Loading...
HomeMy WebLinkAbout0895.06 SWFR 254.pdfEarth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 1 of 4 Report No. 254 Time On Site 2:50 Time Off Site 3:25 Date 12/2/20 Day of Week Wednesday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC Erosion Control BMPs (13 Elements) Overall Condition (Good; Fair; Poor) Needs Repair? (Yes; No) Comments 1.Preserve Vegetation; Mark Clearing Limits •Buffer Zones around Sensitive Areas •Silt Fence F Y -Reinstall silt fence removed during construction 2.Establish Construction Access •Fabric; Quarry Spalls •Wheel Wash •Sweeper Truck F Y -Sweep roadway when soil is seen on surface, replenish quarry spalls as needed 3.Control Flow Rates •Stormwater Vault or Facility •Straw Wattles •Check Dams G N N/A 4.Install Sediment Controls •Silt Fence •Straw Bale Barriers •Vegetation •Straw •Sediment Ponds, Traps & Filters •Treatment •Sediment Pond (Temp. or Perm.) •Water Truck F Y -Silt fence needs to be overlapping on section outlined on Pg. 3 -Silt fence buried on incorrect side along southwestern edge of site 5. Stabilize Soils •Nets & Blankets •Mulch, Bark & Rock •Hydroseeding; Grass •Plastic Sheeting •Straw Stockpiles •Stockpiles •PAM F Y -Cover stockpiles unworked for 2 days and before weekends -Install filter fabric and rock on roads with exposed soil and 2-4” of straw on all other exposed soils 6.Protect Slopes •Benching; Track-Walking •Pipe Slope Drains •Plastic Sheeting; Anchors G N N/A 7.Protect Drain Inlets •Catch Basin Inserts •Gutter; Road G N -CB inserts on road working as intended 8.Stabilize Channels and Outlets •Channel Lining •Check Dam •Outlet Protection •Nets and Blankets G N N/A 9. Control Pollutants •Chemical Storage Area Covered •Concrete Handling G N N/A 10. Control Dewatering - - N/A 11. Maintain BMPs F Y See recommended notes 12.Maintain SWPPP & Site Logbook G N Available upon request 13. Protect Low-Impact Development (LID BMPs) •Bioretention Rain Garden Facilities •Permeable Pavement - - N/A Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 2 of 4 Report No. 254 Time On Site 2:50 Time Off Site 3:25 Date 12/2/20 Day of Week Wednesday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC Monitoring, Records & Recommendations Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? Yes No List the completed, not-yet-completed, or ongoing action items in the table below: Actions Items Completed? (Yes; No; Ongoing) Date (If Completed) Sweep site entrance when soil is seen on roadway O 11/24/20 Add filter fabric and rock to exposed roads, 2-4” of straw everywhere else exposed N Replace silt fence in areas recommended. Ensure silt fence is overlapping when installed. N Current Weather: 58°F, Cloudy Precipitation since last inspection (approximate): 0.58 inches Precipitation in the last 24 hours (approximate): 0.00 inches Was water quality sampling part of this inspection?  Yes No If “Yes”: •Record results in the table below. •Characterize the stormwater discharge, e.g., the presence of suspended sediment, “cloudiness”, discoloration, or oil sheen, if present: •Hanna Turbidity Meter # 93703 Monitoring Location Turbidity (NTU) pH Notes Is the site in compliance with the SWPPP and the permit requirements? Yes No If “No”: •Indicate the tasks necessary to bring the site into compliance in the table above. •Has the non-compliance been reported to the Department of Ecology?Yes No •Should the SWPPP be modified?Yes No “This report is true, accurate, and complete to the best of my knowledge and belief.” Inspector Name: Alexandra Shaner CESCL Number: ECO-3-9272007 Inspection Date: 12/2/20 Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 3 of 4 Report No. 254 Time On Site 2:50 Time Off Site 3:25 Date 12/2/20 Day of Week Wednesday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC w BMP LEGEND SILT FENCE STOCKPILES QUARRY SPALL ENTRANCE BAKER TANK WHEEL WASH SWALE SEDIMENT TRAP WATTLE Sit fence requiring repairs Sit fence requiring repairs Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com ESNW Rep. AES Project No. 0895.06 Page 4 of 4 Report No. 254 Time On Site 2:50 Time Off Site 3:25 Date 12/2/20 Day of Week Wednesday NPDES Permit No. WAR-307963 Reviewed CONSTRUCTION STORMWATER GENERAL PERMIT – FIELD REPORT Project Name Weatherly Inn Job Location 4500 Talbot Rd. S., Renton Client/Owner RJ Development, LLC Photo 1: A section of silt fence along the western edge of the site requiring repairs.