Loading...
HomeMy WebLinkAbout0895.06 DFR 245.pdfEarth Solutions NW, LLC LETTER OF TRANSMITTAL 15365 NE 90th Street, Suite 100 Redmond, WA 98052 (425) 449-4704 FAX (425) 449-4711 To: RJ Development Date: December 3, 2020 401 Central Street SE ESNW No.: ES- 895.06 Olympia, WA 98501 Project: Weatherly Inn Attn: Mr. Jeff Bennett Email: jeffb@accrete.build No. of Copies Date Description 1 10/21/20 Daily Field Report(s) # 245 Comments: CC: 1: John Wilson ATTN: johnw@rinocon.com 2: Mark Richardson ATTN: mark@accrete.build 3: Jennifer Vogele ATTN: jennifer@accrete.build 4: Jonathan Chavez ATTN: jchavez@rentonwa.gov 5: Joe W ATTN: joew@accrete.build 6: Caitlin Dunnington ATTN: caitlin@accrete.build 7: Nick R ATTN: nickr@rinocon.com 8: ATTN: Transmitted By: Earth Solutions NW, LLC PM: Scott Riegel, L.G., L.E.G. Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 245 Time On Site Time Off Site Date Day of Week 10:00 AM 10:45 AM 10/21/20 Wednesday Travel Time Weather 1.00Hr. RT 60s, Cloudy Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Rino Construction Mike LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site?Project No.Permit No. Supplementary Report: At the client’s request, ESNW rep was onsite to observe and test water main backfill and observe slope stability. Water Main Backfill ESNW Rep observed contractor excavating to 9’ for water main connection. Rep observed contractor backfill with crushed recycled concrete 1 ¼’’ minus material . While onsite, rep used a ½” steel t-probe and observed the subgrade to be very dense, firm, unyielding, and suitable for support of the proposed water main connection. Rep observed 1’ lifts of native material compacted with a jumping jack to grade. ESNW rep observed that the contractor had achieved minimum compaction standards of 95% or greater in areas tested. Cut Slopes While onsite, rep observed slopes of the cut slopes to be near vertical. Rep observed that the north slopes of the excavation were near a 0.75:1 (H:V) slope. Although over-steepened, slopes are stable in current configuration and stable to work within. The contractor is responsible for providing all safety measures in accordance with state and federal regulation ESNW rep will return to observe earthwork activities when requested by client Fig 1. Water main tie in backfilled with 1 ¼’’ minus crushed concrete Jackson Lundgren Field Technician 206-468-0991 1/2 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com DAILY FIELD REPORT ESNW Rep. Project No. Page Report No. JTL 0895.06 245 Time On Site Time Off Site Date Day of Week 10:00 AM 10:45 AM 10/21/20 Wednesday Travel Time Weather 1.00Hr. RT 60s, Cloudy Project Name Job Location Client/Owner Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC Contractor #1 Contact Field Supervisor Reviewed Rino Construction Mike LAC Contractor #2 Contact Project Manager Reviewed SSR Are approved plans/permits on site?Project No.Permit No. Test Number Test Location (Water line backfill) Elevation Reference Compaction Curve Maximum Dry Density (pcf) Fill Moisture (%) Test Dry Density (pcf) % of Maximum Dry Density 266 See map -8’ SG 6 133.0 9.04 128.6 97 267 See map -6’ SG 6 133.0 8.76 126.5 95 268 See map -5’ SG 6 133.0 7.65 127.4 96 269 See map -4’ SG 6 133.0 7.76 125.7 95 270 See map -3’ SG 6 133.0 8.42 126.8 95 Fig. 2 Approximate location of compaction tests 266-270 on water main connection to site 2/2 266-270