HomeMy WebLinkAbout0895.06 DFR 66-70.pdfTo
Earth
�lufion
NWT
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
RJ Development Date: November 15, 2019
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: _Weatherly Inn
Attn: Mr. Duane Meyer
Email: duane accrete.build
No. of
uo ies Date Description
1. 1 1 11/4-11/8/19 Daily Field Report(s) # 66-70
Comments:
CC:
1:
2:
3:
4:
5:
John Wilson
Mark Richardson
Jeff Brain
Jennifer Vo ele
Jonathan Chavez
ATTN-
ATTN
ATTN:
ATTN:
ATTN:
johnw@rinocon.com
markg.accrete. build
jeff@accrete.build
Jennifer accrete. build
Lhavez@rentonwa.gov
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
1805 — 136t" PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutlo"s NWLLC Field Rep.
Project No Page of
Report No.
AK
0895.06 1 /1
66
1805 1361h Place NE, FAX: Time On Site
_
Time Off Site Date
Day of Week
NWLLC
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
12:45 PM
1:15 PM 11/4/19
Monday
(425) 449-4704 (866) 366-8710
DAILY FIELD REPORT Travel Time
Weather
1.25 Hr. RT
50s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
General Contractor's Superintendent
RJ Development, LLC
Received Onsite By
_l
General Contractor
Grading Contractor Grading Foreman Checked By
Rino Construction I Rod11110
Are approved Plans/Permits onsite L _1 YES ❑ NO Project No Permit No
..... J
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD6'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Rep will return to take
compaction test as needed tomorrow, November 5, 2019.
Vault Excavation
Rep observed contractor grading the vault excavation to design elevation with a large excavator. Rep observed the
south slope to be near vertical, the east and north slope to be 1:1 (H:V) to a near 7' vertical toe, and the west slope to
be (H:V) to a near 3' vertical toe. Although over -steepened, slopes are stable in current configuration and stable to
work within. The contractor is responsible for providing all safety measures in accordance with state and federal
regulation. Rep will return to take compaction test as needed tomorrow, November 5, 2019.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Senior Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
Earth SOIUH0CIS NWLLC
Field Rep.
Project No.
Page of Report No
AK
j 0895.06
1 /2
+ I t
1805 136" Place NE, FAX:
_67
Date Day of Week
Time On Site Time Off Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
12:00 PM;
12:15 PM;
11/5/19 Tuesday
(425) 449-4704 (866) 366-8710
3:15 PM
4:15 PM
Weather
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
50s°F, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor
General Contractor's Superintendent
Received Onsite By
Grading Contractor
Grading Foreman
Checked By tf/15
�
Rino Construction
Rod
Are approved Plans/Permits onsite ❑ YES f NO Project No.
I
Permit No.
Test
Reference
Maximum Fill Test Dry
% of
Number
Test Location (Water Backfill) Elevation
Compaction
Dry Density Moisture Density
Maximum
Curve
Ibs /cu.ft. % lbs./cu.ft.
Dry Density
57
See map for approximate location
-4'
1
130.7
96
58
See map for approximate location
-2'
1
130.7
Ll2.124.8
123.6
95
59
See map for approximate location
! SG
1
130.7
Zff
123.9
95
Test
Reference
Maximum
Fill
Test Dry
% of
Number
Test Location (Vault Backfill)
Elevation
Compaction
Dry Density
Moisture
Density
Maximum
...... ...........
...... ... _
See map for approximate location
Curve
1
Ibs /cu.ft.
130.7
%
Ibs./cu.ft.
Dry Density
60
-8'
12.0
124.6
95
61
See map for approximate location
See map for approximate location
-6'
1
130.7
11.1
124.9
96
62
-8'
1
130.7
10.7
124.8
96
63
See map for approximate location
-6
1
130.7
1 12.4 1
124.1
95
At the client's request, ESNW rep was onsite to observe or test water line backfill and vault backfill.
IA/#e. 1 :.... 12 11CH
r.n c uavnu
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD6'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Rep observed contractor
place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction
tests on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7 Ibs./cu. ft.).
Vault Excavation and Backfill
Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe
pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry
density (130.7 Ibs./cu. ft.). Contractor expressed plans to continue backfilling vault tomorrow, November 5, 2019. Rep
will return to observe and test compaction as needed.
ESNW rep will return to observe earthwork activities when requested by client.
r
Andrew Kimn, Senior Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
------------
Field Rep. Project No. Page of
Earth SOMHOHS NW«c AK 0895.06 2/2
F ionsl 1805 1361h Place NE, FAX: Time On Site Time Off Site Date
Suite 201 (425) 449-4711
6L Bellevue, WA 98005 TOLL FREE: 12:00 PM; 12:15 PM; 11/5/19
(425) 449-4704 (866) 366-8710 3:15 PM 4:15 PM
DAILY FIELD REPORT Travel Time Weather
1.25 Hr. RT 50s°F, Clear
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman Checked By
Rino Construction Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No Permit No
57, 58, 59
COPY TO:
Report No.
67
Day of Week
Tuesday
CONTINUED ON NEXT PAGE u
Earth Solutions NIVLLC
Field Rep
Project No.
Page of
Report No.
