Loading...
HomeMy WebLinkAbout0895.06 SWFR 128A.pdfEarth Solutions NWLLC ESNW Rep. Page Report No. " AK 0895.06 1 of 2 128a 15365 NE Street, Suite 100 (425) 449-4711 Time On Site Time Off Site Date Day of Week Main (425) 449-4704 1 Fax 425 Redmond,n WA 911:45 AM 12:15 PM 2/10120 Monday www.esnw coin Reviewed WAR-307963 � tq­ CONSTRUCTION STORMWATER GENERAL PERMIT - FIELD REPORT Project Name Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC Erosion Control BMPs Overall Needs 1 (13 Elements) Condition Repair? Comments (Good; Fair; Poor) 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas G N Silt fence working as intended • Silt Fence 2. Establish Construction Access • Fabric; Quarry Spalls G N Sweep roadway when soil is seen on surface, • Wheel Wash replenish quarry spalls as needed • Sweeper Truck 3. Control Flow Rates • Stormwater Vault or Facility G N Add check dams and straw wattles as needed to • Straw Wattles slow stormwater onsite • Check Dams 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation • Straw G N Add straw as needed throughout the site, 2" • Sediment Ponds, Traps & Filters minimum • Treatment • Sediment Pond (Temp or Perm ) • Water Truck 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass G N • Plastic Sheeting • Straw Stockpiles • Stockpiles • PAM 6. Protect Slopes G N • Benching; Track -Walking • Pipe Slope Drains • Plastic Sheeting; Anchors 7. Protect Drain Inlets • Catch Basin Inserts G N CB inserts working as intended • Gutter; Road N/A 8. Stabilize Channels and Outlets N/A N/A • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets N/A 9. Control Pollutants N/A N/A • Chemical Storage Area Covered • Concrete Handling 10. Control Dewatering N/A N/A N/A 11. Maintain BMPs G N See recommended notes 12. Maintain SWPPP & Site Logbook G N Available upon request 13. Protect Low -impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement N/A N/A N/A Earth Solutions NWLLC ESNW Rep 0895.06 Page Report No. AK 2 of 2 128a 15365 NE Street, Suite 100 Time On Site Time Off Site Date Day of Week Redmond,n WA 98052 Main (425) 449-4704 I Fax (425) 449-4711 11:45 AM 12:15 PM 2/10/20 Monday www esnw.com Reviewed WAR-307963 .. ........................................................................... CONSTRUCTION STORMWATER GENERAL PERMIT - FIELD REPORT Project Name Weatherly Inn 4500 Talbot Rd. S., Renton RJ Development, LLC Monitoring, Records & Recommendations Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? ❑ Yes Q No List the completed, not -yet -completed, or ongoing action items in the table below: Actions Items Completed? (Yes; No; Ongoing) Date (If Completed) I Sweep site entrance when soil is seen on roadway Ongoing Add 2" straw throughout the site over exposed soils as needed Ongoing Replenish quarry spalls at the main entrance to the site as needed Ongoing Replace plastic sheeting on exposed slopes as needed Ongoing Current Weather: 40s° F. v rca Precipitation since last inspection (approximate): 2_02 inches Precipitation in the last 24 hours (approximate): 0.02 inches Was water quality sampling part of this inspection? ❑ Yes 0 No If "Yes": • Record results in the table below. • Characterize the stormwater discharge, e.g., the presence of suspended sediment, "cloudiness", discoloration, or oil sheen, if present: _N/A . Hanna Turbidity Meter # Is the site in compliance with the SWPPP and the permit requirements? 0 Yes ❑ No If No - Indicate the tasks necessary to bring the site into compliance in the table above. • Has the non-compliance been reported to the Department of Ecology? ❑ Yes • Should the SWPPP be modified? ❑ Yes ❑ No "This report is true, accurate, and complete to the best of my knowledge and belief." Inspector Name- Andrew Kimn CESCL Number: CESCL-EF8182309 ❑ No 1146yG__ Date: 2/10/20