HomeMy WebLinkAbout0895.06 SWFR 23A&28A.pdfField Rep Project No
i I Earth Solutions NWLLc AK 0895.06
NWLJLC 1805 — 136T" Place N.E., Suite 201, Time On Site Time Off Site
Bellevue, WA 98005
Phone (425) 449-4704 FAX (425) 449-4711 2:30 PM 3:00 PM
CONSTRUCTION STORMWATER
GENERAL PERMIT - FIELD REPORT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton
Page 1 of 2 Report No
23a
Date Day of Week
9/3/19 Tuesday
NPDES Permit No
WAR -
Client / Owner
RJ Development, LLC
; - ....--- . ............. _...
Erosion Control BMPs
Overall Condition
Need Repair
(13 Elements)
G= Good F=Fair
Y= Yes N=No
Comments
P=Poor
1. Preserve Vegetation/Mark Clearing Limits
• Buffer Zones Around Sensitive Areas
G
N
Silt fence working as intended
• Silt Fence
2. Establish Construction Access
• Fabric/Quarry Spalls
G
N
Sweep roadway when soil is seen on surface,
• Wheel Wash
replenish quarry spalls as needed
• Sweeper Truck
3. Control Flow Rates
• Stormwater Vault/Facility
F
N
Add check dams and straw wattles as needed to
• Straw Wattles
slow stonnwater onsite
• Check Dams
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation
G
N
Add straw as needed throughout the site, 2"
• Straw
minimum
• Sediment Ponds/Traps/Filters
• Chemical Treatment
5. Stabilize Soils
• Nets and Blankets
• Mulch / Bark / Rock
• Hydroseeding / Grass
• Plastic Sheeting
G
N
• Stabilize Stockpiles
• Stockpiles
• PAM
• Water Truck
6. Protect Slopes
G
N
• Benching / Track Walking
• Pipe Slope Drains
• Plastic Sheeting / Anchors (1)
7. Protect Drain Inlets
• Catch Basin Inserts
G
N
CB inserts working as intended
• Gutter / Road
1.
...--....
8. Stabilize Channels and Outlets
N/A
N/A
N/A
• Channel Lining
• Check Dam
• Outlet Protection
• Nets and Blankets
N/A
N/A
N/A
9. Control Pollutants
• Chemical Storage Area Covered
• Concrete Handling
10. Control De -Watering
N/A
N/A
N/A
11. Maintain BMPs
G
N
See recommended notes
12. Manage the Project
Maintain SWPPP / Site LogBook
G
N
Available upon request
13. Protect Low Impact Development
(LID BMPs)
• Bioretention Rain Garden Facilities
N/A
N/A
N/A
• Permeable Pavement
Field Rep. NPDES Permit No. Date Project No. Page 2 of 2 Report No.
AK WAR- 9/3/19 ` 0895.06 23a
Monitoring and Records / Recommendations?
Will existing BMPs need to be modified or removed, or other BMPs installed?
If YES, list the action items to be completed on the following table: ❑ YES ® NO
Actions / Recommendations To Be Completed
Completed
Y or N
Initials / Date
If Complete)
Sweep site entrance when soil is seen on roadway
Ongoing
Ongoing
Add 2" straw throughout the site over exposed soils as needed
Ongoing
Ongoing
Add straw wattles and/or check dams throughout site as needed to slow stormwater
Ongoing
Ongoing
Replenish quarry spalls at the main entrance to the site as needed
Ongoing
Ongoing
Describe Current Weather Conditions: 70s° F, Clear
Approximate amount of precipitation since last inspection: 0.08 inches
Approximate amount of precipitation in the last 24 hours: 0.00 inches
Was water quality sampling part of this inspection? ❑ YES ® NO
If YES, record results in the table below:
Describe below the discharging stormwater, if present.
Note the presence of suspended sediment, "cloudiness",
discoloration, or oil sheen. N/A
Turbidity Meter Used: Hanna Meter # 15
Monitor Location ; Turbidity (NTUs) pH Notes
• Is the site in compliance with the SWPPP and the permit requirements?
• If NO, indicate tasks necessary to bring site into compliance on the "Actions To
Be Completed" table above, and include dates each job will be completed
• If NO, has the non-compliance been report to Dept. of Ecology?
• If NO, should the SWPPP be modified?
Sign the following certificate:
"I certify that this report is true, accurate, and complete, to the best of my knowledge and belief."
