LETTER OF TRANSMITTAL
To: RJ Development Date: December 24, 2019
401 Central Street SE ESNW No.: ES- 895.06
Olympia, WA 98501 Project: Weatherly Inn
Attn: Mr. Duane Meyer
Email: duaneAaccrete.build
No. of
uo les uate uescri tion
1 1 12/16-12/20/19 1 Daily Field Report(s) # 95-99
Comments:
CC:
1:
2:
3:
4:
5:
John Wilson
Mark Richardson
Jeff Brain
Jennifer Vogele
Jonathan Chavez
ATTN:
ATTN:
ATTN:
ATTN
ATTN.
johnw a2rinocon.com
mark accrete. build
_Jeff cr accrete.build
Jennifer accrete.build
jchavez@rentonwa.gov
Transmitted By: Earth Solutions NW, LLC
PM: Scott Riegel, L.G., L.E.G.
1805 — 136t" PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NW«C
t i 15365 NE 901h Street, Suite 100
MELRedmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
Supplementary Report:
ESNW Rep, I Project No Page Report No.
AK j 0895.06 1/2 95
Time On Site Time Off Site Date Day of Week
11:15 AM 1:15 PM 12/16/19 Monday
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No.
Weather
40s°F, Clear
RJ Development, LLC
Field Supervisor Reviewed
LAC Lt tf%2-S
Proiect Manager Reviwe�d
Permit No.
At the client's request, ESNW rep was onsite to observe footing excavations, vault backfill, test pH of stormwater
and earthwork activities.
Footing Excavations
While onsite, rep observed contractor forming boards for the footings. Rep observed south slopes of the
excavation to be near vertical. Rep observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope.
Although over -steepened, slopes are stable in current configuration and stable to work within. The contractor is
responsible for providing all safety measures in accordance with state and federal regulation. Rep observed that
contractor had sloped the southeast corner of the footing excavation to a 1:1 (H:V).
Rep observed that contractor had placed plastic sheeting over the exposed slopes for the footing excavation, the
exposed slopes between the lock and load wall and the rockery as recommended
Vault Backfill
Rep observed contractor use a medium sized excavator to excavate the water line that has been redesigned to
be placed adjacent from the south perimeter of the stormwater vault.
Rep observed contractor install a 6" perforated drain pipe at the toe of the footings embedded in a IT' lift of 1"-2"
wash rock. Outside of the wash rock, rep observed that contractor had placed a woven geotextile Contractor
expressed plans to continue working on installing the drain pipe for the stormwater vault footing tomorrow,
December 17, 2019. Rep observed contractor place brown silty sand with gravel material in loose 12"-18" lifts and
compacting with a hoe pack. Rep took compaction tests on backfill and observed material to be adequate of at
least 95% of its maximum dry density (130.7 lbs./cu. ft.).
Test pH of Stormwater
Rep took pH tests to determine the acidity of stormwater. Rep took pH tests at the east end of the quarry spall
entrance and observed a pH level of 6.5/7 pH. At the west of the quarry spall entrance stormwater (temporary)
collection pit and observed a pH level of 9 pH. On the street, rep took a pH test and observed stormwater to be a
6.5/7 pH. Rep observed that pH level was contained onsite and that stormwater pH level in street was in
compliance of required pH level at 6.5/7 pH.
Earthwork Activities
Rep observed contractor use a large excavator and several haul trucks to export material offsite. Rep met with
Accrete and Rino representatives to discuss work moving forward onsite.
ESNW rep will return to observe earthwork activities when requested by client.
4-13 �_
Andrew Kimn, Field Technician, 206-430-9183
Earth Solutions NW
ESNW Rep.
-LC
AK
15365 NE 901h Street, Suite 100
Redmond, WA 98052
Time On Site
Main (425) 449-4704 1 Fax (425) 449-4711
www.esnw.com
11:15 AM
DAILY FIELD REPORT
Travel Time
1.25 Hr. RT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
No. Page Report No.
6 2�Z 95
Site Date Day of Week
12/16/19 Monday
Weather
40sOF, Clear
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project
0895.0
Time Off
1:15 PM
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project Manager I Reviewed
Are approved plans/permits on site? Project No. Permit No. I
Project
0895.0
Time Off
1:15 PM
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project Manager I Reviewed
Are approved plans/permits on site? Project No. Permit No. I
,. Earth Solutions NWT«
15365 NE 90" Street, Suite 100
Redmond. WA 98052
wo Main (425) 449-4704 i Fax (425) 449-4711
www.esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
ESNW Rep.
AK
Project No.
0895.06
Page
1/2
Report No.
96
Day of Week
Time On Site
Time Off Site
Date
Tuesday
1:15 PM
3:15 PM
12/17/19
Travel Time
Weather
1.25 Hr. RT
40s°F, Overcast
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No
RJ Development, LLC
Field Supervisor Reviewed
LAC w1' 11./Z3
Project Manager Reviewed
Permit No.
