HomeMy WebLinkAbout0895.06 SWFR 13A.pdfE�il'tli
Solution
NWLLC
Field Rep. I Project No Page 1 of 2 Report No.
Earth Solutions NWLLc AK 0895.06 1 13
1805 - 1361" Place N.E., Suite 201, Time On Site Time Off Site
Bellevue, WA 98005
Phone (425) 449-4704 FAX (425) 449-4711 11:00 AM 1 11:30 AM
CONSTRUCTION STORMWATER
GENERAL PERMIT — FIELD REPORT
1 Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton
a
Date Day of Week
8/19/19 Monday
NPDES Permit No.
WAR-
._ f
Erosion Control BMPs Overall Condition
G= Good F=Fair Need Repair Comments
(13 Elements) P=Poor Y= Yes N=No
1. Preserve Vegetation/Mark Clearing Limits -
• Buffer Zones Around Sensitive Areas G N Silt fence working as intended
• Silt Fence
2. Establish Construction Access
• Fabric/Quarry Spalls
• Wheel Wash G N Sweep roadway when soil is seen on surface
■ Sweeper Truck
3. Control Flow Rates
• Stormwater Vault/Facility F N
• Straw Wattles
• Check Dams
4. Install Sediment Controls
Silt Fence
Straw Bale Barriers
Vegetation
Straw
Sediment Ponds/Traps/Filters
Chemical Treatment
5. Stabilize Soils
• Nets and Blankets
• Mulch / Bark / Rock
• Hydroseeding / Grass
• Plastic Sheeting
• Stabilize Stockpiles
• Stockpiles
■ PAM
Wate-.r -'ruck
6. Protect Slopes
• Benching / Track Walking
• Pipe Slope Drains
• Plastic Sheeting / Anchors (1)
7. Protect Drain Inlets
• Catch Basin Inserts
• Gutter / Road
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam
• Outlet Protection
• Nets and Blankets
9. Control Pollutants
• Chemical Storage Area Covered
• Concrete Handling
10. Control De -Watering
11. Maintain BMPs
12. Manage the Project
• Maintain SWPPP / Site Log Book
13. Protect Low Impact Development
(LID BMPs)
• Bioretention Rain Garden Facilities
• Permeable Pavement
G I N
G I N
Client / Owner
RJ Development, LLC
G N
G N CB inserts working as intended
N/A N/A N/A
N/A I N/A f N/A
N/A N/A w
G N See recommended notes
G N Available upon request
N/A I N/A I N/A
Field Rep.
NPDES Permit No.
Date
Project No-
Page 2 of 2
Report No.
AK
WAR-
8/19/19
0895.06
13a
Monitoring and Records / Recommendations?
Will existing BMPs need to be modified or removed, or other BMPs installed?
If YES, list the action items to be completed on the following table: ❑ YES ® NO
Actions / Recommendations To Be Completed
Sweep site entrance when soil is seen on roadway
Describe Current Weather Conditions: 70s° F, Clear
Approximate amount of precipitation since last inspection
Approximate amount of precipitation in the last 24 hours:
Was water quality sampling part of this inspection?
If YES, record results in the table below:
Describe below the discharging stormwater, if present
Note the presence of suspended sediment, "cloudiness",
discoloration, or oil sheen
Turbidity Meter Used: Hanna Meter # 15
0.00 inches
000 inches
❑ YES ® NO
N/A
Monitor Location Turbidity (NTUs) pH Notes
f
• Is the site in compliance with the SWPPP and the permit requirements?
• If NO, indicate tasks necessary to bring site into compliance on the "Actions To
Be Completed" table above, and include dates each job will be completed.
• If NO, has the non-compliance been report to Dept of Ecology?
• If NO, should the SWPPP be modified?
Sign the following certificate:
"I certify that this report is true, accurate, and complete, to the best of my knowledge and belief.'
By: (Print/Sign) Andrew Kimn
CESCL Certification Number: CESCL-EF8182309
Inspection completed on: (Date) 8/19/19
® YES ❑ NO
❑ YES ❑ NO