Loading...
HomeMy WebLinkAbout0895.06 SWFR 61A.pdfField Rep Project No. LL t Earth Solutions NWLLC , AK 0895.06 NWILLC 1805 — 136" Place N.E., Suite 201, Time On Site Time Off Site Bellevue, WA 98005 Phone (425) 449-4704 FAX (425) 449-4711 11:45 AM 12:15 PM CONSTRUCTION STORMWATER GENERAL PERMIT - FIELD REPORT Project Name 74500 ob Location Weatherly Inn Talbot Rd. S., Renton Erosion Control BMPs Overall ConditionG= Good F=Fair Need Repair (13 Elements) P=Poor Y= Yes N=No 1. Preserve Vegetation/Mark Clearing Limits • Buffer Zones Around Sensitive Areas G N • Silt Fence 2. Establish Construction Access • Fabric/Quarry Spalls G N • Wheel Wash • Sweeper Truck 3. Control Flow Rates • Stormwater Vault/Facility • Straw Wattles G N • Check Dams 4. Install Sediment Controls • Silt Fence • Straw Bale Barriers • Vegetation G N Straw • Sediment Ponds/Traps/Filters • Chemical Treatment 5. Stabilize Soils ■ Nets and Blankets • Mulch / Bark / Rock • Hydroseeding / Grass • Plastic Sheeting • Stabilize Stockpiles • Stockpiles • PAM • Water Truck 6. Protect Slopes • Benching / Track Walking • Pipe Slope Drains • Plastic Sheeting /Anchors (1) 7. Protect Drain Inlets • Catch Basin Inserts • Gutter/ Road 8. Stabilize Channels and Outlets • Channel Lining • Check Dam • Outlet Protection Nets and Blankets 9. Control Pollutants • Chemical Storage Area Covered • Concrete Handling 10. Control De -Watering 11. Maintain BMPs 12. Manage the Project • Maintain SWPPP / Site Loa Book 13. Protect Low Impact Development (LID BMPs) • Bioretention Rain Garden Facilities • Permeable Pavement G N G N G N N/A N/A Page 1 of 2 Report No. 61a i Date _ Day of Week 10/28/19 Monday NPDES Permit No WAR-307963 Client / Owner RJ Development, LLC Comments Silt fence working as intended Sweep roadway when soil is seen on surface, replenish quarry spalls as needed Add check dams and straw wattles as needed to slow stonnwater onsite Add straw as needed throughout the site, 2" minimum CB inserts working as intended N/A N/A I N/A 1 N/A N/A N/A N/A G N See recommended notes G N Available upon request Field Rep. NPDES Permit No Date Project No. AK WAR-307963 10/28/19 0895.06 Monitoring and Records / Recommendations? Will existing BMPs need to be modified or removed, or other BMPs installed? If YES, list the action items to be completed on the following table: ❑ YES ® NO Page 2 of 2 Report No. 61a Actions / Recommendations To Be Completed _ Sweep site entrance when soil is seen on roadway Completed Y or N Initials / Date If Complete) Ongoing Ongoing Add 2" straw throughout the site over exposed soils as needed Ongoing Ongoing Replenish quarry spalls at the main entrance to the site as needed Ongoing Ongoing Replace plastic sheeting on exposed slopes as needed Ongoing Ongoing Describe Current Weather Conditions: 50sO F, Clear Approximate amount of precipitation since last inspection: 0.07 inches Approximate amount of precipitation in the last 24 hours: 0.00 inches Was water quality sampling part of this inspection? ❑ YES ® NO If YES, record results in the table below: Describe below the discharging stormwater, if present. Note the presence of suspended sediment, "cloudiness", discoloration, or oil sheen. N/A Turbidity Meter Used: Hanna Meter # Monitor Location Turbidity (NTUs) pH Notes ® YES ❑ NO • Is the site in compliance with the SWPPP and the permit requirements? • If NO, indicate tasks necessary to bring site into compliance on the "Actions To Be Completed" table above, and include dates each job will be completed ■ If NO, has the non-compliance been report to Dept. of Ecology? ❑ YES ❑ NO • If NO, should the SWPPP be modified? ❑ YES ❑ NO Sign the following certificate: "I certify that this report is true, accurate, and complete, to the best of my knowledge and belief." y. g n rew imn CESCL Certification Number: _CESCL-EF8182309 etokbb Inspection completed on: (Date) 10/28/19