3/11 /20
Weather
40s°F, Clear
Client/Owner
Report No,
150
Day of Week
Wed
Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
ContactMike
Contact
Project No.
Field SupervisorLAC
Project ManagerRay
Permit No.
Review� ""t/i ,;
Reviewed
the client's request, ESNW rep was onsite to observe or test cut slopes, footing backfill, test pH of stormwater and
earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1: 1 (H :V).
Rep observed contractor using a medium sized excavator to place 2" wash rock behind the wall. Rep observed
that contractor had placed miradrain to the top elevation of the cast-in-place wall. Contractor expressed plans to
continue working on wall backfill.
Footing Backfill
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place 8" -
8" lifts and compaction with a jumping jack. Rep will return to take compaction tests as needed.
Test pH of Stormwater
Rep took pH tests to determine the pH of stormwater. In the filled baker tanks rep observed 2.0 NTU and a pH of
6.5. Rep observed that pH level was contained onsite at 6.5 pH.
ESNW rep will return to observe earthwork activities when requested by client �f-
Andrew Kimn, Senior Technician, 206-430-9183
Project Name
Weatherly Inn
Earth Solutions NWuc
15365 NE 90'" Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Job Location
ESNWRep. AK
Time On Site
3:45 PM
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
4:00 PM
Page
1/1
Date
3/12/20
Weather
40s°F, Clear
ClienUOwner 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Report No.
151
Day of Week
Thursday
Contractor #1
Rina Construction
Contact Mike Field Supervisor
LAC Reviewe� "'/i .s
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
Contact
Project No.
Project Manager
Ray
Permit No.
the client's request, ESNW rep was onsite to observe or test cut slopes and earthwork activities.
Cut Slopes
Reviewed
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1 :1 (H:V).
Rep observed contractor using a medium sized excavator to place 2" wash rock behind the wall. Rep observed
that contractor had placed miradrain to the top elevation of the cast-in-place wall. Contractor expressed plans to
continue working on wall backfill.
ESNW rep will return to observe earthwork activities when requested by client +wf-
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWLLc
15365 NE 90 th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com
DAILY FIELD REPORT
Job Location
ESNWRep. AK
Time On Site
1:30 PM
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
3:30 PM
Page
1/2
Date
3/13/20
Weather
40s°F, Clear
ClienUOwner
Report No.
152
Day of Week
Friday
Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rina Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
Contact Mike
Contact
Project No.
Field Supervisor
LAC
Project Manager Ray
Permit No.
Reviewc,._. "/i S
Reviewed
the client's request, ESNW rep was onsite to observe or test cut slopes, footing backfill and earthwork activities.
Cut Slopes
While onsite, rep observed south slopes of the cut slopes to be near vertical and covered in plastic sheeting. Rep
observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes
are stable in current configuration and stable to work within. The contractor is responsible for providing all safety
measures in accordance with state and federal regulation. Rep observed that contractor had sloped the southeast
corner of the footing excavation to a 1: 1 (H:V).
Footing Backfill
Rep observed contractor use a medium sized excavator to mix and cement treat native brown silty sand with gravel
material. Rep observed contractor treat native material with a 3% cement mix. Rep observed contractor place 8"-
8" lifts and compaction with a jumping jack. Rep took compaction tests on backfill and observed material to be
adequate of at least 95% of its maximum dry density that was adjusted based on calculations with the cement
treatment (130.7 lbs./cu. ft.).
ESNW rep will return to observe earthwork activities when requested by client �f-
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NWuc
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 I Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
Job Location
ESNWRep. AK
Time On Site
1:30 PM
Travel Time
1.25 Hr. RT
Project No.
0895.06
Time Off Site
3:30 PM
Page
2/2
Date
3/13/20
Weather
40s°F, Clear
ClienUOwner
Report No.
152
Day of Week
Friday
Project Name
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1
Rina Construction
Contact
Mike
Contractor #2 Contact
Are approved plans/permits on site? Project No.
Test
Number
135
136
137
Test Location
(Footing Backfill) Elevation
See map for approximate location SG
See map for approximate location SG
See map for approximate location SG
..... ---- ■-...... -•r ,,. _.. ·---
►•--- ... ___ _ ... _,,._4' __ ... ..._ ...-- ·
135 136
Reference
Compaction
Curve
1
1
Maximum
Field Supervisor
LAC
Project Manager Ray
Permit No.
Fill
Dry Density Moisture
(pcf)
130.7
130.7
130.7
'I.' ..
(%)
23.3
25.0
22.8
Reviewed
Reviewed
Test % of
Dry Density Maximum
(pcf) Dry Density
125.2 96
125.0 96
124.8 96
_J