Loading...
HomeMy WebLinkAbout0895.06 SWFR 13A.pdfE�il'tli Solution NWLLC Field Rep. I Project No Page 1 of 2 Report No. Earth Solutions NWLLc AK 0895.06 1 13 1805 - 1361" Place N.E., Suite 201, Time On Site Time Off Site Bellevue, WA 98005 Phone (425) 449-4704 FAX (425) 449-4711 11:00 AM 1 11:30 AM CONSTRUCTION STORMWATER GENERAL PERMIT — FIELD REPORT 1 Project Name Job Location Weatherly Inn 4500 Talbot Rd. S., Renton a Date Day of Week 8/19/19 Monday NPDES Permit No. WAR- ._ f Erosion Control BMPs Overall Condition G= Good F=Fair Need Repair Comments (13 Elements) P=Poor Y= Yes N=No 1. Preserve Vegetation/Mark Clearing Limits - • Buffer Zones Around Sensitive Areas G N Silt fence working as intended • Silt Fence 2. Establish Construction Access • Fabric/Quarry Spalls • Wheel Wash G N Sweep roadway when soil is seen on surface ■ Sweeper Truck 3. Control Flow Rates • Stormwater Vault/Facility F N • Straw Wattles • Check Dams 4. Install Sediment Controls Silt Fence Straw Bale Barriers Vegetation Straw Sediment Ponds/Traps/Filters Chemical Treatment 5. Stabilize Soils • Nets and Blankets • Mulch / Bark / Rock • Hydroseeding / Grass • Plastic Sheeting • Stabilize Stockpiles • Stockpiles ■ PAM Wate-.r -'ruck 6. Protect Slopes • Benching / Track Walking • Pipe Slope Drains • Plastic Sheeting / Anchors (1) 7. Protect Drain Inlets • Catch Basin Inserts • Gutter / Road 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling 10. Control De -Watering 11. Maintain BMPs 12. Manage the Project • Maintain SWPPP / Site Log Book 13. Protect Low Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement G I N G I N Client / Owner RJ Development, LLC G N G N CB inserts working as intended N/A N/A N/A N/A I N/A f N/A N/A N/A w G N See recommended notes G N Available upon request N/A I N/A I N/A Field Rep. NPDES Permit No. Date Project No- Page 2 of 2 Report No. AK WAR- 8/19/19 0895.06 13a Monitoring and Records / Recommendations? Will existing BMPs need to be modified or removed, or other BMPs installed? If YES, list the action items to be completed on the following table: ❑ YES ® NO Actions / Recommendations To Be Completed Sweep site entrance when soil is seen on roadway Describe Current Weather Conditions: 70s° F, Clear Approximate amount of precipitation since last inspection Approximate amount of precipitation in the last 24 hours: Was water quality sampling part of this inspection? If YES, record results in the table below: Describe below the discharging stormwater, if present Note the presence of suspended sediment, "cloudiness", discoloration, or oil sheen Turbidity Meter Used: Hanna Meter # 15 0.00 inches 000 inches ❑ YES ® NO N/A Monitor Location Turbidity (NTUs) pH Notes f • Is the site in compliance with the SWPPP and the permit requirements? • If NO, indicate tasks necessary to bring site into compliance on the "Actions To Be Completed" table above, and include dates each job will be completed. • If NO, has the non-compliance been report to Dept of Ecology? • If NO, should the SWPPP be modified? Sign the following certificate: "I certify that this report is true, accurate, and complete, to the best of my knowledge and belief.' By: (Print/Sign) Andrew Kimn CESCL Certification Number: CESCL-EF8182309 Inspection completed on: (Date) 8/19/19 ® YES ❑ NO ❑ YES ❑ NO ❑ YES ❑ NO