LETTER OF TRANSMITTAL
RJ Development Date: August 20, 2019
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: weathedy Inn
Attn: Mr. Duane Meyer
Email: duane accrete.build
No. of
Coies Date Description
1 8/12-8/16/19 Daily Field Report(s) # 8-12
Comments:
CC:
1:
2
3.
4:
5:
John Wilson
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
ATTN.
ATTN:
ATTN
ATTN
ATTN.
.ohnw rinocon.com
1805 — 136t" PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NW«C Field Rep
AK
Solutions,
1805 13611 Place NE, FAX: Time On Site
Suite 201 (425) 449-4711
6L Bellevue, WA 98005 TOLL FREE:
(425)449-4704 (866)366-8710 1:45 PM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractor's Superintendent
Project No.
Page of
Report No.
0895.06
1 /1
8
Time Off Site
Date
Day of Week
2:15 PM
8/12/19
Monday
Weather
80s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Grading Contractor Grading Foreman Checked By $ltq
Rino Construction I Rod
Are approved Plans/Permits onsite
❑ YES ❑ NO Project No
Permit No.
At the client's request, ESNW rep was onsite to observe rockeries and earthwork activities.
Rockeries
While onsite, rep used a'/z" steel t-probe and observed the keyway for the rockery located at the northeast corner of
the site to be very dense, firm, unyielding, and suitable for support of the proposed rockery. Rep observed contractor
use a medium sized excavator to place a few courses of rocks with a 4" perforated pipe behind the basecourse. Pipe
was observed embedded in an 8" lift of 1 "-2" wash rock wrapped in a geotextile. Above the wash rock rep observed
contractor backfilling the rockery face with 2"-4" quarry spalls.
Earthwork Activities
Rep observed contractor use a large dozer, a large excavator, and several haul trucks to excavate material from site.
Rep observed contractor exporting material offsite.
ESNW rep will return to observe earthwork activities when requested by client.
f
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE 1-1
mEarth Solutions NWIL«
o 1805 1361' Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425)449-4704
(866)366-8710
DAILY FIELD REPORT
Field Rep
AK
Time On Site
11:30 AM;
1:15 PM
Travel Time
1.25 Hr. RT
Project Name
i Job Location
Weatherly Inn _
j 4500 Talbot Rd. S., Renton, WA
General Contractor
General Contractor's Superintendent
Grading Contractor
Grading Foreman
1
Rino Construction
Rod
Are approved Plans/Permits onsite
❑ YES ❑ NO Project No
Project No. Page of Report No
0895.06 1 /1 9
Time Off Site Date Day of Week
12:00 PM; 8/13/19 Tuesday
2:00 PM
Weather
80s°F, Clear
TRent/ Owner
Development, LLC
eived Onsite By
Checked By
Permit No.
At the client's request, ESNW rep was onsite to observe rockeries and earthwork activities.
Rockeries
While onsite, rep used a 1/" steel t-probe and observed the keyway for the rockery located along the north perimeter
of the site. Rep observed keyway to be very dense, firm, unyielding, and suitable for support of the proposed rockery.
Rep observed contractor use a medium sized excavator to place the first courses of rocks with a 4" perforated pipe
behind the basecourse. Pipe was observed embedded in an 8" lift of V-2" wash rock wrapped in a geotextile. Above
the wash rock rep observed contractor backfilling the rockery face with 2"-4" quarry spalls.
Earthwork Activities
Rep observed contractor use a large dozer, a large excavator, and several haul trucks to excavate material from site.
Rep observed contractor exporting material offsite. Rep also observed contractor use several large excavators to
excavate and cut the southeast corner of the site for the rockery.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE ���
I Field Rep
%J1 MI Earth Solutions NW«C AK
F 1805 1361h Place NE, FAX: Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 10:00 AM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractor's Superintendent
i
Grading Contractor
Rino Construction
ZZ
Are approved Plans/Permits onsite
Grading Foreman
Rod
YES ❑ NO
Project No
Project No
Page of
Report No.
0895.06
1 /1
10
Time Off Site
Date
Day of Week
11:00 AM
8/14/19
Wed
Weather
80s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No.
At the client's request, ESNW rep was onsite to observe rockeries and earthwork activities.
Rockeries
While onsite, rep used a '/" steel t-probe and observed the keyway for the rockery located along the north and east
perimeters of the site. Rep observed keyway to be very dense, firm, unyielding, and suitable for support of the
proposed rockery. Rep observed contractor use a medium sized excavator to place the first courses of rocks with a
4" perforated pipe behind the basecourse. Pipe was observed embedded in an 8" lift of V-2" wash rock wrapped in a
geotextile. Above the wash rock rep observed contractor backfilling the rockery face with 2"-4" quarry spalls.
Earthwork Activities
Rep observed contractor use a large dozer, a large excavator, and several haul trucks to excavate material from site.
Rep observed contractor exporting material offsite. Rep also observed contractor use several large excavators to
excavate and cut the southeast corner of the site for the rockery. Rep met with ESNW manager Scott, to discuss and
review the current configurations of the rockery cuts in the southeast corner of the site.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE
EJJ
Earth Solutions NW«C Field Rep. Project No. Page of
AK 0895.06 1 /1
} 1805 136'h Place NE, FAX: Time On Site Time Off Site ' Date
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 12:15 PM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractor's Superintendent
Grading Contractor Grading Foreman
Rino Construction Rod
Are approved Plans/Permits onsite ❑ YES ❑ NO Project No
r
Report No.