_AK
0895.06
1 /2
68
1805 136" Place NE, FAX:
Time On Site
Time Off Site Date
Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
1:00 PM
2:00 PM 11/6/19
Wed
(425) 449-4704 (866) 366-8710
DAILY FIELD REPORT
Travel Time
Weather
1.25 Hr. RT
50sOF, Clear
Project Name
Job Location
Client / Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
General Contractor's Superintendent
Received Onsite By
General Contractor
Grading Contractor
Grading Foreman
Checked By
Rino Construction
Rod
Are approved Plans/Permits
onsite ❑ YES NO Project No.
Permit No.
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD18'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Rep observed contractor
place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took compaction
tests on backfill and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation
Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts above the vault. Contractor
expressed plans to continue placing native material above the vault for the parking lot subgrade. Rep will return
tomorrow, November 7, 2019, to observe and test the material as needed.
ESNW rep will return to observe earthwork activities when requested by client.
f r
Andrew Kimn, Senior Technician, 206-430-9183
i
COPY TO: CONTINUED ON NEXT PAGE
Earth Solutions NW«C Field Rep Project No. Page of Report No.
AK 0895.06 2/2 68
I 1 =J1805 136`h Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 11/6/19 Wed
(425) 449-4704 (866) 366-8710 1:00 PM 2:00 PM
DAILY FIELD REPORT Travel Time Weather
1.25 Hr. RT 50s°F, Clear
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
General Contractor General Contractor's Superintendent Received On site By
i
Checked By
Grading Contractor Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite YES NO Project No. Permit No
Test Reference Maximum Fill Test Dry % of
Number Test Location (Water Backfill) Elevation Compaction Dry Density Moisture Density Maximum
Curve lbs./cu.fL % Ibs-/cu.ft. Dry Density
64 See map for approximate location -4' 1 130.7 12.5 124.5 95
65 See map for approximate location -2' 1 130.7 12.3 123.8 1 95
66 See map for approximate location SG 1 1 130.7 11.6 124.3 95
64, 65, 66
COPY TO: CONTINUED ON NEXT PAGE ❑
bArMl
Earth Solutions NW«C
Field Rep.
AK
I I I
1805 136" Place NE, FAX:
Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
11:45 AM
(425) 449-4704 (866) 366-8710
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Project Name
Job Location
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
General Contractor
General Contractor's Superintendent
Grading Contractor
Rino Construction
Project No.
Page of
Report No.
0895.06
1 /1
69
Time Off Site
Date
_
Day of Week
2:00 PM
11/7/19
Thursday
Weather
50s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
1*f1/10
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No. Permit No.
...........
At the client's request, ESNW rep was onsite to observe and test water line backfill, vault excavation and earthwork
activities.
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W5'xD18'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Contractor expressed plans
to continue backfilling material for the water line after a thrust block has been poured.
Grading Foreman
Rod
Vault Excavation
Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts above the vault. Contractor
expressed plans to continue placing native material above the vault for the parking lot subgrade. Rep will return
tomorrow, November 8, 2019, to observe and test the material as needed.
ESNW rep will return to observe earthwork activities when requested by client.
Earth Solutions NWLLc
i t i 1805 13611 Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue. WA 98005 TOLL FREE:
(425)449-4704 (866)366-8710
DAILY FIELD REPORT
Project Name
Weatherly Inn
General Contractor
Grading Contractor
Rino Construction
Field Rep
AK
Time On Site
12:15 PM;
3:15 PM
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
General Contractor's Superintendent
Grading Foreman
Rod
Are approved Plans/Permits onsite 0 YES ❑ NO Project No.
Project No
Page of
I Report No.
0895.06
1 /2
70
Time Off Site Date
Day of Week
1:45 PM; 11/8/19
Friday
4:45 PM
Weather
50s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
FAtthelient's request, ESNW rep was onsite to observe or test lock and load wall and vault backfill.
Lock and Load Wall
While onsite, rep observed contractor use a large excavator to excavate the slope and excavation for the lock and
load wall. Rep observed contractor excavate the keyway for the wall. Although over -steepened (near vertical), rep
observed that the cut was stable in its current configuration. ESNW recommends that ENSW representative be onsite
while contractor is working near or within the cut slope. Rep recommended that contractor place plastic sheeting over
the exposed slope to prevent stormwater from permeating the surface. Rep will return Monday, November 11, 2019,
to observe the conditions of the slope.
Vault Excavation and Backfill
Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe
pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry
density (130.7 lbs./cu. ft.). Contractor expressed plans to continue backfilling vault Monday, November 11, 2019. Rep
will return to observe and test compaction as needed.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Senior Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
Earth Solutions NWLLC Field Rep Project No. Page of Report No -
AK 0895.06 2/2 70
ir 1805 136" Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 12:15 PM; 1:45 PM; 11/8/19 Friday
(425) 449-4704 (866) 366-8710 3:15 PM 4:45 PM
DAILY FIELD REPORT Travel Time Weather
1.25 Hr. RT 50s°F, Clear
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA _RJ Development, LLC
General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman
Checked By
Rino Construction Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO
Project No.
Permit No.
Test
Reference
Maximum Fill
Test Dry
% of
Number Test Location (Vault Backfill)
Elevation
Compaction
Dry Density Moisture
Density
Maximum
Curve
lbs./cu.ft. %
lbs./cu,ft-
Dry Density
67
See map for approximate location
-61
1
130.7
12.0
124.7
95
68
See map for approximate location
-4'
1
130.7
11.8
124.0
95
COPY TO: CONTINUED ON NEXT PAGE