HomeMy WebLinkAbout0895.06 DFR 32-36.pdfFai�
NWUJD
To: RJ Development
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Meyer
Email: duane ,accrete.build
No. of
Date: September 23, 2019
ESNW No.: ES- 895.06
Project: Weatherly Inn
Copies Date Description
1 9/16-9/20/19 Daily Field Report(s) # 32-36
Comments:
CC:
1: John Wilson
2: Mark Richardson
3: Jeff Brain
4: Jennifer Vo ele
5: Jonathan Chavez
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
ATTN: iohnw(c).rinocon.com
ATTN: mark(a)accrete.build
ATTN. eff accrete. build
ATTN. Jennifer accrete. build
ATTN- jchavez rentonwa. ov
1805 — 136"' PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions N1N«c
Field Rep.
Project No.
Page of
Report No.
AK
0895.06
1 /2
32
' 1=1 1805 1361" Place NE, FAX:
Time On Site Time Off Site
Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
12:30 PM 2:00 PM
9/16/19
Monday
(425) 449-4704 (866) 366-8710
Weather
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
60s°F, Overcast
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By
9%Z2
Rino Construction
Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No. Permit No.
Test
Reference
Maximum
Fill
Test Dry
% of
Number
Test Location (Sewer Backfill)
Elevation
Compaction
Dry Density
Moisture
Density
Maximum
Curve
lbs./cu.ft.
%
lbs./cu.ft.
Dry Density
27
See map for approximate location
4
1
130.7
12.2
124.9
96
28
See map for approximate location
-2'
1
130.7
12.7
123.8
95
29
See map for approximate location
SG
1 1 1
130.7
1 12.4
124.6
95
At the client's request, ESNW rep was onsite to observe and test sewer line backfill, vault excavation and earthwork
activities.
Sewer Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a sewer line (W5'xD7'). Rep observed
contractor place an 8" PVC pipe at the toe of the trench. Rep observed contractor bedding the pipe in a 12" lift of pea
gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with
a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its
maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NWLLC Field Rep,
Project No.
Report No.
AK
0895.06
32
t r
1805 136`h Place NE, FAX: Time On Site
FDate
Time Off Site
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 12:30 PM
2:00 PM
Monday
(425)449-4704 (866)366-8710
DAILY FIELD REPORT Travel Time
Weather
1.25 Hr. RT
60s°F, Overcast
—.......
Project Name
...... ........
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By
Rino Construction
Rod
i
Are approved Plans/Permits onsite F-] YES ❑ NO Project No.
Permit No.
r -
- - 27, 28, 29
COPY TO:
CONTINUED ON NEXT PAGE
Earth Solutions NW«� Field Rep. Project No Page of Report No.
AK 0895.06 1 /2 33
1805 136'" Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 9/17/19 Tuesday
(425) 449-4704 (866) 366-8710 11:15 AM 1:00 PM
DAILY FIELD REPORT Travel Time Weather
_ 1.25 Hr. RT 60s°F, Rain
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman Checked By
�2L
Rino Construction Rod r
Are approved Plans/Permits onsite YES NO Project No. Permit No.
Reference
Maximum
Fill
Test Dry
% of
Test
Number
Test Location (Sewer Backfill)
Elevation
Compaction
Dry Density
Moisture
Density
Maximum
Curve
lbs./cu.ft.
%
lbs./cu.ft.
Dry Density
30
See map for approximate location
-4'
1
130.7
13.0
124.5
95
31
See map for approximate location
-2'
1
130.7
11.9
124.8
96
32
See map for approximate location
SG
1
130.7
12.5
123.9
95
At the client's request, ESNW rep was onsite to observe and test sewer line backfill, vault excavation and earthwork
activities.
Sewer Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a sewer line (W5'xD7'). Rep observed
contractor place an 8" PVC pipe at the toe of the trench. Rep observed contractor bedding the pipe in a 12" lift of pea
gravel. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with
a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its
maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NWLLC Field Rep.
Project No. Page of
Report No.
AK
0895.06 2/2
33
1805 1361h Place NE, FAX: Time On Site
Time Off Site Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 11:15 AM
1:00 PM 9/17/19
Tuesday
(425) 449-4704 (866) 366-8710
Travel Time
Weather
DAILY FIELD REPORT
1.25 Hr. RT
6WF, Rain
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By
Rino Construction
Rod
Are approved Plans/Permits onsite El YES NO Project No.
Permit No.
I` ".:.. ..�..•r.�$+"a r - '`ice^-,.
COPY TO:
CONTINUED ON NEXT PAGE
Earth Solutions NWT«
Field Rep.
Project No.
Page of
Report No.
AK
0895.06
1/1
34
s 1805 1360 Place NE, FAX:
Time On Site
Time Off Site
Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
10:30 AM
11:00 AM
9/18/19
Wed
(425) 449-4704 (866) 366-8710
Travel Time
Weather
DAILY FIELD REPORT
1.25 Hr. RT _
60s0F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor
Rino Construction
Grading Foreman
Rod
Checked By * a J
Are approved Plans/Permits onsite DYES ❑ NO Project No. Permit No.
At the client's request, ESNW rep was onsite to observe earthwork activities.
While onsite, rep observed that due to weather conditions and the condition of the site that contractor had postponed
earthwork activities. Contractor expressed plans to continue working onsite when conditions have improved.
Contractor also expressed plans to work on erosion control throughout the site to prepare for the wet season which
starts on October 1, 2019. Rep will return as needed to observe and test backfill of trench work.
ESNW rep will return
to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO: CONTINUED ON NEXT PAGE ❑
Earth Solutions N1 LLC
Field Rep.
Project No.
Page of
Report No.
AK
0895.06
1/1
35
1805 1361h Place NE, FAX:
Time On Site
Time Off Site
Date
Day of Week
Suite 201 (425) 4494711
Bellevue, WA 98005 TOLL FREE:
11:45 AM
1:30 PM
9/19/19
Thursday
(425) 449-4704 (866) 366-8710
Travel Time
Weather
DAILY FIELD REPORT
1.25 Hr. RT
60s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By Wq/V.
Rino Construction
Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No. Permit No.
At the client's request, ESNW rep was onsite to observe water line backfill and earthwork activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a trench in the southeast corner of the site
for a water line. Contractor expressed plans to continue excavating trench.
Earthwork Activities
Rep observed that a baker tank was delivered. Rep observed contractor use two pumps to pump water from the
stormwater vault excavation. Rep and contractor met with City of Renton inspector, Tom, to discuss erosion control
plans moving forward before the wet season.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO: CONTINUED ON NEXT PAGE ❑
Earth Solutions NWLLC
Field Rep.
Project No.
Page of
Report No.
AK
0895.06
1 /1
36
4 1805 13611 Place NE, FAX:
Time On Site
Time Off Site
Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
6iiilL(425)
11:30 AM
11:45 AM
9/20/19
Friday
449-4704 (866) 366-8710
Travel Time
Weather
DAILY FIELD REPORT
1.25 Hr. RT
60s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By q/
Rino Construction
Rod
Are approved Plans/Permits onsite ❑ YES NO Project No. Permit No.
At the client's request, ESNW rep was onsite to observe earthwork activities.
While onsite, rep observed that all the baker tanks were delivered. Contractor expressed plans to begin adding erosion
control measures (BMPs) to the site. Contractor expressed the need to cover exposed slopes and begin covering
exposed surface areas throughout the site. Rep observed contractor working on editing the SWPPP map for erosion
control onsite.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO: CONTINUED ON NEXT PAGE