HomeMy WebLinkAbout0895.06 DFR 71-75.pdf1
Ea�
(VWLW
Earth Solutions NW, LLC
LETTER OF TRANSMITTAL
To: RJ Development
401 Central Street SE
Olympia, WA 98501
_Attn: Mr. Duane Meyer
Email: duane(i�,accrete.build
No. of
Date: November 18. 2019
ESNW No.: ES- 895.06
Project: Weatherly Inn
uo ies Uate Description
1 11/11-11/15/19 1 Daily Field Report(s) # 71-75
Comments:
CC:
1: John Wilson
2: Mark Richardson
3: Jeff Brain
4: Jennifer Vo ele
5: Jonathan Chavez
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
ATTN: johnwe-rinocon.com
ATTN: mark(cDaccrete.build
ATTN. jell accrete. bullcl
ATTN: j nnifer@accrete. build
ATTN jchavez rentonwa. ov
1805 — 136"' PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NW«C
t 1805 136" Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425)449-4704 (866)366-8710
DAILY FIELD REPORT
Project Name
Weatherly Inn
General Contractor
Grading Contractor
Rino Construction
Are approved Plans/Permits onsite
Field Rep. Project No Page of
AK, ACH 0895.06 1 /2
Report No.
71
Time On Site Time Off Site
i Date
Day of Week
7:45 AM; 1:00 PM;
11/11/19
Monday
3:00 PM 4:30 PM
Travel Time
Weather
1.25 Hr. RT 150s°F, Clear
Job Location
4500 Talbot Rd. S., Renton, WA
General Contractor's Superintendent
Grading Foreman
Rod
❑ YES ❑ NO Project No.
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
Test
Reference
Maximum
Fill
Test Dry % of
Number
Test Location (Water Backfill)
Elevation
Compaction
Dry Density
Moisture
Density Maximum
Curve
lbs./cu.ft
%
lbs./cu.ft. Dry Density
69
See map for approximate location
-2'
SG
1
1
130.7
130.7
11.4
125.5
96
70
See map for approximate location
11.6
124.2
95
At the client's request, ESNW reps were onsite to observe and test lock and load wall, water line backfill, vault
excavation and backfill and earthwork activities.
Lock and Load Wall
While onsite, reps observed contractor use a large excavator to excavate the slope and excavation for the lock and
load wall. Reps observed contractor excavate the keyway for the wall. Reps observed contractor place a —4"-6" lift of
5/8" minus crushed rock for the basecourse for the keyway. Although over -steepened (near vertical), reps observed
that the cut was stable in its current configuration. ESNW recommends that ENSW representative be onsite while
contractor is working near or within the cut slope. Rep(s) will return tomorrow, November 12, 2019, to observe the
conditions of the slope.
Water Line Backfill
Reps observed contractor use a large excavator to excavate a water line (W4'xD5'). Reps observed contractor place
8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Reps observed contractor place brown silty
sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Reps took compaction tests on backfill
and observed material to be adequate of at least 95% of its maximum dry density (130.7 lbs./cu. ft.).
Vault Excavation and Backfill
Reps observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe
pack. Rep took compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry
density (130.7 lbs./cu. ft.). Contractor expressed plans to continue backfilling vault tomorrow, November 12, 2019.
Rep(s) will return to observe and test compaction as needed.
ESNW rep(s) will return to observe earthwork activities when requested by client.
Andrew Kimn, Senior Technician, 206-430-9183
COI PY To:
CONTINUED ON NEXT PAGE �,v`�
Earth Solutions I�Ilr1'LLC Field Rep.
AK, ACH
t 1805 136'h Place NE, FAX: Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE: 7:45 AM;
(425) 449-4704 (866) 366-8710 j 3:00 PM
DAILY FIELD REPORT Travel Time
C 1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractor's Superintendent
Project No.
