HomeMy WebLinkAbout0895.06 DFR 234&236-240.pdfEarth Solutions NW, LLC
LETTER OF TRANSMITTAL
15365 NE 90th Street, Suite 100 Redmond, WA 98052
(425) 449-4704 FAX (425) 449-4711
To: RJ Development Date: October 23, 2020
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duane@accrete.build
No. of
Copies Date Description
1 9/22-9/30/20 Daily Field Report(s) # 233-238
Comments:
CC:
1: John Wilson ATTN: johnw@rinocon.com
2: Mark Richardson ATTN: mark@accrete.build
3: Jeff Bennett ATTN: jeffb@accrete.build
4: Jennifer Vogele ATTN: jennifer@accrete.build
5: Jonathan Chavez ATTN: jchavez@rentonwa.gov
6: Joe W ATTN: joew@accrete.build
7: Roxanne Caballero ATTN: roxanne@accrete.build
8: Nick R ATTN: nickr@rinocon.com
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 233
Time On Site Time Off Site Date Day of Week
11:30 AM 1:00 PM 9/22/20 Tuesday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe and test sewer main backfill and slope stability.
Sewer Main Backfill
ESNW Rep observed contractor backfill around a sewer main junction connecting to the main building. Rep
observed contractor backfill with native brown silty sand with gravel material. While onsite, rep used a ½” steel t-
probe and observed the subgrade to be very dense, firm, unyielding, and suitable for support of the 8’’ sewer main.
Rep observed contractor place 18’’ of pea gravel and then 1’ lifts of native material compacted with a jumping jack
to grade. ESNW rep observed that the contractor had achieved minimum compaction standards of 95% or
greater in locations tested.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
1/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 233
Time On Site Time Off Site Date Day of Week
11:30 AM 1:00 PM 9/22/20 Tuesday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Test Number Test Location
(Sewer main
backfill) Elevation Reference
Compaction
Curve
Maximum Dry
Density (pcf) Fill Moisture
(%) Test
Dry Density
(pcf)
% of Maximum
Dry Density
248 See map -4’ SG 6 133.0 126.7 6.33 95
249 See map -4’ SG 6 133.0 128.2 5.78 96
250 See map -3’ SG 6 133.0 1259 6.21 95
251 See map -3’ SG 6 133.0 126.2 6.68 95
Fig. 1 Approximate location of compaction tests 248-251 on water main backfill
248-251
2/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 234
Time On Site Time Off Site Date Day of Week
10:00 AM 11:00 AM 9/24/20 Thursday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to test pH of stormwater and observe slope stability.
Test pH of Stormwater
ESNW Rep took tests to determine the pH of stormwater. Rep observed <25NTU in the filled baker tank. Rep
observed that contractor added dry ice to lower the pH level to 6.5, suitable for sewer discharge. Rep observed
that pH level was contained onsite.
Catchment Basin:
Slopes of new temporary stormwater catchment basin were in a stable condition. Slopes of temporary basin were
observed to be in a stable condition. Slopes are stable in current configuration and stable to work within. The
contractor is responsible for providing all safety measures in accordance with state and federal regulation.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Fig 1. Catchment basin with drainage ditch
Jackson Lundgren Field Technician 206-468-0991
1/1
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 235
Time On Site Time Off Site Date Day of Week
10:45 AM 12:00 PM 9/25/20 Friday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe trench excavation and slope stability.
Water Line Trench Excavation
While onsite, contractor was observed using a medium excavator to excavate 100’ of 4’ deep trench for a 6’’ ductile
iron water line. Contractor relayed pipe would be covered with 18’’ of pea gravel and then backfilled with brown
silty sand with gravel native material. Rep used a ½” steel t-probe to probe the trench and observed the water line
trench subgrade to be very dense, firm, unyielding, and suitable for support of the proposed water line.
Roof Drain Trench
ESNW rep observed contractor using a medium sized excavator to excavate a 150’ long 2’ deep trench for a roof
drain along the southern margin of the main building. Rep used a ½” steel t-probe and observed the subgrade to
be very dense, firm, unyielding, and suitable for support of the proposed roof drain.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
1/1
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 236
Time On Site Time Off Site Date Day of Week
8:45 AM 9:45 AM 9/28/20 Monday
Travel Time Weather
1.00Hr. RT 60s, Cloudy
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to test pH of stormwater and observe trench excavation and slope
stability.