Supplementary Report
At the client's request, ESNW rep was onsite to observe footing excavations, vault backfill, test pH of stormwater
and earthwork activities.
Footing Excavations
While onsite, rep observed contractor forming boards for the footings. Rep observed south slopes of the
excavation to be near vertical. Rep observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope.
Although over -steepened, slopes are stable in current configuration and stable to work within The contractor is
responsible for providing all safety measures in accordance with state and federal regulation. Rep observed that
contractor had sloped the southeast corner of the footing excavation to a 1:1 (H:V).
Rep observed that contractor had placed plastic sheeting over the exposed slopes for the footing excavation, the
exposed slopes between the lock and load wall and the rockery as recommended.
Vault Backfill
Rep observed contractor use a medium sized excavator to excavate and install the drain pipe south of the
stormwater vault.
Rep observed contractor install a 6" perforated drain pipe at the toe of the footings embedded in a 12" lift of 1"-2"
wash rock. Outside of the wash rock, rep observed that contractor had placed a woven geotextile. Rep observed
contractor place brown silty sand with gravel material in loose 12"-18" lifts and compacting with a hoe pack. Rep
took compaction tests on backfill and observed material to be adequate of at least 95% of its maximum dry density
(130.7 lbs./cu. ft.).
Test pH of Stormwater
Rep took pH tests to determine the acidity of stormwater. Rep took pH tests at the east end of the quarry spall
entrance and observed a pH level of 6.5/7 pH. At the west of the quarry spall entrance stormwater (temporary)
collection pit and observed a pH level of 9 pH. On the street, rep took a pH test and observed stormwater to be a
6.5/7 pH. Rep observed that pH level was contained onsite and that stormwater pH level in street was in
compliance of required pH level at 6.5/7 pH.
Earthwork Activities
Rep observed contractor use a large excavator and several haul trucks to export material offsite.
ESNW
rep will return to observe earthwork activities when requested by client.
I
Andrew Kimn, Field Technician, 206-430-9183
" Earth Solutions N1N11-11-o
ESNW Rep.
Project No,
Page
2/2
Report No.
AK
0895.06
96
15365 NE 90w Street, Suite 100
Redmond, WA 98052
Time On Site
Time Off Site
Date
Day of Weel
Main (425) 449-4704 1 Fax (425) 449-4711
Tuesday
www.esnw.com
1:15 PM
3:15 PM
12/17/19
DAILY FIELD REPORT
Travel Time Weather
1.25 Hr. RT 40s°F, Overcast
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Rd. S., Renton, WA RJ Development, LLC
Contractor #1 Contact Field Supervisor Reviewed
Rino Construction Mike LAC
Contractor #2 Contact Project Manager Reviewed
kre approved plans/permits on site? Project No, Permit No,
Test Test Location
Number /' \ [� M )
103 See map for approximate location
104 See map for approximate location
Supplementary Report
Reference
Maximum
Fill
Test
% of
Elevation
Compaction
Dry Density
Moisture
Dry Density
Maximum
Curve
(pcf)
(%)
(pcf)
Dry Density
-4'
1
130.7
12.0
124.6
95
-2'
1
130.7
12.3
124.4
95
L 103, 104'
r
Earth Solutions NWLLc
15365 NE 90`h Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
Are approved plans/permits on site?
ESNW Rep. Project No. Page Report No.
AK 0895.06 1/1 97
Time On Site Time Off Site Date Day of Week
11:00 AM 12:00 PM 12/18/19 Wed
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No.
Weather
40sOF, Overcast
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC
Project Manager Reviewed
Permit No.
Supplementary Report:
At the client's request, ESNW rep was onsite to observe footing excavations, test pH of stormwater, site CTB and
earthwork activities.
Footing Excavations
While onsite, rep observed contractor forming boards for the footings. Rep observed south slopes of the
excavation to be near vertical. Rep observed that the east slopes of the excavation were near a 0.75:1 (H:V) slope.
Although over -steepened, slopes are stable in current configuration and stable to work within. The contractor is
responsible for providing all safety measures in accordance with state and federal regulation. Rep observed that
contractor had sloped the southeast corner of the footing excavation to a 1:1 (H:V).
Test pH of Stormwater
Rep took pH tests to determine the acidity of stormwater. Rep took pH tests at the east end of the quarry spall
entrance and observed a pH level of 6.5/7 pH. At the west of the quarry spall entrance stormwater (temporary)
collection pit and observed a pH level of 9 pH. On the street, rep took a pH test and observed stormwater to be a
6.5/7 pH. Rep observed that pH level was contained onsite and that stormwater pH level in street was in
compliance of required pH level at 6.5/7 pH.
Site CTB
Rep observed contractor grading throughout the site with cement, Ren observed contractor placing a
cement treated base (CTB). Rep observed contractor mix 3% of cement into the native material. Rep
observed contractor mix material with a 5rader and compact with a large single drum roller.