By: (Print/Sign) Andrew Kimn
CESCL Certification Number: CESCL-EF8182309
Inspection completed on: (Date) 9/3/19
® YES ❑ NO
❑ YES ❑ NO
❑ YES ❑ NO
Field Rep Project No
Eartht t Earth Solutions NWuc AK 0895.06
NWLLC 1805 —13611 Place N.E., Suite 201, Time On Site Time Off Site
Bellevue, WA 98005
Phone (425) 449-4704 FAX (425) 449-4711 11:30 AM 12:00 PM
CONSTRUCTION STORMWATER
GENERAL PERMIT — FIELD REPORT
Project Name Job Location
Weatherly Inn 4500 Talbot Rd. S., Renton
Erosion Control BMPs
(13 Elements)
1. Preserve Vegetation/Mark Clearing Limits
• Buffer Zones Around Sensitive Areas
• Silt Fence
2. Establish Construction Access
• Fabric/Quarry Spalls
• Wheel Wash
• Sweeper Truck
LontrolFlow Rates
Stormwater Vault/Facility
Straw Wattles
Check Dams
[ 4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation
• Straw
■ Sediment Ponds/Traps/Filters
• Chemical Treatment
5. Stabilize Solis
• Nets and Blankets
• Mulch / Bark / Rock
Li d
d/ G
G= Good F=Fair
P=Poor
G
G
F
i
• y —see ng rass
• Plastic Sheeting G
• Stabilize Stockpiles
• Stockpiles
• PAM
• Water Truck
6. Protect Slopes ! G
• Benching / Track Walking
• Pipe Slope Drains
• Plastic Sheeting / Anchors (1)
7. Protect Drain Inlets
• Catch Basin Inserts
Gutter / Road
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam
• Outlet Protection
• Nets and Blankets
9. Control Pollutants
• Chemical Storage Area Covered
• Concrete Handling
10. Control De -Watering
11. Maintain BMPs
12. Manage the Project
• Maintain SWPPP / Site Loa Book
G
Client / Owner
RJ Develoo
Page 1 of 2 Report No
28a
Date Day of Week
9/10/19 Tuesday
NPDES Permit No.
w#V• 301 '�\(.1'25
LLC
Need Repair i Comments
Y= Yes N=No
N Silt fence working as intended
N Sweep roadway when soil is seen on surface,
replenish quarry spalls as needed
N Add check dams and straw wattles as needed to
I slow stormwater onsite
N Add straw as needed throughout the site, 2"
+ minimum
N
N
N I CB inserts working as intended
N/A I N/A
N/A I N/A I N/A
N/A N/A N/A
G N See recommended notes
G N Available upon request
13. Protect Low Impact Development
(LID BMPs) N/A N/A N/A
• Bioretention Rain Garden Facilities
• Permeable Pavement
Field Rep NPDES Permit No. Date Project No. I Page 2 of 2 Report No.
AK W 3D1 � 9/10�i 9 0895.06 i 28a
Monitoring and Records / Recommendations?
Will existing BMPs need to be modified or removed, or other BMPs installed?
If YES, list the action items to be completed on the following table: ❑ YES ® NO
Actions / Recommendations To Be Completed
Completed
Y or N
Initials / Date
If Complete)
Sweep site entrance when soil is seen on roadway
Ongoing
Ongoing
Ongoing
Ongoing
Add 2" straw throughout the site over exposed soils as needed
Replenish quarry spalls at the main entrance to the site as needed
Ongoing
Ongoing
Describe Current Weather Conditions: 70sO F, Clear
Approximate amount of precipitation since last inspection: 082 inches
Approximate amount of precipitation in the last 24 hours: 0.22 inches
Was water quality sampling part of this inspection? ❑ YES ® NO
If YES, record results in the table below:
Describe below the discharging stormwater, if present
Note the presence of suspended sediment, "cloudiness",
discoloration, or oil sheen N/A
Turbidity Meter Used: Hanna Meter # 15
Monitor Location Turbidity (NTUs)
® • Is the site in compliance with the SWPPP and the permit requirements? YES ❑ NO
• If NO, indicate tasks necessary to bring site into compliance on the "Actions To
Be Completed" table above, and include dates each job will be completed.
• If NO, has the non-compliance been report to Dept. of Ecology? ❑ YES ❑ NO
• If NO, should the SWPPP be modified? ❑ YES ❑ NO
Sign the following certificate:
"I certify that this report is true, accurate, and complete, to the best of my knowledge and belief."
By. (Print/Sign) Andrew Itimn
CESCL Certification Number: CESCL-EF8182309
Inspection completed on: (Date) 9/10/19