Page of
Report No
0895.06
2/2
71
Time Off Site
Date
Day of Week
1:00 PM;
11/11/19
Monday
4:30 PM
Weather
50s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Grading Contractor
Rino Construction
Grading Foreman
Rod
I Checked By
Are approved Plans/Permits onsite L1 YES ❑ NO
Project No
Permit No -
Test
Reference
Maximum Fill
Test Dry
% of
Number Test Location (Vault Backfill)
Elevation Compaction
Dry Density Moisture
Density
Maximum
Curve
lbs./cu.ft. %
1
lbs./cu.ft.
Dry Density
71
See map for approximate location
-4'
1
130.7
12.2
125.0
96
COPY TO: CONTINUED ON NEXT PAGE 7
Earth Solutions NWILILC Field Rep.
AK, Marley
' ' ' 1805 1361h Place NE, FAX: Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 8:30 AM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
General Contractor
Grading Contractor
Rino Construction
Job Location
4500 Talbot Rd. S., Renton, WA
General Contractors Superintendent
Grading Foreman
Rod
Project No
Page of
Report No.
0895.06
1 /1
72
Time Off Site
Date
Day of Week
9:30AM
11/12/19
Tuesday
Weather
50s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No Permit No.
At the client's request, ESNW reps were onsite to observe and test lock and load wall and earthwork activities.
Lock and Load Wall
While onsite, rep observed contractor use a large excavator to excavate the slope and excavation for the lock and
load wall. Rep observed contractor excavate the keyway for the wall. Rep observed contractor place a -4"-6" lift of
5/8" clean crushed rock for the basecourse for the keyway. Although over -steepened (near vertical), rep observed
that the cut was stable in its current configuration. ESNW recommends that ENSW representative be onsite while
contractor is working near or within the cut slope. Rep(s) will return tomorrow, November 13, 2019, to observe the
conditions of the slope.
Earthwork Activities
Rep, ESNW stormwater manager, and client rep met to discuss the process of sewer water discharge moving forward
onsite. I
ESNW rep(s) will return to observe earthwork activities when requested by client.
.I
Andrew Kimn, Senior Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
ka Earth Solutions NWLLC
ESNW Rep,
Project No,
Page
Report No.
AK
0895.06
1 of 2
73
15365 NE 90" Street, Suite 100
Redmond. WA 98052
Time On Site
Time Off Site
Date
Da Y of Week
Main (425) 449-4704 1 Fax (425) 449-4711
8:45 AM
10:15 AM
11/13/19
Wed
www.esnw com Travel Time
DAILY FIELD REPORT 1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
Contractor #1 Contact
Rino Construction Mike
Contractor #2 Contact
[Are approved plans/permits on site? Project No
Weather
50s°F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC " 4-7
Projecrtt Manager Reviewed
Permit No.
Test
Test Location
Reference
Maximum
Fill
Test
% of
Number
(See Map)
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
(%)
(pcf)
Dry Density
72
See map for approximate location
-2-
1
130.7
9.7
124.4
95
73
See map for approximate location
SG
1 130.7
11.2
124.9
96
Supplementary Report:
At the client's request, ESNW reps were onsite to observe and test water line backfill and earthwork activities
Water Line Backfill
While onsite, rep observed contractor use a large excavator to excavate a water line (W4'xD5'). Rep observed
contractor place 8" ductile iron pipe at the toe of the excavation in a 6" lift of pea gravel. Rep observed contractor
place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep took
compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry density
(130.7 lbs./cu. ft.).
ESNW rep(s) will return to observe earthwork activities when requester
Earth Solutions NWLLC
ESNW Rep.
Project No.
Page
Report No
AK
0895.06
2 of 2
73
15365 NE Street, Suite 100
t Redmond.n WA 98052
Time On Site
Time Off Site
Date
Da Y of Week
Main (425) 449-4704 1 Fax (425) 449-4711
8:45 AM
10:15 AM
11/13/19
Wed
www.esnw.com Travel Time
DAILY FIELD REPORT 1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
Contractor #1 Contact
Rino Construction Mike
Contractor #2 Contact
Are approved plans/permits on site? Project No
Weather
50s°F, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager Reviewed
55V,
Permit No.