ESNW rep will return to observe earthwork activities when requested by client
4_11� �_
Andrew Kimn, Field Technician, 206-430-9183
Earth Solutions NWLLC
ESNW Rep.
AK
Project No.
0895.06
Page
1/1
UReporto.
15365 NE 90'h Street, Suite 100
Redmond, WA 98052
Time On Site
Time Off Site
Date
Day of Week
Main (425) 449-4704 1 Fax (425) 449-4711
12:00 PM;
1:45 PM;
Thursday
www.esnw.com
3:30 PM
4:15 PM
12/19/19
DAILY FIELD REPORT
Weather
-
Travel Time
1.25 Hr. RT
40s0F, Rain
Project Name
Weatherly Inn
Job Location
4500 Talbot Rd. S., Renton, WA
Client/Owner
RJ Development, LLC
Contractor #1
Contact
Field Supervisor
Reviewed
Rino Construction
Mike
Contact
LAC
Project Manager
Reviewed
Contractor #2
Are approved plans/permits on site? Project No. Permit No.
Supplementary Report:
At the client's request, ESNW rep was onsite to observe footing excavations, test pH of stormwater and earthwork
activities.
Footing Excavations
While onsite, rep observed contractor pouring concrete into the footing forms. Rep observed that contractor had
cut and excavated the south building footings. Rep recommended that contractor add a crushed rock material to
berm the footings below the load and load wall. Rep observed contractor use a large loader and a medium sized
excavator to place 5/8" minus crushed recycled concrete as a temporary berm at the toe of the lock and load wall
within the south footing excavations.
Rep observed south slopes of the excavation to be near vertical. Rep observed that the east slopes of the
excavation were near a 0.75:1 (H:V) slope. Although over -steepened, slopes are stable in current configuration
and stable to work within. The contractor is responsible for providing all safety measures in accordance with state
and federal regulation. Rep observed that contractor had sloped the southeast corner of the footing excavation to
a 1:1 (H:V).
Test pH of Stormwater
Rep took pH tests to determine the acidity of stormwater. Rep took pH tests at the east end of the quarry spall
entrance and observed a pH level of 6.5/7 pH. At the west of the quarry spall entrance stormwater (temporary)
collection pit and observed a pH level of 9 pH. On the street, rep took a pH test and observed stormwater to be a
6.5/7 pH. Rep tested banker tank located on the southwest quadrant of the site and observed a 9.5 pH. Rep
observed that pH level was contained onsite and that stormwater pH level in street was in compliance of required
pH level at 6.5/7 pH.
ESNW rep will return to observe earthwork activities when requested by client.
Andrew Kimn, Field Technician, 206-430-9183
Earth Solutions NWLLc
t t 15365 NE 90' Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 1 Fax (425) 449-4711
www esnw com
DAILY FIELD REPORT
Project Name
Weatherly Inn
Contractor #1
Rino Construction
Contractor #2
l
Are approved plans/permits on site?
Supplementary Report:
ESNW Rep. Project No. Page Report No.
AK 0895.06 1/1 99
Time On Site Time Off Site Date Day of Week
10:30 AM 11:30 AM 12/20/19 Friday
Travel Time
1.25 Hr. RT
Job Location
4500 Talbot Rd. S., Renton, WA
Contact
Mike
Contact
Project No
Weather
40sOF, Rain
Client/Owner
RJ Development, LLC
Field Supervisor Reviewed
LAC 4—
Project Manager Revid
Permit No.
At the client's request, ESNW rep was onsite to observe or test pH of stormwater and earthwork activities.
Test pH of Stormwater
While onsite, rep took pH tests to determine the acidity of stormwater. Rep took pH tests at the east end of the
quarry spall entrance and observed a pH level of 6.5/7 pH. At the west of the quarry spall entrance stormwater
(temporary) collection pit and observed a pH level of 10 pH. On the street, north and south of the west entrance,
rep took a pH tests and observed stormwater to be a 6.5/7 pH. Rep tested banker tank located on the southwest
quadrant of the site and observed a 9.5 pH Rep observed that pH level was contained onsite and that stormwater
pH level in street was in compliance of required pH level at 6.5/7 pH.
Rep observed contractor working on erosion control due to 1.44" of rainfall.
Earthwork Activities
Rep met with ESNW managef Tyler, to discuss the current conditions of the rockery, lock and load wall, and the
erosion control throughout the site. ESNW recommended that contractor keep stormwater onsite and prevent it
from pooling near the outer perimeters of the site. ESNW recommends that contractor place quarry spalls at the
top tier of the rockery (located at the mid -east of the site) to stabilize the soils and allow for continuous stormwater
flow.
ESNW
�rep
`will return to observe earthwork activities when requested by client.
f
Andrew Kimn, Senior Technician, 206-430-9183