HomeMy WebLinkAbout0895.06 DFR 61-65.pdfEarth
Nw
ulo
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: RJ Development
401 Central Street SE
Olympia, WA 98501
Attn: Mr. Duane Meyer
Email: duane accrete.build
No. of
Conies ngtP. npczrrintinn
Date: November 5, 2019
ESNW No.: ES- 895.06
Project: Weatherly Inn
1 10/28-11/1/19 Daily Field Reports # 61-65
Comments:
CC:
1: John Wilson
2: Mark Richardson
3: Jeff Brain
4: Jennifer Vo ele
5: Jonathan Chavez
Transmitted By: Earth Solutions NW, LLC
PM: Scott Rie el, L.G., L.E.G.
ATTN: iohnwCor nnocon.com
ATTN: Tar€c accrete build
ATTN: effi(cDaccrete.build
ATTN: 'ennifer accrete. build
ATTN: jhavez@rentonwa.gov
1805 — 136t" PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth
Solutions
NWwc
Earth Solutions NW«C
1805 136" Place NE,
FAX:
Suite 201
(425) 449-4711
Bellevue, WA 98005
TOLL FREE:
(425)449-4704
(866)366-8710
Field Rep.
Project No.
Page of
Report No.
AK
0895.06
1 /1
61
Time On Site
Time Off Site
Date
Day of Wei
12:15 PM
1:15 PM
10/28/19
Monday
DAILY FIELD REPORT Travel Time Weather
_i 1.25 Hr. RT I 50s°F, Clear
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman Checked By
f Rino Construction Rod
LAre approved Plans/Permits onsite 0 YES ❑ NO Project No Permit No.
[At the client's request, ESNW rep was onsite to observe and test water line backfill, storm water discharge, vault
excavation and earthwork activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD6'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Rep will return tomorrow,
October 29, 2019, to observe and test the backfill of the water line.
Storm Water Discharge
Rep used IMHOFF cone to test baker tank sewer water discharge. Rep used IMHOFF cone and found sediment (<3
ml) after testing water for one hour. Rep took PH test and found water suitable for discharge at a PH level of 6.5.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Senior Technician, 206-430-9183
FC0_PyTO:
CONTINUED ON NEXT PAGE Ell
Earth Solutions NWLLC
rEamth 9
Field Rep
AK
Project No.
0895.06
Page of Report No.
1 /2 62
Solutions 1805 136`h Place NE, FAX:
Time On Site
Date Day of Week
Time Off Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
2:00 PM
3:00 PM
10/29/19 Tuesday
(425) 449-4704 (866) 366-8710
Travel Time
DAILY FIELD REPORT
Weather
1.25 Hr. RT
50s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
Received Onsite By
General Contractor
General Contractors Superintendent
Grading Contractor
Grading Foreman
Checked By fly
Rino Construction
Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No. Permit No.
Test Reference Maximum Fill Test Dry % of
Number Test Location (Water Backfill) Elevation Compaction Dry Density Moisture Density Maximum
Curve lbs./cu.ft % lbs./cu.ft. Dry Density
46
See map for approximate location
-2'
SG
1
1
130.7
130.7
11.3
12.1
123.6
123.9
95
1 95
47
See map for approximate location
At the client's request, ESNW rep was onsite to observe and test water line backfill, storm water discharge, vault
excavation and earthwork activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD6'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Rep observed contractor
place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction
tests on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.).
Storm Water Discharge
Rep used IMHOFF cone to test baker tank sewer water discharge. Rep used IMHOFF cone and found sediment (<3
ml) after testing water for one hour. Rep took PH test and found water suitable for discharge at a PH level of 6.5.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
SOUL" slope to be near vertical, the east and north slope to be 1.1 (H.V) to a near 7 vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Senior Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
Earth Solutions NWLLC Field Rep
AK
1805 136" Place NE, FAX: Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 1 2:00 PM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
.............,
General Contractor General Contractor's Superintendent
Grading Contractor Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No.
Project No. Page of Report No
0895.06 2/2 _62
Time Off Site Date Day of Week
3:00 PM 10/29/19 Tuesday
Weather
50s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
COPY TO: CONTINUED ON NEXT PAGE ❑
Earth
solutions
NWuc
Project Name
Weatherly Inn
General Contractor
F
Earth Solutions NW«cield Rep. Project No.I AK 1 0895.06
1805 136" Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425)449-4704 (866)366-8710
DAILY FIELD REPORT
Time On Site I Time Off Site
3:00 PM 3:45 PM
Travel Time
1.25 Hr. RT
Page of Report No-
1/2 63
Date Day of Week
10/30/19 Wed
Weather
50s°F, Clear
Job Location Client / Owner
4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman Checked By 1�
Rino Construction Rod
Are approved Plans/Permits onsite YES ❑ NO Project No Permit No
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD6'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Contractor expressed plans
to pour thrust blocks tomorrow, October 31, 2019. Rep will return to observe and test compaction as needed.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
Rep observed contractor installing miradrain on the outer walls of the vault. Due to the existing storm line elevation
contractor was observed raising the elevation for the drain pipe around the vault. Rep observed contractor place
brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction tests
on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.). Once
material was placed, rep observed contractor place a woven geotextile, a 6" perforated drain pipe, a 12" lift of 1 "-2"
wash rock above the drain pipe, and more woven geotextile wrap above the wash rock and pipe.