Supplementary Report:
3
72,73 • '
i i
" Earth Solutions NW«C
tSNW Rep
AKAK,
Scott,,
15365 NE 90"' Street, Suite 100
TJD
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
Time On Site
com
9:00 AM;
DAILY FIELD REPORT
11:45AM
Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
Project No.
Page
0895.06
1 of 1
Time Off Site
Date
10:30AM;
11/14/19
1:45 PM
Job Location
4500 Talbot Rd. S., Renton, WA
Contractor #1 Contact
Rino Construction Mike
Contractor #2 Contact
Are approved plans/permits on site?
l
Project No
Report No
74
Day of Week
Thursday
Weather
50s°F, Overcast
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager Reviewed
5s2
Permit No.
Supplementary Report:
At the client's request, ESNW reps were onsite to observe or test lock and load wall and earthwork activities.
Lock and Load Wall
While onsite, rep observed that contractor sloped the south end of the site to a near vertical cut. Rep observed
that cut was stable in its current configuration. Rep observed that contractor had cut the keyway for the lock and
load wall and placed a 6" lift of 5/8" clean crushed rock.
Contractor intends to begin installing lock and load panels tomorrow, November 15, 2019. Although over -
steepened, slopes are stable in current configuration and stable to work within. The contractor is responsible for
providing all safety measures in accordance with state and federal regulation. Rep will return to observe the
conditions of the slopes while contractor is working in the excavation.
ESNW recommended that contractor use a 5/8" crushed rock material for the wall backfill and compact to at least
95% of its maximum dry density. Rep met with ESNW manager, Scott, to discuss the recommendations and wall
construction. Rep met with assistant field manager, Terry, to discuss recommendations and the conditions of the
current south slope.
ESNW rep(s) will return to observe earthwork activities when requested by client.
Andrew Kimn, Senior Technician, 206-430-9183
Earth Solutions NW«C
t 15365 NE 90" Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw com
DAILY FIELD REPORT
ESNW Rep.
AK
Project No.
0895.06
Page Report No
1 of 1 75
Date Day of Week
Time On Site
Time Off Site
7:15 AM;
8:45 AM;
12:30 PM;
1:00 PM;
11/15/19 Friday
1:45 PM
2:45 PM
Travel Time
Weather
1.25 Hr. RT
50s°F, Overcast
Project Name
Job Location
Client/Owner
Weatherly Inn
4500 Talbot Rd. S., Renton, WA
RJ Development, LLC
Contractor#1
Rino Construction
Contact
Field Supervisor Reviewed II
Mike
LAC
/WI )i
Contractor #2
Contact
Project Manager
Reviewed
S0; 1`
Are approved plans/permits on site? Project No
Permit No.
Supplementary Report:
At the client's request, ESNW reps were onsite to observe or test lock and load wall and earthwork activities.
Lock and Load Wall
While onsite, rep observed that contractor sloped the south end of the site to a near vertical cut. Rep observed
that cut was stable in its current configuration. Rep observed that contractor had cut the keyway for the lock and
load wall and placed a 6" lift of 5/8" clean crushed rock.
Contractor intends to begin installing lock and load panels Monday, November 18, 2019. Although over -steepened,
slopes are stable in current configuration and stable to work within. The contractor is responsible for providing all
safety measures in accordance with state and federal regulation. Rep will return to observe the conditions of the
slopes while contractor is working in the excavation.
Rep recommended that contractor either place crushed rock along the bottom of the slope excavation to minimize
the over -saturated materials before and after rainfall events. ESNW also recommended that contractor cover the
exposed slopes with plastic. Rep observed contractor place plastic over the exposed slopes and the subgrade to
the lock and load wall.
Rep observed contractor importing a 5/8" minus crushed recycled concrete for the lock and load backfill. Rep
collected sample proctor of the material.
ESNW rep(s) will return to observe earthwork activities when requested by client.
Andrew Kimn, Senior Technician, 206-430-9183