HomeMy WebLinkAbout0895.06 DFR 205.pdfEarth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 205
Time On Site Time Off Site Date Day of Week
9:30 AM 11:00 AM 7/14/20 Tuesday
Travel Time Weather
1.00Hr. RT 60s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe and test water main backfill, roof drain trench, and slope
stability.
Water Main Backfill
ESNW Rep observed contractor excavating to for water main connection. Rep observed contractor backfill with
18’’ of pea gravel then native material to grade. Rep observed trench to be approximately 30’ long and 3’ deep.
While onsite, rep used a ½” steel t-probe and observed the subgrade to be very dense, firm, unyielding, and
suitable for support of the proposed water main connection. Rep observed 1’ lifts of native material compacted
with a jumping jack to grade. ESNW rep observed that the contractor had achieved minimum compaction
standards of 95% or greater in areas tested.
Roof Drain Trench
ESNW rep observed contractor using a medium sized excavator to excavate a 2’ deep 150’ long trench along the
eastern margin to the building. ESNW rep observed contractor placing an 8’’ drain pipe. Rep used a ½” steel t-
probe and observed the subgrade to be very dense, firm, unyielding, and suitable for support of the proposed roof
drains.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Fig 1. Water main connection to building
Jackson Lundgren Field Technician 206-468-0991
1/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 205
Time On Site Time Off Site Date Day of Week
9:30 AM 11:00 AM 7/14/20 Tuesday
Travel Time Weather
1.00Hr. RT 60s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Test Number Test Location
(Water Backfill) Elevation Reference
Compaction
Curve
Maximum Dry
Density (pcf) Fill Moisture
(%) Test
Dry Density
(pcf)
% of Maximum
Dry Density
218 See map SG 6 133.0 7.23 126.5 95
219 See map SG 6 133.0 6.98 127.2 96
220 See map SG 6 133.0 7.11 126.9 95
Fig. 2 Approximate location of compaction tests 218-220 on water main backfill
218-220
2/2