Water Line Trench Excavation
While onsite, contractor was observed using a medium excavator to excavate 100’ of 4’ deep trench for a 6’’ ductile
iron water line. Contractor relayed pipe would be covered with 18’’ of pea gravel and then backfilled with brown
silty sand with gravel native material. Rep used a ½” steel t-probe to probe the trench and observed the water line
trench subgrade to be very dense, firm, unyielding, and suitable for support of the proposed water line.
Test pH of Stormwater
ESNW Rep took pH tests to determine the pH of stormwater. Rep observed <25NTU in the filled baker tank. Rep
observed that contractor added dry ice to lower the pH level to 6.5, suitable for sewer discharge. Rep observed
that pH level was contained onsite.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Fig 1. 6’’ ductile iron fire line
Jackson Lundgren Field Technician 206-468-0991
1/1
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 237
Time On Site Time Off Site Date Day of Week
1:30 PM 2:30 PM 9/29/20 Tuesday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to test pH of stormwater and observe trench excavation and slope
stability.
Water Line Trench Excavation
While onsite, contractor was observed using a medium excavator to excavate 100’ of 4’ deep trench for a 6’’ ductile
iron water line. Contractor relayed pipe would be covered with 18’’ of pea gravel and then backfilled with brown
silty sand with gravel native material. Rep used a ½” steel t-probe to probe the trench and observed the water line
trench subgrade to be very dense, firm, unyielding, and suitable for support of the proposed water line.
Test pH of Stormwater
ESNW Rep took pH tests to determine the pH of stormwater. Rep observed <25NTU in the filled baker tank. Rep
observed that contractor added dry ice to lower the pH level to 6.5, suitable for sewer discharge. Rep observed
that pH level was contained onsite.
Roof Drain Trench
ESNW rep observed contractor using a medium sized excavator to excavate a 150’ long 3’ deep trench for a roof
drain with 8’’ pipe along the southern margin of the main building. Rep used a ½” steel t-probe and observed the
subgrade to be very dense, firm, unyielding, and suitable for support of the proposed roof drain.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Fig 1. 8’’ pipe in 3’ roof drain trench
Jackson Lundgren Field Technician 206-468-0991
1/1
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 238
Time On Site Time Off Site Date Day of Week
3:00 PM 3:45 PM 9/30/20 Wednesday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Supplementary Report:
At the client’s request, ESNW rep was onsite to observe and test roof drain backfill and slope stability.
Roof Drain Trench
ESNW rep observed contractor using a medium sized excavator to excavate a 150’ long 3’ deep trench for a roof
drain with 8’’ pipe along the west margin of the main building. Rep used a ½” steel t-probe and observed the
subgrade to be very dense, firm, unyielding, and suitable for support of the proposed roof drain. Rep observed
contractor backfill with 18’’ of pea gravel and then 1’ lifts of native material compacted with a jumping jack to grade.
ESNW rep observed that the contractor had achieved minimum compaction standards of 95% or greater
in locations tested.
Cut Slopes
While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation
ESNW rep will return to observe earthwork activities when requested by client
Jackson Lundgren Field Technician 206-468-0991
1/2
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com DAILY FIELD REPORT
ESNW Rep. Project No. Page Report No.
JTL 0895.06 238
Time On Site Time Off Site Date Day of Week
3:00 PM 3:45 PM 9/30/20 Wednesday
Travel Time Weather
1.00Hr. RT 70s, Sun
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
SSR
Are approved plans/permits on site?Project No.Permit No.
Test Number Test Location
(Roof Drain
backfill) Elevation Reference
Compaction
Curve
Maximum Dry
Density (pcf) Fill Moisture
(%) Test
Dry Density
(pcf)
% of Maximum
Dry Density
252 See map -1’ SG 6 133.0 125.9 9.76 95
253 See map -1’ SG 6 133.0 127.9 8.98 96
254 See map SG 6 133.0 128.0 9.56 96
255 See map SG 6 133.0 126.6 8.65 95
Fig. 1 Approximate location of compaction tests 252-255 on water main backfill
252-255
2/2