To: RJ Development
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Meyer
Email: duane2,accrete.build
No. of
Date: August 12, 2019
ESNW No.: ES- 895.06
Project: Weatherly Inn _
Uo ies Uate Description
1 1 8/5-8/9/19 Dailv Field Report(s) # 3-7
Comments:
CC:
1:
2:
3:
4:
5:
John Wilson
Transmitted By: Earth Solutions NW, LLC
PM: Scott Rie el, L.G., L.E.G.
ATTN:
ATTN:
ATTN:
ATTN:
ATTN:
johnw@rinocon.com
1805 —136th PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NWLLC
Field Rep.
AK
1805 136" Place NE, FAX:
Time On Site
6lL
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
10:45 AM
(425) 449-4704 (866) 366-8710
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Project Name
Job Location
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
General Contractor
General Contractor's Superintendent
Grading Contractor
Rino Construction
Grading Foreman
Rod
Project No.
Page of
Report No.
0895.06
1 /1
3
Time Off Site
Date
Day of Week
11:45 AM
8/5/19
Monday
Weather
80s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
g 1,
Are approved Plans/Permits onsite 0 YES NO Project No Permit No
At the client's request, ESNW rep was onsite to observe and test mass fill and earthwork activities.
Mass Fill
While onsite, rep observed contractor use two large excavators, a large dozer, and several haul trucks. Rep observed
contractor export material offsite. Rep observed contractor place and compact with native material for general fill in
the northwest corner of the site. Rep observed contractor using a large sheep's foot roller for compaction. Rep took
compaction tests and will release compaction test results once proctor is processed.
ESNW rep `will return to observe earthwork activities when requested by client
f /
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
Earth Solutions NW«C
T 7 %i
1 1805 136" Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710
DAILY FIELD REPORT
Project No.
0895.06
Time Off Site
10:00 AM;
12:15 PM
Page of
Report No
1 /1
4
Date
Day of Week
8/6/19
Tuesday
r80
eather
s°F, Clear
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractors Superintendent Received Onsite By
Grading Contractor Grading Foreman Checked ByLA-
e!
Rino Construction Rodrytt
_......
Are approved Plans/Permits onsite _ F] YES t NO Project No. Permit No.
........... ............. .
At the client's request, ESNW rep was onsite to observe and test mass fill, rockeries and earthwork activities.
Mass Fill
While onsite, rep observed contractor use two large excavators, a large dozer, and several haul trucks. Rep observed
contractor export material offsite. Rep observed contractor place and compact with native material for general fill in
the northwest corner of the site. Rep observed contractor using a large sheep's foot roller for compaction. Rep took
compaction tests and will release compaction test results once proctor is processed.
Field Rep.
AK
Time On Site
8:30 AM;
11:00 AM
Travel Time
1.25 Hr. RT
Rockeries
Rep was onsite with ESNW manager Scott. Rep and Scott discussed the conditions of the keyways for the proposed
rockeries. ESNW recommends that ESNW rep be onsite when rockery contractor is onsite to observe the construction
of the rockeries.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
[COPY TO:
CONTINUED ON NEXT PAGE
El
Larth Solutions NWLLC Field Rep
AK
Project No. Page of Report No.
0895.06 1 /2 5
' 5 136`h Place NE, FAX: Time On Site
_
Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 8:45 AM;
11:30 AM; 8/7/19 Wed
(425) 449-4704 (866) 366-8710 12:15 PM
12:45 PM
DAILY FIELD REPORT Travel Time
Weather
1.25 Hr. RT
80s°F, Clear
Project Name Job Location
Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor General Contractor's Superintendent
Received Onsite By
II
Grading Contractor Grading Foreman
Checked By$/i1
Rino Construction Rod
Are approved Plans/Permits onsite El YES NO Project No.
Permit No.
Test Reference
Maximum Fill Test Dry % of
r Test Location Elevation Compaction
Dry Density Moisture Density Maximum
r7l!eL fill Curve
lbs./cu.ft. % lbs./cu.ft. Dry Density
1
See map for approximate location
-5'
-3'
1
1
130.7
130.7
10.3
10.0
124.3
123.6
95
95
2
See map for approximate location
3
See map for approximate location
-1'
1
130.7
9.6
123.8
95
4
See map for approximate location
-5'
1
130.7
9.4
124.0
95
5
See map for approximate location
-3'
1
130.7
10.8
124.7
95
6
See map for approximate location
-1'
1
130.7
11.3
123.5
95
7
See map for approximate location
-4'
1
130.7
10.2
123.9
95
8
See map for approximate location
-2'
1
1 130.7
10.7
124.6
95
g
See map for approximate location
-4'
1
1 130.7
9.5
124.3
95
At the client's request, ESNW rep was onsite to observe and test mass fill, rockeries and earthwork activities.