11
Day of Week
2:15 PM 8/15/19 Thursday
Weather
80s°F, Clear
Client / Owner
RJ Development, LLC
Received Onsite By
Checked By
Permit No
At the client's request, ESNW rep was onsite to observe rockeries and earthwork activities.
Rockeries
While onsite, rep used a '/2" steel t-probe and observed the keyway for the rockery located along the north and east
perimeters of the site. Rep observed keyway to be very dense, firm, unyielding, and suitable for support of the
proposed rockery. Rep observed contractor use a medium sized excavator to place the first courses of rocks with a
4" perforated pipe behind the basecourse. Pipe was observed embedded in an 8" lift of 1 "-2" wash rock wrapped in a
geotextile. Above the wash rock rep observed contractor backfilling the rockery face with 2"-4" quarry spalls. Rep
observed contractor place geogrid as per plan. (Mirafi 5Xt)
Earthwork Activities
Rep observed contractor use a large dozer, a large excavator, and several haul trucks to excavate material from site.
Rep observed contractor exporting material offsite. Rep also observed contractor use several large excavators to
excavate and cut the southeast corner of the site for the rockery.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
COPY TO:
CONTINUED ON NEXT PAGE ❑
Field Rep.
Earth Solutions NW«t✓ AK
' 1805 136" Place NE, FAX: Time On Site
Suite 201 (425) 449-4711
Bellevue, WA 98005 TOLL FREE:
(425) 449-4704 (866) 366-8710 11:15 AM
DAILY FIELD REPORT Travel Time
1.25 Hr. RT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton, WA
General Contractor General Contractors Superintendent
Project No. Page of Report No.
0895.06 1 /2 12
Time Off Site Date Day of Week
1:15 PM 8/16/19 Friday
Weather J
70sOF, Overcast
Client / Owner
RJ Development, LLC
Received Onsite By
Grading Contractor Grading Foreman Checked By
Rino Construction Rod S� 1
Are approved Plans/Permits onsite ] YES ❑ NO Project No. Permit No
Test Reference Maximum Fill Test Dry % of
Number Test Location (Fill) Elevation Compaction Dry Density Moisture Density Maximum
Curve lbs./cuff. % lbs./cuff Dry Density
10 See map for approximate location SG 1 130.7 11.9 125.1 96
11 See map for approximate location SG 1 130.7 1 12.2 1 123.9 1 95
12 See map for approximate location SG 1 130.7 10.4 1 123.6 95
13 See map for approximate location SG 1 130.7 11.7 124.2 95
At the client's request, ESNW rep was onsite to observe and test mass fill, rockeries, vault excavation and earthwork
activities.
Mass Fill
While onsite, rep observed contractor use two large excavators, a large dozer, and several haul trucks. Rep observed
contractor export material offsite. Rep observed contractor place and compact with native material for general fill in
the northwest corner of the site. Rep observed contractor use a dozer to place loose 6" lifts and using a large sheep's
foot roller for compaction. Rep took compaction tests and observed material to be adequate of at least 95% of its
maximum dry density (130.7 lbs./cu. ft.). Rep observed contractor using a water truck to add water to native material
fill.
Rockeries
Rep used a %Z" steel t-probe and observed the keyway for the rockery located along the north and east perimeters of
the site. Rep observed keyway to be very dense, firm, unyielding, and suitable for support of the proposed rockery.
Rep observed contractor use a medium sized excavator to place the first courses of rocks with a 4" perforated pipe
behind the basecourse. Pipe was observed embedded in an 8" lift of 1 "-2" wash rock wrapped in a geotextile. Above
the wash rock rep observed contractor backfilling the rockery face with 2"-4" quarry spalls. Rep observed contractor
place geogrid as per plan. (Mirafi 5XT)
Earthwork Activities
Rep observed contractor use a large dozer, a large excavator, and several haul trucks to excavate material from site.
Rep observed contractor exporting material offsite. Rep also observed contractor use several large excavators to
excavate and cut the southeast corner of the site for the rockery.
Vault Excavation
Rep observed contractor use a large excavator to excavate the vault. Contractor expressed plans to continue working
in the vault excavation next week. Rep will return to observe the conditions of the slopes next week.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
F
Y TO: CONTINUED ON NEXT PAGE
Earth Solutions I�W«� Field Rep. Project No. Page of Report No.
AK 0895.06 2/2 12
Solutions1805 136" Place NE, FAX: Time On Site Time Off Site Date Day of Week
Suite 201 (425) 449-4711
6L Bellevue, WA 98005 TOLL FREE: 11:15 AM 1:15 PM 8/16/19 Friday
(425)449-4704 (866)366-8710
DAILY FIELD REPORT Travel Time Weather
1.25 Hr. RT 70s°F, Overcast
Project Name Job Location Client / Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
i General Contractor General Contractor's Superintendent Received Onsite By
Grading Contractor Grading Foreman
[I Rino Construction Rod
Are approved Plans/Permits onsite YES ❑ NO Project No.
9 - •� y '�
Checked By
Permit No.
CONTINUED ON NEXT PAGE