Loading...
HomeMy WebLinkAbout0895.06 DFR 190.pdf Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. AK 0895.06 190 Time On Site Time Off Site Date Day of Week 11:00 AM 1:00 PM 6/12/20 Friday Travel Time Weather 1.25 Hr. RT 50soF, Rain Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Rino Construction Mike LAC Contractor #2 Contact Project Manager Reviewed Ray Are approved plans/permits on site? Project No. Permit No. Supplementary Report: At the client’s request, ESNW rep was onsite to observe footing excavations and earthwork activities. Footings Excavations While onsite, rep observed contractor use a medium sized excavator to excavate and the building footings. Rep observed contractor place a 3”-4” lift of 1 ¼” minus crushed rock for the footing subgrade to increase stability during wall construction. Rep used a ½” steel t-probe and observed the subgrade to be very dense, firm, unyielding, and suitable for support of the proposed footings. ESNW rep will return to observe earthwork activities when requested by client Andrew Kimn, Senior Technician, 206-430-9183 1/1