ESNW rep will return to observe earthwork activities when requested by client.
f
Andrew Kimn, Senior Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE Z
Earth Solutions lilWLLC Field Rep Project No Page of Report No
AK 0895.06 2/2 63
1805 13611 Place NE, FAX: Date Day of Week
Suite 201 (425) 449-4711 Time On Site Time Off Site
Bellevue, WA 98005 TOLL FREE: 10/30/19 Wed
(425) 449-4704 (866) 366-8710 3:00 PM 3:45 PM
DAILY FIELD REPORT Travel Time Weather
........................
1.25 Hr. RT 50s°F, Clear
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman Checked By
Rino Construction Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No. Permit No.
Test Reference Maximum Fill Test Dry % of
Number Test Location (Vault Backfill) Elevation Compaction Dry Density Moisture Density Maximum
Curve lbs./cu ft. % lbs./cu.ft. Dry Density
48 See map for approximate location -10, 1 130.7 11.6 123.8 95
49 See map for approximate location -10, 1 1 130.7 1 11.2 124.1 95
49
4-0 t rr�
—4�.
k
COPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NW«�
Field Rep.
Project No. Page of
Report No
AK
0895.06 1 /2
64
t {
1805 136" Place NE, FAX:
Time On Site
Time Off Site Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
11:00 AM
11:30 AM 10/31/19
Thursday
(425)449-4704 (866)366-8710
DAILY FIELD REPORT
Travel Time
Weather
1.25 Hr. RT
50sOF, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractors Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By 1 ,�
Rino Construction
Rod
Are approved Plans/Permits
onsite ❑ YES ❑ NO Project No.
Permit No.
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W2'xD3'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Contractor expressed plans
to continue working on water line tomorrow, November 1, 2019. Rep will return to observe and test compaction as
needed.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
Rep observed contractor installing miradrain on the outer walls of the vault. Rep observed contractor place brown silty
sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction tests on backfill
and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.).
ESNW rep w`ill return to observe earthwork activities when requested by client.
I il
Andrew Kimn, Senior Technician, 206-430-9183
COPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NINLLC
Field Rep.
AK
Project No.
0895.06
Page of
2/2
Report No.
64
1805 136" Place NE, FAX:
Time On Site
Time Off Site
Date
Day of Week
NWLLc Suite 201 (425) 449-4711
61L Bellevue, WA 98005 TOLL FREE:
11:00 AM
11:30 AM
10/31/19
Thursday
(425)449-4704 (866)366-8710
Travel Time
Weather
DAILY FIELD REPORT
1.25 Hr. RT
50s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
Received Onsite By
Checked By
General Contractor
General Contractor's Superintendent
Grading Contractor
Grading Foreman
Rino Construction
Rod
Are approved Plans/Permits onsite 171 YES ❑ NO Project No.
Permit No.
Test Reference
Maximum Fill Test Dry
% of
Number Test Location (Vault Backfill) Elevation Compaction
Dry Density Moisture Density
Maximum
Curve
lbs./cu.ft. % lbs./cu.ft.
Dry Density
S4
See map for approximate location
_7'
1
130.7
13.0
124.1
95
5
See map for approximate location
-5
1
130.7
11.6
1 124.E
1 95
Z
See map for approximate location
-7'
1
130.7
12.4 1
123.9
1 95
53
See map for approximate location
-5-
1 1
130.7
11.8 1
124.5
1 95
A
7
'S yy
t.-�..-.
wti .. �..... ...�-�.....rH ram•-..,y�� ��-.
...
................ ......_...
...................
---...............-------'---... ..
COPY TO:
CONTINUED ON NEXT PAGE El
1
Earth Solutions NW«C Held Rep
t r 1805 136" Place NE, FAX: Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 11:30 AM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractor's Superintendent
Grading Contractor f Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite
❑ YES ❑ NO Project No.
Project No.
Page of
Report No,
0895.06
1 /2
65
Time Off Site
Date
Day of Week
12:30 PM
11/1/19
Friday
Weather
50s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By 11��
Permit No
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD6'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Rep observed contractor
place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction
tests on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation.
Rep observed contractor installing miradrain on the outer walls of the vault. Due to the existing storm line elevation
contractor was observed raising the elevation for the drain pipe around the vault. Rep observed contractor place
brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction tests
on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.).
Contractor expressed plans to continue backfilling vault tomorrow, November 2, 2019. Rep will return to observe and
test compaction as needed.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Senior Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE 01
Earth Solutions NIN«C
I Field Rep.
Project No.
Page of
Report No.
AK
0895.06
2/2
65
I
1805 136" Place NE, FAX:
Time On Site
Time Off Site
Date
Day of Week
Suite 201 (425) 449-4711
6L
Bellevue, WA 98005 TOLL FREE:
11:30 AM
12:30 PM
11/1/19
Friday
(425) 449-4704 (866) 366-8710
Travel Time
Weather
DAILY FIELD REPORT
1.25 Hr. RT
50s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By
Rino Construction
Rod
Are approved Plans/Permits onsite YES ❑ NO Project No,
Permit No.
Test
Reference
Maximum
Fill
Test Dry
% of
Number
Test Location (Vault Backfill)
Elevation
Compaction
Dry Density
Moisture
Density
Maximum
Curve
lbs./cu.ft.
%
lbs./cu.ft.
Dry Density
$4
See map for approximate location
-10,
1
130.7
11.0
124.3
95
55
See map for approximate location
-10'
1 1
130.7
12.3
124.7
95
Test
Reference
Maximum
Fill
Test Dry
% of
Number
Test Location (Water Backfill)
Elevation
Compaction
Dry Density
Moisture
Density
Maximum
Curve
lbs./cu.ft-
%
lbs./cu.ft
Dry Density
5 (,
See map for approximate location
SG
1
130.7
11.5
123.9
95
56
t
COPY TO:
CONTINUED ON NEXT PAGE El1