HomeMy WebLinkAbout0895.06 DFR 190.pdf
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
AK 0895.06 190
Time On Site Time Off Site Date Day of Week
11:00 AM 1:00 PM
6/12/20 Friday
Travel Time Weather
1.25 Hr. RT 50soF, Rain
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
Ray
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe footing excavations and earthwork activities.
Footings Excavations
While onsite, rep observed contractor use a medium sized excavator to excavate and the building footings. Rep
observed contractor place a 3”-4” lift of 1 ¼” minus crushed rock for the footing subgrade to increase stability
during wall construction. Rep used a ½” steel t-probe and observed the subgrade to be very dense, firm,
unyielding, and suitable for support of the proposed footings.
ESNW rep will return to observe earthwork activities when requested by client
Andrew Kimn, Senior Technician, 206-430-9183