Mass Fill
While onsite, rep observed contractor use two large excavators, a large dozer, and several haul trucks. Rep observed
contractor export material offsite. Rep observed contractor place and compact
with native material for general fill in
the northwest corner of the site. Rep observed contractor use a dozer to place loose 6" lifts and using a large sheep's
foot roller for compaction. Rep took compaction tests and observed material to be adequate of at least 95% of its
maximum dry density (130.7 lbs./cu. ft.). Rep observed contractor using a water truck to add water to native material
fill.
Rockeries
Rep used a'/z" steel t-probe and observed the keyway for the rockery located at the northeast corner of the site to be
very dense, firm, unyielding, and suitable for support of the proposed rockery.
Earthwork Activities
Rep observed contractor use a large dozer, a large excavator, and several haul trucks to excavate material from site.
Rep observed contractor exporting material offsite.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NW«C
Field Rep.
Project No.
Page of
Report No.
AK
0895.06
2/2
5
F
1805 136" Place NE, FAX:
Time On Site
Time Off Site
Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
8:45 AM;
11:30 AM;
8/7/19
Wed
(425) 449-4704 (866) 366-8710
12:15 PM
12:45 PM
DAILY FIELD REPORT
Travel Time
Weather
1.25 Hr. RT
80s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By
Rino Construction
Rod
Are approved Plans/Permits onsite L—S YES NO Project No Permit No.
ir
1 2, 3
t r" r.3
W�..�
it AP
COPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NW«C Field Rep Project No. Page of Report No.
AK 0895.06 1 /1 6
t 1805 1361h Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 10:15 AM 1:00 PM 8/8/19 Thursday
(425)449-4704 (866)366-8710
DAILY FIELD REPORT Travel Time Weather
1.25 Hr. RT 70s°F, Cloudy
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman Checked By
Rino Construction Rod g�tt
Are approved Plans/Permits onsite 0 YES ❑ NO Project No Permit No.
At the client's request, ESNW rep was onsite to observe and test mass fill, rockeries and earthwork activities.
Mass Fill
While onsite, rep observed contractor use two large excavators, a large dozer, and several haul trucks. Rep observed
contractor export material offsite. Rep observed contractor place and compact with native material for general fill in
the northwest corner of the site. Rep observed contractor use a dozer to place loose 6" lifts and using a large sheep's
foot roller for compaction. Rep collected sample proctor of material from fill. Rep will return to take compaction tests
as needed.
Rockeries
Rep used a 1/" steel t-probe and observed the keyway for the rockery
located at the northeast corner of the site to be very dense, firm,
unyielding, and suitable for support of the proposed rockery. Rep
observed contractor place a few courses of rocks with a 4" perforated pipe
behind the basecourse. Pipe was observed embedded in an 8" lift of V-
2" wash rock wrapped in a geotextile. Above the wash rock rep observed
contractor backfilling the rockery face with 2"-4" quarry spalls.
Earthwork Activities
Rep observed contractor use a large dozer, a large excavator, and several
haul trucks to excavate material from site. Rep observed contractor
exporting material offsite.
ESNW rep will return to observe earthwork activities when requested by
client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
Earth Solutions NWLLC Field Rep Project No Page of Report No
AK 0895.06 1 /1 7
1805 136" Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 8/9/19 Friday
(425) 449-4704 (866) 366-8710 10:00 AM 11:00 AM y
.............
DAILY FIELD REPORT Travel Time Weather
1.25 Hr. RT 70s°F, Cloudy
Project Name
Weatherly Inn
I General Contractor
Grading Contractor
Rino Construction
Are approved Plans/Permits onsite
Job Location
4500 Talbot Rd. S., Renton, WA
General Contractor's Superintendent
Grading Foreman
Rod
YES ❑ NO Project No
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By 14, 8
`1 `
Permit No.
At the client's request, ESNW rep was onsite to observe rockeries and earthwork activities.
Rockeries
While onsite, rep used a '/" steel t-probe and observed the keyway for the rockery located at the northeast corner of
the site to be very dense, firm, unyielding, and suitable for support of the proposed rockery. Rep observed contractor
use a medium sized excavator to place a few courses of rocks with a 4" perforated pipe behind the basecourse. Pipe .
was observed embedded in an 8" lift of 1 "-2" wash rock wrapped in a geotextile. Above the wash rock rep observed
contractor backfilling the rockery face with 2"-4" quarry spalls. j
Earthwork Activities
Rep observed contractor use a large dozer, a large excavator, and several haul trucks to excavate material from site.
Rep observed contractor exporting material offsite.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183