HomeMy WebLinkAbout0895.06 SWFR 144A.pdfEarth Solutions NWLLc 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 I Fax (425) 449-4711 www.esnw.com CONSTRUCTION STORMWATER GENERAL PERMIT - FIELD REPORT ESNW Rep. AK Time On Site 1:00 PM WAR-307963 Project Name 14500 Talbot Rd. S., Renton Weatherly Inn Erosion Control BMPs Overall Needs (13 Elements) Condition Repair? (Qood; fair; foor) (Yes;No) 1. Preserve Vegetation; Mark Clearing Limits • Buffer Zones around Sensitive Areas G N •Silt Fence 2.Establish Construction Access. Fabric; Quarry Spalls • Wheel Wash G N • Sweeper Truck 3.Control Flow Rates • Stormwater Vault or Facility G N •Straw Wattles •Check Dams 4. Install Sediment Controls • Sill Fence • Straw Bale Barriers • Vegetation • Straw G N • Sediment Ponds, Traps & Filters • Treatment • Sediment Pond (Temp. or Perm.) • Water Truck 5. Stabilize Soils • Nets & Blankets • Mulch, Bark & Rock • Hydroseeding; Grass G N • Plastic Sheeting • Straw Stockpiles • Stockpiles • PAM 6. Protect Slopes G N • Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors 7. Protect Drain Inlets • Catch Basin Inserts G N • Gutter; Road 8. Stabilize Channels and Outlets N/A N/A • Channel Lining • Check Dam • Outlet Protection • Nets and Blankets 9. Control Pollutants N/A N/A • Chemical Storage Area Covered • Concrete Handling 10. Control Dewatering N/A N/A 11. Maintain BMPs G N 12. Maintain SWPPP & Site Logbook G N 13. Protect Low-Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement N/A N/A 0895.06 Page Report No. 1 of 2 144a Time Off Site Date Day of Week 1:15 PM 3/3/20 Tuesday Reviewed e3l4' I RJ Development, LLC I Comments Silt fence working as intended Sweep roadway when soil is seen on surface, replenish quarry spalls as needed Add check dams and straw wattles as needed to slow stormwater onsite Add straw as needed throughout the site, 2" minimum CB inserts working as intended N/A N/A N/A See recommended notes Available upon request N/A Earth Solutions I\IWLLc 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 I Fax (425) 449-4711 www.esnw.com CONSTRUCTION STORMWA TER GENERAL PERMIT -FIELD REPORT ESNW Rep. AK Time On Site 1:00 PM WAR-307963 Project Name 14500 Talbot Rd. S., Renton Weatherly Inn Monitoring, Records & Recommendations 0895.06 Page 2 of 2 Time Off Site Date 1 :15 PM 3/3/20 Reviewed I RJ Development, LLC Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? D Yes 0No List the completed, not-yet-completed, or ongoing action items in the table below: Actions Items Completed? (Yes; No; Qngoing) Sweep site entrance when soil is seen on roadway Ongoing Add 2" straw throughout the site over exposed soils as needed Ongoing Replenish quarry spalls at the main entrance to the site as needed Ongoing Replace plastic sheeting on exposed slopes as needed Ongoing Current Weather: 4Q§° F, QverQast Precipitation since last inspection (approximate): 0.54 ___ inches Precipitation in the last 24 hours (approximate): 0.12 inches Was water quality sampling part of this inspection? D Yes lt'.fNo If "Yes": • Record results in the table below. Report No. 144a Day of Week Tuesday Date (If Completed) • Characterize the stormwater discharge, e.g., the presence of suspended sediment, "cloudiness", discoloration, or oil sheen, if present: NIA • Hanna Turbidity Meter# Monitoring Location Turbidity pH Notes (NTU) Is the site in compliance with the SWPPP and the permit requirements? 0Yes □No lf"No": • Indicate the tasks necessary to bring the site into compliance in the table above. • Has the non-compliance been reported to the Department of Ecology?D Yes □No • Should the SWPPP be modified?D Yes □No �f-"This report is true, accurate, and complete to the best of my knowledge and belief." Inspector Name: Andrew Kimn CESCL Number: CESCL-EFB183912 Inspection Date: 3/3/20 I :